LTC 589-2019 CIP Monthly Construction Projects Update - OctoberOFFICE OF THE CITY MANAGER 589-2019 LETTER TO COMMISSION NO. LTC# TO: Mayor Dan Gelber and Members of FROM: Jimmy L. Morales, City Manager DATE: October 29, 2019 SUBJECT: CIP Monthly Construction Projec Below please find the monthly update for activ ity of Miami Beach construction projects under the purview of the Office of Capital Improvement Projects (CIP). 42"d Street Improvements Scope: 42 Street is a one-way, two lane corridors between Pine Tree Drive and Prairie Avenue. Traffic studies confirmed that making this a two-way road will improve traffic, and benefit safety, by providing signalized pedestrian crossings at the intersection of Pine tree Drive and 42 Street. Existing traffic signals at the intersection of Pine Tree Drive and 42 Street will be retrofitted to serve eastbound traffic. Status: Traffic Signalization and street improvements are complete. Landscaping is complete. The intersection of Pine Tree Drive and 42 Street is operational. Anticipated Completion: Project is substantially complete. Altos Del Mar Park Scope: Park Improvements include new landscape, irrigation, site lighting, sand volleyball courts, walkways, terraced lawn, and new restroom building. Status: Project is 98% complete. Final inspections are ongoing. Ribbon cutting held on October 29, 2019. Anticipated Completion: Complete Carl Fisher Clubhouse Restoration Scope: Historical restoration of the Carl Fisher Clubhouse (interior and exterior) and adjacent site and landscaping work. This project is part of the Convention Center Renovation Project. Status: The contractor is working to complete the electrical, mechanical, and plumbing rough-in work, and structural repairs. The interior framing is also approaching completion. The construction progress was delayed slightly due to structural modifications to building openings required to accommodate the new windows and doors. Anticipated Completion: November 2019 1 Central Bayshore South Neighborhood Improvements Scope: Neighborhood improvements bounded by 34 Street to the north, Pine Tree Drive to the east, 28 Street to the south, Prairie Ave to the West Ave and Meridian Ave from 28 Street to Dade Blvd. Status: Project is on hold waiting for Commission directive, based on Jacobs Engineering's review of the City's stormwater criteria, prioritization and sequencing of projects. Anticipated Completion: TBD Collins Park Parking Garage Scope: Demolition of existing structure and construction of a new parking facility which consists of a seven (7) level parking garage with 513 parking spaces and approximately 15,000 SF of retail spaces at the ground level. Liberty Avenue will be closed and used for vehicular ingress and egress from 23 Street to the Collins Park Garage. The balance of the roadway (to 22 Street) is planned as a pedestrian plaza with associated amenities. Status: The installation of precast structures is 75% complete. Work on Liberty Avenue continues and remains closed to vehicular and pedestrian access. Installation of drainage and infrastructure has commenced and is expected to be completed in November 2019. Maintenance of Traffic (MOT) for the installation of the water main on Park Avenue and 23 Street has been approved. City staff is coordinating with the stakeholders prior to mobilization on Park Avenue. Anticipated Completion: May 2020 Convention Center Park (P-Lot) Scope: A new 5.8-acre park, replacing the existing surface parking lot located across the street from the newly renovated Convention Center. The park will include open lawn spaces, shade areas, walkways, lighting, a veteran's plaza, a public restroom facility, and a flexible area space. Status: Park is currently 80% complete. Contractor continues pouring concrete walkways and performing final grading. Site light installation is complete, and installation of electrical wiring is ongoing. Topsoil delivery and spreading is nearing completion and landscape installation, including sod and trees, has commenced. Anticipated Completion: October 2019 Flamingo Park Fitness Cluster Scope: Constructing a new outdoor Fitness Area in Flamingo Park to include new ADA accessible fitness equipment, new concrete pathways, a new canopy shade structure, added lighting, as well as drainage, landscape and irrigation improvements. Status: Construction completed, Ribbon cutting ceremony was held on September 24, 2019. Anticipated Completion: Complete 2 Flamingo Park Handball Courts Scope: Renovation of existing handball courts to include various electrical upgrades, new general lighting, stucco repairs, court resurfacing, new frameless windows and doors and new fencing and painting. The courts will also include seating areas and water drinking fountains for players and visitors. As a result of community input and requests, the project was split into two phases, in order to provide uninterrupted usage of the courts. Status: The project's consultant has met with various contractors and specialty material manufacturers to determine the most effective resolution to the stucco failures. Upon completion of evaluation, the consultant will recommend the most cost-effective solution, and the project will be able to proceed with the stucco remediation. Windows have been delivered and contractor has completed paint removal. Anticipated Completion: May/June 2020 (Contingent on resolution of stucco remediation) Flamingo Parkwide Improvements -Phase I Scope: Park wide renovations to include landscape, irrigation & drainage improvements, as well as addition and renovation of walkways and pedestrian lighting. Status: Pedestrian light poles and concrete walkways completed. Irrigation completed. Topsoil and planting installation underway. Anticipated Completion: November 2019 North Shore Bandshell Canopy Scope: Design, manufacture and install a custom canopy at the North Beach Band Shell facility. The area of coverage for the canopy is approximately 4,000 square feet. Status: Construction started September 4, 2019. While the project was scheduled to be completed prior to the start of scheduled Rhythm Foundation and City activities, delays in permitting and structural evaluations require that the work be performed in two phases. Partial installation of the drainage systems has been completed. Phase 1, for the installation of the foundations has also been completed. Phase 2 will commence on January 7, 2020 with the installation of the canopy, and the completion of electrical work and the drainage. Anticipated Completion: February 2020 Palm & Hibiscus Island Neighborhood Improvements Scope: Neighborhood improvements on Palm and Hibiscus Islands. Status: The overall project scope of work, including the addition of generators, is 93% complete. The design-builder continues to progress on the design of the private side drains, for those properties which qualify under the City's new drainage policy. Meetings are being held with property owners to discuss the new private side yard drains. Permit modifications and some of the private property drainage connection packages have been submitted to DERM for review. Contractor has delivered and commenced installation of two of the emergency back-up generators. Anticipated Completion: Spring 2020 3 Stormwater Pump Station at 191h Street Scope: Installation of a stormwater pump station, including an emergency generator and seawall reconstruction along Collins Canal. Expansion of the Botanical Gardens to Collins Canal. New seawall at the Carl Fisher Clubhouse. Status: 191h Street Pump Station: Substantial Completion achieved on the Pump Station components only, with provision that the Design/Builder will address any issues which may be forthcoming from DERM. Pending formal comments or acceptance from DERM. Botanical Garden Component: Expansion Project is pending the ongoing removal of the existing power poles by FPL and electrical work necessary to disconnect the existing overhead lines. FPL discovered a previously unknown street signal connection and has worked with staff and Miami-Dade County to reroute electrical service, prior to pole removal. FPL power poles have been removed. Anticipated completion February 2020 Carl Fisher Sea Wall: Payment to DERM for application has been processed. Payment to mitigation bank for SFWMD permit was sent on September 5, 2019. Project continues to await USAGE permit approval. Anticipated completion four months from permit issuance. Sunset Island 1 & 2 -Guardhouse Scope: Renovation of the interior and exterior of the existing guardhouse and the construction of a new guardhouse kiosk in the center of the entrance road on W. 29 Street. Status: Construction commenced on June 2019. The project required re-design of the foundations due an unforeseen conflict with underground utility lines, delaying the progress. This issue has been discussed and coordinated with the HOA and revised foundation design has been submitted to the Building Department for approval. Anticipated Completion: February 2020 Surface Parking Lot P2-Nikki Beach (Penrods) Scope: Reconstruction of the parking lot that includes landscaping, turtle friendly lighting, improvements to storm water drainage, irrigation, paving and signage, and infrastructure for future electric car charging stations. Status: The completion and inspection of the irrigation system, landscaping and electrical work has been completed. Contractor .is addressing drainage comments received pursuant to inspection by Public Works. The project is 95% complete. Anticipated Completion: November 2019 4 Venetian Islands Neighborhood Improvements Scope: Neighborhood improvements on San Marino, Dilido and Rivo Alto Islands. Status: Start-up for the North Rivo pump station was completed and is now operational. Final restoration to the North Rivo Alto easement will commence in Mid-October. Staff is currently working with Consultant to obtain a new design for the roadway, with an improved service life based on the new test results obtained by the Geotech. Anticipated Completion: TBD Venetian Islands Seawalls Scope: This project entails seawall replacement, at two (2) locations consisting of precast concrete bulkhead panels, king piles, batter piles and concrete cap; and seawall cap raising at five (5) locations consisting in new concrete cap, batter piles and retaining walls, at all locations within the Venetian Islands. Status: The Building Department permit comments have been addressed but is pending a DERM permit modification approval. The Contractor is waiting on permit approval to submit final schedule prior to issuance of the notice to proceed with construction. The Consultant is working on DERM permit modification for the San Marino south seawall due to existing conditions. Revised plans for all other five seawalls are complete and are under review. Anticipated Completion: TBD West Avenue Phase II Improvements-North of 14th Street Scope: Neighborhood Right of Way improvements north of 141h Street to Lincoln Lane. Status: Design of the watermain and sanitary sewer systems completed. Roadway and landscaping plans are 90% complete. Pump Station design is 90% complete and will be presented to the community before the end of October. Drainage Model prepared by the Design-builder was approved by staff. Proposed overall landscape plans were presented to the Community and received positive feedback. Anticipated Completion: November 2022 West Avenue Phase II Improvements -South of 14th Street Scope: Neighborhood Right of Way improvements south of 141h Street to 61h Street. Status: Design of the watermain and sanitary sewer systems completed. Roadway and landscaping plans are 90% complete. Drainage Model prepared by the Design-builder was approved by staff. Proposed overall landscape plans were presented to the Community and received positive feedback. Anticipated Completion: October 2021 Pocket Park at 20 Street Scope: A new community park located at the vacant lot at the intersection of 20 1h Street and North Bay Road, providing a 4,000 square feet playground with nontraditional play equipment for children ages 2-5 and 5-12, to include cornstalks, play mounds and climbing walls. Two picnic areas shall be provided. The play area 5 is designed to be shaded with shade structures and large canopy trees. Status: Trees have been relocated. All the playground equipment for the project has been ordered and delivered. The foundations, concrete block walls, and columns for the perimeter fence have been installed. Foundations for shade sails have been completed and the contractor has commenced installation of silva cells and irrigation system. Anticipated Completion: November 2019 :Si.M {) <h~ I JLM/~~71:jfiA'V\ 6