HomeMy WebLinkAboutOrdinance 2026-4825ORDINANCE NO. 2026-4825
AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, AMENDING CHAPTER 2 OF THE
CODE OF THE CITY OF MIAMI BEACH, ENTITLED
"ADMINISTRATION," BY AMENDING ARTICLE II, ENTITLED "CITY
COMMISSION," BY AMENDING SECTION 2-18 ENTITLED "STOP THE
PAUSE POLICY" TO ESTABLISH MINIMUM VOTING THRESHOLDS
FOR THE CITY COMMISSION RELATING TO SPECIFIED PROJECTS
AT ADVANCED STAGES OF COMPLETION HAVING AN ESTIMATED
CONSTRUCTION COST ABOVE A STATED THRESHOLD; TO FULLY
INFORM THE PUBLIC OF THE DETAILS AND ADDITIONAL EXPENSE
OF MATERIAL CHANGES TO SUCH PROJECTS; AND PROVIDING
FOR REPEALER, SEVERABILITY, CODIFICATION, AND AN
EFFECTIVE DATE.
WHEREAS, the City of Miami Beach enacted Ordinance No. 2024-4648 on September
21, 2024, establishing voting thresholds for critical infrastructure projects; and
WHEREAS, the City Commission now desires to expand the coverage of the ordinance
to include all capital projects having an estimated construction cost above a stated threshold at
stated points of completion where substantial taxpayer funds have already been expended except
in the case of unforeseen site conditions that materially impact the cost of the project; and
WHEREAS, the City Commission further finds that material changes to increase the scope
of a project could result in significant cost overruns or negate the project entirely, and therefore
should require a higher voting threshold than a simple majority; and
WHEREAS, these amendments will ensure clarity, fiscal responsibility, and continuity in
the execution of capital projects, as well as greater transparency of their costs and consequences;
and
WHEREAS, the City Commission finds that it is prudent to establish a higher threshold of
approval by the Commission and heightened awareness by the public of the anticipated additional
expense to pause, delay, stop, or materially modify capital projects at advanced stages to ensure
continuity, timely completion, and accountability, while allowing for exceptions in the case of
unforeseen site conditions that materially impact the cost of the project, and provided, this policy
shall not in any way limit the City Commission's ability to accept the recommendation of the City
Manager to reject all bids or to take any action the Commission deems necessary to protect the
City's rights under a contract with a design consultant or contractor; and
WHEREAS, the City will ensure robust communications in advance of design and
throughout the project, including public meetings, a project specific web page, a map of active
projects, dedicated Public Information Outreach (PIO) firm, door-to-door distributions, onsite
coordination, and other mechanisms to clarify information and timely address stakeholder
questions and feedback, and
WHEREAS, the 30, 60, and 90-percent design completion points are significant
milestones, and as the design advances, changes become more difficult and costly, and
WHEREAS, the City will utilize robust communications to inform the community about the
nature, process and critical timelines of important design milestones and engage the community
for feedback prior to important design milestones being reached leading up to and including any
action by the City to materially modify the specified projects; and
WHEREAS, the City Commission finds that holding a public project "kick-off' meeting
immediately following execution of the design contract will serve the community well by providing
an opportunity for residents to meet the design consultants and provide feedback at the earliest
phase of project development; and
WHEREAS, such early engagement will assist in the development of the 30% design
documents, allowing community concerns and input to be meaningfully incorporated into the
design process, provided such input remains within the authority and project definition resolved
by the City Commission; and
WHEREAS, establishing such higher thresholds of approval and cost transparency to
pause, delay, stop or materially modify projects will also result in substantial cost savings to
taxpayers.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, AS FOLLOWS:
SECTION 1. Article II of Chapter 2 of the Code of the City Miami Beach is hereby amended to
create Section 2-18 as follows:
CHAPTER 2
ADMINISTRATION
ARTICLE II. CITY COMMISSION
Sec. 2-18. Stop the Pause Policy.
Definitions.
For purposes of this section only:
(a) Capital projects shall include all protects contained in the City's five-year Capital
Improvement Program (CIP).
(b) 30% Design Completion Milestone shall mean the stage at which the overall vision
and main ideas for the project have been developed. At this stage the design will reveal
the prolect's size, shape, and purpose. Deliverables generally include:
(i) Site plan and basic floor plans showing overall layout, adjacencies, and key
dimensions;
(ii) Initial building systems approach (structural concept, preliminary (MEP)
strategies);
(iii) Preliminary architectural concepts (massing, elevations, basic materials):
(iv) Initial code and regulatory analysis identifying major constraints: and
(v) Preliminary cost estimate
(c) 60% Design Completion Milestone shall mean the stage at which drawings and
documents have much more detail, showing how different systems and materials will
come together and how the building will actually function, based on the concept
developed at the 30% level. At 60%, the design has been substantially developed,
enabling detailed cost reconciliation and value engineering decisions. Deliverables
typically include:
Updated architectural drawinas, includina developed plans. elevations. and
building sections:
(ii) Detailed engineering documents, including structural framing plans, MEP
system layouts, and civil/utility design progress.
(iii) Outline specifications expanded to identify all major materials, equipment,
and performance criteria.
(iv) More refined code compliance analysis.
(v) Second phase cost estimate from the Architect (required at each
benchmark).
(d) 90% Design Completion Milestone shall mean documents are nearly complete and
suitable for final cost setting and the start of permitting, including:
Full architectural and enaineerina construction drawinas. nearina final
coordination level.
(ii) Final technical specifications covering all divisions.
(iii) Integrated MEP, structural, civil, landscape, and specialty systems with
minimal outstanding decisions.
(iv) Quality control and interdisciplinary coordination completed, with only
minor adjustments anticipated.
(v) 90% cost estimate (A/E) supporting preparation of the City's bid documents
or the CM's Guaranteed Maximum Price ("GMP").
2) Public Outreach Reauirements
(a.) Immediately following execution of the design contract for any capital project
subject to this section, the City shall hold a public "project kick-off' meeting for the
purpose of introducing the design consultants, presenting the scope and objectives
of the project, and obtaining community feedback. Input received at this meeting
shall be considered in the development of the 30% Design Completion Milestone
documents, to the extent such input remains within the authority and project
definition resolved by the City Commission.
(b.) Once a project reaches the 30% Design Completion Milestone, the City shall hold
a public meeting to present the preliminary proiect concepts and design, prior to
presentations to Design Review Board or Historic Preservation Board.
3 Votinq Requirements to Pause, Delay, Stop or Materially Modify Capital Projects.
A 5/7th vote of the city commission shall be required before taking any action that
has the effect of pausing, delaying, stopping, or materially modifying (including,
without limitation, material modifications increasing or decreasing the proiect
scope) a capital proiect having an estimated construction cost of $1,000,000 or
more that has reached or exceeded the 60% Design Completion Milestone.
A 6/7th vote of the city commission shall be required before taking any action that
has the effect of pausing, delaying, stopping, or materially modifying (including,
without limitation, material modifications increasing or decreasing the proiect
scope) a capital proiect having an estimated construction cost of $1,000,000 or
more that has reached or exceeded the 90% Design Completion Milestone and
has obtained all required permits necessary for commencement of construction.
In connection with any vote taken by the City Commission pursuant to subsections
(a) or (b), a detailed estimate of additional costs expected to be incurred due to
any pause, delay, stop, or material modification shall be included in any public
information provided by the City prior to the vote, and the amount of such estimate
shall be stated in the text of any resolution for approval of same.
Notwithstanding subsections (a) and (b), only a 4/7th vote shall be required for the
city commission to take such action in the event of unforeseen site conditions that
impact the cost of construction and provided, the provisions of this section shall
not in any way limit the commission's ability, on a 4/7th vote, to accept the
recommendation of the city manager to reject all bids, to value engineer a proiect
to reduce costs if it is more than 10% over budget, or to take any action the
commission deems necessary to protect the city's rights under a contract with a
design consultant or contractor.
SECTION 2. REPEALER.
All ordinances or parts of ordinances in conflict herewith be and the same are hereby
repealed.
SECTION 3. SEVERABILITY.
If any section, subsection, clause or provision of this Ordinance is held invalid, the
remainder shall not be affected by such invalidity.
SECTION 4. CODIFICATION.
It is the intention of the Mayor and City Commission of the City of Miami Beach, and it is
hereby ordained that the provisions of this Ordinance shall become and be made part of the Code
of the City of Miami Beach, Florida. The sections of this Ordinance may be renumbered or
relettered to accomplish such intention, and the word 'ordinance" may be changed to "section,"
"article," or other appropriate word.
SECTION 5. EFFECTIVE DATE.
This Ordinance shall take effect on the day of 4111, , 2026.
PASSED AND ADOPTED this ay day of 774 *P— 2026. or
ATTEST:
JUN 2 6 2026
Rafael E. Granado, City Clerk
(Sponsored by Commissioner Alex J. Fernandez)
Steven Meiner, Mayor
Underline denotes additions
StFikethmugh denotes deletions
Double underline denotes additions on second reading
APPROVED AS TO
FORM & LANGUAGE
& F CUTION 17
City Attorney ;M Date
Ordinances - R5 O
MIAMI BEACH
COMMISSION MEMORANDUM
TO Honorable Mayor and Members of the City Commission
FROM: City Attorney Ricardo J. Dopico
DATE: June 24, 2026 9 55 a m. Second Reading Public Hearing
TITLE: AN ORDINANCE OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, AMENDING CHAPTER 2 OF THE CODE OF THE CITY
OF MIAMI BEACH, ENTITLED "ADMINISTRATION," BY AMENDING ARTICLE II,
ENTITLED CITY COMMISSION." BY AMENDING SECTION 2-18 ENTITLED
"STOP THE PAUSE POLICY" TO ESTABLISH MINIMUM VOTING THRESHOLDS
FOR THE CITY COMMISSION RELATING TO SPECIFIED PROJECTS AT
ADVANCED STAGES OF COMPLETION HAVING AN ESTIMATED
CONSTRUCTION COST ABOVE A STATED THRESHOLD, AND PROVIDING FOR
REPEALER, SEVERABILITY. CODIFICATION, AND AN EFFECTIVE DATE.
RECOMMENDATION
BACKGROUND/HISTORY
ANALYSIS
The City of Miami Beach enacted Ordinance No. 2024-4648 on September 21, 2024, establishing
voting thresholds for critical infrastructure projects.
The sponsor of this proposed Ordinance, Commissioner Alex Fernandez, now desires to expand
the coverage of the ordinance to include all capital projects having an estimated construction cost
above a stated threshold at stated points of completion where substantial taxpayer funds have
already been expended except in the case of unforeseen site conditions that materially impact
the cost of the project.
The sponsor contends that material changes to increase the scope of a project could result in
significant cost overruns or negate the project entirely, and therefore should require a higher
voting threshold than a simple majority.
If adopted, the proposed Ordinance would require that (with designated exceptions)
(1.) A 5/7th_vot_e of the city commission shall be required before takina anv action that
has the effect of pausing, delaying, stopping. or materially modifying (including,
without limitation, material modifications increasing or decreasing the project
scope) a capital project having an estimated construction cost of $1 000 000 or
more that is at least at 60% design completion.
(2.) A 6/7th vote of the city commission shall be required before taking any action that
has the effect of pausing, delaying, stopping or materially modifying (including
without limitation, material modifications increasing or decreasing the project
1131 of 2591
scope) a capital project having an estimated construction cost of $1,000,000 or
more that is at least at 90% design completion and has obtained all required
permits necessary for commencement of construction.
(3.) Notwithstanding subsections (a) and (b), only a 4/7th vote shall be required for the
city commission to take such action in the event of unforeseen site conditions that
impact the cost of construction and provided, the provisions of this section shall
not in any way limit the commission's ability, on a 4/7th vote, to accept the
recommendation of the city manager to reject all bids, to value engineer a project
to reduce costs if it is more than 10% over budget, or to take any action the
commission deems necessary to protect the city's rights under a contract with a
design consultant or contractor.
The City's General Obligation Bond Oversight Committee voted unanimously, at its January 22,
2026 meeting, to recommend enactment of this Ordinance, as -written.
SECOND READING AMENDMENTS
The second reading of this Ordinance includes enhanced public outreach standards to ensure
early and meaningful community involvement in capital projects. These updates strengthen the
requirement for robust communication efforts before major design milestones, particularly prior to
completion of the 30% design phase. As part of these improvements, the sponsor of the item met
with the Neighborhood Resiliency Projects Advisory Committee to identify more effective methods
for reaching residents early in the process. This collaboration focused on ensuring that the
community is well-informed and supportive of the project concepts before the 30% design
milestone is finalized, reinforcing the City's commitment to transparency, engagement, and
proactive consensus -building.
FISCAL IMPACT STATEMENT
0M
Does this Ordinance require a Business Impact Estimate? Yes
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on: 3/4/2026
See BIE at: hops://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/
FINANCIAL INFORMATION
CONCLUSION
Applicable Area
Citywide
Is this a "Residents Right to Know" item, Is this item related to a G.O. Bond
pursuant to City Code Section 2-17? Project?
1132 of 2591
Yes
Yes
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec 2-481
includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
City Attorney
Sponsor(s)
Commissioner Alex Fernandez
Co-sponsor(s)
Condensed Title
9:55 a.m. 2nd Rdg, Expand Stop the Pause Ordinance. (Fernandez) CA
Previous Action (For City Clerk Use Only)
Continued from 5/20/2026 - R5 N; Continued from 4/22/2026 - R5 K; Continued from 3/18/2026
- R5 G; First Reading Public Hearing on 2/25/2026 - R5 S; Not reached on 2/5/2026 - R5 AA
1133 of 2591