LTC 641-2019 G.O. Bond Program - Project Implementation Update No. 5•
•
•
•
EXHIBIT A
EXHIBIT B
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
Table of Contents
Content Page
Summary
Project Activity ................................................................................................................................... 3
Program Expenditures ..................................................................................................................... 3
Project Status ...................................................................................................................................... 4
Detail
Project Details ..................................................................................................................................... 8
www.gombinfo.com 2
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
Parks Infrastructure Public Safety All
Spent $4,449,007 $1,696,287 $4,137,262 $10,282,556
Available $82,283,987 $26,303,709 $32,268,733 $140,856,429
Future $81,167,006 $168,000,004 $34,809,005 $283,976,015
Total $167,900,000 $196,000,000 $71,215,000 $435,115,000
PROGRAM EXPENDITURES
Parks Infrastructure Public Safety All
Complete 3 0 0 3
Active 13 7 9 29
Pending 3 1 2 6
Future 11 6 2 19
All 30 14 13 57
PROJECT ACTIVITY
PROJECT CATEGORY
PROJECT CATEGORY
PROGRAM
FUNDS
PROJECT
STATUS
www.gombinfo.com 3
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
Status
Active
Tranche Category Project Name Tranches Active Phase
Anticipated
End Date
COMPLETE (3)
1 PARKS GO#3: CRESPI PARK 1 Complete 12/09/2019
GO#17: POLO PARK 1 Complete 08/10/2019
GO#21: STILLWATER PARK 1 Complete 12/08/2019
ACTIVE (29)
1 PARKS GO#1: 72 ST. COMMUNITY COMPLEX 1 Planning 07/28/2023
GO#2: COLLINS PARK 1 Design 04/30/2020
GO#4: FAIRWAY PARK 1 Planning 01/01/2021
GO#10: MAURICE GIBB PARK 1 Design 08/23/2022
GO#12: NORTH BEACH OCEANSIDE PARK BEACHWALK 1 Design 01/26/2022
GO#13: NORTH SHORE PARK & YOUTH CENTER
#13 NORTH SHORE BASEBALL FIELDS 1 Pending 01/01/2022
#13 NORTH SHORE CAMERAS 1 Design 06/05/2020
#13 NORTH SHORE GENERATOR 1 Design 07/12/2020
#13 NORTH SHORE JOGGING PATH 1 Pending 01/01/2022
#13 NORTH SHORE LIGHTS & PAINT 1 Complete 11/13/2019
#13 NORTH SHORE OTHER IMPROVEMENTS 2 Future 01/01/2025
#13 NORTH SHORE ROOF 1 Construction 01/14/2020
GO#15: PAR 3/BAYSHORE PARK 1 Design 10/01/2021
GO#18: SCOTT RAKOW YOUTH CENTER
#18 SCOTT RAKOW CAMERAS 1 Design 04/22/2020
#18 SCOTT RAKOW FIRE ALARM 1 Cancelled 04/01/2019
#18 SCOTT RAKOW FLOORS 2 Future 01/01/2025
#18 SCOTT RAKOW GENERATOR 1 Design 07/16/2020
#18 SCOTT RAKOW HVAC 1 Construction 01/30/2020
#18 SCOTT RAKOW PAINT 1 Complete 11/17/2019
#18 SCOTT RAKOW POOL 1 Design 07/04/2020
#18 SCOTT RAKOW ROOF 1 Construction 03/11/2020
#18 SCOTT RAKOW WINDOWS 1 Design 03/30/2020
GO#19: SOUNDSCAPE PARK
#19 SOUNDSCAPE 4K TECHNOLOGY 1 Complete 11/01/2019
#19 SOUNDSCAPE RESTROOMS/STORAGE 1 Pending 01/01/2022
GO#23: BAYWALK
#23 BAY GARDEN MANOR LINK 3 Future 03/26/2028
#23 BAYVIEW TERRACE LINK 3 Future 12/15/2025
#23 PEDESTRIAN BRIDGE 1 Design 08/29/2020
#23 SOUTH BAY CLUB LINK 2 Future 01/01/2025
GO#24: MIDDLE BEACH BEACHWALK PH3 1 Preconstruction 02/16/2021
GO#26: ROOFS FOR CULTURAL FACILITIES
#26 COLONY THEATRE ROOF 1 Complete 10/14/2019
PROJECT STATUS
www.gombinfo.com 4
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
Status
Active
Tranche Category Project Name Tranches Active Phase
Anticipated
End Date
1 PARKS #26 FILLMORE ROOF 1 Construction 02/29/2020
#26 MIAMI CITY BALLET ROOF 1 Design 02/11/2020
GO#29: WEST LOTS 1,2,3 Planning 10/02/2028
INFRASTRUCTURE GO#32: PALM & HIBISCUS LANDSCAPING 1 Construction 03/03/2020
GO#33: STREET TREE MASTER PLAN
#33 PART 1 TREE PLANTING 1 Construction 01/01/2021
#33 PART 2 TREE PLANTING 2 Future 01/01/2025
GO#37: SIDEWALK IMPROVEMENTS
#37 PART 1 SIDEWALKS 1 Construction 01/01/2022
#37 PART 2 SIDEWALKS 2 Future 01/02/2025
#37 PART 3 SIDEWALKS 3 Future 01/01/2028
#37 PART 4 SIDEWALKS 4 Future 01/01/2031
GO#38: STREET PAVEMENT
#38 PART 1 STREETS 1 Construction 01/01/2022
#38 PART 2 STREETS 2 Future 01/01/2025
#38 PART 3 STREETS 3 Future 01/01/2028
#38 PART 4 STREETS 4 Future 01/01/2031
GO#40: 41 ST. CORRIDOR 1,2,3,4 Planning 01/01/2031
GO#42: TRAFFIC CALMING
#42 BAYSHORE NORTH TRAFFIC CALMING 2 Future 01/01/2025
#42 BAYSHORE SOUTH TRAFFIC CALMING 1 Pending 01/01/2022
#42 NAUTILUS TRAFFIC CALMING 1 Construction 01/31/2020
#42 NORMANDY ISLE TRAFFIC CALMING 1 Pending 01/01/2022
#42 PALM VIEW TRAFFIC CALMING 1 Pending 01/01/2022
GO#43: BIKE LANES & SHARED PATHS
#43 23 ST. STREETSCAPE IMPROVEMENTS 1 Planning 10/02/2020
#43 63 ST. STREETSCAPE IMPROVEMENTS 3 Future 01/01/2028
#43 ALTON ROAD SHARED USE PATH 1 Design 10/01/2025
#43 CHASE AVE/34 ST SHARED USE PATH 1 Planning 09/01/2021
PUBLIC SAFETY GO#45: FIRE STATION #1 1,2 Design 03/31/2023
GO#47: LICENSE PLATE READERS
#47 71 ST. ENTRANCE READERS 1 Construction 12/06/2019
#47 JULIA TUTTLE CSWY READERS 1 Construction 11/29/2019
#47 MACARTHUR CSWY READERS 1 Construction 11/28/2019
#47 OTHER READERS CITYWIDE 1 Pending 01/01/2022
GO#48: POLICE HEADQUARTERS FACILITY
#48 PART 1 POLICE HQ 1 Planning 01/01/2028
#48 PART 2 POLICE HQ 3 Future 01/01/2028
GO#49: PUBLIC SAFETY RADIO SYSTEM 1 Construction 02/28/2020
GO#52: LED LIGHTING IN PARKS
#52 CRESPI PARK LED LIGHTING 1 Complete 10/21/2019
#52 NORMANDY ISLE PARK LED LIGHTING 1 Construction 11/20/2019
www.gombinfo.com 5
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
Status
Active
Tranche Category Project Name Tranches Active Phase
Anticipated
End Date
1 PUBLIC SAFETY #52 OTHER PARKS LED LIGHTING 2 Future 01/01/2025
#52 STILLWATER PARK LED LIGHTING 1 Complete 10/21/2019
#52 TATUM PARK LED LIGHTING 1 Complete 10/14/2019
GO#53: SECURITY FOR PUBLIC SPACES
#53 CONVENTION CENTER BOLLARDS 1 Pending 01/01/2022
#53 LINCOLN ROAD BOLLARDS 2 Future 01/01/2025
#53 PORTABLE BOLLARDS 1 Complete 07/31/2019
#53 SOUNDSCAPE PARK BOLLARDS 1 Pending 01/01/2022
#53 SOUTH POINTE PARK BOLLARDS 1 Pending 01/01/2022
GO#55: STREET LIGHTING IMPROVEMENTS
#55 PART 1 STREET LIGHTS 1 Planning 01/01/2022
#55 PART 2 STREET LIGHTS 2 Future 01/02/2028
GO#56: CAMERAS- BEACHWALK 1 Planning 03/19/2020
GO#57: CAMERAS- ENTERTAINMENT DISTRICT
#57 COLLINS AVE/WASH AVE CAMERAS 1 Pending 01/01/2022
#57 LUMMUS PARK/OCEAN DRIVE CAMERAS 1 Design 02/03/2020
PENDING (6)
1 PARKS GO#5: FLAMINGO PARK & YOUTH CENTER
#5 FLAMINGO PARK MASTER PLAN 3 Future 01/01/2028
#5 FLAMINGO YOUTH CENTER FACILITY 1 Pending 07/02/2022
GO#8: LUMMUS PARK 1 Pending 01/01/2022
GO#9: MARJORY STONEMAN DOUGLAS PARK
#9 M.S.DOUGLAS PARK IMPROVEMENTS 1 Pending 01/01/2022
#9 M.S.DOUGLAS PARK PLAYGROUND 1 Pending 01/01/2022
INFRASTRUCTURE GO#39: SEAWALLS & SHORELINES 1,2 Pending 01/01/2025
PUBLIC SAFETY GO#50: CAMERAS- BUSINESS DISTRICT
#50 41 ST. CORRIDOR CAMERAS 1 Pending 01/01/2022
#50 71 STREET CORRIDOR CAMERAS 1 Pending 01/01/2022
#50 ALTON RD. CORRIDOR CAMERAS 1 Pending 01/01/2022
#50 DADE BLVD. CORRIDOR CAMERAS 1 Pending 01/01/2022
GO#54: MARINE PATROL FACILITY 1 Pending 08/23/2022
FUTURE (19)
2 PARKS GO#14 PALM ISLAND PARK 2 Future 01/01/2025
GO#16: PINETREE PARK 2 Future 01/01/2025
GO#25: WATERWAY RESTORATION 2,3 Future 01/01/2028
GO#27: LOG CABIN 2 Future 01/01/2025
GO#28: ART DECO MUSEUM 2 Future 01/01/2025
INFRASTRUCTURE GO#31: OCEAN DRIVE CORRIDOR 2,3,4 Future 01/01/2031
GO#34: ABOVE GROUND IMPROVEMENTS 2,3,4 Future 01/01/2031
GO#36: WASHINGTON AVE. CORRIDOR 2,3,4 Future 01/01/2031
www.gombinfo.com 6
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
Status
Active
Tranche Category Project Name Tranches Active Phase
Anticipated
End Date
2 INFRASTRUCTURE GO#41: LA GORCE NEIGHBORHOOD 2,3,4 Future 01/01/2031
3 PARKS GO#7: LA GORCE PARK 3 Future 01/02/2028
GO#11: MUSS PARK 3 Future 01/01/2028
GO#20: SOUTH POINTE PARK 3 Future 01/01/2028
GO#30: SKATE PARK 3 Future 01/01/2028
INFRASTRUCTURE GO#35: FLAMINGO PARK NEIGHBORHOOD 3,4 Future 12/31/2030
GO#44: NORTH SHORE NEIGHBORHOOD 3 Future 01/01/2028
PUBLIC SAFETY GO#51: FIRE STATION #3 3,4 Future 12/30/2031
4 PARKS GO#6: FISHER PARK 4 Future 01/01/2031
GO#22: TATUM PARK 4 Future 01/01/2031
PUBLIC SAFETY GO#46: OCEAN RESCUE NORTH BEACH FACILITY 4 Future 01/01/2031
www.gombinfo.com 7
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
01
North Beach
Active Phase:Planning
Department:Capital
Improvement
Projects
SCOPE
Build a new community facility at 72 Street between Collins Avenue
and Harding Avenue that includes an olympic-sized roof-top swimming
competition pool, a warm-up pool, a library/media center, a
community room, an activated liner, a fitness gym with running track,
green space and a multi-level parking garage.
GOB FUNDING
Budget:$53,800,000
Spent:$42,120
Available:$10,757,880
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 12/17/2018 02/11/2020 02/12/2020 14.07mo
Design 02/12/2020 04/01/2021 04/02/2021 13.83mo
Permitting 01/10/2021 07/28/2021 07/29/2021 6.67mo
Construction 07/31/2021 05/26/2023 07/28/2023 24.23mo
Project Category:Parks
UPDATE
Development of the Design Criteria Package has commenced. Start of
Design Builder advertisement early 2020.
GO#1: 72 ST. COMMUNITY COMPLEX
- This project has additional sources of funding
www.gombinfo.com 8
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
02
South Beach
Active Phase:Design
Department:Parks & Recreation
SCOPE
Replace the damaged paver pathways throughout the park and plaza
with new, smooth and structurally-sound pavement.
GOB FUNDING
Budget:$640,000
Spent:$0
Available:$640,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 07/01/2019 07/31/2019 07/31/2019 31d
Design/Permitting 08/15/2019 01/15/2020 01/15/2020 154d
Construction 01/16/2020 03/31/2020 03/31/2020 76d
Close-out 04/01/2020 04/30/2020 04/30/2020 30d
Project Category:Parks
UPDATE
Currently in the design/permitting phase. Proposal from contractor has
been received.
GO#2: COLLINS PARK
www.gombinfo.com 9
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
03
North Beach
Active Phase:Complete
Department:Parks & Recreation
SCOPE
Replace the existing perimeter fence with a higher security fencing
structure, construct a new walking/jogging path, add fresh paint and
new flooring to pavilion and restroom areas.
GOB FUNDING
Budget:$211,000
Spent:$0
Available:$211,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2019 06/17/2019 07/01/2019 61d
Design/Permitting 07/01/2019 07/05/2019 08/01/2019 31d
Construction 08/01/2019 09/09/2019 11/09/2019 100d
Close-out 11/09/2019 09/30/2019 12/09/2019 30d
Project Category:Parks
UPDATE
Project complete.
GO#3: CRESPI PARK
www.gombinfo.com 10
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
04
North Beach
Active Phase:Planning
Department:Parks & Recreation
SCOPE
Replace the aged perimeter fence with higher-quality and higher-
security fencing; refresh the pavilion, restroom and office facilities with
a new paint job.
GOB FUNDING
Budget:$260,000
Spent:$0
Available:$260,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 01/01/2020 01/01/2021 01/01/2021 367d
Project Category:Parks
UPDATE
This project will be performed concurrently with the non-GOB CIP
project at this park, which is currently in permitting phase and expected
to begin sometime in the Fall.
GO#4: FAIRWAY PARK
www.gombinfo.com 11
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
10
Middle Beach
Active Phase:Design
Department:Capital
Improvement
Projects
SCOPE
Construct new walking paths, additional fishing piers, a dog park and a
large bay overlook; replace the current playground with a custom-
made music-themed play structure; increase park resiliency with soil
remediation, irrigation and natural landscaping fixes.
GOB FUNDING
Budget:$3,300,000
Spent:$5,352
Available:$3,294,647
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 02/16/2016 08/27/2017 08/27/2017 558.13d
Design 08/28/2017 09/17/2020 09/17/2020 1116.25d
Contractor Selection - ITB 09/21/2020 09/03/2020 01/28/2021 25.80w
Construction 01/29/2021 02/26/2022 08/23/2022 19.03mo
Project Category:Parks
UPDATE
Design 60 % complete. The permit process with the Army Corps of
Engineers, FDEP and Miami Dade County DERM has been initiated.
GO#10: MAURICE GIBB PARK
- This project has additional sources of funding
www.gombinfo.com 21
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
12
North Beach
Active Phase:Design
Department:Capital
Improvement
Projects
SCOPE
Construct an on-grade, ADA accessible and decorative paver pathway
from streets 79 to 87, completing the final link of the city's entire
beachwalk system. Redevelop the Beachwalk to expand path networks
and dune systems, new landscaping and wayfinding signage and
turtle-friendly lighting.
GOB FUNDING
Budget:$2,000,000
Spent:$3,250
Available:$1,996,750
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 08/13/2015 07/27/2016 07/28/2016 350d
Design / Permitting 07/28/2016 11/20/2019 08/14/2020 49.27mo
Contractor Selection - ITB - B 08/14/2020 03/31/2020 12/30/2020 4.60mo
Construction 12/30/2020 03/26/2021 01/26/2022 13.07mo
Project Category:Parks
UPDATE
The project is fully designed. Waiting on a $1M FDOT Grant expected
by July 2020.
GO#12: NORTH BEACH OCEANSIDE PARK BEACHWALK
- This project has additional sources of funding
www.gombinfo.com 23
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
13
North Beach Department:Capital
Improvement
Projects
SCOPE
Improve park features and functions by adding two additional baseball
fields with new artificial turf, LED lighting fixtures and more security
cameras; replace the aged roof and construct a new walking/jogging
pathway.
GOB FUNDING
Budget:$5,725,000
Project Category:Parks
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#13: NORTH SHORE PARK & YOUTH CENTER
No. of Sub-Projects:7
NOTES
www.gombinfo.com 24
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#13 NORTH SHORE CAMERAS
GOB Project #:
Location:
13
North Beach
Active Phase:Design
Department:Property
Management
SCOPE
Install additional security cameras.
GOB FUNDING
Budget:$205,700
Spent:$41,419
Available:$164,280
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 08/02/2019 08/02/2019 123d
Design/Permitting 08/02/2019 11/08/2019 11/08/2019 98d
Construction 11/08/2019 05/06/2020 05/06/2020 180d
Close-out 05/06/2020 06/05/2020 06/05/2020 30d
Project Category:Parks
UPDATE
Purchase orders have been issued for Phase 1. The Police Department
is currently working on proposals for Phase 2.
GO#13: NORTH SHORE PARK & YOUTH CENTER
www.gombinfo.com 26
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#13 NORTH SHORE GENERATOR
GOB Project #:
Location:
13
North Beach
Active Phase:Design
Department:Property
Management
SCOPE
Install a generator to the facility, allowing it to function as a city-
designated Emergency Operations Activation (EOA) Center during
power outages.
GOB FUNDING
Budget:$500,000
Spent:$456
Available:$499,544
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 07/02/2019 07/02/2019 93d
Design/Permitting 07/03/2019 11/14/2019 12/15/2019 166d
Construction 12/16/2019 05/12/2020 06/12/2020 180d
Close-out 06/13/2020 06/11/2020 07/12/2020 30d
Project Category:Parks
UPDATE
Permitting underway.
GO#13: NORTH SHORE PARK & YOUTH CENTER
www.gombinfo.com 27
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#13 NORTH SHORE LIGHTS & PAINT
GOB Project #:
Location:
13
North Beach
Active Phase:Complete
Department:Property
Management
SCOPE
Install LED lighting fixtures; paint building interior.
GOB FUNDING
Budget:$130,300
Spent:$64,125
Available:$66,175
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 07/01/2019 07/01/2019 92d
Design/Permitting 07/02/2019 08/15/2019 08/15/2019 45d
Construction 08/16/2019 10/13/2019 10/14/2019 60d
Close-out 10/15/2019 11/12/2019 11/13/2019 30d
Project Category:Parks
UPDATE
This project is complete.
GO#13: NORTH SHORE PARK & YOUTH CENTER
www.gombinfo.com 29
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#13 NORTH SHORE ROOF
GOB Project #:
Location:
13
North Beach
Active Phase:Construction
Department:Property
Management
SCOPE
Replace the existing aged roof with a new durable roof.
GOB FUNDING
Budget:$400,000
Spent:$0
Available:$400,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 06/14/2019 06/14/2019 106d
Design/Permitting 06/15/2019 10/01/2019 10/01/2019 109d
Construction 10/02/2019 12/15/2019 12/15/2019 75d
Close-out 12/16/2019 01/14/2020 01/14/2020 30d
Project Category:Parks
UPDATE
Construction underway. On schedule to be completed by January 2020.
GO#13: NORTH SHORE PARK & YOUTH CENTER
www.gombinfo.com 31
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
15
Middle Beach
Active Phase:Design
Department:Capital
Improvement
Projects
SCOPE
Develop a brand new park space with environmental remediation and
resiliency components; construct an outdoor ampitheatre, a walking
trail with a lake overlook, tennis courts and restroom facility, a pavillion
shade structure, a dog park, a vita course, a playground, and a butterfly
garden.
GOB FUNDING
Budget:$15,700,000
Spent:$0
Available:$15,700,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 08/12/2015 05/30/2016 05/30/2016 293d
Design 08/12/2016 01/08/2020 02/29/2020 43.23mo
Contractor Selection - ITB 03/02/2020 05/26/2020 07/28/2020 4.97mo
Construction 07/29/2020 06/25/2021 10/01/2021 14.33mo
Project Category:Parks
UPDATE
Proceeding towards 90% design. Project team continues to meet with
RER to address challenges posed by them regarding the environmental
remediation/resiliency strategy. Currently developing a resiliency
concept that includes the evaluation of a gravity well system to address
the neighborhood's stormwater runoff. Bid advertisement early next
year.
GO#15: PAR 3/BAYSHORE PARK
- This project has additional sources of funding
www.gombinfo.com 33
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
17
Middle Beach
Active Phase:Complete
Department:Parks & Recreation
SCOPE
Renovate the baseball field to include a new dugout area, additional
spectator bleacher seats, higher fencing and safety netting; construct a
new concrete perimeter pathway; add new park furnishings; improve
irrigation and landscaping.
GOB FUNDING
Budget:$500,000
Spent:$493,600
Available:$6,400
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/18/2019 04/12/2019 26d
Design/Permitting 04/13/2019 06/22/2019 71d
Construction 06/23/2019 08/10/2019 49d
Project Category:Parks
UPDATE
This project is complete. A ribbon-cutting ceremony was held on
09/05/19. Pending final payment to contractor.
GO#17: POLO PARK
www.gombinfo.com 35
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
18
Middle Beach Department:Property
Management
SCOPE
Improve structural elements of youth center facilities to include: a full
roof replacement, pool area renovations and new basketball court
flooring; install high impact windows, an emergency generator, a new
HVAC system and more security cameras.
GOB FUNDING
Budget:$5,088,000
Project Category:Parks
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#18: SCOTT RAKOW YOUTH CENTER
No. of Sub-Projects:9
NOTES
www.gombinfo.com 36
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW CAMERAS
GOB Project #:
Location:
18
Middle Beach
Active Phase:Design
Department:Property
Management
SCOPE
Install additional security cameras.
GOB FUNDING
Budget:$250,000
Spent:$4,018
Available:$245,981
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 06/15/2019 06/15/2019 107d
Design/Permitting 06/16/2019 09/27/2019 09/27/2019 104d
Construction 09/28/2019 03/24/2020 03/24/2020 179d
Close-out 03/25/2020 04/22/2020 04/22/2020 29d
Project Category:Parks
UPDATE
Infrastructure work has been completed. The Police Department is
working on proposals for Phase 2.
GO#18: SCOTT RAKOW YOUTH CENTER
- This project has additional sources of funding
www.gombinfo.com 37
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW FIRE ALARM
GOB Project #:
Location:
18
Middle Beach
Active Phase:Cancelled
Department:Property
Management
SCOPE
Install a new operational fire alarm system.
GOB FUNDING
Budget:$80,000
Spent:$0
Available:$80,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Project Category:Parks
UPDATE
It has been determined that the fire alarm system is not at the end of
its useful life and therefore will not need to be replaced. Funds will
remain within the Scott Rakow Project until completion of all sub-
projects.
GO#18: SCOTT RAKOW YOUTH CENTER
www.gombinfo.com 38
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW GENERATOR
GOB Project #:
Location:
18
Middle Beach
Active Phase:Design
Department:Property
Management
SCOPE
Install a generator to the facility, allowing it to function as a city-
designated Emergency Operations Activation (EOA) Center during
power outages.
GOB FUNDING
Budget:$500,000
Spent:$0
Available:$500,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 06/29/2019 06/29/2019 90d
Design/Permitting 06/30/2019 11/06/2019 12/15/2019 169d
Construction 12/16/2019 05/08/2020 06/16/2020 184d
Close-out 06/17/2020 06/07/2020 07/16/2020 30d
Project Category:Parks
UPDATE
Permitting in process.
GO#18: SCOTT RAKOW YOUTH CENTER
- This project has additional sources of funding
www.gombinfo.com 40
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW HVAC
GOB Project #:
Location:
18
Middle Beach
Active Phase:Construction
Department:Property
Management
SCOPE
Replace the aged existing HVAC system with a new, energy-efficient air
conditioning unit.
GOB FUNDING
Budget:$150,000
Spent:$0
Available:$150,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 06/10/2019 06/10/2019 71d
Design/Permitting 06/11/2019 07/10/2019 07/10/2019 30d
Construction 07/11/2019 10/31/2019 12/31/2019 174d
Close-out 01/01/2020 11/30/2019 01/30/2020 30d
Project Category:Parks
UPDATE
Four out of the six HVACs have been replaced. The last 2 units are
expected to be replaced by mid-December. Construction is phased
around operation schedule.
GO#18: SCOTT RAKOW YOUTH CENTER
www.gombinfo.com 41
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW PAINT
GOB Project #:
Location:
18
Middle Beach
Active Phase:Complete
Department:Property
Management
SCOPE
Paint interior and exterior walls.
GOB FUNDING
Budget:$130,000
Spent:$114,800
Available:$15,200
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 07/29/2019 06/24/2019 85d
Design/Permitting 06/25/2019 08/13/2019 08/13/2019 50d
Construction 08/14/2019 11/12/2019 10/18/2019 66d
Close-out 10/19/2019 12/12/2019 11/17/2019 30d
Project Category:Parks
UPDATE
This project is complete and currently in the close-out phase.
GO#18: SCOTT RAKOW YOUTH CENTER
www.gombinfo.com 42
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW POOL
GOB Project #:
Location:
18
Middle Beach
Active Phase:Design
Department:Parks & Recreation
SCOPE
Upgrade pool filtration system and renovate pool restrooms.
GOB FUNDING
Budget:$538,000
Spent:$0
Available:$538,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/27/2019 06/22/2019 06/23/2019 27d
Design/Permitting 06/23/2019 11/06/2019 12/09/2019 169d
Construction 12/10/2019 05/01/2020 06/04/2020 177d
Close-out 06/04/2020 05/31/2020 07/04/2020 30d
Project Category:Parks
UPDATE
Waiting on revised proposal from contractor. On schedule to be
completed by May 2020.
GO#18: SCOTT RAKOW YOUTH CENTER
www.gombinfo.com 43
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW ROOF
GOB Project #:
Location:
18
Middle Beach
Active Phase:Construction
Department:Property
Management
SCOPE
Replace the existing aged roof with a new durable roof.
GOB FUNDING
Budget:$2,100,000
Spent:$0
Available:$2,100,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 09/30/2019 09/30/2019 183d
Design/Permitting 10/01/2019 10/30/2019 10/13/2019 13d
Construction 10/14/2019 02/27/2020 02/10/2020 120d
Close-out 02/11/2020 03/28/2020 03/11/2020 30d
Project Category:Parks
UPDATE
Construction began 10/14/19 and is scheduled to be completed
02/10/20.
GO#18: SCOTT RAKOW YOUTH CENTER
www.gombinfo.com 44
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#18 SCOTT RAKOW WINDOWS
GOB Project #:
Location:
18
Middle Beach
Active Phase:Design
Department:Property
Management
SCOPE
Replace the existing standard windows with high-impact windows.
GOB FUNDING
Budget:$700,000
Spent:$0
Available:$700,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 08/30/2019 08/30/2019 152d
Design/Permitting 08/31/2019 01/01/2020 01/01/2020 124d
Construction 01/02/2020 02/29/2020 02/29/2020 59d
Close-out 03/01/2020 03/30/2020 03/30/2020 30d
Project Category:Parks
UPDATE
NTP 1 issued. Shop drawings underway.
GO#18: SCOTT RAKOW YOUTH CENTER
- This project has additional sources of funding
www.gombinfo.com 45
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
19
South Beach Department:Tourism & Culture
SCOPE
Enhance the local arts & culture facility with upgraded WALLCAST
technology and equipment, installing a custom 4K ultra-high definition
display system; construct a permanent restroom and storage facility.
GOB FUNDING
Budget:$4,500,000
Project Category:Parks
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#19: SOUNDSCAPE PARK
No. of Sub-Projects:2
NOTES
www.gombinfo.com 46
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#19 SOUNDSCAPE 4K TECHNOLOGY
GOB Project #:
Location:
19
South Beach
Active Phase:Complete
Department:Tourism & Culture
SCOPE
Upgrade WALLCAST equipment and technology to have custom-made
video screens and 4K HDR visual capabilities.
GOB FUNDING
Budget:$3,800,000
Spent:$3,205,582
Available:$594,417
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 04/01/2019 04/01/2019 32d
Design/Permitting 04/02/2019 05/27/2019 05/27/2019 56d
Construction 05/28/2019 09/30/2019 09/30/2019 126d
Close-out 10/01/2019 11/01/2019 11/01/2019 32d
Project Category:Parks
UPDATE
Project complete. New technology unveiled during New World
Symphony's 100th WALLCAST Concert on October 12, 2019.
GO#19: SOUNDSCAPE PARK
www.gombinfo.com 47
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
21
North Beach
Active Phase:Complete
Department:Parks & Recreation
SCOPE
Replace the existing perimeter fence with a higher security fencing
structure, construct a new walking/jogging, add fresh paint and new
flooring to pavilion and restroom areas.
GOB FUNDING
Budget:$145,000
Spent:$0
Available:$145,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2019 06/30/2019 06/30/2019 61d
Design/Permitting 07/01/2019 07/31/2019 07/31/2019 31d
Construction 08/01/2019 11/08/2019 11/08/2019 100d
Close-out 11/09/2019 12/08/2019 12/08/2019 30d
Project Category:Parks
UPDATE
Project complete.
GO#21: STILLWATER PARK
www.gombinfo.com 50
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
23
South Beach Department:Capital
Improvement
Projects
SCOPE
Construct the last portions of the Baywalk path to provide a continuous
link from South Pointe to Lincoln Road with a custom designed
pedestrian bridge to stretch across 5 Street.
GOB FUNDING
Budget:$15,000,000
Project Category:Parks
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#23: BAYWALK
No. of Sub-Projects:4
NOTES
www.gombinfo.com 52
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#23 PEDESTRIAN BRIDGE
GOB Project #:
Location:
23
South Beach
Active Phase:Design
Department:Capital
Improvement
Projects
SCOPE
Construct a custom designed pedestrian bridge to stretch across 5th
Street - providing a continuous Baywalk link from the city's entrance at
Biscayne Bay and West Avenue to Lincoln Road.
GOB FUNDING
Budget:$10,000,000
Spent:$108,601
Available:$9,891,398
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 11/06/2018 06/14/2019 06/15/2019 221d
Design 04/10/2019 12/10/2019 12/11/2019 8.17mo
Construction 12/11/2019 08/28/2020 08/29/2020 8.73mo
Project Category:Parks
UPDATE
Design 95% complete. Due to utility conflicts and other concerns, the
developer and design team are evaluating modifications to the plans.
Permitting process continues at FDOT and City of Miami Beach.
GO#23: BAYWALK
www.gombinfo.com 55
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
24
Middle Beach
Active Phase:Preconstruction
Department:Capital
Improvement
Projects
SCOPE
Replace the current wooden boardwalk structure that exists between
23rd Street and 45th Street with an on-grade pedestrian pathway that
connects Mid Beach with South Beach and North Beach Beachwalk
portions - providing one seamless oceanside pathway that stretches
from 1st Street to 87th Street.
GOB FUNDING
Budget:$4,500,000
Spent:$58,500
Available:$4,441,500
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 10/22/2015 05/29/2016 05/29/2016 220.88d
Design and Permitting 06/07/2016 05/22/2019 05/23/2019 1080d
Contractor Selection - ITB 05/22/2019 11/03/2019 11/04/2019 166d
Construction 11/18/2019 01/12/2021 02/16/2021 15.20mo
Project Category:Parks
UPDATE
Construction started on 11/18/2019. The construction sequencing will
start on the South end and move North. Demolition of the existing
boardwalk is scheduled between December 2019 and March 2020.
GO#24: MIDDLE BEACH BEACHWALK PH3
- This project has additional sources of funding
www.gombinfo.com 57
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
26
City Wide Department:Property
Management
SCOPE
Preserve and strengthen the cultural facilities at The Fillmore, Miami
City Ballet, and The Colony Theater by replacing their aged and leaking
roofs with structurally-sound and resilient roofs.
GOB FUNDING
Budget:$2,980,000
Project Category:Parks
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#26: ROOFS FOR CULTURAL FACILITIES
No. of Sub-Projects:3
NOTES
www.gombinfo.com 59
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#26 COLONY THEATRE ROOF
GOB Project #:
Location:
26
City Wide
Active Phase:Complete
Department:Property
Management
SCOPE
Replace the roof at the Colony Theatre with a new sustainable roof.
GOB FUNDING
Budget:$300,000
Spent:$295,090
Available:$4,910
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 05/14/2019 05/14/2019 75d
Design/Permitting 05/15/2019 06/10/2019 06/10/2019 27d
Construction 07/08/2019 09/27/2019 10/14/2019 99d
Project Category:Parks
UPDATE
Project complete. Pending closeout and final payment to contractor.
GO#26: ROOFS FOR CULTURAL FACILITIES
www.gombinfo.com 60
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#26 FILLMORE ROOF
GOB Project #:
Location:
26
City Wide
Active Phase:Construction
Department:Property
Management
SCOPE
Replace the roof at The Fillmore with a new sustainable roof.
GOB FUNDING
Budget:$2,010,000
Spent:$5,625
Available:$2,004,375
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 06/28/2019 06/28/2019 120d
Design/Permitting 06/29/2019 10/01/2019 10/31/2019 125d
Construction 11/01/2019 02/29/2020 02/29/2020 121d
Project Category:Parks
UPDATE
Contractor mobilizing on November 11. On track to be completed by
February 2020.
GO#26: ROOFS FOR CULTURAL FACILITIES
www.gombinfo.com 61
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#26 MIAMI CITY BALLET ROOF
GOB Project #:
Location:
26
City Wide
Active Phase:Design
Department:Property
Management
SCOPE
Replace the roof at Miami City Ballet with a new sustainable roof.
GOB FUNDING
Budget:$670,000
Spent:$6,469
Available:$663,530
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 06/28/2019 06/28/2019 120d
Design/Permitting 06/29/2019 11/03/2019 11/03/2019 128d
Construction 11/04/2019 01/12/2020 01/12/2020 70d
Close-out 01/13/2020 02/11/2020 02/11/2020 30d
Project Category:Parks
UPDATE
Contractor mobilizing on November 11. On track to be completed by
January 04, 2020.
GO#26: ROOFS FOR CULTURAL FACILITIES
www.gombinfo.com 62
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
29
North Beach
Active Phase:Planning
Department:Economic
Development
SCOPE
Re-develop and re-purpose the area known as the "West Lots" (8
blocks of city-owned land located across the street from North Shore
Open Space Park) as cohesive mixed-use space for recreational/civic/
neighborhood activity.
GOB FUNDING
Budget:$5,000,000
Spent:$0
Available:$1,000,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Future 01/01/2020 10/02/2028 10/02/2028 3198d
Project Category:Parks
UPDATE
This project is in Tranche 1,2,3, which is programmed between the
years of 2020-2028.
GO#29: WEST LOTS
www.gombinfo.com 65
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
32
South Beach
Active Phase:Construction
Department:Capital
Improvement
Projects
SCOPE
Beautify the islands with new landscaping installed to along Palm
Avenue, Fountain Street and neighborhood medians.
GOB FUNDING
Budget:$1,000,000
Spent:$16,250
Available:$983,750
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 02/11/2019 04/09/2019 04/10/2019 58d
Design 04/10/2019 07/22/2019 07/23/2019 104d
Procurement - NJPA 07/23/2019 10/30/2019 10/31/2019 100d
Construction 11/04/2019 02/28/2020 03/03/2020 24.20w
Project Category:Infrastructure
UPDATE
Notice to Proceed to start construction was issued on 11/4/2019.
GO#32: PALM & HIBISCUS LANDSCAPING
- This project has additional sources of funding
www.gombinfo.com 68
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
33
North Beach Department:Environmental
SCOPE
Plant up to 5,000 trees citywide, increasing overall shaded tree canopy
coverage as part of the City's Street Tree Master Plan.
GOB FUNDING
Budget:$5,000,000
Project Category:Infrastructure
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#33: STREET TREE MASTER PLAN
No. of Sub-Projects:2
NOTES
www.gombinfo.com 69
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#33 PART 1 TREE PLANTING
GOB Project #:
Location:
33
North Beach
Active Phase:Construction
Department:Environmental
SCOPE
Plant the first $2.5 million worth of trees to under-shaded parks and
neighborhoods citywide.
GOB FUNDING
Budget:$2,500,000
Spent:$106,073
Available:$2,393,926
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/22/2019 05/05/2019 05/05/2019 15.63d
Design/Permitting 05/05/2019 07/11/2019 07/11/2019 75.25d
Construction 07/11/2019 01/01/2021 01/01/2021 607.38d
Project Category:Infrastructure
UPDATE
Over 150 trees have been planted at Normandy Isle, Brittany Bay, and
the 5 Street Corridor. Construction at the Pocket Park on 20 St will
begin in November. Construction at Stillwater Neighborhood, Muss
Park, and 40 Street will begin in December, totaling 184 trees.
Construction at Biscayne Pointe will begin in January, totaling 122
trees.
GO#33: STREET TREE MASTER PLAN
- This project has additional sources of funding
www.gombinfo.com 70
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
37
City Wide Department:Public Works
Department
SCOPE
Renovate 25% of the City's sidewalks by replacing cracked and faulty
sidewalk surfaces in areas citywide.
GOB FUNDING
Budget:$13,000,000
Project Category:Infrastructure
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#37: SIDEWALK IMPROVEMENTS
No. of Sub-Projects:4
NOTES
www.gombinfo.com 75
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#37 PART 1 SIDEWALKS
GOB Project #:
Location:
37
City Wide
Active Phase:Construction
Department:Public Works
Department
SCOPE
Renovate part 1 of deteriorated sidewalks, as per the city's pavement
condition index assessment.
GOB FUNDING
Budget:$3,500,000
Spent:$291,390
Available:$3,208,609
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 04/01/2019 04/01/2019 32d
Design/Permitting 04/02/2019 05/12/2019 05/12/2019 41d
Construction 05/13/2019 01/01/2022 01/01/2022 965d
Project Category:Infrastructure
UPDATE
This project is currently under construction. Approximately 5,400 sf has
been completed in North Beach, 11,900 sf in Middle Beach, and 37,117
sf in South Beach.
GO#37: SIDEWALK IMPROVEMENTS
www.gombinfo.com 76
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
38
City Wide Department:Public Works
Department
SCOPE
Improve citywide roadway conditions by re-paving and applying
pavement preservation strategies to cracked and deteriorated streets
that have been identified to have a below marginal Pavement
Condition Index ratings.
GOB FUNDING
Budget:$30,000,000
Project Category:Infrastructure
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#38: STREET PAVEMENT
No. of Sub-Projects:4
NOTES
www.gombinfo.com 80
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#38 PART 1 STREETS
GOB Project #:
Location:
38
City Wide
Active Phase:Construction
Department:Public Works
Department
SCOPE
Repave and restore part 1 of deteriorated streets, as per the city's
pavement condition index assessment.
GOB FUNDING
Budget:$7,500,000
Spent:$868,172
Available:$6,631,827
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 04/01/2019 04/01/2019 32d
Design/Permitting 04/02/2019 05/12/2019 05/12/2019 41d
Construction 05/13/2019 01/01/2022 01/01/2022 965d
Project Category:Infrastructure
UPDATE
This project is currently under construction. Approximately 51,685 sy
has been completed.
GO#38: STREET PAVEMENT
www.gombinfo.com 81
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
40
Middle Beach
Active Phase:Planning
Department:Economic
Development
SCOPE
Revitalize the 41st Street Cooridor with neighborhood landscaping and
infrastructure improvements such as new high-tech street lighting, an
expanded shaded tree canopy, and new streetscape designs for better
public transportation, pedestrian and driving mobility.
GOB FUNDING
Budget:$15,000,000
Spent:$0
Available:$1,500,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 09/25/2019 01/01/2031 01/01/2031 4117d
Project Category:Infrastructure
UPDATE
This project is in Tranche 1, 2, 3, and 4, which is programmed between
the years 2019-2031. Staff is currently drafting a scope of services for
the 41st Street initiatives for the issuance of a work order to an
Architectural and Engineering consultant from the approved pool.
GO#40: 41 ST. CORRIDOR
- This project has additional sources of funding
www.gombinfo.com 86
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
42
City Wide Department:Transportation
SCOPE
Implement various traffic calming features in neighborhoods with
heavy traffic and frequent speeding incidents such as: Nautilus,
Bayshore, Normandy Isle, and Palm View. Include traffic circles, speed
humps, designated bike lanes and reduced speed limit signage.
GOB FUNDING
Budget:$2,000,000
Project Category:Infrastructure
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#42: TRAFFIC CALMING
No. of Sub-Projects:5
NOTES
www.gombinfo.com 88
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#42 NAUTILUS TRAFFIC CALMING
GOB Project #:
Location:
42
City Wide
Active Phase:Construction
Department:Transportation
SCOPE
Implement traffic calming measures in the Nautilus neighborhood.
GOB FUNDING
Budget:$739,500
Spent:$414,402
Available:$325,097
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 04/01/2019 04/01/2019 32d
Design/Permitting 04/02/2019 09/11/2019 09/11/2019 163d
Construction 09/12/2019 01/15/2020 01/15/2020 126d
Close-out 01/16/2020 02/05/2020 01/31/2020 16d
Project Category:Infrastructure
UPDATE
Completion date of speed limit signage and green bike lane is 10/18.
Speed table construction will be completed by 10/31 and traffic circle
construction will be completed by mid-January.
GO#42: TRAFFIC CALMING
www.gombinfo.com 91
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
43
City Wide Department:Transportation
SCOPE
Improve citywide public safety and mobility by designing protected
bicycle lanes and shared-use paths for: Chase Avenue from Alton Road
to 34 Street, 23 Street, and 63 Street.
GOB FUNDING
Budget:$5,000,000
Project Category:Infrastructure
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#43: BIKE LANES & SHARED PATHS
No. of Sub-Projects:4
NOTES
www.gombinfo.com 94
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#43 23 ST. STREETSCAPE IMPROVEMENTS
GOB Project #:
Location:
43
City Wide
Active Phase:Planning
Department:Transportation
SCOPE
Redesign the streetscape on 23 Street (as part of the Transportation
Masterplan) to be more pedestrian friendly; enhance landscaping,
install traffic lights, improve sidewalks, etc.
GOB FUNDING
Budget:$1,500,000
Spent:$0
Available:$1,500,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2018 12/01/2019 12/01/2019 579d
Design/Permitting 12/01/2019 05/02/2020 05/02/2020 153d
Construction 05/02/2020 10/02/2020 10/02/2020 153d
Project Category:Infrastructure
UPDATE
Currently working with the Capital Improvement Projects Department
to add this project to existing Collins Park Garage Project.
GO#43: BIKE LANES & SHARED PATHS
www.gombinfo.com 95
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#43 ALTON ROAD SHARED USE PATH
GOB Project #:
Location:
43
City Wide
Active Phase:Design
Department:Transportation
SCOPE
Implement a shared use path between Michigan Avenue and Chase
Avenue (as part of the Transportation Masterplan) to provide a safe
travel link to Chase Avenue for both pedestrians and cyclists.
GOB FUNDING
Budget:$1,370,000
Spent:$0
Available:$170,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2018 12/01/2019 12/01/2019 579d
Design/Permitting 12/01/2019 10/01/2020 10/01/2020 305d
Construction 10/01/2020 10/01/2025 10/01/2025 1826d
Project Category:Infrastructure
UPDATE
This project will be implemented with the FDOT project. Currently
finalizing the Agreement with FDOT.
GO#43: BIKE LANES & SHARED PATHS
- This project has additional sources of funding
www.gombinfo.com 97
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#43 CHASE AVE/34 ST SHARED USE PATH
GOB Project #:
Location:
43
City Wide
Active Phase:Planning
Department:Transportation
SCOPE
Implement a shared use path on Chase Avenue and 34 Street (as part
of the Transportation Masterplan) to provide a save travel link to Prairie
Avenue for both pedestrians and cyclists.
GOB FUNDING
Budget:$830,000
Spent:$0
Available:$830,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/18/2018 11/29/2019 11/29/2019 560d
Design/Permitting 11/29/2019 09/30/2020 09/30/2020 306d
Construction 09/30/2020 09/01/2021 09/01/2021 336d
Project Category:Infrastructure
UPDATE
Currently in negotiations with the Consultant for design services.
GO#43: BIKE LANES & SHARED PATHS
- This project has additional sources of funding
www.gombinfo.com 98
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
45
South Beach
Active Phase:Design
Department:Capital
Improvement
Projects
SCOPE
Replace the deteriorated Fire Station #1 facility with a new and larger
building in a location that expands emergency coverage in South
Beach; include space for a 911 call center.
GOB FUNDING
Budget:$10,000,000
Spent:$34,125
Available:$6,965,875
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 11/06/2018 10/23/2019 10/24/2019 352d
Design 10/21/2019 10/12/2021 10/13/2021 24.10mo
CM@Risk Selection 09/05/2019 12/28/2021 12/29/2021 846d
Construction 01/05/2022 02/28/2023 03/01/2023 420d
Final Completion 03/01/2023 03/30/2023 03/31/2023 30d
Project Category:Public Safety
UPDATE
Architect of Record is conducting project site analysis and schematic
building footprint. Construction Manager at Risk (CMR) selection is
underway. Award of CMR is expected in January 2020.
GO#45: FIRE STATION #1
www.gombinfo.com 100
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
47
City Wide Department:Police
SCOPE
Install advanced software recognition technology and License Plate
Readers to additional strategic locations across the city to aid crime-
prevention efforts.
GOB FUNDING
Budget:$1,950,000
Project Category:Public Safety
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#47: LICENSE PLATE READERS
No. of Sub-Projects:4
NOTES
www.gombinfo.com 102
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#47 71 ST. ENTRANCE READERS
GOB Project #:
Location:
47
City Wide
Active Phase:Construction
Department:Police
SCOPE
Install License Plate Readers (LPRs) to the 71 St. entrance to the city.
GOB FUNDING
Budget:$240,000
Spent:$0
Available:$240,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 03/26/2019 03/26/2019 26d
Design/Permitting 03/27/2019 09/06/2019 09/06/2019 164d
Construction 10/01/2019 11/06/2019 12/06/2019 67d
Project Category:Public Safety
UPDATE
Construction underway. Slight delay due to FDOT. Construction
timeline moved to the beginning of December.
GO#47: LICENSE PLATE READERS
www.gombinfo.com 103
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#47 JULIA TUTTLE CSWY READERS
GOB Project #:
Location:
47
City Wide
Active Phase:Construction
Department:Police
SCOPE
Install License Plate Readers (LPRs) to the Julia Tuttle Causeway
entrance to the city.
GOB FUNDING
Budget:$200,000
Spent:$0
Available:$200,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 03/26/2019 03/26/2019 26d
Design/Permitting 03/27/2019 10/25/2019 10/25/2019 213d
Construction 10/28/2019 11/29/2019 11/29/2019 33d
Project Category:Public Safety
UPDATE
On track to be completed by the end of November.
GO#47: LICENSE PLATE READERS
www.gombinfo.com 104
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#47 MACARTHUR CSWY READERS
GOB Project #:
Location:
47
City Wide
Active Phase:Construction
Department:Police
SCOPE
Install License Plate Readers (LPRs) to the MacArthur Causeway
entrance to the city.
GOB FUNDING
Budget:$120,000
Spent:$0
Available:$120,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 03/01/2019 03/26/2019 03/26/2019 26d
Design/Permitting 03/27/2019 09/06/2019 09/06/2019 164d
Construction 10/28/2019 11/28/2019 11/28/2019 32d
Project Category:Public Safety
UPDATE
Poles have been installed. On track for completion by the end of
November.
GO#47: LICENSE PLATE READERS
www.gombinfo.com 105
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
48
South Beach Department:Property
Management
SCOPE
Renovate Police Headquarter facilities by upgrading fire alarm, sprinkler
and HVAC systems and installing building generators; improve police
officer training and certification programs with the installation of a new
practice shooting range.
GOB FUNDING
Budget:$10,000,000
Project Category:Public Safety
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#48: POLICE HEADQUARTERS FACILITY
No. of Sub-Projects:2
NOTES
www.gombinfo.com 107
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#48 PART 1 POLICE HQ
GOB Project #:
Location:
48
South Beach
Active Phase:Planning
Department:Property
Management
SCOPE
Conduct feasibility study and space design; renovate practice firing
range; refurbish windows and HVAC system.
GOB FUNDING
Budget:$4,000,000
Spent:$0
Available:$4,000,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Future 01/01/2020 01/01/2028 01/01/2028 2923d
Project Category:Public Safety
UPDATE
This project is programmed between the years of 2020-2022. A/E Fee
Proposal received from Leo A. Daly on 10/18/19- Property
Management to vet proposal and schedule meeting with Design Team.
GO#48: POLICE HEADQUARTERS FACILITY
www.gombinfo.com 108
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
49
City Wide
Active Phase:Construction
Department:Police
SCOPE
Replace the city's outdated Motorola analog radio system with a new
Harris Corporation satellite radio system, giving first responders access
to a state-of-the-art emergency communications technology network
with high tech functions such as seamless interoperability and
encrypted data.
GOB FUNDING
Budget:$10,000,000
Spent:$3,501,858
Available:$6,498,141
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Implementation 01/01/2019 02/28/2020 02/28/2020 424d
Project Category:Public Safety
UPDATE
Currently in the implementation phase with site(s) improvements and
construction. Factory Acceptance Tests have been completed.
GO#49: PUBLIC SAFETY RADIO SYSTEM
www.gombinfo.com 110
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
52
City Wide Department:Parks & Recreation
SCOPE
Upgrade sports and pathway lighting in Flamingo, North Shore,
Normandy Isle, Tatum, Stillwater and Crespi Parks, to a modern LED
technology system that illuminates outdoor areas while also saving
energy.
GOB FUNDING
Budget:$4,500,000
Project Category:Public Safety
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#52: LED LIGHTING IN PARKS
No. of Sub-Projects:5
NOTES
www.gombinfo.com 117
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#52 CRESPI PARK LED LIGHTING
GOB Project #:
Location:
52
City Wide
Active Phase:Complete
Department:Parks & Recreation
SCOPE
Upgrade park lights to LED technology.
GOB FUNDING
Budget:$87,000
Spent:$458
Available:$86,541
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2019 06/30/2019 06/30/2019 61d
Design/Permitting 07/01/2019 10/31/2019 09/30/2019 92d
Construction 10/01/2019 11/15/2019 10/21/2019 21d
Project Category:Public Safety
UPDATE
Project is complete. Currently in the close-out phase.
GO#52: LED LIGHTING IN PARKS
www.gombinfo.com 118
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#52 NORMANDY ISLE PARK LED LIGHTING
GOB Project #:
Location:
52
City Wide
Active Phase:Construction
Department:Parks & Recreation
SCOPE
Upgrade park lights to LED technology.
GOB FUNDING
Budget:$715,000
Spent:$0
Available:$715,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2019 06/30/2019 06/30/2019 61d
Design/Permitting 07/01/2019 11/30/2019 10/30/2019 122d
Construction 10/31/2019 12/21/2019 11/20/2019 21d
Project Category:Public Safety
UPDATE
Project is on schedule to be completed by mid-November.
GO#52: LED LIGHTING IN PARKS
www.gombinfo.com 119
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#52 STILLWATER PARK LED LIGHTING
GOB Project #:
Location:
52
City Wide
Active Phase:Complete
Department:Parks & Recreation
SCOPE
Upgrade park lights to LED technology.
GOB FUNDING
Budget:$87,000
Spent:$458
Available:$86,541
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2019 06/30/2019 06/30/2019 61d
Design/Permitting 07/01/2019 10/15/2019 09/27/2019 89d
Construction 09/30/2019 10/31/2019 10/21/2019 22d
Project Category:Public Safety
UPDATE
Project is complete. Currently in the close-out phase.
GO#52: LED LIGHTING IN PARKS
www.gombinfo.com 121
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#52 TATUM PARK LED LIGHTING
GOB Project #:
Location:
52
City Wide
Active Phase:Complete
Department:Parks & Recreation
SCOPE
Upgrade park lights to LED technology.
GOB FUNDING
Budget:$152,000
Spent:$448
Available:$151,551
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 05/01/2019 06/30/2019 06/30/2019 61d
Design/Permitting 07/01/2019 11/15/2019 09/23/2019 85d
Construction 09/24/2019 11/30/2019 10/14/2019 21d
Project Category:Public Safety
UPDATE
Project is complete. Currently in the close-out phase.
GO#52: LED LIGHTING IN PARKS
www.gombinfo.com 122
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
53
City Wide Department:Public Works
Department
SCOPE
Install hostile vehicle barriers and decorative bollards (both stationary
and mobile) to Entertainment District areas with frequent event activity
and heavy foot traffic. Provide storage for housing portable bollards for
use when crowd control is not needed.
GOB FUNDING
Budget:$4,350,000
Project Category:Public Safety
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#53: SECURITY FOR PUBLIC SPACES
No. of Sub-Projects:5
NOTES
www.gombinfo.com 123
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#53 PORTABLE BOLLARDS
GOB Project #:
Location:
53
City Wide
Active Phase:Complete
Department:Police
SCOPE
Acquire portable barriers to store and deploy for special event use.
GOB FUNDING
Budget:$600,000
Spent:$599,915
Available:$84
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
PLANNING 04/01/2019 04/21/2019 04/21/2019 21d
DESIGN/PERMITTING 04/22/2019 05/13/2019 05/13/2019 22d
CONSTRUCTION 05/14/2019 07/31/2019 07/31/2019 79d
Project Category:Public Safety
UPDATE
COMPLETE.
GO#53: SECURITY FOR PUBLIC SPACES
www.gombinfo.com 126
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
55
City Wide Department:Public Works
Department
SCOPE
Install a state-of-the-art, energy-efficient, LED street lighting system to
roadways and walkways citywide, thereby increasing public safety and
security for drivers and pedestrians across the city.
GOB FUNDING
Budget:$10,000,000
Project Category:Public Safety
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#55: STREET LIGHTING IMPROVEMENTS
No. of Sub-Projects:2
NOTES
www.gombinfo.com 130
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#55 PART 1 STREET LIGHTS
GOB Project #:
Location:
55
City Wide
Active Phase:Planning
Department:Public Works
Department
SCOPE
Install a state-of-the-art, energy-efficient, LED street lighting system to
roadways and walkways citywide, thereby increasing public safety and
security for drivers and pedestrians across the city.
GOB FUNDING
Budget:$5,000,000
Spent:$0
Available:$5,000,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 11/01/2019 01/01/2022 01/01/2020 62d
Design/Permitting 01/02/2020 11/01/2020 305d
Construction 11/02/2020 01/01/2022 426d
Project Category:Public Safety
UPDATE
Johnson Controls Inc. is currently working on the Smart Street Lighting
Master Plan project. The City is currently reviewing 100% submittals of
Lighting Standards and Urban Design Report and anticipate presenting
these to Commission for approval and adoption by January 2020.
GO#55: STREET LIGHTING IMPROVEMENTS
- This project has additional sources of funding
www.gombinfo.com 131
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
56
South Beach
Active Phase:Planning
Department:Police
SCOPE
Improve public safety for residents and visitors between 14th Place to
23rd Street by installing several new security cameras along the
pedestrian beachwalk path.
GOB FUNDING
Budget:$400,000
Spent:$0
Available:$400,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 05/05/2019 05/05/2019 35d
Design/Permitting 05/06/2019 01/14/2020 01/14/2020 254d
Construction 01/15/2020 03/19/2020 03/19/2020 65d
Project Category:Public Safety
UPDATE
Quotes from vendor are under evaluation. Will kick off after the
Lummus Park Connectivity is completed.
GO#56: CAMERAS- BEACHWALK
www.gombinfo.com 133
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
GOB Project #:
Location:
57
South Beach Department:Police
SCOPE
Improve public safety in the Entertainment District by adding several
additional security cameras along Collins and Washington Avenues
between 5 Street and 17 Street.
GOB FUNDING
Budget:$1,490,000
Project Category:Public Safety
This project is broken down into more than one sub-project. Each sub-
project has a full page of detailed information to follow.
GO#57: CAMERAS- ENTERTAINMENT DISTRICT
No. of Sub-Projects:2
NOTES
www.gombinfo.com 134
Thursday, November 21, 2019 10:56 AM
City of Miami Beach GO Bond Program
Program Progress Report: November 21, 2019
#57 LUMMUS PARK/OCEAN DRIVE CAMERAS
GOB Project #:
Location:
57
South Beach
Active Phase:Design
Department:Police
SCOPE
Install additional security cameras to expand monitored coverage in
Lummus Park and Ocean Drive.
GOB FUNDING
Budget:$815,000
Spent:$0
Available:$815,000
SCHEDULE
Phase Description Start Date Original
End Date
Anticipated
End Date
Duration
Planning 04/01/2019 05/05/2019 05/05/2019 35d
Design/Permitting 05/06/2019 11/15/2019 11/29/2019 208d
Construction 11/30/2019 02/01/2020 02/03/2020 66d
Project Category:Public Safety
UPDATE
Final revisions from A&E contractor provided.
GO#57: CAMERAS- ENTERTAINMENT DISTRICT
www.gombinfo.com 136
Thursday, November 21, 2019 10:56 AM
•
•
•
Legend:
¹ A sub-project is an element of one of the main 57 approved G.O. Bond projects that is budgeted and
therefore tracked as an individual line item with its own scope of work and implementation timeline.
EXHIBIT B1
G.
O
.
B
o
n
d
I
m
p
l
e
m
e
n
t
a
t
i
o
n
P
l
a
n
-
Q
u
i
c
k
W
i
n
s
-
Page 1 of 5
Ex
p
o
r
t
e
d
o
n
N
o
v
e
m
b
e
r
2
1
,
2
0
1
9
3
:
3
5
:
1
4
P
M
E
S
T
No
v
e
m
b
e
r
2
1
,
2
0
1
9
E XH
I
B
I
T
C
Page 2 of 5
Ex
p
o
r
t
e
d
o
n
N
o
v
e
m
b
e
r
2
1
,
2
0
1
9
3
:
3
5
:
1
5
P
M
E
S
T
Page 3 of 5
Ex
p
o
r
t
e
d
o
n
N
o
v
e
m
b
e
r
2
1
,
2
0
1
9
3
:
3
5
:
1
6
P
M
E
S
T
Page 4 of 5
Ex
p
o
r
t
e
d
o
n
N
o
v
e
m
b
e
r
2
1
,
2
0
1
9
3
:
3
5
:
1
7
P
M
E
S
T
Page 5 of 5
Ex
p
o
r
t
e
d
o
n
N
o
v
e
m
b
e
r
2
1
,
2
0
1
9
3
:
3
5
:
1
8
P
M
E
S
T
SOCIAL
1