LTC 157-2019 Update on Request for Proposals (RFP) No. 2018-233-KB for design, build, operate and maintain water, wastewater and stormwater supervisory control and data acquisition (SCADA) & Programmable Logic Controller (PLC)City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov Jimmy L. Morales, City Manager Tel: 305-673-701 0 , Fax: 305-673-7782 NO. LTC# 157-2019 TO: Mayor Dan Gelber and Members of th FROM: Jimmy L. Morales, City Manager DATE: March 19, 2019 LETTER TO COMMISSION SUBJECT: UPDATE ON REQUEST FOR PR POSALS (RFP) NO. 2018-233-KB FOR DESIGN, BUILD, OPERATE AND MAINTAIN WATER, WASTEWATER AND STORMWATER SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) & PROGRAMMABLE LOGIC CONTROLLER (PLC). The purpose of this LTC is to update the Mayor and City Commission on RFP 2018-233-KB for design, build, operate and maintain water, wastewater and stormwater supervisory control and data acquisition (SCADA) and programmable logic controller (PLC). On June 6, 2018, the City Commission approved the issuance of RFP 2018-233-KB. The RFP was issued on June 2, 2018, with an opening date of August 15, 2018. The RFP provides for a two-step, phased evaluation process. The Phase I selection process, which is the reason for this item, relates to the qualifications, experience and availability of the proposers and key members of the design-build team; including the lead designer and lead constructor. Only those Proposers short-listed during Phase I are authorized to proceed to Phase II of the RFP selection process, in which price and detailed technical proposal~ based on the approved Design Criteria Package (the "DCP") will be considered. On October 17, 2018, via resolution No.' 2018-30541, the Mayor and the City Commission approved the shortlisting of the three top-ranked proposers, namely (1) SICE, Inc., (2) Data Flow Systems, Inc., and (3) Revere Control Systems, Inc., to be further considered in Phase II of the evaluation process. As per the RFP, the City will provide the shortlisted proposers with the Design Criteria Package (DCP) for the SCADA system and PLC. The City Administration has contracted with Hazen and Sawyer to develop the DCP. The DCP is currently being developed and will be provided to the shortlisted proposers no later than June 21, 2019. The shortlisted proposers will provide a technical proposal for phase II of the RFP selection process in which price and detailed technica{ specifications are submitted based of the approved DCP. While the Cone of Silence prohibits discussion of proposals, please do not hesitate to contact the Roy Coley, Public Works Director or Alex Denis, Procurement Director, should you have any procedural questions. A1 ~A, lil/~&1 JLM I ft~l RC I f"D I KB