20120111 LTC 004-2012MIAMI BEACH OFFICE OF THE CITY MANAGER LTC #: 004-2012 LETTER TO COMMISSION TO: FROM: DATE: Mayor Matti Herrera Bower and Members of the City Commission Jorge M. Gonzalez, City Manager ~---6 January 4, 2012 U SUBJECT: REPORTS AND INFORMATIONAL ITEMS FOR THE JANUARY 11, 2012 COMMISSION MEETING Pursuant to the changes directed by the City Commission for meeting agenda distribution, the following reports will now be provided on a monthly basis via LTC and also posted on the City's website. 1. Parking Status Report -November 2011. 2. Informational Report To The Mayor And City Commission, On Federal, State, Miami- Dade County, U.S. Communities, And All Existing City Contracts For Renewal Or Extensions In The Next 180 Days. 3. Status Report On The Palm & Hibiscus Islands Underground Utilities Project. 4. CIP Monthly Construction Project! Update. 5. Report Of The Itemized Revenues And Expenditures Of The Miami Beach Redevelopm'ent Agency's City Center District & South Pointe (Pre-Termination Carry Forward Balances) For The Month Of November, 2011. JMG/REP/lc F:ICLERI$ALLIUUAICommission-Meetings\2012\January 11, 20121LTC,doc 0 1"'0.) = -l 1"'0.) -< L n ;co. r z rrl I ::::0 ::;:;: U1 " (j; '-0 0 :::iI: --I'} N -n .. n U1 rr; W -..... /,) fi'l ,f'"'> '" .' "T1 < :on 'J ~ MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: DATE: Jorge M. Gonzalez, City Manager J January 11, 20 12 ~ U SUBJECT: PARKING STATUS REPORT UOVEMBER 2011 During the month of November the Parking Department received revenue from different sources outlined in the categories listed below: REVENUE SOURCE NOVEMBER 2010 NOVEMBER 2011 %INC/(DEC) I. Meters (Single & Multi Space)$l ,604,675.12 $1,842,974.08 14.85% II. OH-Street Facilities a. Garages and AHended 17th Street Garage City Hall Garage 7 th Street Garage Pennsylvania Ave Garage 12th Street Garage 13 th Street Garage 42nd Street Garage 16 th Street Garage $887,497.70 $301,850.55 $45,151.15 $ 1 38, 1 05. 1 6 $28,692.50 $46,368.59 $86,134.21 $27,687.69 $213,507.85 $929,506.04 $326,057.60 $44,841.34 $140,665.19 $52,360.94 $42,109.71 $86,336.29 $24,846.18 $212,288.79 4.73% 8.02% (0.69%) 1.85% 82.49% (9.18%) 0.23% (10.26%) (0.57%) REVENUE SOURCE OCTOBER 2010 OCTOBER 2011 %INC/(DEC) b. Joint Venture 51 h & Alton Garage $21,818.14 $51,636.88* 136.67% *46% of total revenue which represents the City's pro-rata share pursuant to the Development Agreement. REVENUE SOURCE III. Enforcement a. M-D Cty Pkg Violations b. Towing IV. Permit Sales NOVEMBER 2010 $318,051.79 $297,601.79 $20,450.00 $274,565.34 a. Municipal Monthly Permits $70,062.75 b. Valet & Space Rental $100,025.94 c. Residential Permits $50,541.65 d. Hotel Ha ng Tags (800 tags) $12,000.00 e. In Vehicle Parking Meter (206 iParks) $41,935.00 NOVEMBER 2011 %INC/(DEC) $382,613.98 20.30% $361,238.98 21.38% $21,375.00 4.52% $306,020.51 11.46% $58,101.96 (17.07%) $130,227.18 30.19% $54,321.37 7.48% $8,000.00 (33.33%) $55,370.00 32.04% #/ January 77,2072 City Commission Memorandum Parking Status Report -November 20 7 7 Page 2 of 2 Meters: the increase of meter revenue is primarily due to an increase in the hourly rate from $1.50 to $1.75 south of 23 rd Street. Garages & Attended Lots: the overall revenue in the garages and lots increased by 4.73% due to an increase in 17th Street, 7 th Street, Penn Avenue, and 13th Street Garages. In an effort to reduce operating expenses, the Parking Department continues to decrease the number of labor hours for garage and attended lot operations including cashiers/attendants, supervisors. However, please note that an increase to the Living Wage Hourly Rate became effective in October 2010, increasing expenses despite the aforementioned reduction in labor. Operating expenses increased by 14.31 %; when including the additional expenses for the new Pennsylvania Avenue Garage, expenses cumulatively increased by 21.29%. Anchor Garage expenses increased due to a $27795 elevator repair (elevator jack cylinder replacement) Enforcement: the 20.30% increose in revenue is a result of a 14.22% increase in the number of citations issued. Permit Sales: the overall revenue increase in permits sales is a result of increased valet & Space Rental, residential permits and IVPM sales. Additionally, non-resident IVPMs are available at Publix supermarkets and select Walgreens. Since August 2009 we have sold a total of 1123 devices to these retail stores (1060 to Publix and 63 to Walgreens). 5th and Alton Garage: The 5 th and Alton Garage is a joint venture project (parking garage) with the "Developer" (Berkowitz Development Group) containing 1,080 parking spaces. The Developer and City own 54% and 46% of the parking spaces, respectively, and profit/loss is also shared in the same manner. The City's revenue portion (46%) is $51,636.88; resulting in a total net income of $30,243.53 for the month of October 2011. Pursuant to the Development Agreement, the City receives its proportionate share of profit or must subsidize any loss. The City and Developer continue to jointly pursue initiatives to promote the use of the garage. These initiatives include but are not limited to "after hours" flat rate parking; valet parking storage; monthly parking; and strategically placed electronic signage directing users to the facility. Future considerations include promotional rates for "after hours"; valet parking storage; and park and ride options to the entertainment districts. Attached are detailed reports for each category listed above that comprises the total monthly revenue. Unfortunately the November 2011 information for the 5 th & Alton Garage was not available at time of rint and will be submitted at a later date. JMG N\RAR\Parking Status Repart\FY 2011-2012\201 1-1 l.dac Diff % ~arages~ Attended Lots Nov-10 Nov-11 $ 887,497.70 $ 929,506.04 $ 42,008.34 4.73% Towing & Parking Violations 11% Permit Sales & Space Rentals 9% $3,500,000.00 $3,000,000.00 $2,500,000.00 $2,000,000.00 $1,500,000.00 $1,000,000.00 $500,000.00 $- Attended Lots PARKING DEPARTMENT REVENUE November-1 1 M..eters Permit :::ia es & :::ioace loYting_&XaL~ing (55 &MS) Rentals Violation~ $ 1,604,675.12 $ 274,565.34 $ 318,051.79 $ 1,842,974.08 $ 306,020.51 $ 382,613.98 $ 238,298.96 $ 31,455.17 $ 64,562.19 14.85% 11.46% 20.30% Revenue 2011 :--___ Gorages & Attended lots ., • • " ~ • R • • p -. • .. ., • .. • • .. • • It 1 ... ~~ ........ ~~ ..... ~ .. ~" . . ~ . . ~ . . . . . ~ . . .. . . . . . . ·.-_-_·.-_-_·.-_-.·.-_MetElr.s·.·.-_-.·.-_· -.:: :::::::::::::: !~~~~:~!:: ::: ... - Meters (55 & MS) Permit Sales & Space Rentals Towing & Parking Violations 27% TOTAL Nov-11 TOTAL $ 3,084,789.95 $ 3,461,114.61 $ 376,324.66 12.20% aNov·l0 CNov.ll PARKING DEPARTMENT REVENUE YTD November-ll :.:;arages 1St. lowing 1St. Parking Attended Lots Meters (SS & MS) Permit Sales Y:iQlations TOTAL Oct-11 $ 867,589.31 $ 1,689,714.18 $ 356,298.91 $ 362,213.28 $ 3,275,815.68 Nov-11 $ 929,506.04 $ 1,842,974.08 $ 306,020.51 $ 382,613.98 $ 3,461,114.61 Dec-11 $ - jan-12 $ - Feb-12 $ - Mar-12 $ - Apr-12 $ - May-12 $ - jun-12 $ - jul-12 $ - Aug-12 $ - Sep-12 $ YTD $ 1,797,095.35 $ 3,532,688.26 $ 662,319.42 $ 744,827.26 $ 6,736,930.29 $4,000,000.00 $3,500,000.00 ~ $3,000,000.00 -1!Im\;.n--------------------------I ~. $2,500,000.00 .:.:.:. m--------------------------j ,':<":-: aTowing & Parking Violations CPermit Sales eM",,, (55 & MS) CGarcges & Attended lots $1,000,000.00 $500,000.00 $. 17th Street Garage -2G Ticket $ 263,477.60 Valet Monthly Permits $ 62,580.00 $ 326,057.60 $300,000.00 $250,000.00 $200,000.00 $150,000.00 $100,000.00 $50,000.00 $- PenDs}d~aDia A~e Garage-G9 $ $ $ 42,000.94 10,360.00 52,360.94 " 0) e o C;:(9 "'" ~ Vi ~ PARKING GARAGE REVENUE CATEGORIES l7Z5Meridian 7th Street Garaae CH Garage -G7 -1G $ 27,504.68 $ 127,840.19 $ $ 13,416.66 $ 3,920.00 $ 12,825.00 $ $ 44,841.34 $ 140,665.19 $ " :r: > «0-Ur-., " .Q (9 0) c: dJ 6(9 e 19> .!ij' 0 ,..,~ '5i ~ C;:(9 ~ 0 ::z: ~ ,,~ §(9 '" 0 ~ " r-.,(9 V) "-i'o. £ r-., November-ll 12th Street Garage -2A 37,489.71 4,620.00 42,109.71 " 0) e 0 c;:« ill'" -'= V) £ '" " 0) e o (9« -r-., ~'":" V) -" cry 13th Street Garage -1ZA $ 77,796.29 $ 8,540.00 $ 86,336.29 -« ill 00 ~ ~ -ge' '" 0 "<;/(9 $ $ $ 420d Street Gc[age -SA 4,826.18 20,020.00 24,846.18 " 0) e <3 0 --" " u " c: ~« -" .:0 16th Street Garage -Anchor TOTAL $ 145,281.79 $ 726,217.38 $ 22,807.00 $ 36,223.66 $ 44,200.00 $ 167,065.00 $ - $ 212,288.79 $ 929,506.04 OTicket mVolet OMonlhly Permits 17th Street Garage -2G Date Day Total Vehicle Peak Period Peak Vehicle Total Vehicle Entries Count Entries 1 TU 3705 19:00-19:59 754 578 2 W 3290 19:00-19:59 556 574 3 TH 3405 18:00-18:59 574 711 4 F 4108 19:00-19:59 773 913 5 SA 4786 17:00-17:59 789 1471 6 SU 4428 17:00-17:59 874 1173 7 MO 1903 17:00-17:59 331 569 8 TU 1915 17:00-17:59 383 568 9 W 1998 19:00-19:59 367 552 10 TH 2269 19:00-19:59 508 736 11 F 6316 18:00-18:59 3662 1033 12 SA 3782 17:00-17:59 665 1316 13 SU 4142 19:00-19:59 822 1124 14 MO 3041 17:00-17:59 535 566 15 TU 3073 14:00-14:59 482 561 16 W 2534 17:00-17:59 383 647 17 TH 2548 18:00-18:59 407 1246 18 F 2863 18:00-18:59 415 587 19 SA 4074 18:00-18:59 692 1192 20 SU 3311 14:00-14:59 545 975 21 MO 2457 18:00-18:59 416 588 22 TU 2467 17:00-17:59 403 703 23 W 2920 15:00-15:59 440 777 24 TH 1628 15:00-15:59 268 695 25 F 7587 16:00-16:59 644 1041 26 SA 7267 16:00-16:59 622 1411 27 SU 4452 17:00-17:59 552 1273 28 MO 2490 17:00-17:59 391 555 29 TU 3394 18:00-18:59 523 516 30 W 4112 17:00-17:59 655 575 106265 25226 J City of Miami Beoch Parking Department Daily Vehicle Entry Report -November 2011 ------ 7th St Garage - 1 G 16th Street Garage -ANCHOR Peak Period Peak Vehicle Total Vehicle Peak Period Peak Vehicle Count Entries Count 16:00-16:59 98 901 00:00-00:59 207 18:00-18:59 95 868 18:00-18:59 139 15:00-15:59 125 1006 15:00-15:59 159 16:00-16:59 179 868 14:00-14:59 135 16:00-16:59 246 1542 22:00-22:59 249 00:00-00:59 221 1149 00:00-00:59 291 16:00-16:59 99 866 15:00-15:59 146 16:00-16:59 97 902 17:00-17:59 150 16:00-16:59 94 821 15:00-15:59 135 16:00-16:59 148 946 14:00-14:59 136 16:00-16:59 194 1230 15:00-15:59 187 16:00-16:59 222 1180 16:00-16:59 172 16:00-16:59 204 1008 00:00-00:59 142 16:00-16:59 92 887 17:00-17:59 144 18:00-18:59 97 939 15:00-15:59 146 17:00-17:59 109 917 17:00-17:59 143 18:00-18:59 236 1107 14:00-14:59 138 17:00-17:59 82 1125 15:00-15:59 140 16:00-16:59 214 1370 23:00-23:59 183 00:00-00:59 155 1043 00:00-00:59 174 18:00-18:59 104 1061 14:00-14:59 149 16:00-16:59 119 976 08:00-08:59 148 16:00-16:59 153 854 16:00-16:59 129 15:00-15:59 131 801 14:00-14:59 119 15:00-15:59 191 1037 17:00-17:59 145 15:00-15:59 255 1072 17:00-17:59 154 17:00-17:59 247 1059 15:00-15:59 166 17:00-17:59 102 881 17:00-17:59 139 16:00-16:59 86 877 14:00-14:59 126 15:00-15:59 101 1180 20:00-20:59 156 30473 1775 Meridian Garage -G7 Total Vehicle Peak Period Peak Vehicle Entries Count 775 08:00-08:59 194 761 08:00-08:59 185 717 08:00-08:59 186 802 17:00-17:59 162 1256 19:00-19:59 310 846 13:00-13:59 229 653 17:00-17:59 167 700 17:00-17:59 192 732 08:00-08:59 181 700 08:00-08:59 174 126 13:00-13:59 22 170 21 :00-21 :59 40 164 18:00-18:59 34 864 17:00-17:59 211 807 17:00-17:59 191 705 17:00-17:59 182 692 17:00-17:59 182 670 08:00-08:59 186 121 17:00-17:59 20 70 15:00-15:59 16 643 17:00-17:59 172 648 08:00-08:59 163 572 08:00-08:59 144 42 12:00-12:59 9 94 21 :00-21 :59 15 145 16:00-16:59 45 82 09:00-09:59 15 700 08:00-08:59 180 792 08:00-08:59 191 1153 19:00-19:59 279 17202 12th St Garage -2A Day Total Vehicle Peak Period Peak Vehicle Total Vehicle Date Entries Count Entries 1 TU 201 13:00-13:59 34 317 2 W 214 09:00-09:59 37 360 3 TH 265 12:00-12:59 48 409 4 F 275 12:00-12:59 36 524 5 SA 304 23:00-23:59 62 579 6 SU 180 15:00-15:59 33 554 7 MO 281 12:00-12:59 48 293 8 TU 213 17:00-17:59 40 282 9 W 212 07:00-07:59 33 291 10 TH 236 16:00-16:59 45 365 11 F 187 16:00-16:59 32 494 12 SA 281 23:00-23:59 48 637 13 SU 179 04:00-04:59 45 582 14 MO 217 17:00-17:59 42 380 15 TU 195 17:00-17:59 39 378 16 W 219 16:00-16:59 39 326 17 TH 300 22:00-22:59 49 483 18 F 234 16:00-16:59 38 317 19 SA 267 18:00-18:59 47 654 20 SU 165 00:00-00:59 34 480 21 MO 193 14:00-14:59 40 313 22 TU 249 18:00-18:59 38 330 23 W 255 16:00-16:59 35 434 24 TH 147 00:00-00:59 35 439 25 F 197 18:00-18:59 30 479 26 SA 308 18:00-18:59 55 695 27 SU 262 13:00-13:59 43 582 28 MO 217 17:00-17:59 41 304 29 TU 170 18:00-18:59 31 290 30 W 231 17:00-17:59 31 324 6854 12895 City of Miami Beach Parking Department Daily Vehicle Entry Report -November 2011 13th St Garage -17A Peak Period Peak Vehicle Total Vehicle Count Entries 00:00-00:59 50 446 15:00-15:59 67 393 16:00-16:59 67 413 16:00-16:59 92 445 14:00-14:59 103 159 16:00-16:59 92 142 15:00-15:59 58 444 15:00-15:59 51 414 15:00-15:59 56 401 15:00-15:59 63 408 15:00-15:59 81 341 17:00-17:59 101 122 17:00-17:59 111 108 16:00-16:59 68 428 17:00-17:59 60 448 17:00-17:59 54 441 22:00-22:59 85 429 15:00-15:59 47 431 16:00-16:59 98 152 16:00-16:59 91 114 15:00-15:59 54 437 16:00-16:59 58 409 23:00-23:59 88 372 15:00-15:59 73 84 14:00-14:59 76 209 15:00-15:59 106 130 17:00-17:59 95 98 17:00-17:59 56 448 16:00-16:59 54 445 16:00-16:59 49 441 9752 42nd St Garage -8A Peak Period 09:00-09:59 08:00-08:59 09:00-09:59 08:00-08:59 08:00-08:59 22:00-22:59 09:00-09:59 08:00-08:59 08:00-08:59 08:00-08:59 08:00-08:59 08:00-08:59 08:00-08:59 08:00-08:59 08:00-08:59 16:00-16:59 08:00-08:59 08:00-08:59 08:00-08:59 22:00-22:59 08:00-08:59 16:00-16:59 08:00-08:59 06:00-06:59 08:00-08:59 07:00-07:59 08:00-08:59 09:00-09:59 09:00-09:59 09:00-09:59 Pennsylvania Avenue Garage-G9 Peak Vehicle Total Vehicle Peak Period Peak Vehicle Count Entries Count 98 469 00:00-00:59 132 84 332 09:00-09:59 69 95 312 09:00-09:59 68 86 478 20:00-20:59 153 30 1062 18:00-18:59 264 23 1026 18:00-18:59 262 81 272 17:00-17:59 57 100 291 09:00-09:59 71 87 315 09:00-09:59 64 96 298 09:00-09:59 75 74 276 09:00-09:59 46 28 555 19:00-19:59 243 26 280 16:00-16:59 113 88 325 13:00-13:59 72 94 298 09:00-09:59 69 98 284 17:00-17:59 60 100 296 09:00-09:59 67 86 332 18:00-18:59 67 36 275 20:00-20:59 64 20 155 1 6:00-1 6:59 42 95 274 17:00-17:59 57 99 279 09:00-09:59 65 79 261 09:00-09:59 49 16 85 00:00-00:59 17 50 154 17:00-17:59 25 27 209 21 :00-21 :59 72 21 146 00:00-00:59 32 87 275 09:00-09:59 55 110 312 17:00-17:59 69 91 795 19:00-19:59 201 10721 Nov-10 *Nov-11 DIFF % * Attendee 17th 5t Garage -Pennsxlvania Ave 2G Garage-G9 i 99J68.45 i 12,193.65 102,092.74 35,424.14 $ 2,324.29 $ 23,230.49 2.33% 190.51% Labor amounts are estimates 42nd St Garage- 8A 13th st%?arage- 17A 6% 12th St Garage - 5% Expenses 16th St Garage - Anchor 22% 7th St Garage - 1 G 16% ------~-~-------------"------ PARKING GARAGE EXPENSES 1775 Meridian 7th 5t Garage - CH Garage -G7 i $ 36,834.25 i 36,218.60 (615.65) $ -1.67% 17th St Garage -2G 27% Pennsylvania Ave Garage-G9 10% 1775 Meridian CH Garage·G7 10% 1G 62,256.02 60,871. 11 (1,384.91) -2.22% November-ll 12th St Garaae -13th 5t Garage - i $ 2A 17,048.95 i 17,306.43 257.48 $ 1.51% $120,000.00 $100,000.00 $80,000.00 $60,000.00 $40,000.00 $20,000.00 $- 17A 22,022.93 22,445.87 422.94 1.92% <l. Q) 0 ·c ill e 0 > 0 ;;;.. (9 '" <:: V5 <:: Q) -£ "-r--.. 42nd 5t Garaae -16th 5t Garage - 8A Anchor TOTAL i 15,637.35 i 41,834.02 $ 307,595.62 15,747.13 82,985.82 $ 373,091.84 $ 109.78 $ 41,151.80 $ 65,496.22 0.70% 98.37% 21.29% Expenses YTD Nov· 1 0 :-t-..... « « Q) U N r--.. co ill <:: Q) e 0 Q) Q) 'U ill ill Q) ill 0 EJ e e ill e (9 ·c e Q) 0 0 0 V5 ~ (9 (9 0 (9 (9 ...<:: Lr) V5 V5 V5 .0 r--.. V5 r--.. ~ ...<:: ""0 N -£ <:: C'") N -.;;t PARKING GARAGE EXPENSES YTD 17th Street Garaae -Pennsxlvania Ave 1775 Meridian 7th Street Garaae -12th Street 13th Street 42nd Street 16th Street 2G Garage-G9 CH Garage -G7 1G Garage -2A Garage -17A Garage -8A Garage -Anchor TOTAL Oct-11 ~ 102,019.98 $ 34,307.44 $ 37755.48 ~ 67,347.99 $ 16734.15 ~ 27722.93 $ 17,209.21 ~ 59,272.27 $ 362,369.45 Nov-11 102,092.74 $ 35A24.14 $ 36,218.60 60,87l.11 $ 17,306.43 22A45.87 $ 15747.13 82,985.82 $ 373,091.84 Dec-11 $ - I lan-12 $ - Feb-12 $ - Mar-12 $ - Apr-12 $ - May-12 $ - lun-12 $ - lul-12 $ Aug-12 $ - Sep-12 $ - $ 204,112.72 $ 69731.58 $ 73,974.08 $ 128,219.10 $ 34,040.58 $ 50,168.80 $ 32,956.34 $ 142,258.09 $ 735A61.29 $400,000.00 $350,000.00 L 16th Sireet Garoge . Anchor $300,000.00 1142nd Sireet Garoge. BA C13th Sireet Garoge. 17A $250,000.00 D 12th Street Gorogo . 2A $200,000.00 a71h Slreet Garage· 1 G $150,000.00 81775 Meridian CH Garage. G7 CPennsy/vanio Av.1I Garoge-G9 $100,000.00 C 17th Sireet Garage. 2G $50,000.00 $- ---------~-~------- PARKING GARAGE EXPENSES CATEGORIES November-ll 17th Street Garaae -Peooslllyania Aye 1775 Meridian CH 7th Street 12th Street Garaae 13th Stre!;lt 42nd Street 16th Street Garane 2G Ga[age-G2 Garage -G7 Ga[age -1G -2A Garage -17A Garage-8A -Anchor TOTAL Security (SA & TransValue) $ 28,551.73 $ 7,852.13 $ 6,065.56 $ 20,339.42 $ 1,220.90 $ 4,813.76 $ 3,403.39 ~ 17,623.75 ~ 89,870.64 Attendant Labor** $ 50,422.88 $ 72,704.76 $ 8,473.56 $ 23,972.77 $ 72,956.86 $ 72,374.09 $ 5,650.98 24,842.07 757,337.85 Janitorial $ 8,100.00 $ 8,200.00 $ 6,368.55 $ 6,900.00 $ 1,660.00 $ 1,660.00 $ 2,540.00 $ 6,460.00 $ 41,888.55 Electricity $ 7,081.33 $ 2,196.65 $ 11,373.43 $ 2,836.79 $ 108.54 $ 2,100.47 $ 2,238.02 $ 2,243.63 $ 30,178.86 Maintenance * $ 7,936.80 $ 4,470.60 $ 3,937.50 $ 6,822.19 $ 1,360.13 $ 1,557.55 $ 1,914.74 $ 31,816.43 $ 59,815.94 $ 102,092.74 $ 35,424.14 $ 36,218.60 $ 60,871.11 $ 17,306.43 $ 22,445.87 $ 15,747.13 $ 82,985.82 $ 373,091.84 ~ , ~ ~ ~ n n ., P"", .,.." ..... "U\; _ ..... "" ...... , ** Attended Labor amounts are estimates. NOTE: ANCHOR expenses increased due to a $27,795 repair (elevator jack cylinder replacement) $60,000.00 $50,000.00 .Security (SA & TransValue) $40,000.00 CAHendanllabor** IIJanitorial $30,000.00 CEleclricity $20,000.00 DMoinlenonce* $10,000.00 $- 17th Street Garage -Pennsylvania Ave 1775 Meridian CH 7th Street Garage -12th Street Garage -13th Street Garage -42nd Street Garage 16th Street Garage- 2G Garage-G9 Garage -G7 1 G 2A 17 A -8A Anchor REVENUE 2010 2011 Increase! LOCATION November November (Decrease) 17 St. Garage 301,850.55 326,057.60 24,207.05 City Hall Garage 45,151.15 44,841.34 (309.81) 7th St. Garage 138,105.16 140,665.19 2,560.03 12th St. Garage 46,368.59 42,109.71 (4,258.88) 13th St. Garage 86,134.21 86,336.29 202.08 42nd St. Garage 27,687.69 24,846.18 (2,841.51) 16th St. -Anchor 213,507.85 212,288.79 (1,219.06) SUB-Totals 858,805.20 877,145.10 18,339.90 Penn Garage 28,692.50 52,360.94 23,668.44 SUB-Totals 28,692.50 52,360.94 23,668.44 TOTALS 887,497.70 929,506.04 42,008.34 Revenue Expenses Profitl(Loss) Per Space Per Space Per Space 17 St. Garage 223.33 69.93 153.40 CIty Hall Garage 68.99 55.72 13.27 7th St. Garage 217.75 94.23 123.52 12th St. Garage 314.25 129.15 185.10 13th St. Garage 301.88 78.48 223.39 42nd St. Garage 40.07 25.40 14.68 16th St. -Anchor 264.37 103.34 161.02 Penn Garage 95.20 64.41 30.79 F:IP INGI$PERSIP&L\2012INovember2011 ITPC-November -2011 SJF Percent of Increase! (Decrease) 8.02% -0.69% 1.85% -9.18% 0.23% -10.26% -0.57% 2.14% 82.49% 82.49% 4.73% CITY OF MIAMI BEACH PARKING DEPARTMENT FINANCIAL REPORT SUMMARY NOVEMBER 2011 EXPENSES PROFIT!(LOSS) 2010 2011 Increase! Percent of 2010 2011 Increase! Percent of November November (Decrease) Increase! November November (Decrease) Increase! (Decrease) (Decrease) 99,768.45 102,092.74 2,324.29 2.33% 202,082.10 223,964.86 21,882.76 10.83% 36,834.25 36,218.60 (615.65) -1.67% 8,316.90 8,622.74 305.84 3.68% 62,256.02 60,871.11 (1,384.91) -2.22% 75,849.14 79,794.08 3,944.94 5.20% 17,048.95 17,306.43 257.48 1.51% 29,319.64 24,803.28 (4,516.36) -15.40% 22,022.93 22,445.87 422.94 1.92% 64,111.28 63,890.42 (220.86) -0.34% 15,637.35 15,747.13 109.78 0.70% 12,050.34 9,099.05 (2,951.29) -24.49% 41,834.02 82,985.82 41,151.80 98.37% 171,673.83 129,302.97 (42,370.86) -24.68% 295,401.97 337,667.70 42,265.73 14.31% 563,403.23 539,477.40 (23,925.83) -4.25% 12.193.65 35,424.14 23,230.49 190.51% 16,498.85 16.936.80 437.95 2.65% 12,193.65 35,424.14 23,230.49 190.51% 16,498.85 16,936.80 437.95 2.65% 307,595.62 373,091.84 65,496.22 21.29% 579,902.08 556,414.20 (23,487.88) -4.05% The 17th Street Garage has 1,460 spaces. The City Hall Garage has 650 spaces. The 7th Street Garage has 646 spaces. The 12th Street Garage has 134 spaces. The 13th Street Garage has 286 spaces. The 42nd Street Garage has 620 spaces. The 16th Street -Anchor Garage has 803 spaces. The Penn Garage has 550 spaces. 1/312012 REVENUE 2010 2011 Increase! LOCATION November November (Decrease) YTD YTD 17 St. Garage 609,044.41 626,867.13 17,822.72 City Hall Garage 87,991.82 74,587.32 (13,404.50) 7th St. Garage 316,769.16 272,960.97 (43,808.19) 12th St. Garage 83,672.32 82,106.42 (1,565.90) 13th St. Garage 176,513.25 179,772.76 3,259.51 42nd St. Garage 54,985.64 48,927.13 (6,058.51) 16th St. -Anchor 451,721.42 419,151.38 (32,570.04) SUB-Totals 1,780,698.02 1,704,373.11 (76,324.91 ) Penn Garage 28,885.02 92,722.24 63,837.22 SUB-Totals 28,885.02 92,722.24 63,837.22 TOTALS 1,809,583.04 1,797,095.35 (12,487.69) Revenue Expenses Profit/(Loss) Per Space Per Space Per Space 17 St. Garage 429.36 139.80 289.56 City Hall Garage 114.75 113.81 0.94 7th St. Garage 422.54 198.48 224.06 12th St. Garage 612.73 254.03 358.70 13th St. Garage 628.58 175.42 453.16 42nd St. Garage 78.91 53.16 25.76 16th St. -Anchor 521.98 177.16 344.82 Penn Garage 168.59 126.78 41.80 F:IPINGI$PERSIP&LI2012INovember2011 ITPC-YTD-November -2011 SJF Percent of Increase! (Decrease) 2.93% -15.23% -13.83% -1.87% 1.85% -11.02% -7.21% -4.29% 221.00% 221.00% -0.69% CITY OF MIAMI BEACH PARKING DEPARTMENT FINANCIAL REPORT SUMMARY-YEAR TO DATE NOVEMBER 2011 EXPENSES PROFIT!(LOSS) 2010 2011 Increase! Percent of 2010 2011 Increase! Percent of November November (Decrease) Increase! November November (Decrease) Increase! YTD YTD (Decrease) YTD YTD (Decrease) 210,882.53 204,112.72 (6,769.81) -3.21% 398,161.88 422,754.41 24,592.53 6.18% 69,519.48 73,974.08 4,454.60 6.41% 18,472.34 613.24 (17,859.10) -96.68% 125,047.11 128,219.10 3,171.99 2.54% 191,722.05 144,741.87 (46,980.18) ·24.50% 33,947.55 34,040.58 93.03 0.27% 49,724.77 48,065.84 (1,658.93) -3.34% 43,659.86 50,168.80 6,508.94 14.91% 1.32,853.39 129,603.96 (3,249.43) -2.45% 31,605.47 32,956.34 1,350.87 4.27% 23,380.17 15,970.79 (7,409.38) -31.69% 85,100.14 142,258.09 57,157.95 67.17% 366,621.28 276,893.29 (89,727.99) -24.47% 599,762.14 665,729.71 65,967.57 11.00% 1,180,935.88 1,038,643.40 (142,292.48) -12.05% 12,449.40 69,731.58 57,282.18 460.12% 16,435.62 22,990.66 6,555.04 39.88% 12,449.40 69,731.58 57,282.18 460.12% 16,435.62 22,990.66 6,555.04 39.88% 612,211.54 735,461.29 123,249.75 20.13% 1,197,371.50 1,061,634.06 (135,737.44) -11.34% The 17th Street Garage has 1,460 spaces. The City Hall Garage has 650 spaces. The 7th Street Garage has 646 spaces. The 12th Street Garage has 134 spaces. The 13th Street Garage has 286 spaces. The 42nd Street Garage has 620 spaces. The 16th Street -Anchor Garage has 803 spaces. The Penn Garage has 550 spaces. 1/3/2012 City of Miami Beach 5th and Alton Parking Garage Fiscal Year beginning October 1,201'1 ending September 30,2012 For the current month ending October 31,2011 Fiscal Current Month YTD Berkowtiz Total Revenues 1 Development CMB46% CMB46% Expenses 54% Portion Portion Portion Operating revenue: 484-8000-344405 5th & Alton Garage -Monthly $ 5,799.55 $ 3,131.76 $ 2,667.79 $ 2,667.79 484-8000-344406 5th & Alton Garage -Transient 45,199.55 24,407.76 20,791.79 20,791.79 484-8000-344410 5th & Alton Garage -Tenant 26,125.00 14,'107.50 12,017.50 12,017.50 484-8000-344587 Valet Parking (Off) -Taxable 35,100.00 18,954.00 16,146.00 16,146.00 484-8000-369999 Miscellaneous Revenue 30.00 16;20 13.80 13.80 Total operating revenue 112,254.10 60,617.22 51,636.88 51,636.88 Operating expenses: 484-0470-000312 Professional Services 9,418.46 5,085.97 4,332.49 4,332.49 484-0470-000313 Bank Fees 377.12 203.64 173.48 173.48 484-0470-000314 Electricity 484-0470-000316 Telephone 769.50 415.53 353.97 353.97 484-0470-000317 Water 1,332.93 719.78 613.15 613.15 484-0470-000318 Sewer Charges 1,999.40 1,079.68 919.72 919.72 484-0470-000319 Sanitation Fees 120.75 65.21 55.55 55.55 484-0470-000321 Postage and Shipping 57.60 31.10 26.50 26.50 484-0470-000323 Rent-Building & Equipment 484-0470-000324 Printing 3,228.00 1,743.12 1,484.88 1,484.88 484-0470-000325 Contract Maintenance 16,952.41 9,154.31 7,798.09 7,798.09 484-0470-000342 Repairs/Maintenance Supply 4,400.00 2,376.00 2,024.00 2,024.00 484-0470-000343 Other Operating Expenditures 513.06 277.05 236.01 236.01 484-0470-000349 Other Contractual Services 7,341.29 3,964.30 3,376.99 3,376.99 484-0470-000368 Taxes & Ucenses 484-0470-000375 Misc Insurance Total operating expenses 46,510.52 25,115.69 21,394.83 21,394.83 Nonoperating revenue 484-8000-361130 Interest-Repurchase Agreement 3.22 1.74 1.48 1.48 Total nonoperating revenue 3.22 1.74 1.48 1.48 Net income/(loss) 65,746.80 35,503.27 30,243.53 30,243.53 Transfers In Change in net assets 65,746.80 35,503.27 30,243.53 30,243.53 I' Net assets, beginning 40,187.35 21,701.17 18,486.18 18,486.18 Net assets, ending $ 105,934.15 $ 57,204.44 $ 48,729.71 $ 48,729.71 I I I Source -Berkowitz Monthly Financial Statements-CMB -GL 12130/2011 I Prepared by: Finance Department 01/03/2011-'1\\. N-I I)t/ 1 1 i Multi Space Revenue 85% PARKING DEPARTMENT METER REVENUE Bill 39% % of USAGE Nov-ll Total Meter Revenue MULTI SPACE METERS Ipark Revenue 3% Single Space Revenue 12% Coin 8% IPARK DE}t'ICE SALES QTY AMQUNT RESIDENT 119 $ 2,380.00 NON-RESI 87 $ 1,740.00 206 $ 4,120.00 IPARK DE}t'ICE SALES Resident Non-Resident Oct-11 118 47 Nov-11 119 87 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 YTD 237 134 IPARKSALES Nov-11 --------------- $25 -RELOAD SALES $50 -RELOAD SALES QTY AMOUNT 492 $ 12,300.00 128 $ 3,200.00 620 $ 15,500.00 IPARKSALES YTD QTY AMOUNT 554 $ 27,700.00 161 $ 8,050.00 715 $ 35,750.00 TOTAL RELOADS $ 40,000.00 $ 11,250.00 $ 51,250.00 $25 -RELOAD SALES $50 -RELOAD SALES Total Resident Non-Resident Resident Non-Resident 165 497 155 522 162 206 492 128 554 161 0 0 0 0 0 0 0 0 0 0 371 989 283 1076 323 NOTE: IPark sales began on November 24, 2008. GRAND TOTAL $ 42,380.00 $ 12,990.00 $ 55,370.00 I TOTAL REVENUE $ 53,800.00 $ 55,370.00 $ 109,170.00 LOCATION I X -(Washing Ion -41h & Uncoln) -On 51reel P2 (IA -(1st Street & Ocean Dr.) -Off Street) P2 (1 A -(1 st Street & Ocean Dr.) -Allended) Total P3 (1 B -(7B Washington Avenue) -Off Street) 2X -(Washinglon -51h & Uncoln) -On 51reel Pll (2B -(6/7 & Meridian) -Off Street) 3X -(Collins & Euclid Ave.) On 51reel 4X -(Allan 71h 51.-Dade Blvd.) -On 51reel 4B -(Alton & 20th St.-Purdy-Dade Blvd.) -On Street P24 (4C -(West Ave & 17th St. ) -Off Street) P23 (4D -(Wesl Ave & lincoln Rd. ) -Off Street) CITY OF MIAMI BEACH PARKING DEPARTMENT ELECTRONIC METER REVENUE COMPARISON November 2011 Accounting Code # of Spaces 480.8000-344501 291 480.8000·344502 62 480.8000-344502 0 62 480-8000-344617 12 480-8000-344503 370 480·8000-344505 25 480-8000·344507 68 480-8000-344509 491 480·8000-344511 213 480-8000-344512 66 480-8000-3445 I 3 30 2010 November $107,310.02 $20,087.49 $0.00 20,087.49 $558.37 $Bl,383.51 $2,077.54 $18,632.03 $139,095.09 $24,301.58 $14,214.11 $4,117.48 P29 (5C -(Convention Clr. Dr. & 17th Street) -Off Stree 480·8000-344517 P29 (5C -(Convention Clr. Dr. & 17th Street) -Allended 480·8000-344517 Total 85 o 85 $13,199.27 19,158.90 32,358.17 5F -(Meridian Ave & 1 Bth Street) -Off Street 5F -(Meridian Ave & 1 Bth Street) -Allended Total 480-8000-3445 I 9 480-8000·3445 I 9 P33 (5H -(19th Street & Meridian Ave) -Off Street) 480·8000·344521 5M -(17th & Meridian Ave) . OFF 51reel (TEMP P-LOT) 5M -(l71h & Meridian Ave) . Allended Total 6X -(Collins -20lh 10 241h 51) -On 51reel P48 (6A· (22nd Street & Park) -Off Street) P4B (6A. (22nd Street & Park) -Allended) Total P49 (6B -(Collins Ave & 21 ,t Street) -Off Street) P49 (6B -(Collins Ave & 21 ,t Street) -Allended) Total 7X -(Ocean -Biscayne -151h 51) -On 51reel 7A -(Collins Ave, 41h 10 151h 51) -On 51reel P14 (7C -(Collin' Ave & 6th St) -Off Street) P14 (7C -(Collins Ave & 6th St) -Allended) Total BX -(Pi~etree-Alton -40th to 42nd St) -On Street G6 (BA -(42nd Street Garage) -Off Street Meters) P63 (BB -(42nd Street & Royal Palm) -Off Street) P63 (BB -(42nd Street & Royal Palm) -Allended) Total P60 (BC -(40/41 Street & Cha,e) -Off Street) P64 (BD -(47th Street & Pinetree) -Off Street) P61 (BE -(41 st Street & Alton) -Off Street) P62 (BF -(4"t Street & Jefferson) -Off Street) 9X -(Collins -64th to 79th St) -On Street PB4 (9A -(Harding & 71 st St) -Off Street) P92 (9B -(72nd 51. & Collins) -OFF 5lreel} P92 (9B -(72nd 51. & Collins) -Allended} Total P85 (9C (Carlyle & 71 st St) -Off Street) F:IP1NGI$PERSIP&L\2012INEWMETER-FY11-12 SJF 480-8000-344506 480-8000·344506 480-8000·344522 480·8000·344523 480.8000·344523 480.8000-344524 480.8000-344524 480.8000·344525 480.8000-344526 480-8000·344528 480-8000·344528 480·8000-344530 480-8000-34453 I 480-8000-344532 480-8000-344532 480-8000·344533 480-8000·344534 480-8000-344535 480-8000·344536 480·8000-344537 480·8000-344538 480-8000-344539 480-8000-344539 480.8000-344540 97 o 97 27 27 o 236 14 o 190 o 190 442 591 14 o 14 386 11 173 o 173 88 16 40 30 527 48 o o o 14 Page 1 of 3 $0.00 0.00 0.00 $1,312.06 $0.00 0.00 0.00 $42,182.60 $616.13 $0.00 $616.13 $73,354.20 0.00 73,354.20 $133,027.78 $249,240.81 $891.26 0.00 891.26 $20,509.13 $372.09 $3,361.10 0.00 3,361.10 $1,027.25 $0.00 $3,497.56 $464.93 $34,047.75 $58.62 $10,197.74 0.00 10,197.74 $122.36 2011 November $127,447.89 $30,643.54 $0.00 30,643.54 $0.00 $92,492.43 $906.54 $13,524.89 $133,688.46 $22,535.56 $18,086.03 $3,807.B8 $13,626.10 22,191.60 35,817.70 $0.00 0.00 0.00 $2,100.71 $0.00 0.00 0.00 $61,724.04 $810.55 $0.00 $810.55 $92,257.56 0.00 92,257.56 $128,399.82 $285,355.43 $1,027.18 0.00 1,027.18 $24,965.08 $701.88 $4,452.49 0.00 4,452.49 $1,900.87 $0.00 $3,268.58 $708.51 $43,365.42 $7,214.92 $13,469.15 0.00 13,469.15 $161.15 Increase/ (Decrease) 20,137.87 10,556.05 10,556.05 (558.37) 11,108.92 (1,171.00) (5,107.14) (5,406.63) (1,766.02) 3,871.92 (309.60) 426.83 3,459.53 0.00 788.65 0.00 19,541.44 194.42 194.42 18,903.36 18,903.36 (4,627.96) 36,114.62 135.92 4,455.95 329.79 1,091.39 873.62 0.00 (228.98) 243.58 9,317.67 7,156.30 3,271.41 38.79 %of Inc/(Dec) 18.77% 52.55% -100.00% 13.65% -56.36% -27.41% -3.89% -7.27% 27.24% -7.52% 10.69% #DIV/OI 60.11% #DIV/OI 46.33% 31.56% 31.56% 25.77% 25.77% -3.48% 14.49% 15.25% 21.73% 88.63% 32.47% 85.04% #DIV/OI ·6.55% 52.39% 27.37% 12207.95% 32.08% 31.70% 113/2012 LOCATION P86 (90 -(Collins & 76th St) . Off Street) P83 (9E· (7lst St, & Hording). Off Street) Pl06 (9F· (75th & Collins) . Off Street) P25 (lOA -(Lincoln Lane & Lenox) • OIIS/reel) lOB -(Lincoln lane & Michigan) . lease lOB· (lincoln lane & Michigan) . AMended Total P27 (10C. (Lincoln Lone & Meridian) . OIIS/reel) P20 (I DO· (Lineofn Lane & Jeflerson -W) . OIIS/reel) P19 (1 DE . (Lincoln Lane & Jellerson . E) . OIIS/reel) 'P18 (I DF . (Lincoln Lane & Euclid) . OIIS/reel) P21 (I DG . (Lincoln Lane & Michigan) • all Slreel ) P15 (II X· (Collins & 11th Street)· Off Street) P15 (llX. (Collins & 11th Street). AMended) Total P12 (l2X. (Washington & 9th Street) . Off Street) P12 (l2X. (Washington & 9th Street) . AMended) Total P13 (13X. (Washington & 10th Street)· Off Street) P13 (13X. (Washington & 10th Street) . AMended) Total 15X· (16th to 18th East 01 Coffins) . On Street 15A -(Washington, 17th to 2Dth) . On Street 158 -(Convention Center Drive) -On Street 16X· (25th to 32nd, E of Collins) . On Street 1M· (35th to 43rd, E of Collins) . On Street 16B· (Indian Crk Dr, 27th to 32nd) . On Street 16C· ( Indian Crk· 33rd to 43rd)· On Street P56 (160 . (Coffins Ave & 34th St) • OIIS/reet) P56 (160· (Coffins Ave & 34th St) • Attended) Total P57 (l6E • (Coffins Ave & 35th 51) • Olf Street) P57 (l6E· (Coffins Ave & 35th 51) . Attended) Total P16 (l7X. (Collins & 13th Street)· off Street) P16 (l7X. (Collins & 13th Street) . AMended) Total P82 (18X· (Indian Crk & 65th St) -Off S/reel) P81 (l8A. (Coffins & 641h 51) • Off S/reel) P81 (l8A· (Coffins & 641h 51) . Attended) Total P71 (l9X· (Coffins & 461h S/reel) -Off S/reel) P71 (l9X· (Coffins & 461h S/reel) -Attended) Total 19A· (Collins & 46th Street) . On Street F:IPING\$PERSIP&L \2012INEWMETER-FY11-12 SJF CITY OF MIAMI BEACH PARKING DEPARTMENT ELECTRONIC METER REVENUE COMPARISON November 2011 Accounting Code # of Spaces 2010 November 480.8000-344541 33 $1,235.44 480-8000-344542 31 $921.63 480,8000.344543 106 $1,438,17 480-8000-344544 70 $31,140,52 480-8000-344545 ° $16,355,14 480-8000-344545 ° 0,00 ° 16,355,14 480-8000-344546 141 $65,302,48 480-8000-344547 62 $24,50.8,34 480-8000.344548 19 $8,863,97 480,8000-344549 36 $18,30.9,97 480-8000-344550 21 $8,171.48 480,8000,344551 ° $0.,0.0. 480,8000,344551 ° 0,00 ° 0,00 480-8000-344552 23 $9,334,31 480-8000-344552 ° 0,00 23 9,334,31 480.8000.344553 33 $16,894,89 480.8000.344553 ° 0,00 33 16,894,89 480-8000-344556 43 $34,0.83,18 480.8000-344557 91 $721.66 480-8000.344558 46 $1,644,90. 480-8000·344559 78 $14,511.45 480.8000.344560 117 $17,490.,60. 480,8000·344561 219 $10,243,49 480-8000·344562 230 $12,712,30. 480-8000-344563 64 $2,0.86,87 480-8000-344563 0. 0.,0.0. 64 2,0.86,87 480·8000-344564 72 $3,454.70. 480·8000.344564 0. 0..0.0. 72 3,454.70. 480-8000-344565 54 $24,595.74 480-8000-344565 ° 0,00 54 24,595.74 480-8000-344567' 53 $942,56 480-8000·344568 67 $7,245,19 480-8000·344568 ° 0,00 67 7,245,19 480-8000-344569 449 $65,366,84 480-8000.344569 0. 22,644,86 449 88,0.11.70. 480.8000.344570 19 $626,20. Page 2 013 2011 Increase/ %of November (Decrease) Inc/(Dec) $2,082.44 847.00 68.56% $1,379,24 457,61 49,65% $3,933.48 2,495,31 173,51% $38,834,85 7,694,33 24.71% $16,355,14 0,00 16,355,14 0,00 0,00% $70,0.97.22 4,794.74 7,34% $27,896,83 3,388,49 13,83% $10.,314,0.7 1,450.,10. 16,36% $20.,654,58 2,344,61 12,81% $8,179,92 8,44 0.,10% $311.41 0,00 311.41 311.41 UOIV/DI $12,024,31 2,690,00 28,82% 0,00 12,024,31 2,690,00 28,82% $18,509,24 0,00 18,509,24 1,614,35 9,56% $32,40.2.70. (1,680.,48) -4,93% $10,267.72 9,546,0.6 1322.79% $3,312,62 1,667.72 101.39% $17,252.71 2,741.26 18,89% $14,986,55 (2,504,05) ·14.32% $12,196,68 1,953,19 19,07% $17,864,26 5,151.96 40,53% $3,425,51 0.,0.0. 3,425,51 1,338,64 64,15% $3,610.0.7 0.,0.0. 3,610,0.7 155,37 4,50% $30.,0.23,63 0,00 30,023,63 5,427,89 non'o $1,045,14 102,58 10,88% $8,462,91 0,00 8,462,91 1,217.72 16,81% $64,0.70.,40. 24,20.0.,0.1 88,270.,41 258.71 0,29% $594,60. (31.60) ·5,05% 11312012 CITY OF MIAMI BEACH PARKING DEPARTMENT ELECTRONIC METER REVENUE COMPARISON November 20 II LOCATION Accounting Code # of Spaces 2010 2011 Increasel %of November November (Decrease) Inc/(Dec) P72 (19B . (Collins & 53rd Sireel). Off Sireel) 480-8000-344571 158 $6,317.61 $6,720.13 P72 (19B . (Collins & 53rd Sireel)· AMended) 480-8000-344571 0 0.00 0.00 Tolal 158 6,317.61 6,720.13 402.52 6.37% P55 (20X· (Collins Ave & 271h 51). Off Sireel) 480·8000-344572 121 $2,123.71 $3,164.89 P55 (20X· (Collins Ave & 271h 51) . AMended) 480-8000·344572 0 0.00 0.00 Tolal 121 2,123.71 3,164.89 1,041.18 49.03% P91 (22X . (Carlyle & 72nd 51). Off Sireel) 480-8000-344574 45 $758.46 $877.03 118.57 15.63% Pll0 (23X . (83rd & AbboM). Off Sireel) 480·8000-344575 25 $33.66 $99.61 65.95 195.93% 24X . (Normandy Isle & 8ay Dr)· On Sireel 480.8000.344576 102 $7,630.26 $7,436.07 (194.19) ·2.54% P89 (24A. (Normandy Isle & Boy Dr)· Off Sireel) 480-8000·344577 26 $962.29 $0.00 (962.29) ·100.00% P88 (24B. (Normandy Isle & Vendome) . Off Street} 480.8000-344578 22 $775.47 $963.71 188.24 24.27% P87 (24C· (Normandy Isle & Bay Rd 5/5) . Off Sireet) 480·8000·344579 33 $1,301.12 $0.00 (1,301.12) ·10000% P90 (25X . (Bonita Drive & 71 sl 51) . Off Sireet) 480·8000·344580 15 $292.94 $493.24 200.30 68.38% 26X . (Collins, 791h 10 871h T err)· On Sireet 480-8000·344581 283 $2,063.13 $3,299.47 1,236.34 59.93% 26Z· (Collins & 871h Sireel) . Off Sireel 480·8000-344616 15 $135.63 $111.12 (24.51) ·18.07% P26 (10X· (Lincoln lane & lenox) • Off Sireel} 480-8000.344582 99 $44,685.53 $54,149.31 P26 (10X· (Lincoln lane & lenox· Attended) 480-8000.344582 0 0.00 0.00 Toiol 99 44,685.53 54,149.31 9,463.78 21.18% Pl08 (26A . (Collins & 80th Sireet)· Off Sireel) 480-8000.344584 62 $857.76 $477.59 Pl08 (26A . (Collins & 80th Sireel)· AMended) 480-8000.344584 0 0.00 0.00 Toiol 62 857.76 477.59 (380.17) ·44.32% P111 (268. (Collins & 841h Sireel) . Off Sireet) 480-8000-344585 62 $1,170.78 $501.75 (669.03) ·57.14% P46 (4E (Purdy & 181h Sireel)· off Sireel) 480.8000-344586 39 $9,154.81 $24,210.17 15,055.36 P46 (4E (Purdy & 1 81h Sireel)· AMended) 480.8000-344586 0 0.00 0.00 Totcl 39 9,154.81 24,210.17 15,055.36 164.45% P58 (8G . (401h Sireel & Royal Palm) . Off Sireel) 480-8000-344592 43 $1,542.02 $2,729.86 1,187.84 77.03% P59 (8H . (40th Street & Prairie)· Off Street) 480-8000-344594 71 $1,301.56 $2,522.89 1,221.33 93.84% Pl07 (26C. (Collins & 79th Sireel)· Off Sireel) 480-8000-344600 34 $295.70 $208.77 (86.93) ·29.40% Pl09 (26D· (Collins & 83rd Sireel) . Off Sireel) 480.8000-344601 95 $393.35 $63.38 (329.97) ·83.89% Pl09 (26D· (Collins & 83rd Sireel). AMended) 480-8000-344601 0 $0.00 $0.00 Toiol 95 393.35 63.38 (329.97) ·83.89% Pl (SLSPOO. (Soulh PoinILol). Off Streel) 480-8000-344602 215 $26,758.74 $39,775.44 Pl (SLSPOO. (Soulh Point LOI). AMended) 480·8000·344602 0 4,095.33 5,865.42 Tolal 215 30,854.07 45,640.86 14,786.79 47.92% P5 (41h & Alton Lol· Off Street) 480-8000.344604 21 $581.47 $910.67 329.20 56.62% 4A· 1833 Bay Road· Off Sireel 480-8000.344608 0 $0.00 $0.00 0.00 #DIV/OI 7D· 10·11 th & Collins (Lease) 480-8000-344529 0 $3,663.55 $3,663.55 0.00 0.00% P22 (10H. (Lincoln Rd. So. & lenox) . Off S/reel} 480-8000-344611 0 $8,893.15 $10,778.76 1,885.61 21.20% 14A . 161h Streel & Washinglon (Lease) 480.8000-344555 0 $16,355.14 $16,355.14 0.00 0.00% P4 . (137 Washinglon Avenue). Off Sireel 480·8000-344516 0 $4,578.01 $10,002.42 5,424.41 11 8.49% P50. (241h Streel & flamingo Drive) . Off Sireel 480·8000-344619 23 $0.00 $0.00 0.00 #DIV/OI P51 • (23rd Sireel & Liberty Avenue East). Off Streel 480·8000·344620 20 $8,967.75 $8,605.53 P51 • (23rd Sireel & Liberty Avenue East). Attended 480·8000·344620 0 0.00 0.00 Tolal 8,967.75 8,605.53 (362.22) ·4.04% P52 • (23rd Sireel & Liberty Avenue West) • Off Sireet 480-8000·344621 35 $9,138.41 $10,811.91 P52 • (23rd Sireel & Liberty Avenue West) • Attended 480-8000·344621 0 0.00 0.00 Toiol 9,138.41 10,811.91 1,673.50 18.31% P85· (71 sl Sireel & Byron) . Off Street 480-8000·344618 0 $582.14 $1,252.72 P85· (71 st Streel & Byron) . Attended 480-8000·344618 0 0.00 0.00 Toiol 0 582.14 1,252.72 670.58 115.19% G7 (MMPf·1755 Meridian Ave) 480.8000·344414 0.00 1,801.03 ······TOTAL·· .. .$1;604,675; ii .... $1,842,974;08. • • . • $238;i98.96 .. ' <14;850/ • NOTE: ZONES WITH MULTI·SPACE PAYSTATIONS ARE ITALICIZED. F:IPING\$PERSIP&L\2012INEWMETER-FY11-12 SJF Page 3 013 1/3/2012 City of Miami Beach Parking Department Profit & Loss Statement Garages & Lots -FYl 0/11 G5 -17th Street Garaae -2G 2010 LOCATION ACCOUNTING CODE October 17th Street Garage -2G Revenue-Ticket 48()'800()'344583 232,573.86 Revenue· Space Rental 480·8000·344583 0.00 I Revenue-Monthly Permits 480·8000·344514 74,620.00 I 17th St. -2G REVENUE 307,193.86 (Sales Tax Excluded) Expenses Security Personnel 32,999.67 Attendant/Cashier Labor 48,177.14 FP&l 7,639.82 Revenue Control Equipment Maintenance 7,534.60 Armed Guard Revenue Pickup 485.33 Elevator Maintenance 4,454.50 I landscape and lot Maintenance 176.00 I Surveillance System Maintenance 0.00 I Garage Cleaning/Maintenance 9,647.02 17th St. -2G EXPENSES 111,114.08 I 17th St, PROFIT /(LOSS) 196,079.78 G7 -City Hall Garaae 2010 LOCATION ACCOUNTING CODE October City Hall Garage -G7 Revenue-Ticket 480·8000·344407 8,697.19 Revenue -Space Renlal 480·8000·344409 28,823.48 Revenue-Monthly Permits 480·8000·344408 5,320.00 CHG -G7 REVENUE 42,840.67 (Sales Tax Excluded) Expenses Security Personnel 3,989.68 AHendant/Coshier labor 7,521.77 FP&l 11,276.78 Revenue Control Equipment Maintanance 0.00 Armed Guard Revenue Pickup 0.00 Elevator Maintenance 0.00 landscape and lot Maintenance 176.00 Garage Cleaning/Maintenance 9,721.00 CHG -G7 EXPENSES 32,685.23 CHG PROFIT/(LOSS) 10,155.44 F;\PING\$IMN\RAR\Parkil1g SIalu5 Reporl\Garage5 FYI I 2010 November 227,020.55 0.00 74,830.00 301,850.55 23,135.84 53,899.60 7,129.26 4,045.40 485.33 1,250.00 176.00 0.00 9,647.02 99,768.45 202,082.10 2010 November 26,064.49 13,416.66 5,670.00 45,151.15 3,987.13 10,726.01 12,224.11 0.00 0.00 0.00 176.00 9,721.00 36,834.25 8,316.90 2010 2011 2011 2011 December January February March 245,013.03 254,135.51 278,964.49 314,791.62 0.00 0.00 0.00 0.00 75,600.00 72,100.00 73,360.00 70,070.00 320,613.03 326,235.51 352,324.49 384,861.62 28,253.48 24,862.42 21,648.33 25,547.16 63,596.25 48,598.16 59,699.32 70,700.67 7,778.66 7,341.15 6,913.47 6,925.58 6,340.70 4,045.40 6,435.65 4,583.40 485.33 485.33 485.33 485.33 4,548.75 1,250.00 2,120.00 1,989.50 88.00 44.00 44.00 44.00 0.00 0.00 0.00 2,186.00 9,647.02 9,647.02 9,647.02 9,647.02 120,738.19 96,273.48 106,993.12 122,108.66 199,874.84 229,962.03 245,331.37 262,752.96 2010 2011 2011 2011 December January February March 28,181.23 13,028.96 47,723.33 22,071.95 13,416.66 13,416.66 13,416.66 13,416.66 5,670.00 5,180.00 4,340.00 4,340.00 47,267.89 31,625.62 65,479.99 39,828.61 4,986.30 4,401.36 3,988.40 4,552.59 10,660.14 8,118.13 10,435.38 12,008.64 11,792.09 10,669.96 11,792.09 10,370.34 2,250.00 2,000.00 2,000.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1,625.00 1,625.00 176.00 0.00 0.00 0.00 12,221.00 9,721.00 9,721.00 9,721.00 42,085.53 34,910.45 39,561.87 40,277.57 5,182.36 ·3,284.83 25,918.12 ·448.96 2011 2011 2011 2011 2011 2011 FY April May June July August September 2010/2011 TOTAL 269,476.68 240,759.79 202,849.53 233,813.09 195,567.29 224,999.97 2,919,965.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73,080.00 70,700.00 72,415.00 71,540.00 71,820.00 71,120.00 871,255.00 342,556.68 311,459.79 275,264.53 305,353.09 267,387.29 296,119.97 3,791,220.41 , 19,547.88 19,547.88 24,895.98 27,980.33 23,230.45 25,057.64 296,707.06 51,306.53 49,257.00 51,350.43 56,918.44 44,003.49 51,507.99 649,015.02 7,557.20 7,663.56 7,599.97 8,413.52 7,564.23 8,248.36 90,774.78 5,861.65 7,104.40 4,045.40 4,347.40 5,475.40 4,404.15 64,223.55 485.33 485.33 485.33 485.33 485.33 485.33 5,823.96 2,199.12 1,329.12 3,301.12 1,743.00 2,430.00 1,250.00 27,865.11 44.00 88.00 5,258.00 220.00 220.00 176.00 6,578.00 697.00 697.00 0.00 697.00 697.00 697.00 5,671.00 9,647.02 10,027.90 9,647.02 14,547.02 9,647.02 13,000.00 124,398.10 97,345.73 96,200.19 106,583.25 115,352.04 93,752.92 104,826.47 1,271,056.58 245,210.95 215,259.60 168,681.28 190,001.05 173,634.37 191,293.50 2,520,163.83 2011 2011 2011 2011 2011 2011 FY April May June July August September 2010/2011 TOTAL 10,422.45 9,206.55 5,074.77 5,451.39 8,216.84 14,278.47 198,417.62 13,416.66 13,416.66 13,416.66 13,416.66 13,416.66 13,416.65 176,406.73 6,790.00 6,650.00 7,000.00 6,720.00 6,580.00 6,580.00 70,840.00 30,629.11 29,273.21 25,491.43 25,588.05 28,213.50 34,275.12 445,664.35 3,562.96 3,562.96 5,884.54 5,388.56 5,022.13 7,945.55 57,272.16 9,489.88 9,021.00 8,141.39 8,769.14 7,012.03 8,463.70 110,367.21 11,673.52 11,703.95 11,512.41 13,025.06 11,369.13 12,449.08 139,858.52 2,000.00 2,267.50 2,000.00 2,000.00 2,000.00 2,000.00 20,517.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,625.00 1,937.00 1,625.00 1,781.00 1,625.00 1,859.00 13,702.00 0.00 0.00 2,791.84 440.00 440.00 352.00 4,551.84 9,721.00 9,721.00 12,221.00 9,721.00 9,721.00 8,868.55 120,799.55 38,072.36 38,213.41 44,176.18 41,124.76 37,189.29 41,937.88 467,068.78 ·7,443.25 ·8,940.20 ·18,684.75 -15,536.71 ·8,975.79 ·7,662.76 ·21,404.43 1/3/2012 City of Miami Beach Parking Department Profit & Loss Stotement Garages & lois -FY10/ll G 1 -7th Street Goroae LOCATION ACCOUNTING CODE 2010 October 7th Street Garage - 1 G Revenue-Ticket 142-8000·344404 162,014.00 Revenue-Monthly Permits 142-8000-344404 16,650.00 7th Street Garage - 1 G RI 178,664.00 (Sales Tax Excluded) Expenses Security 15,387.20 Attendant/Cashier labor 23,823.25 Landscape Maintenance 9,313.08 FP&l 3,340.14 Revenue Conlrol Equipment Maintenance 878.75 Garage Cleaning/Maintenance 7,810.05 Armed Guard Revenue Pickup 485.33 Elevator Maintenance 1,413.29 Surveillance System Maintenance 340.00 7th St. Garage - 1 G EXPE 62,791.09 7th St, - 1 G Estimated De 59,500.00 7th St, - 1 G PROFIT /(LOS! 56,372.91 G2 -12th Sireet Garage -2A 2010 LOCATION ACCOUNTING CODE October 12th Street Garage -2A Revenue-Ticket 480·8000·344504 31,003.73 Revenue-Monthly Permits 480·8000-344593 6,300.00 12th St. -2A REVENUE 37,303.73 (Sales Tax Excluded) Expenses Security Personnel 822.49 AHendant/Cashier labor 11,773.18 FP&l 108.54 Revenue Control Equipment Maintanance 933.55 Elevator Maintenance 162.58 Garage Cleaning/Maintenance 2,084.93 Landscape Maintenance 528.00 Surveillance System Maintenance 0.00 iArmed Guard Revenue Pickup 485.33 12th St, -2A EXPENSES 16,898.60 12th St_ -2A PROFIT /(LO! 20,405.13 F: \PING\S/MN\RAR\Parking Sialus Reporl\Garogos FYI I 2010 November 121,455.16 16,650.00 138,105.16 15,524.73 24,151.07 9,313.08 2,882.72 878.75 7,810.05 485.33 1,210.29 0.00 62,256.02 59,500.00 16,349.14 2010 November 39,648.59 6,720.00 46,368.59 821.96 11,924.06 108.54 933.55 162.58 2,084.93 528.00 0.00 485.33 17,048.95 29,319.64 2010 2011 2011 2011 December January February March 109,224.26 149,358.90 150,053.28 233,678048 16,650.00 16,125.00 16,875.00 12,525.00 125,874.26 165,483.90 166,928.28 246,203.48 19,386.80 15,831.57 15,508.81 18,833.50 30,275.25 26,544.71 24,510.46 39,180.32 4,656.54 2,328.27 2,328.27 2,328.27 2,959.33 2,598.09 2,549.17 2,674.33 1,128.75 878.75 878.75 878.75 7,810.06 7,810.06 7,810.06 7,810.06 485.33 485.33 485.33 485.33 1,210.29 1,210.29 1,210.29 2,123.79 0.00 0.00 255.00 0.00 67,912.35 57,687.07 55,536.14 74,314.35 59,500.00 59,500.00 59,500.00 59,500.00 -1,538.09 48,296.83 51,892.14 112,389.13 2010 2011 2011 2011 December January February March 36,856.07 44,437.40 42,145.56 52,553.27 6,650.00 6,440.00 5,600.00 .5,460.00 43,506.07 50,877.40 47,745.56 58,013.27 1,027.95 1,234.68 822.13 916.74 14,898.76 13,686.54 11,978.76 15,862.54 108.54 108.54 108.54 108.54 1,183.55 933.55 933.55 933.55 162.58 162.58 162.58 162.58 3,484.93 2,084.93 1,900.00 1,900.00 264.00 132.00 132.00 132.00 0.00 0.00 0.00 715.00 485.33 485.33 485.33 485.33 21,615.64 18,828.15 16,522.89 21,216.28 21,890.43 32,049.25 31,222.67 36,796.99 2011 2011 2011 2011 2011 2011 FY April May June July August September 2010/2011 TOTAL 191,078047 207,970.15 146,783.34 194,214.03 149,015.94 141,524.28 1,956,370.29 12,675.00 11,830.00 11,830.00 11,830.00 11,900.00 12,750.00 168,290.00 203,753.47 219,800.15 158,613.34 206,044.03 160,915.94 154,274.28 2,124,660.29 15,085.96 15,068.78 19,194.25 24,546.88 16,184.38 24,170.37 214,723.23 26,798.91 25,253.00 25,342.81 28,199.36 21,938.63 23,729.45 319,747.22 2,328.27 4,656.54 4,656.54 11,841.35 11,641.35 9,313.08 74,704.64 3,093.91 3,071.90 3,256.56 3,305.55 3,080.30 3,389.69 36,201.69 878.75 3,273.58 878.75 1,237.50 878.75 878.75 13,548.58 7,810.06 8,190.94 7,810.06 7,810.06 7,810.06 9,400.00 95,691.52 485.33 485.33 485.33 485.33 485.33 485.33 5,823.96 13,748.90 1,721.90 2,011.90 2,649.90 1,876.90 1,286.90 31,674.64 0.00 595.00 922.00 170.00 170.00 0.00 2,452.00 70,230.09 62,316.97 64,558.20 80,245.93 64,065.70 72,653.57 794,567.48 59,500.00 59,500.00 59,500.00 59,500.00 59,500.00 59,500.00 714,000.00 74,023.38 97,983.18 34,555.14 66,298.10 37,350.24 22,120.71 616,092.81 2011 2011 2011 2011 2011 2011 FY April May June July August September 2010/2011 TOTAL 50,914.97 44,244.87 33,807.53 39,511.19 37,117.75 39,646.76 491,887.69 5,530.00 5,390.00 4,600.00 4,950.00 4,620.00 4,620.00 66,880.00 56,444.97 49,634.87 38,407.53 44,461.19 41,737.75 44,266.76 558,767.69 734.52 734.52 4,806.65 1,142.07 734.28 918.15 14,716.14 12,100.74 11,768.38 12,930.69 14:945.05 14,153.52 13,260.80 159,283.02 108.54 108.54 108.54 108.54 108.54 108.54 1,302.48 933.55 1,618.00 933.55 1,292.30 933.55 933.55 . 12,495.80 172.87 172.87 172.87 162.58 162.58 162.58 1,981.83 1,900.00 1,900.00 3,300.00 1,95\.00 2,135.93 3,060.00 27,786.65 132.00 264.00 396.00 528.00 660.00 528.00 4,224.00 0.00 85.00 0.00 212.50 0.00 0.00 1,012.50 485.33 485.33 485.33 485.33 485.33 485.33 5,823.96 16,567.55 17,136.64 23,133.63 20,827.37 19,373.73 19,456.95 228,626.38 39,877.42 32,498.23 15,273.90 23,633.82 22,364.02 24,809.81 330,141.31 1/3/2012 City of Miami Beach Parking Department Profit & Loss Statement Garages & Lots -FYI 0/11 G3 -13th Street Garaae -17A 2010 LOCATION ACCOUNTING CODE Odober 13th Street Garage -17 A Revenue-Ticket 480·8000·344566 80,299.04 Revenue-Monthly Permits 480-8000-344527 10,080.00 13th St •• 17 A REVENUE 90,379.04 (Sales Tax Excluded) Expenses Security Personnel 1,755.44 Attendant/Cashier Labor 13,899.70 Landscape Maintenance 528.00 FP&L 1,924.91 Revenue Conlrol Equipment Maintenance 933.55 Elevator Maintenance 210.00 Armed Guard Revenue Pickup 485.33 Garage Cle~ning/Mointenance 1,900.00 Surveillance System Maintenance 0.00 13th St •• 17 A EXPENSES 21,636.93 13th St. ·17 A PROFIT /(LO 68,742.11 G6 -42nd Street Garaae -SA 2010 LOCATION ACCOUNTING CODE Odober 42nd Street Garage -SA Revenue-Ticket 480·8000·344531 5,597.95 Revenue-Monthly Permits 480·8000·344595 21,700.00 42nd St •• SA REVENUE 27,297.95 (Sales Tax Excluded) Expenses Security Personnel 3,805.53 Allendonl/Coshier Labor 4,542.03 FP&L 2,388.82 Revenue Control Equipment Maintenance 1,244.74 Elevator Maintenance 762.00 landscape Maintenance 440.00 Garage Cleoning/Maintenance 2,700.00 Surveillance System Maintenance 85.00 42nd St. -SA EXPENSES 15,968.12 42nd St. PROFIT/(LOSS) 11,329.83 F;\PING\$MAN\RAR\Parking Statlls Rapo,t\GaragfJs FYI I 2010 November 76,054.21 10,080.00 86,134.21 1,754.33 14,319.82 528.00 1,891.90 933.55 210.00 485.33 1,900.00 0.00 22,022.93 64,111.28 2010 November 5,287.69 22,400.00 27,687.69 3,803.11 4,723.63 2,275.87 1,244.74 450.00 440.00 2,700.00 0.00 15,637.35 12,050.34 2010 2011 2011 December January February 69,349.56 83,931.72 85,113.07 10,010.00 9,660.00 9,730.00 79,359.56 93,591.72 94,843.07 2,193.95 2,158.89 1,754.88 17,723.97 15,788.77 14,100.26 264.00 132.00 132.00 2,061.22 2,057.77 2,006.76 1,183.55 933.55 933.55 1,710.00 210.00 210.00 485.33 485.33 485.33 3,500.00 1,900.00 1,900.00 0.00 0.00 0.00 29,122.02 23,666.31 21,522.78 50,237.54 69,925.41 73,320.29 2010 2011 2011 December January February 4,604.61 4,642.04 15,193.45 25,900.00 21,560.00 25,340.00 30,504:61 26,202.04 40,533.45 4,756.15 3,804.92 3,804.32 5,913.26 4,712.01 5,444.38 2,445.45 2,292.51 1,890.20 1,494.74 1,244.74 1,244.74 450.00 450.00 450.00 220.00 110.00 110.00 5,200.00 2,700.00 2,700.00 0.00 0.00 0.00 20,479.60 15,314.18 15,643.64 10,025.01 10,887.86 24,889.81 2011 2011 2011 2011 2011 2011 2011 FY March April May June July August September 2010/2011 TOTAL 103,589.75 96,560.80 94,180.41 77,968.22 99,700.90 85,412.18 78,908.40 1,031,068.26 9,660.00 9.800.00 9,310.00 9.590.00 9,520.00 9,940.00 9.380.00 116.760.00 113,249.75 106,360.80 103,490.41 87,558.22 109,220.90 95,352.18 88,288.40 1,147,828.26 1,956.60 1,567.68 1,567.68 5,270.98 5,650.26 4,109.83 5,533.04 35,273.56 20,556.71 14,898.83 14,559.50 14,232.26 15,071.27 11,606.86 13,727.00 180,484.95 132.00 132.00 264.00 396.00 528.00 660.00 528.00 4,224.00 1,914.20 2,116.20 1,972.72 2,119.39 2,063.18 1,921.30 2,204.74 24,254.29 933.55 933.55 2,173.10 933.55 1,292.30 933.55 1,453.55 13,570.90 210.00 210.00 366.00 366.00 561.00 1,942.00 210.00 6,415.00 485.33 485.33 485.33 485.33 485.33 485.33 485.33 5,823.96 1,900.00 1,900.00 1,900.00 3,500.00 1,951.00 1,951.00 3,260.00 27,462.00 945.00 0.00 0.00 0.00 535.00 0.00 3,370.00 4,850.00 29,033.39 22,243.59 23,288.33 27,303.51 28,137.34 23,609.87 30,771.66 302,358.66 84,216.36 84,117.21 80,202.08 60,254.71 81,083.56 71,742.31 57,516.74 845,469.60 2011 2011 2011 2011 2011 2011 2011 FY March April May June July August September 2010/2011 TOTAL 5,442.05 5,926.05 5,909.34 5,827.09 5,434.58 5,849.54 4,715.89 74,430.28 22,260.00 23,100.00 21,700.00 21,665.00 22,540.00 21,770.00 22,190.00 272,125.00 27,702.05 29,026.05 27,609.34 27,492.09 27,974.58 27,619.54 26,905.89 346,555.28 4,241.64 3,398.52 3,398.52 3,400.68 4,250.85 3,397.43 4,248.15 46,309.82 7,498.14 4,669.38 4,669.38 4,712.01 6,548.77 4,882.75 6,682.34 64,998.081 1,966.05 2,133.63 2,899.44 2,244.52 2,295.08 2,369.15 2,397.80 27,598.52 1,244.74 1,244.74 1,603.49 1,244.74 1,603.49 1,244.74 1,244.74 15,904.38 450.00 450.00 450.00 450.00 450.00 1,186.00 450.00 6,448.00 110.00 110.00 220.00 220.00 550.00 440.00 550.00 3,520.00 2,700.00 2,700.00 2,700.00 2,700.00 2,799.80 2,799.80 5,040.00 37,439.60, 929.10 0.00 181.90 0.00 0.00 0.00 0.00 1,196.001 19,139.67 14,706.27 16,122.73 14,971.95 18,497.99 16,319.87 20,613.03 203,414.40' 8,562.38 14,319.78 11,486.61 12,520.14 9,476.59 11,299.67 6,292.86 143,140.88 //3/2012 City of Miami Beach Parking Department Profit & Loss Statement Garages & Lots -FYl 0/11 G4 -16th5treet Garaae -Anchor 2010 LOCATION ACCOUNTING CODE October 16th Street -Anchor Garage Revenue-Ticket 463·8000·344911 173,960.78 Revenue· Valet 463·8000·344587 17,152.79 Revenue-Monthly Permits 463·8000-344903 47,100.00 16th St. Anchor -REVENL 238,213.57 (Sate, Tax Excluded) Expenses Securily Personnel 7,171.77 Attendant/Cashier Lobor 21,983.20 FP&L 2,615.61 Revenue Conlrol Equipment Maintenance 1,462.50 Armed Guard Revenue Pickup 485.33 Elevator Maintenance 1,535.70 landscape and Lot Maintenance 255.00 Garage Cleaning/Maintenance 7,252.13 Sanitation (Waste Removal) 254.88 Fire Alarm Service 250.00 Surveillance System Maintenance 0.00 16th St. -Anchor EXPENS 43,266.12 16th St. PROFIT I{LOSS) 194,947.45 G2 -Eenn A'lenue G( 2010 LOCATION ACCOUNTING CODE October Pennsylvania Avenue Garage -G9 IRevenue.Ticket 480·8000·344411 192.52 avenue -Space Renlal 0.00 avenue-Monthly Permils 480·8000·344412 0.00 Penn.ylvania • -G9 REVE 192.52 (Sale, Tax Excluded) Expenses ily Personnel 0.00 ant/Ca,hier Labor 255.75 0.00 ue Control Equipment Maintanance 0.00 Armed Guard Revenue Pickup 0.00 Elevator Maintenance 0.00 Landscape and Lot Maintenance 0.00 Garage Cleaning/Maintenance 0.00 Pennsylvania. -G9 EXPE 255.75 Penn Ave, PROFIT I{LOSS) ·63.23 F:\PING\$MAN\RAR\Pollcing Siolus Repoll\Gofages FYI I 2010 November 141,588.70 25,919.15 46,000.00 213,507.85 4,925.64 22,699.61 2,702.79 1,462.50 485.33 1,535.70 255.00 7,252.13 265.32 250.00 0.00 41,834.02 171,673.83 2010 November 28,692.50 0.00 0.00 28,692.50 1,099.52 11,094.13 0.00 0.00 0.00 0.00 0.00 0.00 12,193.65 16,498.85 2010 2011 2011 2011 December January February March 145,175.72 173,821.53 181,146.73 253,986.93 20,867.29 20,100.93 34,488.31 34,968.22 46,000.00 44,200.00 45,500.00 46,000.00 212,043.01 238,122.46 261,135.04 334,955.15 7,671.84 7,642.44 4,927.21 5,493.58 28,349.38 23,349.28 22,423.15 36,172.35 2,549.24 2,506.48 2,471.73 2,763.53 1,712.50 1,462.50 1,462.50 1,462.50 485.33 485.33 485.33 485.33 1,535.70 1,535.70 1,535.70 2,347.70 85.00 85.00 85.00 85.00 7,252.13 7,252.13 7,252.13 7,252.13 265.32 265.32 265.32 265.32 485.12 250.00 250.00 495.42 0.00 0.00 0.00 85.00 50,391.56 44,834.18 41,158.07 56,907.86 161,651.45 193,288.28 219,976.97 278,047.29 2010 2011 2011 2011 December January February March 24,567.25 29,591.59 75,216.82 63,286.93 0.00 0.00 0.00 0.00 0.00 6,020.00 7,210.00 7,840.00 24,567.25 35,611.59 82,426.82 71,126.93 0.00 412.32 0.00 3,762.73 15,438.01 11,919.51 14,054.64 17,057.77 0.00 2,971.81 2,636.34 2,837.92 745.00 300.00 2,390.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,447.74 0.00 0.00 0.00 0.00 0.00 11,807.50 9,307.50 9,307.50 9,307.50 27,990.51 24,911.14 29,836.47 32,965.92 .3,423.26 10,700.45 52,590.35 38~ 2011 2011 2011 2011 2011 2011 FY April May June July August September 2010/2011 TOTAL 219,242.98 219,790.68 159,834.56 207,072.89 180,201.38 156,814.97 2,212,637.85 34,520.55 26,494.85 23,969.15 42,188.31 35,078.96 19,997.19 335,745.70 44,200.00 30,870.00 44,000.00 46,600.00 42,700.00 45,100.00 528,270.00 297,963.53 277,155.53 227,803.71 295,861.20 257,980.34 221,912.16 3,076,653.55 4,401.60 4,401.60 5,916.25 13,481.33 15,945.16 19,933.20 101,911.62 25,269.72 22,373.77 24,157.73 28,254.39 21,962.19 27,225.36 304,220.13 2,692.04 2,865.07 2,878.59 2,729.18 3,052.04 2,701.07 32,527.37 2,662.50 5,212.43 1,462.50 1,821.25 1,462.50 1,462.50 23,108.68 485.33 485.33 485.33 485.33 485.33 485.33 5,823.96 1,632.91 1,244.07 1,535.70 2,115.70 1,830.70 10,702.70 29,087.98 85.00 175.83 425.00 340.00 340.00 425.00 2,640.83 7,252.13 7,633.01 10,752.13 7,252.13 7,252.13 9,960.00 93,614.31 265.32 337.92 265.32 265.32 265.32 265.32 3,246.00 601.62 250.00 250.00 250.00 640.00 370.00 4,342.16 0.00 0.00 0.00 170.00 0.00 0.00 255.00 45,348.17 44,979.03 48,128.55 57,164.63 53,235.37 73,530.48 600,778.04 252,615.36 232,176.50 179,675.16 238,696.57 204,744.97 148,381.68 2,475,875.51 2011 2011 2011 2011 2011 2011 FY April May June July August September 2010/2011 TOTAL 36,139.23 19,107.49 17,163.53 17,275.70 18,284.10 30,214.93 359,732.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,630.00 7,700.00 7,715.00 9,100.00 10,150.00 11,480.00 74,845.00 43,769.23 26,807.49 24,878.53 26,375.70 28,434.10 41,694.93 434,577.59 3,014.80 3,014.80 5,078.33 4,221.88 3,013.84 4,717.69 28,335.91 13,926.76 12,969.63 11,570.76 12,965.77 7,677.63 12,781.89 141,712.25 2,796.90 2,643.11 2,782.61 2,749.92 2,690.67 2,928.23 25,037.51 0.00 0.00 0.00 0.00 2,500.00 2,500.00 8,435.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,447.74 0.00 0.00 2,653.36 1,209.62 1,209.62 1,170.60 6,243.20 9,307.50 9,307.50 11,807.50 9,307.50 9,307.50 10,700.00 99,467.50 29,045.96 27,935.04 33,892.56 30,454.69 26,399.26 34,798.41 310,679.36 14,723.27 -1,127.55 ·9,014.03 ·4,078.99 2,034.84 6,896.52 123,898.2311 1/3/2012 MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov TO: FROM: DATE: COMMISSION MEMORANDUM Mayor Matti Herrera Bower and Members of the City Commission Jorge M. Gonzalez, City Manager C\\Jf'c..t' January 11,2012 J U SUBJECT: INFORMATIONAL REPORT TO THE MAYOR AND CITY COMMISSION, ON FEDERAL, STATE, MIAMI-DADE COUNTY, U.S. COMMUNITIES, AND ALL EXISTING CITY CONTRACTS FOR RENEWAL OR EXTENSIONS IN THE NEXT 180 DAYS. The City Commission adopted Resolution No. 2000-24141, which provided that all existing City contracts for renewal or extensions, which by their terms or pursuant to change orders exceed $10,000, and all extensions or renewals of such contracts, shall be presented as an informational report to the Mayor and City Commission, at least 180 days prior to the contract extension or renewal date. Subsequent thereto, the City Commission adopted Resolution No. 2001-24332, changing the reporting requirement from $10,000 to $25,000. The Administration in addition to reporting on all existing City contracts, will now report information relative to Miami-Dade County, State of Florida, U.S. Communities and Federal GSA contracts that are approved for utilization by the City Manager. Pursuant to information contained in Miami-Dade County, State of Florida, U.S. Communities and Federal General Services Administration (GSA) bid list, the following are contracts that will expire within the next 180 days: DESCRIPTION VENDOR EXPIRATIO RENEWAL NDATE TERMS Management and At the 1. Consulting Services for the JRD& 05/31/2012 Desertion of the Building Department. Associates, Inc. State (FL State # 973-001-06-01) Long Distance Month to Month 2. Verizon 7/14/2011 As per Service Provider Agreement Mobile Equipment Manufacturer (OEM) 3 Options years 3. Replacement Parts and See Attached List 6/30/2012 Services to renew (MDDC # 5380-6/14-2) Grounds Maintenance Superior Land & 2 Option years 4. Service for South Pointe Lawn Services, 6/09/2012 Park Inc. to renew Page 2 180 Day Report January 11, 2012 DESCRIPTION VENDOR EXPIRATIO RENEWAL N DATE TERMS 5. Lot Clearance EDJ Service, Inc. 6/22/2012 2 Option years to renew 6. Lot Clearance Personally Yours 2 Option years Lawn Services, 6/22/2012 Inc.; to renew 7. Lot Clearance Weed-A-Way, 6/22/2012 2 Option years Inc. to renew Page 3 180 Day Report January 11, 2012 Mobile Equipment Manufacturer (OEM) Replacement Parts and Services Ace Lawnmower Service, Inc. Genuine Parts Co. d/b/a Napa Old Dominion Brush Co. All Dade Lawnmowers, Inc. Growers Equipment Company Palmetto Ford Trucks Sales Inc. Advantage Golf Cars, Inc. GS Equipment, Inc. Pantropic Power, Inc. Altekco, Inc. Groeneveld Atlantic South, Inc. Peterson's Harley-Davidson Atlantic Ford Truck Sales, Inc. Heil Co.lHeil Environmental Palmetto Ford Trucks Atlantic Truck Center Hydraulic Sales & Service, Inc. Pippin Tractor and Equipment Americas Truck & Equipment Hydraulic Technician, Inc. Pitts Engine & Transmission Blanchard Machinery, Inc. Homestead Mower Center, Inc. Power Brake & Exchange B & B Welding & Machine Kelly Tractor Co. Richards Tractors & Implements Bobcat of Metro Dade, Inc. Knapheide Truck Equipment Rechtien International Trucks Clark Waste System, Inc. KVP Enterprises Expert Diesel Rose Spring Corporation Diesel Power & Injection, Inc. Municipal Equipment Co. LLC RF School Bus Parts E.J. Ward, Inc. National Truck Parts of FL. Inc. South Florida New Holland Electric Sales & Service, Inc. National Lift Truck Service SSES Inc. d/b/a Southern Sewer Environmental Products of Florida Nextran Corporation Total Truck Parts, Inc. Florida Transportation Systems Nortrax Equipment Co. Southeast LP Transportation Equip of Florida Florida Detroit Diesel-Allison, Inc. Nosa, Inc. d/b/a Palmetto Motorsports Truck Max, Inc. FTC, Inc. d/b/a Omaha standard Palm Truck Centers Inc. Stamm Manufacturing Stecco a Division of blue Tee Corp. Team Equipment, Inc. Sunbelt Hydraulic & Equipment P Investments Group LLC Ten-8 Fire Equipment, Inc. Transportation Equipment of Florida Inc. d/b/a Utility Trailer Transcoa Truck Parts, Inc. General Safety Equipment LLC d/b/a Rosenbauer General Safety Equipment Kilpatrick Turf Equipment, Inc. W.E. Johnson Equipment Co. d/b/a Kilpatrick Equipment MIAMI BEACH CAPITAL IMPROVEMENT PROJECTS OFFICE TO: FROM: DATE: MEMORANDUM Mayor Matti Herrera Bower and Members of the City Commission Jorge M. Gonzalez, City Manager .. ~ January 11, 2012 ~IY 0 SUBJECT: STATUS REPORT ON THE PALM & HIBISCUS ISLANDS UNDERGROUND UTILITIES PROJECT CURRENT: I. Status of the FPL, Atlantic Broadband and AT&T drawings: The FPL binding estimate and revised FPL drawings were received by the CIP Department on October 27, 2011 and transmitted to ABB, ATT and a JOC Contractor in order to receive the estimates for their respective portions of the Work. A meeting was held on November 17, 2011, with ABB, ATT, the HOA and CIP to coordinate the ABB and ATT undergrounding. The ABB and ATT will be providing the HOA an invoice to re-engineer the drawings, once the HOA pays for the design service, they will commence with the drawings. In addition, CIP transmitted the FPL revised drawings to the PWD on Novemeber 3, 2011 for their review and approval. The PWD provided comments to the FPL drawings on November 16, 2011 to CIP. II. Status of the Neighborhood Improvement Project: The status of the neighborhood improvement project is as follows: • September 14, 2011 :The City Commission accepted the recommendation of the City Manager to enter into negotiations with Camp, Dresser & McKee Inc (CDM) for the preparation of a Design Criteria Package which is intended to be bid as a Design Build project. • Negotiations with CDM were terminated on November 22, 2011. • Negotiations with the second ranked firm, C3TS commenced on November 30, 2011. • February 2012: Design Criteria Professional Awards Contract. * • August 2012: Design Criteria Completed.* • September 2012: Request for Proposals for Design Builder.* • December 2012: Design Builder Contract Award.* • June 2014: Construction Completion.* *Target Dates 1 Status Report on Palm & Hibiscus Island Project Page 2 of 2 PRIOR HISTORY: III. Status of Utility Undergrounding Project: FVIDM/GME • The Hibiscus Homeowners Association (HOA) pursued a Special Taxing District with Miami-Dade County that was ratified via a Special Assessment on December 7,2010. • The County has collected $510,816.96, from the Homeowners pursuant to language in the Special Taxing District Ordinance # 10-51. • The HOA requested that FPL provide a new binding estimate for the undergrounding of Hibiscus Island only. The HOA believes that the new estimate for the undergrounding of Hibiscus Island will come in at a lower cost than the binding estimate provided on July 15, 2010. FPL's binding estimates are valid for 180 days. • The City will request a new binding estimate from ABB and ATT once the FPL drawings are revised to reflect an open cut trench installation in the roadway. • Once the County receives the new binding estimate from the City and FPL (including ABB & A IT), the County will pursue floating a bond to cover the costs of the undergrounding project. • On August 8, 2011, Ian Kaplan, Hibiscus Island HOA President, requested that the County hold in abeyance the tax roll for the first year since the project is not expected to break ground this year. • The City and the County need to enter into an inter-local agreement in order to reimburse the City for the costs of the utility undergrounding project. The steps necessary for this to occur are as follows: 1. To date, the City of Miami Beach Commission has not adopted a policy to advance money for a private utility undergrounding project funded by public funds. As such, an item regarding this policy would require City Commission approval. 2. The City and the County need to reconcile the issue of FPL's requirement that they are paid upfront for the work. 3. Resolve the issue of whether the County can reimburse the City of Miami Beach for the total amount of the undergrounding project for work incurred as a result of the project. MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov TO: FROM: DATE: SUBJECT: COMMISSION MEMORANDUM Mayor Matti Herrera Bower and Members of the City Commission Jorge M. Gonzalez, City Manager ~ January 11, 2012 O,y'() CIP Monthly Construction Project Update Attached please find the monthly update for active City of Miami Beach construction projects under the purview of the CIP Office. Attachment cc: Duncan Ballantyne Fernando Vazquez David Martinez District Project Mgr. Middle Beach Hernandez, M. Middle Beach Hernandez, M. Middle Beach Hernandez, M. Project Name Bayshore BP 8A -Central Streets/Sidewalks Improvements Bayshore BP 8B -Lower North Bay Road -Streets/Sidewalks Improvements Bayshore BP 8C -Lake Pancoast Streets/Sidewalks Improvements 1213012011 9:32:08 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Package A -Central Bayshore -Neighborhood #8. The area includes 40th Street, Flamingo Drive, the Sheridan Avenue Multi-Family Neighborhood, and the Central Bayshore Community (single-family section). Scope includes street resurfacing, sidewalk repair, swale/planting strip restoration, Installation of curb and gutter, enhanced landscaping, drainage upgrades, streetlight upgrades, traffic calming, water main rehabilitation on Flamingo Dr., and improve on-street parking. A more recent request for additional scope by staff entails providing additional drainage improvements on Prairie Ave. "Hold above-ground unfunded amount funding pending construction bids." Package B -Lower North Bay Road. Scheduled improvements include the installation of valley gutters and a stormwater system with two stormwater pump stations, injection wells, street resurfacing, water main replacement and decorative stamped asphalt flush traffic tables. During development of the construction documents to the permit level, additional costs for stormwater have been identified due to modified scope for drainage. In addition, proportionate funding is needed for CIP Construction Management and contingency. The Program Management fees for the next fiscal year are requested. "Hold above-ground unfunded amount funding pending construction bids." Package C -Lake Pancoast -Neighborhood #8. The area includes Flamingo Drive, West 24th Street, West 25th Terrace, and Lake Pancoast Drive. Scope includes street resurfacing, sidewalk repair, planting strip restoration, curb and gutter upgrades, enhanced landscaping, entryway features, enhanced street signage, streetlight upgrades, water main rehabilitation on Flamingo Dr., and improve on-street parking. During development of the construction documents to the permit level additional costs were identified due to the modified scope and additional regulatory requirements. In addition CIP Construction Management fees and contingency were increased proportionally due to increased construction costs. Construction Status NTP-1 was issued August 19, 2011. A Community Pre-Construction Meeting was held at the Miami Beach Golf Club on August 29, 2011. NTP -2 was issued October 31, 2011. Pre Construction Meeting was held October 26, 2011. Construction started on October 31, 2011. Watermain installation is currently approaching 34th street on Chase Ave and on Flamingo north of 28th street. • Chase Avenue from Alton Road and West 40 Street: Watermain work continues north of West 37 Street. • Flamingo Drive from West 28 Street to West 40 Street: Watermain work continues north of West 35 Street. Staging area has not been identified for this project yet. Negotiations are in process for the trash site adjacent to the golf course. PWD Environmental Department is preparing plans that specify remediation requirements by DERM for pricing by Lanzo. A Community Pre-Construction Meeting was held at the Miami Beach Golf Club on August 4, 2011. NTP-1 was issued on August 18, 2011. PreConstruction Meeting took place on December 5, 2011. Encroachment letters are in process by CIP and are scheduled to be mailed out by the end of December 2011. TransFlorida has not submitted the schedule of values or submittal schedule for CIP's approval prior to issuance of Notice to Proceed 2. Construction is scheduled to begin in January 2012. A Community Pre-Construction Meeting was held at the Collins Park Library on September 21, 2011. NTP-1was issued on August 19, 2011. Pre Construction Meeting was held October 26, 2011 NTP -2 was issued October 31, 2011. Construction mobilization is scheduled to commence in March, 2012. This project is being constructed in tandem with the Central Bayshore A project. Pagel 0/38 District Project Mgr. Middle Beach Iglesias, E. Middle Beach Cabanas, H.lJane Project Name Bayshore BP 8E Sunset Islands 1 & 2 StreetslSidewalks Improvements Fire Station 2 -Bldg. A 1213012011 9:32:09 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Package E -Sunset Island 1 & 2 -Neighborhood #8. Scope includes upgrading the storm water drainage collection and disposal system to handle a 5-year 1- day storm event, replacement of existing water mains to meet City Water Master Plan recommendations, street reconstruction with new pavement markings, and valley gutter curb upgrades. Administration Building A. -This building will be renovated 1 remodeled in its entirety and be made fully ADA accessible. This building has severe spalling throughout all the grade beams, reinforced beams and columns. The wood floor systems will be removed and replaced with structural concrete slabs. All existing structural deficiencies, such as cored structural beams will be corrected as part of the scope. The exterior building walls will remain untouched and structural repairs will be made on the interior of the building not to disturb the exterior historical brick finish of the building. New windows will be installed and structurally fastened to the existing beams to meet code. They will also match the existing historical look of the existing windows. New lighting, electrical, mechanical, and plumbing systems will be installed. The existing wainscot high, wall tile, which is located in the old machine room will be replaced as needed. The building will have a new roof installed and minimal site work as part of this scope. The entire building will serve as the main administrative offices for the Fire Department. The existing square footage of the building will be reduced from 15,094 to 11,305 square feet. The current building additions which are not of historical significance will be demolished and new "connector" additions will be added. Said additions will be a two- story element that will contain a connecting hallway between the buildings, stairs, restrooms and will also serve as exit points. These new elements will mimic the historical connectors that existed at one point in time. The building will also be renovated to meet ADA standards and an elevator in the main building will be provided. Construction Status NTP-1 was issued on August 26, 2011. The Preconstruction Community Meeting was held on November 3, 2011. The first batch of encroachment letters were mailed out late November 2011. The Preconstruction Meeting was held on December 2, 2011 with DMSI. NTP-2 was issued on December 12, 2011. Construction mobilization is scheduled for Janaury 11, 2012. Plans were submitted for Building Department review and approved for permitting. Demo permit approved 12/15/2009 BD100031 and interior demolition commenced on 12/20/2009, by HA Contracting and was stopped due to structural concerns on 2115/2010. A shoring engineer was hired to develop a shoring plan and that scope of work commenced on 4/26/2010. The demolition was restarted on 4/28/2010 and has been completed. Project has been awarded to Edgewater Construction. Building permit #B1001433. NTP#1 was issued and corrections to the documents had to be performed to the CPM, schedule of values and shop drawing submittals. This was due on 10/22/2010. Documents were resubmitted, reviewed and approved with comments. NTP #2 was issued on 10/25/2010. Pre construction meeting was held on 10/28/2010 at the site. Mobilization started on 10/29/2010. Project is progressing. We have encountered extensive spalling, more than expected, throughout all 3 buildings and the hose tower as well. Contract allowance for structural repairs has been exhausted. Change orders for the remaining unforeseen repairs have increase the construction duration by 28 days of non-compensable time. Project is progressing. An item went to the July 18,2011 commission meeting requesting additional funds for the structural repairs in the amount of $415,000. The item was approved. Construction continues and is approx. 80% complete. Page2of38 District Project Mgr. Middle Beach Cabanas, H. Middle Beach Iglesias, E. Project Name Fire Station 2 Hose Tower Refurbishment Fire Station 3 -Overhead Door & Interior Doors Replacement 1213012011 9:32:09 AM Monthly Construction Report Status through December 30,2011 Scope of Work The hose tower will be refurbished in its entirety. The bulk of the work will address structural repairs to the extensive spalling throughout the tower. The window openings were covered with non removable louver windows that preclude using the tower for ladder operations. The window openings and the glass block will remain untouched. The existing stand pipe system is inoperable and will be replaced with a new system. The building will be sealed, painted and re-roofed. The refurbishment will return the ability of fire companies to use it for high rise training. The interior hollow metal and hollow wood core doors are aged, not fire rated, beyond rated life expectancy scratched, utilizing non compliant hardware and, in general, not working properly. The exterior overhead, vehicle bay and doors do not close properly. ----------- Construction Status Selective demolition by HA Contacting has occurred and test results have been given to the structural consultant. Recommendation for repairs have been made and hose tower scope of work has been integrated to main building renovation scope and is part of the overall main project renovation. Plans were submitted for Building Department review and approved for permitting. Demo permit approved 12/15/2009 BD100031 and interior demolition commenced on 12/20/2009, by H.A. Contracting and was stopped due to structural concerns on 2/1512010. A shoring engineer was hired to develop a shoring plan and that scope of work commenced on 4/26/2010. The demolition was restarted on 4/28/2010 and has been completed. Project has been awarded to Edgewater Construction. Building permit #B1001433. NTP#1 was issued and corrections to the documents had to be performed to the CPM, schedule of values and shop drawing submittals. This was due on 10/22/2010. Documents were resubmitted, reviewed and approved with comments. NTP #2 was issued on 10/25/2010. Pre construction meeting was held on 10/28/2010 at the site. Mobilization started on 10/29/2010. Project is progressing. We have encountered extensive spalling, more than expected, throughout all 3 buildings and the hose tower as well. Contract allowance for structural repairs has been exhausted. Change orders for the remaining unforeseen repairs will be submitted and will possibly increase the construction duration. Project is progressing.An item will be going to the May comission meeting to request additonal funds for the strucural repairs. Plans were submitted for Building Department review and approved for permitting. Demo permit approved 12/15/2009 BD100031 and interior demolition commenced on 12/20/2009, by HA Contracting and was stopped due to structural concerns on 2115/2010. A shoring engineer was hired to develop a shoring plan and that scope of work commenced on 4/26/2010. The demolition was restarted on 4/28/2010 and has been completed. The overhead door, column and spalling scope of work was completed in mid August 2011 and the walk thru was held with Property Management and Fire on September 19, 2011. The punch list was completed on September 28, 2011. Interior door replacement is Phase 2 of the project and has not yet been scheduled. Page 3 0/38 District Project Mgr. Middle Beach Sanchez, O. Project Name Indian Creek Water/Wastewater Rehabilitation 26th to 41st Streets 1213012011 9:32:09 AM Monthly Construction Report Status through December 30, 2011 Scope of Work The work consists of water main replacement, sanitary sewer replacement and asphalt re-surfacing along Indian Creek Drive from 26th to 41st Streets. Construction Status The contract with Horizon was executed on May 28, 2009. Notice to Proceed #1 was issued by PWD on June 16, 2009. A pre-construction meeting with the residents and business owners was held on July 22, 2009, and an inter-departmental coordination meeting between all City departments was held on October 15, 2009. The contractor finalized the permit process in October 2009.The second Notice to Proceed was issued on October 22, 2009 and the contractor mobilized after receiving approval on the Maintenance of Traffic Plan and installed the advance traffic warning devices and safety barriers ahead of the work area. Water Main: 4,520 LF of water main has been installed between 26th and 41st Street (sta 30+00 to sta 75+20) as well as all the side streets at 27th,28th,29th,30th,31st,32nd,33rd,34th,36th, 37th,38th,39th and 40th. 35th Street is pending clearance of existing line and removal of a section and connection to new 12" water main. Road restoration and the first lift of asphalt over the trench line are complete between 26th and 41 st Street. Flushing was done between 26th and 40th Street. Pressure test and Bacteorological Test passed on all the water main and side street and DOH had approved mainline between 26th thru 30th Street and side street between 26th and 30th Street. PWD is reviewing the As-builts from 30th Street to 41st Street and all the remainder side streets. Contractor completed the comments on the red lines for the water main between 35th and 41st and side streets north of 35th Street (Le, locations of ARV, offset at water line, show offset below new 12" water line and remove red clouds, etc.). Public Works is waiting on a memo from CIP's inspector to forward the documents for DOH clearance. Meeting held on January 18, 2011 with HCI and PWD. PWD requested the contractor to re-established sample points, pressure test at intersection and chlorinate the line. PWD will coordinate with DOH the locations of sample points. The contractor will provide a cost proposal for review and execution by the City. The contractor provided the cost proposal and is being process by the City. PWD obtained approval of sample point locations from DOH and the contractor has re-established the sample points and began bacteorological tests. Sewer: Approximately 3,020 LF out of 3,100 LF of sewer has been installed on the mainline between 27th and 40th Street (sta 41+20 to sta 71 +40). Road restoration and the first lift of asphalt on the trench line are complete between 28th and 41st Street. Sewer is on hold and the contractor demobilized the well point system due to a conflict with an FPL duct bank which on the plans was shown to be at a sufficient depth to clear the proposed sanitary line. After excavation it was found that the FPL duct bank was shallower than as indicated on the plans and in conflict with the proposed sanitary sewer line. A meeting was held with FPL on May 18, 2010 to review if cables on the upper ducts could be relocated to the lower ducts and have the duct bank reduced in size to allow for the sanitary sewer installation. FPL indicated duct bank is too high and would be required to be lowered. FPL will have to procure for a dive team and will require a permit from DERM to perform the work. Page 4 0/38 District Project Mgr. 1213012011 9:32:09 AM Project Name Monthly Construction Report Status through December 30,2011 Scope of Work Construction Status FPL proposed to move the lower conduit and shave off the concrete which would allow for the installation of the sewer line. After further review PWD agree to this solution and accpeted to have only a 12in clearance between the FPL duct bank and the sanitary sewer line. FPL also indicated this process would reduce the permit and construction time from one and half years to approximately six months. Contractor will follow up progress and stay on top of FPL for resolution. The EOR- PWD agree to have the contractor provide a conflict manhole to connect the old sanitary line with the new line until FPL can resolve the adjustment to the existing duct bank. FPL has indicated is seeking the DERM and US Corp of Engineers permits. CIP provided a draft letter to PWD for submittal to FPL on delays and additional cost to the project. The sanitary line video inspection and the manhole exfiltration test were completed. The contractor will forward the video with added audio as requested by PWD the week of February 21, 2011. Trench Drains at 27th, 28th, 29th, 30th, 31st ,32nd, 33rd,34th,35th, 36th, 38th,39th and 40th Street corners are completed. Inserts have arrived and are stored at PWD. Contractor to pick up and install the inserts. The CEI is in the process of scheduling a sign inspection at the manufacturer's yard. Change Order #1-8 extended the contract completion by (68) days providing a revised final completion date of October 30, 2010. A settlement agreement was reached between the contractor and the City for the water main abandonement and the contractor has indicated that they will re-start the water service transfer the week of November 22, 2010. The only pending items to complete this project are the installation of two sanitary sewer manholes with their associated piping (approximately 80') and the installation of FPL submarine cable at the intersection of Indian Creek Dr. and 41st Street. FPL started construction on December 18 and will take them 2 weeks to complete their work. Once this work is completed, Horizon contractors will start the installation of two sanitary sewer manholes with their associated piping. This work is expected to be finized at the end of January 2012. The project is approximately 90% complete. PageS 0/38 District Project Mgr. Middle Beach Sinnes, A. Middle Beach Sinnes, A. Project Name Seawall Rehabilitation -Pine Tree Dr. & 63rd St. Monthly Construction Report Status through December 30, 2011 Scope of Work Restoration of seawall, new sheet pile wall, new concrete cap, and restoration of landscaping. Seawall Restoration -Sunset Lake Park Restoration of seawall, new sheet pile wall, new concrete cap, and restoration of landscaping. 1213012011 9:32:09 AM Construction Status 12/15/2010: Construction NTP II issued on 12/712010. Preconstruction meeting held with DERM. Sheet piling delivery pending. 1/6/2011 : Sheet piling delivery delayed because this was a special order. Anticipated delivery of the sheet pile is 1/25/2011. 1/24/2011 : Sheet pile installation to start on 1/25/2011. Anticipated project completion in Mid March. 2/17/2011 : All construction scope is substantially complete. Concrete cap was poured on 2/912011. Rip rap installation scheduled for the week of 2/21/2011. 3/15/2011 : Sod installed on 3/112011. DERM accepted project in full. 4/26/2011 : Public Works issued a 2 item punchlist. Completion pending from Contractor. 6/24/2011 : Building Depatment final approval issued on 6/3/2011. 8/15/2011 : Project final approval by Building Department received on 6/03/2011. Project transferred to close-out phase. Seawall, rip-rap boulders and sod replacement is complete. Closeout documents pending from Contractor. 1/612011 : Project is complete. However, one issue remains with the condition of the sod at the park. Parks Department to solicit a price to resod 60% of the sod at the park. The costs will be shared by all parties involved. This estimate is pending. 6.24.2011 A deductive change order was executed by the Contractor, to fund some re-sod work to be performed by Parks. This project is closed out. Page 60/38 District Project Mgr. Middle Beach Iglesias, E. North Beach Rodriguez, R. North Beach Vieira, T. Project Name UTI Sunset Island 1 -Outfalls 1 & 2 Monthly Construction Report Status through December 30, 2011 Scope of Work Stormwater upgrades -Outfalls 1 & 2. 69 Street and Indian Creek Drive Traffic Install New Traffic Signal at the Intersection of Indian Signalization Creek Drive and 69 Street Bandshell Facility Improvements Renovation/rehabilitation of the Bandshell facility and restrooms. 1213012011 9:32:09 AM Construction Status Project was completed prior to July 4, 2011. The only issue pending is the replacement of the sod in the Pardo Residence. Contractor is working out a solution in coordination with the resident's landscaper. The Pardo's landscaper submitted an estimate for $9k to replace the sod and chemically treat for mole cricket infestation. CIP requested alternate proposal from Valleycrest. Their estimate was approximately $7,700. DMSI must pay the Pardo landscaper for warranty repairs or replace the sod with their own landscaper. AGC Electric started demolition of sidewalks on June 21, 2011. On June 24, 2011, AGC reported that they encountered utility conHicts on the northeast corner of Indian Creek Drive and 69 street. CIP met with PWD and a City surveyor to assist in locating the ROW line in order to determine if the mast arm location. Once the location of the mast arm was established, the proposed foundation of the mast arm was in conflict with an existing utility duct bank and the engineer of record had to modify the construction documents. A change order proposal was generated and approved. During a preliminary walkthrough with the County Public Works Department the County inspector noted that the proposed connection of the to the existing traffic signal disconnect will not be acceptable. The reason provided was that the existing disconnect is mounted on an existing FPL pole and the new County requirements mandate that all traffic signal disconnect are mounted on a standalone pole. The contractor will need to submit a change proposal in order to meet the County requirements. Additionally, the County is requiring that the existing control cabinet will need to be updated to the latest standards. Temporary Certificate of Completion (TCe) was issued on April 27, 2011. Punchlist is complete. Project was turned over to Parks Dept. on June 2, 2011. Page 70/38 District Project Mgr. North Beach Arencibia, J. North Beach Rodriguez, R. Project Name Biscayne Point BP 1 Streets/Sidewalks Improvements North Shore -Byron Avenue Roadway Improvement Project 12/30/2011 9:32:09 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Area-wide street improvement may include: street resurfacing; swale restoration; repair of sidewalks; street lighting upgrades to correct deficiencies and provide pedestrian lighting; enhanced landscaping within the street Streets/Sidewalks; traffic calming measures and entryway features, even though not all areas will receive all the previously mentioned improvements. This project includes Biscayne Point (approx. 13,200 Lf.), Biscayne Beach (approx. 14,400 I.f.), and Stillwater (approx. 3,400 Lf.). Streetscape integrated with waterline replacements. Modifications to the BODR were approved on December 2009, the consultant is adjusting the design as per the BODR variations. It is anticipated that the storm water system will have a cost increase of approx. $2,000,000 due to the addition of at least three pump stations and the corresponding pipes and structures needed. "Hold above-ground unfunded amount funding pending construction bids." Byron Avenue from 81st Street to 200' south of 87th Terrace is classified as an urban collector roadway located in the North Beach neighborhood in the City of Miami Beach. This roadway is part of the major network of roadways throughout the North Beach neighborhood and connects to Indian Creek Drive, which is another ARRA funded project. Construction work will include milling and resurfacing, striping, and pavement markings. Construction Status NTP 1 was issued to the Contractor on 05/06/11. Plan revisions for the VE changes were submitted in July 2011; however, PWD requested the plans incorporate 90-sec detention throughout requiring modification of the plans. After coordination with the Contractor, it was decided that plan revisions could be developed and permitted during construction and the schedule modified accordingly. NTP-2 was issed 08/24/11 with an effective date of 08/25/11. Water main installations and electrical conduit installations for the lighting system within Biscayne Point Island are approximately 90% and 75% complete, respectively. Water main installations and lighting fixture replacements on Biscayne Beach have commenced and are approximately 30% and 95% complete, respectively. Water main installations along Stillwater Drive are anticipated to start in approximately 1 week. Stormwater work and above ground improvements have not commence. The overal project completion is approximately 9% complete. Project was not able to start on time because new utility lines had to be installed ahead of the above ground work. Additionally, Miami-Dade County is requesting that the City of Miami Beach removed and relocate existing traffic signal junction boxes that are in conflict with the proposed work. The engineer of record is reviewing all comments issued by the County and will prepare the appropriate modifications to the plans. The two locations that are impacted with the County requirements are the intersections at 81 and 85 street. The modifications have impacted the budget and schedule. The modified plans were issued to the contractor for pricing. On December 1, 2011, a change order proposal was transmitted, for review, which includes items added by the County review and items not included in as part of the original bid documents. The City of Miami Beach requested a time extension from FDOT to extend the LAP agreement until March 31, 2012. The time extension was granted. Page8of38 District Project Mgr. North Beach Rodriguez, R. North Beach Rodriguez, R. North Beach Rodriguez, R. Project Name North Shore -Water main lines crossing FOOT Right-Of-Way along North Shore -Water Main lines crossing FOOT ROW along 71 Street & North Shore-Water main across Group II and Group III ofthe ARRA Corridor Monthly Construction Report Status through December 30,2011 Scope of Work Place 8" DIP that encroach FDOT Right of Way along 71 st St. Install water mains at the intersection of 71 Street and Collins Court North and include the entire alley. Installation of a new 8 inch Ductile Iron Pipe water main line, along Dickens Avenue from 73 Street to 81 Street and Byron Avenue from 81 Street to 85 Street Construction Status Contractor was given NTP 1 on September 3rd, 2010 and NTP 2 on January 6th 2011 Construction started on Carlyle avenue on January 11/2011 and is expected to be complete by early April 2011. This project was managed by Miguel Perez, CPC and on March 10, 2011, it was transferred to Roberto Rodriguez. 1) Original bid documents were not fully completed when Envirowaste provided bid price. 2) Currently, the CIP office is reviewing 15 different change orders for items not included in the original bid documents and field modifications due to conflicts with existing conditions. 3) Change orders are under review. Once the approved the contractor will mobilize to complete the milling and resurfacing of Carlyle Avenue and Bonita Drive. 4) On December 1, 2011, the change orders were approved. PM requested a new schedule from the contractor to complete the milling and resurfacing of Carlyle Avenue and Bonita Drive. DMSI completed the installation of the water main and has transferred all services to the new water main. 1) The original plans provided to the contractor during bid did not identified all the existing services. Additionally, PWD had requested to connect the proposed 8" water main with existing 8" water main at 72 street. 2) All work was completed and the City is reviewing as-built documents to schedule final inspection walkthrough. 3) Comments were issued to the contractor to make corrections to the as-built documents. Contractor to re-submit as-built for final approval and conduct the final acceptance walk-thourg with PWD. Construction started on June 7, 2011. Project is on schedule. Contractor had to connect to existing network at each of the side streets to improve network operation. Additionally, the existing water mains along the ARRA corridor are leaking and must be abandon. These additional connections are addition to the contract and CIP is negotiating with contractor to add to the project. Contractor is waiting for approval of change order to complete the water main connection at 73 Street. This has delayed the overall completion of the project. ;;;;;i.:';;;'i/,.;-·~;il~:X;;;;;~;i;;:'~;;;.:.';:;':;;; ~;.:~; ;;;;'::;;';0;;;~':':;'::;;;';;':"X~:':':;;;';~:.:.<.i;;':':':':;;':':;'i':':;;;:':':;;X~~0:i.:;;;;~i~;,r;>~;':i;';:;:':;.;;:: :,;;;;.:;:;;;i;;~;;;;i.;;;;.:;i;;;;;:;;:J;E;:;:~;;j~:.:i.<;;J;~J;JjjW;':~@;;;':;;lli.ii<jmmmii~I;;:i;U;;i;;)i:;i;i:J;;':;;;;;:;;~;;iw.;;;J;iil:;:";.'i;i;.'j;;;:i;;;;':;!.:::iii;i::.':r::;'';ii.'.'ij;':i.ii~:ii!.:;;:·J;;;;i.:~i.":;;';).~i;;:J];~;;;:iMWm;;;;..g;ijW.-Ag;.;;ii:';*.@@;i@:ii;;';iJ!jii,ii;f,;;J;i.0.'ii.w.@';ii':':':':':~iliili0~j;;'iili;::~i;;i]jiiiili;;iiii].:;':;:i.:i.iS.i;i'J;ii;';;S;:>;ii;i:;:;ij.~;;;;;;;; :;;i;;~:j;;;;;;;;;i;,f;;;;;;i,;;;;ij;;>i;.:;;;j;ii;;;.:ii,i:"=;;~<0;:8,)1;;];" 1213012011 9:32:09 AM Page 10 of 38 District Project Mgr. North Beach Sinnes, A. Project Name Seawall Restoration -Rue Bourdeaux 1213012011 9:32:09 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Restoration of seawall, new sheet pile wall, new concrete cap, and restoration of landscaping. Construction Status 12/15/2010: Construction NTP II issued on 12/812010. Preconstruction meeting with DERM pending. Sheet piling delivery pending. 1/6/2011 : Sheet piling delivery delayed because this was a special order. Anticipated delivery of the sheet pile is 1/25/2011. 1/24/2011 : The existing concrete footer at the base of the existing wall was demolished during the week of 1/17/2011. Sheet piling installation set to commence the week of 2/712011. Project completion anticipated for the end of March. 2/17/2011 : Forming and pouring of the seawall cap scheduled for the week of 2/21/2011. 3/15/2011 : Project substantially complete on 3/112011. DERM has not accepted the rip rap. Acceptance is being handled by Ocean Consulting. 4/26/2011 : Public Works issued a punchlist. One item requested videoing the outfall pipe to verify condition. 6/24/2011 : Project final approval by Building Department received on 6/14/2011. Project transferred to close-out phase. Page 110/38 District Project Mgr. North Beach Sinnes, A. Project Name Seawall Restoration· Trouville Esplanade 1213012011 9:32:09 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Restoration of seawall, new sheet pile wall, new concrete cap, and restoration of landscaping. COllstructioll Status 12/15/2010: Construction NTP II issued on 12/812010. Preconstruction meeting with DERM pending. Sheet piling delivery pending. 1/6/2011 : Sheet piling delivery delayed because this was a special order. Anticipated delivery of the sheet pile is 1/25/2011. 1/24/2011 : Sheet pile installation anticipated to start the week of 1/31/2011. 2/17/2011 : All construction activities are substantially complete. Rip rap installation scheduled for the week of 2/21/2011. 3/15/2011 : DERM has accepted completed project. Contractor pending clean up and sod. 6/24/2011 : Building Dept. final approval received on 6/14/2011. Project transferred to Close-out phase. Page13of38 District Project Mgr. South Beach Vieira, T. Project Name Botanical Garden 9:32:10 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Proposed improvements outlined in the Master Plan adopted by the City Commission on January 13, 2010 are as follows: Phase 1 -Demolition of existing hardscape features, removal and replacement of existing fencing with oolite monolithic walls, relocation of garden entry, construction of various water features and ponds, construction of hardscape paths, plazas and patios, landscape relocation and plantings, irrigation and lighting; Phase 2 -Installation of oolite monolithic walls along the south and east perimeters, trellis work along the south wall, repainting existing buildings, and garden furniture and fixtures; Phase 3, consisting of improvements to the Collins Canal Corridor, to be designed as an extension of the Botanical Garden, has become a separate project called "Botanical Garden I Collins Canal Improvements". Phase 4 -Consists of a donor wish list to fund various improvements, such as shade structures, fountain refurbishing, and other site features, using private contributions. COllstructioll Status Grand Opening took place on October 25, 2011. Punchlist is 95% complete, pending only the replacement of defective light fixtures. Page 170/38 District Project Mgr. South Beach Iglesias, E. Project Name City Center BP 9A Streets/Sidewalks Improvements 1213012011 9:32:10 AM Monthly Construction Report Status through December 30, 2011 Scope of Work The City Center Right of Way (Streets/Sidewalks) Infrastructure Improvement Project BP9A is a $12.6 million infrastructure project which includes the restoration and enhancement of right-of- ways/streetscapes throughout City Center, including roadway, sidewalk, curb and gutter, landscape, irrigation, lighting, potable water, and storm drainage infrastructure. The project limits include the area bounded to the north by Dade Boulevard, to the south by Lincoln Road, to the west by Washington Avenue and to the east by Collins Avenue. COllstruction Status Construction commenced on August 24, 2009. The following is the current status of all improvements: Washington Ave: Water main replacement, stormwater improvements, sidewalk replacement and pedestrian lighting installation are complete. The first lift of roadway milling and resurfacing is complete in both directions and second lift of asphalt on the northbound lane is complete as well except the intersection of 17th street. Final landscaping and irrigation is complete and Partial Turnover Package was transmitted to the Parks Department on May 31, 2011. The culvert repair work was completed on March 17, 2011 and final roadway reconstruction of the southbound lane is complete. Installation of the exfiltration trench on 20th St. & Washington was completed on May 12, 2011. All fire line and water service connections were completed. Lamping inspections have passed with minor exceptions. 18th Street: Water main replacement, stormwater improvements, sidewalk replacement, pedestrian lighting (excluding wiring) is complete; landscaping and irrigaton completion is pending. Final lift of asphalt is also pending. James Avenue: Water main replacement, storm water improvements, sewer main work (pending as builts for PWD Turnover), sidewalk replacement and pedestrian lighting installation (excluding wiring) is complete between Lincoln Road and 19th Street. TECO Gas line relocation was completed on December 2, 2010. The crosswalk header bands at the intersection of 18th and James complete. Irrigation is roughed in and landscaping is scheduled for the end of the project. The bumpouts on 17th and James are complete, only the crosswalks are pending. Pressure testing, water BacT samples and DOH certification is pending in order to proceed with fire line and water service transfers. Drainage repairs are pending. 21st Street: Stormwater improvements, watermain and first lift of asphalt was completed prior to Art Basel weekend of 2010. Hardscape construction is complete. All fire line and water service connections were completed. Landscaping and irrigation in the bumpouts is to be completed towards the end of the project.Drainage repairs are pending. Liberty Ave: Stormwater improvements, watermain and first lift of asphalt was completed. Hardscape construction and pedestrian lighting is complete. DOH certification was approved and all fire line and water service transfers were completed. First lift of asphalt is complete. FPL service point installation is complete on 19th st corner. Lamping Inspection was completed by Envirowaste to assess full scope of drainage repairs. 19th Street: Storm water improvements, watermain and first lift of asphalt was completed. Hardscape construction and pedes train lighting Page 18of38 District Project Mgr. 12130120119:32:10AM Project Name Monthly Construction Report Status through December 30, 2011 Scope of Work Construction Status is complete. DOH certification was approved and all fire line and water service transfers were completed. Park Ave: Stormwater improvements, watermain and first lift of asphalt was completed. Hardscape construction is complete. DOH certification was approved and all fire line and water service transfers were completed. Drainage line repairs are pending. 20th Street: Drainage structures were installed between Collins and Liberty Ave. Due to Non Compliance Reports and Stop Work Directive issued to M. Vila on August 25, 2011, Contractor had to restore the area and comply with all Non Compliance reports prior to continuing drainage installations on the rest of 20th street. Road reconstruction between Liberty Ave and Collins Ave is complete on the south side. The watermain installation is complete except the service laterals (domestic, irrigation and fire). Hardscape reconstruction on the north side of 20th between Liberty Ave and Collins Ave will commence on December 27, 2011. All gravity wells received FDEP Certification of Class V Well Construction Completion and water quality analysis and use authorization. The grates and grouting are pending. Fire line transfers began on March 24, 2011. Approximately 24 out of 37 connections are completed throughout the project. Remaining fire lines will be completed once all DOH Certifications are received on James and 20th street. Lamping Inspections are in progress by PWD and Envirowaste. Washington Ave between Lincoln Road and Washington Ct. are approved. James Ave between 17 and 18 streets is also approved. James between 17 and Lincoln Road are pending re-inspection due to infiltration as well as 21 street, 19th street and Park Ave. Envirowaste completed CCTV inspections and will provide a full report and cost estimate for repairs within one week. Eighteen fire hydrants are required to be added to the project scope due to a Fire Dept code. A JOC Contractor (Metro Express, Inc) was selected to proceed with this work after all watermain installations are certified by the Dept of Health. Eight of the eighteen fire hydrant wet taps have been completed. Project is scheduled for completion early spring of 2012 due to delay caused by M. Vila Contract Termination on October 24, 2011. Metro Express commenced scope of work on October 31, 2011. Page 19 0/38 District Project Mgr. South Beach Dixon, C. Project Name City Center BP 9C Streets/Sidewalks Improvements (Lincoln Road) Monthly Construction Report Status through December 30, 2011 Scope of Work Lincoln Road east of Washington Avenue. This project limits are Lincoln Road between Washington Avenue and Collins Avenue, and has been designed to address the needs of the commercial and retail area, as well as pedestrians, private and public vehicular access. The project includes roadway reconfiguration to accomodate uniform traffic lanes throughout, installation of landscape center median with uplighting, sidewalk replacement, installation of pavers on portions of the sidewalk that ranges in with from approximately 26.6 feet to 15.6 feet, paver crosswalks with ADA curb ramps, bump outs to formalize parking area and reduce the crosswalk distance, installation of street furniture, resurfacing of the asphalt pavement. The project supports the City Center RDA Master Plan. No additional Funding is being requested for the Project at this time. "Hold above-ground unfunded amount funding pending construction bids." COllstructioll Status During the January 26, Mayor's Blue Ribbon Panel on Tourism -Lincoln Road Beautification Sub-Committee meeting, Mr. Gimelstein (Lincoln Road merchant) requested that staff evaluate issues related to the planting material in the center medians, and the need for loading zones. Consensue was reached to maintain the medians if the City would address the issues related to the landscaping as well as the loading zones. Following Lincoln Road Beautification Sub-Committee meeting, City Staff (Planning, Parks, CIP Departments and Chen and Associates) held further discussions regarding these issues. As a result, Chen and Associates modified the organization of the plantings within the median to allow for view corridors between the north and south sides of the street. Two loading zones were also added within the Project limits. The contractor's Notice to Proceed 1 (NTP1) was issued on March 17, 2011. A Community Pre-Construction was held on April 21, 2011. The Notice to Proceed 2 was issued on April 27, 2011. Installation of the sidewalk curb and gutter, decorative brick pavers, irrigation piping, and electrical conduits and wires are installed on the north side of Lincoln Road between Collins and Washington Avenue, and on the South side between Washington and James. The trees are scheduled to be planted during the week of September 12, 2011, addapave installation will follow shortly thereafter, and streetlighting fixtures. The Project is anticipated to be completed in late November 2011. 12/06/2011 : Sidewalks: 95% complete Landscaping: 45% complete Roadway: 25% complete Electrical: 80% complete Anticipated completion 1/1512012. 1213012011 9:32:10 AM Page 20 0/38 District Project Mgr. South Beach Sinnes, A. Project Name City Hall -Building Department Renovation Phase II 1213012011 9:32:10 AM Monthly Construction Report Status through December 30,2011 Scope of Work Renovation of the different sections of the Building Department, located in the 2nd floor of City Hall. New reviewer's stations, demo interior glass partitions, new ceilings, new floors, new partitions and upgrades. Construction Status 10/11/2010: Phase II consists of 3 areas. The first area is 80% complete waiting for desk partitions. 10/27/2010: The funding allocation for the desk,partition change order was received from the Building Department on 10/21/2010. BPO increase is being processed. Project is on hold until BPO increase is approved. 11/15/2010: The desk partition change order has not been approved to date. The reviewers stations are on hold until CO is approved. The violations office build-out is to commence on 11/22/2010. 12/15/2010: The desk partition CO was approved and the material is on order. Anticipated to be installed by January 15, 2011. Violations office build- out 90% complete. Final inspections scheduled through 12/20/2011. 1/6/2011 : Reviewers Station Millwork (CO) -anticipated for the week of 1/17/2011. Violations Office Complete. Conference Room pending Building Department vacating the space. 1/26/2011 : Reviewers station millwork delivery scheduled for 1/28/2011. Conference room start pending the tenant removing the existing office furniture. 2/17/2011 : Reviewers area complete. Conference room 80% complete. 3/15/2011 : All work complete except for one conference room change order for relocating electrical for floor electrical outlet. Change Order pending execution through CMB. 4/26/2011 : Change Order still pending execution. 8/16/2011 : Phase 2 work is completed. Close out documents have been submitted by the contractor. Page 21 0/38 District Project Mgr. South Beach Sinnes, A. Project Name City Hall -Building Department Renovation Phase III Monthly Construction Report Status through December 30, 2011 Scope of Work Renovation of the different sections of the Building Department, located at the 2nd floor of City Hall. New ceilings, new floors, new partitions and upgrades. Construction Status 4/26/2011 : Construction commenced on 4/18/2011. All work is being performed during nights and weekends as to not interfere with normal operations. 6/10/2011 : Base Contract construction work approximately 90% complete. Change Order for miscellaneous extra work submitted to Building for approval. Pending authorization and loading of the account and processing of the BPO increase. 6.24.2011 Change order for additional requested work has not yet been approved by Building Dept. Base Contract work 99% complete. 8.15.11 Change order for additional requested work has been approved by Building and currently being processed. Awaiting Finance approval. 8.30.11 Construction started again. Project scheduled for substantial completion by 9/15/2011. 11/30/2011 : Phase 3 Punchlist walk thru performed with contactor and Building Department. Work completed. Building to perform final walk thru with Contractor and CIP. ';;;;!.i:;;;;j;;:i3;;;;;;;;;~:jii;;;:;;;;:;i;;:i;i;;;; :;;;:;i;::;:;:ii"ii;.; :i;;:':;;;~::;ii;;:,;;;";;;;;,~;:::.~;;:'::;:':;;;~·;;;i;;:;:;;;;];,~J$J;;;;;;;;:;;':':~;;;':;;;~~h'.:iJiw0i;;~;~~~iili;;';]ii~i;ii;';ili;;;i:;.@i;ii;i::fiji!ii.'i;:;.;m;:;;;;lli!im~,'j];;@igi3ill;;;"0;;&";;;;:;j;;;;':':j£i~;iitii;;i;'ili;';ii*ii;i'iiili;ii:;;jiii;lli;,':;.'.~i;Z:i;;;ii.~i@;;;.;.!:i·j;i~Fi.i);;.' .. ,~!mij;;;;;;li;!;i;i;;;:i;;;);;i,iii];;i;ii;iii;;ii3;:;);:g;,~:;;:.r:.:8;illili;;''f5:;;;;~;;;;m;iX]ii~:;;;;;;;;;i;ji;;';i;;;?;".~:~0;;~;;~J;;:';;;;;~·i;. .'r::"';;;~·;·,;;,:i:;h:;;i:';"';i:;'.;j;;:;i;;~·:"'ii;~iliili;;;;~;~ 1213012011 9:32:10 AM Page 22 0/38 District Project Mgr. South Beach Sinnes, A. South Beach Fung, H. Project Name City Hall -Upgrade Halon System City Hall Impact Glass Monthly Construction Report Status through December 30, 2011 Scope of Work Replacement of two 45 pounds halon 1301 tanks by two new environmentally acceptable protection system (HFC-125). Replace existing glass windows and store fronts with impact resistant Dade County approved windows and glass doors. All existing metal hurricane shutters will be removed from building. COllstruction Status 7/2/2010: All suppression systems have been installed. The fifth floor is pending replacement of the AC unit and sealing the room for pressurization. 10/6/2010: Permitting of the new AC unit for the 5th floor is underway. 11/16/2010: Permit received for the AC unit at the 5th floor. 12/15/2010: Mini-split AC unit has been installed. Pending installation of back-up AC unit. 1/6/2011: Testing of the AC units is underway along with final inspections. All work complete. 1/24/2011: All work complete. An existing FA device in the room was found to be broken. The Property Management division must repair in order to complete this project. 2/17/2011: FA device has been repaired. Contractor pending final inspection and sign off. 3/15/2011: Mechanical and Fire Final Inspection scheduled for 3/17/2011. 4/26/2011: Final sign off of all disciplines obtained on 4/21/2011. 4/27/2011 : NTP I issued to Matrix Construction on 4/6/2011. Window subcontractor field measured all existing window openings on the 3rd and 4th floors on 4/23/2011. Field measuring of the 2nd and 1 st floors to be conducted during the week of 5/2/2011. Shop drawings anticipated to be complete by 5/31/2011. 8/04/2011 : Building Permit issued to contractor. 8/05/2011 : NTP II issued to contractor. 08/30/2011 : Material to arrive 09/27/2011. If material arrives on time, construction to start 09/29/2011. 11/02/2011 : Project started on 10/29/2011 and is curretnly at 40% completion. 11/30/11 : Project in progress and is currently at 75% completion. :;;;6;i;ii;,'ii;;;;;;;;!;;"ij;;;;;;j;i~',~i;;i;I;;;";;;;ii;;;I;;ii,;i):.illi;;;;;;;i;:.:....'N~';;N.'..;;;;;;:,;;;;;;! !!';;,;;i;;J.,i...:"L:;S;"' :;'i;;;,;"; ;i;"·j";:;W;;;, ;:;'.Ji;;iiiii;(i,;;;iJ!i<;;i;?Jj;;;}~;,~~X~!;$"''f=tinri'i1@*;;lliiiii'i;j1WWilliiliiiiJii!Eiii,;iiEiiiiJi#:;;ii;;;ti;::;i;;i;';;; .'iiii.:;;;;;.:;;;;;;! ;·:';:ii;;;.';'ilii'iijiiiPi;;;i;;;;;;JiJi;:;;;i';"-i;;:'~~ i'i;i.:;J;;;;;;'; ;:;i;;;':ii;':~;;;':i.i:!iilliiiiilii'i;iii';ij]]miJ;ijjiSiii;;':;i>i.iiili~w.:.:m;J.1'h;.@;iJlli.i;"'Z;';iiiiiii.'jj.']j;;.im;;iii~;;;.'ili:i.'J;;I;;;;;;;;;i;;;:;~'.-;~~i~';;;:;;:]';:i.;i;:>;;i;;:;;;;';!];iii;i:.:.:.';;<':ii;;;i.:;'~:;;;;:.'33:';;;;;';i:fii;'~::[i~r,.:;;i;;;i~;Wi 1213012011 9:32:10 AM Page 23 0/38 District Project Mgr. South Beach Dixon, C. South Beach Hernandez, M. South Beach Iglesias, E. South Beach Iglesias, E. South Beach Vieira, T. Project Name Convention Center Improvements - Phases C & D Fire Station 1 -Fire Alarm System Replacement Fire Station 1 -Interior and Bay Doors Replacement Fire Station No 1 Air Distribution, Exh Fan & Window Unit Flamingo Lummus BP 10F Streets/Sidewalks Improvements Monthly Construction Report Status through December 30,2011 Scope of Work Renovation and ADA improvements to 29 existing restrooms, doors and door hardware. (Includes budget for Phases AB,C, and D). Modifications andlor replacement of the existing Fire Alarm system for a new system in compliance with new codes. The interior hollow metal and hollow wood core doors are aged, not fire rated, beyond rated life expectancy, scratched, utilizing non compliant hardware and, in general, not working properly. The exterior overhead, vehicle bay, doors are aged and damaged. The hardware is worn and some doors do not close properly. The metal rails are also showing signs of age. Renovation on interior mechanical flex ducts. Replacement of damaged curbs and exterior metal ducts. Additional ductwork required may be required in 2nd floor sleeping areas. A portion of Flamingo A between 7th, Meridian, 9th, and Washington will be constructed via JOC as Flamingo F. It is intended that this construction will relieve stormwater bottlenecks from Washington Avenue while making water, streetscaping, and lighting improvements to this area. COllstruction Status Alpine Construction, the original contractor, was terminated from the project and a mediated settlement agreement was negotiated and finalized by the City Attorney's office. Funds were retained from Alpine Construction's contract to complete the scope of work. A JOC proposal is being negotiated with Harbour Construction to complete the remaining scope of work. Building permit approved 10/1/10. Pre-con meeting was held November 16th, 2010. Work commenced on November 29th, 2010. Acoustic ceiling being installed and coordinated with fire alarm final inspection. Construction on first floor is complete. Second Floor is almost complete pending the installation of only seven devices and the fire alarm panel replacement. All devices were terminated and fire alarm panel was replaced. On the week of September 5th, programming and testing of the new panel will be in progress. Final Inspection is scheduled for October 4, 2011. Final Fire Alarm inspection passed on November 1, 2011. Final Electrical Inspection is scheduled for Novemeber 2, 2011. Inspections passed and the project is in final close out. All six overhead doors and motors are completed and installed. Final inspection received 12/3/2010. The overhead doors were turned over to Property Management on May 30, 2011. Interior door replacement is pending. Interior ductowork commenced in the main dorm rooms on June 20, 2011. The partial area inspection was approved on June 27, 2011. They proceeded to install ductwork in the kitchen, dining rooms and TV lounge. Ductwork installation was completed by the end of July. The AHU was rotated on December 8, 2011. The Final Inspection passed on December 21,2011. Punchlist complete. Project turned over to Parks Dept on September 26, 2011. Pending approval from PWD Operations. :if;;;;';];';;!;;;;;:;;;;;;;;;)));i;;;;.;;;;,>,;;;;;; "',iii,;;;;;;,;;';;;;;;' ,"., .:".'h' :;";:;; .. ".: ";; .. ;;; ·;·;:;';:;,~;;~i:;';;';;i;;;;;iJ,=::,:,:;;;;m;;':;ih.ii;;X~:;':;"'i;£>;i;;;Jii;;;i;i;i:;.W:ii;>;;;i);-i.;;;;;;;;;;;':;.~1~;;;iW,;,:;.;;!,,;;g:Jill.:miM~jjf,ziJj~lli.:i;;ill;iJf,iS;;z;i~iii;i;;ilii;,;;iJiii;iiiiim~X#;";:;i;;,;;j;:':':;~;~';;;:;;,;;,;;;i;;i:ii)j,;;;;;ii;:ii;;;.:;;;i;;;;;;;>;:;:;r.;iii'b-~i;:;;X.;;;;,~;J:5'w;;;':;;;jiiiii;:ii.i;;;ij;;iii.:ii~;n;ili;;ilii;~;.2.EJi..~~;:;;ii':::':';'~j~!.i;;;;':':':;;.i.i~~;;;':!;;;';;;':.iliii-iiii;) i;;;';@;i:g;::!;;;;i';';;;;;:i;ii;:.:;,~:;;;:;;;;.;;;r:'~~;;;;;;iJi;';~'.;M;:;~;;;';;;;i;jiiN:;,;;;~;;;;;m;Wi';';;~ 1213012011 9:32:10 AM Page 24 of 38 District Project Mgr. South Beach Cabanas, H. South Beach Dixon, C. Project Name Perry Sculpture Restoration Police Building -Elevators Renovation Monthly Construction Report Status through December 30,2011 Scope of Work Restoration of sculpture located at Scott Rakow Youth Center Complete upgrade of the two (2) passengers elevators located at the main Lobby of the building and the one (1) service elevator located at the North end of the building. Construction Status Meeting scheduled for 4/27 to discuss all outstanding change order work. All base contract work was completed and inspected. 6/10/2011 : Final Fire Department inspection of entire facility scheduled for 6/13/2011. 6/24/2011 : Final Fire Dept. inspection was conducted on 6/17/2011. Only pending item was the permit revision required for the 5th floor Egress Door (change to a NFPA delayed egress locking mechanism) between Tourism and IT Departments. 7/28/2011: Building Final issued. 8/02/2011: Project has received a CO. Sculpture relocated to a storage location where it will be restored and remain in storage for a period of one year. Conservator has noted structural steel damage on October 20, 2009 and has requested that the structural engineer be retained to evaluate. The Purchase Order to pay for the additional structural engineering services was completed on 2/9/10 and Notice to Proceed to the Engineer was provided to complete the design. Engineer has approved the final shop drawings for the renovation. Sculpture has now been placed at the site and is completed. All pending punch list items have been addressed. The City Commission approved the Xpert Contract on January 19, 2011 The Contract was executed on March 17,2011. The first Notice to Proceed was issued on April 25, 2011. The start of construction is anticipated in mid May 2011. 09/06/2011 : Contractor mobilized. ~:.:x:J2.~i;:;;:';.:::i:J:.Q~:r;;;;~x .. ';;.J;;.;i:J...0:i.';,;033;;;·d;;:J;;:V;.:..f;:'.r~i;:;j;r;';~·:i~i;·;;;,;;.:':" ,:)';:;;;;;;;';:;;,;";; j'.:;;)i; ·~'iJ;,';:i;;.';.'.'i;;;:';;i;;;;;;;)5~;:W]iJiW,~i;;;;;i!J;V.ili;;;;ili;;m;;m.i;i!;~jiilljlSilSiijj;~~i;;ihlji.;,~~~ii:Xi]ili.~~..:::~:.:.:::m~~;;&':"'ji;mill>iili@;;;Wjm:jl!jiii::j;jm;jiiJj.jjjji;'~i;!.:::im@i)imijjjjjjij@;.::ii.i;;':;;j.:'ifik;;;:;;J-iJ;:';;i;':;,J,;i.:,;~:i;;~':.;j;i;,;~';i;;;;;iwi;;;;;].iJi;;;i;;;:J;iJ;g~.iJ;;:;;;;~ijj::iiliX~iZi~;""i:milij;;00~jj~;~ 12130120119:32:10AM Page 27of38 District Project Mgr. South Beach Sinnes, A. South Beach Fung, H. Project Name Police Garage Glass Blocks replacement Police Station Halon Replacement Monthly Construction Report Status through December 30,2011 Scope of Work Replacement of the existing glass block staircase at the Police Building Garage with Dade County approved impact glass system. Replacement of Halon system in level 4 IT room located at City of Miami Beach Police Station. COllstructioll Status 10/11/2010: Contractor has obtained permit and is waiting for delivery of windows. Window delivery scheduled for the week of 10/25/2010. Installation to commence by 11/1/2010. Completion of Project by 12/1/2010. 10/27/2010: Contractor commenced work on 10/25/2010. 10/28/2010: Contractor installations approximately 50% complete. 11/15/2010: Contractor installations approximately 80% complete. Anticipated completion by 11/30/2010. 12/15/2010: Project completed on 1212/2010. Pending final invoice and submittal of warranties. 1/6/2011 : Retainage requested on 1/4/2011. Project Complete. All closeout documents have been received. 09102/2011 : Pre Construction Meeting held between Harbour Construction, IT department and CIP. Construction to start on 09/07/2011 09/07/2011 : Contractor mobilized. 11/30/2011 : Project 80% complete. Anticipated completion 1/1/2012. :;ijjj;i;iiijjj;!;iiijjjJ.;ji;;;;,; ,j,";;;;,ji;;; ,;,,~;;;i;:;;i;Hr,,:;;,<';;;:;;i;'N~:;;: ;,;'i;;;;;jii;;;ji;iii;~;;Miji;lli.:ji{:ilii;;;~,;;;"::;:;.J;E.z..:w;;:;;ji;;i;'i;iJ;':;:i;;!ii;;;i5iii);;;/f,i;;j;t.:iiiiUii!iii!T,iiiiiK-iiiH;iJJJJifJiiiiiiiiiiiijjmjjjijjjjjjijjjjjjjjijii;Wiiiliijj;;llj):;;;ij;iiiijii.:i!jimmmj.jjjjjj;;i;~j;jii,;ji;;i~;im;i)~j;;iziiijijj:;ij;ii,;;i;;,'i;;;Jj;i:;;;;Jiij;i~;;'i1Jii;m;;;;;:Sji~ijim;!:ij@llijjijmiNjj~jijJiiiJi'ijiiJj;;;r,;''i'Mili~j;;ijW.,yJjFiYJiiij;iJiiiii.:!-';;W jii;':;;;;;':;;!! j;Pjjj,;;~'jj;jjjj,,'J;;;Jj~';:i';;;;"ji:JjXj; :ii;;;;J.j;j;ji"jj.;;;;;;j,;jii:i;;;;iJ;;; ;;;;;;f;:j;<,~~;i;;;i;;;Ji:;;>i;;;;;;;;~ 1213012011 9:32:10 AM Page 28 of38 District Project Mgr. South Beach Sinnes, A. Project Name Seawall Improvements -Lincoln Road Street End Monthly Construction Report Status through December 30,2011 Scope of Work Restoration of the seawall, improvement to the adjacent Public Park and cul-de-sac located at the west end of Lincoln Road. New landscaping, new paved area, irrigation and exterior lighting. Drainage Improvements added at cul-de-sac due to existing ponding conditions. COllstructioll Status Seawall construction complete. Outfall structures and rip-rap boulders installed. Drainage inlets and pollution control structures delivered. Installation underway. Underground work is 90% complete. Sidewalks and curb and gutters were poured on 1017/2010 and 10/8/2010. . Expected completion by mid November. 10/27/2010: Final tie in of 36" stormwater pipe to outfall structure pending the receipt of an internal compression fitting. When EnviStreetslSidewalksaste receives, progress at the streetend park will recommence. 11/15/2010: Final installations of the park amenities have commenced. Bollards, light bollards, landscaping, irrigation, pavers, benches and street lighting installations anticipated to be complete by 12/3/10. 12/15/2010: Light Bollard bases poured on 12/15/10. Automobile bollards completed. All trees installed. Concrete paver installation scheduled to start on 12/16/10. 116/2011 : All streetend park work complete (pavers, benches, lights, landscaping, etc.). Permanent power pending from FPL (anticipated for mid January, 2011). Sub-prep and paving set to commence on 1/11/2011. 1/24/2011 : All roadway paving is complete. Project completion pending FPL permanent power to energize street and bollard lights and to energize the irrigation controller. 2/17/2011 : FPL permanent power pending. Change Order work to the contractor for additional hedges is pending installation. Punchlist items for pavers are pending. 3/15/2011 : FPL provided permanent power to site on 3/11/2011. Public Works walk through for final acceptance scheduled for 3/16/2011. 4/26/2011: Public Works Dept. issued a one-item punchlist (move trash can away from Fire Hydrant). Work pending completion. CIP arranging for final ~;I.l;,;;.;:; 'jfi!;;;! ·i~,;i;;i;':;;,:!.:;,;;;::;; •• ;;::,;·;';.;;?;;;~;';i:;;:;"):;;;:,~;;;5~M...:x.:.:.:.:i;~;ji.:;;.:Ji;':;;~':::;?,'i;.:;s~;;i]&;;.i.:;;,;~;':;;i~i;2>;.';; ;;" j )~;;;; ;;ni;;;:i;;i;i;;i~;;;;ji:.'i>;;.;:i;i.;;;i?iK~iwii.iX;@!iijjij@k'jim;.@WjiZjji;;jim:;jiili;llilliJifj;;;ij;i.~ii"iJ;i;i<;,~;;ij;;J?,;;;;;;ii":<.gf.j;;i;;';":;;;;ii;?;';;';;;;i':::;~i;~;ii;;i;i;;j;ji.:;i;;;h;ii;~;~';ii:;M,~j;;)Jf;;;S;;;:;;;ill%.·;;;;;i;:X':::i~;.@m;m,'!!;;i':Hi;Jg;i;;;;I,;;j.'i;;j;;;;";[;i;i;mi;m.:ill~;.i?..;;;!Bi;0.Jjmi~i;J.ij;;]~·;'~fu;j.;~;~:;,>i·;;i;~2.i;;; ;j;j.:';;:.~j;;ij;;';!ji;;.:;ii>j ;i;; ;j;;i;i~';;"';;i;:·ii:;;;:i;i;i;;i;i.i.::;>ii~:0i;:;;;;;;;~i;;;:;;i~ 1213012011 9:32:10 AM Page 29 of 38 District Project Mgr. South Beach Sinnes, A. Project Name South Pointe Park Monthly Construction Report Status through December 30,2011 Scope of Work Park Improvements consisting of the following: redesigned park entrance, new pavilion and maintenance buildings including a small concession area, new restroom facility, pedestrian walkways, playground, landscaping, irrigation, and site lighting. COllstructioll Status department turnovers this week. 6/10/2011 : PWD has not issued final approval yet. Parks has accepted and is maintaining grounds. Building Dept. final acceptance pending PWD sign off. 6/24/2011 : Building final approval issued on 6.21.2011. Permit is closed. PWD sign-off received from Hector Castro, Assistant Director on 6.20.2011. Project to transition into close-out phase. Project is in close out phase. Turf Replacement (Parks and Recreation Department) -Remediation report, including budget, a permit set construction documents and other particulars due from consultant on November 22, 2011. Scope includes removal and re-installation of several inches of soil/base, creating a drainage horizon, grading as needed, installation of new irrigation system, installation of new turf and plant material. Initiate remediation in April 2012 to avoid dry season. Playground (Parks and Recreation Department) -Completed. Opened on July 26, 2011. Pathways (Parks and Recreation Department) -Corrective method will involve reworking the existing material. This task will take place after the turf replacement and water feature remediation. Pylon lights -The existing lights will be converted to a fiber optics system to correct the issues that cause the continual failure associated with the copper conductor wiring during lightning storms. The work is tentatively scheduled for FY 11-12. Interactive Water Feature -CIP is in the process of engaging a JOC contractor to begin the remediation process of the water feature. The remediation will address deficiencies identified by the Florida Department of Health. Deficiencies noted included issues associated with the drainage and filtration system and the requirement for restrooms within 200 feet of the wet areas. Park Sign -Portions of the aluminum lettering of the featured park sign that was reportedly stolen is in the process of being ordered. The replacement lettering will be fastened with vandal-resistant fasteners. 11/30/2011: Replacement lettering on order. 12130120119:32:10AM Page30of38 District Project Mgr. South Beach Dixon, C. Project Name South Pointe Streetscape Phase II BP 12C Streets/Sidewalks Improvements 1213012011 9:32:10 AM Monthly Construction Report Status through December 30, 2011 Scope of Work The Project area encompasses the entire Public Right- of-Way between Fifth Street and Second Street, (excluding Third Street) west of Euclid Avenue to Michigan Avenue, including Michigan Court and Lenox Avenue between Fourth and Fifth Streets. The improvements include the replacement of existing water lines to enhance the water pressure and water flow, new stormwater infrastructure to meet the Master Plan recommended level of service throughout the project area; Streetscape Improvements including traffic calming measures, enhanced pedestrian access, landscaping, irrication, lighting, and parking improvements. COllstruction Status Horizon Contractors (HCI) has completed the following: STORMWATER: The installation of approximately 6,160 linear feet of stormwater piping, 130 structures, 21 gravity wells is complete, including certification from FDEP dated April 22, 2010. On July 16, 2010, DERM issued a dewatering permit for the cleaning and testing of the South Pointe Stormwater system, with the exception of the contaminated areas. On 07/15/10 CIP requested that DERM include this area in the existing Class II permit and the request was approved. Tidal control valves are scheduled to be installed in January 2011. WATER MAINS: The installation of approximately 5,610 linear feet of water mains, 151 water services and fire lines have been completed, including the added scope of work (approx 1050 linear feet) on 4th Street between Jefferson Ct and Washington Avenue. HRS authorization to connect the new services has been obtained. The 4th Street water main, and the water main services connections are complete. Water main record drawings/as-builts are being finalized by the contractor for turn over of the system to the City. ELECTRICAL/IRRIGATION AND LANDSCAPING: Inspections of the streetlighting system were conducted with PWD,HCI, Engineer of Record (EOR) and CIP. On 07/15/10, the EOR issued their inspection results/punch list of items which were completed by HCI. As- builts/record drawings are being prepared HCI for Final Certification by the EOR and turnover of the system to the City. The irrigation system preliminary walk through with Parks and landscape architect was conducted on 06/17/10, and on September 2,2010. A Final punch list walk through was held on December 10, 2010, a report from the landscape architect and Greenspace Managent is pending. ADA and Landscape inspections were conducted on 07/19/10. A Report was generated on 07/22/10. The Addapave installation throughout the project is complete with the exception of their replacement in a few tree pits where trees have died. The placement of the final lift of asphalt is 80% complete and is anticipated to be completed in Mid January 2011. Sod and groud cover on the streets is in process. DEMOLITION/RECONSTRUCTION: The administration is proposing during the January 19, 2011, Commission Meeting, milling and resurfacing, striping and pavement markings, addapave and healthy fertilization tree system, sidewalk replacement where the have failed, among other repair work on 3rd Street from Michigan to Washington Avenue. This work would be new Page 31 0/38 District Project Mgr. 1213012011 9:32:10 AM Project Name Monthly Construction Report Status through December 30, 2011 Scope of Work COllstructioll Status scope and would be constructed from February through May of 2011. Signage installation is complete. 116 calendar days have been added to the Contract Time and Substantial Completion is scheduled for March 10, 2011. Third street change order request proposed during the January 19, 2011, Commission Meeting for milling and resurfacing, striping and pavement markings, addapave and healthy fertilization tree system, sidewalk replacement among other repair work on 3rd Street from Michigan to Washington Avenue passed. This work is 80% complete. Certificates of Substantial completion for the Drainage Improvements, Water Distribution System and lighting System, were issued by the Engineer of Record on March 2, 2011. The Project Punch list was issued on April 19, 2011. The Project is currently being closed-out. Page32of38 District Project Mgr. South Beach Dixon, C. Project Name South Pointe Streetscape Phase III, IV, & V BP 12D/E/F Streets/Sidewalks Monthly Construction Report Status through December 30, 2011 Scope of Work The Project limits are bounded by Ocean Drive to the east and Alton Road to the west, and include: 1 st Street, between Alton Road and Ocean Drive Commerce Street, from Alton Road to Washington Avenue; Ocean Drive and Ocean Court, from 5th Street to South Pointe Drive; Collins Avenue and Collins Court, from 5th Street to South Pointe Drive; South Pointe Drive (Biscayne Street), from Alton Road to the eastern street end; Alton Road, from 5th Street to South Pointe Drive; Jefferson Avenue, between South Pointe Drive and 1 st Street; 1 st Street, from Alton Road to Jefferson Avenue; and Commerce Street and other adjacent alleys, roadways, and rights of way. This project is included in the City of Miami Beach Streets/Sidewalks Infrastructure Improvement Program and the Public Works Citywide Water and Sewer Master Plan. The improvements include installation of new stormwater infrastructure within Priority Basin 1 to meet the Master Plan recommended level of service; streetscape Improvements, including new sidewalks; and crosswalks, traffic calming measures and installation of bump-outs at crosswalks; enhanced landscaping within median, swale and bump out areas; pedestrian lighting; bike lanes; and parking improvements. COllstruction Status A Community Pre-Construction Meeting was held at the South Pointe Elementary School on December 7, 2010 at 6:00 p.m. On January 3, 2011, the City issued NTP2, retroactive as of November 29,2010, Trans Florida Development (TFD) has obtained a Public Works Right-of- Way and the DERM Class V dewatering permit has been issued for the cleaning and testing of pipes. The DERM well permit and trench dewatering permits were issued. A Completeness Summary Report was issued to TFD on December 6,2010, and received by the CIP on December 14, 2010. Approximately 80% of the well structures and 50% of the wells have been installed and tested to date. TFD is currently working on the installation of the Pump Station at South Pointe Drive and washington Avenue. WATER MAINS: TFD has completed the installation of water main and is currently in the testing and certification phase. PWD has requested the installation of a new 12-lnch water main on Alton Road between 5th Street and South Poinrte Drive, and removal of the existing and lowering of the 20-lnch water main on South Pointe Drive from Washington Avenue to Ocean Drive. These water mains were designed by PWD, are currently being permitted, and cost proposal from TFD being evaluated. DEMOLITION AND RECONSTRUCTION: The medians along Alton Road and South Pointe Drive have been reconstructed. The 1st lift of asphalt on 4th Street from Washington to Ocean, and Alton Road is currently complete. 2nd Street between Washington and Collins and Commerce Street are currently being reconstructed. Sidewalk, curb and gutter on Ocean Drive from 5th Street to 2nd Street is completed. Relocation of palms in the median on Alton Road is complete. Delivery of live oak trees for Alton are anticipated to be installed in October 2011. The irrigation meters are now in place for Alton Road and soils are being tested prior to delivery of trees. Installation of drainage structures, sidewalk curb and gutter, streetlighting and irrigation on Ocean Drive between 5th Street and 1 st Street is complted, drainage structures on Collins Avenue is in process Preparation for the repair/replacement of sanitary sewer line to allow pavement of 1st Street will commence on 9/12/11, and pavement of 4th Street will commence shortly thereafter. 11/30/2011 : Watermain: 90% complete ;;t;;j.;';ii;;;;:ijji~}i;.;;;:;m;)j;;;::m;;;;;;;;;;;:;;;i;J;~;~;i;-;;;z;;j;;;;~;;;i:;;ii,,;];;;;ili]i:;~;;ifu;;;;;;;; ,·;ii";;,~,,;';;i;ii:;;.;;;.-,;i;>·:;.',;;,;;;;';;i;;;.';!;;i;;:.'i';;5ii;.:;i3iiii,:;;iJii,~:ji};j,=::;j! .ij;jjj]j;m@iiii;;@ijiiiiiiijiiiiMi:iij;;miili~;gxi3ill;::iiW;;w.BYf;·:···':::;:~Wi<illX;!ili@;m!2!~f].@;~~;;mr~iili$.@i$;~:;iSj]ilim;i]iii£1;;;;;l1Jiii??;M;;;;;iiiif;;i;.iiiJ;'~i;;iliSillililliillllij;;;':;i~iili:<:i;ii;;sJ:ji]}>i~;;;i;';d.]~~i;;;;;i~;;~N]ilii;;':;;;:':>':;m;;;;;;.<;::;"i.iJi.i];;j:;;':;:]j;Ji@ilii.:.<;';jjj;;-;'ii;;:;;iii:;;;mmi;ii;j::lii:;~ 1213012011 9:32:10 AM Page 33 0/38 District Project Mgr. South Beach Sinnes, A. South Beach Rodriguez, R. Project Name South Shore CC Chiller Pipe Replacement -Phase II Star Island BP 13A Streets/Sidewalks Improvements 1213012011 9:32:10 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Replacement of exposed sections of the original chiller line pipes. Phase II of this Project involves additional chiller pipe replacement. The original scope for streetscape improvements on Star Island (approx. 4,000 I.f.) includes: street resurfacing, swale restoration, sidewalk repair and upgrades landscape lighting upgrades to correct deficiencies and providing additional landscaping uplighting, enhanced landscaping and traffic calming; all integrated with water line replacement (approx.1400 I.f.). Star Island does not fall within a priority basin, as described in the City's stormwater master plan. However, based on resident concerns with current drainage service levels, and following a discussion on storm water drainage issues in non-priority basins during the May 29, 2008 Finance and Citywide Projects Committee, staff was directed to produce a design that conforms with resident wishes to re-slope the entire street in order that storm water runoff drains toward the center median area. This design will include 3,800 linear feet of 6" concrete curve that will not disturb existing swale areas and encroachments and will eliminate existing roadway pondings directing runoff to existing inlets and the median area. The solution should meet the City's flood criteria for 2-lane residential areas for flood protection associated with a 5 year 124 hour design storm. Construction Status Storm water: 75% complete Roadway: 55% complete Above Ground: 50% complete Estimated completion by 11/2012. 4126/2011 : Piping installation complete at all exterior locations. Subcontractor to commence with overtime interior work during the week of 5/312011. 6/8/2011: Project Substantially Complete on 5/15/2011. Building Department final received. Project to transfer to Close-out phase. Close Out Documents received 6/612011. 8/04/2011 : Final Walk Thru Conducted by contractor, Property Management and CIP. On January 13, 2011, a meeting took place to review bridge loading requirements from Public Works Department (PWD). It was decided at the meeting to postpone the notice of commencement until the requirements are clarified. A meeting with PWD is scheduled for February 8, 2011. Notice to Proceed cannot be issue until the guidelines for the bridge loading requirements are drafted and adopted by PWD. 11/30/2011 : All the conflicts on the roadway have been resolved, Trans Florida is working on a revised schedule and is projecting to complete the project by 2115.2012. The Contractor is planning to complete the first lift of asphalt for the entire island before the Christmas Holiday. Page 34 0/38 District Project Mgr. South Beach Sinnes, A. South Beach Dixon, C. South Beach Dixon, C. Project Name Sunset Harbor I Purdy Ave. Garage TOPAPhase I TOPA Phase III 1213012011 9:32:10 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Acquisition and construction of an approximately 460- space parking garage over retail to be owned by a private partner. Private partner is responsible for approximately 18% of construction costs for retail portion. The original contract amount for construction is $9.27 M (including private partner share). The capital budget sheet reflects the City's construction allocation. Commencement date for demolition was March 15, 2011. Original project duration is 12 months. ADA and Interior Improvements; Improvements include renovations to restrooms, dressing rooms, main lobby galleries and entranceways, extension of balcony, fire sprinkler system, installation of ADA compliant doors & hardware, exterior ADA ramp, and Box Office renovations to meet ADA requirement. South mezzanine level bar Construction Status 3/15/2011 : A limited NTP II for the demolition and test pile program was issued to BCBE on 3/15/2011. A full NTP II shall not be issued until the main building permit is received. 4/26/2011 : The test piles and demolition have been completed except for the demolition of the Tremont Lot. The project is on hold (starting on 4/15/2011) until Scott Robins evicts Tremont Towing from the Tremont Lot. 6/812011 : Tremont Towing vacated the lot completely on 5/23/2011. Change Order #1 to BCBE for delay damages ($36,994) was executed on 5/19/2011 and included a 45 day extension to the Contract time. 8/30/2011: 2nd Floor slab -first pour complete. 2nd Floor slab scheduled to be complete by the end of September. 11/2/2011 : 1st floor -3rd floor structure completed. 4th floor slab final pour scheduled for 11-11-11. 11/30/11 : 1 st floor -4th floor structure completed. 5th floor slab final pour scheduled for 12/06/11. Crane scheduled to come down starting 12/14/11. Re: ADA Project: Permit has been finalized. Re: Interiors Projects: Permit has been finalized; however, premature corrosion of portions of the copper plumbing associated with the waterless urinals in several restrooms has caused wastewater to migrate into the wall cavities causing damage to the wall components. Repair of the walls could be extensive as it requires replacement of special order wall tile. CIP is investigating mitigation of the issue. With respect to life safety issues, Sonny Moore with the Fire Department has been advised that funding has been appropriated to complete the work identified by the Fire Department during the Live Nation renovation. Mr. Moore will inspect the project with the architect and CIP to finalize the list of outstanding life safety items. Work has been completed by Live Nation, per the terms of their agreement with the City. The City has requested back-up documents for costs incurred by Live Nation in order to provide reimbursement. Back- up documents were finally received on November 9, 2009. CIP completed the review of the documents submitted on April 28,2010. CIP submitted request for additional information to Live Nation for supporting documentation. To date, no response received. Page 35 0/38 District Project Mgr. South Beach Rodriguez, R. Project Name Venetian Islands -Venetian Causeway BP 130 Streets/Sidewalks 1213012011 9:32:10 AM Monthly Construction Report Status through December 30,2011 Scope of Work Streetscape improvements for the Venetian Causeway, from Dade Boulevard intersection to the City Line. Improvements to include sidewalk, curb and gutter, lighting, landscaping, traffic control device improvements, and gateway treatment. Construction Status 1 JOn January 10, 2011, Community Asphalt stated to install Maintenance of Traffic at Rivo Alto. The work was postpone due to the ING Marathon taking place on January 30, 2011. Work will resume on February 4, 2011. Construction of stormwater infrastructure is taking place at Rivo Alto and DiLido Islands. 2) On September 2011, the County reported that the overall status of the project was 35%. 3)On November 2011, the County reported that the overall status of the project was 40%. Page 36 0/38 District Project Mgr. South Beach Rodriguez, R. Project Name Venetian Islands BP-13C1 -Venetian Causeway Cross Street Water Main Monthly Construction Report Status through December 30, 2011 Scope of Work This project is part of BP-13C Streets/Sidewalks Improvements and targets water main replacements at Venetian Causeway Cross Streets, at San Marino, Di Lido, and Rivo Alto Islands, prior to Miami-Dade County Causeway construction activity. COllstruction Status On August 20,2010, Ric-Man International (RMI) began the notification to residents that work was beginning on the Venetian Causeway to upgrade existing water mains. On August 30,2010, RMI began to mobilize to Rivo Alto Island and started on Rivo Alto on August 31, 2010. By September 17, 2010, RMI had completed the four tapping connections to existing 16" water mains. All 8" water main installation at the south side of East and West Rivo Alto Drive was completed and the installation of the 8" water mains that cross the Venetian Causeway are completed. RMI is scheduled to complete the balance of the 8" water main installation on the north side of East and West Rivo Alto Drive during the week of September 20 through 24. On September 27,2010, work began at Dilido Island. On October 4, 2010, RMI completed the proposed tapping connections to the existing 20" cast iron water main. On October 5,2010, RMI began the installation of the proposed 8" DIP water mains located at the intersections of and East Di Lido Drive and West Di Lido Drive and Venetian Causeway (Venetian Di Lido Way) On October 6, 2010, RMI began to chlorinate the new water mains at Rivo Alto Island. On October 11, 2010, samples of the water were taken for bacteriological testing. Results will be transmitted within a week. On October 26,2010, pressure test were conducted at DiLido Island and approved. RMI is scheduled to start at San Marino Island on November 1, 2010. The water main that runs from Station Point STA 4+20 E to Station Point STA 1+19 W, (Approx. 565 L.F.) was completed on November 12, 2010. RMI is working on the lateral connections on the south side of the Causeway on west and east San Marino Drive. On December 15, 2010, RMI passed the bacteriological test on the last island (San Marino). Final domestic water connections to individual residences are taking place in Rivo Alto and DiLido Islands. On December 20,2010, RMI transmitted a request for rain delays, unforeseen underground conditions that impacted production schedule and PWD request to delay the connection of new water mains and capping and abandoning existing water mains until the end of the holiday season. This time extension request is for days only and will not incur additional cost to the City. Additionally, the requested time will not interfere with the Miami-Dade County Venetian Causeway Streetscape project. CIP is currently reviewing the request and will inform RMI of the actual days that will be approved. CIP Office is working closely with Public Works Department to schedule all the necessary water main shutdowns in order to complete the project. The schedule will also be impacted by the ING Marathon event ~i.;i;;WJ;X:;!;;;;;;;i;;;;;@:~:Xi'::;;;':':;:.;~';;~;.ii.;;;:i:;~;i.i;;;:j:;;::i:mm;ij;:';':;:;i;;ij;:; ;;;;;;·!;;i:.:;;';;;;;Wj;;;;;i;;;:~i~;:;;;i;;7.:;;;;;;5:"':;'<'j:;']i;;'#ii.;;;.w~~~~;~!H"..lli~x:~;;;iiili.w;;;]j;;~;;;;I~~;iiii;i;;';;iiiHii#~BlliN'j";;·";;;:V·:"·:·~iiJ!JiWf;;;w~~~0i;iiJill!%j]];iill@;;:iiili;ill.!;;;]lliiJ;j.Jii.,:;;~jf;;;il"J.Bi~~i,'lliili]m!llij]lliill;;;jj;;;lmW~jiWJ;:J.J;;;~i;;;,:;;i;;.:;~'Ji:;';i;ii!ii;i.;:i;;mf.i:,;;iji;;j:.::.:j;1~:,j;.:.·;:~·.:;~' ;U;,:.:.i,,;.:;j~~·;;j';i;;:.:.w;'~~:;::";;;:';~;;;;;":i;:"';;;;:';;;;:';':.i;;.;;;'~:.:.:.:.:.!!: 12130120119:32:10AM Page 37of38 District Project Mgr. South Beach Sinnes, A. Project Name Washington Court Seawall Renovation 9:32:10 AM Monthly Construction Report Status through December 30, 2011 Scope of Work Reconstruction of 315 Lf of seawall using vinyl sheet pilling with a reinforced concrete cap Construction Status occurring on January 30, 2011. Final cut/cap and abandon of existing line at Rivo Alto Island is being coordinated with FPL. FPL has an existing pole that is in conflict and encroaching with the proposed work. The FPL pole is schedule to be removed and FPL is currently removing the existing lines to new poles. Contractor submitted a change order proposal for additional water main installation at West Rivo Alto. The proposed point of connection, with the existing water main, occurred next to several large Ficus trees. In order to avoid damaging the trees, the contractor was directed to extend the water main an additional 60 linear feet to the south in order to avoid the trees. On November 3, 2011, the contractor was able to complete the final cut/cap connection that was pending. Contractor is completing the as- built documents in order to schedule an acceptance inspection. 10/11/2010: Sheet piling installation is 60% complete. Estimated completion of Project: January 10, 2011. 10/27/2010: Sheet pile installation complete. Contractor commenced with excavation and formwork of the seawall cap. 11/15/2010: The first 100 I.f. of seawall cap was poured on 11/9/2010. The second section is being formed. Anticipated second pour date by 11/23/2010. 12/15/2010: Seawall Cap is complete. Forms are being removed on the last 100 If section. Backfilling operations on-going. Project completion anticipated for 12/30/2010. 1/6/2011: Manatee Grate installation pending as well as temp fence removal. Building Department final inspections scheduled for the week of 1/10/2011. DERM final inspection to follow. 1/12/2011: Building Final obtained. 1/26/2011: Project construction complete. DERM requested minor removal of existing debris in canal. 1/27/2011: Contractor submitted close out documents. Page38of38 REPORT OF THE ITEMIZED REVENUES AND EXPENDITURES OF THE MIAMI BEACH REDEVELOPMENT AGENCY'S CITY CENTER DISTRICT & SOUTH POINTE (PRE-TERMINATION CARRY FORWARD BALANCES) FOR THE MONTH OF NOVEMBER 2011 Agenda Item LTC Date 1-11-2012 MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov TO: REDEVELOPMENT AGENCY MEMORANUM Chairperson and Members of the Miami Beach Redevelopment Agency FROM: Jorge M. Gonzalez, ExecuHfe Director DATE: January 11, 2012 SUBJECT: Report of the Itemized Revenues and Expenditures of the Miami Beach Redevelopment Agency's City Center District and the South Pointe (Pre- Termination Carry Forward Balances) br the Month Ended November 30, 2011. On July 15, 1998 the Chairman and Members of the Board of the Miami Beach Redevelopment Agency resolved that an itemized report of the revenues and expenditures of the Miami Beach Redevelopment Agency, with respect to each redevelopment area, would be made available to the Chairman and Members of the Board of the Miami Beach Redevelopment Agency at the end of each month. Further, it was resolved that such report would be made available no later than five days prior to the second regularly scheduled Redevelopment Agency meeting in the month immediately following the month for which such report is prepared and that the report would be placed on the Redevelopment Agency Agenda for the second meeting of each month as a discussion item. Because the distribution date for the second Commission meeting of some months falls prior to our receipt of bank statements for the month, we advised on October 21, 1998, that beginning with the report for the month ending October 31, 1998 all monthly Redevelopment Agency reports would henceforth be included as part of the agenda for the first Commission meeting of each month. As of September 30, 2005, the South Pointe Redevelopment District ceased to be a redevelopment area within the Miami Beach Redevelopment Agency's jurisdiction. At that point, the City of Miami Beach assumed the responsibilities for the South Pointe Area. This report will continue to summarize the capital expenditures incurred for the South Pointe construction projects that have been appropriated as of September 30, 2005 and that are being paid from the remaining RDASouth Pointe TIF balance. The attached material includes the following: Section A -South Pointe (Pre-Termination Carry Forward Balances) • Summary of Cash Basis Transactions by Project and by Expenditure Type for the Fiscal Years Ended September 30, 1988 through 2011 and the Month ended November 30, 2011 • Check and Wire Transfer Register Sorted by Project and Type of Expenditure forthe Month Ended November 30, 2011 • Narrative of Major Projects Planned and/or Underway Section B -City Center District • Summary of Cash Basis Transactions by Project and by Expenditure Type for the Fiscal Years Ended September 30, 1988 through 2011 and the Month ended November 30,2011 • Check and Wire Transfer Register Sorted by Project and Type of Expenditure for the Month Ended November 30, 2011 • Narrative of Major Projects Planned and/or Underway JMG:PDW:aw ~ ~ SOUTH POINTE (PRE-TERMINATION CARRY FORWARD BALANCES) FINANCIAL INFORMATION FOR THE MONTH ENDED NOVEMBER 30, 2011 . MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov REDEVELOPMENT AGENCY MEMORANUM TO: Jorge M. Gonzalez, City Manager FROM: Patricia D. Walker, Chief Financi~ff~ January 11,2012 II ~ DATE: SUBJECT: South Pointe Financial Information for the Month Ended November 30, 2011 At the July 15, 1998 Commission/Redevelopment Agency meeting a request was made for monthly financial information for the South Pointe Redevelopment District. As of September 30, 2005, the South Pointe Redevelopment District ceased to be a redevelopment area within the Miami Beach Redevelopment Agency's jurisdiction. However, this report will continue to summarize the capital expenditures incurred for the South Pointe construction projects that have been appropriated as of September 30, 2005 and that are being paid from the remaining RDA South Pointe TIF balance (pre-termination carry forward balances). The information has been compiled and is attached. Historical Cash Basis Financial Information The summary report included in the attached material reflects that during the period from October 1, 1987 through November 30, 2011 approximately $119,957,000 of revenues were received in the South Pointe Area. The primary sources of these revenues included: Incremental Ad Valorem tax $ 94,048,269 Bond proceeds 6,860,000 Land sale 5,187,944 Interest income 8,147,713 Rental income 3,169,547 Loan from the City of Miami Beach 1,000,000 State grant 350,000 Various sources 1,193,378 $ 119,956,851 The opening cash balance for October 1, 1987 was approximately $1,042,000; therefore, the total amount of funds available for the period was $120,999,000. On the expenditure side, approximately $11 0,730,000 has been expended from October 1, 1987 through November 30, 2011. VVe (lre ccmmiifed to providing excellenll public service c:md scfe~v jo ali \.vno live: IA/orK, and ploy in our vIbrant, tropical, historic community. These approximate expenditures were primarily made in the following areas: Cobb/Courts Project Debt Service Payments Portofino Project South Pointe Streetscape/Park Administrative Costs SSDI Project Marina Project Community Policing Washington Avenue Carner-Mason Settlement and Other Reimbursements Miami Beach Community Development Corporation Funding Agreement -530 Meridian Building -Affordable Housing Other Project Costs $ $ 16,384,670 14,028,441 12,330,291 36,582,552 7,354,045 6,446,941 5,913,256 2,465,482 1,541,983 1,044,733 1,500,000 5,137,988 110,730,382 The cash balance as of November 30, 2011 is approximately $10,268,000 consisting of cash and investments. JMG:PDW:aw ~ \!'v'e ore cornrnitfed io providing exceiJent public .5elVice and 5(1fe~\;' to oll'who five, worK; and ploy in our vibront, trol.?icoi, historic community. SUMMARY OF CASH BASIS TRANSACTIONS FOR THE MONTH ENDED NOVEMBER 30, 2011 RDA -South Pointe Pre-Termination Balances Summary of Cash Basis Transactions by Project Fiscal Years 1988 -2012 RDA-South Pointe Pre-Termination RDA-South Pointe Balances Carry Forward Prior Years FY 2012 OPENING CASH/INVSTMT BALANCE $ 1,041,730 $ 10,322,773 REVENUE -Tax increment -City 55,162,212 -Tax increment -County 37,562,671 -Tax increment (Interest) -County 26,627 -Tax increment -Children's Trust 1,296,759 -Bond proceeds 6,860,000 -Cobb Partners -Closing Parcel 1, 2 5,187,944 -Marina rental income 3,169,547 -Interest income 8,147,501 212 -Loan from City 1,000,000 -Grants (Fla. Inland Navig.; shoreline restore.) 350,000 -Other Grants 5,000 -St. sales tax (receipt -income for pmt. to St) 209,358 -Daughters of Israel contrib.-reloc. Mikvah 28,000 -Consulting fee refund-Rahn S. Beach 27,026 -Olympus Hldg.-reimb. Portofino advertsg. 24,405 -Mendelson environ. reimb.lrefund 10,000 -Regosa Engineering refund -Marina 8,500 -Portofino DRI Payment from Greenberg T. 121,531 -Payment received from Greenberg T. for CMB 23,500 -Payment received from Olympus Holdings, Inc. 96,276 -Payment received from Marquesa, Inc. 2,000 -Contribution from Continuum II for S. Pointe Park 200,000 -Cost of asbestos remediation reimb.-Cobb 5,800 -Miscellaneous income 8,267 -Galbut & Galbut contrib.-reloc. Mikvah 3,500 -Murano Two, Ltd-Cash Bond per Agreement 242,000 -Other (void ck; IRS refund; Am. Bonding) 178,215 Total Revenues 119,956,639 212 Total Rev.lExpend. $ 55,162,212 37,562,671 26,627 1,296,759 6,860,000 5,187,944 3,169,547 8,147,713 1,000,000 350,000 5,000 209,358 28,000 27,026 24,405 10,000 8,500 121,531 23,500 96,276 2,000 200,000 5,800 8,267 3,500 242,000 178,215 $ 119,956,851 RDA -South Pointe Pre-Termination Balances Summary of Cash Basis Transactions by Project Fiscal Years 1988 -2012 RDA-South Pointe Pre-Termination RDA-South Pointe Balances Carry Forward Prior Years FY 2012 EXPENDITURES PROJECTS Cobb/Courts (16,384,670) Marina (5,913,256) Portofino (12,330,291) South Pointe Streetscape (36,549,830) (32,722) SSDI (6,446,941) Fifth St. Beautification (300,000) Beach Colony (I'scape/stscape/site imprvmt) (80,912) Marriott (53,061) Washington Ave. (1,541,983) . Washington Ave Surface Lot (280,790.00) Design guidelines (43,708) MBTMNMobility (32,225) S. Pointe Zoning (20,819) Alaska Baywalk (218,323) Victory/Community Gardens (174,477) Washington Park (50,590) Water/Sewer Pump Station Upgrade (1,062,751) (1,269) Flamingo S. Bid A R.O.W. (394,548) Flamingo Neigh-Lummus (428,246) Potamkin Project (318,525) Lummus Park (103,916) Wayfinding Projcet (176,481) Jewish Museum of Florida (500,000) MBCDC Loan -530 Meridian Bldg. (1,500,000) 6th & Lenox Infrastructure Project (770,438) Beachwalk \I Project (63,795) (2,982) Miscellaneous (60,132) Total Projects (85,800,708) (36,973) ADMINISTRATIVE (7,336,232) (17,813) DEBT SERVICE/LOAN REPA YMENT (14,028,441) Total Rev.lExpend. (16,384,670) (5,913,256) (12,330,291) (36,582,552) (6,446,941) (300,000) (80,912) (53,061) (1,541,983) (280,790) (43,708) (32,225) (20,819) (218,323) (174,477) (50,590) (1,064,020) (394,548) (428,246) (318,525) (103,916) (176,481) (500,000) (1,500,000) (770,438) (66,777) (60,132) (85,837,681) (7,354,045) (14,028,441 ) RDA -South Pointe Pre-Termination Balances Summary of Cash Basis Transactions by Project Fiscal Years 1988 -2012 MISCELLANEOUS Carner Mason settlement City of Miami Beach (reimburse water main) Miscellaneous COMMUNITY POLICING TOTAL EXPENDITURES RDA-South Pointe Prior Years (946,163) (74,067) (24,503) (1,044,733) (2,465,482) (110,675,596) 10,322,773 lENDING CASH/INVSTMT. BALANCE =$========= RDA-South Pointe Pre-Termination Balances Carry Forward FY 2012 (54,786) $ 10,268,199 Total Rev .lExpend. (946,163) (74,067) (24,503) (1,044,733) (2,465,482) $ (110,730,382) RDA -South Pointe Pre-Termination Balances Summary of Cash Basis Transactions by Expenditure Type Fiscal Years 1988 -2012 RDA-South Pointe Pre-Termination RDA-South Pointe Balances Carry Forward Prior Years FY 2012 OPENING CASHIINVSTMT BALANCE $ 1,041,730 $ 10,322,773 REVENUE -Tax incremenl-City 55,162,212 -Tax increment -County 37,562,671 -Tax increment (Interest) -County 26,627 -Tax increment -Children's Trust 1,296,759 -Bond proceeds 6,860,000 -Cobb Partners -Closing Parcel 1, 2 5,187,944 -Marina rental income 3,169,547 -Interest income 8,147,501 212 -Loan from City 1,000,000 -Grants (Fla. Inland Navig.; shoreline restore.) 350,000 -Other Grants 5,000 -St. sales tax (receipt -income for pmt. to St) 209,358 -Daughters of Israel contrib.-reloc. Mikvah 28,000 -Consulting fee refund-Rahn S. Beach 27,026 -Olympus Hldg.-reimb. Portofino advertsg. 24,405 -Mendelson environ. reimb.lrefund 10,000 -Regosa Engineering refund -Marina 8,500 -Portofino DRI Payment from Greenberg T. 121,531 -Payment received from Greenberg T. for CMB 23,500 -Payment received from Olympus Holdings, Inc. 96,276 -Payment received from Marquesa, Inc. 2,000 -Contribution from Continuum II for S. Pointe Park 200,000 -Cost of asbestos remediation reimb.-Cobb 5,800 -Miscellaneous income 8,267 -Galbut & Galbut contrib.-reloc. Mikvah 3,500 -Murano Two, Ltd-Cash Bond per Agreement 242,000 -Other (void ck; IRS refund; Am. Bonding) 178,215 Total Revenues 119,956,639 212 Expenditures Land acquisition (9,444,065) Legal feeslcosts (9,392,304) Professional services (17,797,700) (31,411) Construction (30,674,379) (5,562) Utilities relocation (1,873,213) Environmental (416,044) Submerged land lease (2,017,803) Lease agreements (6,863,371 ) Miscellaneous (3,500,194) Property Taxes (389,260) Common Area Maintenance (131,140) Administration (7,336,232) (17,813) Debt Servicelloan repayment (14,028,441) Refund of Cash Bond (242,000) Miscellaneous Project Costs (2,103,968) Grant (500,000) MBCDC Loan -530 Meridian Bldg. (1,500,000) Community Policing (2,465,482) (110,675,596) (54,786) lENDING CASH/INVSTMT. BALANCE $ 10,322,773 $ 10,268,199 Total Rev.lExeend. $ 55,162,212 37,562,671 26,627 1,296,759 6,860,000 5,187,944 3,169,547 8,147,713 1,000,000 350,000 5,000 209,358 28,000 27,026 24,405 10,000 8,500 121,531 23,500 96,276 2,000 200,000· 5,800 8,267 3,500 242,000 178,215 $ 119,956,851 (9,444,065) (9,392,304) (17,829,111) (30,679,941) (1,873,213) (416,044) (2,017,803) (6,863,371 ) (3,500,194) (389,260) (131,140) (7,354,045) (14,028,441) (242,000) (2,103,968) (500,000) (1,500,000) (2,465,482) $ P 10,730,382) I . CHECK & WIRE TRANSFER REGISTER SORTED BY PROJECT & TYPE OF EXPENDITURE FOR THE MONTH ENDED NOVEMBER 30, 2011 \ '. 'HitMll' w·m_ ACH 10104/11 Auto ded. 10/11/11 Auto ded. 11/30/11 297 11/15/11 298 11/29/11 296 11/08/11 293 10/13/11 292 10/13/11 295 11/08/11 294 10/18/11 RDA -South Pointe Pre-Termination Check & Wire Transfer Register by Project & Type of Expense Fiscal Year 2012 Payee Amount Type of Expense Fiduciary Trust International 349.32 Quarterly Fee 6/30/2011 -9/30/2011 Fiduciary Trust International 6,205.95 Accrued interest on investment purchase Fiduciary Trust International 9,295.08 Accrued interest on investment purchase Project or N/A Administration Administration Administration Cutwater Investor Services 416.64 Asset management fees for September 201 Administration Cutwater Investor Services 1,545.74 Asset management fees for October 2011 Administration 17,812.73 TOTAL ADMINISTRATION 17,812.73 Chen and Associates 108.98 Professional services -Design 2334 -S. Pointe Streetscape Chen and Associates 25,413.59 Professional services -Design 2335 -S. Pointe Streetscap, 25,522.57 Wolfberg Alvarez & Partners 1,637.00 Professional Services Ph.2 2332 -S. Pointe Streetscape 1,637.00 TOTAL S. POINTE STREETSCAPE 27,159.57 Harbour Construction 5,561.72 Construction Services -Beach Shower 2171 -S. Pointe Park 5,561.72 TOTAL S. POINTE PARK 5,561.72 Camp Dresser & McKee, Inc 1,269.16 Design 2312 -Master Sewer Pump: 1,269.16 TOTAL WATERISEWER PUMP STATION UPGRADE 1,269.16 Coastal Systems International 2,982.05 Professional Architecturall Engineering Serv 2541 -Beachwalk II Project 2,982.05 TOTAL BEACHWALK II PROJECT 2,982.05 REPORT TOTAL $ 54,785.23 PAGE 1 OF 1 ATTACHMENT "A" SUMMARY OF MAJOR PROJECTS SOUTH POINTE PROJECTS (Planned andlor Underway) South Pointe South Pointe Streetscape Improvements Phase II ThIS project includes the replacement of existing water lines to enhance the water pressure and water flow, new stonnwater infrastructure to meet the Master Plan recommended level of service throughout the project area as well as streetscape improvements including traffic calming measures and enhanced pedestrian access. The project area encompasses the entIre Right-of-Way of Lenox Avenue, MichIgan Court, Jefferson Court, jefferson Avenue, Meridian Court, MeridIan Avenue, Euclid Court and Euclid Avenue between 5th St. and 2nd St. (excluding 3rd St. east of MIchigan). Project Management Department: CIP Office Total Project Cost: $16,225,067 Total CRA participation. $8,254,725 Source' Pg. 341 -Capital Improvement Plan and FY 08/09 Capital Budget South Pointe Streetscape Improvements Phase ill-V South Pointe Park ThIs project includes the installation of new stonnwater infrastructure within priority Basin J to meet the Master Plan recommended level of service The project limits are bounded by Ocean Drive to the East and Alton Road to the West, and Includes. J sf Street between Alton and Ocean, Commerce Street from Alton to Washington, Ocean Drive, Ocean Court from 5th to South POInte Drive, Collins Avenue and Collins Court from 5th to South POinte DrIve, South Pointe Drive, Jefferson Avenue between South POInte Drive and 1 S\ and other adjacent alleys, roadways and rights of way Project Management Department: CIP Office Total Project Cost: $25,603,389 Total CRA participation. $4,927,566 Source: Pg. 343 -CapItal Improvement Plan and FY 08/09 CapItal Budget This project includes improvements to the 17 acre regIOnal park per the City of Miami Beach Parks Master Plan, 1996. Elements include: redesigned park entrance, new restroom building, pedestrian paving, site lighting, playgrounds, signage, landscaping and irrigatIOn. Improvements to the park Will prOVide a memorable and safer park experience. The park is now open to the publtc and a grand openmg ceremony was held March 22, 2009. Project Management Department: CIP Office Total Project Cost: $28,246,772 Total CRA participation. $12,657,580 Source: Pg. 253 -Capital Improvement Plan and FY 08/09 Capital Budget Page 1 of2 South Pointe Coast Guard Booster Wastewater Pump Station-South Pointe Beachwalk II This project IS for a new master in-line wastewater booster statIon to be located at 151 Street and Jefferson Avenue location. It IS an integral part of the cIty-wIde wastewater pump station upgrades that are currently under construction under the 1995 Water and Sewer bond. Project Management Department: CIP Office Total Project Cost: $24,431,281 Total CRA participatIOn: $1,442,348 Source: Pg. 420 -Capital Improvement Plan and FY 08/09 Capital Budget The Beachwalk n project will establish a southern Imk between Lummus Park and South Pointe Park. Beachwalk II will be a 0.6 mile path runnmg North-South, west of the dune system and east of Ocean Drive. The project will include an extensive dune enhancement component including use of turtle friendly lighting, removal of invasives, planting of native plants, dune fill, rope and post, and sand fencing. Additional objectives of the project includes physical improvements to support multi modal transportation, link bicycle and pedestrian destinations, increase pedestrian and bicycle safety, improve trail network connectivity, eliminate barriers that prevent bicycle trips, and develop future bikeway corridors. Project Management Department: Public Works Total Project Cost: $4,736,731 Total eRA participation: $2,800,600 Source: Pg. 455 -Capital Improvement Plan and FY 09/1 0 CapItal Budget Page 2 of2 CITY CENTER REDEVELOPMENT DISTRICT FINANCIAL INFORMATION FOR THE MONTH ENDED NOVEMBER 30, 2011 MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov REDEVELOPMENT AGENCY MEMORANUM TO: Jorge M. Gonzalez, Executive Director FROM: Patricia D. Walker, Chief Financial Officer DATE: January 11, 2011 SUBJECT: City Center Redevelopment District Financial Information For the Month Ended November 30, 2011 At the July 15, 1998 Commission/RedevelopmentAgency meeting a request was made for monthly financial information for the City Center Redevelopment District. The information has been compiled and is attached. Historical Cash Basis Financial Information The summary report included in the attached material, reflects that during the period from October 1, 1993 through November 30,2011 approximately $563,605,000 of revenues were received in the City Center District of the Redevelopment Agency ("RON). The primary sources of these revenues included approximately: Incremental Ad Valorem tax Bond proceeds Loews Hotel Exercise Option Resort tax contributions Draws from the line of credit from the City of Miami Beach Anchor Garage receipts Pennsylvania Garage receipts Royal Palm Land Sale Interest income Loews Ground Lease receipts Anchor Shops receipts Pennsylvania Shops receipts; Loan from the City of Miami Beach Contributions from GMCVB toward debt service payments Reimbursements from other state and local agencies Contribution from CMB Parking Department RDP Royal Palm Ground Lease receipts Contribution from New World Symphony Cost of Issuance Proceeds-Series 2005 From Various Sources Total Revenues $ 274,662,806 108,779,453 27,498,975 40,321,920 19,190,000 27,940,039 560,915 12,562,278 19,813,810 8,234,784 7,125,471 220,176 3,000,000 2,700,000 1,975,762 700,000 470,222 250,000 402,221 7,196,409 $ 563,605,241 --------- On the expenditure' side, approximately $497,500,000 has been expended from October 1, 1993 through November 30, 2011. These approximate expenditures were primarily made in the following areas: Debt Service Payments $ 153,170,580 Convention Center Hotel Project (Loews Hotel) 61,516,007 Lincoln Road/Bass Museum Loan Repayment to CMB 30,467,142 Hotel Garage Project 18,247,976 African-American Hotel Project 12,968,666 Collins Park Cultural Center 16,948,736 Colony Theater 6,512,868 Anchor Garage Operations 19,024,005 Pennsylvania Garage Operations 276,953 Pennsylvania Shop Operations 81,649 Administrative Costs 19,292,200 Beachwalk Project 5,233,711 Miami City Ballet 5,487,984 Community Policing 19,814,793 Secondary Pledge Repayments (Resort Tax) 2,385,000 Washington Avenue Streetscapes 3,198,183 Lincoln Road Project 1,443,063 Water & Wastewater Pump Station 1,228,541 R.O.W. Improvements 2,356,207 New World Symphony Grant-In-Aid 15,000,000 Capital Projects Maintenance 11,315,529 South Beach Area Property Management 2,011,929 Anchor Shops Operations 1,875,216 Cost of Issuance-Series 2005A&B 375,047 Movie Theater Project 182,200 Purchase of the Barclay, the Allen and the London House for MBCDC 14,154,643 Washington Avenue Bridge Restoration Loan ($630,987 - Refunded) 700,000 Other Project Costs 72,218,126 Total Expenditures $ 497,486,954 The cash balance as of November 30, 2011 is approximately $66,118,000. This balance consisted of the following amounts: Cash & Investments Balance Fully funded Debt Service Reserves JMG:PDW:aw ~ $ 59,540,565 6,577,722 $ __ ....;6;.;;,6.:..,;' 1...;.1..;.,:8,,;;.28.;..;,7_ SUMMARY OF CASH BASIS TRANSACTIONS FOR THE MONTH ENDED NOVEMBER 30, 2011 Redevelopment Agency -City Center/Historic Convention Village Summary of Cash Basis Transactions by Project Fiscal Years 1994 -2012 Prior Years FY 2012 OPENING CASH/INVESTMENT BALANCE $ $ 68,824,841 REVENUE -Tax increment -County 122,025,423 $ -Tax increment -City 143,918,095 -Tax increment (Interest) -County 19,057 -Tax increment -Children's Trust 8,700,231 -Bond proceeds 108,779,453 -Rental income 258,482 -Anchor Garage receipts 27,358,557 424,190 -Anchor Garage deposit card receipts 30,788 -Anchor Shops rental income 6,928,408 108,822 -Anchor Shops rental deposits 88,241 -Pennsylvania Garage receipts 465,661 95,014 -Pennsylvania Garage deposit card receipts 230 10 -Pennsylvania Shops rental income 48,794 -Pennsylvania Shops rental deposits 25,000 146,382 -Legal settlement 100,000 -Loews Facility Use/Usage Fee 126,504 -Loews Ground Lease Receipts 8,234,784 -Loew Hotel -exercise option 27,498,975 -RDP Royal Palm Ground Lease Receipts 470,222 -RDP Royal Palm -Sale of Land 12,562,278.00 -New World Symphony Contribution 250,000.00 -Interest income 19,808,094 5,716 -Resort tax contributions 39,743,496 578,424 -Cost of Issuance Proceeds-Series 2005 402,221 -Bid deposits -hotels 375,000 -Bid deposits -cinema 100,000 -Loan from City 3,000,000 -Line of credit from City 19,190,000 -Cultural Campus 1,975,762 -St. Moritz Hotel -refund/reimbursement 925,450 -Reimbursements (GMCVB/RE taxes/Grants) 3,864,530 -St. sales tax (receipt -income for pmt. to St) 2,354,029 17,532 -Miami City Ballet environmental clean-up 31,698 -Anchor Garage insurance reimbursement 26,170 -Real Estate taxes refund 264,261 -Refund from Dept. of Mgmt Services 139,239 -Refund -Loews -Water/Sewer Impact Fees 331,241 2,151 -Refund -Police Salaries and Wages 698,677 -Miscellaneous/Prior Year Refunds & Voids 1,107,949 TOTAL REVENUE 562,178,206 1,427,035 $ EXPENDITURES PROJECTS African-American Hotel (12,968,666) Convention Hotel (61,516,007) Hotel Garage -Construction (18,247,976) Movie Theater Project (182,200) Lincoln Road (1,443,063) Beachwalk (5,233,711) Collins Park Cultural Center (16,819,308) (129,428) Bus Prop. Ctr. (159) Total Rev.lEx[2end. 122,025,423 143,918,095 19,057 8,700,231 108,779,453 258,482 27,782,747 30,788 7,037,230 88,241 560,675 240 48,794 171,382 100,000 126,504 8,234,784 27,498,975 470,222 12,562,278 250,000 19,813,810 40,321,920 402,221 375,000 100,000 3,000,000 19,190,000 1,975,762 925,450 3,864,530 2,371,561 31,698 . 26,170 264,261 139,239 333,392 698,677 1,107,949 563,605,241 (12,968,666) (61,516,007) (18,247,976) (182,200) (1,443,063) (5,233,711) (16,948,736) (159) Redevelopment Agency -City Center/Historic Convention Village Summary of Cash Basis Transactions by Project Fiscal Years 1994 -2012 Prior Years FY 2012 Chamber of Commerce Relocation Study (2,000) Colony Theater (6,512,868) Construction of Library (14,586) EastlWest Corridor (88) Electrowave (3,161) Garden Center (93) Guidelines (12,450) Old City Hall (499) 17th Street Surface Lot (256,887) 10A Surface Lot-Lennox (382,854) Streetscapes (324,849) 6th Street Streetscape (577) Botanical Gardens (209,879) (63,388) Transportation Mobility Study (32,225) Convention Center Storm Water Improve. (1,821,297) (1,611) New World Symphony (21,308,476) New World Symphony Park Project (14,408,904) (23,874) Washington Avenue Streetscape (3,198,183) Rotunda (101,122) R.O.W. Improvements (2,356,207) Flamingo (16 st. Corridor) (4,721) Flamingo Neigh.South -Bid A (10,186) Flamingo Neigh. Lummus -Bid B (456,047) Flamingo Bid C -N/ENV Neigh. (13,877) Beachfront Restrooms (431,147) Water & Wastewater Pump Station (1,228,541 ) Miami City Ballet (5,487,984) Wayfinding Project (324,219) West Ave/Bay Road Neigh. Improve. (687,720) Multi-Purpose Building Adj. City Hall (14,661,410) (11,446) Bass Museum (488,175) Purchase of the Barclay, the Allen and the London House for MBCDC (14,154,643) Alleyway Restoration Program (221,632) Lincoln Road Between Lennox and Alton (6,151,710) Lincoln Road Between CollinsNVashington (263,725) (9,593) Little Stage Complex (287,813) Preferred Parking Surface Lot (526,649) Tree Wells Pilot Project (409,571) Washington Ave. Bridge Restoration Loan (700,000) Collins Canal Enhancement Project (178,361) (5,227) CCHV Neighborhood Improvements (7,095,516) (504,886) Animal Waste Dispensers & Receptacles (25,000) Pedestrian Countdown Signals (54,868) Maze Project -21st Street & Collins (135,000) Directory Signs in City Center ROW (4,500) (1,548) 24" PVC Sanitary Sewer Improvements (275,587) Bicycle Parking Project (9,013} Total Projects (221,645,910) (751,001 ) NEW WORLD SYMPHONY GRANT-IN-AID (15,OOO,OOO.00} CAPITAL PROJECTS MAINTENANCE (11 ,251 ,992.00} (63,537} Total Rev.lExeend. (2,000) (6,512,868) (14,586) (88) (3,161) (93) (12,450) (499) (256,887) (382,854) (324,849) (577) (273,267) (32,225) (1,822,908) (21,308,476) (14,432,778) (3,198,183) (101,122) (2,356,207) (4,721) (10,186) (456,047) (13,877) (431,147) (1,228,541) (5,487,984) (324,219) (687,720) (14,672,856) (488,175) (14,154,643) (221,632) (6,151,710) (273,318) (287,813) (526,649) (409,571) (700,000) (183;588) (7,600,402) (25,000) (54,868) (135,000) (6,048) (275,587) (9,013} (222,396,911) (15,OOO,OOO} (11,315,529} Redevelopment Agency -City Center/Historic Convention Village Summary of Cash Basis Transactions by Project Fiscal Years 1994 -2012 Prior Years FY 2012 SOUTH BEACH AREA PROPERTY MANAGEMENT (2,009,214) (2,715) ADMINISTRA TlON (17,302,242) (1,989,958) COST OF ISSUANCE-SERIES 2005A&B (375,047) DEBT SERVICE/LOAN REPA YMENT (155,555,580) CITY OF MIAMI BEACH/LOAN REPA YMENT {30 ,467,142) ANCHOR GARAGE OPERA TlONS {18,329,045) {694,960) ANCHOR SHOPS OPERA TlONS {1 ,841 ,577) {33,639) PENNSYLVANIA GARAGE OPERATIONS (274,211) (2,742) PENNSYLVANIA SHOPS OPERATIONS {81,649) COMMUNITY POLICING (19,301,405) (513,388) TOTAL EXPENDITURES (493,353,365) (4,133,589) $ ENDING CASH/INVSTMT. BALANCE $ 68,824,841 $ 66,118,287 Total Rev .IExeend. (2,011,929) (19,292,200) (375,047) (155,555,580) {30,467,142) {19,024,005) (1,875,216) (276,953) {81,649) (19,814,793) (497,405,305) Redevelopment Agency -City Center/Historic Convention Village Summary of Cash Basis Transactions by Expenditure Type Fiscal Years 1994 -2012 Prior Years FY 2012 OPENING CASH/INVESTMENT BALANCE $ $ 68,824,841 REVENUE -Tax increment -County 122,025,423 $ -Tax increment -City 143,918,095 -Tax increment (Interest) -County 19,057 -Tax increment -Children's Trust 8,700,231 -Bond proceeds 108,779,453 -Rental income 258,482 -Anchor Garage receipts 27,358,557 424,190 -Anchor Garage deposit card receipts 30,788 -Anchor Shops rental income 6,928,408 108,822 -Anchor Shops rental deposits 88,241 -Pennsylvania Garage receipts 465,661 95,014 -Pennsylvania Garage deposit card receipts 230 10 -Pennsylvania Shops rental income 48,794 -Pennsylvania Shops rental deposits 25,000 146,382 -Legal settlement 100,000 -Loews Facility Use/Usage Fee 126,504 -Loews Ground Lease Receipts 8,234,784 -Loew Hotel -exercise option 27,498,975 -RDP Royal Palm Ground Lease Receipts 470,222 -RDP Royal Palm -Sale of Land 12,562,278 -New World Symphony Contribution 250,000 -Interest income 19,808,094 5,716 -Resort tax contributions 39,743,496 578,424 -Cost of Issuance Proceeds-Series 2005 402,221 -Bid deposits -hotels 375,000 -Bid deposits -cinema 100,000 -Loan from City 3,000,000 -Line of credit from City 19,190,000 -Cultural Campus 1,975,762 -st. Moritz Hotel -refund/reimbursement 925,450 -Reimbursements (GMCVB/RE taxes/Grants) 3,864,530 -St. sales tax (receipt -income for pmt. to St) 2,354,029 17,532 -Miami City Ballet environmental clean-up 31,698 -Anchor Garage insurance reimbursement 26,170 -Real estate taxes refund 264,261 -Refund from Dept. of Mgmt Services 139,239 -Refund -Loews -Water/Sewer Impact Fees 331,241 2,151 -Refund -Police Salaries and Wages 698,677 -Miscellaneous/Prior Year Refunds & Voids 1,107,949 TOTAL REVENUE 562,178,206 1,427,035 $ EXPENDITURES Administrative fees (31,684) Appraisal fees (125,368) Bid refund (230,000) Board up (60,758) Bond costs (211,440) Building permit fees (173,269) Construction (54,404,243) (129,428) Delivery (2,995) Demolition (203,195) Electric service (1,976) Environmental (354,908) Equipment rental (55,496) Hotel negotiation consultant (849,243) Total Rev.lEx~end. 122,025,423 143,918,095 19,057 8,700,231 108,779,453 258,482 27,782,747 30,788 7,037,230 88,241 560,675 240 48,794 171,382 100,000 126,504 8,234,784 27,498,975 470,222 12,562,278 250,000 19,813,810 40,321,920 402,221 375,000 100,000 3,000,000 19,190,000 1,975,762 925,450 3,864,530 2,371,561 31,698 26,170 264,261 139,239 333,392 698,677 1,107,949 563,605,241 (31,684) (125,368) (230,000) (60,758) (211,440) (173,269) (54,533,671 ) (2,995) (203,195) (1,976) (354,908) (55,496) (849,243) Redevelopment Agency -City Center/Historic Convention Village Summary of Cash Basis Transactions by Expenditure Type Fiscal Years 1994 -2012 Prior Years FY 2012 Hotel selection/study (263,357) Land acquisition (41,240,564) Legal fees/costs (2,770,339) Lighting (60,805) Lot clearing (34,771) Maintenance (245,288) Miscellaneous (762,046) Owner's representative fee & expenses (1,823,466) Postage, printing & mailing (27,855) Professional services (6,872,046) Public notice/advertisement (26,472) Purchase of the Barclay, the Allen and the London House for MBCDC (14,154,643) Refund of deposits (185,000) Reimburse closing costs to C.M.B. (3,000,000) Reimbursements (78,041) Relocation (131,784) Revitalization (960,522) Security guard service (277,825) Streetscape (401,312) Temporary staffing (69,158) Title insurance (25,271) Traffic parking study (8,600) Training, conferences & meetings (3,268) Travel & related expenses (28,730) Utilities (420,289) Washington Ave. Bridge Restoration Loan (700,000) Water/Sewer (impact fees) (25,240) Total (131,301,267) (129,428) -Miscellaneous Projects (90,344,643) (621,573) Total Projects (221,645,910) (751,001 ) NEW WORLD SYMPHONY GRANT-IN-AID (15,000,000) CAPITAL PROJECTS MAINTENANCE (11,251,992) (63,537) SOUTH BEACH AREA PROPERTY MANAGEMENT (2,009,214) (2,715) COST OF ISSUANCE-SERIES 2005A&B (375,047) A DMINISTRA TlON (17,302,242) (1,989,958) DEBT SERVICE/LOAN REPA YMENT (155,555,580) CITY OF MIAMI BEACH/LOAN REPA YMENT (30,467,142) ANCHOR GARAGE OPERATIONS (18,329,045) (694,960) ANCHOR SHOPS OPERA TlONS (1,841,577) (33,639) PENNSYLVANIA GARAGE OPERATIONS (274,211) (2,742) PENNSYLVANIA SHOPS OPERATIONS (81,649) COMMUNITY POLICING (19,301,405) (513,388) TOTAL EXPENDITURES (493,353,365) (4,133,589) $ Total Rev.lExeend. (263,357) (41,240,564) (2,770,339) (60,805) (34,771) (245,288) (762,046) (1,823,466) (27,855) (6,872,046) (26,472) 0 (14,154,643) (185,000) (3,000,000) (78,041) (131,784) (960,522) (277,825) (401,312) (69,158) (25,271) (8,600) (3,268) (28,730) (420,289) (700,000) (25,240) (131,430,695) (90,966,216) (222,396,911 ) (15,000,000) (11,315,529) (2,011,929) . (375,047) (19,292,200) (155,555,580) (30,467,142) (19,024,005) (1,875,216) (276,953) (81,649) (19,814,793) (497,405,305) Redevelopment Agency -City Center/Historic Convention Village Summary of Cash Basis Transactions by Expenditure Type Fiscal Years 1994 -2012 Prior Years FY 2012 ENDING CASH/INVSTMT. BALANCE $ 68,824,841 .,;,$====,6;,;;6=,1=18=,=28=7= Total Rev'/Expend. CHECK & WIRE TRANSFER REGISTER SORTED BY PROJECT & TYPE OF EXPENDITURE FOR THE MONTH ENDED NOVEMBER 30, 2011 13572626 11/15/11 13572628 11/15/11 2842 10/04/11 2843 10/04/11 2871 10/13/11 2872 10/13/11 2848 10/06/11 2908 11/15/11 Wire 10/04/11 2865 10/13/11 2884 10/25/11 2854 10/13/11 2861 10/13/11 2847 10/04/11 2853 10/11111 2878 10/18/11 2911 11122/11 2851 10/11/11 2901 11/08/11 2844 10/04/11 2845 10/04/11 2859 10/13/11 2864 10/13/11 2880 10/20/11 2881 10/20111 2885 10/26/11 2890 10/27/11 2894 11/01/11 2900 11/08/11 2916 11/29/11 WIRE 10/11/11 2864 10/13/11 WIRE 10117111 2889 10/27/11 2919 11/29/11 2918 111291011 2877 10/18/11 2920 11129111 2846 10/04/11 2874 10/14/11 2874 10/14/11 2906 11110111 2906 11/10/11 2904 11/10/11 US Bank, NA US Bank, NA Fonntec Water Products Office Max Payee Rutledge, Ecenia, PUrnell & Hoffman, PA Bloom & Minsker Jacob 1535 Properties, Inc. International Data Depository Cutwater Investor Services Fiduciary Trust International TOTAL ADMINISTRATION The Children's Trust The Children's Trust City of Miami Beach Miami-Dade County OMB TOTAL INTERLOCAL AGREEMENT ADM. FEES UIA Management, LLC Valleycrest Landscaping UIA Managemenl, LLC UIA Managemenl, LLC TOTAL CAPITAL MAINTENANCE EI Toro Exterminator Corp. King Pumps, Inc. TOTAL SOUTH BEACH AREA PROPERTY MGMT Security Alliance Security Alliance Miami Beach Bicycle Security Alliance Nextel/Sprint Verizon Wireless City of Miami Beach Security Alliance Verizon Wireless City of Miami Beach City of Miami Beach TOTAL COMMUNITY POLICING Fiduciary Trust International TOTAL ACCRUED INVESTMENT INTEREST Security Alliance City of Miami Beach 420 Lincoln Road Association 420 Lincoln Road Association Miami-Dade Tax Collector Transvalue, Inc. Transvalue, Inc. Superior Landscaping & Lawn City of Miami Beach City of Miami Beach City of Miami Beach City of Miami Beach City of Miami Beach Redevelopment Agency ~ CIty Center DJstnct Check & W,re Transfer Regist~r by Project & Type of Expense Fiscal Year 2012 ·itH.Ii!.! Type of Expense 5,000.00 Truslee Fees 2005 Series A & B ____ ~75~0~.0!!;!_0 Truslee Fess refunding series 1996A and 1998B Bonds 5.750.00 774.45 Office Supplies ____ --!'~~~~,,:~"'--~ Office Max-Office Supplies Professional Legal Services 12,350.48 Professional Legal Services -Re: Jacob 1535 Poperties, Inc. ___ -.,.7;<.5"'0~0".0"!__0 Selllemeni Agreemenl 19.850.48 -----1~1~~~~:~"!--; File Storage 2,414.04 Advisory Services -For September 2011 ___ ~:-9~3~6~.2~3 Quarterly Service Fee 3.350.27 30,101.91 1,474,830.00 25.00 1,474.855.00 253,531.35 221,782.43 475.313.78 1,950,168.78 ReimbUrsement for Payment -FY 20010/11 Reimbursement for Stop Payment Fee Fiscal Year 11 Admin. Fee (lnterlocal) Fiscal Year 10 Admin. Fee (Interlocal) Maintenance of the 1100 Block of Uncoln Road as provided in Section 52-6 of the Development Agreement between CMS and UIA 10,771.66 Mgmt, dated April 11 ,2007 28,329.81 Soundscape Maintenance Maintenance of the 1100 Block of Lincoln Road as provided in Section 52-6 of the Development Agreement between CMB and UIA 10,577.60 Mgmt, dated April 11, 2007 Maintenance of the 1100 Block of Lincoln Road as provided in Section 52·6 of the Development Agreement betwaen CMB and UIA ___ -:1~3"'.8""5~8.~26"'" Mgmt, dated April 11 , 2007 63,537.33 63,537.33 190.00 Exterminator Service ___ -:2§",5¥.2~5,!j.0~0 Repairs and Maintenance 700 Block -Linclon Road 2,715.00 66,252.33 55,942.39 13,696.77 82.00 6,910.66 226.13 560.14 225.62 13,920.11 560.14 264,245.39 157,018.29 513,387.64 513,387.64 Security Service Security Service Bicycle Repairs and Maintenance Security Service Nextel/Spnnt -Communications Aircards Reimb.CMB -Visa: Sprint -Communications Security Service Air cards Salaries and Benefits PP# 18, 19, and 20 Salaries and Benefits PP# 21 and 22 ____ 9?,~57,;7"'.5"!__3 Accrued interest on investmenls purchased 9,577.53 9,577.53 23,919.84 23,919.84 2,492.75 2,492.75 214.00 107.00 321.00 327,875.33 327,875.33 485.33 485.33 970.66 765.00 765.00 44.98 164.39 150.35 44.98 275.00 Security Services '-,\ Utility Billing -September 2011 Refund for Two cards Refunding for over charging 2011 Ad Valorem Taxes· Anchor Garage Annor Car Services -September 11 Armor Car Services -October 11 Weekly Landscape -August & September '11 Reimb.CMB-Visa: Atlantic Broadband Reimb.CMB-Visa: ATT -Communications Reimb.CMB-Visa; Atlantic Broadband Reimb.CMB-Visa: ATT -Communications Visa.-Service call1557 Washington Avenue PrOject or NJA Administration Administration Administration Administration Administration Administration Administration Administration Administration Administration Intertocal Agreement Interlocal Agreement Interlocal Agree. Adm. Fees Interloca[ Agree. Adm. Fees Capital Maintenance Capital Maintenance Capital Maintenance Capital Maintenance South Beach Area Property Management 9964-South Beach Property Management Community Policing Community Policing Community Policing Community Policing Community POlicing Community Policing Community Policing Community POlicing 1224 -Community Policing 1224 -Community Policing 1224 -Community Policing Accrued Invest. Interest Anchor Garage Operations Anchor Garage Operations Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garaga Operations Anchor Garage Operations Anchor Garage Operations Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garage Operations PAGE 1 OF 3 Payee 2904 11/10/11 City of Miami Beach 2862 10/13/11 Omarcio Cleaning Service 2883 10125/11 Sheet Metal Experts, Inc. 2898 11/03/11 Waste Management. Inc. 2917 11/29/11 Haig's Service Corp 2867 10/13/11 Thyssenkrupp Elevator 2910 11/22/11 Thyssenkrupp Elevator 2895 11/03/11 FPL 2876 10/18/11 Miami Beach Redevelopmen~ Inc 2903 11/08/11 Miami Beach Redevelopment, Inc 2852 10/11/11 Impark Imperial Parking (impark) 2886 10/27/11 Standard Parking 2899 11/08/11 Standard Parking WIRE 10120111 Florida Department of Revenue TOTAL ANCHOR GARAGE OPER. 2849 10/06/11 Miami Beach Community Development Corp 2888 10/27/11 Miami Beach Community Development Corp 2902 11108/11 Master Mechanical Service WIRE 10120/11 Florida Department of Revenue TOTAL ANCHOR SHOPS OPER. WIRE 10/20/11 Florida Department of Revenue 2912 11/23/11 Maria Ramos 2913 11/23/11 Jing Zeng 2914 11/23/11 Nidia Martinez 2915 11/23/11 Dillion Patel TOTAL PENNSYLVANIA GARAGE OPERATIONS 2905 11/10/11 The Konvier Stem Group TOTAL PENNSYLVANIA SHOPS OPERATIONS 2858 10/13/11 Metro Express 2870 10/13/11 Metro Express TOTAL COLLINS PARK CULTURAL CENTER 2863 10/13/11 Raymond Jungles, Inc. 2893 11/01/11 The Gordian Group 2896 11103111 Harbour Construction 2897 11/03/11 The Gordian Group TOTAL BOTANICAL GARDENS PROJECT 2875 10/18/11 Atkins North America, Inc. 2879 10/20/11 Atkins North America, Inc. 2860 10/13/11 New World Symphony 2873 10/13/11 New World Symphony TOTAL NWS LINCOLN PARK PROJECT 2841 10/04/11 Chen & Associates 2850 10/11/11 Chen & Associates CONVENTION CENTER STREETSCAPE 2866 10/13/11 The Gordian Group 2840 10/04/11 Berman, Renner, Vogel & Mandler 2855 10/13/11 Harbour Construction 2869 10/13111 Harbour Construction Redevelopment Agency -City Center District Check & Wire Transfer Register by Project & Type of Expense Fiscal Year 2012 ·im,l'id Type of Expens~ ----...,7,;~7;:~~~=--Visa -Replace electric locks and E-combination 6,459.33 Pressure Cleaning Anchor Garage 364.00 Drain Pans for IVC Units 265.32 Anchor Shops waste service 7.088.65 ____ ...,;,,;"'~"':~:;.-~ Alarm Maintenance October 1 thru December 31, 2011 9.167.00 4.607.11 13.774.11 2.701.07 2.701.07 Elevator Repair at Anchor Garage FY 10/11 -1st & 2nd Installment Elevator Repairs and Maintenance for Nov 2011 -Jan. 2012 Electricity 188,073.83 Facility Use I Usage Fee -Jan-March 2011 ---"2~;;~"':~"'~"'~:0;;~=--; Facility Use I Usage Fee -July -Seplember 2011 8,059.46 2,781.37 27,225.36 38,066.19 15,279.84 15,279.84 695,069.22 Salary Reimbursements Salary Reimbursements -Cashier Services Cashiering services -September 2011 Sales Tax 7,667.23 Monthly Fees -August 2011 ___ --i3".,7;-<7""7"'.9:;.-3 Monthly Fees -September 2011 11.445.16 ___ ---7.17",9,,7"'0"'.0:;.-0 HVAC Replacement -Anchor Shops 17,970.00 ___ --:1;",6,,0,,7"'.9=--5 Sales Tax 1,607.95 31,023.11 2,704.14 17.00 9.00 7.00 5.00 2,742.14 2,742.14 Sales Tax Parking refund Parking refund Parking refund Parking refund ___ -'8"'1'",6~4"'8."'7=--9 25% Lease commission for Gigil Penn Shops 81.648.79 81,648.79 2,550.54 Collins Pari< & Rotunda Improvements 126.877.80 Collins Park & Rotunda Improvements 129,428.34 129,428.34 3,125.00 Professional Services 670.98 Gordain fee from Harbour Construction Project. 58,414.81 Construction ___ --,,;1"',1""7"'7.0;;22:;--Construction 63,388.01 63,388.01 1,362.06 Signal Modification Plans ___ -;3"',9"'3,,8.,,8;:-5 Signal Modification Plans 5,300.91 940.00 17,633.00 18,573.00 23,873.91 Raimb. Request for Park -Res 543-2007, 552-2007 Reimb. Request for Additionallmprov. -Res 543-2007, 552-2007 1,447.44 Professional Services ___ --;,.,1~673.~9;:-4 PrOfessional Services 1,611.38 1,611.38 198.95 JOC Fees for first floor break room ----...;~"'~"~:"'~5=--0 Mediation Costs 10,202.86 Construction Services ___ --;;,.;3;,:4~3.~60;-Construction Services 10,546.46 PrOject or N/A 1990 -Anchor Garage Operations Anchor Garage Operations Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garage Operations Anchor Garage Operations Anchor Garage Operations 1990 -Anchor Garage Operations 1990 -Anchor Garage Operations Anchor Garage Operations 1990 -Anchor Garage Operations Anchor Garage Operations Anchor Garage Operations 1990 -Anchor Garage Operations Anchor Garage Operations Anchor Shops Oper. Anchor Shops Oper. 1995 -Anchor Shops Oper. Anchor Shops Oper. 365 -Pennsylvania Garage Operations 365 -Pennsylvania Garage Operations 365 -Pennsylvania Garage Operations 365 -Pennsylvania Garage Operations 365 -Pennsylvania Garage Operations 1997 -Pennsylvania Shops Operations Collins Pari< Cultural Center Collins Park Cultural Center Garden Center Renovations 2144 -Garden Center Renovations 2144 -Garden Center Renovations 2144 -Garden Center Renovations New World Symphony Park Project New World Symphony Park Project New World Symphony ParK Project New World Symphony Park Project Convention Center Streetscape ·ROW Convention Center Streetscape -ROW Multi-Purpose Build.Adj.City Hall Multi-Purpose Build.Adj.City Hall Multi-Purpose Build.Adj.City Hall Multi-Purpose Build.Adj.City Hall PAGE 2 OF 3 2891 10/27/11 2909 11/22/11 2904 11/10/11 2841 10/04/11 2850 10/11111 2868 10/13/11 2857 10/13/11 2856 10/13/11 Redevelopment Agency -CIty Center District Check & Wire Transf~r Register by Project & Type of Expense FIscal Year 2012 Payee ·'ui.Ii!'! Type of Expense TOTAL MULTI.PURPOSE BUILD.ADJ.CITY H. 11,445.41 Central Concrete Supermix, Inc. 6,548.50 Direct Payment for concrete Central Concrete Supermix, Inc. 3.043.94 Direct Payment for concrete 9.592.44 TOTAL LINCOLN RD BTW. COLLINS AND WASHINGTON 9,592.44 Harbour Construction 5.227.36 Construction Services 5.227.36 TOTAL COLLINS CANAL ENHANCEMENT PROJECT 5,227.36 Chen & Associates 25,432.66 Professional Services Chen & Associates 14,979.99 Professional Services Universal Engineering Sciences 635.00 Professional Services 41,047.65 M. Vila & AssOCiates, Inc. 463,838.77 Construction Services 463,838.77 TOTAL CCHV NEIGHBORHOOD IMPROVEMENTS 504,886.42 Ideal Architectural Design, PA 1,548.00 Professional Services -Design Services 1,548.00 TOTAL DIRECTORY SIGNS IN THE CITY CENTER ROW 1,548.00 REPORT TOTAL 4,130,972.72 Project or NfA 2664-Lincoln Road Between Collins & Wast 2664-Lincoln Road Between Collins & Wast 2950 -Collins Canal Enhancement Project CCHV Neigh. Improv. -Historic Dist. CCHV Neigh.lmprov. -Historic Dist. CCHV Neigh. Improv. -Historic Dist. CCHV Neigh. Improv. -Historic Dist. Directory Signs in the City Center ROW PAGE 3 OF 3 ATTACHMENT ':'A" SUMMARY OF MAJOR PRO.JECTS REDEVELOPMENT PROJECTS (Planned and/or Underway) City Center Collins ParkiStreetscapelRotunda This project IS for the renovation and redeSign of Collins Park on the west side ofColhns Avenue (approx. 4 5 acres) per Cultural Campus Master Plan after the demolition of the existing library This project does not Include CollinS Park Improvements on the east Side of CollinS Avenue (approx. 3.3 acres), for which design and constructIOn are to be coordinated with the streets cape Improvements and beach walk improvements. Project Management Department: CIP Office Total Project Cost: $10,342, I 06 Total CRA participation $8,522, I 06 Source. Pg. 312 -Capital Improvement Plan and FY 08/09 Capital Budget Collins Park Children's Feature Colony Theatre Renovation ThiS project is for the constructIOn of a child oriented art/interactive feature as part of the CollinS Park project. The project will complement the previously approved Collins Park project and will provide a needed children's space within the Collins Park/Oceanfront Neighborhood. Project Management Department: CIP Office Total Project Cost: $ 150,000 Total CRA participation: $150,000 Source' Pg. 289 -Capital Improvement Plan and FY 0911 0 Capital Budget ThiS project IS for the renovation of the existing ground floor restrooms of the Colony Theatre to comply With the Amencans with Disablhtles Act (ADA), and to provide a remote trash disposal enclosure at an adjacent City owned surface parking lot. These projects are not going to be done concurrently. Project Management Department: CIP Office Total Project Cost: $734,690 Total CRA partiCipation $734,690 ($500,000 Grant Funded) Source: Pg. I 17 -Capital Improvement Plan and FY 08/09 Capital Budget Page 1 of6 " City Center City Center Right-or-Way Improvement Project (City Center-Commercial District BP9B) ThIS project Includes the restoratIOn and enhancement of right-of wayslstreetscapes throughout the City Center, includIng roadway, SIdewalks, curb and gutter, landscape, streetscape, IrrIgation, lIghtIng, potable water, and storm draInage infrastructure as needed. The project limits include Drexel Avenue from LIncoln Lane to Lincoln Lane North, Pennsylvania Avenue from 16 th to 1 ill Street, Euclid Avenue from LIncoln Lane to Lincoln Road Mall, Mendlan Avenue from 16 th to 17 th , Jefferson Avenue from LIncoln Lane to 1 i h St., MichIgan A venue from 161h to I ih, Lenox A venue from 16 th to 17 1h , Lenox Court, Lincoln Lane to 16 1h , LIncoln Lane from Drexel to Alton Rd., Lincoln Lane North from Washington to Alton, WashIngton to Dade Blvd, Convention Center DrIve and 19 th Street. Project Management Department: CIP Office Total Project Cost: $ n,209,842 Total CRA participatIon. $13,209,842 Source' Pg. 310 -Capital Improvement Plan and FY 08/09 CapItal Budget New World Symphony Garage Project ThIS project IS for The Frank Gehry-designed PennsylvanIa Avenue public parking garage just west of the New World Symphony. This fully self-serve garage features 550 parkIng spaces and approxImately 8,000 square feet of first class retail space The garage provides access to the New World Symphony vIa a thIrd floor covered walkway and is ilium mated With LED lights at nIght that coordInate In color WIth lights on the protrudIng sunshade from New World Symphony's north fa9ade Project Management Department: RDA Total Project Cost: $15,210,185 Total CRA partIcIpatIOn' $15,210,185 Source' Pg. 199 -Capital Improvement Plan and FY 08/09 Capital Budget New World Symphony Park Project This project IS for a new park which IS an Integral component of the overall Master Plan InvolVing the New World Symphony Sound Space Project. The partnership between the City and the New World Symphony (the "Symphony") has resulted In the New World Center; a new, state of the art performance and recording facility whIch opened In February 20 lIon City-owned land, with the adjacent City owned 2 85 acre park, SoundScape, which features a 7,000 square foot projectIon wall on the eastern front of the New World building. Complete with a world-class audio system, ExoStage after dark provides a canvas for VIdeo art, mUSIC, film and simulcasts of concerts plaYIng InSIde the New World Center ThIS facIlity is a technologIcal wonder designed by celebrIty archItect Frank Gehry and the first of ItS kmd in the world. Page 2 of6 City Center New World Symphony Park Project cont'd ... Project Management Department: RDA Total Project Cost: $22,300,000 Total CRA partICIpatIOn: $22,300,000 Source: Pg. 273 -CapItal Improvement Plan and FY 08/09 CapItal Budget Multi-Purpose Municipal Parking Facility ThIS project is a seven level parking facility having 65 I parkmg . spaces, approximately 32,000 sq ft. of commercial office space facmg Meridian Avenue and assOCIated site Improvements. The project IS located on the East SIde of Meridian Avenue at 17th Street m the CIty of MIamI Beach FlOrida behind City HalJ. The project is to be constructed m five separate constructIOn phases: DemolitIon, PJlmg, Underground UtIlitIes, Garage & Office Complex and Tenant Build-Out. The garage and office complex contract was awarded to the Tower Group. ThIS project IS currently in Phase 4 which tncludes construction of the main building structure as well as site Improvements such as landscaping and the new plaza area, street resurfacing, Sidewalks, etc. Project Management Department: CIP Office Total Project Cost: $40,140,255 Total CRA partiCipation. $19,653,098 Source: Pg. 192 -CapItal Improvement Plan and FY 08/09 Capital Budget and Page 10 ofCIP's Bi-Weekly ConstructIOn Report dated January 15,2010 Lincoln Road between Collins & Washington This project is between the Lincoln Road Mall and the Beachfront Area, and will be designed to address the needs of the commerCIal and retail area *s well as the pedestrian, private and public vehicular access. The project tncludes roadway reconfiguration to accommodate Uniform traffic lanes throughout, installation of a landscaped center median with uplighting, sidewalk replacement, mstallatlOn of a brick paver crosswalk with ADA curb ramps, installatIOn of a bump out to formalize the parkmg area and reduce the crosswalk dIstance, tnstallatlOn of street furniture and resurfacing of the asphalt pavement. Project Management Department: CIP Office Total Project Cost: $2,488,093 Total CRA partiCipation' $2,488,093 Source' Pg. 324 -Capital Improvement Plan and FY 08/09 Capital Budget Page 3 of6 City Center Collins Canal Enhancement Project Little Stage Complex The CollIns Canal Enhancement Project includes the development of the Dade Blvd. Bike path, which is a recreational greenway that will connect to the Venetian Causeway Bike Path and the Beachwalk, as well as seawall restoration for the north bank of the canal The major bikeway artery will tie Into a regional network of planned recreational trails/alternative transportation routes, called the Atlantic Greenway Network, connecting five public parks, eight beach access areas, and seven regional parking facIlIties In Miami Beach. This project IS part of the larger AtlantiC Greenway Network which alms to promote the use of alternative transportation and reduce traffic congestion The Collins Canal Project will provide environmental, social and human health benefits to the community. Project Management Department: PublIc Works Total Project Cost: $8,555,127 Total CRA participation-$1,600,000 Source· Pg. 94 -Capital Improvement Plan and FY 08/09 Capital Budget The Little Stage Complex project scope Includes planning, programming, design, bid and award and construction administration, restoration and/or rehabilitation of the Little Stage Theater (Acorn Theater), Carl Fisher Clubhouse, Outdoor Dance Plaza / Bandshell (proposed to be demolished), and associated walkway areas adjacent to these facilities to accommodate pedestrIan circulation and lImited vehicular routes as necessary Project Management Department: crp Office Total Project Cost: $7,937,392 Total CRA participation: $637,200 Source: Pg. 121 Capital Improvement Plan and FY 08/09 Capital .Budget West Avenue/Bay Road Improvements The West Avenue/ Bay Road Improvements project is an area-wide street improvement which may Include street resurfacing, swale restoration, repair of sidewalks, street lighting upgrades, enhanced landscaping and entryway features. The scope of thiS project Includes West Avenue and Bay Road from 5th St. to Collins Canal, east/west side streets west of Alton Road from 6 th to Lmcoln Road and Lincoln Court, Integrated With drainage Improvements to BaSinS 7, 8, 11, 12, and 13 per the Storm water Master Plan Project Management Department: CIP Office Total Project Cost: $25,735,556 Total CRA participation-$750,000 Source· Pg. 357 -Capital Improvement Plan and FY 08/09 Capital Budget Page 4 of6 City Center CCHC Neighborhood Improvements -Historic District ThIS project Includes Improvements to the stormwater collectIOn and disposal system upgrades, water dIstributIon center upgrades, roadway resurfacIng and streetscape enhancements, landscaping, traffic calmIng InstallatIons, additIOnal pedestrian lighting, and enhanced pedestrian lInkages. The project lImIts are bounded by WashIngton Avenue to the west, CollIns Avenue to the east, LIncoln Road to the South, and Dade Blvd to the north, and Includes James, Park and LIberty Avenue, li\ 18 1\ 19 1h and 20 th Streets, and 21 51 Street west of Park Avenue The City entered into an agreement with Chen and Associates for the design of the proJect. . Project-Management Department: crp Office Total Project Cost: $18,502,024 Total CRA partIcipation: $18,463,939 Source' Pg. 309 -CapItal Improvement Plan and FY 08/09 CapItal Budget Botanical Garden (Garden Center) Pedestrian Countdown Signals ThIS project IS for Phase II of renovatIOns to the Garden Center Phase I Improvements, which are complete, Included new fenCIng, new roof WIth related asbestos abatement, restroom renovatIons, exterIor paInt, new doors, trash cans, benches and other sIte furntshIngs. The Phase II project wIll Include renovatIons to the buildIng, entry, patio roof, pergola, maintenance area, sIte Improvements, lighting, signage, plantIng, irrIgatIOn, InterIOr renovatIOns and InterIor acoustic improvements. Raymond Jungles, Inc was ranked first by the commIttee as the firm to develop the concept plan prIor to proceedIng to deSIgn development. Project Management Department: crp Office Total Project Cost: $1,851,925 Total CRA partIcipation $351,925 Source' Pg. 91 -CapItal. Improvement Plan and FY 08/09 CapItal Budget This project IS to provide pedestrIan countdown signals at key intersections. Pedestrian countdown SIgnals prOVIde an extra level of publIc safety PedestrIans crossing an Intersection can visually see how many seconds are left before the traffic light changes. Phase I of the program will provide for pedestrIan countdown SIgnals in thIrty-two Intersections. Project Management Department: PublIc Works Total Project Cost: $496,000 Total CRA partIcIpation $56,000 Source: Pg. 480 -Capital Improvement Plan and FY 09/1 0 CapItal Budget Page 5 of6 City Center Directory Signs in the City Center ROW This project IS for the InstallatIon of Monument DIrectory signs within the CIty Center neIghborhood rIghts of way, In vicInIty of City Hall, and on City Hall Campus Buildings to dIrect resIdents and vIsitors to City offices and servIces. Project Management Department: CiP Office Total Project Cost: $108,268 Total CRA participatIon: $] 08,268 Source' Pg. 434 -CapItal Improvement Plan and FY ] 0111 CapItal Budget 24" PVC Sanitary Sewer Improvements ThIs SanItary Sewer Mam Improvements project includes installing approximately 960 lInear feet of 24-lnch PVC C905 and 1]90 linear feet of 8-mch PVC C900 pipe and fittings; 7 manholes, traffic control and all anCIllary and mIscellaneous work. As a result of added development wIthin this sewer shed, the capacIty of thIs SanItary Sewer distributIon system WIll need to be increased to convey the increased floor Project Management Department: Public Works Total Project Cost: $646,031 Total CRA particIpation $646,031 Reallocated -Reso# 568-20 10 Source' Pg. 568 -Capital Improvement Plan and FY 11112 CapItal Budget Page 6 of6