HomeMy WebLinkAboutResolution 2026-34315RESOLUTION NO. 2026-34315
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, ACCEPTING THE FAVORABLE
RECOMMENDATION OF THE FINANCE AND ECONOMIC RESILIENCY
COMMITTEE AT ITS APRIL 1, 2026 MEETING TO IDENTIFY THE
INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2 STREET, MIAMI BEACH, AS A BUDGET PRIORITY
FOR THE FISCAL YEAR 2027 BUDGET PROCESS.
WHEREAS, the City of Miami Beach ("City") is committed to enhancing the quality and
usability of its public parks, including dog parks, for residents and visitors; and
WHEREAS, the dog park located at 201 2 Street, Miami Beach ("Park") serves as a
popular amenity for pet owners; and
WHEREAS, the Park is open every day from sunrise to sunset, but it currently lacks
lighting, which limits the Park's usability after sunset; and
WHEREAS, on December 17, 2025, the Mayor and City Commission referred an item to
the Finance and Economic Resiliency Committee ("FERC") at the request of Commissioner
Monica Matteo-Salinas to discuss the proposed installation of enhanced amber -colored, solar -
powered tree wrap lights on certain trees at the Park; and
WHEREAS, on April 1, 2026, the FERC transmitted the proposal to install enhanced
lighting at the Park to the City Commission with a favorable recommendation to identify lighting
at the Park as a budget priority for the Fiscal Year 2027 Budget process; and
WHEREAS, the Mayor and City Commission desire to prioritize this proposed
improvement during the Fiscal Year 2027 Budget process.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION
OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby
accept the recommendation of the Finance and Economic Resiliency Committee at its April 1,
2026 meeting to identify the installation of enhanced lighting at the dog park located at 201 2
Street, Miami Beach, as a budget priority for the Fiscal Year 2027 Budget process.
PASSED and ADOPTED this d q day of 101,e_ 2026.
ATTEST:
JUN 2 6 2026 --
Steven Meiner, Mayor
Rafael . Granado, City Clerk
(Sponsored by Commissioner Monica Matteo-Salinas)
APPROVED AS TO
FORM AND LANGUAGE
& FOR EXECUTION
:\P ..........
INCDRP�ORAiED� City Attorney /a Date
�► :C� = bJC
Cy 25 .
Resolutions - C7 P
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Eric Carpenter, City Manager
DATE: June 24, 2026
TITLE: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ACCEPTING THE FAVORABLE RECOMMENDATION
OF THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE AT ITS APRIL 1,
2026 MEETING TO IDENTIFY THE INSTALLATION OF ENHANCED LIGHTING AT
THE DOG PARK LOCATED AT 201 2 STREET, MIAMI BEACH. AS A BUDGET
PRIORITY FOR THE FISCAL YEAR 2027 BUDGET PROCESS.
RECOMMENDATION
Administration recommends that while the City Commission accepts the recommendation from
the Finance and Economic Resiliency Committee ("FERC") for the installation of enhanced
lighting at the dog park located at 201 2nd Street and any associated costs for the project, it also
carefully considers several critical factors that will significantly impact the General Fund budget:
The Commission's December 17, 2025 Resolution The Commission has directed the
Administration to prepare the FY 2027 budget based on the projected rolled -back
millage rate. This directive may necessitate expenditure reductions of up to $25 million
from the current service -level budget before any consideration of enhancements.
Escalating Capital Needs: The City continues to face an increasingly unfunded Capital
Improvement Program, placing additional pressure on long-term financial sustainability.
State -Level Tax Policy Risks The State is contemplating measures to eliminate or
significantly reduce property taxes. Given that 6290 of the General Fund revenue is
derived from property taxes, this poses a substantial risk to the City's fiscal stability.
Additionally, the Parks and Recreation Department has numerous unfunded capital and renewal
and repair projects. While considering new projects, it is important to evaluate those against
existing needs A few current critical capital needs include
Flamingo Park Football Stadium: Artificial turf (Estimated $1,400,000)
Lummus Park: Playground replacement (Estimated $1,320,000)
Normandy Isle Park: Playground replacement ($880,000)
These considerations are essential to ensure that decisions regarding any costs associated with
enhancing the lighting at the dog park on 2nd Street aligns with the City's broader long-term
financial stability and strategic priorities. If the Commission recommends funding the costs to
install enhanced lighting at the dog park on 2nd Street, the Administration recommends it be
considered as part of the FY 2027 budget process.
BACKGROUND/HISTORY
771 of 2591
At the December 17, 2025, City Commission meeting, at the request of Vice Mayor Monica Matteo
Salinas, the Mayor and City Commission referred a discussion item to the Finance and Economic
Resiliency Committee to discuss the installation of enhanced lighting at the dog park located at
201 2nd Street. (Exhibit A)
At the February 20, 2026, Finance and Economic Resiliency Committee ( FERC") meeting, the
item was discussed and the motion passed was for the Department of Parks. Facilities, Fleet and
Beaches to explore more cost effective and environmentally sensitive lighting alternatives and to
return to Committee for further consideration. (Exhibit B)
At the April 1, 2026, Finance and Economic Resiliency Committee meeting, a favorable
recommendation was made to install amber -colored tree wrap lights on three trees in the dog
park at 201 2nd Street.
Our Bark parks are popular and well utilized within the city's parks system. Washington Avenue
Bark Park is open every day from sunrise to sunset, but it currently lacks lighting. Many of our
park users live in multifamily units and rely on this Bark Park to bring their dogs after sunset.
ANALYSIS
The project will consist of providing amber -colored,
three trees at the dog park located at 201 2nd Street
a priority in the FY 2027 budget process.
FISCAL IMPACT STATEMENT
The estimated project cost is $9,807.99.
solar -powered tree wrap lights installed on
. Funding for this project will be considered
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on:
See BIE at: https://www.miamibeachfi.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
The estimated cost for this project is $9,807.99. Funding for this project will be considered a
priority in the FY 2027 budget process. A $1,200.00 budget should be added each year to the
department's operating budget for the repairs and maintenance of this lighting system.
CONCLUSION
The Administration recommends that while the City Commission evaluates installing amber -
colored tree wrap lights on three trees in the dog park at 201 2nd Street. It also carefully considers
the factors identified in the "Recommendation" component of this memo that will significantly
impact the General Fund budget.
772 of 2591
These considerations are essential to ensure that decisions regarding costs by installing amber -
colored tree wrap lights on three trees in the dog park at 201 2nd Street. It also carefully considers
align with the City's broader long-term financial stability and strategic priorities. If the Commission
wishes to pursue this project, it be considered a priority in the FY 2027 budget process.
Attachments:
Exhibit A — Referral Memo from December 17, 2025 Commission Meeting Item C4 Q
Exhibit B — Memo from the February 20, 2026 Finance and Economic Resiliency Committee Item
NB. 15
Exhibit C — Memo from the April 1, 2026 Finance and Economic Resiliency Committee Item NB.
9
Exhibit D — Estimate for solar -powered tree -wrap lights.
Applicable Area
South Beach
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
Yes
Is this item related to a G.O. Bond
Project?
M
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying?
If so, specify the name of lobbyist(s) and principal(s):
Department
Parks, Facilities, Fleet & Beaches
Sponsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Accept Recllnstall Enhanced Lighting at 201 2nd Street Dog Park. (MMS) PFFB
Previous Action (For City Clerk Use Only)
773 of 2591
C4 Q REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTINGAT THE DOG PARK
LOCATED AT 201 2ND STREET.
Applicable Area:
774 of 2591
Committee Referrals - C4 Q
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Commissioner Monica Matteo-Salinas
DATE: December 17, 2025
TITLE: REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
Please place on the December 17, 2025 agenda a referral to the Finance and Economic
Resiliency Committee (FERC) to discuss the installation of enhanced lighting at the dog park
located at 201 2nd Street.
BACKGROUND/HISTORY
The dog park located at 201 2nd Street is a valued recreational space for residents and their pets.
However, concerns have been raised regarding inadequate lighting conditions during early
morning and evening hours, which may impact safety, visibility, and overall usability of the park.
Improved lighting would enhance the experience for park users, increase safety, and support the
City's broader goals of promoting accessible and well -maintained public spaces.
ANALYSIS
The Administration should be prepared to provide an overview of the following to the Committee:
The feasibility and cost of installing enhanced lighting at the dog park located at 201 2nd Street.
Potential funding sources or partnerships to support the installation.
Timeline and implementation considerations.
FISCAL IMPACT STATEMENT
The sponsor of this item requests that the Administration be prepared to address the fiscal impact
of this proposed measure at the City Commission meeting.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on:
See BIE at: https://www.miamibeachfi.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
775 of 2591
CONCLUSION
Applicable Area
Citywide
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
No
Is this item related to a G.O. Bond
Proiect?
No
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
City Attorney
Sponsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Ref. FERC - Discuss Enhanced Lighting at Dog Park at 201 2nd Street. (Matteo-Salinas)
Previous Action (For City Clerk Use Only)
776 of 2591
NB 15. DISCUSSION ON INSTALLATION OF ENHANCED LIGHTINGAT THE DOG
PARK LOCATEDAT 201 2ND STREET.
Applicable Area:
777 of 2591
NEW BUSINESS 15
MIAMI BEACH
COMMITTEE MEMORANDUM
TO: Finance and Economic Resiliency Committee Members
FROM: Eric Carpenter, City Manager
DATE: February 20, 2026
TITLE: DISCUSSION ON INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
The Administration recommends that the Finance and Economic Resiliency Committee ("FERC")
evaluate the installation of enhanced lighting at the dog park located at 201 2nd Street and any
costs associated with making such improvements. Further, the Administration recommends that
while the FERC evaluates installing enhanced lighting at the dog park on 2nd Street, it also
carefully considers several critical factors that will significantly impact the General Fund budget:
1. The Commission's December 17, 2025 Resolution: The Commission has directed the
Administration to prepare the FY 2027 budget based on the projected rolled -back millage rate.
This directive may necessitate expenditure reductions of up to $25 million from the current
service -level budget before any consideration of enhancements.
2. Escalating Capital Needs: The City continues to face an increasingly unfunded Capital
Improvement Program, placing additional pressure on long-term financial sustainability.
3. State -Level Tax Policy Risks: The State is contemplating measures to eliminate or
significantly reduce property taxes. Given that 62% of the General Fund revenue is derived from
property taxes, this poses a substantial risk to the City's fiscal stability.
Additionally, the Department of Parks, Facilities, Fleet and Beaches has numerous unfunded
capital and renewal and repair projects. While considering new projects, it is important to evaluate
those against existing needs. A few current critical capital needs include:
• Flamingo Park Football Stadium: Artificial turf (Estimated $1,400,000)-
• Lummus Park: Playground replacement (Estimated $1,320,000)
• Muss Park: Playground Pour -in -Place safety surface ($200,000)
These considerations are essential to ensure that decisions regarding any costs associated with
enhancing the lighting at the dog park on 2nd Street aligns with the City's broader long-term
financial stability and strategic priorities. Administration recommends if the City Commission
wishes to pursue this project, it be added to the Department's 5-year CIP and evaluated and
prioritized against other needs and that it be part of the FY 2027 budget process.
BACKGROUND/HISTORY
At the December 17, 2025, City Commission meeting, at the request of Vice Mayor Monica Matteo
Salinas, the Mayor and City Commission referred a discussion item to the Finance and Economic
Resiliency Committee to discuss the installation of enhanced lighting at the dog park located at
201 2nd Street. (Exhibit A).
778 of 2591
Our Bark parks are popular and well utilized within the city's parks system. Washington Avenue
Bark Park is open every day from sunrise to sunset, but it currently lacks lighting. Many of our
park users live in multifamily units and rely on this Bark Park to bring their dogs after sunset.
Improved lighting would increase operational hours, enhance the experience for park users,
enhance safety, and support the City's broader goals of promoting accessible, well -maintained
public spaces.
ANALYSIS
The project will consist of providing engineering plans and drawings, permit fees, electrical service
to the park, and installing (6) LED lights mounted on black decorative poles with acorn luminaire.
The estimated cost is $137,584.00.
FISCAL IMPACT STATEMENT
N/A
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
The Business Impact Estimate (BIE) was published on.
See BIE at: https://www.miamibeachfi.gov/city-hall/city-clerk/meetino-notices/
FINANCIAL INFORMATION
The estimated cost for this project is $137,584.00. Funding for this project would be considered
as part of the FY27 budget process.
CONCLUSION
The Administration supports this project and recommends that while the FERC evaluates the
installation of enhanced lighting at the dog park on 2nd Street, it also carefully considers the
factors identified in the "Recommendation" component of this memo that will significantly impact
the General Fund budget.
These considerations are essential to ensure that decisions regarding funding any costs
associated with the installation of enhanced lighting at the dog park on 2nd Street aligns with the
City's broader long-term financial stability and strategic priorities. Further, the Administration
recommends that if the City Commission wishes to pursue this project, that it be added to the
Department's 5-year CIP and that it be evaluated and prioritized against other needs and be
considered as part of the FY 2027 budget process.
Attachments:
Exhibit A — Referral Memo from December 17, 2025 Commission Meeting Item C4 Q
Applicable Area
South Beach
779 of 2591
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
Yes
Is this item related to a G.O. Bond
Proiect?
No
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
Parks, Facilities, Fleet & Beaches
Sponsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Discuss Installation Enhanced Lighting Dog Park at 201 2nd Street (Matteo Salinas)
780 of 2591
C4 Q REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
Applicable Area:
781 of 2591
Committee Referrals - C4 Q
MIAMIBEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Commissioner Monica Matteo-Salinas
DATE: December 17, 2025
TITLE: REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
Please place on the December 17, 2025 agenda a referral to the Finance and Economic
Resiliency Committee (FERC) to discuss the installation of enhanced lighting at the dog park
located at 201 2nd Street.
BACKGROUND/HISTORY
The dog park located at 201 2nd Street is a valued recreational space for residents and their pets.
However, concerns have been raised regarding inadequate lighting conditions during early
morning and evening hours, which may impact safety, visibility, and overall usability of the park.
Improved lighting would enhance the experience for park users, increase safety, and support the
City's broader goals of promoting accessible and well -maintained public spaces.
ANALYSIS
The Administration should be prepared to provide an overview of the following to the Committee:
The feasibility and cost of installing enhanced lighting at the dog park located at 201 2nd Street.
Potential funding sources or partnerships to support the installation.
Timeline and implementation considerations.
FISCAL IMPACT STATEMENT
The sponsor of this item requests that the Administration be prepared to address the fiscal impact
of this proposed measure at the City Commission meeting.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on:
See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
782 of 2591
CONCLUSION
Applicable Area
Citywide
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
No
Is this item related to a G.O. Bond
Proiect?
No
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
City Attorney
Soonsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Ref. FERC - Discuss Enhanced Lighting at Dog Park at 201 2nd Street. (Matteo-Salinas)
Previous Action (For City Clerk Use Only)
783 of 2591
NB 9. DISCUSSION ON INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATEDAT 201 2ND STREET.
Applicable Area:
784 of 2591
NEW BUSINESS 9
MIAMI BEACH
COMMITTEE MEMORANDUM
TO: Finance and Economic Resiliency Committee Members
FROM: Eric Carpenter, City Manager
DATE: April 1, 2026
TITLE: DISCUSSION ON INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
The Administration recommends that the Finance and Economic Resiliency Committee ("FERC")
evaluate the installation of enhanced lighting at the dog park located at 201 2nd Street and any
costs associated with making such improvements. Further, the Administration recommends that
while the FERC evaluates installing enhanced lighting at the dog park on 2nd Street, it also
carefully considers several critical factors that will significantly impact the General Fund budget:
1. The Commission's December 17, 2025 Resolution: The Commission has directed the
Administration to prepare the FY 2027 budget based on the projected rolled -back millage rate.
This directive may necessitate expenditure reductions of up to $25 million from the current
service -level budget before any consideration of enhancements.
2. Escalating Capital Needs: The City continues to face an increasingly unfunded Capital
Improvement Program, placing additional pressure on long-term financial sustainability.
3. State -Level Tax Policy Risks: The State is contemplating measures to eliminate or
significantly reduce property taxes. Given that 62% of the General Fund revenue is derived from
property taxes, this poses a substantial risk to the City's fiscal stability.
These considerations are essential to ensure that decisions regarding any costs associated with
enhancing the lighting at the dog park on 2nd Street aligns with the City's broader long-term
financial stability and strategic priorities. If the Committee recommends funding the costs to install
enhanced lighting at the dog park on 2nd Street, the Administration recommends it be considered
as part of the FY 2027 budget process
BACKGROUND/HISTORY
At the December 17, 2025, City Commission meeting, at the request of Vice Mayor Monica Matteo
Salinas, the Mayor and City Commission referred a discussion item to the Finance and Economic
Resiliency Committee to discuss the installation of enhanced lighting at the dog park located at
201 2nd Street. (Exhibit A)
At the February 20, 2026, Finance and Economic Resiliency Committee ("FERC") meeting, the
item was discussed and the motion passed was for the Department of Parks, Facilities, Fleet and
Beaches to explore more cost effective and environmentally sensitive lighting altematives and to
return to Committee for further consideration. (Exhibit B)
Our Bark parks are popular and well utilized within the city's parks system. Washington Avenue
Bark Park is open every day from sunrise to sunset, but it currently lacks lighting. Many of our
park users live in multifamily units and rely on this Bark Park to bring their dogs after sunset.
Improved lighting would increase operational hours, enhance the experience for park users,
enhance safety, and support the City's broader goals of promoting accessible, well -maintained
785 of 2591
public spaces.
ANALYSIS
The project will consist of providing engineering plans and drawings, permit fees, and electrical
service to the park. The scope of work will bring electrical service into the park and install
underground infrastructure to power the new outlets, and install tree wrap lights, like those
installed on Meridian Avenue from 11th to 15th Street. The estimated cost is $75,630.45.
Approximately half of this expense covers the infrastructure needed to supply power to the park.
Funding for this project will be considered as part of the FY 2027 budget process.
FISCAL IMPACT STATEMENT
The estimated project cost is $75,630.45.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
The Business Impact Estimate (BIE) was published on.
See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
The estimated cost for this project is $75,630.45. Funding for this project will be part of the FY27
budget process.
Additionally, the Parks and Recreation Department has numerous unfunded capital and renewal
and repair projects. While considering new projects, it is important to evaluate those against
existing needs. A few current critical capital needs include:
Flamingo Park Football Stadium: Artificial turf (Estimated $1,400,000)
Lummus Park: Playground replacement (Estimated $1,320,000)
Normandy Isle Park: Playground replacement ($880,000)
Administration recommends if the Committee wishes to pursue this project, it be added to the
department's 5-year CIP and evaluated and prioritized against other needs.
CONCLUSION
The Administration recommends that while the FERC evaluates the installation of enhanced
lighting at the dog park on 2nd Street, it also carefully considers the factors identified in the
"Recommendation" component of this memo that will significantly impact the General Fund
budget.
Attachments:
Exhibit A — Referral Memo from December 17, 2025 Commission Meeting Item C4 Q
Exhibit B — Memo from the February 20, 2026 Finance and Economic Resiliency Committee Item
NB. 15
786 of 2591
Applicable Area
South Beach
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
Yes
Is this item related to a G.O. Bond
Proiect?
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
Parks, Facilities, Fleet & Beaches
Sponsors)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Discuss Installation Enhanced Lighting Dog Park at 201 2nd Street (Matteo Salinas)
787 of 2591
C4 Q REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTINGAT THE DOG PARK
LOCATED AT 201 2ND STREET.
Applicable Area:
788 of 2591
Committee Referrals - C4 Q
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Commissioner Monica Matteo-Salinas
DATE: December 17, 2025
TITLE: REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
Please place on the December 17, 2025 agenda a referral to the Finance and Economic
Resiliency Committee (FERC) to discuss the installation of enhanced lighting at the dog park
located at 201 2nd Street.
BACKGROUND/HISTORY
The dog park located at 201 2nd Street is a valued recreational space for residents and their pets.
However, concerns have been raised regarding inadequate lighting conditions during early
morning and evening hours, which may impact safety, visibility, and overall usability of the park.
Improved lighting would enhance the experience for park users, increase safety, and support the
City's broader goals of promoting accessible and well -maintained public spaces.
The Administration should be prepared to provide an overview of the following to the Committee:
The feasibility and cost of installing enhanced lighting at the dog park located at 201 2nd Street.
Potential funding sources or partnerships to support the installation.
Timeline and implementation considerations.
FISCAL IMPACT STATEMENT
The sponsor of this item requests that the Administration be prepared to address the fiscal impact
of this proposed measure at the City Commission meeting.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on:
See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
789 of 2591
CONCLUSION
Applicable Area
Citywide
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
No
Is this item related to a G.O. Bond
Proiect?
No
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
City Attorney
Sponsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsors)
Condensed Title
Ref. FERC - Discuss Enhanced Lighting at Dog Park at 201 2nd Street. (Matteo-Salinas)
Previous Action (For City Clerk Use Only)
790 of 2591
NB 15. DISCUSSION ON INSTALLATION OF ENHANCED LIGHTINGAT THE DOG
PARK LOCATEDAT 201 2ND STREET.
Applicable Area:
791 of 2591
NEW BUSINESS 15
MIAMI BEACH
COMMITTEE MEMORANDUM
TO: Finance and Economic Resiliency Committee Members
FROM: Eric Carpenter, City Manager
DATE: February 20, 2026
TITLE: DISCUSSION ON INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
The Administration recommends that the Finance and Economic Resiliency Committee ("FERC")
evaluate the installation of enhanced lighting at the dog park located at 201 2nd Street and any
costs associated with making such improvements. Further, the Administration recommends that
while the FERC evaluates installing enhanced lighting at the dog park on 2nd Street, it also
carefully considers several critical factors that will significantly impact the General Fund budget:
1. The Commission's December 17, 2025 Resolution: The Commission has directed the
Administration to prepare the FY 2027 budget based on the projected rolled -back millage rate.
This directive may necessitate expenditure reductions of up to $25 million from the current
service -level budget before any consideration of enhancements.
2. Escalating Capital Needs: The City continues to face an increasingly unfunded Capital
Improvement Program, placing additional pressure on long-term financial sustainability.
3. State -Level Tax Policy Risks: The State is contemplating measures to eliminate or
significantly reduce property taxes. Given that 62% of the General Fund revenue is derived from
property taxes, this poses a substantial risk to the City's fiscal stability.
Additionally, the Department of Parks, Facilities, Fleet and Beaches has numerous unfunded
capital and renewal and repair projects. While considering new projects, it is important to evaluate
those against existing needs. A few current critical capital needs include:
Flamingo Park Football Stadium: Artificial turf (Estimated $1,400,000).
Lummus Park: Playground replacement (Estimated $1,320,000)
Muss Park: Playground Pour -in -Place safety surface ($200,000)
These considerations are essential to ensure that decisions regarding any costs associated with
enhancing the lighting at the dog park on 2nd Street aligns with the City's broader long-term
financial stability and strategic priorities. Administration recommends if the City Commission
wishes to pursue this project, it be added to the Department's 5-year CIP and evaluated and
prioritized against other needs and that it be part of the FY 2027 budget process.
BACKGROUND/HISTORY
At the December 17, 2025, City Commission meeting, at the request of Vice Mayor Monica Matteo
Salinas, the Mayor and City Commission referred a discussion item to the Finance and Economic
Resiliency Committee to discuss the installation of enhanced lighting at the dog park located at
201 2nd Street. (Exhibit A).
792 of 2591
Our Bark parks are popular and well utilized within the city's parks system. Washington Avenue
Bark Park is open every day from sunrise to sunset, but it currently lacks lighting. Many of our
park users live in multifamily units and rely on this Bark Park to bring their dogs after sunset.
Improved lighting would increase operational hours, enhance the experience for park users,
enhance safety, and support the City's broader goals of promoting accessible, well -maintained
public spaces.
ANALYSIS
The project will consist of providing engineering plans and drawings, permit fees, electrical service
to the park, and installing (6) LED lights mounted on black decorative poles with acorn luminaire.
The estimated cost is $137,584.00.
FISCAL IMPACT STATEMENT
N/A
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
The Business Impact Estimate (BIE) was published on.
See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
The estimated cost for this project is $137,584.00. Funding for this project would be considered
as part of the FY27 budget process.
CONCLUSION
The Administration supports this project and recommends that while the FERC evaluates the
installation of enhanced lighting at the dog park on 2nd Street, it also carefully considers the
factors identified in the "Recommendation" component of this memo that will significantly impact
the General Fund budget.
These considerations are essential to ensure that decisions regarding funding any costs
associated with the installation of enhanced lighting at the dog park on 2nd Street aligns with the
City's broader long-term financial stability and strategic priorities. Further, the Administration
recommends that if the City Commission wishes to pursue this project, that it be added to the
Department's 5-year CIP and that it be evaluated and prioritized against other needs and be
considered as part of the FY 2027 budget process.
Attachments:
Exhibit A — Referral Memo from December 17, 2025 Commission Meeting Item C4 Q
Applicable Area
South Beach
793 of 2591
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
Yes
Is this item related to a G.O. Bond
Proiect?
No
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
Parks, Facilities, Fleet 8 Beaches
Sponsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Discuss Installation Enhanced Lighting Dog Park at 201 2nd Street (Matteo Salinas)
794 of 2591
C4 Q REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
Applicable Area:
795 of 2591
Committee Referrals - C4 Q
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Commissioner Monica Matteo-Salinas
DATE: December 17, 2025
TITLE: REFERRAL TO THE FINANCE AND ECONOMIC RESILIENCY COMMITTEE —
DISCUSS INSTALLATION OF ENHANCED LIGHTING AT THE DOG PARK
LOCATED AT 201 2ND STREET.
RECOMMENDATION
Please place on the December 17, 2025 agenda a referral to the Finance and Economic
Resiliency Committee (FERC) to discuss the installation of enhanced lighting at the dog park
located at 201 2nd Street.
BACKGROUND/HISTORY
The dog park located at 201 2nd Street is a valued recreational space for residents and their pets.
However, concerns have been raised regarding inadequate lighting conditions during early
morning and evening hours, which may impact safety, visibility, and overall usability of the park.
Improved lighting would enhance the experience for park users, increase safety, and support the
City's broader goals of promoting accessible and well -maintained public spaces.
ANALYSIS
The Administration should be prepared to provide an overview of the following to the Committee:
The feasibility and cost of installing enhanced lighting at the dog park located at 201 2nd Street.
Potential funding sources or partnerships to support the installation.
Timeline and implementation considerations.
FISCAL IMPACT STATEMENT
The sponsor of this item requests that the Administration be prepared to address the fiscal impact
of this proposed measure at the City Commission meeting.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on:
See BIE at: https://www.miamibeachfi.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
796 of 2591
CONCLUSION
Applicable Area
Citywide
Is this a "Residents Right to Know" item,
pursuant to City Code Section 2-17?
No
Is this item related to a G.O. Bond
Proiect?
M
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481,
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
City Attorney
Sponsor(s)
Commissioner Monica Matteo-Salinas
Co-sponsor(s)
Condensed Title
Ref. FERC - Discuss Enhanced Lighting at Dog Park at 201 2nd Street. (Matteo-Salinas)
Previous Action (For City Clerk Use Only)
797 of 2591
rAN C-IRISfr~ U\j ,
Miami Christmas Lights
14374 Commerce Way
Miami Lakes. FL 33016
Customer Information
City of Miami Beach
Anthony Scalb
1700 corroentio t Center Dr
"am, Beach. FL 33333
Ph. 3o5.604.4824
Lim: Anthony5caMormamibeathf Row
Type your text here...
Estimate
305 908.8000
info@miamichristmastights.com
www. miamichristmoslights. com
Proposal Information
Estimate*: 26 -1391
Fstimate Siiiect City of Miami Bear) - Washington Dog Park arxiLal lighting
Proposal Datc7 May 4. 2026
Lights on Date. May 31. 2026
Term: '. years after execution
Product Details
Price Units Total
1 Area Descriphori Dog Park. Washington and 2nd
1000 1 $ 0.00
25.771505484643292,-80.13447068058831
2 Install solar panel with mount - estmated 3 per tree, number of iig-it stings to determine.
$ 275 78 12 1 3,309.36
3 Install solar compatible low voltage 5mm warm white string lights on 3 large leaf trees.
$ 89,00 63 1 5.607.00
Trees TBD. Ma to albcate 21 lines per tree.
4 Amount paid and billed monthly
1891.63 1 $ 891.63
MCL provides a monthly maintenance warranty for all lights, decorations, and materials, covering rianufacturer defects
and labor defects for as long as the cientt monthly mainterance payments are current The warranty inckiees the
replacement of lights. decorations, materah. and supplies due to normal wear and tear to ensure the display remains
fulty hvnctional The warranty excludes damages or maltunctiom caused by vandalism, rut cords, or intentional or
accidertal danage to lights, decorations- or materials Repairs or replacements for erduded items will be billed to the
client at standard rates for labor and materials. Upon the client's cancellation of the warranty. MCL will •emove all covered
lights. decorations, and materials at its earliest convenience. and no further maintenance services wig be provided. MCL s
liability is limited to repair or replacement of covered items, and the client agrees to promptly, report issues requiring
warranty service. Failure to maintain ct:rent paymerts or unauthorized tampering with the dtspli y will terminate the
warranty immediately.
Sub Total
s 9,807.99
Discount Terms
$ 0.00
Adjustments
$0.00
Grand Total
19.807."
Pay Deposit Now Onli
)!
ne
P'ices include all materials, which are supplied py Miami Christmas Lights and remain the property of Miami Christmas Lghts. instaYaton. maintenance. and removal. Customer is
oily respozs ble to supply adequate power sources_ M Customer is providing any materialthat will be noted it the Notes section..
Miami Christmas Lights carries 13.00O.00C/14,000.000 commercial liability and $1.000,COO workers compensation insurancelro be added as ar additionally insured pleasectick
hsrr.
By signing here. i agree and understands that this Estimate combined with theMiaml Christmas Lights Standard 'erns and Conditions posted at
www.miamichristmaslfights.com/termsandcond tions.pdf of which 1 have read and understand are incorporated by reference hereinbecomes a legally binding contract Miami
Chrlstmas UILtits will not begin any work inril deposit is received.
Date
798 of 2591