Loading...
HomeMy WebLinkAboutAmendment No. 1 to the Contract between the CMB and Ric-Man International, Inc.DOW5ign Envelope ID: D03792D9-F70681AU832C-BFFEBBDEOADA Zo S7 3 1 C,d S_ AMENDMENT NO. 1 JUL - 6 2026 TO THE CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND RIC-MAN INTERNATIONAL, INC. This Amendment No. 1 (the "Amendment") to Contract No. 2024-016-01 dated as of March 26, 2024 (the "Agreement"), by and between the City of Miami Beach, Florida, a municipal corporation organized and existing under the laws of the Slate of Florida (the "City") having its principal place of business at 1700 Convention Center Drive, Miami Beach, Florida 33139. and Ric -Man International, Inc., a Florida corporation (the "Contractor'), having its principal place of business at 1545 NW 27th Avenue, Pompano Beach, Florida 33069, is entered into this _ day of 2026, and effective as of December 17, 2025 (the "Effective Date"). All defined s u not defined herein shall have the meaning set forth in the Agreement. RECITALS WHEREAS, on January 31, 2024, the Mayor and City Commission adopted a resolution approving the award of Invitation to Bid (ITB) 2024-016-LB Force Main Canal Crossing Replacement at Pine Tree Drive; WHEREAS, on March 26. 2024, the City and Contractor executed the Agreement with respect to the force mains canal crossing replacement at Pine Tree Drive, which services include sewer force main replacements; WHEREAS, construction activities have been underway since December 2024, and the Project is currently over 80 percent complete; WHEREAS, during construction, Contractor encountered unforeseen ch3llenges such as unanticipated permitting delays and significant discrepancies between field conditions and the conditions documented in the record drawings; WHEREAS, these discrepancies included undocumented utility conflicts and one of the existing force mains being significantly deeper than identified in the contract documents, triggering constructability concerns that led to a modification in scope, requiring additional labor and materials; WHEREAS, moreover, the age of the City's existing sewer infrastructure presents challenges regarding the reliability of the existing isolation valves in the vicinity of the Project Site, including the inability to operate the CiKs existing sewer system valves; WHEREAS, this has resulted in the development of a bypass and isolation plan that includes additional line stops from those anticipated in the original design; WHEREAS, accordingly, a modification to the scope is now critical for the Project's completion; WHEREAS, Contractor's proposal, herein referred to as Exhibit A, represents the amounts and scope pursuant to the information provided by the City and known as of September 24, 2025; Dacusgn EnveWe ID: DD3792D&F70"l AD432C-BFFEeeDE9ADA WHEREAS, on December 17, 2025, the Mayor and City Commission adopted Resolution No. 2025-34005, authorizing the City Manager and City Clerk to amend the Agreement to provide for the fumishment and installation of a sanitary sewer bypass system and additional 30-inch ductile iron pipe, located at the intersection of Pine Tree Drive and West 51 at Street, as well as fittings and appurtenances needed to complete the Project, in the not -to - exceed amount of $1,232,270.78, increasing the total Contract Price from $5,189,255.50 to $6,421,526.28; and WHEREAS, the Contract Time will increase by thirty (30) days. NOW THEREFORE, in consideration of the mutual promises and conditions contained herein, and other good and valuable consideration, the sufficiency of which is hereby acknowledged, the City and Contractor hereby agree to amend the Agreement as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as part of this Amendment. 2. MODIFICATIONS. The Agreement is hereby amended (deleted items straok thereof and inserted items underlined) as follows: (a) The Agreement is hereby amended to include the additional scope of work described in Exhibit A, attached hereto and incorporated herein. The Contractor shall perform all work, furnish all materials, and provide all labor, equipment, and incidentals necessary to complete the additional work as set forth in Exhibit A, in accordance with the terms and conditions of the Agreement. (b) The Agreement is hereby amended to increase the Contract Time by an additional thirty (30) days. The Section titled 'Contract Time and Schedule' on page 2 of the Agreement is hereby deleted in its entirety and replaced with the following: Contract Time and Schedule Days for Substantial Completion: 485 calendar days Days for Final Completion: 25 calendar days (c) The Agreement is hereby amended to increase the Contract Price by the not -to - exceed amount of $1,232,270.78. from $5,189,255.50 to $6,421,526.28, The project budget on page 1 of the Agreement is hereby deleted in its entirety and replaced with the following: Total Base Bid + Indemnification $4,528,505.00 Total Permit Allowance Account $84,000.00 Total Off -Duty Police Officer Allowance $15,000.00 Total Flow Management During Construction Allowance $90,000.00 Total Alternate Items (if applicable) NONE Original Owner's Contingency $471,750.50 Amendment No. 1, Additional Scope of Work $1,120,246.16 Amendment No. 1, Additional Owner's Contingency $112,024.62 Contract Price $6,421,526.28 3. CONTRACTOR'S ACKNQW EDGMENT AND RELEASE, The amount and time change designated herein are the maximum agreed to by both the City and Contractor Dowsign Envelops ID: DD3792D 0681AD-8=-BFFEBBDEOADA for this Amendment. Contractor attests that the adjustment provided herein is reasonable, and constitutes compensation in full for all costs, claims, markup and expenses, direct or indirect, attributable to this or any other prior amendments or Change Orders, including but not limited to compensation in full foranydelays, acceleration, orloss of efficiency encountered by Contractor in the performance of the Work through the date of this Amendment, and for the performance of this and any prioramendments or Change Orders by or before the date of Substantial Completion. In consideration of the compensation and time in this Amendment, Contractor hereby releases the City from all Claims, demands or causes of action arising out of the transactions, events and occurrences giving rise to this Amendment. This written Amendment is the entire agreement between the City and Contractor with respect to this modification of the Agreement. No other agreements or modifications shall apply to this Amendment unless expressly provided herein. For the avoidance of doubt, the City and Contractor acknowledge that Contractor has submitted the following seven (7) written change order requests (the "Pending COS"): Change Order #9 (February 23, 2026), Change Order #10 (February 25, 2026), Change Order #11 (February 25, 2026). Change Order #12 (March 11, 2026), Change Order #13 (March 11, 2026), Change Order #14 (March 11, 2026), and Change Order #15 (April 7, 2026). Only to the extent the condition(s) giving rise to the Pending COS were not known to the Contractor prior to the Effective Date, the foregoing release shall not be deemed to include the Pending COS. This clarification does not constitute, and shall not be construed as: (i) City approval or acceptance of any one of the Pending COS; (ii) a determination by the City of Contractor's entitlement to any additional time or compensation; (III) a commitment on behalf of the City to negotiate, settle or grant any additional time or compensations; (iv) a waiver of any City fights, defenses, or objections to any of the Pending COS; (v) a limitation on the City's right to deny, modify, negotiate or condition approval of any Pending CO in accordance with the terms of the Agreement; or (vi) a waiver of any requirement for the approval of the Mayor and City Commission. 4. RATIFICATION. Except as amended herein, all other terms and conditions of the Agreement shall remain unchanged and in full force and effect. In the event there is a conflict between the provisions of this Amendment and the Agreement, the provisions of this Amendment shall govern. [SIGNATURE PAGE FOLLOWS] Do sign EnvelW 10: DD3792D9-F70541ADd32C-BFFEBBDEOADA IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed by their appropriate officials, as of the date first entered above. FOR CITY: ATTES Rafael E. Granado, City Clerk JUL - 6 2026 Date FOR SUB -RECIPIENT: ATTEST: CAI, L�h Witness Signature Andres G. Diaz Print Name 6/171202619:39 AM EDT CITY OF MIAMI BEACH, FLORIDA By: Eric T. Carpentef City Manager t i, RIC-MAN INTERNATIONAL, INC. By: Michael Jankowski / President Print NamelTitle APPROVED AS TO FORM & LANGUAGE REION 4./t,41 City Attorney ery Date Dowsgn Envelope ID: DD3792D9-F705-81AD-B32G FFEBBDEOADA EXHIBIT A ADDITIONAL SCOPE OF WORK (to In attached) Dowsign Envelope ID'. DD3792D9-F705 1AD-832C-l3FFEBBDEOADA 4/"RIC .�3AN INTERNATIO �'AL, INC. �/, GENERAL wrrraACToa 40* 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone:(954)426-1D42Fax.(954)426-0717 2/28/2025 Letter No. 001 Raul Cabrera Project Manager City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Re: 30-INCH PARALLEL FORCE MAINS CANAL CROSSING REPLACEMENT ALONG PINE TREE DRIVE (UNDER FLAMINGO WATERWAY) Contract #: 24-016-01 Pipe Storage Dear Mr. Cabrera Ric -Man International requests to bill for the storage fee of the HDPE pipe for the Directional Drill regarding the City 30" Parallel Force mains Canal Crossing Project through the Contingency Line Item in Pay Application #4. In an effort to minimize residents' complaints, The City decided to delay pipe delivery and not obstruct traffic during Art Basel. Therefore, The City opted for an increase in storage fees for the manufacturer to hold the pipe in lieu of double handling the material. See attached email and Invoices for Backup Documentation_ If you require any additional information, please let us know. Best Regards, Andres G. Diaz, PE/CGC General Manager Cc: Jeff Crews Enclosed: Email Backup Cindy Arevalo Invoices Matt LePera, PE 1802 of 3458 Dmusign Envelope ID: DD3792D&F705-91ADb32C-BFFEBBDEOADA a Outlook RE: 24-MBFM Pine Tree Drive (SO #: 09072844) From Matt Volz <Man Volz@isco-pipe.comI Date Thu 11/7/2024 10:58 AM To Bryan Fletcher <BryanTIetcher@isco-pipe.com>; Michael Jankowski <michaelj@ric-man.us> Cc lake Watterworth <jakew@ric-manus>; Steve Herp <Steve.Herp@isco-pipe.com>; 24-MBFM <24-MBFM@nc- man.us> Morning Michael, Touched base with the manufacturer & got the info for how the storage fees work, see below. They charge a 5% storage fee added to the current pipe price per toot. The new pipe price with the storage fee included becomes the current price for the next month & so on. Below is a chart of what that would look like, this is for the first 3 months. Please keep in mind that the ship date for all pipe is Friday 11/15 so if we are able to get everything shipped by that date, then storage fees will not apply. Any pipe not shipped would dinged with the storage fees to the pipe price. Storage Fees Current PI a Price Sto a Fee New Pipe Price Month 1 $MOO 5% $20710 Month2 $107.30 5% IW-46 Month 3 $112.46 5% stllgg Thanks, Matt Volz TSM Lead — East/Southeast/FL ISCO Industries, Inc. 100 Witherspoon St., 2West, Louisville, KY, 40202 Office: 502-714-5326 From: Bryan Fletcher <Bryan.Fletcher@isco-pipe.com> Sent: Wednesday, November 6, 2024 6:59 PM To: Michael Jankowski <michaelj@ric-man.us> Cc: Jake Watterworth <jakew@ric-man.uS>; Matt Volz <Matt.VDlz@isco-pipe.com>; Steve Herp <Steve.Herp@isco- pipe.com>; 24-MBFM <24-MBFM@ric-man.us> Subject: Re: 24-MBFM Pine Tree Drive (SO #: D9072844) Matt is finding out for us. Bryan Fletcher Sr. Regional Sales Manager ISCO Industries 4072868258 1803 of 3458 Dacaagn Envelope ID: DD3792DB 05d1AD432C-BFFEBBDE0ADA 9Nm srw Te: 92]&15 CITY DFMIPMI BEACH SCO• IWWITHERSRPOONSTW2wEST CROSSING REPLACEMENAT� LOUISVILLE. MI4 22I 6 PINETREEO9IVE WAMI BEACH, FL ]Jlo) QUOtatiOn b Ym a 0 fi 320 rz4 Pn n 10 en erne D pmer all CITY OF MIAMI BEACH ory RUFFIN MILKY arm PREPAID AND ALLOW a as FL EAST Beal Way B'nal 11e.BM Fpa wine Leal Croatia Raa4onnwl. RIw Tne ft. A Or, BM Product Dasrlptlan Eeca Exlelded BID REM 2. 30" HOPE PIPE AND FITTINGS FOR SEWER FORCE YAM 1 1A00 FT 10301398' 30' DR 13.5 DIPS PIPE AVINA HOPE GREEN STRIPE 102.00 193,600.DO -50' I,omb- 2 4 EA WW9999' 30' DR 13.5 DIPS MJ ADAPTER W/BE STIFFENER 2445.00 9.780.00 3 4 EA 53300025' 30' ACCESSORY KIT 0110 FOR W ADAPTER W/ GASKET 1315.00 5 2SD00 4 4 EA 53300026' 30' IPS I DIPS GLAND RING FOR MJ ADAPTER 335.00 1,34000 5 5.000 EA 53129999' 12GA ENS CCS TRACER WIRE GREEN X 2500' ROLLS TIM 1,660.00 SYetobl 20i'mo0 NOTES 'DELIVERED PRICING TO MIAW BEACH, FL' • Der. w11sarwlna mr- ISCO Standard Tern and Conditions apply. Plum visit htip!IA W W.iac"ipe.com/tennsand�ndidone.aapx Merchandise Total Tasm 1 FrNSMt2l Ouob TeW 201,630.00 12,147.80 0.00 I US 213,m.80 1 Sales I" MIT M charged MWd on the Whip to address at the time of invoice a mere B M tax Wrtiecete on Me. Accepted By: 2 FrapM amount in This an esemab only. Ac1Va1 freight bans and Printed Name: chChargess will b determined ined at to fime fine abler Is p1xIN1 Date: �W w, I "Ish. ���I�.WY 1�eYp0.�C� RT m6p2 y0� W1NDfAlrllf0 Docusign Envelope ID: DD3792D9-F70SBIAD4NC-BFFEBBDE0ADA vowwm�\ M Te: Order Confirmation ' CO* I=13 RIC-MAN WTERNATNNUL, INC. t5A5 NW 27 AVE POMPANO BEACH. FL 33p69 RIC,MAN INTERNATIONAL INC CITVOFMHWMAGHRE-e10EOR0 MAINS CANAL CROSSING REPUCEME MIAMI REACH, FL WIM JAKE WATTERWORTH 1164-426-IM2 Order Number 090725" Order Date 11/15/24 .,. Page IOf1 Baa aY MET ttms um x4NBPM3 PREPAID AND ALLOW CRUP er MATT Vq2 n NMBFM PWF TRF - - �, relghfia7l6c—T��R(7� l a 01Y LIM Product Daaarlplbn Eau Emended BID ITEM 2 - 30' HOPE PIPE AND FITTINGS FOR SEWER FORCE MAIN (1) Ia5D6 FT 10301398- 3P DR 13.5 DIPS PIPE AAWA HDPE GREEN STRIPE 107,10 198,135.00 -50'Finn- PRICING INCLUDES 5%STO AGE FEE FOR 11/15 IV16 (2) 4 EA 53309999' N- DR 13S DIPS MJ ADAPTER W/SS STIFFENER 2"S.00 978000 (3) 4 EA 53300025- 30' ACCESSORY KIT C110 FOR W ADAPTER W/ GASKET 1315 M 5.280.00 (4) 4 EA S3300026' 30' IPS / DIPS GLAND RING FOR W ADAPTER 335 00 1.340.00 (5) 2500 EA 53129999' 12GA ENS-CCS TRACER WIRE GREEN X 250D ROLLS 033 825.00 NOTES 'DELIVERED PRICING TO MIAMI BEACH. FL' - Mnoua Nen-srockmg M1am ISCO Standard Terms and CdndiOons apply. Pleue visit hltps:/MWW.loco-plps.comllerm"ndcondltionmmpa MarchaT Taut Tull) ShlppinWHaTtdlne(2) Great TIMM 215,340.00 12,970.40 0.00 us $ 220,310.40 1 Saus tax .11 be charged based on Me ship,10 address at ewe t,me Of In,,we H there K 110 W D Mfi ate on file. Accepted e cep y' Printed Name: x ACNal shippingMaMling cfla,9as wio be deMrmir at the ome W ahlpm rit Date' 100 wrmEllaPOMN 51 - LwenI.I. AT w[ue aoaloltsa 7w Docusign Envelope ID: DD3792D9-F705-81AD-802GBFFEBBDE0ADA die RIGINIAN INTERNATIONAL, INC. GENERAL CONTRACTORS 1545127th Avenue Pompano Beach, Florida 33073 Phone:(954)426-1042- Fax'(954)426-0717 Breakdown of Costs Project: Pine Tree Drive FM Date: 03121125 Description: Unforeseen Condition Existing pipe at Increased depth - Part A Grand Total: S - 153,274.95 LABOR COSTS C Regular Over Time CLASSIFICATION Oty Mrs Rate Sub Totals H7s Rate Sub Totals Totals SUPERINTENDENT 1 44.00 163.92 7,21248 - 245.88 0.00 7,212.48 PROJECT MANAGER 1 1700 13804 2,34668 - 207.06 0.00 2,346.68 FOREMAN 1 6400 69.02 4417,28 - 103.53 000 4,41728 OPERATOR EXCAVATOR 1 6400 5B 94 3,64416 1600 85,41 1, 36656 5,01072 OPERATOR LOADER 1 64.00 42.27 2,705.28 1600 6341 1,014.56 3719.84 PIPE LAVER 2 6400 4486 5,742.08 16.00 67.29 2,153.28 7,895.36 LABORER 2 EA 00 2761 3,53408 1600 4142 132544 4,859.52 TRUCK DRIVER 1 6400 3856 2467.84 1600 5784 925 d4 3,393.28 Subtotal: 38,855. 16 contractors Fee 10% 3,885.52 Subtotal 42,740.68 Labor Total: 42,74111 MATERIAL COSTS SIZE DESCRIPTION CITY Unit Price Totals � Ilni� P ,.. Tot, 1, Rock #57 Slone 20 TON 860 17200 Subtotal 172 00 Sales Tax @ 7.50% 12.90 Subtotal'. 184.90 Contractors Fee 1000% 18.49 EQUIPMENT 3 7 MT 1 80 128.05 10,244 00 1KETS i I , 1 80 8�32 565.60 190HP 1 80 74�84 5,98720 Tri-Axel Dump Truck 1 80 5113 4,09040 PICKUPS �1 SUPERINTENDENT TRUCK 00 44 13.90 611,60 PROJECT MANAGER TRUCK 1.00 6 1250 75.00 '/.Ton Single Cab 2 80 12.35 1, 976.00 1 Ton Utility P-U 1 80 12.35 98800 Pu P F ,.I .. Nell Point Pump 10"' 1 80 41 71 3,336�80 -leader Pip.(20') 15 80 5.12 6,14400 Discharge Pipe (20') 30 80 2.26 5,42400 )et Pump 6" 1 80 40.37 3.22960 A_RMI-Claim Form -Increased Depth- xSrh 1806 of 3458 719, 5 9' 7 60 16. 161 6:. 1 45 116 D0 781 60 32 91 2 632 80 8 620 00 103 27 8.261 60 12 352 IN: 4296 1,89112 2,50212 42.98 257.88 332.88 2305 3,688 00 5.664 00 1742 1, 393.60 236160 2170 1,736. DO 5,072.60 008 9600 6,24000 008 19200 561600 1700 1.360.00 4.589.60 PAGE 1 OF 2 Doasi9n Emebye ID: DD379209-F70MIADE32C43FFEBSDE0ADA Jet Hose(50'j 1 80 4.37 34980 008 _ _ 640 _ 35600 "Mud, Purpose Pump 1 24 23.69 568.56 1000 2Q 00 60656 8" Suction Hose (25') 2 24 3.87 18576 0.10 4,80 19056 6' Discharge Hose (50') 4 24 2.35 225.60 0.10 9.60 23520 SAFETY t7., 5,m lma• .. .. Trench Be. 8' x 6' x 24' 1 60 58 87 4709,60 1.51 120.80 4,83040 Trench Shields Plates 10x20 10 80 23.21 48,568.00 0.26 208.00 18,77600 Ladder 80 545 43600 008 640 442401 OTHER - -.I I ,.is _.. _.,. Small Tools 1 80 4440 3,55200 4.60 368.00 3,92000 Equipment Total: 99,873.92 Contractors Fee 10.00% 9,987.39 Equipment Total: 109,861.31 SUBCONTRACTOR DESCRIPTION OTY Unit Price Totals Portable San. Facilities 13 EiD 485 6305 TRAFFIC MAINTENANCE Oty Unit Rate Oty Unit Totals Bamcades/Drums 200 EA 0.14 8 Days 224,00 Signs Large 8 EA 029 8 Days 18.56 Arm. Board 2 EA 7.50 8 Days 120.00 Type H Corrals 4 EA D.35 8 Days 11 20 Subcontractor Total: 436.81 Subtotal. 436.81 Contractors Fee 7.50% 32.7f SUMMARY OF COSTS Labor otal 42740.68 Materials Total 20339 Equipment Total. 109.66131 Subcontractors Total. 469.57 57,274.95 Grand Total: 153,274.95 A_RMI-Claim Form -Increased Depth-.xlsm PAGE 2 OF 2 1807 of 3458 Time Extension Requested B Days Sub Total: 1 Docusign Envelope ID: DD3792D9-F705­B1A0-632C-13FFEB13DEOADA RIC-vIA"N' INTERNATIONAL, INC. GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone. (954) 426-1042 Fax (954) 426-0717 3/21/2025 Letter No. 2 Raul Cabrera Project Manager City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Re: 30-INCH PARALLEL FORCE MAINS CANAL CROSSING REPLACEMENT ALONG PINE TREE DRIVE (UNDER FLAMINGO WATERWAY) Contract #. 24-016-01 Unforeseen Condition Existing Pipe at Increased Depth - Part A Dear Mr. Cabrera, Ric -Man International respectfully requests a change order for additional work required to complete the city project, resulting from unforeseen conditions related to the existing 30" force mains. The project was originally bid based on design plans that indicated the force main would be at a depth of 4 feet, as indicated in the provided documents. However, upon further inspection, it has been determined that the pipe is, in fact, located at an average depth of 8 feet on the north end, particularly at the points of connection. In addition to the increased depth, we encountered unforeseen conflicts, including a 6" sewer line, a 2" service line, and a gas line on the southern portion of the project. These conditions necessitate significant additional labor and adjustments to complete the installation as planned. The cost included herein, is solely up to the new proposed plug valve locations. Below is a brief overview of some of the extra work required, along with an attached Change Order detailing the breakdown of labor, materials, and equipment costs: • Dewatering of the entire northern pit, with an increased volume and the need for additional pumps. • Additional shoring to tie into the existing force main at a greater depth. • Additional wellpoint and exploration to locate the pipe and connection points, as the existing pipe is not positioned as indicated in the plans. • Cutting, modifying, and refusing HDPE adapters to address unforeseen conflicts. • Deflecting the 30" HDPE on the project's south end due to unforeseen conflicts. • Additional labor and material to cut and replace unforeseen conflicts. Additional MOT equipment and rentals (extra days). Once we have completed the exploratory work and confirmed the temporary well has the capacity necessary to dewater the deeper excavation, we will present the anticipated cost to complete the tie-in. 1808 of 3458 Dowsign Envelope ID: DD3792De-F70"1A 32G8FFEBBDE0ADA dew RIC-MAN INTERNATIONAL, INC. GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone: (954) 426-1042 Fax: (954)426.0717 We appreciate your understanding and look forward to your approval of the attached change order to proceed with the necessary adjustments. Please don't hest'atR to reach out if you require further details or clarification. This change order is based solely on direct cost elements such as labor, material, and stipulated markups and does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead, acceleration, or impact costs that are impossible to assess at the present time. Right is expressly reserved to claim for any and all time as well as these related items of compensable costs prior to the final settlement of this Contract. Best Regards, Jake Watterworth Project Manager J4k� waM . Cc: Jeff Crews Enclosed: Change Order #1 Cindy Arevalo Matt LePera. PE 1809 of 3458 Docusipn Envelope ID: DD3792D9-F705-81AD-0 2C-BFFEBBDE0ADA RIC-MAN INTERNATIONAL, INC. defor GENERAL CONTRACTORS 1545 NW 27th Avenue Pompano Beach, Florida 33073 Phone '.(954)426-1042- Fax:(954) 426-0717 Breakdown of Costs Project : Pine Tree Drive FM Date: Description: Unforeseen Condition Existing pipe at Increased depth - Part B North side expl(Grand Total: 9 LABOR COSTS Regular Over Time CLASSIFICATION oty Hra Rate Sub Totals His Rate Sub Totals 04/10/25 65,979.43 Totah SUPERINTENDENT 1 29o0 163. 92 4.753.68 - 245.88 Goo 4,753.6E PROJECT MANAGER 1 3.00 138.04 41412 20706 0.00 414. 1: FOREMAN 1 40.00 69.02 2,76080 - 103.53 000 2.7608( OPERATOR EXCAVATOR 1 34.00 5694 1,935.96 6.00 8541 51246 2448.4; OPERATOR LOADER 1 3400 42.27 1,43718 6D0 6341 38046 1.817.6, PIPE LAVER 2 34.00 44.86 3.05048 6.00 67.29 807.48 3,857 9( LABORER 2 3400 27.61 1,87748 600 4142 49704 2, 374.5: TRUCK DRIVER 1 16.00 38.56 616.96 4,00 57.84 231.36 848. 3: Subtotal. 19 275 Z Contractors Fee 10% 1, 927.5! Subtotal 21 203.01 Labor Total: 21,203.01 MATERIAL COSTS SIZE DESCRIPTION CITY -Unit Price Total% Asphalt 8 TON 115.00 920.00 Rock F57 Stone 12TON 860 103.2C . 1,023 Sales Tax @ 7.50% 76 74 LCSubtotal Subtotal. 1,09994 ontractor's Fee 10.00% 109.99 Material Total: 1,209A3 EQUIPMENT Operating T pe Model Cry His Rate Sub Total Costs Sub Total Total BACKHOES CAT 3280 347 MT 1 40 128.05 5, 12200 73.97 2,95E 80 808080 2cy 1 40 8.32 33280 14E 5800 390.80 LOADERS Komanu WA320 198HP 1 40 74.84 2.993 60 32 91 1.316.40 431000 TRUCK .. Tn-Axel Dump Truck 1 20 51.13 1 02260 103.27 206540 3,08800 PICKUPS - v SUPERINTENDENT TRUCK 1.00 35 13.90 48650 42.98 150430 1.990. so PROJECT MANAGER TRUCK 1 00 3 12.50 37.50 42.98 12894 166 44 I/. Ton Single Cab 2 40 12.35 98800 2305 1 8" 00 2 832 O0 1 Ton Utility P-U 1 40 12.35 49400 17.42 69690 1, 190.80 CUTTING TOOLS Saw Edco 14'Stmet 1 20 26 91 53820 0.00 0 00 538.20 PUMPS_ Well Point Pump 10"' 1 40 41 71 1668.40 21.70 86800 2536.40 A_RMI-Claim Form #2- Exploratory increased depth-.xlsm PAGE 1 OF 2 1810 of 3458 Docusi9n Envelope ID: DD3792D9-F70S81AD8UC-BFFEBBDE0A0A Header Pipe(20') 15 40 5.12 3,07200 008 4800 3.121 Discharge Pipe(20') 30 40 2.26 2,71200 008 96.00 2,801 Jet Pump 6' 1 40 40.37 1.61480 17.00 680.00 2,29d Jet Hose (50') 1 40 T37 174.80 0.08 320 171 6' Multi Purpose Pump 1 24 23.89 568.56 10.00 240.00 801 S' Suction Hose (25') 2 24 387 185.76 0.10 4.80 191 6" Discharge Hose (60') 4 24 235 22560 0.10 960 23! WETY 'al 9d"mal Ic:�' Trench Box 8" x 8' x 16' 1 40 28.26 1 130 40 1.05 42.00 1.17, OTHER _ . . , I _.. ' S ", -Mal :, d Small Tod; 1 40 44�40 1,776,00 4.60 18400 1,961 Steel Plates (Per Dayl 4 4 7600 1,21600 0.00 0.00 1,21, 14 1n Fee 10.00% 3,910. - SUBCONTRACTOR DESCRIPTION OTV Unit Price Totals Haul Disposal 2 LD 135,00 270.00 Portable San. Facilities 4 FJD 4,85 1940. TRAFFIC MAINTENANCE Oty Unit Rate Oty Unit Totals BamcadeslDrums 225 EA 0.14 4 Days 126.00 Signs Large 22 EA 029 4 Days 25.52 Pedestrian LCD 2 EA 040 4 Days 3.20 Arrow Board 2 EA 7.50 4 Days 50.00 Type H Corrals 4 EA 036 4 Days 5.60 Subcontractor Total: 509.72 Subtotal. 509.72 Contractors Fee 750% 38.23 Subcontractor Total: 547.96 r SUMMARY OF COSTS Labor Total 21 203.01 Materials Total. 1 209.93 Equipment Total 43018.54 Subcontractors Total. 5479 Time Extension Requested 4 Days Sub Total: 65,979.43 Grand Total: 65,979.43 A_RMI-Claim Form #2- Exploratory increased depth-.xism PAGE 2 OF 2 1811 of 3458 13owsi9n Envelope ID: DD37921osF70r,81AD-832CAFPEB8oe0mA � RIC-141A �' INTER'NTAL, I SIC. / GENERAL CON?RACTOROTOR 1545 NW 27TH Ave - Pompano Beach, Florida 33069 Phone: (954) 426-1042 Fax .(954)426-0717 4/1012025 Letter No. 3 Raul Cabrera Project Manager City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Re- 30-INCH PARALLEL FORCE MAINS CANAL CROSSING REPLACEMENT ALONG PINE TREE DRIVE (UNDER FLAMINGO WATERWAY) Contract #. 24-016-01 Unforeseen Condition Existing Pipe at Increased Depth — Part B North Side Exploration Dear Mr. Cabrera, Ric -Man International respectfully requests a change order for additional work required to complete the city project, resulting from unforeseen conditions related to the existing 30" force mains. The project was originally bid based on design plans that indicated the force main would be at a depth of 4 feet, as indicated in the provided documents. However, upon further inspection, it has been determined that the pipe is, in fact, located at an average depth of 8 feet on the north end, particularly at the points of connection. In addition to the increased depth, the 30" force mains located on the north side are not in accordance with the original plans and are, at a minimum, twice the anticipated depth. These unforeseen conditions require substantial additional labor, dewatering efforts, and on -site adjustments to accurately locate and complete the installation as intended. The costs outlined herein reflect the effort to identify and confirm the location of the existing lines, determine if additional materials are necessary, and provide location and information for 300 Engineering to redesign the connection points to the existing force mains. Below is a brief summary of the additional work required, along with the attached Change Order, which provides a detailed breakdown of labor, material, and equipment costs. • Additional roadway and pedestrian MOT • Exploration of the northern area to locate existing lines and verify the condition of existing pipes • Set up, Install, and remove Wellpoints. • Dewatering of the entire northern pit, with an increased volume, duration, and the need for additional pumps. • Temporary Restoration of pits, roadway, and sidewalk. • Additional shoring. • Additional labor and material to safety the pits and locate force mains. • Additional equipment and rentals (extra days). 1812 of 3458 Dp sign Enwe pe ID: DD378]D%-F70581AD832"FFEBBDEOADA RIC-MAN INTERNATIONAL, INC. / GENERAL CDNTRADTDR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone: (954) 426-1042 Fax (954) 426-0717 Once we have completed the exploratory work and confirmed the temporary well has the capacity necessary to dewater the deeper excarvotion, we will present the anticipated cost to complete the tie-in. We appreciate your understanding and look forward to your approval of the attached change order so we can proceed with the necessary adjustments. Please don't hesitate to reach out if you require further details or clarification. This change order is based solely on direct cost elements such as labor, material, and stipulated markups and does not Include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead, acceleration, or impact costs that are impossible to assess at the present time. Right is expressly reserved to claim for any and all time as well as these related items of compensable costs prior to the final settlement of this Contract. Best Regards, Jake Watterworth Project Manager Cc:Jeff Crews Enclosed'. Change Order #1 Cindy Arevalo Matt LePera, PE 1813 of 3458 Doarsign Envelope ID: DD3792DI WR15&81A"32GBFFEBBDEOADA RIGMAN INTERNATIONAL, INC. GENERAL CONTRACTORS 40* 1545 NW 27th Avenue - Pompano Beach, Florida 33073 Phone. (954( 426-1042 - Fax: (954( 426-0717 Breakdown of Costs Project : Pine Tree Drive FM Description: Proctor 8 Density Tests Proposal LABOR COSTS MATERIAL COSTS SUBCONTRACTOR Field Density Tests (Mm 4 tests per trip) Site Visit to Pick-up samples (when not on site for tests) Limemck Bearing Ratio Tests Concrete Compression Test (4 Cyl/Set + Slump) Time Extension Requested 0 Days Data: 04116125 Grand Total: $ 7,692,98 Over Time ub Totals Hrs Rate F 100 - 207.06 Contractors Fee 10% 345 Subtotal 3,796. Labor Total: 3.796. Sale, Tax g 750% Subtotal. Contractors Fee 1000% Material Total: iTY Unit Price 5 EA 135,00 36 EA 40.00 5 Trip 100.00 1 EA 28500 5 Set 145.00 Subtotal'. 3 625.00 Contractors Feebcontractor 7 50% 271.88I SuTotal: 3,811il r SUMMARY OF COSTS labor Totac 1 Materials Tolaf 0.00 Egmpment Total. 0 00 Subcontractors Totat. 3 8896.88 Sub Total: 7,692.96 Grand Total: 7,692.99 Proctor. Density Proposalxlsm 1814 of 3458 PAGE 1 OF 1 Docusign Envelope ID: DD3792D9-F705-81AD-832C-BFFEBBDEDADA QuEST Gent Ric-Mw Inlanwbo 1al, Inc. 1545 NW 27 Avenue Pomporro Bach, FL - 33D69 Attention Mr Jake WalteMath Ph (964)426 1042 Fax (964)426 D717 Mot aMai Jskem@rlc-man us Consu" EreghlMrbtg Twbng SHORT FORM AGREEMENT Prgect Profect 24-MBFM 4949 Pine Tree Drive Mramr Bead) FL Prop No. P-25092 Dew 04l14125 Bid p MEM NO DESCRIPTION UNIT QUANTITY AMOUNT S $ 1 Modified Proctor (T-180) Tests Each 135.00 2 Limerock Seanq Ratlo Teets Each 29500 3 FiWd Denaltr Tea (Min 4 lest, per Trip) Teat 40 OD 4 Concrete C9mpraWon Tests (4 CylJSet I Sksnp) So( 145 00 5 Site Visit to Rek-up Samptee (~ not os nb fa tam) Try 100.00 Condom, 1. Thewwk wB bodory In accordp wall ate attached OuEST Gensil Cond bam 2 Servlcn not kited have wS be gupm request Horsty rain belied on pun portakto-WW times 3. Slsldby krne for agirman lg tecllncian will be IdAW at $60 00 pW hour 4. We will only tit you for to ataal WOLO Of tuM doM. sulbrd W bat minmum9. 5 Additmi tan wie be IAIwO at the sane arA rates. S,now0y. Ouest Engn nn0 Services 8 T"inp Inc AoceoWlce Agmad In by ___.. —_—. ___..__.. 011 Sgnature _ Title: Company O eat Engwww" % 4 T4ete Inc 27J7 NW 19 St p pans ll C , FL 3300 Rl f"4) sat 9" � 9pa4rergg cp 1815 of 3458 Docusign Envelope ID: I ►AIll AND SCOPE OF 1011 1(: puast Er ri welq SarvcM 6 Tesonq mc. lNetp eMlw Cole ree m M' Srl dray a+Wds sad mmpww or U brwnth. wOa4my Or dlikow pMonniy era aOrL Wprm' means tee a ii pfirs. m8, er'M Wr oarw awvba to M t to W ci by GUEST ST Iw farm a ng a _ 'are r 'Clyrf ryroR m tlb occ4p or b Y OUE entity op+ "y +art m a [bN by am T TM Weanly2 d w o " p QEST a eve N aoupbnp y GUE$Te proposal are Mw Garwel CWn"roM TIy Wm assralw aWe raAponaaMfl b Mlan�rinp wreaswr 8tB SrwIR4 an" the rWaaa d Ne work u"rnA w Ins clra :. ads V b ere KA .s Incwe"se "I"a, e Tea amp d Wu rr.IfM apM not hepL"e wlFs'^0 ft/frpaareM win 18Mn eaaaY arNW PS+U aafery nanram►w 2. SCSEDISJNG OF WOIU(: The swe'Irla sal fprp In GrE$Ti popwr altar wan a afCepsamete rill N xmmpllshM m a amry an" pmPrudW pave by QE ST w lea w� of ampaa" II QE$T a f .hw p p rlM\'ay carmancer,f pi pP IN, rvl or a r t b spopurn Or in the apr pTpra d Its wah ass ration pl caw beer t n ma acing pl ma eNrM ragrwaMa M sr aunt e'IanuDUwe In ft propw d mnsavabn. W o8rw carve e•yvb bw "iran rwwrbe rone'd d GUEST. ea"nlaW WSaa M N apfYraero wrp peyabla by -lye. 2 ACCESS TO SRE. Clwr( will proa0a Te equa iff acuM to 8re rb for Q:EST to perbne en sons GUEST ahM baa raaamaLVa mrwraVprKgApns to mnlm ve amnapa b li w m ma rron & ip wvit or IM uN of a enoi, enl PuES� camol 4 led" rrpmsp4 b ry 4nMpa nsukln8 bam M Wbrv,J W IncwNnW b tee errb a. SAMPLE DISPOSAL Tact %mit rrws or aampfm MII be lNpaaap .larw6rely rpm wrrplebon dew tat NI tlr+rle .soul., s .p.C.rwla.N C. a.po..a u.n Iw) e.y, der awmupon m wEsra Ia i 6, PWAWOMOSILITN tyEST ,sari rot be Iespoeii b aupervlrrO or rlpAwmiwrby bw a. n,,epi asWspi aaalmrlwe Or ImpMS.nr of mrNatmpbart. eerua8fmp rM"ninb w A11acNV P* -te-011 mcenvp h-li a -WV Or neni,,e nGYFE$T vnipltuoa"^7in nMpu "pbrgAyeto cswtorpy 10 0i IacmWSI Y pnWwawaay. WCMb IB r,apwueb 1p Brava IW GC are ttS+w IlApaty alsurneca 6 STAMGAMD OF CAME OEST .amram a SWI M Mgng,. remmmaMrwrA. apadlmaorw. or prCbacrr Mawr., rarnrna" hwrn, hoes wan womlAMW rM bill props n acowMini MEI Witel Sit Wafamral WiSnewbp bracbpa in " In"wal" No aaw wwracer en ImpN" W alprra l Sbgrmwte n1w"a in GUEST, raDWU win <plrbrs blasae upon a^Drlaws'O eApmwea wel rbtaa not be co ititi r lam ShmW Ou"T or " of a walarby wrplayMe be Im" to Ibsa pawn nadl8i, in " paatmmwpa of IS wpr, fW aw Contract cu l aY Pi arnlnb mrogn dwn ra al paver ctrrrrp b Nw - wry way Falb" upon GUEST, .bra Mrea bw eve madmum appwpb wnym Of lee liabary OF QEST Its d8®s brrplpNsa wm" Marls "I M linUG m S10,0 DD a 8le srr yn ent d fM pw m OuEST nor a wWa Pipe, e" m eel prgApl. r.rseheMr tun is yaaDar T. PAVIENT clam •pAaa m pill, Wei Anyaba Mwn ywwry 8va (25) "M d 4 rawiP dyn hobs apses b pry serer m ae saver nmlra" aro rw y" a Discs," b b .wd ,suss In MnE MSen aab pamb" M bee rW d ryAaan 08) pwown pw wavn vq pad Own agni to pay OASrs Coal Of mlacbon of all anmbtamM "ua And vpAd Allan awty (80) "ay,, d dN Corn C wM nrarWla aavmeys low Thee Ganaral Co"Im" an Out roots M QUEST ",e a live, wfrenewr tibmy b cOGwM par M w*OI/Y Faun b real. paM^wrt w 25 days of ewasv bN8 mUnAe a I,OeMe of PuE$T ,salt very and rl rLrme whke dwa rlwy Nea in Ipn m wrrincf. Mygw known n ullvrprwl8wr 8. WOEMki Srplrl 10 eV bingo" lamamcm Coll Mrae, m witm fy en" nob OMr, hWmiw Prom an" aDMmal any wee r :wnasoreepee an",grow i hdm8 nrnube nloma✓s fees asp can cob (n Viii'm "n mul), a^aerp into d oUEsrs naypwba m aW e"anl Of QUEST', na8a8anm. oya WNW prase", era Mini wuaalow" no Pea rent d Ie ^adtvwrce a w d ne Wb marawrrra ti ti awry a a Ww r.a aN tiara ,arils pay m OuEST ti cMY w wpww nrumd q OuE$T b In+raaab. aM+ A erAarb a wegrq neeulMra anpnlaye: wrlror roM and aM cone b aV aeMM tlw OuE$T pavtla n wd� soil. Tau currlrrmct may err M aeeyred b e asrtl pony +,etas wnMn sllwrneon hpn OEST oe,rn ,per Sw er,y w urspwlpe rl wravawwrca M ncmmwde" m pre mwnMrwca nenMl eeakryl8 Wpaeawe are rrbarry ra0,ln uaa" b r • iwarAl d ar. naparavw S TERMINATION: Tfw Ayteanwn Cory ee permmre" by aibw parry upo' iw Mi pnor vr, ran pap In IN went Of wme�Aam. OuEsi anal !A nprpwrlaArp by <ly, Or as no Prat Agri [M termb,li INN nch.4" wmeWy.bb sips,,. IS. WITNESS FEES: QEsT ampmyAaa enr rn Oe nmlwe" r Mpen »blew ,¢apt by sparwe wren aw, ins Csarn qeM to pay OUE$ra I"W a+Dwlw. a6mnabaQrw maY line roe W rsowa w CkESrs dean fee ed , b OuEST )o 1111 any Wbpoane If. PROVISIONS SPMIA111-E: In are aevnt ary of er prowAmA Or tleaa Gsrarr Coml(nne snow" be bra b M error" ,mbe, n ear bii, iiai wd tN l.." perliims shad M .1pe ads 12 EMTME AGREENVot oes eprerrwn caeeaAr aW ,tarn un"rabrr"rg d it, Pwtir a.e Cory be w'rwl"e" Wr Iwmnaaao on, In wmirp, wvbC el, each al pwwr Iwab QuEST 1816 of 3458 Docusign Envelope ID: DD3792D8f705b8MD-832C8FFEB8DEOADA RIC-MAN INTERNATIONAL, INC. GENERAL CONTRACTORS 1545 NW 27th Avenue- Pompano Beach, Florida 33073 Phone:(954) 426-1042 Fax, (954) 426-0717 Breakdown of Costs Project'. Pine Tree Drive FM Description: Change of Material -10" Installation LABOR COSTS CLASSIFICATION ON Nn Regular Rate Date: 06i30/25 Grand Total: 9 71,945.18 PROJECT MANAGER 1 16.00 13804 2.20864 - 20706 000 2,208.6 FOREMAN 1 3000 6902 207060 - 10353 0.00 2,070E OPERATOR EXCAVATOR 1 24.00 56.94 1,366.56 600 85.41 512.46 1879.0 OPERATOR LOADER 1 24.00 4227 101448 6.00 63.41 38046 1,394.9 PIPE LAYER 2 2400 4186 2,15328 6.00 6729 80748 2,960.7 LABORER 2 29.00 2761 7801.38 6.00 4142 497.04 2,0984 TRUCK DRIVER 1 2400 38.56 925.44 600 57.84 34704 1,2724 LOW BOY DRIVER 1 8.00 57.94 46352 - 8691 0.00 463.5 u ota Contractors Fee 10% 1,697.1 Subtotal 18,660. Labor Total: 18,80.i - MATERIAL COSTS 10' Restraint wl 31688 bolting Neo Gasket 21 EA 395 8,295 12' Restraint w/ 316S5 balling Neo Gasket 2 EA 445.00 890.( 6" PVC C900 DR 14 pipe 2O' GRN PC305 20 LF 1800 360 ( 10' PVC C900 DR 14 pipe 20' GRN PC305 80 LF 6500 5.2DO 1 IT PVC C900 DR 14 pipe 20' GRN PC305 20 LF 6900 1,380.( 10' PVC Bell Joint Restraint 1610 wl 316SS Are 3 EA 53000 1,5901 6' MJ Cap C153 P401 2 EA 45000 900.1 Dixon 6' FLGxPE Camlock adapt 1 EA 394.00 3941 Dixon 6' Alum Dust Plug 1 EA 8100 81.i 6' Restraint MJ DI 1106 wl 316SS rise Gasket 2 EA 22700 4511 6x1/8 FLG acc set wl 316 b8n 2EA 4700 94.i 6' FLG Swing Chk Valve 1 EA 1 700.00 1,700 6" MJ reg acc set w/ 316 blin 2 EA 18000 360. To!: 6" Mega FLG w/316SS bolts Neo Gasket 2 EA 38500 770. 10"x6" Tee MJ C153 P401 1 EA Of, 0. 10'00"RAJ Tee C153 P401 t EA 1,38300 1,383, 30'k12" MJ Tee C153 P401 1 EA 9,15300 9,153. 12'x10' Reducer MJ C153 P401 1 EA 1,09700 1,097. 30" Restraint wl 316SS Boring Neo Gasket 2 EA 262500 5.250. 12' FLGxPE DI Pipe P401 2' 1 EA 1.156.00 1.156. 10" MJ 45 C153 P401 4 EA City 0. 10' MJ UP Sleeve C153 P401 2 EA City 0 10' MJ Cap C153 P401 3 EA 72500 2,175. 7635 Sewer Valve box 8 Cover 2 EA 27000 540 BRZ Disc f/ I O' VLV MRKR 2 EA 2200 44 VSIO Polywrap 27x374 White 10-12' DIP 1 RL 60000 600 Flowable Fill 1 LS 130658 1306 6" Plug Valve 1 LS (2.020.00) 2,020 6" EBAA Megalugs wl SS Ace 15 EA (185 00) -2,775 6" MJ Neo Gasket w/Acc 15 EA (42. DO) 630 A_RMI-Claim Forrn 114-10 inch Installationxlsm PAGE 1 OF 3 1817 of 3458 Doc ign Envelope ID: DD3792D ()"1AD832C-WFEBBMADA 6" TJ P401 zinc coated 100 EA (55.00) 5.500 6" Tylon Nan Gaskets 5 LF (16 00) AO 6" MJ 45 C153 P401 Zinc Coated 4 EA (413 00) -1 852 6" MJ Tee C153 P401 Zloc Coated 1 EA (54400) -544 6' MJ Cap C153 P401 1 EA (31500) -315 VBIO 3"-8" Polywrap 1 FA (403.00) 403 30x6 MJ Tee C153 P401 Zinc 1 EA (5,708 00) 5.708. 30' Restraint w/ 316SS Bolting Neo Gasket 2 EA (2,62500) .5,250 10' Plug Valves 2 EA City 0 1 EQUIPMENT Sales Tax Contractors Fee total. 7 '." $uDrofal - 10.00% Material Total: 2 04810 54 22 081 12 2,20S.1t 24,289.23 Operating Type Model City Mrs Rate Sub Total' Costs Sub iota) Total BACKHOES Komats PC88 8.1 MT 30 85 12 2,553 60 4212 1 26360 3.817 20 LOADERS I I, i KomatsL WA320 198HP 1 30 7484 2,245.20 32.91 987.30 3,232 50 CAT IS 262C 7,9%b 1 30 5720 1,716.00 3547 1,064.10 278010 Skid Steer Bucket 1 30 908 27240 0.00 000 27240 TRUCKS 4' Mr Rmr _c in'pIY Tn Axel Dump Truck 1 30 51.13 1533.90 10327 3.098.10 4632 DO 40Ton Low Boy Trader 1 8 29.07 23256 760 60.80 29336 Mack Tr4Mor 1 8 5786 462.88 60.85 486.80 94968 PICKUPS Jlr, N -� „c, -10, I ,. - ,., rota: T SUPERINTENDENT TRUCK 1.00 16 13.9D 22240 � 4298 687.68 91008 PROJECT MANAGER TRUCK 1.DO 6 12.50 75.00 4298 25788 33288 /. 3Ton Single Cab _ 2 30 1235 74100 2305 1,38300 2, 124. DO 1 Ton Utility P-U 1 30 1235 370.50 1742 52260 893. 10 PUMP Cl3 ) Jet Pump 6" 1 30 40.37 121110 17.00 51000 1,721.10 Jet Hose (50') 1 30 4437 131 10 0.08 2.40 133.50 6" Mum Purpose Pump 1 30 23.69 71070 10.00 300.00 _ 1,01070 6" Suction Hose(2S) 2 30 387 232.20 010 6.OD 238.20 6" Discharge Hose (50') 4 30 235 282 00 010 12,00 294.00 Small Tools 30 4440 '.33200 460 13800 147n OD Contractors Fee 1000/ SUBCONTRACTOR Portable San. Facilities 3 @D 4.85 14 TRAFFIC MAINTENANCE City Unit Rate Cry Unit Tol Bamcades/Drums 200 EA 0.14 3 Days M Signs Large 8 EA 0.29 3 Days 6 A. Board 2 EA 750 3 Days 45 Type H Corrals 4 EA D 35 3 Days 4 Subcontractor otal: 1,2 6 Subtotal. 1,276 Contractors Fee 7.50 0 95 r SUMMARY OF COSTS LaborTotal 18.668 21 Materials Total 24,289 23 Equipment Total 27,615 28 A_RMI-Claim Form ff4-10 inch Installation.xlsm PAGE 2 OF 3 1818 of 3458 Docusi9n Envelope ID: 313379209�05-81AD-832CAFFEBBOEOAOA 5ubcontractors Totalt 372 4¢ Time EAenslon Requested- 4 Days I Sub Total. 71,945-18 Grand Total: 71,945.18 A_RMI-Claim Forrn 714-10 inch Installation.xlsm PAGE 3 OF 3 1819 of 3458 Docusign Envelope ID: DD3792D9-FT05411AD432 FFEBBDEOADA RIC-MAi\ INTERNATIONAL, INC. 49* GENEIIAL CONTRACTORS 1545 NW 27m Avenue Pompano Beach, Florida 33073 Phone (954)426-1042 Fax: (954)426-0737 Breakdown of Costs Project Pine Tree Drive FM Date. 06126125 Description. Additbonal Fittings Needed due to Unforeseen Conditions CONS Grand Totalf 208,994.67 r LABOR COSTS CLASSIFICATION Gry Hrs Rate Sub Totals Hrs Rate Sub Totals Totals SUPERINTENDENT 30.00 16392 4917.60 24-88 00 4,91760 PROJECT MANAGER 1 300 13B 04 414.12 - 20706 0.00 414 12 FOREMAN 1 4200. 69.02 2,89884 - 103.53 0.00 289884 OPERATOR EXCAVATOR 1 4200 5694 239148 - 8541 0.00 2391.48 OPERATOR LOADER 1 4200 4227 1, 775.34 - 6341 0.00 1775.34 PIPE LAYER 2 4200 4486 3,768.24 - 6729 0.00 3,768.24 LABORER 2 4200 27.61 2,319.24 - 4142 0.00 2,319.24 TRUCK DRIVER 1 8.00 3856 30948 57.84 000 30848 —Subtotal 3.34 Contractors Fee 10% 1,679.33 Subtotal. 20,672.67 Labor Total: 20,672.67 MATERIAL COSTS SIZE DESCRIPTION OTY Unit Price Totals 30'MJ45 C153 P401 Zinc 2EA 6, 198.00 12,39600 30' MJ 22-1/2 C 153 P401 Zinc 3 EA 5,80000 17,40000 30'MJ 11-1l4 C153 P401 Zinc 2EA 555400 11, 108.00 30' MJ Sleeve C153 P401 Zinc 5 EA 5340.00 26.700.00 30" EBAA Megalug MJ DI PST wl SS accessories 24 FA 2,62500 63,000 00 Rock 57 Stone 1 Ton 2380 2380 EQUIPMENT me Model City Hrs Rate Sub Total II Sales Tax @ Contractors Fee Operating Costs 7.50% Subtotal. 1000% Material Total: Bub Total 9,797 140424 14,042 154,467 To ACKHOES AT 328D 34]MIT 1 42 12805 5.37810 73.97 3 106 74 8484 PECIALTV BUCKETS ;.. :y 1 42 8�32 34944 145. 0090 410 DADERS j imatx WA320 198HP 1 42 7484 3,14328 32.91 138222 4, 525 sconnect Forks 1 42 807 33894 1.80 7560 414 16c Attachment 1 42 232 9744 1.27 5334 ito RUCKS - I 1 -Axel Dump Truck 1 8 5113 40904 10327 826 16 1.235 CKUPS I JPERINTENDENT TRUCK 100 30 1390 41700 4298 728940 1,706 Ton Utility P U 1 42 1235 518 70 1742 731 64 1,25D DAD WAV lmot Sweeper Ford Broom 1 4 15618 624 72 2222 8888 713 CUTTING TOOLS 't-0B Saw(StiM) 1 12 807 9684 2.10 2520 122 A_RMI-Claim Form #5-Additional Fittingsxlsm PAGE 1 0172 1820 of 3458 Docusign Envelope 10: DD3791D&F70" t AD-fl C4 FFEBSDEOADA INSTRUMENTS - Leyel Survey Instrument 1 42 12.62 530.04 PUMPS ... F I Well Point Pump 10"' 1 42 41 71 1,751 62 Header Pipe(20') 15 42 512 3225.60 Discharge Pipe (20') 30 42 2.26 284760 OTHER Small Tools 1 42 4440 1.864 �80 _.c Iota 105 86.10 616. Sub Total -- 2170 91140 2,663. 008 5040 3 276 0.08 100.80 2 948 Total �193.20 460 205B. Fee 10 00 % .SUBCONTRACTOR DESCRIPTION OTY Unit Pride To Portable San. Faolsties 4 E/D 485 9 TRAFFIC MAINTENANCE Oty Unit Rate Oty Unit To BanlcadeslDrums 200 EA 0.14 4 Days 11: Signs Large 8 EA 0.29 4 Days Arrow Board 2 EA 7.50 4 Days 61 Type H Canals 4 EA 0 35 4 Days Subcontractor o Subtotal 20 Contractor's Fee 7.50% 1 r SUMMARY OF COSTS abor otar67267, 5 Materials Total. 14 467 38 Equipment Total. 33 63287 Subcontractors Total 221.75 Time Extension Requested. 4 pays Sub Total: 208,994.87 Grand Total: 208,994.87 A RMI-Claim Form #5-Additional Fittingsxlsm PAGE 2 OF 2 1821 of 3458 Total: 208,994.87 Grand Total: 208,994.87 A RMI-Claim Form #5-Additional Fittingsxlsm PAGE 2 OF 2 1821 of 3458 Dowsign Envelope ID: DD3n2D3-F70"1AD-03209FFEBB0EOADA RIC-14AN INTERNATIO vTAL, INC. dGpr GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone. (954) 426-1 D42 Fax (954)426-0717 8/15/2025 Letter No. e Raul Cabrera Project Manager City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Re: 30-INCH PARALLEL FORCE MAINS CANAL CROSSING REPLACEMENT ALONG PINE TREE DRIVE (UNDER FLAMINGO WATERWAY) Contract #: 24-016-01 Additional Fittings Due to Unforeseen Conditions. Dear Mr. Cabrera, See attached Change order for breakdown of costs required to Furnish & Install the additional fittings needed due to unforeseen conditions on the City of Miami Beach Parallel Force mains Canal Crossing Project. The costs outlined herein reflect the additional material and work necessary to complete the new 30" Force main and tie into the existing system- Below is a brief summary of the additional work included but not limited to, along with the attached Change Order, which provides a detailed breakdown of labor, material, and equipment costs. • Additional roadway and pedestrian MOT • Additional Fittings. • Additional Megalugs, Gaskets & Accessories. • Additional equipment and rentals (extra days). • Delivery of Materials. • Additional labor required for installation due to unforeseen conflicts. This Additional material was previously Approved by you during City Progress meetings in order to minimize any excessive project delay due to the extended lead time on 30" DIP Fittings. The Total additional cost of these fittings and accessories with labor is $208,994.67. However, these items replace three 30" DIP Tees called for in the original plans, resulting in a Creditof $62,091.89. Resulting in a net increase of $146,902.78 to the contract amount. We appreciate your understanding and look forward to your prompt approval of the attached change order so we can proceed with the necessary adjustments, agreements and material orders. Please don't hesitate to reach out if you require further details or clarification. This change order is based solely on direct cost elements such as labor, material, and stipulated markups and does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead, acceleration, or impact costs that are impossible to assess at the present time. Right is expressly reserved to claim for any and all time as well as these related items of compensable costs prior to the final settlement of this Contract. 1822 of 3458 Dmusign Enwlope ID: DD37921)4F70581AD832CbFFEBBDEDADA �/�� RIGVIAN INTERNATIONAL, INC. �/ GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone '(954)426-1042 Fax:(954) 426-0717 Best Regards, Jake Watterworth Project Manager Cc:Jeff Crews Enclosed: Change Order #5 Cindy Arevalo Matt LePera, PE 1823 of 3458 Dowsi9n Errvelope ID: DD9792D&F70"1AD-932GBFFEBBDEOADA RIC-MAN INTERNATIONAL, INC. GENERAL CONTRACTORS 1545 NW 27th Avenue - Pompano Beach, Florida 33073 Phone: (954) 476-1042 - Fax :(9541426-0717 Breakdown of Costs Project: Pine Tree Drive FM Date: 09/24r25 Description: Bypass, Linestops & Deeper Pipe Connection Negotiated LS: $ _ 1,150,000.00 DESCRIPTION CITY Unit Price Total Remobilization 1 LS 1 23,000.00 23,00000 Subtotal 23.000.00 10" Bypass DESCRIPTION CITY Unit 1 Price I Total NERC B ass Pump Rental 1 I LS 1 10.750.00 1 10,750.00 Labor & Mat for 120 LF of 10- Bypass 1 1 LS 1 90,982.00 1 90,982.00 10- Check Valve & Appurtenances 1 I LS 1 7.160,40 1 7, 160.40 30" Line Stops and Temporary Interconnect De Subtotal 108,892.40 DESCRIPTION OTY Unit Price Total Ran eline Double Linestop 3 EA 95 804.00 287,412.00 Ran eline 30" x 24" CIP FM Test and TapoNy 2 EA 3,844.25 7,688.50 Tapping valve and saddle 2 EA 43,116.00 86.232.00 Labor & Equipment for installing tapping saddles 2 EA 31,345 00 62.690.00 Labor & Mat for 50 LF of 24" Bypass 1 EA 84,089.00 84,089D0 Credit for not engaging double Line Stop LS 52,145,02 Labor & Equipment for installing and encasing in concrete saddles, Incl. MOT 6 EA 70.738.00 424,428,00 Subtotal 952 539,50 'per rI wnnealon DESCRIPTION CITY Unit Price Total Labor & Equipment for deeper installation, Inc]. shoring 1 LS I 65,568.10 I 65,568.10 Subtotal 65,568. 10 Note: RMI assumes no liability for the existing pipe failure. This negotiated lump assume excludes unforeseen conditions. City to provide time for low peak flows (less than 2fps) to engage and disengage line stops. City forces to coordinate the drawdown and operation of pump stations connected to the system. City to coordinate and obtain approval for Noise Ordinance Wavier and Night Work. City to coordinate and obtain approval for full lane closure. Line Stops are to be performed during after hours. Remainder of the work to be performed during regular hours. Provided this is a negotiated lump sum. RMI reserves its rights to renegotiate if any scope is reduced or eliminated Restoration is to be paid under the contract fine items. Change order needs to be approved by November 2025 for City to avoid incurring in additional insurance and overhead 1824 of 3458 Docusign Envelope 10: DD37920&F706-81ADA32C-BFFEBBDECADA RIC-MAN INTERNATIONAL, INC. GENERAL CONTRACTORS 1545 NW 27th Avenue - Pompano Beach, Florida 33073 Phone:(9541426-1042 Fax: (9 54) 42 6-07 17 s Breakdown of Costs Project Pine Tree Drive FM Date: 07/15/25 Description: Additional Work Required for Tie ins due to unforeseen conditions Grand Total: f 173,424.63 LABOR COSTS PROJECT MANAGER 1 B.00 13B 04 1104,32 207.06 0.00 1,11] FOREMAN 1 9000 69.02 6,211.80 - 103.53 0.00 6,21 OPERATOR EXCAVATOR 1 7200 56.94 4,09968 1800 85,41 1.537.38 5,62 OPERATOR LOADER 1 7200. 42.27 3,043.44 1800 63.41 1,141.38 4,16 PIPE LAVER 2 7200. 44 86 6.459.84 1800 6729 2,422.44 8,8E LABORER 2 7200. 2761 3,975.84 1800 4142 1491.12 5,4E TRUCK DRIVER 1 16.00 38.56 61696 400 57.84 231.36 84 — MATERIAL COSTS — SIZE DESCRIPTION Concrete Flovable Fill lLt It Sr d,0 Ur1N Rock #57 Stone EQUIPMENT 347 MT 198HP '1-Axel Dump Truck ICKUPS UPERINTENDENT TRUCK ROJECT MANAGER TRUCK Ton Single Gab Ton Utility P-U LIMPS fell Point Pump 10"' eadsr Pipe (20') iscnarge Pipe120'I Contractor's Fee 10% 4 Subtotal. 47 oTY Unit Price 20 bV 173.90 G.•P ' 1 Pi.-u 18 TON 23.80 3,478 Sales Tax @ 7.50% Subtotal'. 4, Contractors Fee 10.00% Material Total: 4. 1 90 12805 11,52450 73.97 6,657.30 18,181 I Total 1 90 8 32 74880 1 45 13050 879 owe 1 90 74 34 6 72560 3291 2.961 90 9.697 1 20 5113 1,02260 103.27 2.06540 3,088 �tj • 100 65 13.90 903.50 42.98 2, 793.70 3,697 1 00 4 12.50 50.00 42 98 171 92 221 1 90 1235 1,11150 2305 2074.50 3,186 1 90 12 35 1.111 50 17 42 1 56780 2,679 � 1 90 41.71 3,75390 2170 1,953.00 5,706 15 90 5 12 6,912.00 008 10800 7,02C 30 90 2.26 6, 10200 008 - 216.00 6,318 A_RMI-Claim Form #7- Tie Insxlsm PAGE 1 OF 2 1825 of 3458 Docusign Envelope to: DD379209�0681AD-832C-BFFEBBDEMDA Jet Pump 6" Jet Hose (50') 6` Multi Purpose Pump 6" Suction Hose (25) " Discharge Hose(50') Siltation Box SAFETY- Trench Box 8" x 8' x 16' ITrench Shleius Plates 10x20 '.Ladder OTHER Small Tools 1 1 1 2 4 1 1 13 t 90 90 90 90 90 90 90 90 DO 90 40.37 4.37 2369 387 2.35 11.84 at. 28.26 2321 545 4440 3,63330 393 30 2.132 10 69660 84600 1.06560 ,I 254340 27.15570 49050 3,99600 17.00 1, 530.00 008 7 20 10.00 90000 010 16.00 010 36.00 018 16.20 1.05 9460 0.26 304 20 008 720 4,60 414 00 5, 163.30 400.50 3,032 10 714.60 88200 108180 , 2.63790 27,45990 49770 4 410.00 Equipment Total: 106,955.72 Contractor's Fee 10.00% 10.695.57 Equipment Total: 117,651.29 - SUBCONTRACTOR DESCRIPTION CITY Unit Price Totals Haul Disposal 2 LD 230.00 46000 Brothers concrete Pumping 1 LS 2,244.00 2,244.00 Dumpster 9 FID 30.67 27603 Portable San Facilities 9 EID 13.27 11943 TRAFFIC MAINTENANCE City Unit Rate City Unit Totals Barricades/Dmms 225 EA 0.14 9 Days 283.50 Signs Large 22 EA 0.29 9 Days 57.42 Pedestrian LCO 2 EA 0.40 9 Days 7.20 Arrow Board 2 EA 750 9 Days 13500 Type H Corrals 4 EA 035 9 Days 12.60 Subcontractor Total: 3,396.18 Subtotal 3,595.18 Contractors Fee 750% 269.64 Subcontractor Total: 3,864.82 r SUMMARY OF COSTS Labor Total 47,2 940 Materials Total 4.619 32 Equipment Z.a 11%51.29 Subcontractors Total: 3,864 . 82 Time Extenson Requested. 9 Days Sub Total: 173,424.83 Grand Total. 173,424.93 A_RMI-Claim Form #7- Tie Ins.xlsm PAGE 2 OF 2 1826 of 3458 Docul Envelope ID DD3782D0-F70S81AD832C-BFFEBBDEMM GC W"X RIC-M ti INTERNATIONAL, INC. GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone. (954) 426-1042 Fax .(954)426-0717 7/15/2025 Letter No. 7 Raul Cabrera Project Manager City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Re: 30-INCH PARALLEL FORCE MAINS CANAL CROSSING REPLACEMENT ALONG PINE TREE DRIVE (UNDER FLAMINGO WATERWAY) Contract #: 24-016-01 Additional Work required for Tie -ins - Dear Mr. Cabrera, See attached Change order for breakdown of costs required to complete the 30" Tie-ins due to unforeseen conditions on the City of Miami Beach Parallel Force mains Canal Crossing Project. The costs outlined herein reflect the work necessary to complete the new 30" Force main and tie into the existing system. Below is a brief summary of the additional work included but not limited to, along with the attached Change Order, which provides a detailed breakdown of labor, material, and equipment costs. • Additional roadway and pedestrian MOT • Additional excavation for increased depth. • Additional shoring due to increased depth. • Set up, Install, and remove Wellpoints due to increased depth. • Additional equipment and rentals (extra days). • Work dictated in Bypass Plan provided by the city - Steps #5,8. Only additional work per given design. • Additional labor required due to unforeseen conflicts. • Flowable fill and Pumping rentals. We appreciate your understanding and lookforward to yourapproval of the attached change order so we can proceed with the necessary adjustments, agreements and material orders. Please don't hesitate to reach out if you require further details or clarification. This change order is based solely on direct cost elements such as labor, material, and stipulated markups and does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead, acceleration, or impact costs that are impossible to assess at the present time. Right is expressly reserved to claim for any and all time as well as these related items of compensable costs prior to the final settlement of this Contract. Best Regards, Jake Watterworth Project Manager 1827 of 3458 D000sign Envelope ID: D1337921D9-F70541A 32C-BFFEBBDEOADA RIC-MAN INTERNATIONAL, INC. GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone --.(954)426-1042 Fax. (954) 426-0717 Cc: Jeff Crews Enclosed: Change Order #7 Cindy Arevalo Matt LePera, PE 1828 of 3458 Docusi9n Emalope ID: DD3792D9-F7068IA 2GBFFE8BDE0ADA RIC=MAN INTERNATIONAL, INC. GENERAL CONTRACTORS 1545 N W 27th Avenue - Pompano Beach, Florida 33073 Phone (954)426- 1042- Fax:(954) 426-0717 Breakdown of Costs Project: Pine Tree Drive FM Date: 08/15/25 Description: Additional Work Required for Striping the expanded asphalt Scope Grand Total: S ___6,257_93 — LABOR COSTS Regular Over Time CLASSIFICATION CIy His Rate Sub Totals Hm Rate Sub Totals Total, PROJECT MANAGER 7 300 138.04 414.12 - 207.06 0,00 414A2 Subtotal 414.1, Contractors Fee 10 % 41.41 Subtotal 455. 52 Labor Twat: 455.51 — MATERIAL COSTS Subtotal 0.0 Sales Tax Q 7.50% 0.0C Subtotal: OOC Contractors Fee 10,00% 0.00 Material Total: 0.00 SUBCONTRACTOR DESCRIPTION Additional Striping for extended Asphalt TRAFFIC MAINTENANCE Barncades/Drums Signs Large Pedestnan LCD Arrow Board Type H Corrals CITY Unit Price 1 LS 5,342.50 CRY Unit Rate Dry Link 225 EA 0.14 1 Days 22 EA 0.29 1 Days 2 EA 040 1 Days 2 EA 750 1 Days 4 EA 035 1 Days Subcontractor Total: 5,397.58 Subtotal. 539758 Contractors Fee 7.50% 404.82 Subcontractor Total: 5,802.40 r SUMMARY OF COSTS Labor roal 455.53 Materials Total 0 00 Equipment Total 0.00 Subcontractors Total 5 8C2 4 Time Extension Requested' 1 Day Sub Total: 6,257.93 Grand Total: 6,257.93 A_RMI-Ciaim Form #8- Striping.xlsm PAGE 1 OF 1 1829 of 3458 Docuscn Envelope JD: DD3792D9-F705A1AD-532C-BFFEBBDEOADA dc�� RIC-MAN INTERNATIONAL, INC. / GENERAL CONTRACTOR 1545 NW 27TH Ave Pompano Beach, Florida 33069 Phone: (954) 426-1042 Fax: (954) 426-0717 8/1512025 Letter No. 9 Raul Cabrera Project Manager City of Miami Beach Public Works Department 1700 Convention Center Drive Miami Beach, FL 33139 Re: 30-INCH PARALLEL FORCE MAINS CANAL CROSSING REPLACEMENT ALONG PINE TREE DRIVE (UNDER FLAMINGO WATERWAY) Contract ft 24-016-01 Additional Work required for Increased scope of striping. Dear Mr. Cabrera, See attached Change order for breakdown of costs required to complete the additional striping necessitated due to the increased scope of asphalt area utilizing the Cities Imestop & Bypass plan on the City of Miami Beach Parallel Force mains Canal Crossing Project. The costs outlined herein reflect the work necessary to complete the additional striping required to cover the additional asphalt area per specifications. Below is a brief summary of the additional work included but not limited to, along with the attached Change Order, which provides a detailed breakdown of labor, material, and equipment costs. Additional Roadway striping. Additional MOT and Rentals We appreciate your understanding and look forward to your approval of the attached change order so we can proceed with the necessary adjustments, agreements and material orders. Please don't hesitate to reach out if you require further details or clarification. This change order is based solely on direct cost elements such as labor, material, and stipulated markups and does not include any amount for changes in the sequence of work, delays, disruption, rescheduling, extended overhead, acceleration, or impact costs that are impossible to assess at the present time. Right is expressly reserved to claim for any and all time as well as these related items of compensable costs prior to the final settlement of this Contract. Best Regards, Jake Watterworth Project Manager Cc Jeff Crews Enclosed Change Order#8 Cindy Arevalo Matt LePera, PE 1830 of 3458 m MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, w .miamibeoch l.gov PUBLIC WORKS DEPARTMENT Tel: 305-673-7080, Fax: 305-673-702B ROUTING COVER LETTER DATE: 06/23/26 SHORT TITLE: Amendment No.1 to the contract between the City and Ric -Man International, Force Main Canal Crossing Replacement at Pine Tree Drive. FROM:..,� DEPARTMENT: Public Works 9 Vol"- G Nu—r'J CONTACT: Fiorella/Daisy Ext:6007 Rou �/-A id Martinez, Assistant City Manager Eric T. Carpenter, City Managerr� �� �(� OTHER (Name): RQj,Qh &Z0A A&0 Description: In December 2025, the City Commission approved resolution 2025-34005 which authorized the City Manager to execute Amendment No.1 to the City's construction contract 24-016-01, which would increase the construction contract amount by $1,232,270.79. We are now presenting Amendment No. 1 to the City Manager for signature in order to process the change orders. We are committed to providing exce0ent public service and safety to all who live, work, and play in our vibrant, tropical, historic community. Y; 2025-34005 RESOLUTION NO. A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER AND CITY CLERK TO EXECUTE AMENDMENT NO. 1 TO CONTRACT NO.24-016-01 BETWEEN THE CITY OF MIAMI BEACH AND RIC- MAN INTERNATIONAL, INC., ISSUED UNDER ITS 2024-016-LB FOR THE FORCE MAIN CANAL CROSSING REPLACEMENT AT PINE TREE DRIVE; SAID AMENDMENT PROVIDING FOR THE FURNISHMENT AND INSTALLATION OF A SANITARY SEWER BYPASS SYSTEM AND ADDITIONAL 304NCH DUCTILE IRON PIPE, LOCATED AT THE INTERSECTION OF PINE TREE DRIVE AND WEST 51ST STREET, AS WELL AS FITTINGS AND APPURTENANCES NEEDED TO COMPLETE THE PROJECT, IN THE NOT -TO - EXCEED AMOUNT OF $1,232,270.78, INCREASING THE TOTAL CONTRACT COST FROM $5,189,255.50 TO $6,421,526.28. WHEREAS, the objective of this project is to install two new parallel 30-inch diameter sanitary sewer force mains at the intersection of Pine Tree Drive and West 51st Street; and WHEREAS, these new parallel force mains will replace two existing ones that have reached the end of their useful life and are at risk of failure; and WHEREAS, these force mains are critical to the City's sewer infrastructure and were identified through condition assessments and recommended for complete replacement in the City's 2019 Sewer Master Plan; and WHEREAS, these force mains convey all sewage flows from the north side of the City, including all satellite cities, southward towards Miami Dade County's Central Districts Wastewater Treatment Plant; and WHEREAS, the replacement of these assets is a high priority for the City and was recommended to take place between 2020 and 2025; and WHEREAS, Contract No. 24-016-01, the construction contract for this force main replacement project, was awarded to Ric -Man International, Inc. ("Ric -Man'), the lowest responsible bidder, pursuant to Invitation to Bid (ITS) No. 2024-016-LB; and WHEREAS, construction activities have been underway since December 2024, and the project is currently 80 percent complete; and WHEREAS, during construction, Ric -Man encountered unforeseen challenges such as unanticipated permitting delays and significant discrepancies between field conditions and the conditions documented in the record drawings; and WHEREAS, these discrepancies included undocumented utility conflicts and one of the existing force mains being significantly deeper than identified in the contract documents, triggering constructability, concerns that led to a modification in scope, requiring additional labor and materials; and WHEREAS, moreover, the age of the City's existing sewer infrastructure presents challenges regarding the reliability of the existing isolation valves in the vicinity of the project site, including the inability to operate the City's existing sewer system valves, and WHEREAS, this has resulted in the development of a bypass and isolation plan that includes additional line stops from those anticipated in the original design; and WHEREAS, accordingly, a modification to the scope is now critical for the project's completion; and WHEREAS, collectively, the project requires a scope amendment totaling $1,232,270.78, reflecting the following adjustments: • Contractor fees for storing and transporting the pipe required for project completion. • Scope adjustments for changing the interconnection between the two systems from the north to the south of the bridge. • Scope adjustments for encountering the pipes at deeper elevations than originally anticipated per contract documents/reoord drawings. • Additional field testing and ensuring compliance with construction permits. • Upsizing the force main serving Sewer Pump Station #15 from 6 inches to 10 inches as required based on encountered conditions. • Furnishing and installing additional pipe, fittings, and appurtenances required to change the interconnection location, avoid conflicts with undocumented utilities, and tie-in to pipes at deeper elevations than initially anticipated. • Constructing a bypass system between the two force mains to maintain sewer flow and service while construction activities take place and provide temporary line stops in lieu of operational valves as required for tie-ins to take place without further compromising the City's existing sewer infrastructure, • Conducting tie-in operations, including maintaining excavations and backfilling. • Additional re -striping required to restore the site. WHEREAS, the Administration recommends approval of Amendment No. 1 to Contract No. 24-016-01 to modify the project scope and allow for the completion of this critical project. NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayorand City Commission hereby approve and authorize the City Manager and City Clerk to execute Amendment No. 1 to Contract No. 24-016-01 between the City of Miami Beach and Ric -Man International, Inc., issued under ITB 2024-016-LB for the force main canal crossing replacement at Pine Tree Drive; said amendment providing for the fumishment and installation of a sanitary sewer bypass system and additional 30-inch ductile iron pipe, located at the intersection of Pine Tree Drive and West 51st Street, as well as fittings and appurtenances needed to complete the project, in the not -to -exceed amount of $1,232,270.78, increasing the total contract cost from $5,189,255.50 to $6,421,526.28. PASSED and ADOPTED this 17 day of Q•Ghn%"' 2025. wL Steven Meiner, Mayor ATTEST: DU 2 z APPROVED AS TO Rafael E. Granado, City Cled< FORM & LANGUAGE "INroi� OR1*[o & FOR EXECUTION Ci orney -W Date