Loading...
LTC 398-2019 PROPERTY MANAGEMENT QUARTERLY CONSTRUCTION PROJECTS UPDATE Iv\ AMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach FL 33139 LTC# 398-2019 LETTER TO COMMISSION TO: Mayor Dan Gelber and Members of e City Com ission FROM: Jimmy L. Morales, City Manager DATE: July 15, 2019 SUBJECT: PROPERTY MANAGEMENT QUARTERL CONSTRUCTION PROJECTS UPDATE The purpose of this LTC is to update the Mayor and City Commission of the Capital Renewal and Replacement projects being conducted by Property Management. In 2004, the Mayor and City Commission authorized the establishment of a permanent Capital Renewal and Replacement Fund to provide dedicated funding for capital renewal and replacement projects that would extend the useful life of general fund assets by more than five (5) years. Property Management currently has 150 active projects. Below you will find highlights for key projects that are underway. 28th Street Obelisk Restoration Scope: Restoration of the obelisk, base building and the surrounding plaza. Phase: Construction Status: Unforeseen ground conditions have merited additional site work at this project. The State has approved an extension request for completion of project until 10/31/2019. Estimated completion date is July 31, 2019. Bass Museum Emergency Generator Replacement Scope: Replace existing generator and associated switch gear with a new, more efficient unit. Phase: Construction Status: Revised construction documents (based on logger meter readings) are in for permitting with CMB Building Department. Estimated completion date is December 31, 2019. Beach Shower Replacement (Phase II) Scope: Replace and remodel 17 beach showers from South Pointe to 81St Street. Phase: Permitting Status: FDEP pre-construction meeting scheduled for July 11, 2019. Construction scheduled to commence on July 22, 2019. Estimated completion date is January 30, 2020. Marine Patrol Emergency Generator Installation Scope: Install a new emergency generator for the Marine Patrol building. Phase: Construction Status: Purchase order has been issued and notice to proceed has been given to contractor. Project on hold due to GO Bond project to rebuild facility. LTC: Property Management Quarterly Construction Projects Update Page: 2 of 8 Code Compliance Department Relocation Scope: Relocation of the Code Compliance Department. Phase: Procurement Status: Minor interior alterations needed for secure vestibule at Customer Service area. Permit Drawings for interior alterations expected by 07/15/19. Estimated completion date is September 15, 2019. Housing and Community Services Department Relocation Scope: Relocation of the Housing and Community Services Department. Phase: Permitting Status: 100% Construction Documents expected by 07/15/19. Estimated completion date is September 15, 2019. Miami Beach Police Department Generators Replacement Scope: Replace the existing emergency generators for two new 500 KW generators that are EPA Tier 4 certified; ensuring the new equipment meets the EPA's most stringent regulations for emissions reductions. Phase: Construction Status: New generators and paralleling switchgear are ready for delivery. Estimated completion date is December 31, 2019. Miami City Ballet Window Replacement Scope: Replace approximately 83 existing windows at the Miami City Ballet with new, impact resistant, energy efficient windows and doors capable of rejecting solar heat gain. Surrounding concrete restoration work also included. Phase: Construction Status: Project in progress at 70% completion. Estimated Final Completion date is September 15, 2019. Property Management Facility Generator Installation Scope: Installation of a new generator, fuel tank and transfer switch. Phase: Permitting Status: Project permitted, equipment on order from manufacturer. Estimated completion date is December 31, 2019. Public Works Facility Generator Replacement Scope: Installation of a new generator, fuel tank and transfer switch. Phase: Permitting Status: Project permitted, equipment on order from manufacturer. Estimated completion date is December 31, 2019. Storage Tank Replacement Scope: Replace two 5,000 gallon above ground fuel storage tanks one for Pump Station 28 and one for Pump Station 29. Phase: Construction Status: Project completed, pending final inspection by Miami-Dade County DRER. Marine Patrol Dock Replacement Scope: Repair of the three (3) boat docks at Maurice Gibb Park. LTC: Property Management Quarterly Construction Projects Update Page: 3 of 8 Phase: Construction Status: Contactor to mobilize on 07/15/19. Estimated completion date is August 31, 2019. 17th Street Garage 40-Year Recertification Scope: 40-year structural recertification of the 17th Street Garage. Phase: Construction Status: Work has commenced on this project. Estimated completion date is September 30, 2019. Several completion dates have changed due to coordination with stakeholders, material availability, and in an effort to avoid disruption. Capital Renewal and Replacement Projects: Project Project Title Estimated Number Completion Date 62418 12TH STREET PARKING GARAGE ROOF AND PARKING DECK COATING 04/2020 62118 12TH STREET PARKING GARAGE UPGRADE LIGHTING(LED) 04/2020 61660 13th St PARKING GARAGE-ELEVATOR 04/2020 60130 13th St PARKING GARAGE-FIRE ALARM 02/2020 62218 13TH STREET PARKING GARAGE UPGRADE LIGHTING(LED) 09/2019 60120 13TH STREET PARKING GARAGE COATING 02/2020 64419 13TH STREET GARAGE WATER SYSTEM 08/2019 61718 16TH STREET PARKING GARAGE FIRE SPRINKLER RENEWAL 10/2020 65019 16TH STREET PARKING GARAGE-PAINT 09/2019 61818 16TH STREET PARKING GARAGE RENEWAL OF PEDESTRIAN COATING IN STAIRWAYS 04/2020 61918 16TH STREET PARKING GARAGE ROOF AND PARKING DECK COATING 04/2020 62518 1755 MERIDIAN PARKING GARAGE ROOF AND PARKING DECK COATING 09/2020 61930 17th ST.PARKING GARAGE-ELEVATOR 09/2020 64519 17th ST.PARKING GARAGE-1ST FLR OFFICE 10/2019 26290 17th ST.PARKING GARAGE-MAINTENANCE- 12/2019 4th floor drains 60119 17th ST.PARKING GARAGE COATING 11/2019 64018 17TH ST.PARKING GARAGE 40 YR RECERTIFICATION 09/2019 28710 P14 6TH STREET&COLLINS PARKING LOT 12/2019 64619 SURFACE LOTS CITYWIDE LANDSCAPING 10/2019 LTC: Property Management Quarterly Construction Projects Update Page: 4 of 8 20110 28th St OBELISK STABILIZATION (RESTORATION) 07/2019 69380 42nd St PARKING GARAGE-ELEVATOR REPLACEMENT 02/2020 69370 42ndST PARKING GARAGE-FIRE ALARM SYSTEM 12/2019 62100 42ndST PARKING GARAGE MAINTENANCE 07/2019 69310 7th St PARKING GARAGE-FIRE ALARM SYSTEM 09/2019 61218 7TH STREET PARKING GARAGE VESTIBULE ROOFTOP RENEWAL 09/2019 61118 7TH STREET GARAGE LIGHTING UPGRADE 8/2019 64719 7TH STREET GARAGE DOOR REPLACEMENT09/2019 TBD TENANT IMP ROVEMENTS AT PENN GARAGE08/2019 63719 1755 MERIDIAN CHILLER REPLACEMENT TBD 60190 ANCHOR GARAGE ELEVATOR REPLACEMENT 08/2019 20001 ALTON ROAD FOUNTAIN AT 20TH STREET10/2019 65319 INTERNAL AUDIT RELOCATION/INSPECTOR GENERAL 092019 67360 BASS MUSEUM EMERGENCY GENERATOR 12/2019 26010 BASS MUSEUM HYDRAULIC ELEVATOR 10/2019 62119 BASS MUSEUM ROOF REPLACEMENT08/2019 62419 BASS MUSEUM FREIGHT ELEVATOR 11/2019 TBD BASS MUSEUM WINDOW REPLACEMENT10/2020 65118 BASS MUSEUM FIRE PUMP REPLACEMENT 08/2019 27970 BEACH SHOWER DRAINAGE 01/2020 61519 BEACH SHOWER DRAINAGE PHASE II01/2020 61419 BEACHFRONT RESTROOM RENOVATIONS 08/2019 61819 BEACHWALK DRAINAGE-24TH ST TO 46TH ST 05/2020 62519 BEACHWALK DRAINAGE SOUTH POINTE TO 23RD STREET 05/2020 62319 BOTANICAL GARDEN ROOF REPAIRS 08/2019 TBD BUILDING DEPARTMENT REMODEL 10/2020 68760 CITY HALL-ELECTRICAL UPGRADES 09/2019 61290 CITY HALL-FIRE ALARM SYSTEM 01/2020 REPLACEMENT LTC: Property Management Quarterly Construction Projects Update Page: 5 of 8 67210 CITY HALL-ROOF&SKYLIGHT RESTORATION 08/2019 64019 CITY HALL ENERGY EFFICIENT BUILDING 10/2019 62940 CITYWIDE PARKING LOT LIGHTING 02/2020 65319 CODE/HOUSING OFFICES RELOCATION 09/2019 67370 COLLINS AVE.BOARDWALK REPLACEMENT 10/2019 29219 COLONY THEATER ROOF REPLACEMENT 10/2019 (GO Bond) 64819 COLONY THEATER FIRE ALARM SYSTEM 09/2019 TBD ECONOMIC DEVELOPMENT SPACE PLAN 09/2019 29019 FILLMORE ROOF REPLACEMENT 02/2020 (GO Bond) 62219 FILLMORE SIGNAGE REPLACEMENT 08/2019 64919 FILLMORE SITE LIGHTING RENOVATION 08/2019 60077 FIRE STATION#2-ALARM SYSTEM 02/2020 67220/ FIRE STATION#3-EMERGENCY 60057 GENERATOR 02/2020 62818 FIRE STATION#2-GARAGE DOORS 08/2019 REPLACEMENT TBD FIRE STATION#2-WIND RETROFIT PROJECT 10/2020 67200 FIRE STATION#3-FIRE ALARM UPGRADE 02/2020 TBD FIRE STATION#3-40 YR RECERTIFICATION 06/2020 23118 FIRE STATION#4-SECURITY ENHANCEMENT 08/2019 TBD FIRE STATION#4-GARAGE DOORS 11/2019 69470 FLEET/SANITATION FIRE ALARM SYSTEM 04/2020 24630 FLAGLER MONUMENT SOLAR ILLUMINATION 07/2019 TBD GREENSPACE FACILITY RENOVATION TBD 60618 HISTORIC CITY HALL FIRE ALARM SYSTEM RENEWAL 11/2019 60418 HISTORIC CITY HALL HVAC FRESH AIR UNIT 07/2019 HUMIDITY CONTROL TBD HISTORIC CITY HALL-50 YEAR 01/2020 RECERTIFICATION 63019 HOUSING AND COMMUNITY SERVICES BUILDOUT AT 1701,4TH FLOOR 09/2019 29880 LINCOLN ROAD MALL ADA PEDESTRIAN 10/2020 ENHANCEMENTS 27780 MIAMI CITY BALLET-WINDOW 09/2019 REPLACEMENT LTC: Property Management Quarterly Construction Projects Update Page: 6 of 8 29119 MIAMI CITY BALLET ROOF REPLACEMENT 11/2019 (GO Bond) 64618 MIAMI CITY BALLET VARIOUS REPAIRS 09/2019 51118 MIAMI CITY BALLET RENOVATIO PHASE 1 09/2019 61100 PAL BUILDING FIRE ALARM REPLACEMENT 10/2019 68720 POLICE HQ&PARKING GARAGE-FIRE ALARM REPLACEMENT 10/2019 60030 POLICE STATION MEN'S LOCKER ROOM 10/2019 60007 POLICE STATION NEW GENERATOR 12/2019 60047 POLICE STATION EMERGENCY LIGHTING 8/2019 TBD POLICE STATION RENOVATION 06/2024 21918 PROPERTY MANAGEMENT FACILITY CARPENTRY SHOP DUST CONTROL SYSTEM 08/2019 21818 PROPERTY MANAGEMENT FACILITY NEW 500KW GENERATOR AND TRANSFER 12/2019 SWITCH 69220 PUBLIC WORKS MAINT. FACILITY GENERATOR 12/2019 65218 PURDY AVENUE BOAT RAMPS 10/2019 63718 SANITATION-INTERIOR REPLACEMENT 12/2019 60038 SOUTH SHORE COMMUNITY CENTER FIRE HOLD-TBD ALARM SYSTEM RENEWAL 67240 777 BUILDING-HVAC 4th FLOOR 09/2019 TBD 777 BUILDING-40 YR RECERTIFICATION 06/2020 63819 SSCC—ROOF MITIGATION&FLOORING HOLD-TBD 60919 SSCC—BATHROOM&KITCHEN UPGRADE HOLD-TBD 61119 SSCC—PLAYGROUND AREA MITIGATION HOLD-TBD TBD STAR ISLAND WATER TOWER RESTORATION TBD 62412 BASS MUSEUM FREIGHT ELEVATOR 09/2019 60519 CITY HALL 40 YEAR STRUCTURAL RECERTIFICATION 08/2019 64020 CITY HALL CARD ACCESS SYSTEM 06/2020 REPLACMENT 53318 418'STREET FOUNTAIN RESTORATION 08/2019 61719 41 ST STREET BRIDGE REPAIRS 09/2020 21019 SHORT-TERM 41ST STREET 10/2019 RECOMMENDATIONS(PARKLET) 23219 SCOTT RAKOW YOUTH CENTER ROOF REPLACEMENT 02/2020 (GO Bond) LTC: Property Management Quarterly Construction Projects Update Page: 7 of 8 23819 SCOTT RAKOW YOUTH CENTER HVAC REPLACEMENT 10/2019 (GO Bond) 23919 SCOTT RAKOW YOUTH CENTER GENERATOR 05/2020 (GO Bond) 24019 SCOTT RAKOW YOUTH CENTER WINDOWS 04/2020 (GO Bond) 29419 SCOTT RAKOW YOUTH CENTER SECURITY CAMERAS 03/2020 (GO Bond) 69619 SCOTT RAKOW YOUTH CENTER FIRE ALARM REPLACEMENT 02/2020 (GO Bond) 69419 SCOTT RAKOW YOUTH CENTER INTERIOR/ EXTERIOR PAINT 11/2019 (GO Bond) 29619 NORTH SHORE YOUTH CENTER GENERATOR 05/2020 (GO Bond) 29519 NORTH SHORE YOUTH CENTER SECURITY CAMERAS 04/2020 (GO Bond) 24119 NORTH SHORE YOUTH CENTER ROOF REPLACEMENT 12/2019 (GO Bond) 69519 NORTH SHORE YOUTH CENTER PAINTING 10/2019 (GO Bond) 63918 PUBLIC WORKS FACILITY RENOVATION 09/2019 69220 PUBLIC WORKS FACILITY GENERATOR 12/2019 65219 SOUTH POINTE PARK HVAC REPLACEMENT 09/2019 23018 SOUTH POINTE PARK LIGHTING 10/2019 64418 THE FILLMORE 40 YR RECERTIFICATION 08/2019 60719 UNIDAD ELEVATOR MODERNIZATION 10/2019 Projects under$25,000 (prosect completion is 9/2019): Project Title 10th STREET AUDITORIUM ROOF RE- COATING FLAMINGO PARK ELECTRICAL ROOM RE- ROOFING FLAMINGO PARK LOCKER ROOM RE- ROOFING FLAMINGO PARK POOL BUILDING A/C REPLAEMENT FLAMINGO PARK PUMP ROOM RE-ROOFING BASS MUSEUM WINDOW CAULKING BASS MUSEUM EXTERIOR DOOR REPLACEMENT PARK RANGER FACILITY RE-ROOFING PARK RANGER FACILITY RESTROOM RENOVATION MBGC WALK-IN COOLER CONDENSING UNIT REPLACEMENT CITY HALL EXTERIOR PAINTING , LTC: Property Management Quarterly Construction Projects Update Page: 8 of 8 COLONY THEATER CARD ACCESS SYSTEM COLONY THEATER SECURITY SYSTEM UPGRADE PENN GARAGE OFFICE A/C UPGRADE BOTANICAL GARDEN EXTERIOR PAINT FLEET MANAGEMENT 2ND FLOOR EXTERIOR HALLWAY CEILING REPAIRS FLEET MANAGEMENT METAL ROOF AND EXIT GATE REPAIRS,REPLACEMENT OF EYE WASH STATIONS IT OFFICE IMPROVEMENTS NORTH SHORE BANDSHELL HVAC REPLACEMENT SUNSET HARBOR GARAGE PENETRATING SEALER 17`"STREET GARAGE 2Dd FLOOR A/C UNIT UPGRADE PUBLIC WORKS YARD ROOF ACCESS LADDER INSTALLATION SUNSET HARBOR GARAGE PENETRATING SEALER 42ND STREET GARAGE BATHROOM RENOVATION SOUTH POINTE BUILDING GARAGE FIRE ALARM REPLACEMENT UNIDAD BUILDING FIRE ALARM REPLACEMENT INTERNAL AFFAIRS PARKING LOT AND AWNING Should you have any additional questions, please contact Adrian Morales at 305.673.7000 ext. 2932. JLM/MT/AM/FG