No preview available
 /
     
Resolution 2024-33286RESOLUTION NO.2024-33286 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF MIAMI BEACH, FLORIDA,AFFIRMING ITS COMMITMENT TO PRESERVE THE FILLMORE MIAMI BEACH AT THE JACKIE GLEASON THEATER FROM DEMOLITION, AND FURTHER,DIRECTING THE ADMINISTRATION TO ENGAGE WITH LIVE NATION ENTERTAINMENT,INC.,TO PURSUE POTENTIAL TERMS OF REHABILITATION AND RENOVATION. WHEREAS,the Fillm ore Miami Beach At The Jackie Gleason Theater (the "Venue")is a City owned building located at 1700 Washington Avenue;and WHEREAS,the City opened the Venue as the Miam i Beach Municipal Auditorium in 1951 and the Venue was the home of the Jackie Gleason Show from 1964 to 1970;and WHEREAS,the Venue's auditorium was remodeled in 1971 by architect Morris Lapidus and renam ed the Miam i Beach Theater of the Performing Arts;and WHEREAS,the Venue's facade was remodeled in 1988 to resemble the Art Deco architecture iconic to Miam i Beach,and was renamed the Jackie Gleason Theater of the Perform ing Arts;and WHEREAS,in October 2006,the City entered into a management agreement with Live Nation Entertainm ent,Inc.("Live Nation")for the rights to operate the Venue,and it was rebranded the "Fillm ore Miami Beach at the Jackie Gleason Theater";and WHEREAS,in 2019,engineers M.C.Harry and Associates conducted a Conditions Assessm ent and pro vided recom mendations for impro vements,estimated at $23,634,681;and WHEREAS,on Novem ber 8,2022,the City's voters approved a $159 million General O bligation (G .O .)Bond for Arts and Culture that included $29,100,000 for the renovation of the Venue;and WHEREAS,on May 24,2023,at the request of the City Commission,Live Nation presented a concept fo r a new theater in place of the existing Venue and a motion was made by Com missioner Richardson to discuss the item at City Commission and further,directed the Adm inistration to explore the option of building a new facility,however this item was withdrawn by the sponsor;and WHEREAS,on January 31,2024 at the request of Commissioner Joe Magazine,the City Com mission appro ved the referral of this item to Finance and Economic Resiliency Committee (FERC);and WHEREAS,In April 2024,at the direction of the City Commission,the Administration engaged with Live Nation in developing an alternate "gut-renovation"plan to be presented before the Mayor and City Commission;and WHEREAS,on July 8,2024,Live Nation presented the Administration with two concept designs and their corresponding cost estim ates:$57.7 million for the New Building Concept and $87.1 million for the Gut-Renovation Concept;and W HEREAS,on August 22,2024,the Administration and Live Nation presented the concepts being considered to residents in a virtual listening session and open comment period; and W HEREAS,at the September 11,2024 City Commission meeting,Commissioner Alex Fernandez made a motion to remove from consideration the demolition of the Venue;and W HEREAS,at the same meeting,Commissioner Tanya Bhatt made a motion to direct the Administration to engage Live Nation in a discussion of terms to renovate the Venue with a to-be- determined scope of work and contribution from Live Nation. NOW ,THEREFORE ,BE IT DULY RESOLVED BY THE MAYOR AND CITY CO MM ISSIO N OF THE CITY OF MIAMI BEACH,FLORIDA,that the Mayor and City Commission hereby affirm its commitment to preserve the Fillmore Miami Beach At The Jackie Gleason Theater from demolition,and further,direct the Administration to engage with Live Nation Entertainment,Inc.,to pursue potential terms of rehabilitation and renovation. PASSED and ADOPTED TH IS If day of~ Steven Meiner,Mayor ATTEsr:/••Rafael E.Granado,City I Sponsored by Com mi ssioner Joseph Magazine Co-Sponsored by Commissioner David Suarez Co-Sponsored by Commissioner Tanya K.Bhatt APPROVE AS TO FORM &LANGUAGE EXECUTION 2hol2o2 ~O•• 2 Discussion Items -R9 AL MIAMI BEAC H COMMISSION MEMORANDUM T O :Honorable M ayo r and M em bers of the City C om m ission FR O M :Eric C arpenter,C ity M anager D A T E :Septem ber 11,2024 T IT LE :DI S C US S A ND TA KE AC T IO N R E G A R DI N G TH E PO S S IB LE C O NS TR U C TIO N O F A N E W T H EA TE R O R R EN O V A T ING TH E EX IS TING FILLM O RE THEA TER AT TH E JA C K IE G LEA SO N TH E AT E R SIT E. Recommendation B ased on building conditions,resident feedback,and desired objectives,it is the Adm inistration's reco m m endation that the City C om m ission consider m oving forw ard with a lim ited renovation of the existing theater.T he focus of the lim ited renovation w ould include the scope of w ork as defined in the M C H arry C ond itio ns A ssessm ent and funded by the G.O Bond for A rt and Culture (G O B A C ),along w ith additional w ork prioritizing upgrades to the artist areas.This would create a m o re eff icient and hospitable venue for visiting perform ers and concert goers alike,w hile staying clo se r to the available budget.If the C ity C om m ission believes this direction w ould be in the City's be st interest,the A dm inistratio n w ould request perm ission to negotiate w ith Li ve Nation on the add itional scope.A s part of the negotiations,the Adm inistration and Live Nation could discuss O pe rator contributio n tow ards the cost of the backstage upgrades that are beyond what is funded in the G .O .Bond. BACKGROUND/HISTORY O n January 31,2024 ,at the request of C om m issioner Joseph M agaz ine,the M ayor and C ity C o m m ission appro ved the referral of item C 4 A D to the Finance and Econom ic Resiliency C o m m ittee ("F E R C "or "Co m m ittee")to discuss the Live Nation project to build a new theater. A t the M arch 22,2024 ,FE R C m eeting,Live Nation W orldw ide ("Li ve Nation")presented their concept for a new theater,previously presented at the M ay 24,2023,FE R C m eeting.A motion w as appro ved by acclam ation,for this item to be heard by the C ity Com m ission w ith a favorable recom m endation to direct staff to negotiate w ith Live N ation to build a new theater.This item was to be retained and return to FE R C with the resulting pro posals.C om m issioner A lex Fern andez and C o m m issioner T anya B hatt requested to be added as co-sponsors. C o nsequently,on A pril 3,2024,the M ayor and C ity C om m ission discussed the Resolution spo nsored by C om m issioner M agazine,accepting the recom m endation of the FERC at its M arch 22 ,2024 m eeting direct ing the A dm inistration to initiate non-binding discussions w ith Li ve Nation rega rding the possible construction of a new theater at the Jackie G leason Theater site,and referring the m att er back to the FERC .At the C ity C om m ission m eeting,the item w as separated by C o m m issioner T anya Bhatt and (at the tim e)V ice-M ayor Laura Dom inguez fro m the Consent A ge nda .C om m issioner Bhatt m ade a m otion to defer the item with direction to explore the option for renovation,seeking input from the operator and the public.The A dm inistration was given direction to return w ith a com parison of the tw o options,renovation of the existing building and the building of a new the ater. ANALYSIS Page 12 96 of 13 77 T he Fillm ore M iam i Beach at the Jackie Gleason T heater (the "F illm ore"or "Venue")has been an ico nic perf orm ance venue in the C ity.T he V enue opened in 19 51 as the M iam i Beach M unicipal A uditorium ,designed by noted M iam i Beach architects L.M urray D ixon,Henry Hohauser,and R ussell T .Pancoast &A ssociates.It has hosted m usical and dance perform ances,com edy,and occasionally boxing m atches.Thro ugh the deca des the Venue has gone through several renovatio ns,as illustrated in Exhibit A. In 20 19 ,M .C .H arry &A ssociates conducted a C onditions Assessm ent and R ecom m endations re port ,outlining the conditions of the facility that m ay be com pro m ising the quality of the prog ram s offered at this V enue .The repo rt provided recom m endations fo r im provem ents with associated co nceptual cost data.A t the tim e of the assessm ent,the total cost of rem ediating deficiencies, up grading m ajor building system s,and upgrading theatrica l system s was estim ated at $2 3 ,6 34,681 (E xhibit B).T he report characterizes the condition of the struct ural system s to appear "g e ne rally serv iceab le". O n Novem ber 8,2022,the C ity 's voters appro ved a $159 m illion G eneral O bligation (G .O .)Bond for A rts and C ulture ("G O BA C ")that included $29,100,000 fo r the renovations of the Fillm ore M ia m i Beach as recom m ended in the conditions assessm ent as w ell as other requests from Li ve N atio n. O n M ay 24,2023,at the request of the C ity,Live Nation (the "O perator")presented befo re the FE R C a plan fo r the re-im agining of the Fillm ore M iam i Beach.Live Nation presented a design for a new state-of-the-art theater that w ill attract the highest caliber of perform ers and better serv e the residents and visitors of the City of M iam i Beach.A t that tim e,a R ough O rder of M agnitude ("R O M ")estim ate of this new theater,w ell exceeded the $29.1 m illion GO B AC appropriation. D uring said m eeting ,a m otion w as m ade by Com m issioner R ichardson to discuss the item at City C o m m ission and furt her,directed the Adm inistration to explore the option of building a new faci lity. T h is discussion item w as to return to the July 28,2023,FERC m eeting to address potential fundin g opportunities.H ow ever,the item was w ithdraw n by the sponsor,and no further discussion w as had until the C o m m issio n appro ved the referral of this item ,on January 31,2024. In A pril 2024,at the direction of the C ity C om m ission,the Adm inistration engaged Live Nation in de velo ping an altern ate "gut-renovation"plan and updating the 2023 pro posal for a new building. T he gut-renovation plan w ould address the building's and O perator's fo reseeable needs in a co m plete redesign of the interior.This concept w ould update the fro nt of house spaces and accom m odate the back of ho use requirem ents of any art ist that would norm ally be appropriate for a state-of-the-art venue of this nature.O n July 8,2024 ,Live Nation return ed to the A dm inistration tw o (2)concept designs and cost estim ates for the New Building C oncept (Exhibit C )at $57.7 m illio n and the G ut-Renovation C oncept (E xhibit D )at $87.1 m illion.Both of these co ncepts present substantial funding gaps that exceed the GO B A C funding appro priation.A chart co m paring som e im portant details of the tw o (2)concepts and the original G O B AC renovation scope of w ork is att ached he reto as Exhibit E. W ith viable optio ns for the renovation of the existing building and the construction of a new theater, the A dm inistration co nduct ed a virt ual m eeting on Thursday,A ugust 22,2024,to present to the reside nts the concepts being considered,answ er their questions,and listen to their com m ents. Fifty -three (53)individuals attended the listening session.O f the residents w ho voiced their op inio ns,none supported eithe r the gut-renovation ($87.1M )nor the new building ($57.7M ) co ncepts.Som e expressed the opinion that the existing Fillm ore is already "a fantastic venue"to w atch concerts and that only necessary repairs should be pursued w ith the existing funds.An ope n com m ent period of tw o (2)w eeks,com m encing on A ugust 22,2024,and ending on S e ptem ber 6,2024 ,w as allott ed fo r furt her com m ents.T hose com m ents will be com piled and subm itted as a supplem ental (Exhibit F)to the Septem ber 11,2024,C ity C om m ission m eeting. B a sed on this feedback and direct ion fro m Com m ission,the A dm inistration and Live Nation w ill be ab le to refine the vision for the Fillm ore and research funding m odels for a renew ed venue, w hose future w ill significa ntly im pact the C onvention C enter C om plex.By way of this item ,the Page 1297 of 13 77 Commission may discuss and provide direction on renovating the existing facility or reconstructing a new Fillmore at the Jackie Gleason Theater. FIS C A L IM P A C T ST AT E M E NT ROM for Gut-Renovation as proposed by Live Nation:(88,590 SF w/o basement):$87,100,000 ROM for Construction of New Building proposed by Live Nation:(54,193 SF)$57,700,000 ROM for G.O.Bond Renovation Scope of Work (>88,590 SF with basement):$29,100,000 D o e s this O rd in ance req uire a B u sin ess Im pact Estim ate? (FOR ORDINANCES ONLY) If ap p licab le,the B usiness Im p act Estim ate (BIE)w as publish ed on: See B IE at:https://www .m iam ib eachfl.go v/ci ty-hall/city-c lerk/m eeting-notices/57 FIN A N C IA L IN FO R M A T IO N The G.O.Bond for Art and Culture has $29,100,000 budgeted for the renovation of the existing Fillmore/Gleason theater. C O N C L U S IO N In consideration of the foregoing,the Administration recommends that the City Commission discuss and provide direction on the concept of partnering with Live Nation to renovate the existing Fillmore/Gleason theater,build a new theater,or proceed with only the scope approved in the GO Bond for Art and Culture. The City Commission may also consider moving forward with a limited renovation of the existing building.The focus of the limited renovation would include the scope of work as defined in the MC Harry Conditions Assessment and funded by the GOBAC,along with additional work prioritizing upgrades to the artist areas.This would create a more efficient and hospitable venue for visiting performers and concert goers alike,while staying closer to the available budget.If the City Commission believes this direction would be in the City's best interest,the Administration would request permission to negotiate with Live Nation on the additional scope.As part of the negotiations,the Administration and Live Nation could discuss Operator contribution towards the cost of the backstage upgrades that are beyond what is funded in the G.O.Bond. A p p lic ab le A rea South Beach Is th is a "R esid ents R ig ht to Kno w "item , pu rsua nt to C ity C ode Sectio n 2-17 2 Yes Is this item related to a G .O .Bond Project? Yes a s th is A g e nd a Item in itially _req uested by a lob byist w h ich,as defined_in C ode Sec.2-4 81, in c lu d es a prin cip al en g ag ed in lob byin g ?No If so,specify the name of lobbyist(s)and principal(s): D ep art m e nt Facilities and Fleet Management Page 1298 of 1377 S p o n s o r(s ) C o m m issio ne r Joseph M agazine C o -sp o ns o r(s ) C o m m issio ne r D avid S ua rez C o m m issio ner A lex Fern a nd ez C o m m issio ner Tanya K .Bhatt C o n d e nse d T itle D iscuss Li ve N atio n Project to Build N ew Theater or R enovate Existing Venue .(JM /D S /AF/T B) FF Page 12 99 of 13 77 Exhibit A Design History 1951 to 1964:Miami Beach Municipal Auditorium Designed by noted Miami Beach architects L.Murray Dixon,Henry Hohauser,and Russell T Pancoast &Associates,originally opened in 1951 as the "Miami Beach Municipal Auditorium".The venue was "Dedicated to the m emory of the men and women of our community who have served their country in peace and in war to preserve our American heritage of democracy."The building contained a flat event floor and balconies on three sides,allowing many types of events to take place,from sporting events to banquets to perform ances. 1964 to 1970:Miami Beach Auditorium In 1964,the theatre was renamed the "Miami Beach Auditorium"after the building became co-owned by the City of Miami Beach and CBS Studios.During this time,it also became the home of the third revival of The Jackie Gleason Show.The show ran from 1964,with the final episode airing February 1970. 1 I 3 Rev.20240822 Page 1300 of 1377 Exhibit A Design History 19 71 to 19 84 :M ia m i B e ac h Theater of the Perf o rm in g A rt s S hort ly aft er The Jackie Gleason Show ended,fam ed M iam i Beach architect M orris Lapidus w as called in to rede sign the the ater.In 19 7 4,the the atre reopened as the "M iam i Beach Theater of the Perf orm ing A rts"w ith sig nificant alterations pro viding the auditorium w ith inclined the atre-style seating, and a sing le la rge balco ny level that incl uded box seating alo ng the north and south w alls.T he venue w as the n bett er suited to ho st Broadw ay style pro ductions,as w ell as functioning as a concert hall, ho sting a varie ty of m usic and dance perf orm ances. 19 88 , T he venue w as reno vated w ith a design by a joint venture of Borrelli Frankel Blitstein and Sasaki A ssociates,Inc.,giving it its curr ent A rt D eco facade ;sim ilar in appearance to m any buildings in the M iam i Beach area .S ig nificant rem odeling added escalators in the east part of the building.Follow ing the death of Jackie G leaso n in June 19 87,the C ity of M iam i Beach com m em ora ted his career and renam ed his fo rm er show 's hom e,the "Jackie G leason Theater of the Perf orm ing A rts". Rev.20240822 Page 130 1 of 13 77 Exhibit A Design History 19 99, The Port Cochere was expanded to its current appearance by noted Miami Beach architects Giller and G iller,Inc. -- # d }i& 11 El? 2007 :T he Fill m o re M iam i B each at the Jackie G leason Theater In O ctober 2006,Live Nation acquired operating rights to the venue.Shortly after,the venue began a renovation of approximately $3.5 million,designed by ADD Inc. ag 313 Rev.20240822 Page 1302 of 1377 Exhibit B CMB P.O.20191539-00 The Fillmore Miami Beach at the Jackie Gleason Theater 17 00 W ashin g to n A v en ue M iam i Beach ,FL 3313 9 MIAMI BEACH CONDITIONS ASSESSMENT AND RECOMMENDATIONS 09-23-2019 PR E P A R E D B Y : MCHARRYASSOCIATES 2780 SW D o ug las R o ad ,Su ite 302 M iam i,FL 3313 3 305-4 45-3765 A N D S O M C o n sultin g Eng ineers,In c. D o ug las W ood A sso c iates,In c. Ed w ard D ug g er +A sso c iates.P.A . Terraco n C o n su ltants In c. FOR: C IT Y OF MIAMI B E A C H PROPERTY MANAGEMENT DEPARTMENT 18 33 B a y R o ad ,M ia m i B each,FL 33139 Page 13 03 of 13 77 The Fillmore Miami Beach at the Jackie Gleason Theater Conditions Assessment and Recommendations Rough Order of Magnitude Cost Estimate September 23,2019 Rec.Recommendation Ranking for Implementation M.C.HARRY &ASSOCIATES 2780 SW DOUGLAS ROAD,302 MIAMI,FLORIDA 33133 1:Now 2:Near Future 3:Distant Future EXISTING BUILDING (FE Quantity Unit /Unit Cost Sub-Total -f--p -FR O N T O F HO U S E GENERAL 2 Demolition -Light Demolition of Finishes 132.000 SF $0.75 99,000--- AUDITORIUM Auditorium Chairs -Replace All $400 -2 1,946 LS 778,400 2 Auditorium Carpet -Aisles and Walkways 5,000 SF $25 125,000 2 Auditorium -clean and seal cone.floor under chairs 21,000 SF $4 84,000 2 Auditorium Acoutical Panel Repairs and Replacement 1 LS $100.000 100.000 2 Auditorium Ceiling Repairs &Painting (note:new light 16.000 SF $6 96,000 fixtures included in Theatrical section below,not here) ~-Renovations include new finishes and light fixtures FIRST FLOOR I-------2 Main Lobby 4,019 SF $65 261,235 2 Box Office Lobby 888 SF $65 57,720 2 Elevator Lobby 203 SF $65 13.195 2 North Main Lobby 952 SF $65 61,880 2 North Gallery Lobby 4,536 SF $65 294,840 2 South Main Lobby 952 SF $65 61,880 2 South Gallery Lobby $65 -4,536 SF 294,840 2 Box Office 270 SF $65 17,550 2 North Gallery Lobby 4,356 SF $65 283,140-f--2 South Gallery Lobby 4,356 SF $65 283,140 2 Bar -Upgrade Finishes Only 4 ea $7,500 30,000 2 Door Upgrades -Hardware only 16 ea $1.000 16.000 2 Restrooms -Repairs Only,Not complete renovation 2,462 SF $20 49,240 2 VI P Room Remodeling 1,318 SF $75 98,850 2 Offices 814 SF $40 32 .5s60----- SECOND FLOOR 2 Main Lobby 2.442 SF $65 158,730 2 North Main Lobby 1,419 SF $65 92,235 2 North Gallery Lobby 3,476 SF $65 225,940 South Main Lobby ----$6521,419 SF 92,235 2 South Gallery Lobby 3,476 SF $65 225,940 2 Storage Rooms near Bars 316 SF $65 20,540 2 Bar -Upgrade Finishes Only 3 ea $7,500 22,500 - 2 Restrooms -Repairs Only.Not complete renovation 1.376 SF $20 27,520 2 Offices 482 SF $40 19,280-- 1 Partitions in South Mechanical Rooms 1 LS $38.000 38,000--- Page 1304 of 1377 Jackie Gleason Theater Conditions Assessment Rough Order of Magnitude Cost Estimate M.C.Harry and Associates,Inc. ARCHITECTURE PLANNING INTERIORS THIRD FLOOR -------2 M ain Lo b by 2,826 SF $65 183,690-------2 N o rth M a in Lobby 952 S F $6 5 61.,880-2 N o rth G a lle ry Lo b by 2.4 0 5 S F $6 5 15 6 .32 5 2 S outh Lo bby 952 SF $6 5 61,8 80 2 S o uth G alle ry Lo b by 2.4 0 5 S F $6 5 15 6 ,325f2Bar-Upg rade Finishes O nly -~0-.---2 ea $7 ,50 0 15 ,000-----2 R estro om s 1.2 10 SF s20 24 ,200-------- FOURTH FLOOR 2 Exit Co rrid o r -C a rpet and paint only 1,3 74 S F $30 41,2 20---1-------- -------- --------CATWALK 1 R e pa irs to C a tw alk G rating 1 L S $7 ,50 0 7,500 2 R estroo m -C om p lete renovatio n 325 SF $8 0 26 ,0 00 -----------ROOF----2 N ew Structural Pa ne ls at S tag e R oo f Pentho use 1,500 SF $3 0 45,0 00 2 Ne w Lape yre S tair to replace interio r ladd er at N W 1 L S $7 ,5 00 7,5 00 N IC ROOFING -SEPARATE GOB PROJECT----F uture C o nfig ura tio n only:aft er de m o for Ho te l 55 ,10 0 SF------ -- --EXTERIOR 1 E xte rnal Stair Tow ers (per leaf)6 db l drs &ha rdw are 12 ea $3 ,0 00 36,0 00----$5 .000 -1 Replace exit doors w est end of 1st fl N&S galleries w/strfrt 10 ea 50 ,000--2a $5 .0003Replaceremaininggroundfirstorefrontdoorsw/acoust ea 12 0 ,000 2 R epla ce exte rior w ind ow s at dressing ro o m s &offi ces 523 sf $8 0 41,840 2 Re pla ce rem aining exterio r w indow s 688 sf $8 0 55,0 40 4 R epair co rroded connections at ro o f la dde rs 4 LS $5 ,000 5,0 00------2 R e pair or replace corroded A H U stand s at ro o f 6 ea $3 ,0 00 18 .000~s.00o2Repaircorrodedframingeastfacadebladesign1LS$5.000 2 Structural repa irs allow ance 4 LS $4 8 ,0 00 48,0 00 1 Structural for large A C replace m e nt w o rk +fin ishes 1 LS $15 0 ,0 00 15 0 ,0 00 2 Re m o vab le Flood Barrie rs at ground flo_or pe rim eter 450 LF $15 0 67,5 00-~ --~ Subtotal 5,444 ,2 90 _Estim atin g C o ntin ge ncy 15 %816 ,6 44--~- 1-----1---l t-------FRONT OF HOUSE SUBTOTAL 6,260,934 Page 2 Page 1305 of 1377 Jackie Gleason Theater Conditions Assessment Ro ug h O rder of M agnitud e Cost Estim ate M.C.Harry and Associates.Inc. ARCHITECTURE PLANNING INTERIORS Rec.ll [@oar@y I Unit Unit_Cost Sub-Total I BA C K O F HO U S E I Renovations include new finishes and light fixtures -f---BASEMENT -f---2 Hallway 2.645/SF $40 105.800 2 Storage Rooms 3.408 SF $20 I 68,160 2 Restro oms 1,127 SF $300 338,100 Dressing Room --$100 I22,102 SF 210.200 Laundry Room ----632/2 SF $80 50,560---1 Sum p pumps;2 at rigging,8 perimeter+construction 10 ea $20,000 200,000 GROUND FLOOR 2 Hallw ay 701 SF $10 0 70,10 0 2 Offices 650 SF $100 65,000 Restro oms -2 251 SF $300 75.300 2 Dressing Room 729 SF $100 72.900 2 Crew Lounge 447 SF $80 35.760 2 New Generator Room 300 SF $300 90,000--1 N ew Acoustically Rated Overhead Doors at Loading 3 ea $20.000 60,000--1 New Acoustical panels around stage walls up to 10'1 LS $20.000 20.000-1 Repairs to steel sprial stairs 1 LS $7.500 7.500- -SECOND FLOOR--2 Hallw ay 902 SF $40 36,080 2 Offices 402 SF $40 16,080---·2 Restrooms 286 SF $300 85,800 2 Dressing Room 1,328 SF $100 132,800 ~-----GENERALt -Acoustical Improvements Dressing Rooms.Corridors 1 LS $50,000 50.000 2 Asbestos.Lead Paint,IAQ Abatement Allowance 1 LS $200.000 200,000 ----Subtotal 1.990,140-~-- Estimating Contingency -------15%298.521 BA C K O F HO U SE SU B TO TA L 2,288,661---f----I ~ -f----f- Page 3 Page 1306 of 1377 Jackie Gleason Theater Conditions Assessment R o u g h O rde r of Magnitude Cost Estimate M.C.Harry and Associates,Inc. ARCHITECTURE PLANNING INTERIORS Rec.ll [Quantity _Unit_Unit_Cost Sb-Total MECHANICAL 1 Replace HVAC Units and Controls 524 tons $1,200 628,800--~-1 Replace Fan (Smoke Evac -Large)10 ea $10.000 100.000-----Replace Fan (Relief Fan -Small)1 ea $8.000 8,000 2 Replace Fan (Supply Fan -Small)5 ea $8.000 40,000 2 Exhaust Fan at each Electrical Room 10 ea $1,500 15,000 2 Chilled W ater Lines Insulation 1,000 ft $50 50,000--~- ------- EL E C T R IC A L 1 Replace Entire EMS System 2 (2)2000 Amp,480V,3ph distribution pane!boardsI<(2)80 0 Amp.480V,3ph distribution pane/boards 2 New Generator -350 kW 132.000,sr ,S6,792.000l 2 ea $50,000 10 0,0002'eal $30.000 60.0004'ea's150.000 150.000 3 Replace Fan (Supply Fan -Small)5 ea $8,000 40,000 3 Exhaust Fan at each Electrical Room 1 Fire Alarm tamper switches at 6"backflow assembly 2 Fire Alarm Devices allowance for interior renovation----Existing Fire Alarm system and devices were 10 ea $1,500 15,000-2 ea $2.000 4,000-132.000 SF $0.50 66,000 l foundtobefunction'gadequatelyI II I P L U M B IN G (2)Janitor Sinks 2 ea $2,000 4,000 1 (3)W ater Coolers 3 ea $2,000 6,000 2 Replace all instant hot water heaters2Relocationofsanitarylinesfromfood sericero oms ] 11 ea 1 LS $1,500 $10,000 16.500 10,000 --------+-------NO TE:Restro om Replacem ent Fixt ures in Arch Est. FIR E SP R IN K L E R ----- -----1 (2)6"OS&Y fire valves at backflow assembly 2 SF $1.500--~-1 6"alarm fire valve 2 ea $40,000 1 Replace damaged cor ro ded piping BO H FIr -1 5,740 SF $34Replacedamagedcorroded4".2-1/2"FP piping bsmt 12,355 SF $3-New Fire Pum p 750 gpm -~-1 1 ea $65.000-- .-- SUBTOTAL ---------4se,-~Estimating Contingency --- ------------M E P -F P S U B T O T A L 3.000 80,000 17 ,220 37,065 65,000 2,307,585 346,138 2,6 53,7 2 3 Page 4 Page 1307 of 1377 Jackie G leaso n T heater Conditions A ssessm ent Rough Order of Magnitude Cost Estimate M.C.Harry and Associates,Inc. ARCHITECTURE PLANNING INTERIORS -I ---THEATRICAL SYSTEMS - I ---- 2 Softgoods and Tracks 1 LS $97,000 I 97,000 1 Testing /Study of Em ergency O perations system s 1 LS $15,000 15,000 2 Upgrades Em ergency O perations system s allow ance 1 LS $100,000 I 100,000---1s.00o1RiggingSafetyInspection1LS$15.000------2 Perf orm ance Rigging System s 1 LS $765.000 765,000 1 Pow er and Contro l System s 4 LS $823.000 823.000 2 Perf orm ance Li ghting Fixtures 1 LS $4 68.000 468.000 2 A rchitectural Li ghting Fixtures 1 LS $238.000 238,000-$11,000'-2 Cables and Assem blies 1 LS 11,000----2 A udio Digital Backbone 1 LS $200.000 200,000f---$150.0003ReplaceStageFloor4LS 150,000--f--- --~--- ----Subtotal 2,882,000- Estim ating Contingency 15 %432.300 THEATRICAL SUBTOTAL 3,314,300--------I l ----~ ~------------- Page 5 Page 1308 of 1377 Jackie Gleason Theater Conditions Assessment Ro ug h O rde r of M ag n itud e Co st Estim ate . M.C.Harry and Associates,Inc. ARCHITECTURE PLANNING INTERIORS }}-------~----EX IS T ING BU IL D IN G RE N O V A T IO N SU B T O T A L 14 ,517,617 FFE Permitting Contractor General Conditions.Overhead and Profit Contractor Insurance and Bond Design Fees Arch.,Interiors,Theatrical,MEP-FP,Civil,Structural 12% 2%,___ 22% 2% 10% 1,742,114 290,352 3,193,876 290,352 1,451,762 --------11 EXISTING BUILDING RENOVATION+FEES SUBTOTAL $21,486,074 Owner Contingency 10%$2,148,607 i--t ---EX IS T IN G BU IL D IN G R E N O V A T IO N +FE E S &CO N T IN G E N C Y S U B T O T A L----------1 --$23,634 ,681 I EXISTING BUILDING AREA 132,000 SF CO S T /SF $179 1 EX IS T IN G B U IL D IN G RE N O V A T IO N CO S T ES T IM A T E SO R T E D BY RE C O M M E N D E D RA N K IN G--- 1.N o w 3,164,085 add 15%cont.3,638,698 Man /Replace HVAC,EMS,Lighting Controls,Fire Pump & Items Valves,limited sprinkler piping work,Stair towers doors, add bsmt sump pumps,replace smokeexhaust fans With All Fees &Owner 10%Cont.5 ,923,800 ----------2.N e a r Fu tu re 9,134,930 add 15%cont.10,505,170 Main Interior Renovation Public Areas and Back of House. Items New generator,new elec.distribution panels,upgrades to TheatricalSystems,Lighting.Acoustics,Audit.With AII Fees &Owner 10%Cont.17,102,416 ![3.D is ta n t Fu ture -325,000 add 15%cont.373,750--Main /Replace stage floor,small exhaust fans,replace Items !remainder of ground floor storefront doors.New kitchen With All Fees &Owner 10%Cont.608,465 I Page 6 Page 1309 of 1377 Exh ibit C Miami Beach 3.375 C apacity 54 .193 S F Updated 07/01/2024 Blueprint/'studio 100 Building &Fit-Out Costs Trad e C os ts G eneral Co nd ition s and G ene ral Req uireme nts Overhead.Profit &insurance Escalaton through 2025 200 Soft Costs B rand ing Architecture &Engineenng R end ering s Ste &CNvd Projec t M ana ge me nt Kitchen Equipme nt De sig n (TnMark) Ar ch &Produ ction Lighting D esig n (Ba nd t Ltes A cou stic Des ign (K2 &M e tropo ltan » C A Se rv ice s S ig nage /W ayfi nd ing D esig n (TB ) Zon ing Perm it Fee s Testing /Q uality C on trol (T B D ) Reimbursable Expenses 300 FF&E Costs Fed Se ating Box Seating VP Lounge Kitchen &Bar Equipment POS Port able Bars C C TV D ata (W F i &N etwo rk)Systems Office Fumrture Ex terio r Sig nage /Publ ic Art !Wayfndng Interior Art &Decor Adm.nus traton Producton -F F &E Pr od ucton -So ft G ood s Pr odu ction -A ud io &V id eo Sys tems Production -Lightng Total s 35.988.612 $3157 72 5 s 1,627,520 $1.630.954 $42,400,000 s 100.000 $2.200,000 s 25,000 $50 .000 s 860 .000 $50.000 $60 ,000 s 50 .000 s 400.000 s 75.000 $500 000 $50.000 $50,000 s 4,470.000 $160.000 s 370 000 $950.000 $s 78,000 s 80.000 $100 000 $100.000 $75.000 $450.000 s 500,000 s 150.000 s 100.000 $500.,000 $1.,200.000 s 800.000 $5,610.000 Core and Shell Tl FF&E Total S/SF s 19,793.737 s 16.194.875 s $664 s 1.736.749 $1,420.976 s $58 s 895,136 s 732.384 $s $30 $897.025 $733.929 $s 30.10 $23,320,000 $19.080.000 $$782 I $$100.000 s $2 $1,320.000 $880.000 s $41 s 6,250 s 18,750 s $0 $50,000 $$$1 $430.000 $430.000 s $16 $$50.000 $$1 s $60.000 s s 4 $25.000 $25.000 $s 1 $240.000 $160.000 $$7 s s 75,000 s $1 $300.000 $200.,000 s $9 $25.000 $25.000 $s 1 s 25.000 s 25.000 s $1 $2,421,250 $2,048,750 $$82 I s 160.000 $3 $370 000 $7 s 950.000 $18 $78.000 $1 $80.000 s 1 s 100.000 s 2 s 100.000 $2 s 75,000 s 1 s 450.000 $8 s 500 000 $9 s 150.000 s 3 s 100.000 $2 s 500.000 $9 s 1,200.000 s 22 s 800 000 s 15 $$$5,610,000 $104 I 400 Owner Held Contingency Total Capital I s 2.so][·a91·1·31van51so9[$"] s7.zoo.sos][(sso.so[szsaooo»ls6a0999%ls1ass] Page 1310 of 1377 Exhibit D Miami Beach 3.400 Capacity 88.590 SF Updated 06/14/2024 Blueprint /'studio 100 Building &Fit-Out Costs Trace Costs G ener al Contons an d G ener al Feq urrerents Ovread.rot &insu rance Contractor Con tinge ncy 200 Soft Costs Branching Ar chi tec tu re &Engreen ng Hende nnq s Sa e A Cnwl Project Managemen t (LA Ont y int ema t PM Kit chen Equipment Design (TnMa rk rcn &Pr oduc ton Lg nt ng Design (B8and t Ltes» ACOu SC DOesqn K2 5 Metropolitan CA Servo.es Signage.W ayfi nd ing De sign (T B8 ZorigPerrt Fees Testng /Qu aity Control (TB» Reim bu rsa ble Expen se s 300 FFSE Co sts Fud Se atng Bo»Se atnq VIP Lou nge Kit.hen 6 Ba r Equeprren t PO S port able Ba rs C C TV Data £is Netw ork +Systems Orce Fur nrru re Evtenor Sgage'Puc Ar Wahrdng Int:rot An A Deco r Aro ns tr aton Producton £FA £ Production -Sot G ood s Pr oduct ion Auto &Video Syst em s Prod ucton -Lughtg Total 59 .8 11.762 5.299.02 3,789 448 68,900.000 $100.000 $2 400.000 $25.000 s $200.000 $50.000 s 100.000 $90.000 $300.000 $100.000 s 500,000 $150.000 $75 000 s 4,090,000 $70 000 $900.000 S 1.350.000 $60.000 s 120 ,000 $100 000 s 100 000 $75.000 $250.000 $350.000 $75.000 $100.000 s 400.,000 $1.650.000 $600 000s6.200.000 Enablina Works Core and Shel l n FFAE Total $SF $15 4 39 .52 7 $23.300.636 $21 07 1.599 s $675 s 1.367.866 s 2.064 121 $1,866.839 $$60 $978.190 $14 76241 s 1.335.017 $s 43 $$ s 17,790.000 s 26.840,000 s 24,270,000 $$778 I s s $100 000 $$1 $600 000 $960.000 5 840.000 $s 27 $$6.250 $18.750 $$0 $$s s $ $S0.000 s 80.000 $70 000 $s 2 $s s 50.000 s $1 s $$100.000 $$1 $$45.000 $45.000 $s 1 s 75.000 $120.000 s 105.000 $$3 $s $s 100.000 $$1 s 125.000 $200.000 s 175.000 s s 6 $$75.000 $s 75.000 $$2 s $37.500 $37.500 $s 1 s 850 .000 $1,523,750 s 1,716 ,250 $$46 I $70 000 s 1 $900.000 $10 $1 350 000 s 15 $60 000 $1 $120 .000 s 1 $100 .000 $1 s 100.000 s 1 s 75.000 $1 $250 000 $3 $350 000 $4 $75.000 s 1 $100 000 s 1 $400.000 $5 $1,650 000 $19 s 600.000 s 7 s s s $6.200.000 s 70 I 400 Ow ner He ld Con tingen cy Total Capital [ [s 1ass [sviooo[sas.sslssass[iaooooTs83) 87,100,000 I ,_s 20_,soo~,_ooo_+-s __J_1_,200_,_ooo_+-s__28_,600__,ooo_+-s 6_,aoo__,ooo_-+-s 983~ 231/sf 352/st 323st 77 sl Ebling orks Definition -All woris required to get the site ready tor the ore'cons tru ton De molio n of the tenor stru cture.brought back tow the ski.Shorn2 of the extenor skm as pow not suppor ted str utually Th s is done nter ally and extem ally Remfotcem e t of the sm utual oluui o nutates!wttn the sk in facade add mten to schedule and soft costs ass«o uted to thus element works Enabling W orks Cost Im pa ts: De m olitiou:.Total Combined Cost 0f $5914 SF Total Value of $5,611,125 Selective demolition of all tenor fini shes.slab eu grade .complete existing floor assemblies strucnue ou muluple floors H s is a very slow tedious prec ess by l ong and temv t of I floor at a tie Assued str uctur e assem bly is concrete deck on top of steel tramun g. shoring:Total Cost is $86.14 SF a d Iotal Value of $8,173,758 Int Shorng required for the mulnple mnten or tlonng slab as sembly de molmton Int Shoning required of the etstug Ft walls untl new steel str w tun e is stalled It h orn z requ ired for the exustung roo f area un l new stee l str ucture ts installed steel Fram ing Premiums-Total Cost f $69.75sf and Iotal Value of $6,618.578 Stu ucrual Stee l New Iteno r Steel Fame Stru tue -assumed at I5Ib <qft o Inefficien t P o es s Th is will be doe fro tbe upside of the bui ld by usug sma ller pieces butts lul ls so there ts additional labor costs and schedule impacts Setsnc Retrofit Streugthen Exus tng Structure ($121.0I included above, Note Is doe s ot Include any new foun datou ple suppo rt system changes other than the mluled new ottete ptead footmgs Sc hedule and Assoc iated Staffi ng Im pacts Dur to Enabling Mork Abo « Lx teuded Schedule D uranon Inc lud es a 22-month schedule o T s c hetle t-lnget tan yo ut typtal construction Hild o Due to the extenusve ad slows selective de molten.sbonu and new steel substmu tuue tamug th-adds 6 months to tbe typial schedule Page 1311 of 1377 Exhibit E Scope and Cost Comparison GO BOND Scope New Building Renovation Cost of Project $29,100,000.00 $57,700,000.00 $87,100,000.00 Square Feet 88,590 54,193 88,590 Lobby 3,000 SF (approx)2,622 SF 3,358 SF Cost per Square Foot $328.48 $1,064.71 $983.18 Capacity 2,713 3,375 3,400 Number of VIP Boxes No 18 so VIP Lounge Yes Yes (approx.2,850 SF)Yes (approx.4,000 SF) Special Event Spaces N/A No 3,500 saft On-Site Restaurant or Retail space (unfinished)No No 8,000 sqft Artist Dressing Rooms 5 5 6 Artist Ancillary Lounges 2 No 2 Offices 2 6 6 Additional Work Stations 0 0 16 Rev.20240822 Page 1312 of 1377 Page 1 of 2 GO Bond Scope of Work GO BOND Scope New Building Renovation Auditorium furniture and finishes replacement Yes Yes Yes First Floor Lighting and Finish Upgrades (FOH)Yes N/A Yes Second Floor Lighting and Finish Upgrades (FOH)Yes N/A Yes Third Floor Lighting and Finish Upgrades (FOH)Yes N/A Yes Fourth Floor Exit Corridor-Painting and Carpet Replacement (FOH)Yes N/A Yes Repairs to Existing Catwalk Yes N/A Yes Structural Panels at Stage Roof Penthouse +Lapeyre Stair Yes N/A Yes Exterior Window and Door Replacement Yes N/A Yes Exterior Structural Repairs Yes N/A TBD Driveway Redesign and enhanced pedestrian area Yes N/A TBD Basement Lighting and Finish upgrades Yes N/A TBD First Floor Lighting and Finish Upgrades (BOH)Yes N/A Yes Second Floor Lighting and Finish Upgrades (BOH)Yes N/A Yes New Second Floor VIP Area Yes Yes Yes New Commercial Kitchen Yes Yes Yes Acoustical Improvements at Dressing Rooms/Corridors Yes N/A Yes Asbestos,Lead Paint,IAQ Abatement Allowance Yes N/A Yes Freight Elevator renewal Yes N/A Yes Exhaust System renewal Yes N/A Yes Chilled Water Piping renewal Yes N/A Yes HVAC Replacements Yes N/A Yes Electrical Enhancements (including FA allowance)Yes N/A Yes Plumbing Enhancements (facilitywide)Yes N/A Yes Upgrades to Existing Fire Protection System Yes N/A Yes Emergency Lighting renewal Yes N/A Yes Fillmore Miami Beach Exterior Window and Door Replacement Yes N/A Yes Fillmore Restoration of Mermaid Sculpture at Fillmore Miami Beach Yes TBD TBD Theatrical Systems Upgrade Yes Yes Yes New LED Marquee Sign Yes N/A TBD Rev.20240822 Page 1313 of 1377 Page 2 of 2