20120718 LTC 172-2012MIAMI BEACH
OFFICE OF THE CITY MANAGER
LTC# 172-2012
--c· ·-· 1 \ ' ""~ ~~} F< t. ·" ~:. ' ·~ r:. L-
LETTER TO COMftVdM-IdNPM IZ: 0 I
CITY CLEFH\'3 OFF ICE
TO: Mayor Matti Herrera Bower and Members of the City Commission ·
FROM' Kathie G. Brooks, Interim City Manager /A~ •
DATE: July 11, 2012
SUBJECT: REPORTS AND' INFORMATIONAL ITEMS FOR THE JULY 18, 2012
COMMISSION MEETING
Pursuant to the changes directed by the City Commission for meeting agenda distribution,
the following reports will now be provided on a monthly basis via LTC and also posted on the
City's website.
1. Parking Status Report~ May 2012.
2. Informational Report To The Mayor And City Commission, On Federal, State, Miami-
Dade County, U.S. Communities, And All Existing City Contracts For Renewal Or
Extensions In The Next 180 Days.
3. Status Report On The Palm & Hibiscus Islands Neighborhood ROW Project And
Utilities Underground Project.
4. CIP Monthly Construction Project Update.
5. Report Of The Itemized Revenues And Expenditures Of The Miami Beach
Redevelopment Agency's City Center District & South Pointe (Pre~ Termination Carry
Forward Balances) For The Month Of May 2012.
F:\CLER\$ALL\LILIA\Commission-Meetings\2012\July 18, 2012\L TC.doc
~ MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachll.gov
COMMISSION MEMORANDUM
TO:
FROM:
DATE:
Mayor Matti Herrera Bower and Members of the City Commission
Kathie G. Brooks, Interim City Manager /~ .4--
July 1 8, 20 1 2 /
SUBJECT: PARKING STATUS REPORT-MAY 2012
During the month of May the Parking Department received revenue from different sources
outlined in the categories listed below:
REVENUE SOURCE MAY 2011
I. Meters (Single & Multi SpaceJ$1 ,842,371.87
II. Off-Street Facilities
a. Garages and AHended $1,045,230.79
17th Street Garage $311 A59.79
City Hall Garage $29,273.21
7th Street Garage $219,800.15
Pennsylvania Ave Garage $26,807.49
12th Street Garage $49,634.87
13th Street Garage $1 03A90.41
42"d Street Garage $27,609.34
16th Street Garage $277,155.53
REVENUE SOURCE APRIL 2011
b. Joint Venture
MAY 2012 %1NC/(DEC)
$1,912,687.48 3.82%
$959,136.33
$290A40.68
$26,240.84
$179,305.14
$36,985.41
$50,091.00
$97,372.52
$31,332.51
$247,368.23
(8.24%)
(6.75%)
(1 0.36%)
(18.42%)
37.97%
0.92%
(5.91%)
13.49%
(1 0.75%)
APRIL 2012 %1NC/(DEC)
5th & Alton Garage $45A09.28 $40,881.72* · (9.97%)
*46% of total revenue which represents the City's pro-rata share pursuant to the Development Agreement.
REVENUE SOURCE MAY2011 MAY 2012 %1NC/(DEC)
Ill. Enforcement $372,841.61 $334,531.71 (10.28%)
a. M-D Cty Pkg Violations $334,616.61 $320781 .71 (4.13%)
b. Towing $38,225.00 $13750.00 (64.03%)
IV. Permit Sales $297,323.16 $283,727.75 (4.57%)
a. Municipal Monthly Permits $51,906.03 $59741.65 15.10%
b. Valet & Space Rental $111 A04.oo $103A70.10 (7.12%)
c. Residential Permits $68,733.13 $60,851.00 (11.47%)
d. Hotel Hang Tags (20 tags) $9,000.00 $200.00 (97.78%)
e. In Vehicle Parking Meter
(167 iParksJ $56,280.00 $59A65.oo 5.66%
July 7 8, 2072
City Commission Memorandum
Parking Status Report-May 20 7 2
Page 2 of 2
Meters: meter revenue remained consistent with last year.
Garages & Attended Lots: the overall revenue in the garages decreased by 8.24% due to a
decrease in usage in garages system wide with the exception of the Pennsylvania Avenue,
12th Street and 42nd Street Garages.
In an effort to reduce operating expenses, the Parking Department continues to decrease the
number of labor hours for garage and attended lot operations including cashiers/attendants,
supervisors. However, please note that although an increase to the Living Wage Hourly Rate
became effective in October 2011, expenses only increased by 4.83%.
Enforcement: there was a decrease in citation revenue of 4.13% and a 64.03% decrease in
towing revenue resulting in an overall decrease of 10.28%.
Permit Sales: the overall revenue decrease in permits sales is a result of a decrease in valet &
space rental, residential permit and hotel hang tag sales. Additionally, non-resident IVPMs
are available at Publix supermarkets and select Walgreens. Since August 2009 we have sold
a total of 1368 devices to these retail stores (1305 to Publix and 63 to Walgreens).
5th and Alton Garage:
The 5fh and Alton Garage is a joint venture project (parking garage) with the "Developer"
(Berkowitz Development Group) containing 1,080 parking spaces. The Developer and City
own 54% and 46% of the parking spaces, respectively, and profit/loss is also shared in the
same manner. The City's revenue portion (46%) is $40,881.72; resulting in a total net
income of $13,191.69 for the month of April2012. Pursuant to the Development Agreement,
the City receives its proportionate share of profit or must subsidize any loss. The City and
Developer continue to jointly pursue initiatives to promote the use of the garage. These
initiatives include but are not limited to "after hours" flat rate parking; valet parking storage;
monthly parking; and strategically placed electronic signage directing users to the facility.
Future considerations include promotional rates for" after hours"; valet parking storage; and
park and ride options to the entertainment districts. Attached are detailed reports for each
category listed above that comprises the total monthly revenue.
Unfortunately the May 2012 information for the 5th & Alton Garage was not available at time
of print and will be submitted at a later date.
·~
KGB/PDW /SF /RA
'~'"'"'"'""' ''""' ,,,.m 201 '·2012\2012"' d~
Diff
%
Garages &
Attended Lots
May-11 $ 1,045,230.79
May-12 $ 959,136.33
$ (86,094.46}
-8.24%
Towing & Parking
10%
Permit Sales & Space
8%
$4,000,000.00
$3,500,000.00
$3,000,000.00
$2,500,000.00
$2,000,000.00
$1,500,000.00
$1,000,000.00
$500,000.00
$-
Attended
Lots
PARKING DEPARTMENT REVENUE
May-12
M..eters Permit ::,a es & ::,pace
(SS & MS) Rentals
$ 1,842,371.87 $ 297,323.16
$ 1,912,687.48 $ 283,727.75
$ 70,315.61 $ (13,595.41}
3.82% -4.57%
Revenue 2012
Meters
(SS &
MS}
Permit
Sales & Towing & TOTAL
Parking
Space Violations
Rentals
owing & f'grking
:-iiolations TOTAL
$ 372,841.61 $ 3,557,767.43
$ 334,531.71 $ 3,490,083.27
$ (38,309.90) $ (67,684.16)
-10.28% -1.90%
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
YTD
PARKING DEPARTMENT REVENUE YTD
May-12
Garages &
Attended Lots Meters (SS & MS) Permit Sales
$ 867,589.31 $ 1,689,714.18 $ 356,298.91
$ 929,506.04 $ 1,842,974.08 $ 306,020.51
$ 953,314.41 $ 1 '986,457. 14 $ 338,837.17
$ 997,963.99 $ 1,915,534.60 $ 290,868.27
$ 1 ,060,157.06 $ 1,961,619.66 $ 356,042.95
$ 1,282,425.33 $ 2,364,012.00 $ 380,054.36
$ 1,060,778.73 $ 1,991,959.03 $ 381,655.48
$ 959,136.33 $ 1,912,687.48 $ 283,727.75
$ 8,110,871.20 $ 15,664,958.17 $ 2,693,505.40
$5,000,000.00 -.--------------------------------,
$4,500,000.00 -1------------~---------------1
$4,000,000.00 +-----------,
$3,500,000.00 +----::
$3,000,000.00
$2,500,000.00
$2,000,000.00
$1,500,000.00
$1,000,000.00
$500,000.00
$-
oy,<ing & t"'grking
Y:iolations TOTAL
$ 362,213.28 $ 3,275,815.68
$ 382,613.98 $ 3,461,114.61
$ 389,371.24 $ 3,667,979.96
$ 402,542.25 $ 3,606,909.11
$ 386,457.13 $ 3,764,276.80
$ 387,201.32 $ 4,413,693.01
$ 348,750.64 $ 3,783,143.88
$ 334,531.71 $ 3,490,083.27
$ -
$ -
$ -
$ -
$ 2,993,681.55 $ 29,463,016.32
Ti
c
k
e
t
$
Va
l
e
t
Mo
n
t
h
l
y
Pe
r
m
i
t
s
$
$
17
t
h
St
r
e
e
t
Ga
r
a
g
e
Pe
n
n
s
x
l
y
a
n
i
a
G5
(o
l
d
2G
J
Ay
e
Ga
r
a
g
e
-
G9
22
0
,
7
9
0
.
6
8
69
,
6
5
0
.
0
0
29
0
,
4
4
0
.
6
8
$2
5
0
,
0
0
0
.
0
0
$2
0
0
,
0
0
0
.
0
0
$1
5
0
,
0
0
0
.
0
0
$1
0
0
,
0
0
0
.
0
0
$5
0
,
0
0
0
.
0
0
$-
$
23
,
9
6
5
.
4
1
$
13
,
0
2
0
.
0
0
$
36
,
9
8
5
.
4
1
" e'
-
o
t
9
(.
9
N
(i
i
:
:
:
Q
e.
£
.
Vi
<
o
~<.
9
PA
R
K
I
N
G
GA
R
A
G
E
RE
V
E
N
U
E
CA
T
E
G
O
R
I
E
S
Ma
y
-
1
2
17
7
5
M
e
r
i
d
i
a
n
CH
Ga
r
a
g
e
-
G7
i $
:j
i
6,
4
5
4
.
1
8
13
,
4
1
6
.
6
6
6,
3
7
0
.
0
0
26
,
2
4
0
.
8
4
~~
o
t
9
·c
:
"
I u c:~
'
-
.9
<.9
-
u
·
7t
h
St
r
e
e
t
Ga
r
a
a
e
G1
(o
l
d
1G
J
$
16
6
,
5
5
5
.
1
4
$
12
,
7
5
0
.
0
0
$
17
9
,
3
0
5
.
1
4
" ~<:
?
o
_
-
[
e
~
0
2<
.
?
·;
:
:
Q)
~
e
<{
)
0
<.
9
-
u
mo
.
,
_
b>
(
9
~
"
a.
.
::
:
:
(
.
?
$ $
$
12
t
h
St
r
e
e
t
13
t
h
St
r
e
e
t
Ga
r
a
g
e
Ga
r
a
g
e
G2
(o
l
d
2A
J
G3
(o
l
d
1Z
8
J
45
,
4
7
1
.
0
0
$
4,
6
2
0
.
0
0
$
50
,
0
9
1
.
0
0
$
" e_
o
<
(
<.
9
"
'
-
-u
Q
)
-
~..
2
.
cn
N
_.
c
t
9
c;:
;
"
0
)
e
<
0
1
'
-
.
<.
9
-
Gi
:
,
Q
"
0
dJ
~
-<
:
(
.
9
c:
;
87
,
9
9
2
.
5
2
9,
3
8
0
.
0
0
97
,
3
7
2
.
5
2
~Q
)
~
U)
g':
:
:
g
-g
O
.
£
.
"
'
<
.
9
"
'
'<
I
<.9
$ $
$
42
n
d
St
r
e
e
t
~
G6
(o
l
d
8A
J
5,
2
9
2
.
5
1
26
,
0
4
0
.
0
0
31
,
3
3
2
.
5
1
"
O
l
e"
"
C
'
0
0
(.
9
-
<
:
Q)
g
e
~
Vi
'<
I
-<
:
<
.
9
;a
16th Street Garage G4 (Anchor) TOTAL i 171,686.00 i 728,207.44 33,482.23 46,898.89 $ 42,200.00 $ 184,030.00 $ -$ 247,368.23 :ji 959,136.33 g;,cJ..o r:P<i... ~~"''"¥ ........
-
-
-
-
~
-
-
-
-
-
-
I
-
17
t
h
St
r
e
e
t
Ga
r
a
g
e
-
G5
(o
l
d
2G
)
To
t
a
l
Ve
h
i
c
l
e
Pe
a
k
Pe
r
i
o
d
Pe
a
k
Ve
h
i
c
l
e
Da
t
e
Da
y
En
t
r
i
e
s
Co
u
n
t
1
TU
28
3
3
19
:
0
0
-
1
9
:
5
9
45
0
2
w
25
6
4
18
:
0
0
-
1
8
:
5
9
36
9
3
TH
26
5
9
18
:
0
0
-
1
8
:
5
9
41
2
4
F
34
4
2
20
:
0
0
-
2
0
:
5
9
53
7
5
SA
37
5
4
19
:
0
0
-
1
9
:
5
9
71
9
6
su
38
1
2
15
:
0
0
-
1
5
:
5
9
63
1
7
MO
22
9
9
17
:
0
0
-
1
7
:
5
9
37
7
8
TU
23
3
3
17
:
0
0
-
1
7
:
5
9
36
1
9
w
31
3
9
14
:
0
0
-
1
4
:
5
9
44
6
10
TH
24
6
2
18
:
0
0
-
1
8
:
5
9
38
0
11
F
34
3
4
20
:
0
0
-
2
0
:
5
9
94
6
12
SA
37
7
3
19
:
0
0
-
1
9
:
5
9
79
0
13
su
29
4
1
15
:
0
0
-
1
5
:
5
9
52
4
14
MO
20
9
7
16
:
0
0
-
1
6
:
5
9
34
2
15
TU
27
3
1
18
:
0
0
-
1
8
:
5
9
44
6
16
w
27
8
9
20
:
0
0
-
2
0
:
5
9
45
9
17
TH
24
0
9
17
:
0
0
-
1
7
:
5
9
35
8
18
F
31
4
9
19
:
0
0
-
1
9
:
5
9
65
2
19
SA
39
2
9
20
:
0
0
-
2
0
:
5
9
59
4
20
su
32
9
2
15
:
0
0
-
1
5
:
5
9
66
4
21
MO
23
8
0
17
:
0
0
-
1
7
:
5
9
38
8
22
TU
20
7
0
17
:
0
0
-
1
7
:
5
9
32
0
23
w
24
4
6
18
:
0
0
-
1
8
:
5
9
33
5
24
TH
23
5
2
18
:
0
0
-
1
8
:
5
9
39
2
25
F
25
2
1
15
:
0
0
-
1
5
:
5
9
36
9
26
SA
23
3
3
15
:
0
0
-
1
5
:
5
9
29
8
27
su
22
5
5
17
:
0
0
-
1
7
:
5
9
29
6
28
MO
18
2
8
15
:
0
0
-
1
5
:
5
9
28
1
29
TU
22
4
6
17
:
0
0
-
1
7
:
5
9
34
2
30
w
24
9
6
17
:
0
0
-
1
7
:
5
9
38
8
31
TH
26
0
5
17
:
0
0
-
1
7
:
5
9
36
7
85
3
7
3
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
r
k
i
n
g
De
p
a
r
t
m
e
n
t
Da
i
l
y
Ve
h
i
c
l
e
En
t
r
y
Re
p
o
r
t
-
Ma
y
20
1
2
7t
h
St
Ga
r
a
g
e
-
G
1
(o
l
d
1 G)
16
t
h
St
r
e
e
t
Ga
r
a
g
e
-
G4
(A
N
C
H
O
R
)
To
t
a
l
Ve
h
i
c
l
e
Pe
a
k
Pe
r
i
o
d
Pe
a
k
Ve
h
i
c
l
e
To
t
a
l
Ve
h
i
c
l
e
Pe
a
k
Pe
r
i
o
d
Pe
a
k
Ve
h
i
c
l
e
En
t
r
i
e
s
Co
u
n
t
En
t
r
i
e
s
Co
u
n
t
64
8
15
:
0
0
-
1
5
:
5
9
11
2
98
0
17
:
0
0
-
1
7
:
5
9
13
2
76
2
17
:
0
0
-
1
7
:
5
9
13
8
10
1
1
15
:
0
0
-
1
5
:
5
9
15
2
10
0
8
16
:
0
0
-
1
6
:
5
9
19
7
10
9
1
17
:
0
0
-
1
7
:
5
9
14
8
82
3
16
:
0
0
-
1
6
:
5
9
15
7
12
8
1
14
:
0
0
-
1
4
:
5
9
17
3
16
5
2
12
:
0
0
-
1
2
:
5
9
26
6
17
5
1
17
:
0
0
-
1
7
:
5
9
24
7
16
5
2
12
:
0
0
-
1
2
:
5
9
28
4
15
5
7
15
:
0
0
-
1
5
:
5
9
25
4
85
0
16
:
0
0
-
1
6
:
5
9
17
8
96
8
16
:
0
0
-
1
6
:
5
9
14
6
65
8
14
:
0
0
-
1
4
:
5
9
15
1
95
7
15
:
0
0
-
1
5
:
5
9
15
8
73
0
15
:
0
0
-
1
5
:
5
9
17
8
10
2
7
15
:
0
0
-
1
5
:
5
9
15
6
87
3
16
:
0
0
-
1
6
:
5
9
18
4
10
6
2
15
:
0
0
-
1
5
:
5
9
15
0
12
6
2
16
:
0
0
-
1
6
:
5
9
25
2
12
9
2
15
:
0
0
-
1
5
:
5
9
18
0
95
3
16
:
0
0
-
1
6
:
5
9
18
2
16
0
4
17
:
0
0
-
1
7
:
5
9
22
2
10
0
7
14
:
0
0
-
1
4
:
5
9
17
8
10
2
6
11
:
0
0
-
1
1
:
5
9
16
1
71
4
15
:
0
0
-
1
5
:
5
9
11
7
81
5
17
:
0
0
-
1
7
:
5
9
12
6
58
9
16
:
0
0
-
1
6
:
5
9
11
6
84
9
17
:
0
0
-
1
7
:
5
9
13
9
56
7
15
:
0
0
-
1
5
:
5
9
95
86
9
15
:
0
0
-
1
5
:
5
9
14
1
75
8
16
:
0
0
-
1
6
:
5
9
14
9
10
1
3
15
:
0
0
-
1
5
:
5
9
14
3
11
2
0
16
:
0
0
-
1
6
:
5
9
15
9
12
9
2
15
:
0
0
-
1
5
:
5
9
18
3
16
0
1
16
:
0
0
-
1
6
:
5
9
24
2
13
1
0
17
:
0
0
-
1
7
:
5
9
17
9
16
8
2
16
:
0
0
-
1
6
:
5
9
27
4
12
2
0
15
:
0
0
-
1
5
:
5
9
17
8
87
1
13
:
0
0
-
1
3
:
5
9
15
7
91
2
15
:
0
0
-
1
5
:
5
9
16
8
59
5
18
:
0
0
-
1
8
:
5
9
95
84
2
17
:
0
0
-
1
7
:
5
9
13
6
69
1
19
:
0
0
-
1
9
:
5
9
11
0
95
0
17
:
0
0
-
1
7
:
5
9
13
5
73
8
19
:
0
0
-
1
9
:
5
9
14
7
78
5
09
:
0
0
-
0
9
:
5
9
10
4
14
4
1
15
:
0
0
-
1
5
:
5
9
22
9
71
0
21
:0
0
-
2
1
:5
9
93
13
0
0
17
:
0
0
-
1
7
:
5
9
20
9
11
2
3
17
:
0
0
-
1
7
:
5
9
16
4
11
6
5
13
:
0
0
-
1
3
:
5
9
20
9
10
5
8
17
:
0
0
-
1
7
:
5
9
13
7
13
7
6
16
:
0
0
-
1
6
:
5
9
25
9
10
1
9
16
:
0
0
-
1
6
:
5
9
17
6
75
9
15
:
0
0
-
1
5
:
5
9
11
7
84
1
17
:
0
0
-
1
7
:
5
9
13
2
72
8
16
:
0
0
-
1
6
:
5
9
14
9
97
0
15
:
0
0
-
1
5
:
5
9
14
0
60
0
19
:
0
0
-
1
9
:
5
9
10
2
92
0
15
:
0
0
-
1
5
:
5
9
14
9
30
1
7
3
33
1
0
5
1775 Meridian Garage-G7 T a tal Vehicle Peak Period Peak Vehicle Entries Count 700 17:00-17:59 165 652 08:00-08:59 177 691 08:00-08:59 197 675 08:00-08:59 183 145 20:00-20:59 27 68 20:00-20:59 14 640 08:00-08:59 172 699 08:00-08:59 180 708 17:00-17:59 165 681 17:00-17:59 175 668 08:00-08:59 176 75 14:00-14:59 17 62 18:00-18:59 17 593 08:00-08:59 154 674 17:00-17:59 182 681 17:00-17:59 188 679 08:00-08:59 184 895 08:00-08:59 175 364 19:00-19:59 92 79 14:00-14:59 16 644 08:00-08:59 180 712 08:00-08:59 184 691 08:00-08:59 179 717 08:00-08:59 177 617 08:00-08:59 156 117 18:00-18:59 23 106 17:00-17:59 19 67 09:00-09:59 14 626 08:00-08:59 158 711 08:00-08:59 191 665 17:00-17:59 173 16102
12
t
h
St
Ga
r
a
g
e
-
G2
(o
l
d
2A
)
Da
y
To
t
a
l
Ve
h
i
c
l
e
Pe
a
k
Pe
r
i
o
d
Pe
a
k
Ve
h
i
c
l
e
Da
t
e
En
t
r
i
e
s
Co
u
n
t
1
TU
21
6
18
:
0
0
-
1
8
:
5
9
41
2
w
25
6
16
:
0
0
-
1
6
:
5
9
41
3
TH
34
2
16
:
0
0
-
1
6
:
5
9
42
4
F
31
9
16
:
0
0
-
1
6
:
5
9
49
5
SA
33
9
16
:
0
0
-
1
6
:
5
9
62
6
su
26
2
16
:
0
0
-
1
6
:
5
9
45
7
MO
21
3
17
:
0
0
-
1
7
:
5
9
46
8
TU
22
8
13
:
0
0
-
1
3
:
5
9
38
9
w
26
6
16
:
0
0
-
1
6
:
5
9
4
0
10
TH
27
1
16
:
0
0
-
1
6
:
5
9
36
11
F
34
9
23
:
0
0
-
2
3
:
5
9
42
12
SA
31
4
22
:
0
0
-
2
2
:
5
9
54
13
su
17
1
00
:
0
0
-
0
0
:
5
9
34
14
MO
19
6
16
:
0
0
-
1
6
:
5
9
41
15
TU
22
7
16
:
0
0
-
1
6
:
5
9
37
16
w
26
3
13
:
0
0
-
1
3
:
5
9
4
0
17
TH
30
1
16
:
0
0
-
1
6
:
5
9
53
18
F
38
0
13
:
0
0
-
1
3
:
5
9
59
19
SA
28
4
00
:
0
0
-
0
0
:
5
9
41
20
su
21
9
18
:
0
0
-
1
8
:
5
9
42
21
MO
23
4
16
:
0
0
-
1
6
:
5
9
38
22
TU
23
4
17
:
0
0
-
1
7
:
5
9
34
23
w
25
2
17
:
0
0
-
1
7
:
5
9
41
24
TH
28
3
16
:
0
0
-
1
6
:
5
9
45
25
F
35
0
16
:
0
0
-
1
6
:
5
9
65
26
SA
28
2
19
:
0
0
-
1
9
:
5
9
40
27
su
31
0
18
:
0
0
-
1
8
:
5
9
53
28
MO
31
5
18
:
0
0
-
1
8
:
5
9
51
29
TU
26
3
17
:
0
0
-
1
7
:
5
9
46
30
w
23
9
11
:
0
0
-
1
1
:
5
9
32
31
TH
27
2
17
:
0
0
-
1
7
:
5
9
36
84
5
0
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
r
k
i
n
g
De
p
a
r
t
m
e
n
t
Da
i
l
y
Ve
h
i
c
l
e
En
t
r
y
Re
p
o
r
t
-
Ma
y
20
1
2
13
t
h
St
Ga
r
a
g
e
-
G3
(o
l
d
17
A)
42
n
d
St
Ga
r
a
g
e
-
G6
(o
l
d
8A
)
To
t
a
l
Ve
h
i
c
l
e
Pe
a
k
Pe
r
i
o
d
Pe
a
k
Ve
h
i
c
l
e
To
t
a
l
Ve
h
i
c
l
e
Pe
a
k
Pe
r
i
o
d
Pe
a
k
Ve
h
i
c
l
e
En
t
r
i
e
s
Co
u
n
t
En
t
r
i
e
s
Co
u
n
t
33
1
17
:
0
0
-
1
7
:
5
9
56
62
9
08
:
0
0
-
0
8
:
5
9
11
1
38
5
16
:
0
0
-
1
6
:
5
9
61
59
1
07
:
0
0
-
0
7
:
5
9
11
4
47
2
1 8:
0
0
-
1
8
:
5
9
76
47
4
08
:
0
0
-
0
8
:
5
9
11
2
55
1
16
:
0
0
-
1
6
:
5
9
97
47
9
08
:
0
0
-
0
8
:
5
9
10
2
61
9
19
:
0
0
-
1
9
:
5
9
81
17
3
06
:
0
0
-
0
6
:
5
9
32
62
0
19
:
0
0
-
1
9
:
5
9
99
11
0
15
:
0
0
-
1
5
:
5
9
24
42
2
15
:
0
0
-
1
5
:
5
9
70
45
6
08
:
0
0
-
0
8
:
5
9
10
8
32
1
14
:
0
0
-
1
4
:
5
9
58
46
3
08
:
0
0
-
0
8
:
5
9
92
35
1
17
:
0
0
-
1
7
:
5
9
60
51
9
08
:
0
0
-
0
8
:
5
9
13
7
40
3
16
:
0
0
-
1
6
:
5
9
69
46
1
08
:
0
0
-
0
8
:
5
9
11
4
59
5
16
:
0
0
-
1
6
:
5
9
86
45
3
08
:
0
0
-
0
8
:
5
9
92
68
2
16
:
0
0
-
1
6
:
5
9
10
6
15
7
07
:
0
0
-
0
7
:
5
9
30
60
1
18
:
0
0
-
1
8
:
5
9
85
10
4
08
:
0
0
-
0
8
:
5
9
20
34
9
17
:
0
0
-
1
7
:
5
9
59
45
1
08
:
0
0
-
0
8
:
5
9
11
9
33
5
17
:
0
0
-
1
7
:
5
9
62
48
3
08
:
0
0
-
0
8
:
5
9
11
1
34
7
18
:
0
0
-
1
8
:
5
9
54
46
6
08
:
0
0
-
0
8
:
5
9
11
5
38
7
18
:
0
0
-
1
8
:
5
9
62
48
4
08
:
0
0
-
0
8
:
5
9
12
3
55
8
15
:
0
0
-
1
5
:
5
9
78
48
9
08
:
0
0
-
0
8
:
5
9
10
2
60
7
17
:
0
0
-
1
7
:
5
9
80
14
5
08
:
0
0
-
0
8
:
5
9
26
57
4
17
:
0
0
-
1
7
:
5
9
97
11
2
08
:
0
0
-
0
8
:
5
9
20
35
1
18
:
0
0
-
1
8
:
5
9
5
7
50
1
08
:
0
0
-
0
8
:
5
9
11
5
28
4
16
:
0
0
-
1
6
:
5
9
46
51
7
08
:
0
0
-
0
8
:
5
9
11
6
37
4
17
:
0
0
-
1
7
:
5
9
65
43
9
08
:
0
0
-
0
8
:
5
9
98
39
0
21
:0
0
-
2
1
:5
9
53
46
8
08
:
0
0
-
0
8
:
5
9
11
8
36
8
16
:
0
0
-
1
6
:
5
9
54
47
3
17
:
0
0
-
1
7
:
5
9
10
8
49
4
17
:
0
0
-
1
7
:
5
9
68
19
4
07
:
0
0
-
0
7
:
5
9
42
48
5
11
:
0
0
-
1
1
:
5
9
74
15
9
18
:
0
0
-
1
8
:
5
9
4
4
57
5
15
:
0
0
-
1
5
:
5
9
92
14
8
07
:
0
0
-
0
7
:
5
9
40
38
8
14
:
0
0
-
1
4
:
5
9
58
50
9
08
:
0
0
-
0
8
:
5
9
10
4
36
1
15
:
0
0
-
1
5
:
5
9
62
46
4
08
:
0
0
-
0
8
:
5
9
11
2
37
1
18
:
0
0
-
1
8
:
5
9
67
45
1
17
:
0
0
-
1
7
:
5
9
96
13
9
5
1
12
0
2
2
Pennsylvania Avenue Garage-G9 Total Vehicle Peak Period Peak Vehicle Entries Count 339 09:00-09:59 72 I 367 09:00-09:59 75 319 09:00-09:59 60 305 1 0:00-1 0:59 59 I 590 22:00-22:59 219 312 13:00-13:59 131 I 282 17:00-17:59 61 297 17:00-17:59 69 I 312 09:00-09:59 70 299 18:00-18:59 59 359 20:00-20:59 66 I 248 23:00-23:59 75 136 00:00-00:59 39 I 265 09:00-09:59 59 294 09:00-09:59 64 292 09:00-09:59 63 I 277 17:00-17:59 56 758 20:00-20:59 187 I 394 00:00-00:59 138 284 01:00-01:59 120 446 18:00-18:59 87 I 273 09:00-09:59 69 282 09:00-09:59 62 I 257 09:00-09:59 49 240 09:00-09:59 52 97 16:00-16:59 20 I 95 16:00-16:59 20 97 18:00-18:59 28 I 277 17:00-17:59 62 339 17:00-17:59 67 301 16:00-16:59 58 9433
Ma
y
-
1
1
*M
a
y
-
1
2
DI
F
F
%
*A
t
t
e
n
d
e
e
17
t
h
St
r
e
e
t
Ga
r
a
g
e
Pe
n
n
s
y
l
v
a
n
i
a
Av
e
G5
(o
l
d
2G
)
Ga
r
a
g
e
-
G9
~
96
,
2
0
0
.
1
9
~
27
,
9
3
5
.
0
4
96
,
6
1
4
.
2
2
33
,
8
1
7
.
8
0
$
41
4
.
0
3
$
5,
8
8
2
.
7
6
0.
4
3
%
21
.
0
6
%
La
b
o
r
am
o
u
n
t
s
ar
e
es
t
i
m
a
t
e
s
6%
Ex
p
e
n
s
e
s
16
t
h
St
r
e
e
t
Ga
r
a
g
e
G
4
(A
n
c
h
o
r
l
16
%
7t
h
St
r
e
e
t
<.
.
>
a
r
a
a
e
_
_
J
G1
(o
l
d
1G
)
18
%
PA
R
K
I
N
G
GA
R
A
G
E
EX
P
E
N
S
E
S
Ma
y
-
1
2
17
7
5
M
e
r
i
d
i
a
n
7t
h
St
r
e
e
t
Ga
r
a
g
e
CH
Ga
r
a
g
e
-
G7
G1
(o
l
d
1G
)
~ $
38
,
2
1
3
.
4
1
~
33
,
3
5
1
.
1
7
(4
,
8
6
2
.
2
4
}
$
-1
2
.
7
2
%
17
t
h
St
r
e
e
t
Ga
r
a
g
e
G5
(o
l
d
2G
)
28
%
Pe
n
n
s
y
l
v
a
n
i
a
Av
e
Ga
r
a
g
e
-
G
9
10
%
17
7
5
M
e
r
i
d
i
a
n
CH
G
a
r
a
g
e
-
G
7
10
%
62
,
3
1
6
.
9
7
62
,
8
8
6
.
2
0
56
9
.
2
3
0.
9
1
%
~ $
12
t
h
St
r
e
e
t
13
t
h
St
r
e
e
t
Ga
r
a
g
e
G
a
r
a
g
e
G2
(o
l
d
2A
)
G3
(o
l
d
17
A
)
17
,
1
3
6
.
6
4
$
20
,
2
0
4
.
4
7
$
3,
0
6
7
.
8
3
$
17
.
9
0
%
$1
0
0
,
0
0
0
.
0
0
$8
0
,
0
0
0
.
0
0
$6
0
,
0
0
0
.
0
0
$4
0
,
0
0
0
.
0
0
$2
0
,
0
0
0
.
0
0
$-
23
,
2
8
8
.
3
3
23
,
9
5
3
.
3
7
66
5
.
0
4
2.
8
6
%
0
·;
:
:
1i
i
0 >
i!
!
~
ii
5
c c
r::
Q)
c.
.
.
42
n
d
St
r
e
e
t
16th Street
Ga
r
a
g
e
Garage
G6
(o
l
d
8A
)
G4 (Aochor} TOTAL
~
16
,
1
2
2
.
7
3
~ 44,979.03 $ 326,192.34
15
,
8
1
4
.
3
2
55,305.66 $ 341,947.21
$
(3
0
8
.
4
1
}
$ 10,326.63 $ 15,754.87
-1
.
9
1
%
22.96% 4.83%
Ex
p
e
n
s
e
s
YT
D
c
0
.:
0
-[]
·~
1ii
1ii
1i
i
1ii 1ii
::
E
i!
!
~
i!
!
i!!
ii
5
~
L
(
)
(
f
)
ii
5
ii5 ii5
1'
-
.
..
.
c
-£
-£
-u
1'
-
.
"
-£
N
("
'
)
c -<> N ~
PA
R
K
I
N
G
GA
R
A
G
E
EX
P
E
N
S
E
S
YT
D
12
t
h
St
r
e
e
t
13
t
b
St
r
e
e
t
17
t
h
St
r
e
e
t
Ga
r
a
g
e
Pe
n
n
s
}
!
l
v
a
n
i
a
Av
e
17
7
5
M
e
r
i
d
i
a
n
7t
h
St
r
e
e
t
Ga
r
a
g
e
Ga
r
a
g
e
~
G5
(o
l
d
2G
)
Ga
r
g
g
e
-
G9
CH
Ga
r
a
g
e
-
G7
G1
(o
l
d
1G
)
G2
(o
l
d
2A
)
G3
(Q
i
d
17
A
)
Oc
t
-
1
1
$
10
2
,
0
1
9
.
9
8
~
34
,
3
0
7
.
4
4
~
37
,
7
5
5
.
4
8
~
67
,
3
4
7
.
9
9
~ 16
,
7
3
4
.
1
5
~
27
,
7
2
2
.
9
3
No
v
-
1
1
$
10
2
,
0
9
2
.
7
4
35
,
4
2
4
.
1
4
36
,
2
1
8
.
6
0
60
,
8
7
1
.
1
1
17
,
3
0
6
.
4
3
22
,
4
4
5
.
8
7
De
c
-
1
1
$
10
5
,
7
7
0
.
9
6
$
33
,
9
0
1
.
8
9
$
38
,
2
3
2
.
9
2
$
65
,
1
2
6
.
9
5
$
17
,
2
3
7
.
2
7
$
23
,
1
6
7
.
7
0
Ja
n
-
1
2
$
97
,
6
9
9
.
9
6
$
33
,
3
7
4
.
6
0
$
35
,
1
7
1
.
7
7
$
60
,
5
2
0
.
7
8
$
.
19
,
0
5
3
.
0
8
$
24
,
7
9
2
.
4
1
Fe
b
-
1
2
$
11
2
,
9
4
4
.
1
0
$
38
,
1
3
1
.
6
3
$
41
,
0
9
6
.
4
8
$
59
,
9
9
2
.
8
8
$
18
,
8
0
7
.
9
4
$
24
,
9
6
2
.
2
7
Ma
r
-
1
2
$
13
7
,
2
0
0
.
0
5
$
42
,
6
7
6
.
6
6
$
43
,
4
0
0
.
7
6
$
81
,
1
0
3
.
8
8
$
25
,
5
9
6
.
3
9
$
33
,
1
9
7
.
4
3
Ap
r
-
1
2
$
97
,
2
6
4
.
6
0
$
32
,
3
1
6
.
5
7
$
32
,
4
0
4
.
6
8
$
61
,
2
1
1
.
0
3
$
16
,
8
9
2
.
8
7
$
22
,
7
3
8
.
3
6
Ma
y
-
1
2
$
96
,
6
1
4
.
2
2
$
33
,
8
1
7
.
8
0
$
33
,
3
5
1
.
1
7
$
62
,
8
8
6
.
2
0
$
20
,
2
0
4
.
4
7
$
23
,
9
5
3
.
3
7
Ju
n
-
1
2
Ju
l
-
1
2
Au
g
-
1
2
Se
p
-
1
2
$
85
1
,
6
0
6
.
6
1
$
28
3
,
9
5
0
.
7
3
$
29
7
,
6
3
1
.
8
6
$
51
9
,
0
6
0
.
8
2
$
15
1
,8
3
2
.
6
0
$
20
2
,
9
8
0
.
3
4
-
$5
0
0
,
0
0
0
.
0
0
$4
5
0
,
0
0
0
.
0
0
$4
0
0
,
0
0
0
.
0
0
$3
5
0
,
0
0
0
.
0
0
$3
0
0
,
0
0
0
.
0
0
$2
5
0
,
0
0
0
.
0
0
$2
0
0
,
0
0
0
.
0
0
$1
5
0
,
0
0
0
.
0
0
$1
0
0
,
0
0
0
.
0
0
$5
0
,
0
0
0
.
0
0
I
/z
I~
ll
I~
ll
I
I
'
$-
6
~
).
!
c
~
42
n
d
St
r
e
e
t
Ga
r
a
g
e
G6
(o
l
d
SA
)
~
17
,
2
0
9
.
2
1
~
15
,
7
4
7
.
1
3
$
18
,
2
8
8
.
5
6
$
$
16
,
3
0
8
.
1
0
$
$
20
,
9
5
0
.
6
5
$
$
20
,
6
8
3
.
3
9
$
$
16
,
1
4
5
.
0
0
$
$
15
,
8
1
4
.
3
2
$
$
14
1
'1
4
6
.
3
6
$ 16th Street Garage G4 (8nchor) 59,272.27 82,985.82 58,295.73 56,267.40 60,361.20 76,923.60 52,768.78 55,305.66 502,180.46 ~~~;,s .... o ..... ~ G~~~ Q130.5t .... t; ...... Gll-!017"1 CJ'oh5t..oG .. o;o Glf,ldLGJ D"'-l'·""·~-a .. og.G9 TOTAL $ 362,369.45 $ 373,091.84 $ 360,021.98 $ 343,188.10 $ 377,247.15 $ 460,782.16 $ 331,741.89 $ 341,947.21 $ -$ -$ -$ -$2,950,389.78 DC4..!5o..,Go-"'l• G61o1H"l Q17j,5o..oc ... .., G2 !;'~ J,l.j •1n5,..,~ ... rnc;,..~·-GT Ul70.5ooo!G'""3• G5f,l~JG)
17
t
h
St
r
e
e
t
Ga
_
r
a
a
e
-
Pe
o
n
s
¥
1
y
a
n
i
a
Ay
e
2G
Ga
r
a
g
e
-
G9
Se
c
u
r
i
t
y
(S
A
&
Tr
a
n
s
V
a
l
u
e
)
~
23
,
1
4
1
.
6
1
~
4,
9
7
7
.
0
0
At
t
e
n
d
a
n
t
La
b
o
r
*
*
57
,
4
2
7
.
5
7
72
,
0
5
6
.
7
2
Ja
n
i
t
o
r
i
a
l
$
8,
5
5
0
.
0
0
$
8,
6
5
0
.
0
0
El
e
c
t
r
i
c
i
t
y
$
6,
7
7
4
.
0
4
$
2,
5
4
3
.
1
9
Ma
i
n
t
e
n
a
n
c
e
*
$
6,
7
2
1
.
0
0
$
5,
5
9
1
.
4
9
$
96
,
6
1
4
.
2
2
$
33
,
8
1
7
.
8
0
~
'
'
n
~
•
'
r
n
r
...
p
PA
R
K
I
N
G
GA
R
A
G
E
EX
P
E
N
S
E
S
CA
T
E
G
O
R
I
E
S
Ma
y
-
1
2
17
7
5
Me
r
i
d
i
a
n
CH
7t
h
St
r
e
e
t
12
t
h
St
r
e
e
t
Ga
r
a
a
e
13
t
h
St
r
e
e
t
Ga
r
a
g
e
-
G7
Ga
r
a
g
e
-
1G
-2
A
Ga
r
a
g
e
-
17
8
~
4,
6
6
2
.
4
1
~ 20
,
9
2
5
.
8
2
~
2,
7
9
6
.
4
5
~
5,
8
6
5
.
5
5
7,
8
7
7
.
0
4
22
,
5
3
4
.
7
0
72
,
0
7
3
.
3
5
7
7,
9
5
5
.
0
6
$
6,
8
1
8
.
5
5
$
7,
3
5
0
.
0
0
$
2,
1
1
0
.
0
0
$
2,
1
1
0
.
0
0
$
9,
4
4
2
.
1
7
$
2,
5
8
4
.
3
4
$
10
8
.
5
4
$
1,
9
5
0
.
2
1
$
4,
5
5
1
.
0
0
$
9,
4
9
1
.
9
4
$
3,
1
1
6
.
1
3
$
2,
0
7
2
.
5
5
$
33
,
3
5
1
.
1
7
$
62
,
8
8
6
.
2
0
$
20
,
2
0
4
.
4
7
$
23
,
9
5
3
.
3
7
42
n
d
Street
Ga
r
a
g
e
-
SA
~
3,322.63 5,567. 79
$
2,540.00
$
2,179.76
$
2,204.74
$
15,814.32
**
At
t
e
n
d
e
d
La
b
o
r
am
o
u
n
t
s
ar
e
es
t
i
m
a
t
e
s
.
$6
0
,
0
0
0
.
0
0
$5
0
,
0
0
0
.
0
0
$4
0
,
0
0
0
.
0
0
$3
0
,
0
0
0
.
0
0
$2
0
,
0
0
0
.
0
0
$1
0
,
0
0
0
.
0
0
$-
17
t
h
St
r
e
e
t
Ga
r
a
g
e
-
Pe
n
n
s
y
l
v
a
n
i
a
Av
e
17
7
5
Me
r
i
d
i
a
n
CH
7t
h
St
r
e
e
t
Ga
r
a
g
e
-
12
t
h
St
r
e
e
t
Ga
r
a
g
e
-
13
t
h
St
r
e
e
t
Ga
r
a
g
e
-
42
n
d
St
r
e
e
t
Ga
r
a
g
e
16
t
h
St
r
e
e
t
Ga
r
a
g
e
-
2G
Ga
r
a
g
e
-
G9
Ga
r
a
g
e
-
G7
1 G
2A
17
A
-
SA
An
c
h
o
r
16th Street Garaae ~ TOTAL ~ 18,023.18 ~ 83,714.65 23,739.49 747,229.92 $ 6,910.00 $ 45,038.55 $ 2,410.13 $ 27,992.38 $ 4,222.86 $ 37,971.71 $· 55,305.66 $ 341,947.21 IISec.ri)IISA&T..,.,,V<>'.o] Clkr••d.,.tlahcn•• Q;:lodo<>'y
,-
-
-
RE
V
E
N
U
E
20
1
1
20
1
2
LO
C
A
T
I
O
N
Ma
y
Ma
y
17
St
.
G
a
r
a
g
e
31
1
,
4
5
9
.
7
9
29
0
,
4
4
0
.
6
8
Ci
t
y
Ha
l
l
G
a
r
a
g
e
29
,
2
7
3
.
2
1
26
,
2
4
0
.
8
4
7
t
h
St
.
G
a
r
a
g
e
21
9
,
8
0
0
.
1
5
17
9
,
3
0
5
.
1
4
12
t
h
St
.
G
a
r
a
g
e
49
,
6
3
4
.
8
7
50
,
0
9
1
.
0
0
13
t
h
St
.
G
a
r
a
g
e
10
3
,
4
9
0
.
4
1
97
,
3
7
2
.
5
2
4
2
n
d
St
.
G
a
r
a
g
e
27
,
6
0
9
.
3
4
31
,
3
3
2
.
5
1
16
t
h
St
.
-
A
n
c
h
o
r
27
7
,
1
5
5
.
5
3
24
7
,
3
6
8
.
2
3
P
e
n
n
G
a
r
a
g
e
26
,
8
0
7
.
4
9
36
,
9
8
5
.
4
1
TO
T
A
L
S
1,
0
4
5
,
2
3
0
.
7
9
95
9
,
1
3
6
.
3
3
Re
v
e
n
u
e
Ex
p
e
n
s
e
s
Pe
r
Sp
a
c
e
Pe
r
Sp
a
c
e
17
St
.
Ga
r
a
g
e
19
8
.
9
3
66
.
1
7
Ci
t
y
Ha
l
l
Ga
r
a
g
e
40
.
3
7
51
.
3
1
7t
h
St
.
Ga
r
a
g
e
27
7
.
5
6
97
.
3
5
12
t
h
St
.
Ga
r
a
g
e
37
3
.
8
1
15
0
.
7
8
13
t
h
St
.
Ga
r
a
g
e
34
0
.
4
6
83
.
7
5
42
n
d
St
.
Ga
r
a
g
e
50
.
5
4
25
.
5
1
16
t
h
St
.
-A
n
c
h
o
r
30
8
.
0
6
68
.
8
7
Pe
n
n
Ga
r
a
g
e
67
.
2
5
61
.
4
9
F:
I
P
I
N
G
I
$
P
E
R
S
\
P
&
L
\
2
0
1
2
\
M
a
y
2
0
1
2
\
T
P
C
-
M
a
y
-
2
0
1
2
SJ
F
In
c
r
e
a
s
e
/
(D
e
c
r
e
a
s
e
)
(2
1
,
0
1
9
.
1
1
)
(3
,
0
3
2
.
3
7
)
(4
0
,
4
9
5
.
0
1
)
45
6
.
1
3
(6
,
1
1
7
.
8
9
)
3,
7
2
3
.
1
7
(2
9
,
7
8
7
.
3
0
)
10
,
1
7
7
.
9
2
(8
6
,
0
9
4
.
4
6
)
Pr
o
f
i
t
/
(
Lo
s
s
)
Pe
r
Sp
a
c
e
13
2
.
7
6
(1
0
.
9
4
)
18
0
.
2
2
22
3
.
0
3
25
6
.
7
1
25
.
0
3
23
9
.
1
8
5.
7
6
Pe
r
c
e
n
t
of
In
c
r
e
a
s
e
/
(D
e
c
r
e
a
s
e
)
-6
.
7
5
%
-1
0
.
3
6
%
-1
8
.
4
2
%
0.
9
2
%
-5
.
9
1
%
13
.
4
9
%
-1
0
.
7
5
%
37
.
9
7
%
-8
.
2
4
%
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
PA
R
K
I
N
G
DE
P
A
R
T
M
E
N
T
FI
N
A
N
C
I
A
L
RE
P
O
R
T
SU
M
M
A
R
Y
MA
Y
2
0
1
2
EX
P
E
N
S
E
S
PROFIT/(LOSS)
20
1
1
20
1
2
In
c
r
e
a
s
e
/
Pe
r
c
e
n
t
of
20
1
1
2012 Increase/ Percent of
Ma
y
Ma
y
(D
e
c
r
e
a
s
e
)
In
c
r
e
a
s
e
/
Ma
y
May (Decrease) Increase/
(D
e
c
r
e
a
s
e
)
(Decrease)
96
,
2
0
0
.
1
9
96
,
6
1
4
.
2
2
41
4
.
0
3
0.
4
3
%
21
5
,
2
5
9
.
6
0
193,826.46 (21,433.14) -9.96%
38
,
2
1
3
.
4
1
33
,
3
5
1
.
1
7
(4
,
8
6
2
.
2
4
)
-1
2
.
7
2
%
-8
,
9
4
0
.
2
0
-7,110.33 1,829.87 -20.47%
62
,
3
1
6
.
9
7
62
,
8
8
6
.
2
0
56
9
.
2
3
0.
9
1
%
15
7
,
4
8
3
.
1
8
1
1
6
,
4
1
8
.
9
4
(41,064.24) -26.08%
17
,
1
3
6
.
6
4
20
,
2
0
4
.
4
7
3,
0
6
7
.
8
3
17
.
9
0
%
32
,
4
9
8
.
2
3
29,886.53 (2,611.70) -8.04%
23
,
2
8
8
.
3
3
23
,
9
5
3
.
3
7
66
5
.
0
4
2.
8
6
%
80
,
2
0
2
.
0
8
73,419.15 (6,782.93) -8.46%
16
,
1
2
2
.
7
3
15
,
8
1
4
.
3
2
(3
0
8
.
4
1
)
-1
.
9
1
%
11
,
4
8
6
.
6
1
15,518.19 4,031.58 35.10%
44
,
9
7
9
.
0
3
55
,
3
0
5
.
6
6
10
,
3
2
6
.
6
3
22
.
9
6
%
23
2
,
1
7
6
.
5
0
192,062.57 (40,113.93) -17.28%
27
,
9
3
5
.
0
4
33
,
8
1
7
.
8
0
5,
8
8
2
.
7
6
21
.
0
6
%
-1
,
1
2
7
.
5
5
3,167.61 4,295.16 -380.93%
32
6
,
1
9
2
.
3
4
34
1
,
9
4
7
.
2
1
15
,
7
5
4
.
8
7
4.
8
3
%
71
9
,
0
3
8
.
4
5
617,189.12 (101 ,849.33) -14.16%
Th
e
17
t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
1,
4
6
0
sp
a
c
e
s
.
Th
e
Ci
t
y
Ha
l
l
Ga
r
a
g
e
ha
s
65
0
sp
a
c
e
s
.
Th
e
7t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
64
6
sp
a
c
e
s
.
Th
e
12
t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
13
4
sp
a
c
e
s
.
Th
e
13
t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
28
6
sp
a
c
e
s
.
Th
e
42
n
d
St
r
e
e
t
Ga
r
a
g
e
ha
s
62
0
sp
a
c
e
s
.
Th
e
16
t
h
St
r
e
e
t
-
An
c
h
o
r
Ga
r
a
g
e
ha
s
80
3
sp
a
c
e
s
.
Th
e
Pe
n
n
Ga
r
a
g
e
ha
s
55
0
sp
a
c
e
s
.
6/26/2012
RE
V
E
N
U
E
20
1
1
20
1
2
LO
C
A
T
I
O
N
Ma
y
Ma
y
YT
D
YT
D
17
St
.
G
a
r
a
g
e
2,
6
4
7
,
0
9
5
.
5
3
2,
6
3
0
,
4
2
2
.
2
0
Ci
t
y
Ha
l
l
G
a
r
a
g
e
33
2
,
0
9
6
.
2
5
28
7
,
6
7
7
.
1
2
7
t
h
St
.
G
a
r
a
g
e
1,
4
4
4
,
8
1
2
.
7
0
1
,
3
5
8
,
9
1
4
.
4
9
12
t
h
St
.
G
a
r
a
g
e
38
9
,
8
9
4
.
4
6
3
8
7
,
2
4
5
.
4
8
13
t
h
St
.
G
a
r
a
g
e
76
7
,
4
0
8
.
5
6
80
9
,
4
5
7
.
9
3
4
2
n
d
St
.
G
a
r
a
g
e
23
6
,
5
6
3
.
1
8
2
3
3
,
6
0
9
.
3
8
16
t
h
St
.
•
A
n
c
h
o
r
2,
0
7
3
,
0
9
6
.
1
4
1,
9
7
5
,
4
9
1
.
9
7
P
e
n
n
G
a
r
a
g
e
31
3
,
1
9
4
.
3
3
42
8
,
0
5
2
.
6
3
-TO
T
A
L
S
8,
2
0
4
,
1
6
1
.
1
5
8,
1
1
0
,
8
7
1
.
2
0
Re
v
e
n
u
e
Ex
p
e
n
s
e
s
Pe
r
Sp
a
c
e
Pe
r
Sp
a
c
e
17
St
.
Ga
r
a
g
e
1,
8
0
1
.
6
6
58
3
.
2
9
Ci
t
y
Ha
l
l
Ga
r
a
g
e
44
2
.
5
8
45
7
.
9
0
7t
h
St
.
Ga
r
a
g
e
2,
1
0
3
.
5
8
80
3
.
5
0
12
t
h
St
.
Ga
r
a
g
e
2,
8
8
9
.
8
9
1,
1
3
3
.
0
8
13
t
h
St
.
Ga
r
a
g
e
2,
8
3
0
.
2
7
70
9
.
7
2
42
n
d
St
.
Ga
r
a
g
e
37
6
.
7
9
22
7
.
6
6
16
t
h
St
.
-A
n
c
h
o
r
2,
4
6
0
.
1
4
62
5
.
3
8
Pe
n
n
Ga
r
a
g
e
77
8
.
2
8
51
6
.
2
7
F:
I
P
I
N
G
I
$
P
E
R
S
\
P
&
L
\
2
0
1
2
\
M
a
y
2
0
1
2
\
T
P
C
-
Y
T
D
-
M
a
y
-
2
0
1
2
SJ
F
In
c
r
e
a
s
e
/
(D
e
c
r
e
a
s
e
)
(1
6
,
6
7
3
.
3
3
)
(4
4
,
4
1
9
.
1
3
)
(8
5
,
8
9
8
.
2
1
)
(2
,
6
4
8
.
9
8
)
42
,
0
4
9
.
3
7
(2
,
9
5
3
.
8
0
)
(9
7
,
6
0
4
.
1
7
)
11
4
,
8
5
8
.
3
0
(9
3
,
2
8
9
.
9
5
)
Pr
o
f
i
t
!
(
Lo
s
s
)
Pe
r
Sp
a
c
e
1,
2
1
8
.
3
7
(1
5
.
3
1
)
1,
3
0
0
.
0
8
1,
7
5
6
.
8
1
2,
1
2
0
.
5
5
14
9
.
1
3
1,
8
3
4
.
7
6
26
2
.
0
0
Pe
r
c
e
n
t
of
In
c
r
e
a
s
e
/
(D
e
c
r
e
a
s
e
)
-0
.
6
3
%
-1
3
.
3
8
%
-5
.
9
5
%
-0
.
6
8
%
5.
4
8
%
-1
.
2
5
%
-4
.
7
1
%
36
.
6
7
%
-1
.
1
4
%
CI
T
Y
OF
MI
A
M
I
BE
A
C
H
PA
R
K
I
N
G
DE
P
A
R
T
M
E
N
T
FI
N
A
N
C
I
A
L
RE
P
O
R
T
SU
M
M
A
R
Y
-
Y
E
A
R
TO
DA
T
E
MA
Y
2
0
1
2
EX
P
E
N
S
E
S
PROFIT/(LOSS)
20
1
1
20
1
2
In
c
r
e
a
s
e
/
Pe
r
c
e
n
t
of
20
1
1
2012 Increase/ Percent of
Ma
y
Ma
y
(D
e
c
r
e
a
s
e
)
In
c
r
e
a
s
e
/
Ma
y
May (Decrease) Increase/
YT
D
YT
D
(D
e
c
r
e
a
s
e
)
YT
D
YTD (Decrease)
85
0
,
5
4
1
.
9
0
85
1
,
6
0
6
.
6
1
1,
0
6
4
.
7
1
0.
1
3
%
1,
7
9
6
,
5
5
3
.
6
3
1,778,815.59 (17,738.04) -0.99%
30
2
,
6
4
0
.
6
7
29
7
,
6
3
1
.
8
6
(5
,
0
0
8
.
8
1
)
-1
.
6
6
%
29
,
4
5
5
.
5
8
-9,954.74 (39,410.32) -133.80%
51
3
,
0
4
4
.
0
8
51
9
,
0
6
0
.
8
2
6,
0
1
6
.
7
4
1.
1
7
%
93
1
,
7
6
8
.
6
2
839,853.67 (91,914.95) -9.86%
14
5
,
8
3
4
.
7
0
15
1
,
8
3
2
.
6
0
5,
9
9
7
.
9
0
4.
1
1
%
24
4
,
0
5
9
.
7
6
235,412.88 (8,646.88) -3.54%
19
2
,
5
3
6
.
2
8
20
2
,
9
8
0
.
3
4
10
,
4
4
4
.
0
6
5.
4
2
%
57
4
,
8
7
2
.
2
8
606,477.59 31,605.31 5.50%
13
3
,
0
1
1
.
5
6
14
1
,
1
4
6
.
3
6
8,
1
3
4
.
8
0
6.
1
2
%
10
3
,
5
5
1
.
6
2
92,463.02 (11 ,088.60) -10.71%
36
8
,
7
1
9
.
0
1
50
2
,
1
8
0
.
4
6
13
3
,
4
6
1
.
4
5
36
.
2
0
%
1,
7
0
4
,
3
7
7
.
1
3
1,473,311.51 (231,065.62) -13.56%
18
5
,
1
3
4
.
4
4
28
3
,
9
5
0
.
7
3
98
,
8
1
6
.
2
9
53
.
3
8
%
12
8
,
0
5
9
.
8
9
144,101.90 16,042.01 12.53%
2,
6
9
1
,
4
6
2
.
6
4
2,
9
5
0
,
3
8
9
.
7
8
25
8
,
9
2
7
.
1
4
9.
6
2
%
5,
5
1
2
,
6
9
8
.
5
1
5,160,481.42 (352,217.09) -6.39%
Th
e
17
t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
1,
4
6
0
sp
a
c
e
s
.
Th
e
Ci
t
y
Ha
l
l
Ga
r
a
g
e
ha
s
65
0
sp
a
c
e
s
.
Th
e
7t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
64
6
sp
a
c
e
s
.
Th
e
12
t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
13
4
sp
a
c
e
s
.
Th
e
13
t
h
St
r
e
e
t
Ga
r
a
g
e
ha
s
28
6
sp
a
c
e
s
.
Th
e
42
n
d
St
r
e
e
t
Ga
r
a
g
e
ha
s
62
0
sp
a
c
e
s
.
Th
e
16
t
h
St
r
e
e
t
-
An
c
h
o
r
Ga
r
a
g
e
ha
s
80
3
sp
a
c
e
s
.
Th
e
Pe
n
n
Ga
r
a
g
e
ha
s
55
0
sp
a
c
e
s
.
6/26/2012
City of Miami Beach
5th and Alton Parking Garage
Fiscal Year beginning October 1, 2011 ending September 30, 2012
For the current month ending April30, 2012
Fiscal
Current Month Nole 1 YTD
Berkowtiz
Total Revenues Development 54% CMB46%
I Expenses Portion Portion CMB GL Nole2
Operating revenue:
484-8000-344405 5th & Alton Garage -Monthly $ 945.00 $ 510.30 $ 434.70 $ 7,923.36
484-8000-344406 5th & Alton Garage-Transient 40,441.53 21,838.43 18,603.10 142,148.46
484-8000-34441 0 5th & Alton Garage-Tenant 26,778.13 '14,460:19 12,317.94 85,324.26
484-8000-344587 Valet Parking (Off)-Taxable 20,678.66 11 '166.48 9,512.18 65,693.16
484-8000-369999 Miscellaneous Revenue 30.00 16.20 13.80 386.17
Total operating revenue 88,873.32 47,991.60 40,881.72 301,475.41
Operating expenses:
484-0470-000312 Professional Services 19,152.89 10,342.56 8,810.33 49,572.90
484-0470-000313 Bank Fees 538.63 290.86 247.77 1,482.79
484-0470-000314 Electricity 329.13 177.73 151.40 12,341.30
484-0470-000316 Telephone 777.10 419.63 357.47 2,496.81
484-0470-000317 Water 705.69 381.07 324.62 3,106.95
484-0470-000318 Sewer Charges 1,058.55 571.62 486.93 4,660.40·
484-0470-000319 Sanitation Fees 362.67
484-0470-000321 Postage and Shipping 28.80 15.55 13.25 159.00
484-0470-000324 Printing 4,454.64
484-0470-000325 Contract Maintenance 17,307.54 9,346.07 7,961.47 49,861.39
484-0470-000342 Repairs/Maintenance Supply 6,968.77 3,763.14 3,205.63 9,685.16
484-0470-000343 Other Operating Expenditures 3,300.13 1,782.08 1,518.05 15,711.54
484-0470-000349 Other Contractual Services 10,039.31 5,421.23 4,618.08 28,170.45
484-0470-000368 Taxes & Licenses 32.20
484-04 70-000484 Depreciation 120,033.16
Total operating expenses 60,206.54 32,511.54 27,695.00 302,131.36
Nonoperating revenue
484-8000-361130 Interest-Repurchase Agreement 10.80 5.83 4.97 23.51
Total nonoperating revenue 10.80 5.83 4.97 23.51
Net income/(loss) 28,677.58 15,485.89 13,191.69 (632.44)
Transfers In
Change in net assets 28,677,58 15,485.89 13,191.69 (632.44)
Net assets, beginning 271,076.56 146,381.35 124,695.21 13,922,185.18
Net assets, ending $ 299,754.14 $ 161,867.24 $ 137,886.90 $ 13,921,552.74
Note 1 : Source -Berkowitz Monthly Financial Statements
Note 2
: CMB-GL 06/07/2012 ~ . • {
Prepared by: Finance Department 06/07/2012-V_j "frYt I
PARKING DEPARTMENT METER REVENUE
%of USAGE
D Multi-Space (Credit
Card)
44%
II Multi-Space (Bill)
35%
May-12
Total Meter Revenue
1!1 lpark Revenue
3%
• Single Space (Coin)
12%
D Multi-Space (Coin)
6%
!P
A
R
K
DE
Y
:
I
C
E
SA
L
E
S
QT
Y
AM
O
U
N
T
RE
S
I
D
E
N
T
11
2
$
2,
2
4
0
.
0
0
NO
N
-
R
E
S
!
5
5
$
1,
1
0
0
.
0
0
1
6
7
$
3
,
3
4
0
.
0
0
!P
A
R
K
DE
Y
:
I
C
E
SA
L
E
S
Re
s
i
d
e
n
t
No
n
-
R
e
s
i
d
e
n
t
Oc
t
-
1
1
11
8
4
7
No
v
-
1
1
11
9
8
7
De
c
-
1
1
13
9
4
7
Ja
n
-
1
2
13
5
75
Fe
b
-
1
2
82
4
0
Ma
r
-
1
2
11
8
35
Ap
r
-
1
2
9
7
38
Ma
y
-
1
2
11
2
5
5
Ju
n
-
1
2
Ju
l
-
1
2
Au
g
-
1
2
Se
p
-
1
2
YT
D
9
2
0
4
2
4
IP
A
R
K
SA
L
E
S
Ma
y
-
1
2
$2
5
-
RE
L
O
A
D
SA
L
E
S
$5
0
-
RE
L
O
A
D
SA
L
E
S
QT
Y
AM
Q
U
N
T
48
8
$
12
,
2
0
0
.
0
0
11
9
$
2,
9
7
5
.
0
0
6
0
7
$
1
5
,
1
7
5
.
0
0
IP
A
R
K
S
A
L
E
S
YT
D
QT
Y
AM
O
U
N
T
61
2
$
3
0
,
6
0
0
.
0
0
2
0
7
$
10
,
3
5
0
.
0
0
8
1
9
$
4
0
,
9
5
0
.
0
0
TO
T
A
L
RE
L
O
A
D
S
$
42
,
8
0
0
.
0
0
$
13
,
3
2
5
.
0
0
$
5
6
,
1
2
5
.
0
0
$2
5
-
&E
L
O
A
D
SA
L
E
S
$5
0
-
RE
L
O
A
D
SA
L
E
S
To
t
a
l
Re
s
i
d
e
n
t
No
n
-
R
e
s
i
d
e
n
t
Re
s
i
d
e
n
t
No
n
-
R
e
s
i
d
e
n
t
16
5
4
9
7
15
5
5
2
2
.
162
20
6
49
2
12
8
5
5
4
161
18
6
5
4
5
15
6
61
5
164
21
0
5
5
0
16
7
7
0
9
182
12
2
4
6
6
14
0
5
7
8
179
15
3
5
3
6
11
0
64
0
201
13
5
5
1
7
13
7
5
8
5
187
16
7
4
8
8
11
9
61
2
207
0 0 0 0
1
3
4
4
4
0
9
1
1
1
1
2
4
8
1
5
1
4
4
3
NO
T
E
:
/P
a
r
k
sa
l
e
s
be
g
a
n
on
No
v
e
m
b
e
r
24
,
20
0
8
.
GRAND TOTAL $ 45,040.00 $ 14,425.00 $ 59,465.00 TOTAL REVENUE $ 53,800.00 $ 55,370.00 $ 60,195.00 $ 66,675.00 $ 55,440.00 $ 61,260.00 $ 57,650.00! $ 59,465.00 I $ 469,855.00
CITY OF MIAMI BEACH
PARKING DEPARTMENT
ELECTRONIC METER REVENUE COMPARISON
LOCATION Accounting Code
1 X· (Washington -4th & Lincoln) • On Street 480-8000.344501
P2 (1 A· (lsi Street & Ocean Dr.)· Off Street) 480-8000.344502
P2 (lA ·(lsi Street & Ocean Dr.)· Attended) 480-8000.344502
Total
P3 (1 B · (78 Washington Avenue)· Off Street) 480-8000-344617
2X-(Washington ·5th & Lincoln) -On Street 480-8000-344503
P11 (2B · (6/7 & Meridian)-Off Street) 480.8000.344505
3X-(Collins & Euclid Ave.) On Street 480-8000-344507
4X-(Alton 7th St.-Dade Blvd.) -On Street 480-8000.344509
4B ·{Alton & 20th St.-Purdy-Dade Blvd.)-On Street 480.8000-344511
P24 (4C · (West Ave & 17th St. ) · Off Street) 480-8000.344512
P23 (4D · (West Ave & Lincoln Rd. ) · Off Street) 480-8000.344513
P29 (5C-(Convention Ctr. Dr. & 17th Street)-Off Stree 480.8000-344517
P29 (5C-(Convention Ctr. Dr. & 17th Street)-Attended 480.8000-344517
Total
P33 (5H ·(19th Street & Meridian Ave)· Off Street)
6X-(Collins · 20th to 24th St) -On Street
P48 (6A · (22nd Street & Park) · Off Street)
P48 (6A · (22nd Street & Park) · Attended)
Total
P49 (6B · (Collins Ave & 21st Street)-Off Street)
P49 (6B · (Collins Ave & 21 sf Street) ·Attended)
Total
7X-(Ocean · Biscayne-15th St) -On Street
7A-(Collins Ave, 4th to 15th St)-On Street
P14 (7C · (Collins Ave & 6th St)-Off Street)
P14 (7C · (Collins Ave & 6th St) ·Attended)
Total
8X-(Pinetree·Aiton ·40th to 42nd St)· On Street
G6 (8A-(42nd Street Garage)-Off Street Meters)
P63 (8B-(42nd Street & Royal Palm)-Off Street)
P63 (8B-(42nd Street & Royal Palm)-Attended)
Total
P60 (8C · (40/41 Street & Chase)· Off Street)
P64 (8D-(47th Street & Pinetree)-Off Street)
P61 (8E · (41 sf Street & Alton) · Off Street)
P62 (8F · (41st Street & Jefferson) · Off Street)
9X · (Collins· 64th to 79th St)· On Street
P84 (9A ·(Harding & 71 sf St)-Off Street)
P92 (98 · (72nd St. & Collins) · Oil Street)
P92 (98 • (72nd St. & Collins) · Attended)
Total
P85 (9C (Carlyle & 71 st St)-Off Street)
F:IPINGI$PERSIP&L\2012\NEWMETER-FY11-12
SJF
480-8000.344521
480-8000-344522
480-8000-344523
480.8000-344523
480-8000-344524
480-8000.344524
480-8000-344525
480-8000-344526
480.8000-344528
480-8000-344528
480-8000.344530
480.8000.344531
480-8000.344532
480-8000.344532
480-8000.344533
480.8000-344534
480.8000-344535
480-8000.344536
480.8000.344537
480-8000-344538
480-8000-344539
480-8000-344539
480-8000-344540
May2012
#of Spaces 2011
May
291 $118,902.46
62 $31,483.33
0 $0.00
62 31,483.33
12 $1,151.18
370 $93,860.58
25 $1,280.43
68 $12,646.57
491 $121,840.64
213 $22,718.36
66 $15,288.69
30 $4,168.30
85 $10,155.76
0 12,420.56
85 22,576.32
27 $1,978.87
236 $57,767.99
14 $709.46
$0.00
$709.46
190 $84,407.27
0 0.00
190 84,407.27
442 $157,837.94
591 $249,352.40
14 $1,273.17
0 0.00
14 1,273.17
386 $21 '149.55
11 $539.15
173 $3,935.62
0 0.00
173 3,935.62
88 $1,744.99
16 $0.00
40 $3,779.61
30 $566.69
527 $46,619.77
48 $6,151.97
0 $24,109.50
0 0.00
0 24,109.50
14 $211.38
Page 1 af3
2012 Increase/ %of
May (Decrease) lnc/(Dec)
$112,763.12 (6,139.34) -5.16%
$33,800.52 2,317.19
$0.00
33,800.52 2,317.19 7.36%
$675.93 (475.25) -41.28%
$99,322.78 5,462.20 5.82%
$687.16 (593.27) -46.33%
$14,590.12 1,943.55 15.37%
$135,496.89 13,656.25 11.21%
$20,753.15 (1,965.21) -8.65%
$22,667.11 7,378.42 48.26%
$3,827.94 (340.36) -8.17%
$14,841.71 4,685.95
7,654.21
22,495.92 (80.40) -0.36%
$2,480.32 501.45 25.34%
$81,726.90 23,958.91 41.47%
$635.46 (74.00) -10.43%
$0.00
$635.46
$67,912.95
0.00
67,912.95 (16,494.32) -19.54%
$143,246.37 (14,591.57) -9.24%
$259,080.69 9,728.29 3.90%
$1,475.70
0.00
1,475.70 202.53 15.91%
$40,436.67 19,287.12 91.19%
$537.68 (1.47) -0.27%
$4,210.20
0.00
4,210.20 274.58 6.98%
$1,609.51 (135.48) -7.76%
$0.00 0.00 #DIV/0!
$3,417.59 (362.02) -9.58%
$764.17 197.48 34.85%
$52,548.15 5,928.38 12.72%
$3,897.10 (2,254.87) -36.65%
$29,741.35
0.00
29,741.35 5,631.85 23.36%
$283.58 72.20 34.16%
6/26/2012
LOCATION
P86 (9D-(Collins & 76th St) ·Off Street)
P83 (9E-(71st St. & Herding)· Off Street)
P106 (9F -(75th & Collins ) · Off Street)
P25 (lOA-(lincoln Lane & Lenox}-Off Street}
lOB-(Lincoln Lane & Michigan) -Lease
1 OB-(Lincoln lane & Michigan) -AHended
Total
P27 ( 1 OC -(lincoln Lane & Meridian} -Off Street)
P20 (I 00-(lincoln Lane & Jefferson -W} -Off Street)
P19 (IDE-(lincoln Lane &Jefferson-E)-Off Street)
PIB (I OF-(lincoln Lane & Euclid} -Off Street}
P21 ( 1 OG -(lincoln Lane & Michigan} -Off Street}
P15 (11 X-(Collins & 11th Street) -Off Street)
P15 (11 X-(Collins & 11th Street) -AHended)
Total
P12 (12X -(Washington & 9th Street)· Off Street)
P12 (12X -(Washington & 9th Street)· AHended)
Total
P13 (l3X -(Washington & 1Oth Street)· Off Street)
P13 (l3X -(Washington & 1Oth Street)· AHended)
Total
15X ·(16th to 18th East of Collins}· On Street
15A · (Washington, I 7th to 20th} • On Street
J 58 -{Convention Center Drive) -On Sfreef
16X · (25th to 32nd, E of Collins) -On Street
16A -(35th to 43rd, E of Collins)-On Street
168 · (Indian Crk Dr, 27th to 32nd) -On Street
16C -(Indian Crk-33rd to 43rd)-On Street
P56 (160-(Collins Ave & 34th St)-Off Street}
P56 (I 60 -(Collins Ave & 34th St} -Attended)
Total
P57 (16E-(Collins Ave & 35th St}-Off Street)
P57 (16E-(Collins Ave & 35th St}-Attended)
Totol
P16 (17X -(Collins & 13th Street)-Off Street)
P16 (17X -(Collins & 13th Street)-AHended)
Total
PB2 (I BX-(Indian Crk & 65th St} -Off Street}
PBI (IBA-(Collins & 64th St}-Off Street}
PBI (I 8A-(Collins & 64th St} -Attended}
Total
P71 (19X-(Collins & 46th Street}-Off Street}
P71 (19X ·(Collins & 46th Street}-Attended}
Total
19A -(Collins & 46th Street)-On Street
F:IPING\$PERS\P&L\2012\NEWMETER-FY11-12
SJF
CITY OF MIAMI BEACH
PARKING DEPARTMENT
ELECTRONIC METER REVENUE COMPARISON
May2012
Accounting Cede #of Spaces 2011
Moy
480-8000-344541 33 $1,888.14
480-8000-344542 31 $0.00
480-8000-344543 106 $7,902.56
480-8000-344544 70 $31,484.57
480-8000-344545 0 $16,355.14
480-8000-344545 0 0.00
0 16,355.14
480-8000-344546 141 $66,653.09
480-8000-344547 62 $24,506.69
480-8000-344548 19 $8,953.38
480-8000-344549 36 $18,549.89
480-8000-344550 21 $6,976.73
480-8000-344551 0 $0.00
480-8000-344551 0 0.00
0 0.00
480-8000-344552 23 $9,744.19
480-8000-344552 0 0.00
23 9,744.19
480-8000-344553 33 $19,050.56
480-8000-344553 0 0.00
33 19,050.56
480-8000-344556 43 $37,251.42
480-8000-344557 91 $10,498.14
480-8000-344558 46 $5,695.14
480-8000-344559 78 $18,410.78
480-8000-344560 117 $19,434.51
480-8000-344561 219 $11,316.38
480-8000-344562 230 $20,708.55
480-8000-344563 64 $4,969.75
480-8000-344563 0 0.00
64 4,969.75
480-8000-344564 72 $5,519.67
480-8000-344564 0 0.00
72 5,519.67
480-8000-344565 54 $28,953.63
480-8000-344565 0 0.00
54 28,953.63
480-8000-344567 53 $2,109.25
480-8000-344568 67 $11,793.29
480-8000-344568 0 0.00
67 11,793.29
480-8000-344569 449 $73,193.21
480-8000-344569 0 40,645.79
449 113,839.00
480-8000-344570 19 $790.29
Page 2 of3
2012 Increase/ %of
May (Decrease) lnc/(Dec)
$2,266.02 377.88 20.01%
$1,231.55 1,231.55 #DIV/01
$9,852.85 1,950.29 24.68%
$33,082.57 1,598.00 5.08%
$16,355.14
0.00
16,355.14 0.00 0.00%
$58,851.55 (7,801.54} -11.70%
$23,465.18 (1,041.51} -4.25%
$9,175.99 222.61 2.49%
$20, I 14.47 1,564.58 8.43%
$7,278.66 301.93 4.33%
$581.52
0.00
581.52 581.52 #OIV/01
$10,823.78 1,079.59 11.08%
0.00
10,823.78 1,079.59 11.08%
$18,413.61
0.00
18,413.61 (636.95) -3.34%
$28,443.56 (8,807.86} -23.64%
$9,773.89 (724.25} -6.90%
$6,504.25 809.11 14.21%
$18,974.44 563.66 3.06%
$21,046.42 1,611.91 8.29%
$20,412.83 9,096.45 80.38%
$36,667.63 15,959.08 77.07%
$6,214.26
0.00
6,214.26 1,244.51 25.04%
$7,350.02
0.00
7,350.02 1,830.35 33.16%
$28,215.06
0.00
28,215.06 (738.57) -2.55%
$1,573.34 (535.91) -25.41%
$11,752.37
0.00
11,752.37 (40.92) -0.35%
$70,137.67
26,842.05
96,979.72 (16,859.28) -14.81%
$796.63 6.34 0.80%
6/26/2012
CITY OF MIAMI BEACH
PARKING DEPARTMENT
ELECTRONIC METER REVENUE COMPARISON
May 2012
LOCATION Accounting Code #of Spaces 2011 2012 Increase/ o/o of
May May (Decrease) lnc/(Dec)
P72 (19B · (Collins & 53rd Street) · Off Street) 480.8000.344571 158 $13,291.60 $12, 12S.71
P72 (l9B ·(Collins & 53rd Street)· AHended) 480.8000.344571 0 0.00 0.00
Total 158 13,291.60 12,125.71 (1,165.89) -8.77%
P55 (20X · (Collins Ave & 27th St) · Off Street) 480-8000.344572 121 $4,670.69 $S,66S.S7
P55 (20X · (Collins Ave & 27th St) · AHended) 480-8000-344572 0 0.00 0.00
Total 121 4,670.69 5,665.57 994.88 21.30%
P91 (22X ·(Carlyle & 72nd St) ·Off Street) 480.8000.34457 4 45 $863.22 $818.28 (44.94) ·5.21%
Pll 0 (23X · (83rd & Abba«)· Off Street) 480.8000.344575 25 $12S.83 $141.74 15.91 12.64%
24X · (Normandy Isle & Bay Dr) · On Street 480.8000.344576 102 $7,966.03 $1S,698.11 7,732.08 97.06%
P89 (24A · (Normandy Isle & Bay Dr) · Off Street) 480.8000-344577 26 $1,322.8S $l,SS0.42 227.57 17.20%
P88 (24B · (Normandy Isle & Vendome) · Off StreeO 480.8000.344578 22 $274.54 $916.85 642.31 233.96%
PB7 (24C · (Normandy Isle & Bay Rd S/S) · Off Street) 480.8000.344579 33 $1,236.07 $993.S2 (242.55) -19.62%
P90 (25X ·(Bonita Drive & 71 st St) ·Off Street) 480-8000.344580 15 $22S.68 $363.39 137.71 61.02%
26X ·(Collins, 79th to 87th Terr) ·On Street 480-8000-344581 283 $8,122.28 $7,848.17 (274.11) -3.37%
26Z · (Collins & 87th Street) · Off Street 480.8000-344616 15 $384.44 $2S9.27 (125.17) -32.56%
P26 (I OX· (Lincoln [one & [enox) ·Off Street) 480-8000-344582 99 $44,076./S $42,488.71
P26 (lOX· (Lincoln [one & [enox · Allended) 480.8000-344582 0 0.00 0.00
Totol 99 44,076./S 42,488.71 (1,587.44) -3.60%
Pl OB (26A ·(Collins & 80th Street)· Off Street) 480.8000-344584 62 $2,830.90 $2,293.77
Pl 08 (26A ·(Collins & 80th Street)· Attended) 480-8000.344584 0 0.00 0.00
Total 62 2,830.90 2,293.77 (537.13) -18.97%
Plll (26B ·(Collins & 84th Street)· Off Street) 480-8000-344585 62 $3,468.7S $2,819.81 (648.94) -18.71%
P46 (4E (Purdy & l Bth Street) · Off Street) 480.8000.344586 39 $20,657.62 $22,793.54
P46 (4E (Purdy & 18th Street) ·Attended) 480.8000.344586 0 0.00 0.00
Totol 39 20,657.62 22,793.54 2,135.92 10.34%
P58 (8G · (40th Street & Royal Palm) · Off Street) 480.8000.344592 43 $2,529.12 $2,143.94 (385.18) -15.23%
P59 (8H · (40th Street & Prairie) · Off Street) 480.8000-344594 71 $2,064.76 $2,095.25 30.49 1.48%
Pl 07 (26C · (Collins & 79th Street) · Off Street) 480-8000.344600 34 $769.22 $489.84 (279.38) -36.32%
Pl 09 (26D ·(Collins & 83rd Street)· Off Street) 480.8000-344601 95 $952.96 $557.89 (395.07) -41.46%
Pl 09 (26D ·(Collins & B3rd Street)· AHended) 480.8000-344601 0 $0.00 $0.00
Total 95 952.96 557.89 (395.07) -41.46%
Pl (SLSPOO · (South Point Lot) · Off Street) 480-8000-344602 215 $34,335.23 $39,086.03
Pl (SLSPOO ·(South Point Lot)· AHended) 480-8000-344602 0 23,349.53 17,512.14
Total 215 57,684.76 56,598.17 (1,086.59) -1.88%
P5 (4th & Alton Lot· Off Street) 480-8000.344604 21 $1,214.25 $817.57 (396.68) -32.67%
4A · l 833 Bay Road . Off Street 480-8000.344608 0 $0.00 $0.00 0.00 #DIV/01
7D · l 0-llth & Collins (Lease) 480.8000-344529 0 $3,663.55 $3,663.55 0.00 0.00%
P22 (IOH ·(Lincoln Rd. So. & [enoxJ ·Off Street) 480-8000.344611 0 $8,528.96 $12,273.88 3,744.92 43.91%
l4A · 16th Street & Washington (Lease) 480.8000-344555 0 $16,355.14 $16,355.14 0.00 0.00%
P4 · (137 Washington Avenue) ·Off Street 480-8000.344516 0 $9,195.05 $10,476.47 1,281.42 13.94%
P50 · (24th Street & Flamingo Drive) · Off Street 480.8000-344619 23 $0.00 $0.00 0.00 #DIV/01
PSI · (23rd Street & Liberty Avenue East) · Off Street 480.8000-344620 20 $6,928.23 $9,553.31
PSI · (23rd Street & Liberty Avenue East) · Allended 480-8000-344620 0 0.00 0.00
Total 6,928.23 9,SS3.31 2,62S.08 37.89%
PS2 · (23rd Street & Liberty Avenue West) ·Off Street 480-8000-344621 35 $9,79S.S2 $ll,S43.72
PS2 · (23rd Street & Liberty Avenue West) · Allended 480.8000-344621 0 0.00 0.00
Total 9,79S.S2 ll,S43.72 1,748.20 17.85%
P80· (71 st Street & Byron) ·Off Street 480.8000.344618 0 $62/.Sl $700.11
P80 ·(7lst Street & Byron) ·AIIended 480.8000-344618 0 0.00 0.00
Total 0 62l.Sl 700.11 78.60 12.65%
G7 (MMPF-1755 Meridian Ave) 480.8000.344414 1,145.26 1,3S9.44
$1 ,842,37LB7 $1 ;912,687.48
F:IPING\$PERSIP&L\2012\NEWMETER·FY11·12
SJF Page 3 of 3 6/26/2012
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
r
k
i
n
g
De
p
a
r
t
m
e
n
t
Pr
o
f
i
t
&
Lo
s
s
St
a
t
e
m
e
n
t
Ga
r
a
g
e
s
&
lo
t
s
-
FY
1
0/
1
1
G
5
-
17
t
h
St
r
e
e
t
Go
m
a
e
-
2G
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
O
c
t
o
b
e
r
17
t
h
St
r
e
e
t
G
a
r
a
g
e
-
2G
Re
v
e
n
u
e
-
T
i
c
k
e
t
48
0
-
8
0
0
0
-
3
4
4
5
8
3
23
2
,
5
7
3
.
8
6
Re
v
e
n
u
e
-
Sp
a
c
e
Re
n
t
a
l
48
0
-
8
0
0
0
-
3
4
4
5
8
3
0.
0
0
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
48
0
-
8
0
0
0
-
3
4
4
5
1
4
74
,
6
2
0
.
0
0
17
t
h
St
.
-
2G
RE
V
E
N
U
E
30
7
,
1
9
3
.
8
6
(S
o
l
e
s
T ox
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
Pe
r
s
o
n
n
e
l
32
,
9
9
9
.
6
7
At
t
e
n
d
a
n
t
/
C
a
s
h
i
e
r
La
b
o
r
48
,
1
7
7
.
1
4
FP
&
L
7,
6
3
9
.
8
2
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
l
a
n
a
n
c
e
7,
5
3
4
.
6
0
Ar
m
e
d
Gu
a
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
48
5
.
3
3
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
4,
4
5
4
.
5
0
La
n
d
s
c
a
p
e
an
d
lo
t
Ma
i
n
t
e
n
a
n
c
e
17
6
.
0
0
Su
r
v
e
i
l
l
a
n
c
e
Sy
s
t
e
m
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
9,
6
4
7
.
0
2
17
t
h
St
.
-
2G
EX
P
E
N
S
E
S
11
1
,
1
1
4
.
0
8
17
t
h
St
.
PR
O
F
I
T
/(
L
O
S
S
)
19
6
,
0
7
9
.
7
8
G
7
-
Ci
t
v
Ha
l
i
_
G
_
r
u
g
_
c
r
n
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
O
c
t
o
b
e
r
Ci
t
y
Ha
l
l
G
a
r
a
g
e
-
G
7
Re
v
e
n
u
e
-
T
i
c
k
e
t
48
0
-
8
0
0
0
-
3
4
4
4
0
7
8,
6
9
7
.
1
9
Re
v
e
n
u
e
-
Sp
a
c
e
Re
n
t
a
l
48
0
-
8
0
0
0
-
3
4
4
4
0
9
28
,
8
2
3
.
4
8
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
48
0
-
8
0
0
0
-
3
4
4
4
0
8
5,
3
2
0
.
0
0
CH
G
-
G
7
RE
V
E
N
U
E
42
,
8
4
0
.
6
7
(S
o
l
e
s
T ox
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
Pe
r
s
o
n
n
e
l
3,
9
8
9
.
6
8
At
t
e
n
d
a
n
t
/
C
a
s
h
i
e
r
la
b
o
r
7,
5
2
1
.
7
7
FP
&
L
11
,
2
7
6
.
7
8
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
l
a
n
a
n
c
e
0.
0
0
Ar
m
e
d
Gu
a
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
0.
0
0
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
La
n
d
s
c
a
p
e
an
d
lo
t
Ma
i
n
t
e
n
a
n
c
e
17
6
.
0
0
Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
9,
7
2
1
.
0
0
CH
G
-
G
7
EX
P
E
N
S
E
S
32
,
6
8
5
.
2
3
CH
G
PR
O
F
I
T
/(
L
O
S
S
)
10
,
1
5
5
.
4
4
F:
\
P
I
N
G
\
$
M
A
N
\
R
A
R
\
P
a
r
k
i
n
g
S/
a
/
u
s
Re
p
o
t
i
\
G
a
r
a
g
e
s
FY
I
I
2
0
1
0
No
v
e
m
b
e
r
22
7
,
0
2
0
.
5
5
0.
0
0
74
,
8
3
0
.
0
0
30
1
,
8
5
0
.
5
5
23
,
1
3
5
.
8
4
53
,
8
9
9
.
6
0
7,
1
2
9
.
2
6
4,
0
4
5
.
4
0
48
5
.
3
3
1,
2
5
0
.
0
0
17
6
.
0
0
0.
0
0
9,
6
4
7
.
0
2
99
,
7
6
8
.
4
5
20
2
,
0
8
2
.
1
0
2
0
1
0
No
v
e
m
b
e
r
26
,
0
6
4
.
4
9
13
,
4
1
6
.
6
6
5,
6
7
0
.
0
0
45
,
1
5
1
.
1
5
3,
9
8
7
.
1
3
10
,
7
2
6
.
0
1
12
,
2
2
4
.
1
1
0.
0
0
0.
0
0
0.
0
0
17
6
.
0
0
9,
7
2
1
.
0
0
36
,
8
3
4
.
2
5
8,
3
1
6
.
9
0
2
0
1
0
20
1
1
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
24
5
,
0
1
3
.
0
3
25
4
,
1
3
5
.
5
1
27
8
,
9
6
4
.
4
9
31
4
,
7
9
1
.
6
2
0.
0
0
0.
0
0
0.
0
0
0.
0
0
75
,
6
0
0
.
0
0
72
,
1
0
0
.
0
0
73
,
3
6
0
.
0
0
70
,
0
7
0
.
0
0
32
0
,
6
1
3
.
0
3
32
6
,
2
3
5
.
5
1
35
2
,
3
2
4
.
4
9
38
4
,
8
6
1
.
6
2
28
,
2
5
3
.
4
8
2
4
,
8
6
2
.
4
2
21
,
6
4
8
.
3
3
25
,
5
4
7
.
1
6
63
,
5
9
6
.
2
5
48
,
5
9
8
.
1
6
59
,
6
9
9
.
3
2
70
,
7
0
0
.
6
7
7,
7
7
8
.
6
6
7,
3
4
1
.
1
5
6,
9
1
3
.
4
7
6
,
9
2
5
.
5
8
6,
3
4
0
.
7
0
4,
0
4
5
.
4
0
6,
4
3
5
.
6
5
4,
5
8
3
.
4
0
48
5
.
3
3
4
8
5
.
3
3
4
8
5
.
3
3
4
8
5
.
3
3
4,
5
4
8
.
7
5
1,
2
5
0
.
0
0
2,
1
2
0
.
0
0
1,
9
8
9
.
5
0
88
.
0
0
44
.
0
0
44
.
0
0
44
.
0
0
0.
0
0
0.
0
0
0.
0
0
2,
1
8
6
.
0
0
9,
6
4
7
.
0
2
9,
6
4
7
.
0
2
9,
6
4
7
.
0
2
9,
6
4
7
.
0
2
12
0
,
7
3
8
.
1
9
96
,
2
7
3
.
4
8
10
6
,
9
9
3
.
1
2
12
2
,
1
0
8
.
6
6
19
9
,
8
7
4
.
8
4
22
9
,
9
6
2
.
0
3
24
5
,
3
3
1
.
3
7
26
2
,
7
5
2
.
9
6
2
0
1
0
20
1
1
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
28
,
1
8
1
.
2
3
13
,
0
2
8
.
9
6
47
,
7
2
3
.
3
3
22
,
0
7
1
.
9
5
13
,
4
1
6
.
6
6
13
,
4
1
6
.
6
6
13
,
4
1
6
.
6
6
13
,
4
1
6
.
6
6
5,
6
7
0
.
0
0
5,
1
8
0
.
0
0
4,
3
4
0
.
0
0
4,
3
4
0
.
0
0
47
,
2
6
7
.
8
9
31
,
6
2
5
.
6
2
65
,
4
7
9
.
9
9
39
,
8
2
8
.
6
1
4,
9
8
6
.
3
0
4,
4
0
1
.
3
6
3,
9
8
8
.
4
0
4,
5
5
2
.
5
9
10
,
6
6
0
.
1
4
8,
1
1
8
.
1
3
10
,
4
3
5
.
3
8
12
,
0
0
8
.
6
4
11
,
7
9
2
.
0
9
10
,
6
6
"
9
.
9
6
11
,
7
9
2
.
0
9
10
,
3
7
0
.
3
4
2,
2
5
0
.
0
0
2,
0
0
0
.
0
0
2,
0
0
0
.
0
0
2,
0
0
0
.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
1,
6
2
5
.
0
0
1,
6
2
5
.
0
0
17
6
.
0
0
0.
0
0
0.
0
0
0.
0
0
12
,
2
2
1
.
0
0
9,
7
2
1
.
0
0
9,
7
2
1
.
0
0
9,
7
2
1
.
0
0
42
,
0
8
5
.
5
3
34
,
9
1
0
.
4
5
39
,
5
6
1
.
8
7
40
,
2
7
7
.
5
7
5,
1
8
2
.
3
6
-3
,
2
8
4
.
8
3
25
,
9
1
8
.
1
2
-4
4
8
.
9
6
20
1
1
20
1
1
20
1
1
2011 2011 2011 FY
Ap
r
i
l
M
a
y
Ju
n
e
July August September 2010/2011 TOTAL
26
9
,
4
7
6
.
6
8
24
0
,
7
5
9
.
7
9
20
2
,
8
4
9
.
5
3
233,813.09 195,567.29 224,999.97 2,919,965.41
0.
0
0
0.
0
0
0.
0
0
0.00 0.00 0.00 0.00
73
,
0
8
0
.
0
0
70
,
7
0
0
.
0
0
72
,
4
1
5
.
0
0
71,540.00 71,820.00 71,120.00 871,255.00
34
2
,
5
5
6
.
6
8
31
1
,
4
5
9
.
7
9
27
5
,
2
6
4
.
5
3
305,353.09 267,387.29 296,119.97 3,791,220.41
19
,
5
4
7
.
8
8
19
,
5
4
7
.
8
8
24
,
8
9
5
.
9
8
27,980.33 23,230.45 25,057.64 296,707.06
51
,
3
0
6
.
5
3
49
,
2
5
7
.
0
0
51
,
3
5
0
.
4
3
56,918.44 44,003.49 51,507.99 649,015.02
7,
5
5
7
.
2
0
7,
6
6
3
.
5
6
7
,
5
9
9
.
9
7
8,413.52 7,564.23 8,248.36 90,774.78
5,
8
6
1
.
6
5
7,
1
0
4
.
4
0
4,
0
4
5
.
4
0
4,347.40 5,475.40 4,404.15 64,223.55
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
485.33 485.33 485.33 5,823.96
2,
1
9
9
.
1
2
1,
3
2
9
.
1
2
3,
3
0
1
.
1
2
1,743.00 2,430.00 1,250.00 27,865.11
44
.
0
0
88
.
0
0
5,
2
5
8
.
0
0
220.00 220.00 176.00 6,578.00
69
7
.
0
0
69
7
.
0
0
0.
0
0
697.00 697.00 697.00 5,671.00
9,
6
4
7
.
0
2
10
,
0
2
7
.
9
0
9,
6
4
7
.
0
2
14,547.02 9,647.02 13,000.00 124,398.10
97
,
3
4
5
.
7
3
96
,
2
0
0
.
1
9
10
6
,
5
8
3
.
2
5
115,352.04 93,752.92 104,826.47 1,271,056.58
24
5
,
2
1
0
.
9
5
21
5
,
2
5
9
.
6
0
16
8
,
6
8
1
.
2
8
190,001.05 173,634.37 191,293.50 2,520, 163.83
20
1
1
20
1
1
20
1
1
2011 2011 2011 FY
Ap
r
i
l
M
a
y
Ju
n
e
July August September 2010/2011 TOTAL
10
,
4
2
2
.
4
5
9,
2
0
6
.
5
5
5,
0
7
4
.
7
7
5,451.39 8,216.84 14,278.47 198,417.62
13
,
4
1
6
.
6
6
13
,
4
1
6
.
6
6
13
,
4
1
6
.
6
6
13,416.66 13,416.66 13,416.65 176,406.73
6,
7
9
0
.
0
0
6,
6
5
0
.
0
0
7,
0
0
0
.
0
0
6,720.00 6,580.00 6,580.00 70,840.00
30
,
6
2
9
.
1
1
29
,
2
7
3
.
2
1
25
,
4
9
1
.
4
3
25,588.05 28,213.50 34,275.12 445,664.35
3,
5
6
2
.
9
6
3,
5
6
2
.
9
6
5,
8
8
4
.
5
4
5
,
3
8
8
.
5
6
5,022.13 7,945.55 57,272.16
9,
4
8
9
.
8
8
9,
0
2
1
.
0
0
8,
1
4
1
.
3
9
8,769.14 7,012.03 8,463.70 110,367.21
11
,
6
7
3
.
5
2
11
,
7
0
3
.
9
5
11
,
5
1
2
.
4
1
13,025.06 11,369.13 12,449.08 139,858.52
2,
0
0
0
.
0
0
2,
2
6
7
.
5
0
2,
0
0
0
.
0
0
2,000.00 2,000.00 2,000.00 20,517.50
0.
0
0
0.
0
0
0.
0
0
0.00 0.00 0.00 0.00
1,
6
2
5
.
0
0
1,
9
3
7
.
0
0
1,
6
2
5
.
0
0
1,781.00 1,625.00 1,859.00 13,702.00
0.
0
0
0.
0
0
2,
7
9
1
.
8
4
440.00 440.00 352.00 4,551.84
9,
7
2
1
.
0
0
9,
7
2
1
.
0
0
12
,
2
2
1
.
0
0
9,721.00 9,721.00 8,868.55 120,799.55
38
,
0
7
2
.
3
6
38
,
2
1
3
.
4
1
44
,
1
7
6
.
1
8
41,124.76 37,189.29 41,937.88 467,068.78
-7
,
4
4
3
.
2
5
-8
,
9
4
0
.
2
0
-1
8
,
6
8
4
.
7
5
-15,536.71 ·8,975.79 -7,662.76 -21,404.43 6/25/2012
,.
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
r
k
i
n
g
De
p
a
r
t
m
e
n
t
Pr
o
f
i
t
&
Lo
s
s
St
a
t
e
m
e
n
t
Ga
r
a
g
e
s
&
Lo
t
s
-
FY
1
0/
1
1
G
l
-
7t
h
St
r
e
e
t
G
a
r
o
a
e
-
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
Oc
t
o
b
e
r
7t
h
St
r
e
e
t
G
a
r
a
g
e
-
1
G
Re
v
e
n
u
e
-
T
i
c
k
e
t
14
2
-
8
0
0
0
-
3
4
4
4
0
4
16
2
,
0
1
4
.
0
0
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
14
2
-
8
0
0
0
-
3
4
4
4
0
4
16
,
6
5
0
.
0
0
7t
h
St
r
e
e
t
G
a
r
a
g
e
-
1
G
Rl
17
8
,
6
6
4
.
0
0
(S
a
l
e
s
Ta
x
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
15
,
3
8
7
.
2
0
At
t
e
n
d
a
n
t
/
C
a
s
h
i
e
r
la
b
o
r
23
,
8
2
3
.
2
5
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
9,
3
1
3
.
0
8
FP
&
l
3,
3
4
0
.
1
4
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
t
e
n
a
n
c
e
87
8
.
7
5
Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
7,
8
1
0
.
0
5
Ar
m
e
d
Gu
a
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
48
5
.
3
3
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
1,
4
1
3
.
2
9
Su
r
v
e
i
l
l
a
n
c
e
Sy
s
t
e
m
Ma
i
n
t
e
n
a
n
c
e
34
0
.
0
0
7t
h
St
.
G
a
r
a
g
e
-
1
G
EX
P
E
62
,
7
9
1
.
0
9
7t
h
St
.
-
1
G
Es
t
i
m
a
t
e
d
De
59
,
5
0
0
.
0
0
7t
h
S
t
.
-
1G
PR
O
F
I
T
/
(
L
O
S
!
56
,
3
7
2
.
9
1
G
2
-
12
t
h
St
r
e
S
l
l
G
a
r
a
g
e
-
2A
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
Oc
t
o
b
e
r
12
t
h
St
r
e
e
t
G
a
r
a
g
e
-
2A
Re
v
e
n
u
e
-
T
i
c
k
e
t
48
0
-
8
0
0
0
-
3
4
4
5
0
4
31
,
0
0
3
.
7
3
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
48
0
-
8
0
0
0
-
3
4
4
5
9
3
6,
3
0
0
.
0
0
12
t
h
St
.
-
2A
RE
V
E
N
U
E
37
,
3
0
3
.
7
3
(S
a
l
e
s
Ta
x
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
Pe
r
s
o
n
n
e
l
82
2
.
4
9
At
t
e
n
d
a
n
t
/
C
a
s
h
i
e
r
la
b
o
r
11
,
7
7
3
.
1
8
FP
&
l
10
8
.
5
4
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
t
a
n
a
n
c
e
93
3
.
5
5
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
16
2
.
5
8
1 Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
2,
0
8
4
.
9
3
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
52
8
.
0
0
Su
r
v
e
i
l
l
a
n
c
e
Sy
s
t
e
m
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
Ar
m
e
d
Gu
d
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
48
5
.
3
3
12
t
h
St
.
-
2A
EX
P
E
N
S
E
S
16
,
8
9
8
.
6
0
12
t
h
St
.
-
2A
PR
O
F
I
T
/(
L
O
!
20
,
4
0
5
.
1
3
F:
\
P
/
N
G
\
$
M
A
N
\
R
A
R
\
P
a
r
k
i
n
g
Si
c
/
u
s
Re
p
a
1
/
\
G
a
r
a
g
e
s
FY
I
I
2
0
1
0
No
v
e
m
b
e
r
12
1
,
4
5
5
.
1
6
16
,
6
5
0
.
0
0
13
8
,
1
0
5
.
1
6
15
,
5
2
4
.
7
3
24
,
1
5
1
.
0
7
9,
3
1
3
.
0
8
2,
8
8
2
.
7
2
87
8
.
7
5
7,
8
1
0
.
0
5
48
5
.
3
3
1,
2
1
0
.
2
9
0.
0
0
62
,
2
5
6
.
0
2
59
,
5
0
0
.
0
0
16
,
3
4
9
.
1
4
2
0
1
0
No
v
e
m
b
e
r
39
,
6
4
8
.
5
9
6,
7
2
0
.
0
0
46
,
3
6
8
.
5
9
82
1
.
9
6
11
,
9
2
4
.
0
6
10
8
.
5
4
93
3
.
5
5
16
2
.
5
8
2,
0
8
4
.
9
3
52
8
.
0
0
0.
0
0
48
5
.
3
3
17
,
0
4
8
.
9
5
29
,
3
1
9
.
6
4
2
0
1
0
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
.
u
a
r
y
Fe
b
r
u
a
r
y
10
9
,
2
2
4
.
2
6
14
9
,
3
5
8
.
9
0
15
0
,
0
5
3
.
2
8
16
,
6
5
0
.
0
0
16
,
1
2
5
.
0
0
16
,
8
7
5
.
0
0
12
5
,
8
7
4
.
2
6
16
5
,
4
8
3
.
9
0
16
6
,
9
2
8
.
2
8
19
,
3
8
6
.
8
0
15
,
8
3
1
.
5
7
15
,
5
0
8
.
8
1
30
,
2
7
5
.
2
5
26
,
5
4
4
.
7
1
24
,
5
1
0
.
4
6
4,
6
5
6
.
5
4
2,
3
2
8
.
2
7
2,
3
2
8
.
2
7
2,
9
5
9
.
3
3
2,
5
9
8
.
0
9
2,
5
4
9
.
1
7
1,
1
2
8
.
7
5
87
8
.
7
5
87
8
.
7
5
7,
8
1
0
.
0
6
7,
8
1
0
.
0
6
7,
8
1
0
.
0
6
48
5
.
3
3
4
8
5
.
3
3
48
5
.
3
3
1,
2
1
0
.
2
9
1,
2
1
0
.
2
9
1,
2
1
0
.
2
9
0.
0
0
0.
0
0
25
5
.
0
0
67
,
9
1
2
.
3
5
57
,
6
8
7
.
0
7
55
,
5
3
6
.
1
4
59
,
5
0
0
.
0
0
59
,
5
0
0
.
0
0
59
,
5
0
0
.
0
0
-1
,
5
3
8
.
0
9
48
,
2
9
6
.
8
3
51
,
8
9
2
.
1
4
-
-
-
-
-
-
-
-
-
2
0
1
0
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
.
;
r
y
36
,
8
5
6
.
0
7
44
,
4
3
7
.
4
0
42
,
1
4
5
.
5
6
6,
6
5
0
.
0
0
6,
4
4
0
.
0
0
5,
6
0
0
.
0
0
43
,
5
0
6
.
0
7
50
,
8
7
7
.
4
0
47
,
7
4
5
.
5
6
1,
0
2
7
.
9
5
1,
2
3
4
.
6
8
82
2
.
1
3
14
,
8
9
8
.
7
6
13
,
6
8
6
.
5
4
11
,
9
7
8
.
7
6
10
8
.
5
4
10
8
.
5
4
10
8
.
5
4
1,
1
8
3
.
5
5
93
3
.
5
5
93
3
.
5
5
16
2
.
5
8
1
6
2
.
5
8
16
2
.
5
8
3,
4
8
4
.
9
3
2,
0
8
4
.
9
3
1,
9
0
0
.
0
0
26
4
.
0
0
13
2
.
0
0
13
2
.
0
0
0.
0
0
0.
0
0
0.
0
0
48
5
.
3
3
4
8
5
.
3
3
4
8
5
.
3
3
21
,
6
1
5
.
6
4
18
,
8
2
8
.
1
5
16
,
5
2
2
.
8
9
21
,
8
9
0
.
4
3
32
,
0
4
9
.
2
5
31
,
2
2
2
.
6
7
20
1
1
20
1
1
20
1
1
20
1
1
2011 2011 2011 FY
Ma
r
c
h
Ap
r
i
l
M
a
y
Ju
n
e
July August September 2010/2011 TOTAL
23
3
,
6
7
8
.
4
8
19
1
,
0
7
8
.
4
7
20
7
,
9
7
0
.
1
5
14
6
,
7
8
3
.
3
4
194,214.03 149,015.94 141,524.28 1,956,370.29
12
,
5
2
5
.
0
0
12
,
6
7
5
.
0
0
11
,
8
3
0
.
0
0
11
,
8
3
0
.
0
0
11,830.00 11,900.00 12,750.00 168,290.00
24
6
,
2
0
3
.
4
8
20
3
,
7
5
3
.
4
7
21
9
,
8
0
0
.
1
5
15
8
,
6
1
3
.
3
4
206,044.03 160,915.94 154,274.28 2, 124,660.29
18
,
8
3
3
.
5
0
15
,
0
8
5
.
9
6
1
5
,
0
6
8
.
7
8
19
,
1
9
4
.
2
5
24,546.88 16,184.38 24,170.37 214,723.23
39
,
1
8
0
.
3
2
26
,
7
9
8
.
9
1
25
,
2
5
3
.
0
0
25
,
3
4
2
.
8
1
28,199.36 21,938.63 23,729.45 319,747.22
2,
3
2
8
.
2
7
2,
3
2
8
.
2
7
4,
6
5
6
.
5
4
4
,
6
5
6
.
5
4
11,841.35 11,641.35 9,313.08 74,704.64
2,
6
7
4
.
3
3
3,
0
9
3
.
9
1
3,
0
7
1
.
9
0
3,
2
5
6
.
5
6
3,305.55 3,080.30 3,389.69 36,201.69
87
8
.
7
5
8
7
8
.
7
5
3,
2
7
3
.
5
8
87
8
.
7
5
1,237.50 878.75 878.75 13,548.58
7,
8
1
0
.
0
6
7,
8
1
0
.
0
6
8,
1
9
0
.
9
4
7,
8
1
0
.
0
6
7,810.06 7,810.06 9,400.00 95,691.52
48
5
.
3
3
4
8
5
.
3
3
48
5
.
3
3
4
8
5
.
3
3
4
8
5
.
3
3
485.33 485.33 5,823.96
2,
1
2
3
.
7
9
13
,
7
4
8
.
9
0
1,
7
2
1
.
9
0
2,
0
1
1
.
9
0
2,649.90 1,876.90 1,286.90 31,674.64
0.
0
0
0.
0
0
59
5
.
0
0
92
2
.
0
0
170.00 170.00 0.00 2,452.00
74
,
3
1
4
.
3
5
70
,
2
3
0
.
0
9
62
,
3
1
6
.
9
7
64
,
5
5
8
.
2
0
80,245.93 64,065.70 72,653.57 794,567.48
59
,
5
0
0
.
0
0
59
,
5
0
0
.
0
0
59
,
5
0
0
.
0
0
59
,
5
0
0
.
0
0
59,500.00 59,500.00 59,500.00 714,000.00
11
2
,
3
8
9
.
1
3
74
,
0
2
3
.
3
8
97
,
9
8
3
.
1
8
34
,
5
5
5
.
1
4
66,298.10 37,350.24 22,120.71 616,092.81
-
-
-
-
-
-
-
-
-
-
-
-
-
20
1
1
20
1
1
20
1
1
20
1
1
2011 2011 2011 FY
Ma
r
c
h
Ap
r
i
l
2010/2011
M
a
y
Ju
n
e
July August September TOTAL
52
,
5
5
3
.
2
7
5
0
,
9
1
4
.
9
7
44
,
2
4
4
.
8
7
33
,
8
0
7
.
5
3
39,511.19 37,117.75 39,646.76 491,887.69
5,
4
6
0
.
0
0
5,
5
3
0
.
0
0
5,
3
9
0
.
0
0
4,
6
0
0
.
0
0
4,950.00 4,620.00 4,620.00 66,880.00
58
,
0
1
3
.
2
7
5
6
,
4
4
4
.
9
7
49
,
6
3
4
.
8
7
38
,
4
0
7
.
5
3
44,461.19 41,737.75 44,266.76 558,767.69
91
6
.
7
4
73
4
.
5
2
7
3
4
.
5
2
4,
8
0
6
.
6
5
1,142.07 734.28 918.15 14,716.14
15
,
8
6
2
.
5
4
12
,
1
0
0
.
7
4
II
,7
6
8
.
3
8
12
,
9
3
0
.
6
9
14,945.05 14,153.52 13,260.80 159,283.02
10
8
.
5
4
1
0
8
.
5
4
10
8
.
5
4
10
8
.
5
4
1
0
8
.
5
4
1
0
8
.
5
4
108.54 1,302.48
93
3
.
5
5
9
3
3
.
5
5
1,
6
1
8
.
0
0
93
3
.
5
5
1,292.30 933.55 933.55 12,495.80
16
2
.
5
8
17
2
.
8
7
1
7
2
.
8
7
17
2
.
8
7
162.58 162.58 162.58 1,981.83
1,
9
0
0
.
0
0
1,
9
0
0
.
0
0
1,
9
0
0
.
0
0
3,
3
0
0
.
0
0
1,951.00 2,135.93 3,060.00 27,786.65
13
2
.
0
0
13
2
.
0
0
26
4
.
0
0
39
6
.
0
0
528.00 660.00 528.00 4,224.00
71
5
.
0
0
0.
0
0
85
.
0
0
0.
0
0
212.50 0.00 0.00 1,012.50
48
5
.
3
3
4
8
5
.
3
3
48
5
.
3
3
48
5
.
3
3
485.33 485.33 485.33 5,823.96
21
,
2
1
6
.
2
8
16
,
5
6
7
.
5
5
17
,
1
3
6
.
6
4
23
,
1
3
3
.
6
3
20,827.37 19,373.73 19,456.95 228,626.38
36
,
7
9
6
.
9
9
39
,
8
7
7
.
4
2
32
,
4
9
8
.
2
3
15
,
2
7
3
.
9
0
23,633.82 22,364.02 24,809.81 330,141.31 6/25/2012
,-
-
-
-
·
-
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
r
k
i
n
g
De
p
a
r
t
m
e
n
t
Pr
o
f
i
t
&
Lo
s
s
St
a
t
e
m
e
n
t
Ga
r
a
g
e
s
&
Lo
t
s
-
FY
1
0/
1
1
G3
-
13
t
b
_
S
t
r
e
e
t
Ga
L
Q
_
a
e
-
17
A
-
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
13
t
h
St
r
e
e
t
G
a
r
a
g
e
-
1
7
A
Re
v
e
n
u
e
-
T
i
c
k
e
t
48
0
-
8
0
0
0
-
3
4
4
5
6
6
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
l
s
48
0
-
8
0
0
0
-
3
4
4
5
2
7
13
t
h
St
.
•
1
7
A
RE
V
E
N
U
E
(S
a
l
e
s
Ta
x
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
Pe
r
s
o
n
n
e
l
At
t
e
n
d
a
n
t
/
C
a
s
h
i
e
r
la
b
o
r
la
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
FP
&
l
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
t
e
n
a
n
c
e
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
Ar
m
e
d
Gu
a
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
Su
r
v
e
i
l
l
a
n
c
e
Sy
s
t
e
m
Ma
i
n
t
e
n
a
n
c
e
13
t
h
St
.
-
1
7
A
EX
P
E
N
S
E
S
13
t
h
St
.
·1
7
A
PR
O
F
I
T
/
(
L
O
G6
-
42
o
d
St
r
e
e
t
Ga
r
o
_
a
.
e
.
.
.
.
:
.
.
.
.
B
.
A
2
0
1
0
O
c
t
o
b
e
r
80
,
2
9
9
.
0
4
10
,
0
8
0
.
0
0
90
,
3
7
9
.
0
4
1,
7
5
5
.
4
4
13
,
8
9
9
.
7
0
52
8
.
0
0
1,
9
2
4
.
9
1
93
3
.
5
5
21
0
.
0
0
48
5
.
3
3
1,
9
0
0
.
0
0
0.
0
0
21
,
6
3
6
.
9
3
6S
,
7
4
2
.
1
1
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
O
c
t
o
b
e
r
4
2
n
d
St
r
e
e
t
G
a
r
a
g
e
-
SA
Re
v
e
n
u
e
-
T
i
c
k
e
t
48
0
-
8
0
0
0
-
3
4
4
5
3
1
5,
5
9
7
.
9
5
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
48
0
-
8
0
0
0
.
3
4
4
5
9
5
21
,
7
0
0
.
0
0
4
2
n
d
St
.
-
SA
RE
V
E
N
U
E
27
,
2
9
7
.
9
5
(S
a
l
e
s
Ta
x
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
Pe
r
s
o
n
n
e
l
3,
8
0
5
.
5
3
Al
l
e
n
d
a
n
t
/
C
a
s
h
i
e
r
La
b
o
r
4,
5
4
2
.
0
3
FP
&
L
2,
3
S
S
.
S
2
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
t
e
n
a
n
c
e
1,
2
4
4
.
7
4
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
76
2
.
0
0
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
44
0
.
0
0
Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
2,
7
0
0
.
0
0
Su
r
v
e
i
l
l
a
n
c
e
Sy
s
t
e
m
Ma
i
n
t
e
n
a
n
c
e
S5
.
0
0
4
2
n
d
St
.
-
SA
EX
P
E
N
S
E
S
15
,
9
6
8
.
1
2
_ 4
2
n
d
St
.
PR
O
F
I
T
/
(
L
O
S
S
)
11
,
3
2
9
.
S
3
F:
\
P
I
N
G
\
$
M
A
N
\
R
A
R
\
P
a
r
k
i
n
g
Sl
a
l
u
s
Re
p
o
r
t
\
G
a
r
a
g
e
s
FY
I
I
2
0
1
0
No
v
e
m
b
e
r
76
,
0
5
4
.
2
1
10
,
0
8
0
.
0
0
86
,
1
3
4
.
2
1
1,
7
5
4
.
3
3
14
,
3
1
9
.
8
2
52
8
.
0
0
1,
8
9
1
.
9
0
93
3
.
5
5
21
0
.
0
0
48
5
.
3
3
1,
9
0
0
.
0
0
0.
0
0
22
,
0
2
2
.
9
3
64
,
1
1
1
.
2
8
2
0
1
0
No
v
e
m
b
e
r
5,
2
8
7
.
6
9
22
,
4
0
0
.
0
0
27
,
6
8
7
.
6
9
3,
8
0
3
.
1
1
4,
7
2
3
.
6
3
2,
2
7
5
.
S
7
1,
2
4
4
.
7
4
45
0
.
0
0
44
0
.
0
0
2,
7
0
0
.
0
0
0.
0
0
15
,
6
3
7
.
3
5
12
,
0
5
0
.
3
4
2
0
1
0
20
1
1
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
69
,
3
4
9
.
5
6
83
,
9
3
1
.
7
2
85
,
1
1
3
.
0
7
10
3
,
5
S
9
.
7
5
10
,
0
1
0
.
0
0
9,
6
6
0
.
0
0
9,
7
3
0
.
0
0
9,
6
6
0
.
0
0
79
,
3
5
9
.
5
6
93
,
5
9
1
.
7
2
94
,
S
4
3
.
0
7
11
3
,
2
4
9
.
7
5
2,
1
9
3
.
9
5
2,
1
5
8
.
8
9
1,
7
5
4
.
8
8
1,
9
5
6
.
6
0
17
,
7
2
3
.
9
7
15
,
7
8
8
.
7
7
14
,
1
0
0
.
2
6
20
,
5
5
6
.
7
1
26
4
.
0
0
13
2
.
0
0
13
2
.
0
0
13
2
.
0
0
2,
0
6
1
.
2
2
2,
0
5
7
.
7
7
2,
0
0
6
.
7
6
1,
9
1
4
.
2
0
1,
1
8
3
.
5
5
93
3
.
5
5
93
3
.
5
5
93
3
.
5
5
1.
7
1
0
.
0
0
21
0
.
0
0
21
0
.
0
0
21
0
.
0
0
48
5
.
3
3
4
8
5
.
3
3
4
8
5
.
3
3
4
8
5
.
3
3
3,
5
0
0
.
0
0
1,
9
0
0
.
0
0
1,
9
0
0
.
0
0
1,
9
0
0
.
0
0
0.
0
0
0.
0
0
0.
0
0
94
5
.
0
0
29
,
1
2
2
.
0
2
23
,
6
6
6
.
3
1
21
,
5
2
2
.
7
8
29
,
0
3
3
.
3
9
50
,
2
3
7
.
5
4
69
,
9
2
5
.
4
1
73
,
3
2
0
.
2
9
84
,
2
1
6
.
3
6
2
0
1
0
20
1
1
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
4,
6
0
4
.
6
1
4,
6
4
2
.
0
4
15
,
1
9
3
.
4
5
5,
4
4
2
.
0
5
25
,
9
0
0
.
0
0
21
,
5
6
0
.
0
0
25
,
3
4
0
.
0
0
22
,
2
6
0
.
0
0
30
,
5
0
4
.
6
1
26
,
2
0
2
.
0
4
40
,
5
3
3
.
4
5
27
,
7
0
2
.
0
5
4,
7
5
6
.
1
5
3,
8
0
4
.
9
2
3,
8
0
4
.
3
2
4,
2
4
1
.
6
4
5,
9
1
3
.
2
6
4,
7
1
2
.
0
1
5,
4
4
4
.
3
8
7,
4
9
8
.
1
4
2,
4
4
5
.
4
5
2,
2
9
2
.
5
1
1,
S
9
0
.
2
0
1,
9
6
6
.
0
5
1,
4
9
4
.
7
4
1,
2
4
4
.
7
4
1,
2
4
4
.
7
4
1,
2
4
4
.
7
4
45
0
.
0
0
45
0
.
0
0
45
0
.
0
0
45
0
.
0
0
22
0
.
0
0
11
0
.
0
0
11
0
.
0
0
11
0
.
0
0
5,
2
0
0
.
0
0
2,
7
0
0
.
0
0
2,
7
0
0
.
0
0
2,
7
0
0
.
0
0
0.
0
0
0.
0
0
0.
0
0
92
9
.
1
0
20
,
4
7
9
.
6
0
15
,
3
1
4
.
1
S
15
,
6
4
3
.
6
4
19
,
1
3
9
.
6
7
10
,
0
2
5
.
0
1
10
,
S
8
7
.
S
6
24
,
S
S
9
.
S
1
S,
5
6
2
.
3
S
20
1
1
20
1
1
20
1
1
2011 2011 2011 FY
Ap
r
i
l
M
a
y
Ju
n
e
July August September 2010/2011 TOTAL
96
,
5
6
0
.
8
0
94
,
1
8
0
.
4
1
77
,
9
6
8
.
2
2
99,700.90 85,412.18 78,908.40 1,031,068.26
9,
8
0
0
.
0
0
9,
3
1
0
.
0
0
9,
5
9
0
.
0
0
9,520.00 9,940.00 9,380.00 116,760.00
10
6
,
3
6
0
.
8
0
10
3
,
4
9
0
.
4
1
87
,
5
5
8
.
2
2
109,220.90 95,352.18 88,288.40 1,147,828.26
1,
5
6
7
.
6
8
1
,
5
6
7
.
6
8
5,
2
7
0
.
9
8
5,650.26 4,109.83 5,533.04 35,273.56
14
,
8
9
8
.
8
3
14
,
5
5
9
.
5
0
14
,
2
3
2
.
2
6
15,071.27 11,606.86 13,727.00 180,484.95
13
2
.
0
0
26
4
.
0
0
39
6
.
0
0
528.00 660.00 528.00 4,224.00
2,
1
1
6
.
2
0
1,
9
7
2
.
7
2
2,
1
1
9
.
3
9
2,063.18 1,921.30 2,204.74 24,254.29
93
3
.
5
5
2,
1
7
3
.
1
0
93
3
.
5
5
1,292.30 933.55 1,453.55 13,570.90
21
0
.
0
0
36
6
.
0
0
36
6
.
0
0
561.00 1,942.00 210.00 6,415.00
48
5
.
3
3
4
8
5
.
3
3
48
5
.
3
3
485.33 4S5.33 485.33 5,823.96
1,
9
0
0
.
0
0
1,
9
0
0
.
0
0
3,
5
0
0
.
0
0
1,951.00 1,951.00 3,260.00 27,462.00
0.
0
0
0.
0
0
0.
0
0
535.00 0.00 3,370.00 4,850.00
22
,
2
4
3
.
5
9
23
,
2
8
8
.
3
3
27
,
3
0
3
.
5
1
28,137.34 23,609.87 30,771.66 302,358.66
84
,
1
1
7
.
2
1
80
,
2
0
2
.
0
8
60
,
2
5
4
.
7
1
81,083.56 71,742.31 57,516.74 845,469.60
20
1
1
20
1
1
20
1
1
2011 2011 2011 FY
Ap
r
i
l
M
a
y
Ju
n
e
July August September 2010/2011 TOTAL
5,
9
2
6
.
0
5
5,
9
0
9
.
3
4
5,
8
2
7
.
0
9
5,434.58 5,849.54 4,715.89 74,430.28
23
,
1
0
0
.
0
0
21
,
7
0
0
.
0
0
21
,
6
6
5
.
0
0
22,540.00 21,770.00 22,190.00 272,125.00
29
,
0
2
6
.
0
5
27
,
6
0
9
.
3
4
27
,
4
9
2
.
0
9
27,974.58 27,619.54 26,905.89 346,555.28
3,
3
9
8
.
5
2
3
,
3
9
8
.
5
2
3,
4
0
0
.
6
8
4,250.85 3,397.43 4,248.15 46,309.82
4,
6
6
9
.
3
S
4,
6
6
9
.
3
S
4,
7
1
2
.
0
1
6,54S.77 4,8S2.75 6,6S2.34 64,99S.OS
2,
1
3
3
.
6
3
2,
S
9
9
.
4
4
2,
2
4
4
.
5
2
2,295.0S 2,369.15 2,397.SO 27,598.52
1,
2
4
4
.
7
4
1,
6
0
3
.
4
9
1,
2
4
4
.
7
4
1,603.49 1,244.74 1,244.74 15,904.3S
45
0
.
0
0
45
0
.
0
0
45
0
.
0
0
450.00 1,1S6.00 450.00 6,44S.OO
11
0
.
0
0
22
0
.
0
0
22
0
.
0
0
550.00 440.00 550.00 3,520.00
2,
7
0
0
.
0
0
2,
7
0
0
.
0
0
2,
7
0
0
.
0
0
2,799.SO 2,799.SO 5,040.00 37,439.60
0.
0
0
18
1
.
9
0
0.
0
0
0.00 0.00 0.00 1,196.00
14
,
7
0
6
.
2
7
16
,
1
2
2
.
7
3
14
,
9
7
1
.
9
5
1S,497.99 16,319.S7 20,613.03 203,414.40
14
,
3
1
9
.
7
S
11
,
4
S
6
.
6
1
12
,
5
2
0
.
1
4
9,476.59 11,299.67 6,292.S6 143,140.~ 6/25/2012
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
r
k
i
n
g
De
p
a
r
t
m
e
n
t
Pr
o
f
i
t
&
Lo
s
s
St
a
t
e
m
e
n
t
Ga
r
a
g
e
s
&
Lo
t
s
-
FY
1
0
/
1
1
G
4
-
16
t
h
St
r
e
e
t
Ga
r
o
a
e
~
A
n
c
h
o
r
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
Oc
t
o
b
e
r
16
t
h
St
r
e
e
t
-
An
c
h
o
r
Ga
r
a
g
e
Re
v
e
n
u
e
-
T
i
c
k
e
t
46
3
-
8
0
0
0
-
3
4
4
9
1
1
17
3
,
9
6
0
.
7
8
Re
v
e
n
u
e
-
Va
l
e
t
46
3
-
8
0
0
0
-
3
4
4
5
8
7
17
,
1
5
2
.
7
9
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
46
3
-
8
0
0
0
-
3
4
4
9
0
3
47
,
1
0
0
.
0
0
16
t
h
St
.
A
n
c
h
o
r
-
RE
V
E
N
L
23
8
,
2
1
3
.
5
7
(S
a
l
e
s
Ta
x
Ex
c
l
u
d
e
d
}
Ex
p
e
n
s
e
s
Se
c
u
r
i
l
y
Pe
r
s
o
n
n
e
l
7,
1
7
1
.
7
7
AH
e
n
d
a
n
t
/
C
a
s
h
i
e
r
La
b
o
r
2i
,
9
8
3
.
2
0
FP
&
L
2,
6
1
5
.
6
1
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
l
a
n
a
n
c
e
1.
4
6
2
.
5
0
Ar
m
e
d
Gu
a
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
48
5
.
3
3
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
1,
5
3
5
.
7
0
La
n
d
s
c
a
p
e
an
d
lo
t
Ma
i
n
t
e
n
a
n
c
e
25
5
.
0
0
Ga
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
7,
2
5
2
.
1
3
Sa
n
i
t
a
t
i
o
n
(W
a
s
t
e
Re
m
o
v
a
l
)
25
4
.
8
8
Fi
r
e
Al
a
r
m
Se
r
v
i
c
e
25
0
.
0
0
Su
r
v
e
i
l
l
a
n
c
e
Sy
s
t
e
m
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
16
t
h
St
.
-
An
c
h
o
r
EX
P
E
N
S
43
,
2
6
6
.
1
2
16
t
h
St
.
PR
O
F
I
T
/
(
L
O
S
S
)
19
4
,
9
4
7
.
4
5
G
9
-
Pe
n
n
A'
l
e
n
u
e
G
a
r
a
g
e
2
0
1
0
LO
C
A
T
I
O
N
AC
C
O
U
N
T
I
N
G
CO
D
E
Oc
t
o
b
e
r
Pe
n
n
s
y
l
v
a
n
i
a
Av
e
n
u
e
Ga
r
a
g
e
-
G
9
Re
v
e
n
u
e
-
T
i
c
k
e
t
48
0
-
8
0
0
0
-
3
4
4
4
1
1
19
2
.
5
2
Re
v
e
n
u
e
-
Sp
a
c
e
Re
n
t
a
l
0.
0
0
Re
v
e
n
u
e
-
M
o
n
t
h
l
y
Pe
r
m
i
t
s
48
0
-
8
0
0
0
-
3
4
4
4
1
2
0.
0
0
Pe
n
n
s
y
l
v
a
n
i
a
•
-
G9
RE
V
E
19
2
.
5
2
(S
a
l
e
s
Ta
x
Ex
c
l
u
d
e
d
)
Ex
p
e
n
s
e
s
Se
c
u
r
i
t
y
Pe
r
s
o
n
n
e
l
0.
0
0
IA
H
e
n
d
a
n
t
/
C
a
s
h
i
e
r
La
b
o
r
25
5
.
7
5
FP
&
l
0.
0
0
Re
v
e
n
u
e
Co
n
t
r
o
l
Eq
u
i
p
m
e
n
t
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
Ar
m
e
d
Gu
a
r
d
Re
v
e
n
u
e
Pi
c
k
u
p
0.
0
0
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
la
n
d
s
c
a
p
e
an
d
Lo
t
Ma
i
n
t
e
n
a
n
c
e
0.
0
0
G
a
r
a
g
e
Cl
e
a
n
i
n
g
/
M
a
i
n
t
e
n
a
n
c
e
0.
0
0
Pe
n
n
s
y
l
v
a
n
i
a
•
-
G9
EX
P
E
25
5
.
7
5
Pe
n
n
Av
e
.
PR
O
F
I
T
/(
L
O
S
S
)
-6
3
.
2
3
F:
\
P
I
N
G
\
$
M
4
.
N
\
R
A
R
\
P
a
r
k
i
n
g
St
a
t
u
s
Re
p
o
r
t
\
G
a
r
a
g
e
s
FY
I
I
2
0
1
0
No
v
e
m
b
e
r
14
1
,
5
8
8
.
7
0
25
,
9
1
9
.
1
5
46
,
0
0
0
.
0
0
21
3
,
5
0
7
.
8
5
4,
9
2
5
.
6
4
22
,
6
9
9
.
6
1
2,
7
0
2
.
7
9
1,
4
6
2
.
5
0
48
5
.
3
3
1,
5
3
5
.
7
0
25
5
.
0
0
7,
2
5
2
.
1
3
26
5
.
3
2
25
0
.
0
0
0.
0
0
41
,
8
3
4
.
0
2
17
1
,
6
7
3
.
8
3
2
0
1
0
No
v
e
m
b
e
r
28
,
6
9
2
.
5
0
0.
0
0
0.
0
0
28
,
6
9
2
.
5
0
1,
0
9
9
.
5
2
11
,
0
9
4
.
1
3
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
12
,
1
9
3
.
6
5
16
.
4
9
8
.
8
5
2
0
1
0
20
1
1
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
14
5
,
1
7
5
.
7
2
17
3
,
8
2
1
.
5
3
18
1
,
1
4
6
.
7
3
25
3
,
9
8
6
.
9
3
20
,
8
6
7
.
2
9
20
,
1
0
0
.
9
3
34
,
4
8
8
.
3
1
34
,
9
6
8
.
2
2
46
,
0
0
0
.
0
0
44
,
2
0
0
.
0
0
45
,
5
0
0
.
0
0
46
,
0
0
0
.
0
0
21
2
,
0
4
3
.
0
1
23
8
,
1
2
2
.
4
6
26
1
,
1
3
5
.
0
4
33
4
,
9
5
5
.
1
5
7,
6
7
1
.
8
4
7,
6
4
2
.
4
4
4,
9
2
7
.
2
1
5,
4
9
3
.
5
8
28
,
3
4
9
.
3
8
23
,
3
4
9
.
2
8
22
.
4
2
3
.
1
5
36
,
1
7
2
.
3
5
2,
5
4
9
.
2
4
2,
5
0
6
.
4
8
2.
4
7
1
.
7
3
2,
7
6
3
.
5
3
1,
7
1
2
.
5
0
1,
4
6
2
.
5
0
1.
4
6
2
.
5
0
1.
4
6
2
.
5
0
48
5
.
3
3
4
8
5
.
3
3
48
5
.
3
3
48
5
.
3
3
1,
5
3
5
.
7
0
1,
5
3
5
.
7
0
1,
5
3
5
.
7
0
2,
3
4
7
.
7
0
85
.
0
0
85
.
0
0
85
.
0
0
85
.
0
0
7,
2
5
2
.
1
3
7,
2
5
2
.
1
3
7,
2
5
2
.
1
3
7,
2
5
2
.
1
3
26
5
.
3
2
26
5
.
3
2
2
6
5
.
3
2
26
5
.
3
2
48
5
.
1
2
25
0
.
0
0
25
0
.
0
0
49
5
.
4
2
0.
0
0
0.
0
0
0.
0
0
85
.
0
0
50
,
3
9
1
.
5
6
44
,
8
3
4
.
1
8
41
,
1
5
8
.
0
7
56
,
9
0
7
.
8
6
16
1
,
6
5
1
.
4
5
19
3
,
2
8
8
.
2
8
21
9
,
9
7
6
.
9
7
27
8
,
0
4
7
.
2
9
2
0
1
0
20
1
1
20
1
1
20
1
1
De
c
e
m
b
e
r
Ja
n
u
a
r
y
Fe
b
r
u
a
r
y
Ma
r
c
h
24
,
5
6
7
.
2
5
29
,
5
9
1
.
5
9
75
,
2
1
6
.
8
2
63
,
2
8
6
.
9
3
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
6,
0
2
0
.
0
0
7,
2
1
0
.
0
0
7,
8
4
0
.
0
0
24
,
5
6
7
.
2
5
35
,
6
1
1
.
5
9
82
.
4
2
6
.
8
2
71
,
1
2
6
.
9
3
0.
0
0
41
2
.
3
2
0.
0
0
3,
7
6
2
.
7
3
15
.
4
3
8
.
0
1
11
,
9
1
9
.
5
1
14
,
0
5
4
.
6
4
17
,
0
5
7
.
7
7
0.
0
0
2,
9
7
1
.
8
1
2,
6
3
6
.
3
4
2,
8
3
7
.
9
2
74
5
.
0
0
30
0
.
0
0
2,
3
9
0
.
2
5
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
1,
4
4
7
.
7
4
0.
0
0
0.
0
0
0.
0
0
0.
0
0
0.
0
0
11
,
8
0
7
.
5
0
9,
3
0
7
.
5
0
9,
3
0
7
.
5
0
9,
3
0
7
.
5
0
27
,
9
9
0
.
5
1
24
,
9
1
1
.
1
4
29
,
8
3
6
.
4
7
32
,
9
6
5
.
9
2
-3
.
4
2
3
.
2
6
10
,
7
0
0
.
4
5
52
,
5
9
0
.
3
5
38
,
1
6
1
.
0
1
20
1
1
20
1
1
2
0
1
1
2
0
1
1
2011 2011 FY
A
p
r
i
l
M
a
y
Ju
n
e
July August September 2010/2011 TOTAL
21
9
,
2
4
2
.
9
8
21
9
,
7
9
0
.
6
8
15
9
,
8
3
4
.
5
6
20
7
,
0
7
2
.
8
9
180,201.38 156,814.97 2,212,637.85
34
,
5
2
0
.
5
5
26
,
4
9
4
.
8
5
23
,
9
6
9
.
1
5
42,188.31 35,078.96 19,997.19 335,745.70
44
,
2
0
0
.
0
0
30
,
8
7
0
.
0
0
44
,
0
0
0
.
0
0
46,600.00 42.700.00 45,100.00 528,270.00
29
7
,
9
6
3
.
5
3
27
7
,
1
5
5
.
5
3
22
7
,
8
0
3
.
7
1
29
5
,
8
6
1
.
2
0
257,980.34 221,912.16 3,076,653.55
4,
4
0
1
.
6
0
4,
4
0
1
.
6
0
5,
9
1
6
.
2
5
13.481.33 15,945.16 19,933.20 101,911.62
25
,
2
6
9
.
7
2
22
,
3
7
3
.
7
7
24
,
1
5
7
.
7
3
28,254.39 21,962.19 27,225.36 304,220.13
2,
6
9
2
.
0
4
2,
8
6
5
.
0
7
2,
8
7
8
.
5
9
2,729.18 3,052.04 2,701.07 32,527.37
2,
6
6
2
.
5
0
5,
2
1
2
.
4
3
1,
4
6
2
.
5
0
1,821.25 1,462.50 1,462.50 23,108.68
48
5
.
3
3
4
8
5
.
3
3
48
5
.
3
3
485.33 485.33 485.33 5,823.96
1,
6
3
2
.
9
1
1,
2
4
4
.
0
7
1,
5
3
5
.
7
0
2,115.70 1,830.70 10,702.70 29,087.98
85
.
0
0
17
5
.
8
3
42
5
.
0
0
340.00 340.00 425.00 2,640.83
7,
2
5
2
.
1
3
7,
6
3
3
.
0
1
10
,
7
5
2
.
1
3
7,252.13 7,252.13 9,960.00 93,614.31
26
5
.
3
2
33
7
.
9
2
26
5
.
3
2
265.32 265.32 265.32 3,246.00
60
1
.
6
2
25
0
.
0
0
25
0
.
0
0
250.00 640.00 370.00 4,342.16
0.
0
0
0.
0
0
0.
0
0
170.00 0.00 0.00 255.00
45
,
3
4
8
.
1
7
44
,
9
7
9
.
0
3
48
,
1
2
8
.
5
5
57,164.63 53,235.37 73,530.48 600,778.04
25
2
,
6
1
5
.
3
6
23
2
,
1
7
6
.
5
0
17
9
,
6
7
5
.
1
6
23
8
,
6
9
6
.
5
7
204.744.97 148,381.68 2.475,875.511
20
1
1
20
1
1
2
0
1
1
2
0
1
1
2011 2011 FY
A
p
r
i
l
M
a
y
Ju
n
e
July 2010/2011 August September TOTAL
36
,
1
3
9
.
2
3
19
,
1
0
7
.
4
9
17
,
1
6
3
.
5
3
17,275.70 18,284.10 30,214.93 359,732.59
0.
0
0
0.
0
0
0.
0
0
0.00 0.00 0.00 0.00
7,
6
3
0
.
0
0
7,
7
0
0
.
0
0
7,
7
1
5
.
0
0
9,100.00 10,150.00 11,480.00 _.2!:845.00
43
,
7
6
9
.
2
3
26
,
8
0
7
.
4
9
24
,
8
7
8
.
5
3
26,375.70 28,434.10 41,694.93 434,577.59
3,
0
1
4
.
8
0
3,
0
1
4
.
8
0
5,
0
7
8
.
3
3
4,221.88 3,013.84 4.717.69 28,335.91
13
,
9
2
6
.
7
6
12
,
9
6
9
.
6
3
11
,
5
7
0
.
7
6
12,965.77 7,677.63 12.781.89 141.712.25
2.
7
9
6
.
9
0
2,
6
4
3
.
1
1
2.
7
8
2
.
6
1
2,749.92 2,690.67 2,928.23 25,037.51
0.
0
0
0.
0
0
0.
0
0
0.00 2,500.00 2,500.00 8,435.25
0.
0
0
0.
0
0
0.
0
0
0.00 0.00 0.00 0.00
0.
0
0
0.
0
0
0.
0
0
0.00 0.00 0.00 1,447.74
0.
0
0
0.
0
0
2,
6
5
3
.
3
6
1,209.62 1,209.62 1,170.60 6,243.20
9,
3
0
7
.
5
0
9,
3
0
7
.
5
0
11
,
8
0
7
.
5
0
9,307.50 9,307.50 10,700.00 99,467.50
29
,
0
4
5
.
9
6
27
,
9
3
5
.
0
4
33
,
8
9
2
.
5
6
30.454.69 26,399.26 34,798.41 310,679.36
14
,
7
2
3
.
2
7
-1
,
1
2
7
.
5
5
-9
,
0
1
4
.
0
3
-4,078.99 2,034.84 6,896.52 123,898.2311 6/25/2012
lD MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
TO:
FROM:
DATE:
SUBJECT:
COMMISSION MEMORANDUM
Mayor Matti Herrera Bower and Members_ofthe c;;·ty Co mission
Kathie G. Brooks, Interim City Manager~ P--
July 18, 2012
INFORMATIONAL REPORT TO THE MAYOR AND CITY COMMISSION, ON
FEDERAL, STATE, MIAMI-DADE COUNTY, U.S. COMMUNITIES, AND ALL
EXISTING CITY CONTRACTS FOR RENEWAL OR EXTENSIONS IN THE NEXT
180 DAYS.
The City Commission adopted Resolution No. 2000-24141, which provided that all existing
City contracts for renewal or extensions, which by their terms or pursuant to change orders
exceed $10,000, and all extensions or renewals of such contracts, shall be presented as an
informational report to the Mayor and City Commission, at least 180 days prior to the
contract extension or renewal date. Subsequent thereto, the City Commission adopted
Resolution No. 2001-24332, changing the reporting requirement from $10,000 to $25,000.
The Administration in addition to reporting on all existing City contracts, will now report
information relative to Miami-Dade County, State of Florida, U.S. Communities and Federal
GSA contracts that are approved for utilization by the City Manager. Pursuant to information
contained in Miami-Dade County, State of Florida, U.S. Communities and Federal General
Services Administration (GSA) bid list, the following are contracts that will expire within the
next 180 days:
DESCRIPTION VENDOR EXPIRATION RENEWAL
DATE TERMS
Emergency Board-up Pillar 1. and Securing Services Consultants, Inc. 02/02/2013 None
ITB-11-09/1 0
Emergency Board-up TCS Empire, 2. and Securing Services 02/02/2013 None
ITB-11-09/10 Inc.
Emergency Board-up A Quick Board-3. and Securing Services up Services, Inc. 02/02/2013 None
ITB-11-09/10
Electric Motor Rewind Condo Electric 3 option years to 4. Motor Repair, 01/17/2013 and Repair Services Corp. renew
Maintenance of
5. Vehicle Exhaust Safe Air Corp. 01/26/2013 3 option years to
Removal Systems renew
ITB-01-1 0/11
Waterway Resources Tow Tell Marine
6. Maintenance Services LLC 12/01/2012 None
ITB-12-05/06 d/b/a H20
KGB:PDW:RA
T:\AGENDA\2012\7-18-12\July 180 Day Report.doc
Page2
DESCRIPTION VENDOR EXPIRATION RENEWAL
DATE TERMS
The Purchase,
7. Delivery and Sunset Sod, Inc. 01/05/2013 2 Option to
Installation of Sod renew
ITB-46-08/09
Rental/Lease of Enterprise
8. Vehicles for the City of Leasing 02/02/2013 One option year
Miami Beach Company remaining
ITB-51-08/09
To Provide Grounds
Maintenance Services SFM Services, 2 option years 9. for Parking Lots 02/03/2013
Citywide Inc. to renew
ITB-57 -08/09
Building Inspections,
Plans Review Services
10. in Various Disciplines, M.T. Causley, 12/8/2012 2 option years to
and Permit Clerks to Inc. renew
Provide Services
RFP-47-08/09
Building Inspections,
Plans Review Services Nova
11. in Various Disciplines, Engineering and 12/8/2012 2 option years to
and Permit Clerks to Environmental renew
Provide Services
RFP-4 7-08/09
Building Inspections,
Plans Review Services Vertical
12. in Various Disciplines, Assessment 12/8/2012 2 option years to
and Permit Clerks to Associates, LLC renew
Provide Services
RFP-47-08/09
Building Inspections,
Plans Review Services CAP
13 in Various Disciplines, Government, 12/8/2012 2 option years to
and Permit Clerks to Inc. renew
Provide Services
RFP-4 7-08/09
For an Insurance Arthur J.
14. Broker of Record, for Gallagher Risk 01/26/2013 One option year
Property and Liability Management remaining
Insurance Services, Inc.
Plumbing Equipment & Please see 4 option years 15. Supplies 11/30/2011
(MDCC # 6582-5/16) Attachment "A" to renew
Petroleum Products -
16. Prequalification B.V. Oil 12/31/2012 5 option years to
(MDCC# 8318-5/17) Company renew
Petroleum Products -
17. Prequalification Blaylock Oil 12/31/2012 5 option years to
(MDCC# 8318-5/17) Company renew
DESCRIPTION VENDOR EXPIRATION RENEWAL
DATE TERMS
Petroleum Products Burck Oil 18. Prequalification 12/31/2012 5 option years to
(MDCC# 8318-5/17) Company, Inc. renew
Petroleum Products -Flamingo Oil 19. Prequalification 12/31/2012 5 option years to
(MDCC# 8318-5/17) Company renew
Petroleum Products -Sid Tool
Prequalification Company, Inc. 5 option years to 20. (MDCC # 8318-5/17) d/b/a MSC 12/31/2012
Industrial Supply renew
Co.
Petroleum Products -Applied
21. Prequalification Industrial 12/31/2012 5 option years to
(MDCC# 8318-5/17) Technolooies renew
Petroleum Products -W.W. Granger, 22. Prequalification 12/31/2012 5 option years to
(MDCC# 8318-5/17) Inc. renew
Petroleum Products Tropical Oil 23. Prequalification 12/31/2012 5 option years to
(MDCC # 8318-5/17) Company renew
Petroleum Products-Osher Oil
24. Prequalification Corporation 12/31/2012 5 option years to
(MDCC # 8318-5/17) d/b/a Costa Oil renew
Company
Petroleum Products
25 Prequalification Santex 12/31/2012 5 option years to
(MDCC# 8318-5/17) Corporation renew
Petroleum Products -
26. Prequalification Enbio Industries, 12/31/2012 5 option years to
(MDCC # 8318-5/17) Inc. renew
Petroleum Products-
27. Prequalification Motion 12/31/2012 5 option years to
(MDCC# 8318-5/17) Industries, Inc. renew
Petroleum Products -SSI Lubricants, Prequalification 5 option years to 28. (MDCC# 8318-5/17) LLC d/b/a SSI 12/31/2012
Petroleum renew
Petroleum Products-NCH Corp d/b/a Prequalification 5 option years to 29. (MDCC # 8318-5/17) Certified 12/31/2012
Laboratories renew
Page4
Attachment A
Miami Dade County Contract# 6582-5/16
HD Supply Waterworks L TO Best Plumbing Specialties, Inc.
SID Tool Co., Inc. Alterna Corp
Niagara Conservation Corporation Interline Brands, Inc. d/b/a J. A.
Sexauer, Inc,
HAJOCA Corporation d/b/a Hugh Desert Diamond Industries, LLC Sl.!QQ!y
FCX Performance, Inc. d/b/a W.W. Granger, Inc. Solares Controls
Ferguson Enterprises, Inc. d/b/a Stone Group Enterprises, Inc. Ferguson Waterworks
Shelton Supply, Inc. d/b/a F.M. Lehman Pipe Supply, Inc. Shelton, Inc.
Bond Plumbing Supply d/b/a Bond Lion Plumbing Supply, Inc. Supp_ly
Palmetto Hardware Plumbing American Plumbing Supply Co., Inc. Supply, Inc. d/b/a Ace Home d/b/a American Plumbing Electric Center
Quigar Electric, Inc. d/b/a Ace Pump Miami Water Heater, Inc. Supply Bee Electric
Laser Lighting, Inc, d/b/a Laser Plusco Supply Corp. SL!22_1y Services
IT Wine, d/b/a AAA Tool & Supply Tesco South, Inc., Hector Turf
Sunshine Plumbing Supply, Inc. Primeline Products, Inc.
Florida Hardware, LLC Berger Plumbing Supply, Inc.
Corcel Corp. Tool Place Corporation
A & B Pipe & Supply, Inc. USSI, LLC
Plumbmaster, Inc.
MIAMI BEACH
CAPITAL IMPROVEMENT PROJECTS OFFICE
MEMORANDUM
TO: Mayor Matti Herrera Bower and Members of the City Commission
FROM: Kathie G. Brooks, Interim City Manager
DATE: July 18, 2012
SUBJECT: STATUS REPORT ON THE PALM & HIBISCUS ISLANDS NEIGHBORHOOD
PROJECT
CURRENT:
I. Status of the Neighborhood Improvement Project:
The Palm and Hibiscus Neighborhood improvement project consists of: landscaping I
irrigation, street lighting, replacement of existing water main infrastructure, improved
storm water drainage collection and disposal infrastructure including swale restoration,
curb and gutter and other facilities, street resurfacing/pavement markings, sewer lining
and repair, repair and/or extension of existing sidewalks to comply with ADA
requirements, incorporation of traffic calming features, and the coordination of the
undergrounding of utilities including Florida Power & Light (FPL), Atlantic Broad Band
(ABB) and AT&T (ATT).
On December 21, 2011, C3TS submitted a proposal and after several negotiations, the
City was able to reach an agreement in the lump sum amount of $523,082. The contract
with C3TS, the City's Consultant, was executed on July 81h, 2012 and they have
commenced their planning phase scope of services.
The estimated completion date for the Design Criteria Documents is August of 2012.
The Request for Proposals for the selection of a Design Build firm is anticipated for
advertisement by September 2012.
The following are the scheduled target dates to project completion (Projected dates):
• August 2012: Design Criteria Completed.
• September 2012: Issue Request for Proposals for Design Builder.
• December 2012: Design Builder Contract Award.
• June 2014: Construction Completion.
II. Status of the Hibiscus Island Utilities Undergrounding [Florida Power & Light
(FPL), Atlantic Broadband (ABB) and AT&T]:
Currently, the ABB agreement has been submitted for review by our legal department.
Subsequently the agreement will be presented to Commission for approval and further
execution by the City. A TT is developing a contract for review by our legal department
and will follow similar steps as the ABB agreement.
FPL has submitted additional contract documents currently under review by our legal
department (City/County Right-Of-Way Agreement for the Undergrounding Conversion
1
'I
Status Report on Palm & Hibiscus Island Project
Page 2 of 2
and Applicant-Installed Facilities Agreement for Undergrounding Conversion).
The undergrounding scope of work will be coordinated with the ROW design criteria and
the commencement of the undergrounding work will be phased and coordinated with the
ROW project schedule.
PRIOR HISTORY:
Ill. Prior completed items:
• The Hibiscus Homeowners Association (HOA) pursued a Special Taxing District
with Miami-Dade County.
• Pursuant to the establishment of the Hibiscus Island Overhead Services Relocation
Improvement Special Taxing District on September 21, 2010, the district was
approved on December 7, 2010 by majority vote of the qualified electors residing
within the District.
• The HOA requested that FPL provide a binding estimate for the undergrounding of
the existing overhead electrical, telephone, and cable television service lines for
Hibiscus Island only. The HOA believed that the new estimate for the
undergrounding of Hibiscus Island will come in at a lower cost than the binding
estimate provided on July 15, 2010 (FPL binding estimates are valid for 180 days
only).
• The City requested new binding estimates from ABB and A TT once the FPL revised
drawings dated 8-24-2011 and updated binding estimates were submitted.
• The County received the new binding estimate amounts from the City and the
County will cover the costs of the utilities undergrounding project up to the amount
stipulated in the lnterlocal Agreement.
• The County has collected $510,816.96, from the Homeowners pursuant to language
in the Special Taxing District Ordinance no. 10-51.
• On August 8, 2011, I an Kaplan, Hibiscus Island HOA President, requested that the
County hold in abeyance the tax roll for the first year since the project was not
expected to break ground that year.
• On May 1, 2012, the FPL Underground Facilities Conversion Agreement -
Governmental Adjustment Factor Waiver was executed.
• On May 1ih, 2012, the City and the County entered into an lnterlocal agreement,
the legal vehicle by which the County may reimburse the City for the construction
costs related to the utility undergrounding project.
• The City Manager has executed the FPL Underground Facilities Conversion
Agreement prior to the expiration date of April 24, 2012. Both the Agreement and
deposit have been transmitted to FPL.
flDM/MER
~ MIAMI BEACH -=-
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
TO:
FROM:
DATE:
COMMISSION MEMORANDUM
Mayor Matti Herrera Bower and Members of the City Commission
Kathie G. Brooks, Interim City Manager/~#---'
July 18, 2012 /
SUBJECT: CIP Monthly Construction Project Update
Attached please find the monthly update for active City of Miami Beach construction projects
under the purview of the CIP Office.
Attachment
cc: Duncan Ballantyne~
Fernando Vazquez / r-
David Martinez
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
i
·
.
Mi
d
d
l
e
Be
a
c
h
Fe
r
n
a
n
d
e
z
,
D.
Pr
o
j
e
c
t
Na
m
e
Ba
y
s
h
o
r
e
BP
SA
-
Ce
n
t
r
a
l
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
u
t
h
(
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Pa
c
k
a
g
e
A
-
Ce
n
t
r
a
l
Ba
y
s
h
o
r
e
-
Th
e
ar
e
a
in
c
l
u
d
e
s
40
t
h
St
r
e
e
t
,
Fl
a
m
i
n
g
o
Dr
i
v
e
,
th
e
Sh
e
r
i
d
a
n
Av
e
n
u
e
Mu
l
t
i
-
F
a
m
i
l
y
Ne
i
g
h
b
o
r
h
o
o
d
,
an
d
th
e
Ce
n
t
r
a
l
Ba
y
s
h
o
r
e
Co
m
m
u
n
i
t
y
(s
i
n
g
l
e
-
f
a
m
i
l
y
se
c
t
i
o
n
)
.
Sc
o
p
e
in
c
l
u
d
e
s
st
r
e
e
t
re
s
u
r
f
a
c
i
n
g
,
si
d
e
w
a
l
k
re
p
a
i
r
,
sw
a
l
e
/
p
l
a
n
t
i
n
g
st
r
i
p
re
s
t
o
r
a
t
i
o
n
,
in
s
t
a
l
l
a
t
i
o
n
of
cu
r
b
an
d
gu
t
t
e
r
,
en
h
a
n
c
e
d
la
n
d
s
c
a
p
i
n
g
,
dr
a
i
n
a
g
e
up
g
r
a
d
e
s
,
tr
a
f
f
i
c
ca
l
m
i
n
g
,
wa
t
e
r
ma
i
n
re
p
l
a
c
e
m
e
n
t
,
an
d
im
p
r
o
v
e
d
on
-
s
t
r
e
e
t
pa
r
k
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
NT
P
-
1
wa
s
is
s
u
e
d
Au
g
u
s
t
19
,
2011.
A
Co
m
m
u
n
i
t
y
Pr
e
-
C
o
n
s
t
r
u
c
t
i
o
n
Meeting was held at the Miami Beach
Go
l
f
Cl
u
b
on
Au
g
u
s
t
29
,
20
1
1
.
Pr
e
Co
n
s
t
r
u
c
t
i
o
n
Me
e
t
i
n
g
wa
s
held October 26, 2011.
NT
P
-2
wa
s
is
s
u
e
d
Oc
t
o
b
e
r
31
,
2011.
Co
n
s
t
r
u
c
t
i
o
n
st
a
r
t
e
d
on
Oc
t
o
b
e
r
31, 2011.
A
pe
r
m
i
t
ex
t
e
n
s
i
o
n
ha
s
be
e
n
su
b
m
i
t
t
e
d
to FDOT on 6/27/12 to allow the
Ci
t
y
to
co
n
t
i
n
u
e
to
us
e
th
e
st
a
g
i
n
g
area until September 2013. CIP is
aw
a
i
t
i
n
g
pe
r
m
i
t
ex
t
e
n
s
i
o
n
ap
p
r
o
v
a
l
.
Wo
r
k
is
cu
r
r
e
n
t
l
y
un
d
e
r
w
a
y
at
the following locations:
-P
r
a
i
r
i
e
Av
e
n
u
e
fr
o
m
34
t
h
St
r
e
e
t
to 40th Street-Drainange
Im
p
r
o
v
e
m
e
n
t
s
.
-3
9
t
h
St
r
e
e
t
an
d
40
t
h
St
r
e
e
t
fr
o
m
Alton Road to Meridian Avenue-
Wa
t
e
r
m
a
i
n
in
s
t
a
l
l
a
t
i
o
n
.
-W
a
t
e
r
se
r
v
i
c
e
co
n
n
e
c
t
i
o
n
s
on
Sheridan Avenue from 31st Street to
40
t
h
St
r
e
e
t
.
On
5/
2
3
/
1
2
th
e
co
n
t
r
a
c
t
o
r
be
g
a
n
removal of encroachments on Chase
Av
e
n
u
e
N.
of
37
t
h
St
r
e
e
t
an
d
Prairie Avenue from 34th Street to 40th
St
r
e
e
t
.
Ch
a
s
e
Av
e
n
u
e
fr
o
m
Al
t
o
n
Ro
a
d
to 40th Street was redsigned to
ac
c
o
m
m
o
d
a
t
e
th
e
Ro
y
a
l
Pa
l
m
trees and Oak trees. Drainage installtion
wi
l
l
st
a
r
t
on
Ju
l
y
24
,
20
1
2
.
Fl
a
m
i
n
g
o
Dr
i
v
e
dr
a
i
n
a
g
e
wo
r
k
has been redesigned to accommodate
th
e
ut
l
i
t
y
co
n
f
l
i
c
t
s
.
Dr
a
i
n
a
g
e
in
s
t
a
l
l
a
i
o
n
is expected to start in August
20
1
2
.
Pu
m
p
St
a
t
i
o
n
s
#1
-
#5
ar
e
un
d
e
r
construction and at different stages of
co
m
p
l
e
t
i
o
n
th
r
o
u
g
h
o
u
t
th
e
pr
o
j
e
c
t
.
Pumps are scheduled for completion
by
Oc
t
o
b
e
r
,
20
1
2
.
Ov
e
a
l
l
pr
o
j
e
c
t
is
30
%
co
m
p
l
e
t
e
and on schedule for completion by
Oc
t
o
b
e
r
,
20
1
3
.
Page 1 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
Mi
d
d
l
e
Be
a
c
h
Fe
r
n
a
n
d
e
z
,
D.
Mi
d
d
l
e
Be
a
c
h
Sa
n
c
h
e
z
,
0
.
Pr
o
j
e
c
t
Na
m
e
Ba
y
s
h
o
r
e
BP
8
8
-
Lo
w
e
r
No
r
t
h
Ba
y
Ro
a
d
-
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
Ba
y
s
h
o
r
e
BP
8C
-
La
k
e
Pa
n
c
o
a
s
t
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
71
2
1
2
0
1
2
5:
2
1
:
3
2
Pi
H
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Pa
c
k
a
g
e
B
-
Lo
w
e
r
No
r
t
h
Ba
y
Ro
a
d
.
Sc
h
e
d
u
l
e
d
im
p
r
o
v
e
m
e
n
t
s
in
c
l
u
d
e
th
e
in
s
t
a
l
l
a
t
i
o
n
of
va
l
l
e
y
gu
t
t
e
r
s
an
d
a
st
o
r
m
w
a
t
e
r
sy
s
t
e
m
wi
t
h
tw
o
st
o
r
m
w
a
t
e
r
pu
m
p
st
a
t
i
o
n
s
,
in
j
e
c
t
i
o
n
we
l
l
s
,
ou
t
f
a
l
l
re
p
a
i
r
an
d
re
p
l
a
c
e
m
e
n
t
,
st
r
e
e
t
re
s
u
r
f
a
c
i
n
g
,
wa
t
e
r
ma
i
n
re
p
l
a
c
e
m
e
n
t
an
d
de
c
o
r
a
t
i
v
e
st
a
m
p
e
d
as
p
h
a
l
t
fl
u
s
h
tr
a
f
f
i
c
ta
b
l
e
s
.
Pa
c
k
a
g
e
C
-
La
k
e
Pa
n
c
o
a
s
t
-
Th
e
ar
e
a
in
c
l
u
d
e
s
Fl
a
m
i
n
g
o
Dr
i
v
e
,
Fl
a
m
i
n
g
o
Pl
a
c
e
,
We
s
t
24
t
h
St
r
e
e
t
to
Pi
n
e
Tr
e
e
Dr
i
v
e
,
an
d
La
k
e
Pa
n
c
o
a
s
t
Dr
i
v
e
.
Sc
o
p
e
in
c
l
u
d
e
s
st
r
e
e
t
re
s
u
r
f
a
c
i
n
g
,
si
d
e
w
a
l
k
re
p
a
i
r
,
pl
a
n
t
i
n
g
st
r
i
p
re
s
t
o
r
a
t
i
o
n
,
cu
r
b
an
d
gu
t
t
e
r
up
g
r
a
d
e
s
,
en
h
a
n
c
e
d
la
n
d
s
c
a
p
i
n
g
,
en
t
r
y
w
a
y
fe
a
t
u
r
e
s
,
en
h
a
n
c
e
d
st
r
e
e
t
si
g
n
a
g
e
,
st
r
e
e
t
l
i
g
h
t
up
g
r
a
d
e
s
,
wa
t
e
r
ma
i
n
re
p
l
a
c
e
m
e
n
t
,
an
d
im
p
r
o
v
e
d
on
-
s
t
r
e
e
t
pa
r
k
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
A
Co
m
m
u
n
i
t
y
Pr
e
-
C
o
n
s
t
r
u
c
t
i
o
n
Meeting was held at the Miami Beach
Go
l
f
Cl
u
b
on
Au
g
u
s
t
4,
20
1
1
.
NT
P
-
1
wa
s
is
s
u
e
d
on
Au
g
u
s
t
18
,
2011.
Pr
e
C
o
n
s
t
r
u
c
t
i
o
n
Me
e
t
i
n
g
oc
u
r
r
e
d
on December 5, 2011.
CI
P
re
c
e
i
v
e
d
ad
d
i
t
o
n
a
l
de
s
i
g
n
comments from Public Works (PWD) on
th
e
Co
n
s
t
r
u
c
t
i
o
n
Se
t
of
pl
a
n
s
on
2/2/12.
On
4/
1
6
/
1
2
CI
P
re
c
e
i
v
e
d
co
n
f
i
r
m
a
t
i
o
n
from CH2MHILL and PWD stating
th
a
t
th
e
ti
e
d
fl
e
x
va
l
v
e
s
wi
l
l
be
in
s
t
a
l
l
e
d
at the outfalls and that no
ad
d
i
t
i
o
n
a
l
ch
a
n
g
e
s
wi
l
l
ne
e
d
to
be done to the plans.
Ph
a
s
e
1
en
c
r
o
a
c
h
m
e
n
t
le
t
t
e
r
s
were sent out on 4/24/12. Encroahcment
le
t
t
e
r
s
fo
r
ad
d
i
t
i
o
n
a
l
ph
a
s
e
s
wi
l
l
not be sent until after issuance of NTP-2.
RO
W
pe
r
m
i
t
wa
s
is
s
u
e
d
by
PW
D
to contractor on May 23, 2012.
Th
e
co
n
t
r
a
c
t
o
r
su
b
m
i
t
t
e
d
a
re
v
i
s
e
d
and increased cost estimate for the
pr
o
j
e
c
t
on
Ma
y
30
,
20
1
2
wh
i
c
h
is currently under review by CIP. An
ap
p
r
o
v
e
d
co
n
s
t
r
u
c
t
i
o
n
sc
h
e
d
u
l
e
is pending.
Is
s
u
a
n
c
e
of
NT
P
-
2
is
pe
n
d
i
n
g
ap
p
r
o
v
a
l
of cost increases and project
sc
h
e
d
u
l
e
.
A
Co
m
m
u
n
i
t
y
Pr
e
-
C
o
n
s
t
r
u
c
t
i
o
n
Meeting was held at the Collins Park
Li
b
r
a
r
y
on
Se
p
t
e
m
b
e
r
21
,
20
1
1
.
NT
P
-
1
w
a
s
is
s
u
e
d
on
Au
g
u
s
t
19
,
2011.
Pr
e
Co
n
s
t
r
u
c
t
i
o
n
Me
e
t
i
n
g
wa
s
held October 26, 2011.
NT
P
-2
wa
s
is
s
u
e
d
Oc
t
o
b
e
r
31
,
2011.
Co
n
s
t
r
u
c
t
i
o
n
mo
b
i
l
i
z
a
t
i
o
n
co
m
m
e
n
c
e
d
on March 2012 and has a 12
mo
n
t
h
du
r
a
t
i
o
n
.
Th
i
s
pr
o
j
e
c
t
is
being constructed in tandem with the
Ce
n
t
r
a
l
Ba
y
s
h
o
r
e
A
pr
o
j
e
c
t
.
Th
e
wa
t
e
r
ma
i
n
in
s
t
a
l
l
a
t
i
o
n
st
a
r
t
e
d
on March 26, 2012 and is complete.
Up
d
a
t
e
6/
2
8
/
1
2
:
-
Pu
m
p
St
a
t
i
o
n
#6
is
un
d
e
r
co
n
s
t
r
u
c
t
i
o
n
.
-W
a
t
e
r
Ma
i
n
In
s
t
a
l
l
a
t
i
o
n
is
co
m
p
l
e
t
e
.
Connection of the water meter
se
r
v
i
c
e
s
ar
e
in
pr
o
c
e
s
s
.
-D
r
a
i
n
a
g
e
In
s
t
a
l
l
a
t
i
o
n
is
co
m
p
l
e
t
e
.
-R
o
a
d
re
c
o
n
s
t
r
u
c
t
i
o
n
is
in
pr
o
c
e
s
s
at the following locations:
-W
e
s
t
24
Te
r
r
a
c
e
be
t
w
e
e
n
Pi
n
e
Tree to Flamingo Drive.
-
Fl
a
m
i
n
g
o
Pl
a
c
e
be
t
w
e
e
n
We
s
t
24 Terrace to West 25 Street.
-W
e
s
t
25
St
r
e
e
t
be
t
w
e
e
n
Pi
n
e
Tree to Flamingo Drive.
Pr
o
j
e
c
t
is
on
sc
h
e
d
u
l
e
fo
r
co
m
p
l
e
t
i
o
n
early 2013. Pagel of45
Di
s
t
r
i
c
t
Pr
r
~
j
e
c
t
Mg
r
.
Mi
d
d
l
e
Be
a
c
h
He
r
n
a
n
d
e
z
,
M.
Pr
o
j
e
c
t
Na
m
e
Ba
y
s
h
o
r
e
BP
SE
Su
n
s
e
t
Is
l
a
n
d
s
1
&
2
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
1
1
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Pa
c
k
a
g
e
E
-
Su
n
s
e
t
Is
l
a
n
d
1
&
2
-
Ne
i
g
h
b
o
r
h
o
o
d
#8
.
Sc
o
p
e
in
c
l
u
d
e
s
up
g
r
a
d
i
n
g
th
e
st
o
r
m
w
a
t
e
r
dr
a
i
n
a
g
e
co
l
l
e
c
t
i
o
n
an
d
di
s
p
o
s
a
l
sy
s
t
e
m
to
ha
n
d
l
e
a
5-
y
e
a
r
1-
da
y
st
o
r
m
ev
e
n
t
,
re
p
l
a
c
e
m
e
n
t
of
ex
i
s
t
i
n
g
wa
t
e
r
ma
i
n
s
to
me
e
t
Ci
t
y
Wa
t
e
r
Ma
s
t
e
r
Pl
a
n
re
c
o
m
m
e
n
d
a
t
i
o
n
s
,
st
r
e
e
t
re
c
o
n
s
t
r
u
c
t
i
o
n
wi
t
h
ne
w
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
,
an
d
va
l
l
e
y
gu
t
t
e
r
cu
r
b
up
g
r
a
d
e
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
Th
e
Pr
e
c
o
n
s
t
r
u
c
t
i
o
n
Co
m
m
u
n
i
t
y
Meeting was held on November 3,
20
1
1
.
Th
e
Pr
e
c
o
n
s
t
r
u
c
t
i
o
n
Me
e
t
i
n
g
wa
s
held on December 2, 2011 witl1
DM
S
I
.
Fi
r
s
t
an
d
Se
c
o
n
d
En
c
r
o
a
c
h
m
e
n
t
Letters were sent to the community
be
t
w
e
e
n
No
v
e
m
b
e
r
an
d
De
c
e
m
b
e
r
,
2011.
NT
P
-
2
wa
s
is
s
u
e
d
on
De
c
e
m
b
e
r
12, 2011 with construction mobilization
sc
h
e
d
u
l
e
d
fo
r
Ja
n
u
a
r
y
11
,
20
1
2
.
DM
S
I
mo
b
i
l
i
z
e
d
on
Ja
n
u
a
r
y
12
,
2012 with the staging area.
En
c
r
o
a
c
h
m
e
n
t
re
m
o
v
a
l
co
m
m
e
n
c
e
d
the week of January 16, 2012 and
is
co
m
p
l
e
t
e
.
Th
e
wa
t
e
r
ma
i
n
in
s
t
a
l
l
a
t
i
o
n
ha
s
been completed on both islands and
co
n
n
e
c
t
i
o
n
s
ar
e
in
pr
o
c
e
s
s
.
Da
i
n
a
g
e
st
r
u
c
t
u
r
e
in
s
t
a
l
l
a
t
i
o
n
on
Sunset Island 2 is 37% complete.
Ro
a
d
Co
n
s
t
r
u
c
i
o
n
an
d
va
l
l
e
y
gu
t
t
e
r
construction will commence in July
on
Su
n
s
e
t
Is
l
a
n
d
2.
Ut
i
l
i
t
y
co
n
f
l
i
c
t
re
m
o
v
a
l
wi
t
h
FP
L
,
ABB, ATT, PWD lighting, and TECO
ga
s
is
in
pr
o
c
e
s
s
.
Pr
o
j
e
c
t
is
cu
r
r
e
n
t
l
y
sc
h
d
u
l
e
d
fo
r
completion by March 2013. P11ge3 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
71
2
1
2
0
1
2
5:
2
1
:
3
2
PM
Pr
o
j
e
c
t
Na
m
e
Mo
u
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o.
f
W
o
r
k
Co
n
s
t
r
u
c
t
i
o
n
St(ttus
is
co
m
p
l
e
t
e
.
DO
H
ce
r
t
i
f
i
c
a
t
i
o
n
wa
s
approved and all fire line and water
se
r
v
i
c
e
tr
a
n
s
f
e
r
s
we
r
e
co
m
p
l
e
t
e
d
.
Pa
r
k
Av
e
:
St
o
r
m
w
a
t
e
r
im
p
r
o
v
e
m
e
n
t
s
,
watermain and first lift of asphalt
wa
s
co
m
p
l
e
t
e
d
.
Ha
r
d
s
c
a
p
e
co
n
s
t
r
u
c
t
i
o
n
is complete. DOH certification
wa
s
ap
p
r
o
v
e
d
an
d
al
l
fi
r
e
li
n
e
an
d
water service transfers were
co
m
p
l
e
t
e
d
.
Dr
a
i
n
a
g
e
li
n
e
re
p
a
i
r
s
are pending.
20
t
h
St
r
e
e
t
:
Dr
a
i
n
a
g
e
st
r
u
c
t
u
r
e
s
were installed between Collins and
Li
b
e
r
t
y
Av
e
.
Du
e
to
No
n
Co
m
p
l
i
a
n
c
e
Reports and Stop Work Directive
is
s
u
e
d
to
M.
Vi
l
a
on
Au
g
u
s
t
25
,
2011, Contractor had to restore the area
an
d
co
m
p
l
y
wi
t
h
al
l
No
n
Co
m
p
l
i
a
n
c
e
reports prior to continuing drainage
in
s
t
a
l
l
a
t
i
o
n
s
on
th
e
re
s
t
of
20
t
h
street. Road reconstruction between
Li
b
e
r
t
y
Av
e
an
d
Co
l
l
i
n
s
Av
e
is
co
m
p
l
e
t
e
on the south side. The
wa
t
e
r
m
a
i
n
in
s
t
a
l
l
a
t
i
o
n
is
co
m
p
l
e
t
e
except the service laterals (domestic,
ir
r
i
g
a
t
i
o
n
an
d
fi
r
e
)
.
Ha
r
d
s
c
a
p
e
re
c
o
n
s
t
r
u
c
t
i
o
n
on the north side of 20th
be
t
w
e
e
n
Li
b
e
r
t
y
Av
e
an
d
Co
l
l
i
n
s
Ave is in progress.
Al
l
gr
a
v
i
t
y
we
l
l
s
re
c
e
i
v
e
d
FD
E
P
Certification of Class V Well
Co
n
s
t
r
u
c
t
i
o
n
Co
m
p
l
e
t
i
o
n
an
d
wa
t
e
r
quality analysis and use
au
t
h
o
r
i
z
a
t
i
o
n
.
Th
e
gr
a
t
e
s
an
d
gr
o
u
t
i
n
g
are pending.
Fi
r
e
li
n
e
tr
a
n
s
f
e
r
s
be
g
a
n
on
Ma
r
c
h
24, 2011 and are complete.
'I
La
m
p
i
n
g
In
s
p
e
c
t
i
o
n
s
we
r
e
co
m
p
l
e
t
e
d
by PWD and Envirowaste.
Wa
s
h
i
n
g
t
o
n
Av
e
be
t
w
e
e
n
Li
n
c
o
l
n
Road and Washington Ct. are
ap
p
r
o
v
e
d
.
Ja
m
e
s
Av
e
be
t
w
e
e
n
17 and 18 streets is also approved.
Ja
m
e
s
be
t
w
e
e
n
17
an
d
Li
n
c
o
l
n
Road are pending repair due to
in
f
i
l
t
r
a
t
i
o
n
as
we
l
l
as
21
st
r
e
e
t
,
19
t
h
street and Park Ave. Envirowaste
co
m
p
l
e
t
e
d
pa
r
t
i
a
l
CC
T
V
in
s
p
e
c
t
i
o
n
s
and provided a report.
On
Oc
t
o
b
e
r
24
,
20
1
1
,
th
e
Ci
t
y
is
s
u
e
d
a Notice of Termination to M. Vila.
On
Oc
t
o
b
e
r
31
,
20
1
1
,
Me
t
r
o
Ex
p
r
e
s
s
was contracted by the City under a
Jo
b
Or
d
e
r
Co
n
t
r
a
c
t
(J
O
G
)
to
co
m
p
l
e
t
e
the remaining scope and repair
de
f
i
c
i
e
n
c
i
e
s
wi
t
h
wo
r
k
po
o
r
l
y
pe
r
f
o
r
m
e
d
by M. Vila. Refer to L TC-290-
20
1
1
.
Ad
d
i
t
o
n
a
l
wo
r
k
fo
r
co
m
p
l
e
t
i
o
n
of pending lighting and electrical
wo
r
k
an
d
la
n
d
s
c
a
p
i
n
g
an
d
ir
r
i
g
a
t
i
o
n
was approved under separate
BP
O
'
s
on
6/
2
7
/
1
2
.
Fi
n
a
l
JO
G
co
n
t
r
a
c
t
wi
t
h
En
v
i
r
o
w
a
s
t
e
was approved and BPO issued on
6/
2
7
/
1
2
.
Dr
i
a
n
a
g
e
re
p
a
i
r
s
ar
e
in
process.
Pr
o
j
e
c
t
is
sc
h
e
d
u
l
e
d
fo
r
co
m
p
l
e
t
i
o
n
by September 2012. Page 5 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
.M
g
r
.
Mi
d
d
l
e
Be
a
c
h
Sa
n
c
h
e
z
,
0
.
7/
2
/
2
0
1
2
5:
2
1
:
3
2
PM
PN
?
j
e
c
t
Nm
1
1
e
In
d
i
a
n
Cr
e
e
k
Wa
t
e
r
/
W
a
s
t
e
w
a
t
e
r
Re
h
a
b
i
l
i
t
a
t
i
o
n
26
t
h
to
41
s
t
St
r
e
e
t
s
Mo
n
t
h
f
;
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.f
u
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Th
e
wo
r
k
co
n
s
i
s
t
s
of
wa
t
e
r
ma
i
n
re
p
l
a
c
e
m
e
n
t
,
sa
n
i
t
a
r
y
se
w
e
r
re
p
l
a
c
e
m
e
n
t
an
d
as
p
h
a
l
t
re
-
s
u
r
f
a
c
i
n
g
al
o
n
g
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
fr
o
m
26
t
h
to
41
s
t
St
r
e
e
t
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
Th
e
co
n
t
r
a
c
t
wi
t
h
Ho
r
i
z
o
n
wa
s
executed on May 28, 2009. Notice to
Pr
o
c
e
e
d
#1
wa
s
is
s
u
e
d
by
PW
D
on June 16, 2009. A pre-construction
me
e
t
i
n
g
wi
t
h
th
e
re
s
i
d
e
n
t
s
an
d
business owners was held on July 22,
20
0
9
,
an
d
an
in
t
e
r
-
d
e
p
a
r
t
m
e
n
t
a
l
coordination meeting between all City
de
p
a
r
t
m
e
n
t
s
wa
s
he
l
d
on
Oc
t
o
b
e
r
15, 2009. The contractor finalized
th
e
pe
r
m
i
t
pr
o
c
e
s
s
in
Oc
t
o
b
e
r
2009.The second Notice to Proceed was
is
s
u
e
d
on
Oc
t
o
b
e
r
22
,
20
0
9
an
d
the contractor mobilized after receiving
ap
p
r
o
v
a
l
on
th
e
Ma
i
n
t
e
n
a
n
c
e
of
Traffic Plan and installed the advance
tr
a
f
f
i
c
wa
r
n
i
n
g
de
v
i
c
e
s
an
d
sa
f
e
t
y
barriers ahead of the work area.
Wa
t
e
r
Ma
i
n
:
4,
5
2
0
LF
of
wa
t
e
r
main has been installed between 26th
an
d
41
s
t
St
r
e
e
t
(s
t
a
30
+
0
0
to
st
a
75+20) as well as all the side streets
at
27
t
h
,
2
8
t
h
,
2
9
t
h
,
3
0
t
h
,
3
1
s
t
,
3
2
n
d
,
3
3
r
d
,
3
4
t
h
,
3
6
t
h
,
37th,38th,39th and
4o
t
h
.
35
t
h
St
r
e
e
t
is
pe
n
d
i
n
g
cl
e
a
r
a
n
c
e
of existing line and removal of a
se
c
t
i
o
n
an
d
co
n
n
e
c
t
i
o
n
to
ne
w
12" water main. Road restoration' and
th
e
fi
r
s
t
li
f
t
of
as
p
h
a
l
t
ov
e
r
th
e
tr
e
n
c
h
line are complete between 26th
an
d
41
s
t
St
r
e
e
t
.
Fl
u
s
h
i
n
g
wa
s
done between 26th and 4oth Street.
Pr
e
s
s
u
r
e
te
s
t
an
d
Ba
c
t
e
o
r
o
l
o
g
i
c
a
l
Test passed on all the water main
an
d
si
d
e
st
r
e
e
t
an
d
DO
H
ha
d
ap
p
r
o
v
e
d
mainline between 26th thru 30th
St
r
e
e
t
an
d
si
d
e
st
r
e
e
t
be
t
w
e
e
n
26th and 30th Street. PWD is reviewing
th
e
As
-
b
u
i
l
t
s
fr
o
m
30
t
h
St
r
e
e
t
to
41st Street and all the remainder side
st
r
e
e
t
s
.
Co
n
t
r
a
c
t
o
r
co
m
p
l
e
t
e
d
the comments on the red lines for the
wa
t
e
r
ma
i
n
be
t
w
e
e
n
35
t
h
an
d
41st and side streets north of 35th Street
(i
.
e
,
lo
c
a
t
i
o
n
s
of
AR
V
,
of
f
s
e
t
at
water line, show offset below new 12"
wa
t
e
r
li
n
e
an
d
re
m
o
v
e
re
d
cl
o
u
d
s
,
etc.). Public Works is waiting on a
me
m
o
fr
o
m
CI
P
'
s
in
s
p
e
c
t
o
r
to
fo
r
w
a
r
d
the documents for DOH
cl
e
a
r
a
n
c
e
.
Me
e
t
i
n
g
he
l
d
on
Ja
n
u
a
r
y
18, 2011 with HCI and PiND.
PW
D
re
q
u
e
s
t
e
d
th
e
co
n
t
r
a
c
t
o
r
to re-established sample points,
pr
e
s
s
u
r
e
te
s
t
at
in
t
e
r
s
e
c
t
i
o
n
an
d
chlorinate the line. PWD will
co
o
r
d
i
n
a
t
e
wi
t
h
DO
H
th
e
lo
c
a
t
i
o
n
s
of sample points. The contractor will
pr
o
v
i
d
e
a
co
s
t
pr
o
p
o
s
a
l
fo
r
re
v
i
e
w
and execution by the City. The
co
n
t
r
a
c
t
o
r
pr
o
v
i
d
e
d
th
e
co
s
t
pr
o
p
o
s
a
l
and is being process by the City.
PW
D
ob
t
a
i
n
e
d
ap
p
r
o
v
a
l
of
sa
m
p
l
e
point locations from DOH and the
co
n
t
r
a
c
t
o
r
ha
s
re
-
e
s
t
a
b
l
i
s
h
e
d
th
e
sample points and began
ba
c
t
e
o
r
o
l
o
g
i
c
a
l
te
s
t
s
.
Se
w
e
r
:
Ap
p
r
o
x
i
m
a
t
e
l
y
3,
0
2
0
LF
out of 3,100 LF of sewer has been
in
s
t
a
l
l
e
d
on
th
e
ma
i
n
l
i
n
e
be
t
w
e
e
n
27th and 4oth Street (sta 41+20 to sta
71
+4
0
)
.
Ro
a
d
re
s
t
o
r
a
t
i
o
n
an
d
th
e
first lift of asphalt on the trench line
ar
e
co
m
p
l
e
t
e
be
t
w
e
e
n
28
t
h
an
d
41st Street. Sewer is on hold and the
co
n
t
r
a
c
t
o
r
de
m
o
b
i
l
i
z
e
d
th
e
we
l
l
point system due to a conflict with an
FP
L
du
c
t
ba
n
k
wh
i
c
h
on
th
e
pl
a
n
s
was shown to be at a sufficient depth
to
cl
e
a
r
th
e
pr
o
p
o
s
e
d
sa
n
i
t
a
r
y
li
n
e
.
After excavation it was found that
th
e
FP
L
du
c
t
ba
n
k
wa
s
sh
a
l
l
o
w
e
r
than as indicated on the plans and in
co
n
f
l
i
c
t
wi
t
h
th
e
pr
o
p
o
s
e
d
sa
n
i
t
a
r
y
sewer line. A meeting was held with
FP
L
on
Ma
y
18
,
20
1
0
to
re
v
i
e
w
if cables on the upper ducts could be
re
l
o
c
a
t
e
d
to
th
e
lo
w
e
r
du
c
t
s
an
d
have the duct bank reduced in size to
al
l
o
w
fo
r
th
e
sa
n
i
t
a
r
y
se
w
e
r
in
s
t
a
l
l
a
t
i
o
n
.
FPL indicated duct bank is too
hi
g
h
an
d
wo
u
l
d
be
re
q
u
i
r
e
d
to
be lowered. FPL will have to procure for
a
di
v
e
te
a
m
an
d
wi
l
l
re
q
u
i
r
e
a
pe
r
m
i
t
from DERM to perform the work. P"ge 6 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
Mi
d
d
l
e
Be
a
c
h
Fu
n
g
,
H.
Pr
o
j
e
c
t
Na
m
e
Pi
n
e
Tr
e
e
Pa
r
k
Sh
o
r
e
l
i
n
e
Re
s
t
o
r
a
t
i
o
n
(I
n
c
l
.
ka
y
a
k
ar
e
a
)
7/
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
A1
o
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Pr
o
j
e
c
t
wi
l
l
st
a
b
i
l
i
z
e
an
en
v
i
r
o
n
m
e
n
t
a
l
l
y
se
n
s
i
t
i
v
e
sh
o
r
e
l
i
n
e
wi
t
h
ri
p
r
a
p
st
r
u
c
t
u
r
i
n
g
,
im
p
r
o
v
e
bi
o
d
i
v
e
r
s
i
t
y
an
d
wa
t
e
r
qu
a
l
i
t
y
th
r
o
u
g
h
th
e
in
c
l
u
s
i
o
n
of
re
d
ma
n
g
r
o
v
e
pl
a
n
t
e
r
s
,
an
d
pr
o
v
i
d
e
a
wa
t
e
r
ac
c
e
s
s
po
i
n
t
fo
r
ka
y
a
k
s
an
d
ot
h
e
r
no
n
-
m
o
t
o
r
i
z
e
d
wa
t
e
r
cr
a
f
t
fo
r
re
c
r
e
a
t
i
o
n
a
l
us
e
by
th
e
pu
b
l
i
c
.
d
Co
n
s
t
r
u
c
t
i
o
n
Status
FP
L
pr
o
p
o
s
e
d
to
mo
v
e
th
e
lo
w
e
r
conduit and shave off the concrete
wh
i
c
h
wo
u
l
d
al
l
o
w
fo
r
th
e
in
s
t
a
l
l
a
t
i
o
n
of the sewer line. After further
re
v
i
e
w
PW
D
ag
r
e
e
to
th
i
s
so
l
u
t
i
o
n
and accpeted to have only a 12in
cl
e
a
r
a
n
c
e
be
t
w
e
e
n
th
e
FP
L
du
c
t
bank and the sanitary sewer line. FPL
al
s
o
in
d
i
c
a
t
e
d
th
i
s
p
r
o
c
e
s
s
wo
u
l
d
reduce the permit and construction
ti
m
e
fr
o
m
on
e
an
d
ha
l
f
ye
a
r
s
to
approximately six months. Contractor
wi
l
l
fo
l
l
o
w
up
pr
o
g
r
e
s
s
an
d
st
a
y
on top of FPL for resolution. The EOR-
PW
D
ag
r
e
e
to
ha
v
e
th
e
co
n
t
r
a
c
t
o
r
provide a conflict manhole to connect
th
e
ol
d
sa
n
i
t
a
r
y
li
n
e
wi
t
h
th
e
ne
w
line until FPL can resolve the
ad
j
u
s
t
m
e
n
t
to
th
e
ex
i
s
t
i
n
g
du
c
t
bank. FPL has indicated is seeking the
DE
R
M
an
d
US
Co
r
p
of
En
g
i
n
e
e
r
s
permits. CIP provided a draft letter to
PW
D
fo
r
su
b
m
i
t
t
a
l
to
FP
L
on
de
l
a
y
s
and additional cost to the project.
Th
e
sa
n
i
t
a
r
y
li
n
e
vi
d
e
o
in
s
p
e
c
t
i
o
n
and the manhole exfiltration test were
co
m
p
l
e
t
e
d
.
Th
e
co
n
t
r
a
c
t
o
r
wi
l
l
forward the video with added audio as
re
q
u
e
s
t
e
d
by
PW
D
th
e
we
e
k
of
February 21, 2011.
Tr
e
n
c
h
Dr
a
i
n
s
at
27
t
h
,
28
t
h
,
29
t
h
,
30th, 31st ,32nd, 33rd,34th,35th,
36
t
h
,
38
t
h
,
3
9
t
h
an
d
40
t
h
St
r
e
e
t
corners are completed. Inserts have
ar
r
i
v
e
d
ar
i
d
ar
e
st
o
r
e
d
at
PW
D
.
Contractor to pick up and install the
in
s
e
r
t
s
.
Th
e
CE
I
is
in
th
e
pr
o
c
e
s
s
of scheduling a sign inspection at the
ma
n
u
f
a
c
t
u
r
e
r
'
s
ya
r
d
.
Ch
a
n
g
e
Or
d
e
r
#1
-
8
ex
t
e
n
d
e
d
th
e
contract completion by (68) days
pr
o
v
i
d
i
n
g
a
re
v
i
s
e
d
fi
n
a
l
co
m
p
l
e
t
i
o
n
.date of October 30, 2010. A
se
t
t
l
e
m
e
n
t
ag
r
e
e
m
e
n
t
wa
s
re
a
c
h
e
d
between the contractor and the City
fo
r
th
e
wa
t
e
r
ma
i
n
ab
a
n
d
o
n
e
m
e
n
t
and the contractor has indicated that
th
e
y
wi
l
l
re
-
s
t
a
r
t
th
e
wa
t
e
r
se
r
v
i
c
e
transfer the week of November 22,
20
1
0
.
Th
e
on
l
y
pe
n
d
i
n
g
it
e
m
s
to
co
m
p
l
e
t
e
this project are the installation of
tw
o
sa
n
i
t
a
r
y
se
w
e
r
ma
n
h
o
l
e
s
with their associated piping (approximately
80
'
)
an
d
th
e
in
s
t
a
l
l
a
t
i
o
n
of
FP
L
submarine cable at the intersection of
In
d
i
a
n
Cr
e
e
k
Dr
.
an
d
41
s
t
St
r
e
e
t
.
Horizon Contractors completed the
in
s
t
a
l
l
a
t
i
o
n
of
th
e
tw
o
sa
n
i
t
a
r
y
sewer manholes with their associated
pi
p
i
n
g
on
Ma
r
c
h
27
,
20
1
2
.
Th
e
road re-construction work was completed
on
Ap
r
i
l
2
6
,
20
1
2
.
Th
e
pr
o
j
e
c
t
is
approximately 99% complete.
03
.
0
7
.
1
2
:
Co
n
t
r
a
c
t
o
r
su
b
m
i
t
t
e
d
dr
a
w
i
n
g
s
for building department review on
03
.
0
6
.
1
2
.
04
.
2
6
.
1
2
:
Dr
a
w
i
n
g
s
re
s
u
b
m
i
t
t
e
d
to
Bu
i
l
d
i
n
g
Department today.
05
.
2
9
.
1
2
:
Bu
i
l
d
i
n
g
Pe
r
m
i
t
Ap
p
r
o
v
e
d
.
06
.
2
5
.
1
2
:
Pr
e
-
c
o
n
s
t
r
u
c
t
i
o
n
me
e
t
i
n
g
.
"
Di
s
t
r
i
c
t
Pr
o
J
e
c
t
Mg
r
.
Mi
d
d
l
e
Be
a
c
h
Si
n
n
e
s
,
A.
PM
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
(
v
2,
20
1
2
Pr
o
J
e
c
t
Na
m
e
Sc
o
p
e
o
f
Wo
r
k
Se
a
w
a
l
l
Re
h
a
b
i
l
i
t
a
t
i
o
n
-
Pi
n
e
Tr
e
e
Dr
.
&
Re
s
t
o
r
a
t
i
o
n
of
se
a
w
a
l
l
,
ne
w
sh
e
e
t
pi
l
e
wa
l
l
,
ne
w
63
r
d
St
.
co
n
c
r
e
t
e
ca
p
,
an
d
re
s
t
o
r
a
t
i
o
n
of
la
n
d
s
c
a
p
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
12
/
1
5
/
2
0
1
0
:
Co
n
s
t
r
u
c
t
i
o
n
NT
P
II
is
s
u
e
d
on
12/7/2010. Preconstruction meeting held
wi
t
h
DE
R
M
.
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
pending.
1/
6
/
2
0
1
1
:
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
de
l
a
y
e
d
be
c
a
u
s
e
this was a special order.
An
t
i
c
i
p
a
t
e
d
de
l
i
v
e
r
y
of
th
e
sh
e
e
t
pile is 1/25/2011.
1/
2
4
/
2
0
1
1
:
Sh
e
e
t
pi
l
e
in
s
t
a
l
l
a
t
i
o
n
to
st
a
r
t
on
1/25/2011. Anticipated project
co
m
p
l
e
t
i
o
n
in
Mi
d
Ma
r
c
h
.
2/
1
7
/
2
0
1
1
:
Al
l
co
n
s
t
r
u
c
t
i
o
n
sc
o
p
e
is
su
b
s
t
a
n
t
i
a
l
l
y
complete. Concrete cap was
po
u
r
e
d
on
2/
9
/
2
0
1
1
.
Ri
p
ra
p
in
s
t
a
l
l
a
t
i
o
n
scheduled for the week of
2/
2
1
/
2
0
1
1
.
3/
1
5
/
2
0
1
1
:
·
So
d
in
s
t
a
l
l
e
d
on
3/
1
/
2
0
1
1
.
DE
R
M
accepted project in full.
4/
2
6
/
2
0
1
1
:
Pu
b
l
i
c
Wo
r
k
s
is
s
u
e
d
a
2
it
e
m
pu
n
c
h
l
i
s
t
.
Completion pending from
Co
n
t
r
a
c
t
o
r
.
6/
2
4
/
2
0
1
1
:
Bu
i
l
d
i
n
g
De
p
a
t
m
e
n
t
fi
n
a
l
ap
p
r
o
v
a
l
issued on 6/3/2011.
8/
1
5
/
2
0
1
1
:
Pr
o
j
e
c
t
fi
n
a
l
ap
p
r
o
v
a
l
by
Bu
i
l
d
i
n
g
Department received on 6/03/2011.
Pr
o
j
e
c
t
tr
a
n
s
f
e
r
r
e
d
to
cl
o
s
e
-
o
u
t
phase.
-:1
P11ge ,fl of 45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
A1
o
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Pr
o
j
e
c
t
Na
m
e
Sc
o
p
e
o
f
Wo
r
k
69
St
r
e
e
t
an
d
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
Tr
a
f
f
i
c
In
s
t
a
l
l
Ne
w
Tr
a
f
f
i
c
Si
g
n
a
l
at
th
e
In
t
e
r
s
e
c
t
i
o
n
o
f
In
d
i
a
n
Si
g
n
a
l
i
z
a
t
i
o
n
Cr
e
e
k
Dr
i
v
e
an
d
69
St
r
e
e
t
7/
2
/
2
0
1
2
5:
2
1
:
3
2
P
M
Co
n
s
t
r
u
c
t
i
o
n
Status
AG
C
El
e
c
t
r
i
c
st
a
r
t
e
d
de
m
o
l
i
t
i
o
n
of sidewalks on June 21, 2011. On June
24
,
20
1
1
,
AG
C
re
p
o
r
t
e
d
th
a
t
th
e
y
e
n
c
o
u
n
t
e
r
e
d
utility conflicts on the
no
r
t
h
e
a
s
t
co
r
n
e
r
of
In
d
i
a
n
Cr
e
e
k
Drive and 69 street. CIP met with PWD
an
d
a
Ci
t
y
su
r
v
e
y
o
r
to
as
s
i
s
t
in
locating the ROW line in order to
de
t
e
r
m
i
n
e
if
th
e
ma
s
t
ar
m
lo
c
a
t
i
o
n
.
Once the location of the mast arm
wa
s
es
t
a
b
l
i
s
h
e
d
,
th
e
pr
o
p
o
s
e
d
foundation of the mast arm was in
co
n
f
l
i
c
t
wi
t
h
an
ex
i
s
t
i
n
g
ut
i
l
i
t
y
duct bank and the engineer of record had
to
mo
d
i
f
y
th
e
co
n
s
t
r
u
c
t
i
o
n
do
c
u
m
e
n
t
s
.
A change order proposal was
ge
n
e
r
a
t
e
d
an
d
ap
p
r
o
v
e
d
.
Du
r
i
n
g
a
pr
e
l
i
m
i
n
a
r
y
wa
l
k
t
h
r
o
u
g
h
with the County Public Works
De
p
a
r
t
m
e
n
t
th
e
Co
u
n
t
y
in
s
p
e
c
t
o
r
noted that the proposed connection of
th
e
to
th
e
ex
i
s
t
i
n
g
tr
a
f
f
i
c
si
g
n
a
l
disconnect will not be acceptable. The
re
a
s
o
n
p
r
o
v
i
d
e
d
wa
s
th
a
t
th
e
existing disconnect is mounted on an
ex
i
s
t
i
n
g
FP
L
po
l
e
an
d
th
e
ne
w
County requirements mandate that all
tr
a
f
f
i
c
si
g
n
a
l
di
s
c
o
n
n
e
c
t
ar
e
mo
u
n
t
e
d
on a standalone pole. The
co
n
t
r
a
c
t
o
r
wi
l
l
ne
e
d
to
su
b
m
i
t
a change proposal in order to meet the
Co
u
n
t
y
re
q
u
i
r
e
m
e
n
t
s
.
Ad
d
i
t
i
o
n
a
l
l
y
,
the County is requiring that the
ex
i
s
t
i
n
g
co
n
t
r
o
l
ca
b
i
n
e
t
wi
l
l
ne
e
d
to be updated to the latest standards.
01
/
2
3
/
2
0
1
2
:
Pr
o
j
e
c
t
is
su
b
s
t
a
n
t
i
a
l
l
y
completed. Contractor is waiting for
th
e
ap
p
r
o
v
a
l
of
ch
a
n
g
e
or
d
e
r
to
add a new service connection point to
ge
t
fi
n
a
l
ap
p
r
o
v
a
l
fr
o
m
Mi
a
m
i
-
D
a
d
e
County. Once the change order is
ap
p
r
o
v
e
d
a
fi
n
a
l
in
s
p
e
c
t
i
o
n
wi
l
l
be coordinated to complete the project.
03
/
0
6
/
2
0
1
2
:
Ch
a
n
g
e
or
d
e
r
wa
s
ap
p
r
o
v
e
d
an
d
contractor completed all the pending
wo
r
k
.
A
fo
r
c
e
ma
i
n
lo
c
a
t
e
d
at
th
e
intersection of 69 street and Indian
Cr
e
e
k
Dr
i
v
e
br
o
k
e
an
d
da
m
a
g
e
d
all the asphalt pavement and
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
at
on
e
of
th
e
crosswalk. The County will not perform
fi
n
a
l
in
s
p
e
c
t
i
o
n
un
t
i
l
th
e
Ci
t
y
re
p
a
i
r
s
the intersection. PWD has retained
a
co
n
t
r
a
c
t
o
r
to
re
p
a
i
r
th
e
in
t
e
r
s
e
c
t
i
o
n
and the work was scheduled to
st
a
r
t
on
Ma
r
c
h
6,
20
1
2
.
On
c
e
all repairs are completed on the
in
t
e
r
s
e
c
t
i
o
n
AG
C
El
e
c
t
r
i
c
wi
l
l
be able to complete this project.
03
/
2
9
/
2
0
1
2
:
Fi
n
a
l
re
s
t
o
r
a
t
i
o
n
of
th
e
pa
v
e
m
e
n
t
markings is scheduled for March 30,
20
1
2
.
On
c
e
th
i
s
wo
r
k
is
co
m
p
l
e
t
e
d
,
AGC Electric will be able to request
fi
n
a
l
in
s
p
e
c
t
i
o
n
an
d
co
m
p
l
e
t
e
th
e
project.
04
/
2
5
/
2
0
1
2
:
Re
s
t
o
r
a
t
i
o
n
of
69
St
r
e
e
t
cr
o
s
s
w
a
l
k
was completed. AGC Electric place
th
e
tr
a
f
f
i
c
si
g
n
a
l
in
th
e
in
i
t
i
a
l
cy
c
l
e
mode.
05
/
2
3
/
2
0
1
2
:
Pr
o
j
e
c
t
wa
s
ac
c
e
p
t
e
d
by
Mi
a
m
i
-
D
a
d
e
County Traffic Signal Division. P(/ge 9 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Ar
e
n
c
i
b
i
a
,
J.
Pr
o
j
e
c
t
Na
m
e
Bi
s
c
a
y
n
e
Po
i
n
t
BP
1
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
71
1
/
2
0
1
2
5:
2
1
:
3
2
PM
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Ar
e
a
-
w
i
d
e
st
r
e
e
t
im
p
r
o
v
e
m
e
n
t
ma
y
in
c
l
u
d
e
:
st
r
e
e
t
re
s
u
r
f
a
c
i
n
g
;
sw
a
l
e
re
s
t
o
r
a
t
i
o
n
;
re
p
a
i
r
of
si
d
e
w
a
l
k
s
;
st
r
e
e
t
li
g
h
t
i
n
g
up
g
r
a
d
e
s
to
co
r
r
e
c
t
de
f
i
c
i
e
n
c
i
e
s
an
d
pr
o
v
i
d
e
pe
d
e
s
t
r
i
a
n
li
g
h
t
i
n
g
;
en
h
a
n
c
e
d
la
n
d
s
c
a
p
i
n
g
wi
t
h
i
n
th
e
st
r
e
e
t
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
;
tr
a
f
f
i
c
ca
l
m
i
n
g
me
a
s
u
r
e
s
an
d
en
t
r
y
w
a
y
fe
a
t
u
r
e
s
,
ev
e
n
th
o
u
g
h
no
t
al
l
ar
e
a
s
wi
l
l
re
c
e
i
v
e
al
l
th
e
pr
e
v
i
o
u
s
l
y
me
n
t
i
o
n
e
d
im
p
r
o
v
e
m
e
n
t
s
.
Th
i
s
pr
o
j
e
c
t
in
c
l
u
d
e
s
Bi
s
c
a
y
n
e
Po
i
n
t
(a
p
p
r
o
x
.
13
,
2
0
0
l.
f
.
)
,
Bi
s
c
a
y
n
e
Be
a
c
h
(a
p
p
r
o
x
.
14
,
4
0
0
l.
f
.
)
,
an
d
St
i
l
l
w
a
t
e
r
(a
p
p
r
o
x
.
3,
4
0
0
l.
f
.
)
.
St
r
e
e
t
s
c
a
p
e
in
t
e
g
r
a
t
e
d
wi
t
h
wa
t
e
r
l
i
n
e
re
p
l
a
c
e
m
e
n
t
s
.
Mo
d
i
f
i
c
a
t
i
o
n
s
to
th
e
BO
O
R
we
r
e
ap
p
r
o
v
e
d
on
De
c
e
m
b
e
r
20
0
9
,
th
e
co
n
s
u
l
t
a
n
t
is
ad
j
u
s
t
i
n
g
th
e
de
s
i
g
n
as
pe
r
th
e
BO
O
R
va
r
i
a
t
i
o
n
s
.
It
is
an
t
i
c
i
p
a
t
e
d
th
a
t
th
e
st
o
r
m
w
a
t
e
r
sy
s
t
e
m
wi
l
l
ha
v
e
a
co
s
t
in
c
r
e
a
s
e
of
ap
p
r
o
x
.
$2
,
0
0
0
,
0
0
0
du
e
to
th
e
ad
d
i
t
i
o
n
of
at
le
a
s
t
th
r
e
e
pu
m
p
st
a
t
i
o
n
s
an
d
th
e
co
r
r
e
s
p
o
n
d
i
n
g
pi
p
e
s
an
d
st
r
u
c
t
u
r
e
s
ne
e
d
e
d
.
"H
o
l
d
ab
o
v
e
-
g
r
o
u
n
d
un
f
u
n
d
e
d
am
o
u
n
t
fu
n
d
i
n
g
pe
n
d
i
n
g
co
n
s
t
r
u
c
t
i
o
n
bi
d
s
.
"
Co
n
s
t
r
u
c
t
i
o
n
Status
Th
e
co
n
s
u
l
t
a
n
t
is
re
v
i
e
w
i
n
g
fi
n
a
l
pay application.
06
/
2
7
/
2
0
1
2
:
Th
e
co
n
t
r
a
c
t
o
r
ne
e
d
s
to
pr
o
v
i
d
e
as-built documents that are acceptable
to
th
e
Ci
t
y
.
Th
e
do
c
u
m
e
n
t
s
th
a
t
were submitted were rejected and
co
n
t
r
a
c
t
o
r
is
in
th
e
pr
o
c
e
s
s
o
f
making the necessary changes.
NT
P
1
wa
s
is
s
u
e
d
to
th
e
Co
n
t
r
a
c
t
o
r
on 05/06/11. Plan revisions for the
VE
ch
a
n
g
e
s
we
r
e
su
b
m
i
t
t
e
d
in
July 2011; however, PWD requested the
pl
a
n
s
in
c
o
r
p
o
r
a
t
e
90
-
s
e
c
de
t
e
n
t
i
o
n
throughout requiring modification of
th
e
pl
a
n
s
.
Af
t
e
r
co
o
r
d
i
n
a
t
i
o
n
wi
t
h
the Contractor, it was decided that
pl
a
n
re
v
i
s
i
o
n
s
co
u
l
d
be
de
v
e
l
o
p
e
d
and permitted during construction
an
d
th
e
sc
h
e
d
u
l
e
mo
d
i
f
i
e
d
ac
c
o
r
d
i
n
g
l
y
.
NTP-2 was issed 08/24/11 with
an
ef
f
e
c
t
i
v
e
da
t
e
of
08
/
2
5
/
1
1
.
Water main installations and electrical
co
n
d
u
i
t
in
s
t
a
l
l
a
t
i
o
n
s
fo
r
th
e
li
g
h
t
i
n
g
system within Biscayne Point Island
ar
e
co
m
p
l
e
t
e
an
d
re
a
d
y
fo
r
to
be placed into service. Water main
in
s
t
a
l
l
a
t
i
o
n
s
on
Bi
s
c
a
y
n
e
Be
a
c
h
is complete. Lighting fixture
re
p
l
a
c
e
m
e
n
t
is
co
m
p
l
e
t
e
Wa
t
e
r
main installations along Stillwater Drive
. is
co
m
p
l
e
t
e
an
d
tr
a
n
s
f
e
r
of
se
r
v
i
c
e
s
is in process. Stormwater work and
ab
o
v
e
gr
o
u
n
d
im
p
r
o
v
e
m
e
n
t
s
ha
v
e
not commence, and are included as
pa
r
t
of
a
ne
w
co
n
t
r
a
c
t
ex
e
c
u
t
e
d
in March 2012. The overal project is
ap
p
r
o
x
i
m
a
t
e
l
y
35
%
co
m
p
l
e
t
e
.
The remaining work will be completed
un
d
e
r
a
ne
w
GM
P
Co
n
t
r
a
c
t
fo
r
which the Fist NTP was issued on May
17
,
20
1
2
.
Th
e
wa
t
e
r
ma
i
n
on
Cl
e
v
e
l
a
n
d
and Noremac Road are
ex
p
e
c
t
e
d
to
co
m
m
e
n
c
e
du
r
i
n
g
the week of May 28, 2012, and the 3 spot
dr
a
i
n
a
g
e
im
p
r
o
v
e
m
e
n
t
on
Bi
s
c
a
y
n
e
Pointe Island is currently being
pe
r
m
i
t
t
e
d
.
Page 10 of45
Di
s
t
r
i
c
t
Pr
o
J
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
Pr
o
J
e
c
t
Na
m
e
No
r
t
h
Sh
o
r
e
•
By
r
o
n
Av
e
n
u
e
Ro
a
d
w
a
y
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
71
2
1
2
0
1
2
5:
2
1
:
3
2
PM
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
{
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
By
r
o
n
Av
e
n
u
e
fr
o
m
81
s
t
St
r
e
e
t
to
20
0
'
so
u
t
h
of
87
t
h
Te
r
r
a
c
e
is
cl
a
s
s
i
f
i
e
d
as
an
ur
b
a
n
co
l
l
e
c
t
o
r
ro
a
d
w
a
y
lo
c
a
t
e
d
in
th
e
No
r
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
in
th
e
Ci
t
y
o
f
Mi
a
m
i
Be
a
c
h
.
Th
i
s
ro
a
d
w
a
y
is
pa
r
t
of
th
e
ma
j
o
r
ne
t
w
o
r
k
o
f
ro
a
d
w
a
y
s
th
r
o
u
g
h
o
u
t
th
e
No
r
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
an
d
co
n
n
e
c
t
s
to
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
,
wh
i
c
h
is
an
o
t
h
e
r
AR
R
A
fu
n
d
e
d
pr
o
j
e
c
t
.
Co
n
s
t
r
u
c
t
i
o
n
wo
r
k
wi
l
l
in
c
l
u
d
e
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
,
st
r
i
p
i
n
g
,
an
d
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
.
;:
!
Co
n
s
t
r
u
c
t
i
o
n
Status
Pr
o
j
e
c
t
wa
s
no
t
ab
l
e
to
st
a
r
t
on
time because new utility lines had to be
in
s
t
a
l
l
e
d
ah
e
a
d
of
th
e
ab
o
v
e
gr
o
u
n
d
work. Additionally, Miami-Dade
Co
u
n
t
y
is
re
q
u
e
s
t
i
n
g
th
a
t
th
e
Ci
t
y
of Miami Beach removed and relocate
ex
i
s
t
i
n
g
tr
a
f
f
i
c
si
g
n
a
l
ju
n
c
t
i
o
n
bo
x
e
s
that are in conflict with the proposed
wo
r
k
.
Th
e
en
g
i
n
e
e
r
of
re
c
o
r
d
is
reviewing all comments issued by the
Co
u
n
t
y
an
d
wi
l
l
pr
e
p
a
r
e
th
e
ap
p
r
o
p
r
i
a
t
e
modifications to the plans. The
tw
o
lo
c
a
t
i
o
n
s
th
a
t
ar
e
im
p
a
c
t
e
d
with the County requirements are the
in
t
e
r
s
e
c
t
i
o
n
s
at
81
an
d
85
st
r
e
e
t
.
Th
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
re
q
u
e
s
t
e
d
a time extension from FOOT to
ex
t
e
n
d
th
e
LA
P
ag
r
e
e
m
e
n
t
un
t
i
l
March 31, 2012. The time extension
wa
s
gr
a
n
t
e
d
.
01
/
2
3
/
2
0
1
2
:
On
Ja
n
u
a
r
y
23
,
2
0
1
2
the engineer of record submitted
ap
p
r
o
v
e
d
re
v
i
s
i
o
n
s
by
Mi
a
m
i
-
D
a
d
e
County Traffic Division that modifies
th
e
or
i
g
i
n
a
l
de
s
i
g
n
.
Th
e
s
e
re
v
i
s
i
o
n
s
will need to be reviewed by
co
n
t
r
a
c
t
o
r
si
n
c
e
it
ad
d
s
ad
d
i
t
i
o
n
a
l
scope to the construction of the
in
t
e
r
s
e
c
t
i
o
n
an
d
si
g
n
a
l
i
z
a
t
i
o
n
op
e
r
a
t
i
o
n
.
03
/
0
6
/
2
0
1
2
:
Re
v
i
s
i
o
n
s
to
85
St
r
e
e
t
in
t
e
r
s
e
c
t
i
o
n
is still under review by the County.
Mr
.
Ei
t
h
e
l
Si
e
r
r
a
fr
o
m
AP
C
T
E
wi
l
l
be meeting with the County on March
8,
20
1
2
to
se
e
if
he
ca
n
fi
n
a
l
i
z
e
the design. Once the design is
co
m
p
l
e
t
e
d
it
wi
l
l
ne
e
d
to
be
tr
a
n
s
m
i
t
t
e
d
to the contractor for a change
pr
o
p
o
s
a
l
.
Th
e
ne
w
de
s
i
g
n
wi
l
l
ad
d
two additions ADA ramps, Pedestrian
pe
d
s
he
a
d
an
d
pu
s
h
bu
t
t
o
n
po
l
e
relocation and traffic loop modifications.
03
/
2
9
/
2
0
1
2
:
Th
e
en
g
i
n
e
e
r
i
n
g
co
n
s
u
l
t
a
n
t
co
m
p
l
e
t
e
d
the design for 85 Street and 81
st
r
e
e
t
.
Pa
c
k
a
g
e
wa
s
de
l
i
v
e
r
e
d
to
CIP on March 28, 2012. Contractor will
ne
e
d
to
re
v
i
e
w
an
d
pr
i
c
e
th
e
ad
d
e
d
changes and provide a change
pr
o
p
o
s
a
l
fo
r
th
e
ad
d
i
t
i
o
n
a
l
sc
o
p
e
.
04
/
2
5
/
2
0
1
2
:
On
Ap
r
i
l
1
1
,
20
1
2
,
GE
C
As
s
o
c
i
a
t
e
s
began to mill and resurface portion
of
th
e
wo
r
k
th
a
t
is
no
t
af
f
e
c
t
e
d
by
the proposed changes to 81 Street
an
d
85
St
r
e
e
t
.
An
es
t
i
m
a
t
e
d
40
%
of the milling and resurfacing is
co
m
p
l
e
t
e
d
.
05
/
2
3
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
co
m
p
l
e
t
e
d
th
e
mi
l
l
i
n
g
and resurfacing from 81 Street to 85
St
r
e
e
t
an
d
fr
o
m
85
St
r
e
e
t
to
87
Street. Pending work; paver crosswalk
at
85
St
r
e
e
t
,
ad
d
i
t
i
o
n
a
l
AD
A
ra
m
p
s
at 85 Street and milling and
re
s
u
r
f
a
c
i
n
g
of
th
e
in
t
e
r
s
e
c
t
i
o
n
s
at 81 street and 85 Street.
06
/
2
7
/
2
0
1
2
:
Page 11 t~f 45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
7/
2
/
2
0
1
2
5:
2
1
:
3
2
P
M
Pr
o
j
e
c
t
Na
m
e
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
,.
s
'
f
a
t
u
s
th
r
o
u
g
h
Ju
(
t
'
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Co
n
s
t
r
u
c
t
i
o
n
Status
Du
e
to
de
s
i
g
n
mo
d
i
f
i
c
a
t
i
o
n
s
to
th
e
alignment of the decorative paver
cr
o
s
s
w
a
l
k
s
an
d
ac
c
e
s
s
i
b
l
e
ra
m
p
s
at the intersection of Byron Avenue
an
d
85
st
r
e
e
t
th
e
st
a
r
t
of
th
e
wo
r
k
was delayed. On June 26, 2012, GEC
As
s
o
c
i
a
t
e
s
st
a
r
t
e
d
th
e
co
n
s
t
r
u
c
t
i
o
n
of the crosswalk at 85 street and
By
r
o
n
Av
e
n
u
e
.
Th
e
co
n
s
t
r
u
c
t
i
o
n
of the crosswalks will be performed in
fo
u
r
ph
a
s
e
s
,
as
pe
r
ap
p
r
o
v
e
d
ma
i
n
t
e
n
a
n
c
e
of traffic plan. Each phase
wi
l
l
ta
k
e
ap
p
r
o
x
i
m
a
t
e
l
y
on
e
we
e
k
to construct. The design changes
ca
u
s
e
a
de
l
a
y
th
a
t
im
p
a
c
t
e
d
th
e
time to complete the project within the
gr
a
n
t
co
m
p
l
e
t
i
o
n
sc
h
e
d
u
l
e
of
Ju
l
y
31, 2012. A time extension will be
re
q
u
e
s
t
e
d
fr
o
m
FO
O
T
fo
r
an
ad
d
i
t
i
o
n
a
l
two month so that the project
ca
n
be
co
m
p
l
e
t
e
d
by
Se
p
t
e
m
b
e
r
30, 2012.
:';
1
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
Pr
o
j
e
c
t
N(
l
m
e
No
r
t
h
Sh
o
r
e
-
Di
c
k
e
n
s
Av
e
n
u
e
Ro
a
d
w
a
y
Im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
Mo
u
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Di
c
k
e
n
s
Av
e
n
u
e
fr
o
m
71
s
t
St
r
e
e
t
to
81
t
h
St
r
e
e
t
is
cl
a
s
s
i
f
i
e
d
as
an
ur
b
a
n
co
l
l
e
c
t
o
r
ro
a
d
w
a
y
lo
c
a
t
e
d
in
th
e
No
r
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
in
th
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
.
Th
i
s
ro
a
d
w
a
y
is
pa
r
t
of
th
e
ma
j
o
r
ne
t
w
o
r
k
of
ro
a
d
w
a
y
s
th
r
o
u
g
h
o
u
t
th
e
No
r
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
an
d
co
n
n
e
c
t
s
to
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
,
wh
i
c
h
is
an
o
t
h
e
r
AR
R
A
fu
n
d
e
d
pr
o
j
e
c
t
.
Co
n
s
t
r
u
c
t
i
o
n
wo
r
k
wi
l
l
in
c
l
u
d
e
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
,
st
r
i
p
i
n
g
,
an
d
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
an
d
bi
k
e
la
n
e
st
r
i
p
i
n
g
an
d
si
g
n
a
g
e
fr
o
m
71
s
t
St
.
to
75
t
h
St
.
Co
n
s
t
r
u
c
t
i
o
n
Status
1)
No
t
i
c
e
to
Pr
o
c
e
e
d
wa
s
is
s
u
e
on June 9, 2011. Contractor mobilized
to
a
su
r
f
a
c
e
lo
t
on
Ju
n
e
10
,
20
1
1
.
2)
Ca
r
i
v
o
n
Co
n
s
t
r
u
c
t
i
o
n
ha
s
su
b
m
i
t
t
e
d
change order for items not
in
c
l
u
d
e
d
in
th
e
or
i
g
i
n
a
l
bi
d
do
c
u
m
e
n
t
s
,
as follows:
a)
Bi
k
e
la
n
e
ma
r
k
i
n
g
s
an
d
si
g
n
s
b)
Tr
e
n
c
h
dr
a
i
n
s
fo
r
bu
m
po
u
t
s
c)
Ad
d
i
t
i
o
n
a
l
si
d
e
w
a
l
k
re
p
a
i
r
s
no
t
included in the bid documents.
3)
Co
n
t
r
a
c
t
o
r
mo
b
i
l
i
z
e
d
on
Oc
t
o
b
e
r
4, 2011, to Tatum Waterway Drive.
Th
e
co
n
t
r
a
c
t
o
r
ha
d
to
st
o
p
wo
r
k
after 5 days because several areas had
di
s
c
r
e
p
a
n
c
i
e
s
wi
t
h
ex
i
s
t
i
n
g
co
n
d
i
t
i
o
n
s
and approved plans. Several
me
e
t
i
n
g
s
ha
v
e
ta
k
e
n
pl
a
c
e
to
re
s
o
l
v
e
the discrepancies and the
en
g
i
n
e
e
r
of
re
c
o
r
d
is
wo
r
k
i
n
g
on
the solutions.
4)
On
No
v
e
m
b
e
r
23
,
20
1
1
th
e
engineer of record submitted a new set of
do
c
u
m
e
n
t
s
th
a
t
re
s
p
o
n
d
e
d
to
al
l
outstanding RFI.
5)
Th
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
re
q
u
e
s
t
e
d
a time extension from FOOT to
ex
t
e
n
d
th
e
LA
P
ag
r
e
e
m
e
n
t
un
t
i
l
March 31, 2012. The time extension
wa
s
gr
a
n
t
e
d
.
01
/
2
3
/
2
0
1
2
:
Wo
r
k
of
th
e
de
c
o
r
a
t
i
v
e
paver crosswalks are taking longer
th
e
n
ex
p
e
c
t
e
d
be
c
a
u
s
e
of
co
o
r
d
i
n
a
t
i
o
n
with local schools and religious
fa
c
i
l
i
t
i
e
s
.
Ot
h
e
r
is
s
u
e
s
im
p
a
c
t
i
n
g
the construction of the crosswalk at 73
st
r
e
e
t
wi
l
l
be
th
e
de
s
i
g
n
an
d
ap
p
r
o
v
a
l
of the traffic loop installation that
wi
l
l
re
q
u
i
r
e
co
u
n
t
y
ap
p
r
o
v
a
l
.
03
/
0
6
/
2
0
1
2
:
On
Fe
b
r
u
a
r
y
21
,
20
1
2
,
a
re
q
u
e
s
t
for time extension was requested from
FO
O
T
.
Th
e
re
q
u
e
s
t
wi
l
l
ex
t
e
n
d
the LAP agreement from March 31, 2012
to
Ju
l
y
31
,
20
1
2
.
Th
e
pr
o
j
e
c
t
is
progressing and all the decorative
cr
o
s
s
w
a
l
k
s
sh
o
u
l
d
be
co
m
p
l
e
t
e
d
by the end of April 2012. The start of
th
e
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
wi
l
l
be contingent on the abandonment of the
ex
i
s
t
i
n
g
wa
t
e
r
ma
i
n
.
04
/
2
5
/
1
2
:
Ca
r
i
v
o
n
Co
n
s
t
r
u
c
t
i
o
n
is
wo
r
k
i
n
g
on the last section of the crosswalks.
Fo
r
th
e
fo
l
l
o
w
i
n
g
tw
o
we
e
k
s
Ca
r
i
v
o
n
will replace some targetted broken
si
d
e
w
a
l
k
s
an
d
cu
r
b
an
d
gu
t
t
e
r
.
05
/
2
3
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
is
wo
r
k
i
n
g
on
re
p
l
a
c
i
n
g
targeted broken sidewalks and gutter.
Wo
r
k
wa
s
de
l
a
y
e
d
du
e
to
ba
d
weather conditions. Additional work to the
in
t
e
r
s
e
c
t
i
o
n
of
Di
c
k
e
n
s
Av
e
n
u
e
and 74 street is pending because the
bu
m
p
-
o
u
t
th
a
t
wa
s
in
s
t
a
l
l
e
d
,
by
plan, may have to be modified.
06
/
2
7
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
ha
s
su
b
m
i
t
t
e
d
ch
a
n
g
e
order proposal for corrective work at
bu
l
b
-
o
u
t
lo
c
a
t
e
d
on
74
St
r
e
e
t
.
A
d
d
i
t
i
o
n
a
l
l
y
,
Public Works Department
re
q
u
e
s
t
e
d
to
in
c
r
e
a
s
e
th
e
as
p
h
a
l
t
thickness from one {1") inch to one Page 13 of45
.-
-
-
-
·
-
-
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
iH
g
r
.
No
r
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
71
2
1
2
0
/
2
5:
2
1
:
3
2
PM
Pm
j
e
c
t
Na
m
e
No
r
t
h
Sh
o
r
e
-
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
Ro
a
d
w
a
y
im
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
(A
R
R
A
Mo
n
t
h
~
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
fr
o
m
Ab
b
o
t
t
Av
e
n
u
e
to
71
s
t
St
r
e
e
t
is
cl
a
s
s
i
f
i
e
d
as
an
ur
b
a
n
ar
t
e
r
i
a
l
ro
a
d
w
a
y
lo
c
a
t
e
d
in
th
e
No
r
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
in
th
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
.
Th
i
s
ro
a
d
w
a
y
pr
o
v
i
d
e
s
a
ma
j
o
r
co
n
n
e
c
t
i
o
n
be
t
w
e
e
n
th
e
No
r
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
to
th
e
Mi
d
d
l
e
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
.
It
is
al
s
o
a
re
g
i
o
n
a
l
co
n
n
e
c
t
i
o
n
ut
i
l
i
z
e
d
by
th
e
co
a
s
t
a
l
co
m
m
u
n
i
t
i
e
s
fr
o
m
th
e
no
r
t
h
to
ac
c
e
s
s
th
e
So
u
t
h
Be
a
c
h
ne
i
g
h
b
o
r
h
o
o
d
of
Mi
a
m
i
Be
a
c
h
an
d
al
s
o
to
ac
c
e
s
s
th
e
Ci
t
y
of
Mi
a
m
i
.
Co
n
s
t
r
u
c
t
i
o
n
wo
r
k
wi
l
l
in
c
l
u
d
e
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
,
st
r
i
p
i
n
g
,
an
d
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
an
d
on
e
ha
l
f
(1
-
1
/
2
"
)
in
c
h
.
Th
i
s
request will generate a change order and
de
l
a
y
th
e
pr
o
j
e
c
t
sc
h
e
d
u
l
e
.
An
extension request will be submitted to
FO
O
T
to
ex
t
e
n
d
th
e
pr
o
j
e
c
t
sc
h
e
d
u
l
e
to 10/31/2012.
Co
n
s
t
r
u
c
t
i
o
n
st
a
r
t
e
d
on
Ju
n
e
20
,
2011. Project is on schedule.
HA
Co
n
t
r
a
c
t
i
n
g
co
m
p
l
e
t
e
d
al
l
co
n
c
r
e
t
e
related work and milling and
re
s
u
r
f
a
c
i
n
g
of
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
from Abbott avenue to 71 Street. All
te
m
p
o
r
a
r
y
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
were completed by August 29, 2011. The
re
m
a
i
n
i
n
g
wo
r
k
is
th
e
fi
n
a
l
ap
p
l
i
c
a
t
i
o
n
of the thermoplastic paving
ma
r
k
i
n
g
.
Th
e
co
n
t
r
a
c
t
o
r
ha
s
to
wait approximately 30 days before the
fi
n
a
l
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
ca
n
be
applied.
Co
n
t
r
a
c
t
o
r
is
wo
r
k
i
n
g
on
th
e
r
m
o
p
l
a
s
t
i
c
paving marking. Several areas
ar
e
be
i
n
g
re
v
i
e
w
e
d
by
Pu
b
l
i
c
Wo
r
k
s
Department to add additional
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
at
Ca
r
l
y
l
e
Avenue to restrict intersection to a right
la
n
e
tu
r
n
on
l
y
.
Co
n
t
r
a
c
t
o
r
is
wa
i
t
i
n
g
for final approved plans to complete
ta
s
k
.
Co
n
t
r
a
c
t
o
r
co
m
p
l
e
t
e
d
th
e
wo
r
k
and now is working on the as-built
do
c
u
m
e
n
t
s
to
cl
o
s
e
-
o
u
t
pr
o
j
e
c
t
.
01
/
2
3
/
2
0
1
2
:
Pr
o
j
e
c
t
is
re
a
d
y
fo
r
final acceptance inspection. Inspection
wi
l
l
be
sc
h
e
d
u
l
e
d
wi
t
h
i
n
th
e
ne
x
t
two weeks.
03
/
0
6
/
2
0
1
2
:
On
Fe
b
r
u
a
r
y
9,
20
1
2
,
an
ac
c
e
p
t
a
n
c
e
inspection was conducted with
PW
D
en
g
i
n
e
e
r
i
n
g
,
op
e
r
a
t
i
o
n
,
de
s
i
g
n
engineer, CEI consultant and CIP.
A
pu
n
c
h
l
i
s
t
ge
n
e
r
a
t
e
d
.
On
Fe
b
r
u
a
r
y
17, 2012 the contractor notified City
th
a
t
th
e
pu
n
c
h
l
i
s
t
it
e
m
s
we
r
e
co
m
p
l
e
t
e
d
and ready for reinspection. On
Fe
b
r
u
a
r
y
29
,
20
1
2
,
Mi
k
e
Al
v
a
r
e
z
,
Director of Operation accepted the
wo
r
k
.
Co
n
t
r
a
c
t
o
r
is
wo
r
k
i
n
g
on
all the close-out documents in order to
co
m
p
l
e
t
e
th
e
pr
o
j
e
c
t
.
04
/
2
5
/
2
0
1
2
:
Th
e
fi
r
m
of
Ca
l
v
i
n
g
Giordano Associates is completing all
th
e
ne
c
e
s
s
a
r
y
pa
p
e
r
w
o
r
k
to
re
p
o
r
t
to FOOT in order to complete the
pr
o
j
e
c
t
.
05
/
2
3
/
2
0
1
2
:
Th
e
fi
r
m
of
Ca
l
v
i
n
g
Giordano Associates is completing all
th
e
ne
c
e
s
s
a
r
y
pa
p
e
r
w
o
r
k
to
re
p
o
r
t
to FOOT in order to complete the
pr
o
j
e
c
t
.
06
/
2
7
/
2
0
1
2
:
Ca
l
v
i
n
,
Gi
o
r
d
a
n
o
&
As
s
o
c
i
a
t
e
s
is
completing all final close-out
do
c
u
m
e
n
t
s
th
a
t
ar
e
re
q
u
i
r
e
d
by
FOOT to complete the project. All
do
c
u
m
e
n
t
s
wi
l
l
be
tr
a
n
s
m
i
t
t
e
d
to
FOOT by 6/29/2012. Page 14 of45
~
-
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
Pr
o
j
e
c
t
Na
m
e
No
r
t
h
Sh
o
r
e
-
Wa
t
e
r
ma
i
n
li
n
e
s
cr
o
s
s
i
n
g
FO
O
T
Ri
g
h
t
-
O
f
-
W
a
y
al
o
n
g
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
m
1
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Pl
a
c
e
8"
DI
P
th
a
t
en
c
r
o
a
c
h
FO
O
T
Ri
g
h
t
of
Wa
y
al
o
n
g
71
s
t
St
.
<i
Co
n
s
t
r
u
c
t
i
o
n
Status
Co
n
t
r
a
c
t
o
r
wa
s
gi
v
e
n
NT
P
1
o
n
September 3rd, 2010 and NTP 2 on
Ja
n
u
a
r
y
6t
h
20
1
1
Co
n
s
t
r
u
c
t
i
o
n
st
a
r
t
e
d
on
Ca
r
l
y
l
e
avenue on January 11/2011 and is
ex
p
e
c
t
e
d
to
be
co
m
p
l
e
t
e
by
ea
r
l
y
April 2011.
Th
i
s
pr
o
j
e
c
t
wa
s
ma
n
a
g
e
d
by
Miguel Perez, CPC and on March 10,
20
1
1
,
it
wa
s
tr
a
n
s
f
e
r
r
e
d
to
Ro
b
e
r
t
o
Rodriguez.
1)
Or
i
g
i
n
a
l
bi
d
do
c
u
m
e
n
t
s
we
r
e
not fully completed when Envirowaste
pr
o
v
i
d
e
d
bi
d
pr
i
c
e
.
2)
Cu
r
r
e
n
t
l
y
,
th
e
CI
P
of
f
i
c
e
is
re
v
i
e
w
i
n
g
15 different change orders for
it
e
m
s
no
t
in
c
l
u
d
e
d
in
th
e
or
i
g
i
n
a
l
bid documents and field modifications
du
e
to
co
n
f
l
i
c
t
s
wi
t
h
ex
i
s
t
i
n
g
co
n
d
i
t
i
o
n
s
.
3)
Ch
a
n
g
e
or
d
e
r
s
ar
e
un
d
e
r
re
v
i
e
w
.
Once the approved the contractor
wi
l
l
mo
b
i
l
i
z
e
to
co
m
p
l
e
t
e
th
e
mi
l
l
i
n
g
and resurfacing of Carlyle Avenue
an
d
Bo
n
i
t
a
Dr
i
v
e
.
4)
On
De
c
e
m
b
e
r
1,
20
1
1
,
th
e
ch
a
n
g
e
orders were approved. PM
re
q
u
e
s
t
e
d
a
ne
w
sc
h
e
d
u
l
e
fr
o
m
the contractor to complete the milling
an
d
re
s
u
r
f
a
c
i
n
g
of
Ca
r
l
y
l
e
Av
e
n
u
e
and Bonita Drive.
01
/
2
3
/
2
0
1
2
:
PM
re
q
u
e
s
t
e
d
fi
n
a
l
as-built documents of water main in
or
d
e
r
to
sc
h
e
d
u
l
e
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
of water main installation.
On
c
e
th
e
wa
t
e
r
ma
i
n
in
s
t
a
l
l
a
t
i
o
n
is accepted by Public Works
De
p
a
r
t
m
e
n
t
th
e
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
will follow.
03
/
0
6
/
2
0
1
2
:
Co
o
r
d
i
n
a
t
i
o
n
Me
e
t
i
n
g
to
oc
c
u
r
by mid March to review shop drawings for
as
p
h
a
l
t
,
pa
v
e
m
e
n
t
ma
r
k
i
n
g
an
d
schedule the work.
03
/
2
9
/
2
0
1
2
:
CI
P
wi
l
l
sc
h
e
d
u
l
e
in
s
p
e
c
t
i
o
n
of
water main in order to set up final
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
an
d
tu
r
n
over system to Public Works Operation.
04
/
2
5
/
2
0
1
2
:
CI
P
wi
l
l
sc
h
e
d
u
l
e
in
s
p
e
c
t
i
o
n
o
f
water main in order to set up final
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
an
d
tu
r
n
over system to Public Works Operation.
05
/
2
3
/
2
0
1
2
:
On
Ma
y
17
,
20
1
2
,
a
in
s
p
e
c
t
i
o
n
walk-through was perform to verify that
al
l
me
t
e
r
bo
x
e
s
an
d
va
l
v
e
s
we
r
e
installed according to the as-built
do
c
u
m
e
n
t
s
.
Th
e
as
-
b
u
i
l
t
do
c
u
m
e
n
t
s
will be transmitted to Public Works
De
p
a
r
t
m
e
n
t
in
or~
e
r
to
sc
h
e
d
u
l
e
an accepatnce inspection of the water
ma
i
n
.
6/
2
7
/
2
0
1
2
:
On
Ju
n
e
12
,
20
1
2
,
a
se
r
v
i
c
e
re
q
u
e
s
t
was issued by Jose Perez
re
q
u
e
s
t
i
n
g
an
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
date from Public Works l'age 15 of 45
,
-
-
-
-
-
-
-
'
Di
s
t
r
i
c
t
Pr
o
J
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
Pr
o
j
e
c
t
Na
m
e
No
r
t
h
Sh
o
r
e
-
Wa
t
e
r
ma
i
n
ac
r
o
s
s
Gr
o
u
p
II
an
d
Gr
o
u
p
Il
l
o
f
th
e
AR
R
A
C
o
r
r
i
d
o
r
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
u
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
In
s
t
a
l
l
a
t
i
o
n
of
a
ne
w
8
in
c
h
Du
c
t
i
l
e
Ir
o
n
Pi
p
e
wa
t
e
r
ma
i
n
li
n
e
,
al
o
n
g
Di
c
k
e
n
s
Av
e
n
u
e
fr
o
m
73
St
r
e
e
t
to
81
St
r
e
e
t
an
d
By
r
o
n
Av
e
n
u
e
fr
o
m
81
St
r
e
e
t
to
85
St
r
e
e
t
Co
n
s
t
r
u
c
t
i
o
n
Status
De
p
a
r
t
m
e
n
t
.
On
Ju
n
e
26
,
20
1
2
a follow up request was transmitted
re
q
u
e
s
t
i
n
g
a
da
t
e
fo
r
in
s
p
e
c
t
i
o
n
.
Co
n
s
t
r
u
c
t
i
o
n
st
a
r
t
e
d
on
Ju
n
e
7,
2011. Project is on schedule.
Co
n
t
r
a
c
t
o
r
ha
d
to
co
n
n
e
c
t
to
ex
i
s
t
i
n
g
network at each of the side streets
to
im
p
r
o
v
e
ne
t
w
o
r
k
op
e
r
a
t
i
o
n
.
Ad
d
i
t
i
o
n
a
l
l
y
,
the existing water mains
al
o
n
g
th
e
AR
R
A
co
r
r
i
d
o
r
ar
e
le
a
k
i
n
g
and must be abandon. These
ad
d
i
t
i
o
n
a
l
co
n
n
e
c
t
i
o
n
s
ar
e
ad
d
i
t
i
o
n
to the contract and CIP is
ne
g
o
t
i
a
t
i
n
g
wi
t
h
co
n
t
r
a
c
t
o
r
to
ad
d
to the project.
01
/
2
3
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
is
wa
i
t
i
n
g
for approval of change order to
co
m
p
l
e
t
e
th
e
wa
t
e
r
ma
i
n
co
n
n
e
c
t
i
o
n
at 73 Street. This has delayed the
ov
e
r
a
l
l
co
m
p
l
e
t
i
o
n
of
th
e
pr
o
j
e
c
t
.
03
/
0
6
/
2
0
1
2
:
Ch
a
n
g
e
or
d
e
r
fo
r
co
n
n
e
c
t
i
o
n
to
73 Street water main was approved on
Ma
r
c
h
5,
20
1
2
.
Co
n
t
r
a
c
t
o
r
is
or
d
e
r
i
n
g
the tapping sleeve in order to
pe
r
f
o
r
m
th
e
wo
r
k
.
Fi
v
e
ot
h
e
r
in
t
e
r
s
e
c
t
i
o
n
s
are pending connections. A
pr
o
p
o
s
a
l
wa
s
re
q
u
e
s
t
e
d
fr
o
m
DM
S
I
to perform this additional work.
03
/
2
9
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
ne
g
o
t
i
a
t
e
d
a
fi
n
a
l
pr
o
p
o
s
a
l
with CIP for the five pending final
co
n
n
e
c
t
i
o
n
.
On
c
e
th
e
pr
o
p
o
s
a
l
is
approved, the work will take place and
th
e
pr
o
j
e
c
t
ca
n
be
co
m
p
l
e
t
e
d
.
04
/
2
5
/
2
0
1
2
:
Pr
o
p
o
s
a
l
fo
r
th
e
fi
v
e
pe
n
d
i
n
g
fi
n
a
l
connection is waiting approval from
Pr
o
c
u
m
e
n
t
Di
v
i
s
i
o
n
to
sc
h
e
d
u
l
e
the work. Once this work is completed a
fi
n
a
l
in
s
p
e
c
t
i
o
n
o~
th
e
pr
o
j
e
c
t
wi
l
l
be coordinated with PWD Operation.
05
/
2
3
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
is
wo
r
k
i
n
g
on
co
m
p
l
e
t
i
n
g
all the five water main connections
an
d
sh
o
u
l
d
be
co
m
p
l
e
t
e
d
wi
t
h
th
i
s
work by June 1, 2012.
06
/
2
7
/
2
0
1
2
:
Al
l
th
e
wa
t
e
r
ma
i
n
co
n
n
e
c
t
i
o
n
s
have been completed. Contractor is
up
d
a
t
i
n
g
th
e
as
-
b
u
i
l
t
do
c
u
m
e
n
t
s
.
Initial walk-thru will be conducted once
th
e
as
-
b
u
i
l
t
ar
e
tr
a
n
s
m
i
t
t
e
d
.
P(lge 16 of 45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
B
e
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
71
2
/
2
0
1
2
5:
2
1
:
3
2
PM
Pr
o
j
e
c
t
Na
m
e
No
r
t
h
Sh
o
r
e
-
Wa
t
e
r
ma
i
n
at
69
St
r
e
e
t
fr
o
m
Ha
r
d
i
n
g
Av
e
n
u
e
t
o
In
d
i
a
n
Cr
e
e
k
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
·
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
In
s
t
a
l
l
a
t
i
o
n
of
a
ne
w
8
in
c
h
Du
c
t
i
l
e
Ir
o
n
Pi
p
e
wa
t
e
r
ma
i
n
li
n
e
,
at
th
e
in
t
e
r
s
e
c
t
i
o
n
of
69
St
r
e
e
t
an
d
In
d
i
a
n
Cr
e
e
k
Dr
i
v
e
.
It
wa
s
al
s
o
de
c
i
d
e
d
to
ex
t
e
n
d
th
e
wa
t
e
r
ma
i
n
s
ea
s
t
to
Ha
r
d
i
n
g
Av
e
n
u
e
to
co
n
n
e
c
t
th
e
th
e
ex
i
s
t
i
n
g
ne
t
w
o
r
k
.
Co
n
s
t
r
u
c
t
i
o
n
Status
01
/
2
3
/
2
0
1
2
:
CI
P
ha
s
re
q
u
e
s
t
e
d
a proposal from DMSI for the proposed
ad
d
i
t
i
o
n
a
l
wo
r
k
.
On
c
e
th
e
pr
o
p
o
s
a
l
is approved, DMSI will complete the
wo
r
k
.
3/
6
/
2
0
1
2
:
Ch
a
n
g
e
or
d
e
r
wa
s
ap
p
r
o
v
e
d
on
March 5, 2012. Contractor will schedule
pe
n
d
i
n
g
wo
r
k
in
or
d
e
r
to
fi
n
a
l
i
z
e
project.
03
/
2
9
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
is
sc
h
e
d
u
l
i
n
g
re
p
a
i
r
to
the traffic loops on Harding and 69
St
r
e
e
t
.
On
c
e
th
i
s
wo
r
k
is
co
m
p
l
e
t
e
d
a final inspection walkthrough will
be
co
n
d
u
c
t
e
d
.
05
/
2
3
/
2
0
1
2
:
Re
p
a
i
r
to
th
e
tr
a
f
f
i
c
lo
o
p
s
is
on
-
g
o
i
n
g
.
Once this work is completed a
fi
n
a
l
in
s
p
e
c
t
i
o
n
of
th
e
pr
o
j
e
c
t
wi
l
l
take place.
06
/
2
7
/
2
0
1
2
:
,,
j
Co
n
t
r
a
c
t
o
r
co
m
p
l
e
t
e
d
th
e
re
p
a
i
r
s
to the traffic loops. CIP has requested
mi
n
o
r
re
v
i
s
i
o
n
s
to
th
e
as
-
b
u
i
l
t
do
c
u
m
e
n
t
s
prior to scheduling the
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
wa
l
k
-
t
h
r
u
.
Page 17 '
r-
-
-
·-
-
-
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
Se
a
w
a
l
l
Re
s
t
o
r
a
t
i
o
n
-
Ru
e
Bo
u
r
d
e
a
u
x
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
s
t
o
r
a
t
i
o
n
of
se
a
w
a
l
l
,
ne
w
sh
e
e
t
pi
l
e
wa
l
l
,
ne
w
co
n
c
r
e
t
e
ca
p
,
an
d
re
s
t
o
r
a
t
i
o
n
of
la
n
d
s
c
a
p
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
12
/
1
5
/
2
0
1
0
:
Co
n
s
t
r
u
c
t
i
o
n
NT
P
II
is
s
u
e
d
on
12/8/2010. Preconstruction meeting with
DE
R
M
pe
n
d
i
n
g
.
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
pending.
1/
6
/
2
0
1
1
:
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
de
l
a
y
e
d
be
c
a
u
s
e
this was a special order.
An
t
i
c
i
p
a
t
e
d
de
l
i
v
e
r
y
of
th
e
sh
e
e
t
pile is 1/25/2011.
1/
2
4
/
2
0
1
1
:
Th
e
ex
i
s
t
i
n
g
co
n
c
r
e
t
e
fo
o
t
e
r
at
the base of the existing wall was
de
m
o
l
i
s
h
e
d
du
r
i
n
g
th
e
we
e
k
of
1/17/2011. Sheet piling installation set to
co
m
m
e
n
c
e
th
e
we
e
k
of
2/
7
/
2
0
1
1
.
Project completion anticipated for the
en
d
of
Ma
r
c
h
.
2/
1
7
/
2
0
1
1
:
Fo
r
m
i
n
g
an
d
po
u
r
i
n
g
of
th
e
se
a
w
a
l
l
cap scheduled for the week of
2/
2
1
/
2
0
1
1
.
3/
1
5
/
2
0
1
1
:
Pr
o
j
e
c
t
su
b
s
t
a
n
t
i
a
l
l
y
co
m
p
l
e
t
e
on 3/1/2011. DERM has not accepted
th
e
ri
p
ra
p
.
Ac
c
e
p
t
a
n
c
e
is
be
i
n
g
handled by Ocean Consulting.
4/
2
6
/
2
0
1
1
:
Pu
b
l
i
c
Wo
r
k
s
is
s
u
e
d
a
pu
n
c
h
li
s
t
.
One item requested videoing the
ou
t
f
a
l
l
pi
p
e
to
ve
r
i
f
y
co
n
d
i
t
i
o
n
.
6/
2
4
/
2
0
1
1
:
Pr
o
j
e
c
t
fi
n
a
l
ap
p
r
o
v
a
l
by
Bu
i
l
d
i
n
g
Department received on 6/14/2011.
Pr
o
j
e
c
t
tr
a
n
s
f
e
r
r
e
d
to
cl
o
s
e
-
o
u
t
phase. Page 18
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
Se
a
w
a
l
l
Re
s
t
o
r
a
t
i
o
n
-
Ru
e
Ve
r
s
a
i
l
l
e
s
A1
o
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
s
t
o
r
a
t
i
o
n
of
se
a
w
a
l
l
,
ne
w
sh
e
e
t
pi
l
e
wa
l
l
,
ne
w
co
n
c
r
e
t
e
ca
p
,
an
d
re
s
t
o
r
a
t
i
o
n
of
la
n
d
s
c
a
p
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
12
/
1
5
/
2
0
1
0
:
Co
n
s
t
r
u
c
t
i
o
n
NT
P
II
is
s
u
e
d
on
12/8/2010. Preconstruction meeting with
DE
R
M
pe
n
d
i
n
g
.
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
pending.
1/
6
/
2
0
1
1
:
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
de
l
a
y
e
d
be
c
a
u
s
e
this was a special order.
An
t
i
c
i
p
a
t
e
d
de
l
i
v
e
r
y
of
th
e
sh
e
e
t
pile is 1/25/2011.
1/
2
4
/
2
0
1
1
:
Th
e
ex
i
s
t
i
n
g
co
n
c
r
e
t
e
fo
o
t
e
r
is
to be removed during the week of
1/
2
4
/
2
0
1
1
.
An
t
i
c
i
p
a
t
e
d
st
a
r
t
of
sheet pile installation is the week of
2/
7
/
2
0
1
1
.
2/
1
7
/
2
0
1
1
:
Al
l
co
n
s
t
r
u
c
t
i
o
n
ac
t
i
v
i
t
i
e
s
ha
v
e
been stopped due to a directive from
Mi
k
e
Al
v
a
r
e
z
of
Pu
b
l
i
c
Wo
r
k
s
.
The location of the sheet pile wall was in
th
e
vi
c
i
n
i
t
y
of
a
24
"
di
a
m
e
t
e
r
tr
a
n
s
m
i
s
s
i
o
n
water main. CIP will re-
co
m
m
e
n
c
e
pr
o
j
e
c
t
af
t
e
r
PW
D
completes the repair of a 16"
tr
a
n
s
m
i
s
s
i
o
n
li
n
e
at
Pi
n
e
Tr
e
e
/
I
n
d
i
a
n
Creek bridge.
Al
l
sh
e
e
t
pi
l
i
n
g
an
d
ga
l
v
a
n
i
z
e
d
rebar are currently being stored at the
Co
n
t
r
a
c
t
o
r
'
s
ya
r
d
un
t
i
l
pr
o
j
e
c
t
re
-
s
t
a
r
t
s
.
4/
2
6
/
2
0
1
1
:
Pr
o
j
e
c
t
st
i
l
l
on
ho
l
d
un
t
i
l
re
l
e
a
s
e
d
by M. Alvarez of PWD Operations.
10
/
3
1
/
2
0
1
1
:
Pr
o
j
e
c
t
ha
s
st
a
r
t
e
d
.
Sh
e
e
t
pi
l
e
installation completed.
11
/
3
0
/
1
1
:
Se
a
w
a
l
l
co
m
p
l
e
t
e
d
.
Ri
p
Ra
p
to
be placed and inspected by DERM.
12
/
2
0
/
2
0
1
1
:
Bu
i
l
d
i
n
g
De
p
t
.
fi
n
a
l
ap
p
r
o
v
a
l
re
c
e
i
v
e
d
on 12/20/2011. Project
tr
a
n
s
f
e
r
r
e
d
to
Cl
o
s
e
-
o
u
t
ph
a
s
e
.
Page 19 of 45
Di
s
t
r
i
c
t
Pn
~
j
e
c
t
Mg
r
.
No
r
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
Se
a
w
a
l
l
Re
s
t
o
r
a
t
i
o
n
-
Tr
o
u
v
i
l
l
e
Es
p
l
a
n
a
d
e
71
1
1
2
0
1
2
5:
2
1
:
3
2
PM
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.f
u
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
s
t
o
r
a
t
i
o
n
of
se
a
w
a
l
l
,
ne
w
sh
e
e
t
pi
l
e
wa
l
l
,
ne
w
co
n
c
r
e
t
e
ca
p
,
an
d
re
s
t
o
r
a
t
i
o
n
of
la
n
d
s
c
a
p
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
12
/
1
5
/
2
0
1
0
:
Co
n
s
t
r
u
c
t
i
o
n
NT
P
II
is
s
u
e
d
on
12/8/2010. Preconstruction meeting with
DE
R
M
pe
n
d
i
n
g
.
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
pending.
1/
6
/
2
0
1
1
:
Sh
e
e
t
pi
l
i
n
g
de
l
i
v
e
r
y
de
l
a
y
e
d
be
c
a
u
s
e
this was a special order.
An
t
i
c
i
p
a
t
e
d
de
l
i
v
e
r
y
of
th
e
sh
e
e
t
pile is 1/25/2011.
1/
2
4
/
2
0
1
1
:
Sh
e
e
t
pi
l
e
in
s
t
a
l
l
a
t
i
o
n
an
t
i
c
i
p
a
t
e
d
to start the week of 1/31/2011.
2/
1
7
/
2
0
1
1
:
Al
l
co
n
s
t
r
u
c
t
i
o
n
ac
t
i
v
i
t
i
e
s
ar
e
su
b
s
t
a
n
t
i
a
l
l
y
complete. Rip rap installation
sc
h
e
d
u
l
e
d
fo
r
th
e
we
e
k
of
2/
2
1
/
2
0
1
1
.
3/
1
5
/
2
0
1
1
:
DE
R
M
ha
s
ac
c
e
p
t
e
d
co
m
p
l
e
t
e
d
project. Contractor pending clean up
an
d
so
d
.
6/
2
4
/
2
0
1
1
:
Bu
i
l
d
i
n
g
De
p
t
.
fi
n
a
l
ap
p
r
o
v
a
l
re
c
e
i
v
e
d
on 6/14/2011. Project transferred
to
Cl
o
s
e
-
o
u
t
ph
a
s
e
.
PageZOof45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
07
t
h
St
r
e
e
t
Pa
r
k
i
n
g
Ga
r
a
g
e
St
r
u
c
t
u
r
a
l
Re
p
a
i
r
s
FY
2
0
0
8
/
0
9
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Th
e
pr
o
j
e
c
t
in
c
l
u
d
e
s
th
e
st
r
u
c
t
u
r
a
l
re
s
t
o
r
a
t
i
o
n
of
th
e
sp
a
l
l
e
d
co
n
c
r
e
t
e
in
th
e
st
a
i
r
w
a
y
s
,
pa
i
n
t
i
n
g
an
d
wa
t
e
r
p
r
o
o
f
co
a
t
i
n
g
s
to
pr
o
t
e
c
t
th
e
co
n
c
r
e
t
e
.
It
al
s
o
re
q
u
i
r
e
s
wa
t
e
r
pr
o
o
f
i
n
g
in
th
e
st
a
i
r
w
a
y
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
8/
4
/
2
0
1
0
:
Th
e
st
r
u
c
t
u
r
a
l
re
s
t
o
r
a
t
i
o
n
at the SW stair tower is 80%
co
m
p
l
e
t
e
.
Th
e
pa
i
n
t
i
n
g
of
th
e
ga
r
a
g
e
ceilings is 95% complete. The
wa
t
e
r
p
r
o
o
f
i
n
g
of
th
e
ga
r
a
g
e
2n
d
Floor is 10% complete.
10
/
6
/
2
0
1
0
:
Th
e
st
r
u
c
t
u
r
a
l
re
s
t
o
r
a
t
i
o
n
and waterproofing at the SW stair
to
w
e
r
is
co
m
p
l
e
t
e
.
Pa
i
n
t
i
n
g
of
th
e
garage is complete. Re-coating of
wa
t
e
r
p
r
o
o
f
i
n
g
at
le
v
e
l
2
is
co
m
p
l
e
t
e
and the parking spaces have been
re
-
s
t
r
i
p
e
d
.
St
r
u
c
t
u
r
a
l
re
s
t
o
r
a
t
i
o
n
at NW stair is complete and
wa
t
e
r
p
r
o
o
f
i
n
g
is
in
pr
o
g
r
e
s
s
.
An
t
i
c
i
p
a
t
e
d
co
m
p
l
e
t
i
o
n
of
co
n
s
t
r
u
c
t
i
o
n
by 10/22/2010.
10
/
1
5
/
2
0
1
0
:
Wa
t
e
r
p
r
o
o
f
i
n
g
co
m
p
l
e
t
e
at the NW Stairs. Repair of
re
m
a
i
n
d
e
r
of
co
n
c
r
e
t
e
sp
a
l
l
s
in
progress.
10
/
2
7
/
2
0
1
0
:
Pr
o
j
e
c
t
Sc
o
p
e
co
m
p
l
e
t
e
.
Co
n
t
r
a
c
t
o
r
awaiting approval for change order
to
re
p
a
i
r
de
f
i
c
i
e
n
t
st
a
i
r
w
e
l
l
do
o
r
s
and miscellaneous electrical conduit
re
p
a
i
r
.
11
/
1
/
2
0
1
0
:
Pr
o
j
e
c
t
co
m
p
l
e
t
e
pe
n
d
i
n
g
pu
n
c
h
l
i
s
t
items. Change Order BPO in
pr
o
g
r
e
s
s
.
11
/
1
5
/
2
0
1
0
:
NT
P
II
is
s
u
e
d
to
Co
n
t
r
a
c
t
o
r
fo
r
Change Orders. New hollow metal doors
an
d
fr
a
m
e
s
to
be
or
d
e
r
e
d
an
d
in
s
t
a
l
l
e
d
.
12
/
1
5
/
2
0
1
0
:
El
e
c
t
r
i
c
a
l
wo
r
k
in
pr
o
g
r
e
s
s
.
Ho
l
l
o
w
metal doors pending delivery in mid
Ja
n
u
a
r
y
,
20
1
1
.
1/
6
/
2
0
1
1
:
Ho
l
l
o
w
me
t
a
l
do
o
r
s
added via change order are expected to
ar
r
i
v
e
in
la
t
e
Ja
n
u
a
r
y
,
20
1
1
.
1/
2
5
/
2
0
1
1
:
Ho
l
l
o
w
me
t
a
l
do
o
r
s
have not arrived. Pending delivery and
in
s
t
a
l
l
a
t
i
o
n
.
2/
1
7
/
2
0
1
1
:
Al
l
ch
a
n
g
e
or
d
e
r
wo
r
k
is complete. Final building
de
p
a
r
t
m
e
n
t
cl
o
s
e
o
u
t
is
pe
n
d
i
n
g
.
3/
3
/
2
0
1
1
:
Bu
i
l
d
i
n
g
Fi
n
a
l
ob
t
a
i
n
e
d
.
3/
1
5
/
2
0
1
1
:
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
required that the contractor pull a
se
p
a
r
a
t
e
fi
r
e
al
a
r
m
pe
r
m
i
t
fo
r
th
e
conduit replacement. Permit
ap
p
l
i
c
a
t
i
o
n
pe
n
d
i
n
g
su
b
m
i
s
s
i
o
n
to the building department.
4/
1
3
/
2
0
1
1
:
Pe
r
co
n
v
e
r
s
a
t
i
o
n
wi
t
h
Chief Electrical and Fire Protection
Ch
i
e
f
,
Fi
r
e
ad
d
e
d
a
30
9
9
in
s
p
e
c
t
i
o
n
to the electrical permit in order to Page21
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
1l
1
g
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
5:
2
1
:
3
2
PM
Pr
o
j
e
c
t
Na
m
e
17
0
1
Me
r
i
d
i
a
n
2n
d
Fl
o
o
r
Te
n
a
n
t
Im
p
r
o
v
e
m
e
n
t
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
De
m
o
l
i
t
i
o
n
an
d
ne
w
bu
i
l
d
ou
t
fo
r
Fi
r
e
Pr
e
v
e
n
t
i
o
n
of
f
i
c
e
s
.
Im
p
r
o
v
e
m
e
n
t
s
in
c
l
u
d
e
:
ne
w
AD
A
ba
t
h
r
o
o
m
s
;
ne
w
ai
r
ha
n
d
l
i
n
g
un
i
t
&
as
s
o
c
i
a
t
e
d
du
c
t
w
o
r
k
;
ne
w
ce
i
l
i
n
g
s
&
fl
o
o
r
s
;
an
d
ne
w
pa
i
n
t
fi
n
i
s
h
e
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
ch
e
c
k
Fi
r
e
Al
a
r
m
co
m
p
o
n
e
t
s
fo
r
function. Joint inspection effort agreed
by
bo
t
h
pa
r
t
i
e
s
.
Fi
r
e
Al
a
r
m
pe
r
m
i
t
is not necessary.
4/
2
7
/
2
0
1
1
:
Fi
r
e
te
s
t
of
th
e
fl
o
w
and tamper switch conducted on,
4/
2
2
/
2
0
1
1
.
Fl
o
w
an
d
ta
m
p
e
r
wa
s
operational. Waiting on Fire Dept.
si
g
n
of
f
in
or
d
e
r
to
cl
o
s
e
ou
t
th
e
permit.
5/
1
9
/
2
0
1
1
:
El
e
c
t
r
i
c
a
l
Fi
n
a
l
ob
t
a
i
n
e
d
.
Cl
o
s
e
out documents received.
De
m
o
l
i
t
i
o
n
co
m
m
e
n
c
e
d
on
Ju
n
e
6, 2010. Design of Tenant
Im
p
r
o
v
e
m
e
n
t
un
d
e
r
w
a
y
.
De
m
o
l
i
t
i
o
n
co
m
p
l
e
t
e
an
d
fi
n
a
l
i
z
e
d
.
HVAC Design/Build NTP 2 issued to
FX
P
on
8/
2
/
1
0
.
Ne
w
AC
un
i
t
de
l
i
v
e
r
e
d
on 8/3/10. Permit for GC (Matrix)
pe
n
d
i
n
g
fi
n
a
l
ac
c
e
p
t
a
n
c
e
fr
o
m
Building Department.
10
/
1
1
/
2
0
1
0
:
HV
A
C
is
co
m
p
l
e
t
e
.
Construction is in progress and
co
n
t
r
a
c
t
o
r
an
t
i
c
i
p
a
t
e
s
co
m
p
l
e
t
i
o
n
of their contracted scope of work for
3r
d
we
e
k
of
Oc
t
o
b
e
r
.
Fi
r
e
al
a
r
m
contractor has submitted drawings to
th
e
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
fo
r
pe
r
m
i
t
.
10
/
2
7
/
2
0
1
0
:
Fi
r
e
Fi
n
a
l
pe
n
d
i
n
g
in
s
p
e
c
t
i
o
n
to
d
a
y
.
All other inspections are approved.
TC
O
ap
p
l
i
c
a
t
i
o
n
wi
l
l
be
su
b
m
i
t
t
e
d
upon receipt of Fire Final.
10
/
2
8
/
2
0
1
0
:
Al
l
pa
r
t
i
a
l
fi
n
a
l
s
ap
p
r
o
v
e
d
.
TC
C
application submitted to the Building
De
p
a
r
t
m
e
n
t
.
El
e
c
t
r
i
c
a
l
,
En
g
i
n
e
e
r
i
n
g
and Planning pending TCC
ap
p
r
o
v
a
l
.
11
/
1
/
2
0
1
0
:
TC
C
is
s
u
e
d
by
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
.
Punchlist item work in progress.
1/
5
/
2
0
1
1
:
CO
is
s
u
e
d
by
th
e
Bu
i
l
d
i
n
g
Department. Project Complete. Page22of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Fu
n
g
,
H.
Pr
o
j
e
c
t
Na
m
e
22
5
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
,
SI
U
Of
f
i
c
e
Re
l
o
c
a
t
i
o
n
71
2
/
2
0
1
2
5:
2
1
:
3
2
Pi
'
d
Mo
n
t
h
f
;
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
(
l
'
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
n
o
v
a
t
i
o
n
of
bu
i
l
d
i
n
g
to
ac
c
o
m
m
o
d
a
t
e
th
e
ne
w
SI
U
of
f
i
c
e
re
l
o
c
a
t
i
o
n
.
Co
n
s
t
r
u
c
t
i
o
n
Statw.·
10
/
1
1
/
2
0
1
0
:
Bu
i
l
d
i
n
g
Pe
r
m
i
t
ap
p
r
o
v
e
d
.
Co
n
s
t
r
u
c
t
i
o
n
to commence October 13, 2010.
10
/
2
7
/
2
0
1
0
:
Wa
l
l
s
ar
e
fr
a
m
e
d
an
d
ME
P
ro
u
g
h
s
are on-going. Rough inspections are
be
i
n
g
sc
h
e
d
u
l
e
d
fo
r
th
e
we
e
k
of
11/1/10.
11
/
1
5
/
2
0
1
0
:
Dr
y
w
a
l
l
in
s
t
a
l
l
e
d
.
Fi
n
i
s
h
i
n
g
in
pr
o
g
r
e
s
s
.
Painting of walls and installation
of
ce
i
l
i
n
g
gr
i
d
sc
h
e
d
u
l
e
d
to
be
co
m
p
l
e
t
e
by 11/30/10.
12
/
1
5
/
2
0
1
0
:
Ac
o
u
s
t
i
c
a
l
ce
i
l
i
n
g
gr
i
d
co
m
p
l
e
t
e
.
Floor slab pour back scheduled for
12
/
1
6
/
1
0
.
Wa
l
l
s
pa
i
n
t
e
d
.
Te
l
e
p
h
o
n
e
room transmitted to ATT on
12
/
1
7
/
1
0
.
1/
6
/
2
0
1
1
:
Ce
i
l
i
n
g
in
s
t
a
l
l
e
d
an
d
wa
l
l
s
pa
i
n
t
e
d
.
Flooring start date scheduled for
1/
1
2
/
2
0
1
1
.
Ex
t
e
r
i
o
r
wo
r
k
on
ho
l
d
due to funding shortfall. Pending
re
s
o
l
u
t
i
o
n
.
1/
2
4
/
2
0
1
1
:
Al
l
fi
n
a
l
in
s
p
e
c
t
i
o
n
s
ar
e
sc
h
e
d
u
l
e
d
for the week of 1/24/2011.
An
t
i
c
i
p
a
t
e
d
TC
O
re
c
e
i
p
t
by
2/
2
/
2
0
1
1
.
2/
1
7
/
2
0
1
1
:
TC
O
re
c
e
i
v
e
d
on
2/
1
/
2
0
1
1
.
Ad
d
i
t
i
o
n
a
l
funding is required to complete
th
e
re
a
r
si
t
e
wo
r
k
sc
o
p
e
it
e
m
s
.
A permit revision is in process for all
ch
a
n
g
e
s
to
th
e
ex
t
e
r
i
o
r
.
3/
1
5
/
2
0
1
1
:
Pe
r
m
i
t
re
v
i
s
i
o
n
is
cu
r
r
e
n
t
l
y
wi
t
h
DERM. Upon DERM approval, building
pe
r
m
i
t
ma
y
be
is
s
u
e
d
.
8/
1
6
/
2
0
1
1
:
DE
R
M
wo
u
l
d
no
t
gr
a
n
t
ap
p
r
o
v
a
l
because trees had been removed and
co
u
l
d
no
t
be
ac
c
o
u
n
t
e
d
fo
r
.
Pa
r
k
s
has identified that these trees were
re
l
o
c
a
t
e
d
to
Be
l
l
Is
l
e
Pa
r
k
.
Tr
e
e
Relocation application must be
su
b
m
i
t
t
e
d
.
08
/
2
2
/
2
0
1
1
:
Tr
e
e
Pe
r
m
i
t
su
b
m
i
t
t
e
d
to
DE
R
M
.
Additional funding is required to
co
m
p
l
e
t
e
th
e
re
a
r
si
t
e
wo
r
k
sc
o
p
e
items. A permit revision is in process
fo
r
al
l
ch
a
n
g
e
s
to
th
e
ex
t
e
r
i
o
r
.
11
/
3
0
/
2
0
1
1
:
Ad
d
i
t
i
o
n
a
l
wo
r
k
at
th
e
re
a
r
si
t
e
is
on hold. No funding has been
pr
o
v
i
d
e
d
by
Po
l
i
c
e
fo
r
th
i
s
wo
r
k
.
Page 23 of 45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
AJ
g
r
.
So
u
t
h
Be
a
c
h
Di
x
o
n
,
C.
Pr
o
J
e
c
t
Na
m
e
Ci
t
y
Ce
n
t
e
r
BP
9C
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
(L
i
n
c
o
l
n
Ro
a
d
)
71
2
1
2
0
1
2
5:
2
1
:
3
2
P1
V
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
b
'
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Li
n
c
o
l
n
Ro
a
d
ea
s
t
of
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
.
Th
i
s
pr
o
j
e
c
t
li
m
i
t
s
ar
e
Li
n
c
o
l
n
Ro
a
d
be
t
w
e
e
n
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
an
d
Co
l
l
i
n
s
Av
e
n
u
e
,
an
d
ha
s
be
e
n
de
s
i
g
n
e
d
to
ad
d
r
e
s
s
th
e
ne
e
d
s
of
th
e
co
m
m
e
r
c
i
a
l
an
d
re
t
a
i
l
ar
e
a
,
as
we
l
l
as
pe
d
e
s
t
r
i
a
n
s
,
pr
i
v
a
t
e
an
d
pu
b
l
i
c
ve
h
i
c
u
l
a
r
ac
c
e
s
s
.
Th
e
pr
o
j
e
c
t
in
c
l
u
d
e
s
ro
a
d
w
a
y
re
c
o
n
f
i
g
u
r
a
t
i
o
n
to
ac
c
o
m
o
d
a
t
e
un
i
f
o
r
m
tr
a
f
f
i
c
la
n
e
s
th
r
o
u
g
h
o
u
t
,
in
s
t
a
l
l
a
t
i
o
n
of
la
n
d
s
c
a
p
e
ce
n
t
e
r
me
d
i
a
n
wi
t
h
up
l
i
g
h
t
i
n
g
,
si
d
e
w
a
l
k
re
p
l
a
c
e
m
e
n
t
,
in
s
t
a
l
l
a
t
i
o
n
of
pa
v
e
r
s
on
po
r
t
i
o
n
s
of
th
e
si
d
e
w
a
l
k
th
a
t
ra
n
g
e
s
in
wi
t
h
fr
o
m
ap
p
r
o
x
i
m
a
t
e
l
y
26
.
6
fe
e
t
to
15
.
6
fe
e
t
,
pa
v
e
r
cr
o
s
s
w
a
l
k
s
wi
t
h
AD
A
cu
r
b
ra
m
p
s
,
bu
m
p
ou
t
s
to
fo
r
m
a
l
i
z
e
pa
r
k
i
n
g
ar
e
a
an
d
re
d
u
c
e
th
e
cr
o
s
s
w
a
l
k
di
s
t
a
n
c
e
,
in
s
t
a
l
l
a
t
i
o
n
of
st
r
e
e
t
fu
r
n
i
t
u
r
e
,
re
s
u
r
f
a
c
i
n
g
of
th
e
as
p
h
a
l
t
pa
v
e
m
e
n
t
.
Th
e
pr
o
j
e
c
t
su
p
p
o
r
t
s
th
e
Ci
t
y
Ce
n
t
e
r
RD
A
Ma
s
t
e
r
Pl
a
n
.
No
ad
d
i
t
i
o
n
a
l
Fu
n
d
i
n
g
is
be
i
n
g
re
q
u
e
s
t
e
d
fo
r
th
e
Pr
o
j
e
c
t
at
th
i
s
ti
m
e
.
"H
o
l
d
ab
o
v
e
-
g
r
o
u
n
d
un
f
u
n
d
e
d
am
o
u
n
t
fu
n
d
i
n
g
pe
n
d
i
n
g
co
n
s
t
r
u
c
t
i
o
n
bi
d
s
.
"
Co
n
s
t
r
u
c
t
i
o
n
Status
Th
e
co
n
t
r
a
c
t
o
r
'
s
No
t
i
c
e
to
Pr
o
c
e
e
d
1 (NTP1) was issued on March 17,
20
1
1
.
A
Co
m
m
u
n
i
t
y
Pr
e
-
C
o
n
s
t
r
u
c
t
i
o
n
was held on April21, 2011. The Notice
to
Pr
o
c
e
e
d
2
wa
s
is
s
u
e
d
on
Ap
r
i
l
27, 2011. Installation of the sidewalk
cu
r
b
an
d
gu
t
t
e
r
,
de
c
o
r
a
t
i
v
e
br
i
c
k
pavers, irrigation system, pedestrian
li
g
h
t
i
n
g
an
d
up
l
i
g
t
i
n
g
,
is
co
m
p
l
e
t
e
.
Planting of trees and groundcover
th
r
o
u
g
h
o
u
t
th
e
pr
o
j
e
c
t
li
m
i
t
s
is
complete. Adapave installation is
co
m
p
l
e
t
e
.
Th
e
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
of the roadway will be scheduled
in
Ma
y
20
1
2
.
Th
e
Pr
o
j
e
c
t
is
an
t
i
c
i
p
a
t
e
d
to be completed in June 2012. A
fi
n
a
l
ir
r
i
g
a
t
i
o
n
an
d
la
n
d
s
c
a
p
e
walk through will be scheduled in mid May
20
1
2
.
03
/
0
7
/
2
0
1
2
:
Si
d
e
w
a
l
k
s
:
98
%
co
m
p
l
e
t
e
La
n
d
s
c
a
p
i
n
g
:
10
0
%
co
m
p
l
e
t
e
Ro
a
d
w
a
y
:
25
%
co
m
p
l
e
t
e
El
e
c
t
r
i
c
a
l
:
10
0
%
co
m
p
l
e
t
e
Th
e
Ge
n
e
r
a
l
Co
n
t
r
a
c
t
o
r
on
th
e
Project has closed its business, and the
Ci
t
y
is
wo
r
k
i
n
g
wi
t
h
th
e
Su
r
e
t
y
to complete the remaining work which is
es
s
e
n
t
i
a
l
l
y
mi
l
l
i
n
g
an
d
re
s
u
r
f
a
c
i
n
g
of the roadway and punch
li
s
t
/
d
e
f
f
i
c
i
e
n
t
it
e
m
s
.
Th
e
wo
r
k
is
anticipated to re-commence in August
20
1
2
.
Page24 of45
Di
s
t
r
i
c
t
PN
~
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
Ci
t
y
Ha
l
l
-
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
Re
n
o
v
a
t
i
o
n
Ph
a
s
e
II
71
2
1
2
0
1
2
5:
2
1
:
3
2
PM
.N
l
o
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
1
1
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
n
o
v
a
t
i
o
n
of
th
e
di
f
f
e
r
e
n
t
se
c
t
i
o
n
s
of
th
e
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
,
lo
c
a
t
e
d
in
th
e
2n
d
fl
o
o
r
of
Ci
t
y
Ha
l
l
.
Ne
w
re
v
i
e
w
e
r
'
s
st
a
t
i
o
n
s
,
de
m
o
in
t
e
r
i
o
r
gl
a
s
s
pa
r
t
i
t
i
o
n
s
,
ne
w
ce
i
l
i
n
g
s
,
ne
w
fl
o
o
r
s
,
ne
w
pa
r
t
i
t
i
o
n
s
an
d
up
g
r
a
d
e
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
10
/
1
1
/
2
0
1
0
:
Ph
a
s
e
II
co
n
s
i
s
t
s
of
3
ar
e
a
s
.
Th
e
first area is 80% complete waiting for
de
s
k
pa
r
t
i
t
i
o
n
s
.
10
/
2
7
/
2
0
1
0
:
Th
e
fu
n
d
i
n
g
al
l
o
c
a
t
i
o
n
fo
r
th
e
desk partition change order was received
fr
o
m
th
e
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
on 10/21/2010. BPO increase is being
pr
o
c
e
s
s
e
d
.
Pr
o
j
e
c
t
is
on
ho
l
d
until BPO increase is approved.
11
/
1
5
/
2
0
1
0
:
Th
e
de
s
k
pa
r
t
i
t
i
o
n
ch
a
n
g
e
or
d
e
r
has not been approved to date. The
re
v
i
e
w
e
r
s
st
a
t
i
o
n
s
ar
e
on
ho
l
d
until CO is approved.
Th
e
vi
o
l
a
t
i
o
n
s
of
f
i
c
e
bu
i
l
d
-
o
u
t
is
to commence on 11/22/2010.
12
/
1
5
/
2
0
1
0
:
Th
e
de
s
k
pa
r
t
i
t
i
o
n
CO
wa
s
ap
p
r
o
v
e
d
and the material is on order.
An
t
i
c
i
p
a
t
e
d
to
be
in
s
t
a
l
l
e
d
by
Ja
n
u
a
r
y
15, 2011. Violations office build-
ou
t
90
%
co
m
p
l
e
t
e
.
Fi
n
a
l
in
s
p
e
c
t
i
o
n
s
scheduled through 12/20/2011.
1/
6
/
2
0
1
1
:
Re
v
i
e
w
e
r
s
St
a
t
i
o
n
Mi
l
l
w
o
r
k
(C
O
)
-
anticipated for the week of 1/17/2011.
Vi
o
l
a
t
i
o
n
s
Of
f
i
c
e
Co
m
p
l
e
t
e
.
Co
n
f
e
r
e
n
c
e
Ro
o
m
pe
n
d
i
n
g
Bu
i
l
d
i
n
g
Department vacating the space.
1/
2
6
/
2
0
1
1
:
Re
v
i
e
w
e
r
s
st
a
t
i
o
n
mi
l
l
w
o
r
k
de
l
i
v
e
r
y
scheduled for 1/28/2011.
Co
n
f
e
r
e
n
c
e
ro
o
m
st
a
r
t
pe
n
d
i
n
g
the tenant removing the existing office
fu
r
n
i
t
u
r
e
.
2/
1
7
/
2
0
1
1
:
Re
v
i
e
w
e
r
s
ar
e
a
co
m
p
l
e
t
e
.
Co
n
f
e
r
e
n
c
e
room 80% complete.
3/
1
5
/
2
0
1
1
:
Al
l
wo
r
k
co
m
p
l
e
t
e
ex
c
e
p
t
fo
r
on
e
conference room change order for
re
l
o
c
a
t
i
n
g
el
e
c
t
r
i
c
a
l
fo
r
fl
o
o
r
el
e
c
t
r
i
c
a
l
outlet. Change Order pending
ex
e
c
u
t
i
o
n
th
r
o
u
g
h
CM
B
.
4/
2
6
/
2
0
1
1
:
Ch
a
n
g
e
Or
d
e
r
st
i
l
l
pe
n
d
i
n
g
ex
e
c
u
t
i
o
n
.
8/
1
6
/
2
0
1
1
:
Ph
a
s
e
2
wo
r
k
is
co
m
p
l
e
t
e
d
.
Cl
o
s
e
out documents have been submitted
by
th
e
co
n
t
r
a
c
t
o
r
.
Page25 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
71
2
/
2
0
1
2
5:
2
1
:
3
2
P
M
Pr
o
j
e
c
t
Na
m
e
Ci
t
y
Ha
l
l
-
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
Re
n
o
v
a
t
i
o
n
Ph
a
s
e
Il
l
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
n
o
v
a
t
i
o
n
of
th
e
di
f
f
e
r
e
n
t
se
c
t
i
o
n
s
of
th
e
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
,
lo
c
a
t
e
d
at
th
e
2n
d
fl
o
o
r
of
Ci
t
y
Ha
l
l
.
Ne
w
ce
i
l
i
n
g
s
,
ne
w
fl
o
o
r
s
,
ne
w
pa
r
t
i
t
i
o
n
s
an
d
up
g
r
a
d
e
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
4/
2
6
/
2
0
1
1
:
Co
n
s
t
r
u
c
t
i
o
n
co
m
m
e
n
c
e
d
on
4/
1
8
/
2
0
1
1
.
All work is being performed
du
r
i
n
g
ni
g
h
t
s
an
d
we
e
k
e
n
d
s
as
to not interfere with normal operations.
6/
1
0
/
2
0
1
1
:
Ba
s
e
Co
n
t
r
a
c
t
co
n
s
t
r
u
c
t
i
o
n
wo
r
k
approximately 90% complete. Change
Or
d
e
r
fo
r
mi
s
c
e
l
l
a
n
e
o
u
s
ex
t
r
a
wo
r
k
submitted to Building for approval.
Pe
n
d
i
n
g
au
t
h
o
r
i
z
a
t
i
o
n
an
d
lo
a
d
i
n
g
of the account and processing of the
BP
O
in
c
r
e
a
s
e
.
6.
2
4
.
2
0
1
1
Ch
a
n
g
e
or
d
e
r
fo
r
ad
d
i
t
i
o
n
a
l
re
q
u
e
s
t
e
d
work has not yet been approved
by
Bu
i
l
d
i
n
g
De
p
t
.
Ba
s
e
Co
n
t
r
a
c
t
work 99% complete.
8.
1
5
.
1
1
Ch
a
n
g
e
or
d
e
r
fo
r
ad
d
i
t
i
o
n
a
l
re
q
u
e
s
t
e
d
work has been approved by
Bu
i
l
d
i
n
g
an
d
cu
r
r
e
n
t
l
y
be
i
n
g
pr
o
c
e
s
s
e
d
.
Awaiting Finance approval.
8.
3
0
.
1
1
Co
n
s
t
r
u
c
t
i
o
n
st
a
r
t
e
d
ag
a
i
n
.
Pr
o
j
e
c
t
scheduled for substantial completion
by
9/
1
5
/
2
0
1
1
.
11
/
3
0
/
2
0
1
1
:
Ph
a
s
e
3
Pu
n
c
h
l
i
s
t
wa
l
k
th
r
u
pe
r
f
o
r
m
e
d
with contactor and Building
De
p
a
r
t
m
e
n
t
.
Wo
r
k
co
m
p
l
e
t
e
d
.
Bu
i
l
d
i
n
g
to
pe
r
f
o
r
m
final walk thru with Contractor and
CI
P
.
Page26of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Nm
1
1
e
·
Ci
t
y
Ha
l
l
-
Up
g
r
a
d
e
Ha
l
o
n
Sy
s
t
e
m
71
1
/
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
... \'
t
a
l
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
p
l
a
c
e
m
e
n
t
of
tw
o
45
po
u
n
d
s
ha
l
o
n
13
0
1
ta
n
k
s
by
tw
o
ne
w
en
v
i
r
o
n
m
e
n
t
a
l
l
y
ac
c
e
p
t
a
b
l
e
pr
o
t
e
c
t
i
o
n
sy
s
t
e
m
(H
F
C
-
1
2
5
)
.
Co
n
s
t
r
u
c
t
i
o
n
Status
7/
2
/
2
0
1
0
:
Al
l
su
p
p
r
e
s
s
i
o
n
sy
s
t
e
m
s
have been installed. The fifth floor is
pe
n
d
i
n
g
re
p
l
a
c
e
m
e
n
t
of
th
e
AC
unit and sealing the room for
pr
e
s
s
u
r
i
z
a
t
i
o
n
.
10
/
6
/
2
0
1
0
:
Pe
r
m
i
t
t
i
n
g
of
th
e
ne
w
AC unit for the 5th floor is underway.
11
/
1
6
/
2
0
1
0
:
Pe
r
m
i
t
re
c
e
i
v
e
d
fo
r
the AC unit at the 5th floor.
12
/
1
5
/
2
0
1
0
:
Mi
n
i
-
s
p
l
i
t
AC
un
i
t
has been installed. Pending installation of
ba
c
k
-
u
p
AC
un
i
t
.
1/
6
/
2
0
1
1
:
Te
s
t
i
n
g
of
th
e
AC
un
i
t
s
is underway along with final
in
s
p
e
c
t
i
o
n
s
.
Al
l
wo
r
k
co
m
p
l
e
t
e
.
1/
2
4
/
2
0
1
1
:
Al
l
wo
r
k
co
m
p
l
e
t
e
.
An existing FA device in the room was
fo
u
n
d
to
be
br
o
k
e
n
.
Th
e
Pr
o
p
e
r
t
y
Management division must repair in
or
d
e
r
to
co
m
p
l
e
t
e
th
i
s
pr
o
j
e
c
t
.
2/
1
7
/
2
0
1
1
:
FA
de
v
i
c
e
ha
s
be
e
n
repaired. Contractor pending final
in
s
p
e
c
t
i
o
n
an
d
si
g
n
of
f
.
3/
1
5
/
2
0
1
1
:
Me
c
h
a
n
i
c
a
l
an
d
Fi
r
e
Final Inspection scheduled for
3/
1
7
/
2
0
1
1
.
4/
2
6
/
2
0
1
1
:
Fi
n
a
l
si
g
n
of
f
of
al
l
disciplines obtained on 4/21/2011. Page 27 of 45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
lv
l
g
r
.
So
u
t
h
Be
a
c
h
Fu
n
g
,
H.
So
u
t
h
Be
a
c
h
Fu
n
g
,
H.
So
u
t
h
Be
a
c
h
Vi
e
i
r
a
,
T.
So
u
t
h
Be
a
c
h
Vi
e
i
r
a
,
T.
Pr
o
j
e
c
t
Na
m
e
Ci
t
y
Ha
l
l
Im
p
a
c
t
Gl
a
s
s
Co
n
v
e
n
t
i
o
n
Ce
n
t
e
r
Im
p
r
o
v
e
m
e
n
t
s
-
Ph
a
s
e
s
C
&
D
Di
r
e
c
t
o
r
y
Si
g
n
s
in
th
e
Ci
t
y
Ce
n
t
e
r
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Pr
o
j
e
c
t
Fl
a
m
i
n
g
o
Lu
m
m
u
s
BP
10
F
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Nl
o
n
t
h
(
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
p
l
a
c
e
ex
i
s
t
i
n
g
gl
a
s
s
wi
n
d
o
w
s
an
d
st
o
r
e
fr
o
n
t
s
wi
t
h
im
p
a
c
t
re
s
i
s
t
a
n
t
Da
d
e
Co
u
n
t
y
ap
p
r
o
v
e
d
wi
n
d
o
w
s
an
d
gl
a
s
s
do
o
r
s
.
Al
l
ex
i
s
t
i
n
g
me
t
a
l
hu
r
r
i
c
a
n
e
sh
u
t
t
e
r
s
wi
l
l
be
re
m
o
v
e
d
fr
o
m
bu
i
l
d
i
n
g
.
Re
n
o
v
a
t
i
o
n
an
d
AD
A
im
p
r
o
v
e
m
e
n
t
s
to
29
ex
i
s
t
i
n
g
re
s
t
r
o
o
m
s
,
do
o
r
s
an
d
do
o
r
ha
r
d
w
a
r
e
.
(I
n
c
l
u
d
e
s
bu
d
g
e
t
fo
r
Ph
a
s
e
s
A,
B
,
C
,
an
d
D)
.
In
s
t
a
l
l
a
t
i
o
n
of
Di
r
e
c
t
o
r
y
Si
g
n
s
in
th
e
Ci
t
y
Ce
n
t
e
r
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
to
in
f
o
r
m
us
e
r
s
o
f
th
e
lo
c
a
t
i
o
n
s
of
th
e
Ci
t
y
of
f
i
c
e
s
an
d
se
r
v
i
c
e
s
.
A
po
r
t
i
o
n
of
Fl
a
m
i
n
g
o
A,
be
t
w
e
e
n
7t
h
,
Me
r
i
d
i
a
n
,
9t
h
,
an
d
Wa
s
h
i
n
g
t
o
n
wi
l
l
be
co
n
s
t
r
u
c
t
e
d
vi
a
JO
C
as
Fl
a
m
i
n
g
o
F.
It
is
in
t
e
n
d
e
d
th
a
t
th
i
s
co
n
s
t
r
u
c
t
i
o
n
wi
l
l
re
l
i
e
v
e
st
o
r
m
w
a
t
e
r
bo
t
t
l
e
n
e
c
k
s
fr
o
m
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
wh
i
l
e
ma
k
i
n
g
wa
t
e
r
,
st
r
e
e
t
s
c
a
p
i
n
g
,
an
d
li
g
h
t
i
n
g
im
p
r
o
v
e
m
e
n
t
s
to
th
i
s
ar
e
a
.
Co
n
s
t
r
u
c
t
i
o
n
Status
4/
2
7
/
2
0
1
1
:
NT
P
I
is
s
u
e
d
to
Ma
t
r
i
x
Co
n
s
t
r
u
c
t
i
o
n
on 4/6/2011. Window subcontractor
fi
e
l
d
me
a
s
u
r
e
d
al
l
ex
i
s
t
i
n
g
wi
n
d
o
w
openings on the 3rd and 4th floors on
4/
2
3
/
2
0
1
1
.
Fi
e
l
d
me
a
s
u
r
i
n
g
of
th
e
2nd and 1st floors to be conducted
du
r
i
n
g
th
e
we
e
k
of
5/
2
/
2
0
1
1
.
Sh
o
p
drawings anticipated to be complete
by
5/
3
1
/
2
0
1
1
.
8/
0
4
/
2
0
1
1
:
Bu
i
l
d
i
n
g
Pe
r
m
i
t
is
s
u
e
d
to
co
n
t
r
a
c
t
o
r
.
8/
0
5
/
2
0
1
1
:
NT
P
II
is
s
u
e
d
to
co
n
t
r
a
c
t
o
r
.
08
/
3
0
/
2
0
1
1
:
Ma
t
e
r
i
a
l
to
ar
r
i
v
e
09
/
2
7
/
2
0
1
1
.
If
material arrives on time, construction to
st
a
r
t
09
/
2
9
/
2
0
1
1
.
11
/
0
2
/
2
0
1
1
:
Pr
o
j
e
c
t
st
a
r
t
e
d
on
10
/
2
9
/
2
0
1
1
an
d
is curretnly at 40% completion.
11
/
3
0
/
1
1
:
Pr
o
j
e
c
t
in
pr
o
g
r
e
s
s
an
d
is
cu
r
r
e
n
t
l
y
at 75% completion.
12
/
3
0
/
1
1
:
Pr
o
j
e
c
t
fi
n
a
l
ap
p
r
o
v
a
l
by
Bu
i
l
d
i
n
g
Department received on 12/23/2011.
Pr
o
j
e
c
t
tr
a
n
s
f
e
r
r
e
d
to
cl
o
s
e
-
o
u
t
phase.
Al
p
i
n
e
Co
n
s
t
r
u
c
t
i
o
n
,
th
e
or
i
g
i
n
a
l
contractor, was terminated from the
pr
o
j
e
c
t
an
d
a
me
d
i
a
t
e
d
se
t
t
l
e
m
e
n
t
agreement was negotiated and
fi
n
a
l
i
z
e
d
by
th
e
Ci
t
y
At
t
o
r
n
e
y
'
s
of
f
i
c
e
.
Funds were retained from Alpine
Co
n
s
t
r
u
c
t
i
o
n
'
s
co
n
t
r
a
c
t
to
co
m
p
l
e
t
e
the scope of work. A JOC proposal
is
be
i
n
g
ne
g
o
t
i
a
t
e
d
wi
t
h
Ha
r
b
o
u
r
Construction to complete the remaining
sc
o
p
e
of
wo
r
k
.
No
t
i
c
e
to
pr
o
c
e
e
d
to
co
n
t
r
a
c
t
o
r
was issued on March 30, 2012. Shop
dr
a
w
i
n
g
s
fo
r
st
a
f
f
re
v
i
e
w
an
d
ap
p
r
o
v
a
l
are expected by April27, 2012.
Pr
o
j
e
c
t
tu
r
n
e
d
ov
e
r
to
Pa
r
k
s
De
p
t
on September 26, 2011.
Pr
o
j
e
c
t
tu
r
n
e
d
ov
e
r
to
PW
D
Op
e
r
a
t
i
o
n
s
on December 22, 2011. Page28 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Vi
e
i
r
a
,
Th
a
i
s
So
u
t
h
Be
a
c
h
Fu
n
g
,
H.
So
u
t
h
Be
a
c
h
Ca
b
a
n
a
s
,
H.
Pr
o
j
e
c
t
Na
m
e
Fl
a
m
i
n
g
o
Pa
r
k
Te
n
n
i
s
Ce
n
t
e
r
Fl
a
m
i
n
g
o
Po
o
l
De
c
k
Re
p
l
a
c
e
m
e
n
t
Mu
l
t
i
-
P
u
r
p
o
s
e
Mu
n
i
c
i
p
a
l
Pa
r
k
i
n
g
Fa
c
i
l
i
t
y
-
4.
St
r
u
c
t
u
r
e
7/
2
1
2
0
1
2
5:
2
1
:
3
2
PM
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.f
u
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
De
m
o
l
i
t
i
o
n
of
ex
i
s
t
i
n
g
fa
c
i
l
i
t
y
an
d
co
u
r
t
s
&
co
n
s
t
r
u
c
t
i
o
n
of
ne
w
te
n
n
i
s
ce
n
t
e
r
fa
c
i
l
i
t
y
&
co
u
r
t
s
.
In
s
t
a
l
l
a
t
i
o
n
of
a
ne
w
ru
b
b
e
r
i
z
e
d
de
c
k
co
a
t
i
n
g
sy
s
t
e
m
.
Th
i
s
ph
a
s
e
in
c
l
u
d
e
s
co
n
s
t
r
u
c
t
i
o
n
of
th
e
ma
i
n
bu
i
l
d
i
n
g
st
r
u
c
t
u
r
e
as
we
l
l
as
si
t
e
im
p
r
o
v
e
m
e
n
t
s
su
c
h
as
la
n
d
s
c
a
p
i
n
g
an
d
th
e
ne
w
pl
a
z
a
ar
e
a
,
st
r
e
e
t
re
s
u
r
f
a
c
i
n
g
,
si
d
e
w
a
l
k
s
,
et
c
.
Co
n
s
t
r
u
c
t
i
o
n
Status
05
/
1
5
/
2
0
1
2
:
NT
P
1
is
s
u
e
d
on
Ap
r
i
l
20
,
20
1
2
.
NT
P
2
is
s
u
e
d
on
Ma
y
15
,
20
1
2
.
05
/
2
3
/
2
0
1
2
:
dr
a
i
n
a
g
e
sy
s
t
e
m
in
s
t
a
l
l
a
t
i
o
n
in north courts in progress.
06
/
2
9
/
2
0
1
2
:
Bu
i
l
d
i
n
g
de
m
o
l
i
t
i
o
n
is complete; building pad and augercast
pi
l
e
in
s
t
a
l
l
a
t
i
o
n
in
pr
o
g
r
e
s
s
.
No
r
t
h
e
r
n
tennis courts construction
un
d
e
r
w
a
y
.
03
.
0
7
.
1
2
:
Co
n
s
t
r
u
c
t
i
o
n
st
a
r
t
e
d
02
.
1
3
.
1
2
.
Substantially complete on 03.07.12.
03
.
2
9
.
1
2
:
Co
n
s
t
r
u
c
t
i
o
n
co
m
p
l
e
t
e
d
on
03
.
0
8
.
1
2
Th
e
MP
M
P
F
ac
h
i
e
v
e
d
a
TC
O
fo
r
the garage portion of the facility on
Fr
i
d
a
y
,
No
v
e
m
b
e
r
13
,
20
0
9
.
Th
e
li
g
h
t
i
n
g
ve
n
d
o
r
,
Co
o
p
e
r
Li
g
h
t
i
n
g
has advised the City that the S-3
li
g
h
t
i
n
g
fi
x
t
u
r
e
s
wi
l
l
be
re
p
l
a
c
e
d
at no cost to the City.
Pu
n
c
h
li
s
t
it
e
m
s
ar
e
pe
n
d
i
n
g
an
d
a structural investingation will be
co
n
d
u
c
t
e
d
un
d
e
r
a
di
f
f
e
r
e
n
t
ve
n
d
o
r
.
Page29of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
1
V
I
g
r
.
So
u
t
h
Be
a
c
h
Ca
b
a
n
a
s
,
H.
Pr
o
j
e
c
t
N{
l
m
e
Mu
l
t
i
-
P
u
r
p
o
s
e
Mu
n
i
c
i
p
a
l
Pa
r
k
i
n
g
Fa
c
i
l
i
t
y
-
5.
Of
f
i
c
e
Bu
i
l
d
-
o
u
t
Pa
c
k
a
g
e
5:
2
1
:
3
2
P
M
Mo
n
t
h
i
;
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
,\
'
t
{
l
f
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
A
co
m
p
o
n
e
n
t
of
th
e
Ci
t
y
Ha
l
l
Ga
r
a
g
e
is
to
co
n
s
t
r
u
c
t
a
5-
s
t
o
r
y
of
f
i
c
e
bu
i
l
d
i
n
g
(3
2
,
0
0
0
SF
)
al
o
n
g
Me
r
i
d
i
a
n
Av
e
n
u
e
.
Th
e
fo
l
l
o
w
i
n
g
De
p
a
r
t
m
e
n
t
s
wi
l
l
re
l
o
c
a
t
e
to
th
i
s
bu
i
l
d
i
n
g
:
Pa
r
k
i
n
g
,
Fi
n
a
n
c
e
,
IT
,
OB
P
I
co
n
f
e
r
e
n
c
e
ro
o
m
an
d
Cu
l
t
u
r
a
l
an
d
To
u
r
i
s
m
De
p
a
r
t
m
e
n
t
.
Si
n
c
e
co
n
s
t
r
u
c
t
i
o
n
co
m
p
l
e
t
i
o
n
in
Ju
n
e
,
20
1
0
,
Te
a
m
5
ha
s
be
e
n
pe
r
f
o
r
m
i
n
g
fi
t
ou
t
pr
o
j
e
c
t
s
fo
r
ea
c
h
de
p
a
r
t
m
e
n
t
te
n
a
n
t
.
Pr
o
j
e
c
t
s
in
c
l
u
d
e
wi
n
d
o
w
bl
i
n
d
s
,
ac
c
e
s
s
co
n
t
r
o
l
,
sp
e
c
i
f
i
c
se
c
u
r
i
t
y
ad
d
i
t
i
o
n
s
an
d
a
fi
r
s
t
fl
o
o
r
br
e
a
k
r
o
o
m
fo
r
th
e
fi
n
a
n
c
e
de
p
a
r
t
m
e
n
t
.
Co
n
s
t
r
u
c
t
i
o
n
St{lfUs
Pr
o
j
e
c
t
ha
s
re
c
e
i
v
e
d
a
TC
O
.
HV
A
C
fi
n
a
l
Te
s
t
an
d
Ba
l
a
n
c
e
report completed and sent to the
Ar
c
h
i
t
e
c
t
.
Pe
n
d
i
n
g
fi
n
a
l
ap
p
r
o
v
a
l
by MEP Engineer. Office furniture
in
s
t
a
l
l
a
t
i
o
n
co
m
p
l
e
t
e
.
Ro
l
l
e
r
sh
a
d
e
installation 95% complete pending
pu
n
c
h
l
i
s
t
it
e
m
s
.
10
/
1
1
/
2
0
1
0
:
Ro
l
l
e
r
Sh
a
d
e
s
ar
e
in
s
t
a
l
l
e
d
.
Al
l
furniture is installed. Miscellaneous
ad
d
i
t
i
o
n
a
l
te
n
a
n
t
re
q
u
e
s
t
s
ar
e
being performed under a JOC with
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
.
Pe
r
m
i
t
t
i
n
g
for this work is underway and JOC
Co
n
t
r
a
c
t
is
be
i
n
g
pr
o
c
e
s
s
e
d
.
10
/
2
7
/
2
0
1
0
:
Pe
r
m
i
t
s
fo
r
Br
e
a
k
r
o
o
m
an
d
Mi
s
c
.
Items are still in review at Building
De
p
t
.
Li
n
k
'
s
CO
is
pe
n
d
i
n
g
lo
w
voltage final inspection from Gisnet and
Fi
r
e
Fi
n
a
l
.
Fi
r
e
re
q
u
i
r
e
s
ad
d
i
t
i
o
n
a
l
stair signage for final sign off. These
si
g
n
s
ar
e
be
i
n
g
su
p
p
l
i
e
d
by
th
e
JOC Contractor.
11
/
1
5
/
2
0
1
0
:
Pe
r
m
i
t
s
fo
r
Br
e
a
k
r
o
o
m
an
d
Mi
s
c
.
Items are still in review at Building
De
p
t
.
(
2
n
d
ro
u
n
d
of
co
m
m
e
n
t
s
)
All items are completed for CO. Fire to
re
i
n
s
p
e
c
t
on
11
/
1
8
/
1
0
.
12
/
1
5
/
2
0
1
0:
Fi
r
e
Fi
n
a
l
in
s
p
e
c
t
i
o
n
pe
n
d
i
n
g
cl
e
a
r
i
n
g
of FA Panel. Breakroom permit
pe
n
d
i
n
g
ap
p
r
o
v
a
l
by
Bu
i
l
d
i
n
g
Dept.
1/
6
/
2
0
1
1
:
Th
e
co
m
m
e
n
c
e
m
e
n
t
of
th
e
br
e
a
k
r
o
o
m
project was issued on 1/6/11.
Fi
r
e
Fi
n
a
l
in
s
p
e
c
t
i
o
n
fo
r
Li
n
k
'
s
CO is still pending the clearing of the FA
Pa
n
e
l
(b
e
i
n
g
pe
r
f
o
r
m
e
d
by
Pr
o
p
e
r
t
y
Management).
2/
1
7
/
2
0
1
1
:
Al
l
ro
u
g
h
in
s
t
a
l
l
a
t
i
o
n
s
ar
e
co
m
p
l
e
t
e
.
Anticipated completion of the
br
e
a
k
r
o
o
m
is
an
t
i
c
i
p
a
t
e
d
fo
r
Ma
r
c
h
1Oth, 2011.
3/
1
5
/
2
0
1
1
:
Br
e
a
k
r
o
o
m
co
n
s
t
r
u
c
t
i
o
n
is
su
b
s
t
a
n
t
i
a
l
l
y
complete. Final walkthrough
wi
t
h
te
n
a
n
t
sc
h
e
q
u
l
e
d
fo
r
3/
1
7
/
2
0
1
1
.
4/
2
6
/
2
0
1
1
:
Page30
,-
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Di
x
o
n
,
C.
Pr
o
j
e
c
t
Na
m
e
Po
l
i
c
e
Bu
i
l
d
i
n
g
-
El
e
v
a
t
o
r
s
Re
n
o
v
a
t
i
o
n
lt
f
o
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Co
m
p
l
e
t
e
up
g
r
a
d
e
of
th
e
tw
o
(2
)
pa
s
s
e
n
g
e
r
s
el
e
v
a
t
o
r
s
lo
c
a
t
e
d
at
th
e
ma
i
n
Lo
b
b
y
of
th
e
bu
i
l
d
i
n
g
an
d
th
e
on
e
(1
)
se
r
v
i
c
e
el
e
v
a
t
o
r
lo
c
a
t
e
d
at
th
e
No
r
t
h
en
d
of
th
e
bu
i
l
d
i
n
g
.
Co
n
s
t
r
u
c
t
i
o
n
Status
Me
e
t
i
n
g
sc
h
e
d
u
l
e
d
fo
r
4/
2
7
to
discuss all outstanding change order
wo
r
k
.
Al
l
ba
s
e
co
n
t
r
a
c
t
wo
r
k
was completed and inspected.
6/
1
0
/
2
0
1
1
:
Fi
n
a
l
Fi
r
e
De
p
a
r
t
m
e
n
t
in
s
p
e
c
t
i
o
n
of entire facility scheduled for
6/
1
3
/
2
0
1
1
.
6/
2
4
/
2
0
1
1
:
Fi
n
a
l
Fi
r
e
De
p
t
.
in
s
p
e
c
t
i
o
n
wa
s
conducted on 6/17/2011. Only pending
it
e
m
wa
s
th
e
pe
r
m
i
t
re
v
i
s
i
o
n
re
q
u
i
r
e
d
for the 5th floor Egress Door
(c
h
a
n
g
e
to
a
NF
P
A
de
l
a
y
e
d
eg
r
e
s
s
locking mechanism) between
To
u
r
i
s
m
an
d
IT
De
p
a
r
t
m
e
n
t
s
.
7/
2
8
/
2
0
1
1
:
Bu
i
l
d
i
n
g
Fi
n
a
l
is
s
u
e
d
.
8/
0
2
/
2
0
1
1
:
Pr
o
j
e
c
t
ha
s
re
c
e
i
v
e
d
a CO.
Th
e
Ci
t
y
Co
m
m
i
s
s
i
o
n
ap
p
r
o
v
e
d
the Xpert Contract on January 19, 2011
Th
e
Co
n
t
r
a
c
t
wa
s
ex
e
c
u
t
e
d
on
March 17, 2011.
Th
e
fi
r
s
t
No
t
i
c
e
to
Pr
o
c
e
e
d
wa
s
issued on April 25, 2011. The start of
co
n
s
t
r
u
c
t
i
o
n
is
an
t
i
c
i
p
a
t
e
d
in
mid May 2011.
09
/
0
6
/
2
0
1
1
:
Co
n
t
r
a
c
t
o
r
mo
b
i
l
i
z
e
d
.
Th
e
Pr
o
j
e
c
t
is
cu
r
r
e
n
t
l
y
90
%
co
m
p
l
e
t
e
,
pending Building Department
pl
a
n
re
v
i
s
i
o
n
s
fo
r
(B
u
i
l
d
i
n
g
De
p
t
)
requested changes. The additional
wo
r
k
is
an
t
i
c
i
p
a
t
e
d
to
be
co
m
p
l
e
t
e
d
in June 2012. Page31 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
So
u
t
h
Be
a
c
h
Fu
n
g
,
H.
So
u
t
h
Be
a
c
h
Fu
n
g
,
H.
Pr
o
j
e
c
t
Na
m
e
Po
l
i
c
e
Ga
r
a
g
e
Gl
a
s
s
Bl
o
c
k
s
re
p
l
a
c
e
m
e
n
t
Po
l
i
c
e
St
a
t
i
o
n
•
Ce
i
l
i
n
g
Re
p
l
a
c
e
m
e
n
t
Ph
a
s
e
2
Po
l
i
c
e
St
a
t
i
o
n
Ha
l
o
n
Re
p
l
a
c
e
m
e
n
t
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
u
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
u
Re
p
m
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
p
l
a
c
e
m
e
n
t
of
th
e
ex
i
s
t
i
n
g
gl
a
s
s
bl
o
c
k
st
a
i
r
c
a
s
e
at
th
e
Po
l
i
c
e
Bu
i
l
d
i
n
g
Ga
r
a
g
e
wi
t
h
Da
d
e
Co
u
n
t
y
ap
p
r
o
v
e
d
im
p
a
c
t
gl
a
s
s
sy
s
t
e
m
.
Re
p
l
a
c
e
m
e
n
t
of
3
ti
e
r
so
f
f
i
t
at
le
v
e
l
1
Co
m
m
u
n
i
t
y
Ro
o
m
an
d
ac
o
u
s
t
i
c
a
l
ce
i
l
i
n
g
at
le
v
e
l
4
si
m
u
l
a
t
i
o
n
ro
o
m
.
Re
p
l
a
c
e
m
e
n
t
of
Ha
l
o
n
sy
s
t
e
m
in
le
v
e
l
4
IT
ro
o
m
lo
c
a
t
e
d
at
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Po
l
i
c
e
St
a
t
i
o
n
.
Co
n
s
t
r
u
c
t
i
o
n
Status
10
/
1
1
/
2
0
1
0
:
Co
n
t
r
a
c
t
o
r
ha
s
ob
t
a
i
n
e
d
pe
r
m
i
t
and is waiting for delivery of windows.
Wi
n
d
o
w
de
l
i
v
e
r
y
sc
h
e
d
u
l
e
d
fo
r
th
e
week of 10/25/2010. Installation to
co
m
m
e
n
c
e
by
11
/
1
/
2
0
1
0
.
Co
m
p
l
e
t
i
o
n
of Project by 12/1/2010.
10
/
2
7
/
2
0
1
0
:
Co
n
t
r
a
c
t
o
r
co
m
m
e
n
c
e
d
wo
r
k
on
10/25/2010.
1 0/
2
8
/
2
0
1
0:
Co
n
t
r
a
c
t
o
r
in
s
t
a
l
l
a
t
i
o
n
s
ap
p
r
o
x
i
m
a
t
e
l
y
50% complete.
11
/
1
5
/
2
0
1
0
:
Co
n
t
r
a
c
t
o
r
in
s
t
a
l
l
a
t
i
o
n
s
ap
p
r
o
x
i
m
a
t
e
l
y
80% complete. Anticipated
co
m
p
l
e
t
i
o
n
by
11
/
3
0
/
2
0
1
0
.
12
/
1
5
/
2
0
1
0
:
Pr
o
j
e
c
t
co
m
p
l
e
t
e
d
on
12
/
2
/
2
0
1
0
.
Pending final invoice and submittal of
wa
r
r
a
n
t
i
e
s
.
1/
6
/
2
0
1
1
:
Re
t
a
i
n
a
g
e
re
q
u
e
s
t
e
d
on
1/
4
/
2
0
1
1
.
Project Complete. All closeout
do
c
u
m
e
n
t
s
ha
v
e
be
e
n
re
c
e
i
v
e
d
.
1.
1
9
.
2
0
1
2
:
Pr
o
j
e
c
t
ha
s
be
e
n
su
b
m
i
t
t
e
d
to
Bu
i
l
d
i
n
g
Department for review.
03
.
0
7
.
1
2
:
Dr
a
w
i
n
g
s
we
n
t
th
r
o
u
g
h
bu
i
l
d
i
n
g
department review and are now with
PE
R
A
.
04
.
2
6
.
1
2
:
Le
v
e
l
4
si
u
m
l
a
t
o
r
ro
o
m
ac
o
u
s
t
i
c
a
l
ceiling completed.
Le
v
e
l
1
co
m
m
u
n
i
t
y
ro
o
m
so
f
f
i
t
cu
r
r
e
n
t
l
y
under construction.
Co
o
r
d
i
n
a
t
i
n
g
in
s
t
a
l
l
a
t
i
o
n
of
ne
w
re
c
e
s
s
e
d
lights to replace damaged
un
i
t
s
wi
t
h
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
.
09
/
0
2
/
2
0
1
1
:
Pr
e
Co
n
s
t
r
u
c
t
i
o
n
Me
e
t
i
n
g
he
l
d
be
t
w
e
e
n
Harbour Construction, IT
de
p
a
r
t
m
e
n
t
an
d
CI
P
.
Co
n
s
t
r
u
c
t
i
o
n
to start on 09/07/2011
09
/
0
7
/
2
0
1
1
:
Co
n
t
r
a
c
t
o
r
mo
b
i
l
i
z
e
d
.
11
/
3
0
/
2
0
1
1
:
Pr
o
j
e
c
t
80
%
co
m
p
l
e
t
e
.
An
t
i
c
i
p
a
t
e
d
completion 12/1/2011.
12
/
2
/
2
0
1
1
:
Pr
o
j
e
c
t
co
m
p
l
e
t
e
Page 32 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
1
:
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
Se
a
w
a
l
l
Im
p
r
o
v
e
m
e
n
t
s
-
Li
n
c
o
l
n
Ro
a
d
St
r
e
e
t
En
d
7/
2
1
1
0
1
2
5:
2
1
:
3
2
P
M
lt
1
o
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
s
t
o
r
a
t
i
o
n
of
th
e
se
a
w
a
l
l
,
im
p
r
o
v
e
m
e
n
t
to
th
e
ad
j
a
c
e
n
t
Pu
b
l
i
c
Pa
r
k
an
d
cu
l
-
d
e
-
s
a
c
lo
c
a
t
e
d
at
th
e
we
s
t
en
d
of
Li
n
c
o
l
n
Ro
a
d
.
Ne
w
la
n
d
s
c
a
p
i
n
g
,
ne
w
pa
v
e
d
ar
e
a
,
ir
r
i
g
a
t
i
o
n
an
d
ex
t
e
r
i
o
r
li
g
h
t
i
n
g
.
Dr
a
i
n
a
g
e
Im
p
r
o
v
e
m
e
n
t
s
ad
d
e
d
at
cu
l
-
d
e
-
s
a
c
du
e
to
ex
i
s
t
i
n
g
po
n
d
i
n
g
co
n
d
i
t
i
o
n
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
Se
a
w
a
l
l
co
n
s
t
r
u
c
t
i
o
n
co
m
p
l
e
t
e
.
Outfall structures and rip-rap boulders
in
s
t
a
l
l
e
d
.
Dr
a
i
n
a
g
e
in
l
e
t
s
an
d
po
l
l
u
t
i
o
n
co
n
t
r
o
l
structures delivered. Installation
un
d
e
r
w
a
y
.
Un
d
e
r
g
r
o
u
n
d
wo
r
k
is
90
%
co
m
p
l
e
t
e
.
Sidewalks and curb and gutters
we
r
e
po
u
r
e
d
on
1,
0
/
7
/
2
0
1
0
an
d
10/8/2010.
Ex
p
e
c
t
e
d
co
m
p
l
e
t
i
o
n
by
mi
d
No
v
e
m
b
e
r
.
10
/
2
7
/
2
0
1
0
:
Fi
n
a
l
ti
e
in
of
36
"
st
o
r
m
w
a
t
e
r
pi
p
e
to outfall structure pending the receipt
of
an
in
t
e
r
n
a
l
co
m
p
r
e
s
s
i
o
n
fi
t
t
i
n
g
.
When EnviStreets/Sidewalksaste
re
c
e
i
v
e
s
,
pr
o
g
r
e
s
s
at
th
e
st
r
e
e
t
e
n
d
park will recommence.
11
/
1
5
/
2
0
1
0
:
Fi
n
a
l
in
s
t
a
l
l
a
t
i
o
n
s
of
th
e
pa
r
k
am
e
n
i
t
i
e
s
have commenced. Bollards, light
bo
l
l
a
r
d
s
,
la
n
d
s
c
a
p
i
n
g
,
ir
r
i
g
a
t
i
o
n
,
pavers, benches and street lighting
in
s
t
a
l
l
a
t
i
o
n
s
an
t
i
c
i
p
a
t
e
d
to
be
co
m
p
l
e
t
e
by 12/3/10.
12
/
1
5
/
2
0
1
0
:
Li
g
h
t
Bo
l
l
a
r
d
ba
s
e
s
po
u
r
e
d
on
12/15/10. Automobile bollards
co
m
p
l
e
t
e
d
.
Al
l
tr
e
e
s
in
s
t
a
l
l
e
d
.
Concrete paver installation scheduled to
st
a
r
t
on
12
/
1
6
/
1
0
.
1/
6
/
2
0
1
1
:
Al
l
st
r
e
e
t
e
n
d
pa
r
k
wo
r
k
co
m
p
l
e
t
e
(pavers, benches, lights, landscaping,
et
c
.
)
.
Pe
r
m
a
n
e
n
t
po
w
e
r
pe
n
d
i
n
g
from FPL (anticipated for mid January,
20
1
1
).
Su
b
-
p
r
e
p
an
d
pa
v
i
n
g
se
t
to commence on 1/11/2011.
1/
2
4
/
2
0
1
1
:
Al
l
ro
a
d
w
a
y
pa
v
i
n
g
is
co
m
p
l
e
t
e
.
Project completion pending FPL
pe
r
m
a
n
e
n
t
po
w
e
r
to
en
e
r
g
i
z
e
st
r
e
e
t
and ballard lights and to energize
th
e
ir
r
i
g
a
t
i
o
n
co
n
t
r
o
l
l
e
r
.
2/
1
7
/
2
0
1
1
:
FP
L
pe
r
m
a
n
e
n
t
po
w
e
r
pe
n
d
i
n
g
.
Change Order work to the contractor
fo
r
ad
d
i
t
i
o
n
a
l
he
d
g
e
s
is
pe
n
d
i
n
g
installation. Punchlist items for pavers
ar
e
pe
n
d
i
n
g
.
3/
1
5
/
2
0
1
1
:
FP
L
pr
o
v
i
d
e
d
pe
r
m
a
n
e
n
t
po
w
e
r
to site on 3/11/2011. Public Works walk
th
r
o
u
g
h
fo
r
fi
n
a
l
ac
c
e
p
t
a
n
c
e
sc
h
e
d
u
l
e
d
for 3/16/2011.
4/
2
6
/
2
0
1
1
:
Pu
b
l
i
c
Wo
r
k
s
De
p
t
.
is
s
u
e
d
a
on
e
-
i
t
e
m
punchlist (move trash can away
fr
o
m
Fi
r
e
Hy
d
r
a
n
t
)
.
Wo
r
k
pe
n
d
i
n
g
completion. CIP arranging for final Page33 of45
,
-
-
-
-
-
-
-
-
-
-
-
~
~
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
So
u
t
h
Po
i
n
t
e
Pa
r
k
71
2
/
2
0
1
2
5:
2
1
:
3
2
P
M
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
L\
'
t
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Pa
r
k
Im
p
r
o
v
e
m
e
n
t
s
co
n
s
i
s
t
i
n
g
of
th
e
fo
l
l
o
w
i
n
g
:
re
d
e
s
i
g
n
e
d
pa
r
k
en
t
r
a
n
c
e
,
ne
w
pa
v
i
l
i
o
n
an
d
ma
i
n
t
e
n
a
n
c
e
bu
i
l
d
i
n
g
s
in
c
l
u
d
i
n
g
a
sm
a
l
l
co
n
c
e
s
s
i
o
n
ar
e
a
,
ne
w
re
s
t
r
o
o
m
fa
c
i
l
i
t
y
,
pe
d
e
s
t
r
i
a
n
wa
l
k
w
a
y
s
,
pl
a
y
g
r
o
u
n
d
,
la
n
d
s
c
a
p
i
n
g
,
ir
r
i
g
a
t
i
o
n
,
an
d
si
t
e
li
g
h
t
i
n
g
.
Co
u
s
t
m
c
t
i
o
n
Sttttus
de
p
a
r
t
m
e
n
t
tu
r
n
o
v
e
r
s
th
i
s
we
e
k
.
6/
1
0
/
2
0
1
1
:
PW
D
ha
s
no
t
is
s
u
e
d
fi
n
a
l
ap
p
r
o
v
a
l
yet. Parks has accepted and is
ma
i
n
t
a
i
n
i
n
g
gr
o
u
n
d
s
.
Bu
i
l
d
i
n
g
Dept. final acceptance pending PWD
si
g
n
of
f
.
6/
2
4
/
2
0
1
1
:
Bu
i
l
d
i
n
g
fi
n
a
l
ap
p
r
o
v
a
l
is
s
u
e
d
on 6.21.2011. Permit is closed. PWD
si
g
n
~
o
f
f
re
c
e
i
v
e
d
fr
o
m
He
c
t
o
r
Castro, Assistant Director on 6.20.2011.
Pr
o
j
e
c
t
to
tr
a
n
s
i
t
i
o
n
in
t
o
cl
o
s
e
~
o
u
t
phase.
Pr
o
j
e
c
t
is
in
cl
o
s
e
ou
t
ph
a
s
e
.
Tu
r
f
Re
p
l
a
c
e
m
e
n
t
(P
a
r
k
s
an
d
Recreation Department)-Remediation
re
p
o
r
t
,
in
c
l
u
d
i
n
g
bu
d
g
e
t
,
a
pe
r
m
i
t
set construction documents and other
pa
r
t
i
c
u
l
a
r
s
du
e
fr
o
m
co
n
s
u
l
t
a
n
t
on November 22, 2011. Scope includes
re
m
o
v
a
l
an
d
re~
i
n
s
t
a
l
l
a
t
i
o
n
of
se
v
e
r
a
l
inches of soil/base, creating a
dr
a
i
n
a
g
e
ho
r
i
z
o
n
,
gr
a
d
i
n
g
as
ne
e
d
e
d
;
installation of new irrigation
sy
s
t
e
m
,
in
s
t
a
l
l
a
t
i
o
n
of
ne
w
tu
r
f
and plant material. Initiate remediation in
Ap
r
i
l
20
1
2
to
av
o
i
d
dr
y
se
a
s
o
n
.
Pl
a
y
g
r
o
u
n
d
(P
a
r
k
s
an
d
Re
c
r
e
a
t
i
o
n
Department) -Completed. Opened
on
Ju
l
y
26
,
20
1
1
.
Pa
t
h
w
a
y
s
(P
a
r
k
s
an
d
Re
c
r
e
a
t
i
o
n
Department)-Corrective method will
in
v
o
l
v
e
re
w
o
r
k
i
n
g
th
e
ex
i
s
t
i
n
g
material. This task will take place after
th
e
tu
r
f
re
p
l
a
c
e
m
e
n
t
an
d
wa
t
e
r
feature remediation.
Py
l
o
n
li
g
h
t
s
-
T
h
e
ex
i
s
t
i
n
g
li
g
h
t
s
will be converted to a fiber optics
sy
s
t
e
m
to
co
r
r
e
c
t
th
e
is
s
u
e
s
th
a
t
cause the continual failure associated
wi
t
h
th
e
co
p
p
e
r
co
n
d
u
c
t
o
r
wi
r
i
n
g
during lightning storms. The work is
te
n
t
a
t
i
v
e
l
y
sc
h
e
d
u
l
e
d
fo
r
FY
11
~
1
2
.
In
t
e
r
a
c
t
i
v
e
Wa
t
e
r
Fe
a
t
u
r
e
-
CI
P
is in the process of engaging a JOC
co
n
t
r
a
c
t
o
r
to
be
g
i
n
th
e
re
m
e
d
i
a
t
i
o
n
process of the water feature. The
re
m
e
d
i
a
t
i
o
n
wi
l
l
ad
d
r
e
s
s
de
f
i
c
i
e
n
c
i
e
s
identified by the Florida
De
p
a
r
t
m
e
n
t
of
He
a
l
t
h
.
De
f
i
c
i
e
n
c
i
e
s
noted included issues associated
wi
t
h
th
e
dr
a
i
n
a
g
e
an
d
fi
l
t
r
a
t
i
o
n
system and the requirement for
re
s
t
r
o
o
m
s
wi
t
h
i
n
20
0
fe
e
t
of
th
e
wet areas.
Pa
r
k
Si
g
n
-
Po
r
t
i
o
n
s
of
th
e
al
u
m
i
n
u
m
lettering of the featured park sign
th
a
t
wa
s
re
p
o
r
t
e
d
l
y
st
o
l
e
n
is
in
the process of being ordered. The
re
p
l
a
c
e
m
e
n
t
le
t
t
e
r
i
n
g
wi
l
l
be
fa
s
t
e
n
e
d
with vandal~resistant fasteners.
11
/
3
0
/
2
0
1
1
:
Re
p
l
a
c
e
m
e
n
t
le
t
t
e
r
i
n
g
on order. Page34
I
I
I I
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
1
:
So
u
t
h
Be
a
c
h
Di
x
o
n
,
C.
Pr
o
j
e
c
t
N{
l
m
e
So
u
t
h
Po
i
n
t
e
St
r
e
e
t
s
c
a
p
e
Ph
a
s
e
II
BP
12
C
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
71
2
/
1
0
1
2
5:
2
1
:
3
2
P
M
Mo
u
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
...
\'
t
(
l
t
u
s
th
r
o
u
g
h
Ju
(
v
2,
20
1
2
Sc
o
p
e
t?
l
Wo
r
k
Th
e
Pr
o
j
e
c
t
ar
e
a
en
c
o
m
p
a
s
s
e
s
th
e
en
t
i
r
e
Pu
b
l
i
c
Ri
g
h
t
-
of
-
W
a
y
be
t
w
e
e
n
Fi
f
t
h
St
r
e
e
t
an
d
Se
c
o
n
d
St
r
e
e
t
,
(e
x
c
l
u
d
i
n
g
Th
i
r
d
St
r
e
e
t
)
we
s
t
of
Eu
c
l
i
d
Av
e
n
u
e
to
Mi
c
h
i
g
a
n
Av
e
n
u
e
,
in
c
l
u
d
i
n
g
Mi
c
h
i
g
a
n
Co
u
r
t
an
d
Le
n
o
x
Av
e
n
u
e
be
t
w
e
e
n
Fo
u
r
t
h
an
d
Fi
f
t
h
St
r
e
e
t
s
.
Th
e
im
p
r
o
v
e
m
e
n
t
s
in
c
l
u
d
e
th
e
re
p
l
a
c
e
m
e
n
t
of
ex
i
s
t
i
n
g
wa
t
e
r
li
n
e
s
to
en
h
a
n
c
e
th
e
wa
t
e
r
pr
e
s
s
u
r
e
an
d
wa
t
e
r
fl
o
w
,
ne
w
st
o
r
m
w
a
t
e
r
in
f
r
a
s
t
r
u
c
t
u
r
e
to
me
e
t
th
e
Ma
s
t
e
r
Pl
a
n
re
c
o
m
m
e
n
d
e
d
le
v
e
l
of
se
r
v
i
c
e
th
r
o
u
g
h
o
u
t
th
e
pr
o
j
e
c
t
ar
e
a
;
St
r
e
e
t
s
c
a
p
e
Im
p
r
o
v
e
m
e
n
t
s
in
c
l
u
d
i
n
g
tr
a
f
f
i
c
ca
l
m
i
n
g
me
a
s
u
r
e
s
,
en
h
a
n
c
e
d
pe
d
e
s
t
r
i
a
n
ac
c
e
s
s
,
la
n
d
s
c
a
p
i
n
g
,
ir
r
i
c
a
t
i
o
n
,
li
g
h
t
i
n
g
,
an
d
pa
r
k
i
n
g
im
p
r
o
v
e
m
e
n
t
s
.
Co
n
s
t
r
u
c
#
o
n
Status
Ho
r
i
z
o
n
Co
n
t
r
a
c
t
o
r
s
(H
C
I
)
ha
s
completed the following:
ST
O
R
M
W
A
T
E
R
:
Th
e
in
s
t
a
l
l
a
t
i
o
n
of
ap
p
r
o
x
i
m
a
t
e
l
y
6,160 linear feet of stormwater piping,
13
0
st
r
u
c
t
u
r
e
s
,
21
gr
a
v
i
t
y
we
l
l
s
is complete, including certification from
FD
E
P
da
t
e
d
Ap
r
i
l
22
,
20
1
0
.
On
July 16, 2010, DERM issued a
de
w
a
t
e
r
i
n
g
pe
r
m
i
t
fo
r
th
e
cl
e
a
n
i
n
g
and testing of the South Pointe
St
o
r
m
w
a
t
e
r
sy
s
t
e
m
,
wi
t
h
th
e
ex
c
e
p
t
i
o
n
of the contaminated areas. On
07
/
1
5
/
1
0
CI
P
re
q
u
e
s
t
e
d
th
a
t
DE
R
M
i
n
c
l
u
d
e
this area in the existing
Cl
a
s
s
II
pe
r
m
i
t
an
d
th
e
re
q
u
e
s
t
was approved. Tidal control valves are
sc
h
e
d
u
l
e
d
to
be
in
s
t
a
l
l
e
d
in
Ja
n
u
a
r
y
2011.
WA
T
E
R
MA
I
N
S
:
Th
e
in
s
t
a
l
l
a
t
i
o
n
of
ap
p
r
o
x
i
m
a
t
e
l
y
5,610 linear feet of water mains, 151
wa
t
e
r
se
r
v
i
c
e
s
an
d
fi
r
e
li
n
e
s
ha
v
e
been completed, including the added
sc
o
p
e
of
wo
r
k
(a
p
p
r
o
x
10
5
0
li
n
e
a
r
feet) on 4th Street between Jefferson
Ct
an
d
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
.
HRS authorization to connect the new
se
r
v
i
c
e
s
ha
s
be
e
n
ob
t
a
i
n
e
d
.
Th
e
4th Street water main, and the water
ma
i
n
se
r
v
i
c
e
s
co
n
n
e
c
t
i
o
n
s
ar
e
complete. Water main record
dr
a
w
i
n
g
s
/
a
s
-
b
u
i
l
t
s
ar
e
be
i
n
g
fi
n
a
l
i
z
e
d
by the contractor for turn over of
th
e
sy
s
t
e
m
to
th
e
Ci
t
y
.
EL
E
C
T
R
I
C
A
L
/
I
R
R
I
G
A
T
I
O
N
AN
D
LANDSCAPING:
In
s
p
e
c
t
i
o
n
s
of
th
e
st
r
e
e
t
l
i
g
h
t
i
n
g
system were conducted with PWD,HCI,
En
g
i
n
e
e
r
of
Re
c
o
r
d
(E
O
R
)
an
d
CIP. On 07/15/10, the EOR issued their
in
s
p
e
c
t
i
o
n
re
s
u
l
t
s
/
p
u
n
c
h
li
s
t
of
items which were completed by HCI. As-
bu
i
l
t
s
/
r
e
c
o
r
d
dr
a
w
i
n
g
s
ar
e
be
i
n
g
prepared HCI for Final Certification by
th
e
EO
R
an
d
tu
r
n
o
v
e
r
of
th
e
sy
s
t
e
m
to the City.
Th
e
ir
r
i
g
a
t
i
o
n
sy
s
t
e
m
pr
e
l
i
m
i
n
a
r
y
walk through with Parks and landscape
ar
c
h
i
t
e
c
t
wa
s
co
n
d
u
c
t
e
d
on
06
/
1
7
/
1
0
,
and on September 2, 2010. A
Fi
n
a
l
pu
n
c
h
li
s
t
wa
l
k
th
r
o
u
g
h
wa
s
held on December 10, 2010, a report
fr
o
m
th
e
la
n
d
s
c
a
p
e
ar
c
h
i
t
e
c
t
an
d
Greenspace Managent is pending.
AD
A
an
d
La
n
d
s
c
a
p
e
in
s
p
e
c
t
i
o
n
s
were conducted on 07/19/10. A Report
wa
s
ge
n
e
r
a
t
e
d
on
07
/
2
2
/
1
0
.
Th
e
Ad
d
a
p
a
v
e
in
s
t
a
l
l
a
t
i
o
n
th
r
o
u
g
h
o
u
t
the project is complete with the
ex
c
e
p
t
i
o
n
of
th
e
i
r
re
p
l
a
c
e
m
e
n
t
in a few tree pits where trees have died.
Th
e
pl
a
c
e
m
e
n
t
of
th
e
fi
n
a
l
li
f
t
of
asphalt is 80% complete and is
an
t
i
c
i
p
a
t
e
d
to
be
co
m
p
l
e
t
e
d
in
Mid January 2011. Sod and groud cover
on
th
e
st
r
e
e
t
s
is
in
pr
o
c
e
s
s
.
DE
M
O
L
I
T
I
O
N
/
R
E
C
O
N
S
T
R
U
C
T
I
O
N
:
Th
e
ad
m
i
n
i
s
t
r
a
t
i
o
n
is
pr
o
p
o
s
i
n
g
during the January 19, 2011,
Co
m
m
i
s
s
i
o
n
Me
e
t
i
n
g
,
mi
l
l
i
n
g
an
d
resurfacing, striping and pavement
ma
r
k
i
n
g
s
,
ad
d
a
p
a
v
e
an
d
he
a
l
t
h
y
fertilization tree system, sidewalk
re
p
l
a
c
e
m
e
n
t
wh
e
r
e
th
e
ha
v
e
fa
i
l
e
d
,
among other repair work on 3rd
St
r
e
e
t
fr
o
m
Mi
c
h
i
g
a
n
to
Wa
s
h
i
n
g
t
o
n
Avenue. This work would be new Page 35 of 45
r
-
-
-
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
71
2
/
2
0
1
2
5:
2
1
:
3
2
P
M
Pr
o
j
e
c
t
Na
m
e
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Co
n
s
t
r
u
c
t
i
o
n
Status
sc
o
p
e
an
d
wo
u
l
d
be
co
n
s
t
r
u
c
t
e
d
from February through May of 2011.
Si
g
n
a
g
e
in
s
t
a
l
l
a
t
i
o
n
is
co
m
p
l
e
t
e
.
11
6
ca
l
e
n
d
a
r
da
y
s
ha
v
e
be
e
n
added to the Contract Time and
Su
b
s
t
a
n
t
i
a
l
Co
m
p
l
e
t
i
o
n
is
sc
h
e
d
u
l
e
d
for March 10,2011.
Th
i
r
d
st
r
e
e
t
ch
a
n
g
e
or
d
e
r
re
q
u
e
s
t
proposed during the January 19,
20
1
1
,
Co
m
m
i
s
s
i
o
n
Me
e
t
i
n
g
fo
r
milling and resurfacing, striping and
pa
v
e
m
e
n
t
ma
r
k
i
n
g
s
,
ad
d
a
p
a
v
e
and healthy fertilization tree system,
si
d
e
w
a
l
k
re
p
l
a
c
e
m
e
n
t
am
o
n
g
other repair work on 3rd Street from
Mi
c
h
i
g
a
n
to
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
passed. This work is 80% complete.
Ce
r
t
i
f
i
c
a
t
e
s
of
Su
b
s
t
a
n
t
i
a
l
co
m
p
l
e
t
i
o
n
for the Drainage Improvements,
Wa
t
e
r
Di
s
t
r
i
b
u
t
i
o
n
Sy
s
t
e
m
an
d
lighting System, were issued by the
En
g
i
n
e
e
r
of
Re
c
o
r
d
on
Ma
r
c
h
2, 2011. The Project Punch list was
is
s
u
e
d
on
Ap
r
i
l
19
,
20
1
1
.
Th
e
Pr
o
j
e
c
t
cl
o
s
e
-
o
u
t
pa
c
k
a
g
e
is currently being prepared for PWD and
Me
d
i
a
t
i
o
n
wi
t
h
TF
D
re
g
a
r
d
i
n
g
th
e
i
r
claim dated October 25, 2011, is
on
g
o
i
n
g
.
Page36 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
1'
\
l
l
g
r
.
So
u
t
h
Be
a
c
h
Di
x
o
n
,
C.
71
2
/
2
0
1
2
PM
Pr
o
j
e
c
t
Na
m
e
So
u
t
h
Po
i
n
t
e
St
r
e
e
t
s
c
a
p
e
Ph
a
s
e
Il
l
,
IV
,
&
V
BP
12
0
/
E
/
F
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.l
u
(
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Th
e
Pr
o
j
e
c
t
li
m
i
t
s
ar
e
bo
u
n
d
e
d
by
Oc
e
a
n
Dr
i
v
e
to
th
e
ea
s
t
an
d
Al
t
o
n
Ro
a
d
to
th
e
we
s
t
,
an
d
in
c
l
u
d
e
:
1s
t
St
r
e
e
t
,
be
t
w
e
e
n
Al
t
o
n
Ro
a
d
an
d
Oc
e
a
n
Dr
i
v
e
Co
m
m
e
r
c
e
St
r
e
e
t
,
fr
o
m
Al
t
o
n
Ro
a
d
to
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
;
Oc
e
a
n
Dr
i
v
e
an
d
Oc
e
a
n
Co
u
r
t
,
fr
o
m
5t
h
St
r
e
e
t
to
So
u
t
h
Po
i
n
t
e
Dr
i
v
e
;
Co
l
l
i
n
s
Av
e
n
u
e
an
d
Co
l
l
i
n
s
Co
u
r
t
,
fr
o
m
5t
h
St
r
e
e
t
to
So
u
t
h
Po
i
n
t
e
Dr
i
v
e
;
So
u
t
h
Po
i
n
t
e
Dr
i
v
e
(B
i
s
c
a
y
n
e
St
r
e
e
t
}
,
fr
o
m
Al
t
o
n
Ro
a
d
to
th
e
ea
s
t
e
r
n
st
r
e
e
t
en
d
;
Al
t
o
n
Ro
a
d
,
fr
o
m
5t
h
St
r
e
e
t
to
So
u
t
h
Po
i
n
t
e
Dr
i
v
e
;
Je
f
f
e
r
s
o
n
Av
e
n
u
e
,
be
t
w
e
e
n
So
u
t
h
Po
i
n
t
e
Dr
i
v
e
an
d
1s
t
St
r
e
e
t
;
1s
t
St
r
e
e
t
,
fr
o
m
Al
t
o
n
Ro
a
d
to
Je
f
f
e
r
s
o
n
Av
e
n
u
e
;
an
d
Co
m
m
e
r
c
e
St
r
e
e
t
an
d
ot
h
e
r
ad
j
a
c
e
n
t
al
l
e
y
s
,
ro
a
d
w
a
y
s
,
an
d
ri
g
h
t
s
of
wa
y
.
Th
i
s
pr
o
j
e
c
t
is
in
c
l
u
d
e
d
in
th
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
In
f
r
a
s
t
r
u
c
t
u
r
e
Im
p
r
o
v
e
m
e
n
t
Pr
o
g
r
a
m
an
d
th
e
Pu
b
l
i
c
Wo
r
k
s
Ci
t
y
w
i
d
e
Wa
t
e
r
an
d
Se
w
e
r
Ma
s
t
e
r
Pl
a
n
.
Th
e
im
p
r
o
v
e
m
e
n
t
s
in
c
l
u
d
e
in
s
t
a
l
l
a
t
i
o
n
of
ne
w
st
o
r
m
w
a
t
e
r
in
f
r
a
s
t
r
u
c
t
u
r
e
wi
t
h
i
n
Pr
i
o
r
i
t
y
Ba
s
i
n
1
to
me
e
t
th
e
Ma
s
t
e
r
Pl
a
n
re
c
o
m
m
e
n
d
e
d
le
v
e
l
of
se
r
v
i
c
e
;
st
r
e
e
t
s
c
a
p
e
Im
p
r
o
v
e
m
e
n
t
s
,
in
c
l
u
d
i
n
g
ne
w
si
d
e
w
a
l
k
s
;
an
d
cr
o
s
s
w
a
l
k
s
,
tr
a
f
f
i
c
ca
l
m
i
n
g
me
a
s
u
r
e
s
an
d
in
s
t
a
l
l
a
t
i
o
n
of
bu
m
p
-
o
u
t
s
at
cr
o
s
s
w
a
l
k
s
;
en
h
a
n
c
e
d
la
n
d
s
c
a
p
i
n
g
wi
t
h
i
n
me
d
i
a
n
,
sw
a
l
e
an
d
bu
m
p
ou
t
ar
e
a
s
;
pe
d
e
s
t
r
i
a
n
li
g
h
t
i
n
g
;
bi
k
e
la
n
e
s
;
an
d
pa
r
k
i
n
g
im
p
r
o
v
e
m
e
n
t
s
.
Co
n
s
t
r
u
c
t
i
o
n
Status
A
Co
m
m
u
n
i
t
y
Pr
e
-
C
o
n
s
t
r
u
c
t
i
o
n
Meeting was held at the South Pointe
El
e
m
e
n
t
a
r
y
Sc
h
o
o
l
on
De
c
e
m
b
e
r
7, 2010 at 6:00p.m.
On
Ja
n
u
a
r
y
3,
20
1
1
,
th
e
Ci
t
y
is
s
u
e
d
NTP2, retroactive as of November
29
,
20
1
0
,
Tr
a
n
s
Fl
o
r
i
d
a
De
v
e
l
o
p
m
e
n
t
(T
F
D
)
has obtained a Public Works Right-of-
Wa
y
an
d
th
e
DE
R
M
Cl
a
s
s
V
de
w
a
t
e
r
i
n
g
permit has been issued for the
cl
e
a
n
i
n
g
an
d
te
s
t
i
n
g
of
pi
p
e
s
.
The DERM well permit and trench
de
w
a
t
e
r
i
n
g
pe
r
m
i
t
s
we
r
e
is
s
u
e
d
.
A Completeness Summary Report
wa
s
is
s
u
e
d
to
TF
D
on
De
c
e
m
b
e
r
6, 2010, and received by the CIP on
De
c
e
m
b
e
r
14
,
20
1
0
.
Ap
p
r
o
x
i
m
a
t
e
l
y
80% of the well structures and 50%
of
th
e
we
l
l
s
ha
v
e
be
e
n
in
s
t
a
l
l
e
d
and tested to date. TFD is currently
wo
r
k
i
n
g
on
th
e
in
s
t
a
l
l
a
t
i
o
n
of
th
e
Pump Station at South Pointe Drive
an
d
wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
.
WA
T
E
R
MA
I
N
S
:
TF
D
ha
s
co
m
p
l
e
t
e
d
th
e
in
s
t
a
l
l
a
t
i
o
n
of water main and is currently in the
te
s
t
i
n
g
an
d
ce
r
t
i
f
i
c
a
t
i
o
n
ph
a
s
e
.
PWD has requested the installation of a
ne
w
12
-
l
n
c
h
wa
t
e
r
ma
i
n
on
Al
t
o
n
Road between 5th Street and South
Po
i
n
r
t
e
Dr
i
v
e
,
an
d
re
m
o
v
a
l
of
th
e
existing and lowering of the 20-lnch
wa
t
e
r
ma
i
n
on
So
u
t
h
Po
i
n
t
e
Dr
i
v
e
from Washington Avenue to Ocean
Dr
i
v
e
.
Th
e
s
e
wa
t
e
r
ma
i
n
s
we
r
e
designed by PWD, are currently being
pe
r
m
i
t
t
e
d
,
an
d
co
s
t
pr
o
p
o
s
a
l
fr
o
m
TFD being evaluated.
DE
M
O
L
I
T
I
O
N
AN
D
RE
C
O
N
S
T
R
U
C
T
I
O
N
:
Th
e
me
d
i
a
n
s
al
o
n
g
Al
t
o
n
Ro
a
d
and South Pointe Drive have been
re
c
o
n
s
t
r
u
c
t
e
d
.
Th
e
1s
t
li
f
t
of
as
p
h
a
l
t
on 4th Street from Washington to
Oc
e
a
n
,
an
d
Al
t
o
n
Ro
a
d
is
cu
r
r
e
n
t
l
y
complete. 2nd Street between
Wa
s
h
i
n
g
t
o
n
an
d
Oc
e
a
n
,
Co
l
l
i
n
s
Avenue, Commerce Street have been
re
c
o
n
s
t
r
u
c
t
e
d
.
Si
d
e
w
a
l
k
,
cu
r
b
and gutter on the west side Ocean Drive
fr
o
m
5t
h
St
r
e
e
t
to
2n
d
St
r
e
e
t
is
completed.
LA
N
D
S
C
A
P
E
Re
l
o
c
a
t
i
o
n
of
pa
l
m
s
in
th
e
me
d
i
a
n
on Alton Road is complete. Planting
of
Li
v
e
Oa
k
tr
e
e
s
on
Al
t
o
n
Ro
a
d
and the 1st Street Triangle is 95%
co
m
p
l
e
t
e
.
05
/
2
4
/
2
0
1
2
:
Wa
t
e
r
m
a
i
n
:
92
%
co
m
p
l
e
t
e
St
o
r
m
w
a
t
e
r
:
92
%
co
m
p
l
e
t
e
Ro
a
d
w
a
y
:
60
%
co
m
p
l
e
t
e
Ab
o
v
e
Gr
o
u
n
d
:
60
%
co
m
p
l
e
t
e
Te
s
t
i
n
g
of
th
e
st
o
r
m
w
a
t
e
r
sy
s
t
e
m
in order to plac the final lift of asphalt
is
on
g
o
i
n
g
,
pu
m
p
st
a
t
i
o
n
in
s
t
a
l
l
a
t
i
o
n
and commerce street landscape is
sc
h
e
d
u
l
e
d
wi
t
h
i
n
th
e
ne
x
t
4-
6
weeks.
Es
t
i
m
a
t
e
d
co
m
p
l
e
t
i
o
n
by
06
/
2
0
1
3
.
Page 37 of 45
r
-
~
·
-
-
-
-
-
·
·
·
-
-
-
-
-
·
-
-
-
·
-
-
-
-
-
-
Di
s
t
r
i
c
t
Pn
4
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Pr
o
j
e
c
t
Na
m
e
So
u
t
h
Sh
o
r
e
CC
Ch
i
l
l
e
r
Pi
p
e
Re
p
l
a
c
e
m
e
n
t
-
Ph
a
s
e
II
71
2
/
2
0
1
2
5:
2
1
:
3
2
Pi
l
l
!
Mo
n
t
h
(
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Re
p
l
a
c
e
m
e
n
t
of
ex
p
o
s
e
d
se
c
t
i
o
n
s
of
th
e
or
i
g
i
n
a
l
ch
i
l
l
e
r
li
n
e
pi
p
e
s
.
Ph
a
s
e
II
of
th
i
s
Pr
o
j
e
c
t
in
v
o
l
v
e
s
ad
d
i
t
i
o
n
a
l
ch
i
l
l
e
r
pi
p
e
re
p
l
a
c
e
m
e
n
t
.
Co
n
s
t
r
u
c
t
i
o
n
Status
4/
2
6
/
2
0
1
1
:
Pi
p
i
n
g
in
s
t
a
l
l
a
t
i
o
n
co
m
p
l
e
t
e
at
all exterior locations. Subcontractor to
co
m
m
e
n
c
e
wi
t
h
ov
e
r
t
i
m
e
in
t
e
r
i
o
r
work during the week of 5/3/2011.
6/
8
/
2
0
1
1
:
Pr
o
j
e
c
t
Su
b
s
t
a
n
t
i
a
l
l
y
Co
m
p
l
e
t
e
on 5/15/2011. Building Department final
re
c
e
i
v
e
d
.
Pr
o
j
e
c
t
to
tr
a
n
s
f
e
r
to
Close-out phase. Close Out Documents
re
c
e
i
v
e
d
6/
6
/
2
0
1
1
.
8/
0
4
/
2
0
1
1
:
Fi
n
a
l
Wa
l
k
Th
r
u
Co
n
d
u
c
t
e
d
by
contractor, Property Management and
CI
P
.
Page38of45
Di
s
t
r
i
c
t
PN
H
e
c
t
Mg
r
.
7/
2
1
2
0
1
2
5:
2
1
:
3
2
PM
Pr
o
j
e
c
t
Na
m
e
Mo
n
t
h
{
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
{
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Co
n
s
t
r
u
c
t
i
o
n
Status
th
e
pr
o
p
o
s
e
d
un
m
e
t
e
r
e
d
se
r
v
i
c
e
s
,
as previously approved by PWD, to
in
s
t
a
l
l
ne
w
me
t
e
r
s
fo
r
ne
w
li
g
h
t
i
n
g
system. FPL would not allow the new
la
n
d
s
c
a
p
e
li
g
h
t
to
be
co
n
n
e
c
t
e
d
to the unmetered street light system.
Th
i
s
mo
d
i
f
i
c
a
t
i
o
n
wi
l
l
ge
n
e
r
a
t
e
a change order and delay the completion
of
th
e
el
e
c
t
r
i
c
a
l
wo
r
k
.
3/
2
8
/
2
0
1
2
:
Tr
a
n
s
Fl
o
r
i
d
a
co
m
p
l
e
t
e
d
th
e
in
s
t
a
l
l
a
t
i
o
n
of sod and irrigation system. On
Ma
r
c
h
28
,
20
1
2
,
la
n
d
s
c
a
p
e
pu
n
c
h
-
l
i
s
t
items were submitted to TFD.
Ch
a
n
g
e
or
d
e
r
wo
r
k
fo
r
th
e
li
g
h
t
i
n
g
is pending. Water main inspection for
ac
c
e
p
t
a
n
c
e
wi
l
l
be
sc
h
e
d
u
l
e
d
fo
r
April 2012.
4/
2
4
/
2
0
1
2
:
On
Ap
r
i
l
23
,
20
1
2
,
an
ac
c
e
p
t
a
n
c
e
inspection was coordinated with
Pa
r
k
s
an
d
Re
c
r
e
9
t
i
o
n
De
p
a
r
t
m
e
n
t
.
The inspection was cancelled at the
fi
e
l
d
be
c
a
u
s
e
th
e
.
i
r
r
i
g
a
t
i
o
n
co
n
t
r
o
l
l
e
r
was not working. Parks and
Re
c
r
e
a
t
i
o
n
wi
l
l
se
n
d
th
e
ma
i
n
t
e
n
a
n
c
e
vendor to check the controller and
a
ne
w
in
s
p
e
c
t
i
o
n
me
e
t
i
n
g
wi
l
l
ne
e
d
to be scheduled. Change order work
fo
r
th
e
li
g
h
t
i
n
g
is
un
d
e
r
re
v
i
e
w
by the consultant. Water main inspection
fo
r
ac
c
e
p
t
a
n
c
e
wa
s
no
t
sc
h
e
d
u
l
e
d
because the as-built were marked up
an
d
TF
D
is
ma
k
i
n
g
co
r
r
e
c
t
i
o
n
s
.
The revised as-built will be submitted by
Ap
r
i
l
2
7
,
20
1
2
.
05
/
2
3
/
2
0
1
2
:
Wa
t
e
r
ma
i
n
as
-
b
u
i
l
t
were transmitted to Public Works
De
p
a
r
t
m
e
n
t
fo
r
re
v
i
e
w
.
An
ac
c
e
p
t
a
n
c
e
inspection will be coordinated
wi
t
h
Pu
b
l
i
c
Wo
r
k
s
fo
r
th
e
we
e
k
of May 29, 2012. Trans Florida will
co
m
p
l
e
t
e
th
e
la
n
d
s
c
a
p
e
pu
n
c
h
list items by June 1, 2012. Additional
li
g
h
t
i
n
g
sc
o
p
e
of
wo
r
k
is
cu
r
r
e
n
t
l
y
being reviewed by Trans Florida.
6/
2
7
/
2
0
1
2
:
On
Ju
n
e
7,
20
1
2
,
an
ac
c
e
p
t
a
n
c
e
inspection with Public Works was
pe
r
f
o
r
m
e
d
.
On
Ju
n
e
13
,
20
1
2
,
th
e
punchlist for the water main was
tr
a
n
s
m
i
t
t
e
d
to
Tr
a
n
s
Fl
o
r
i
d
a
fo
r
items that need corrections. On June 25,
20
1
2
,
Th
e
pu
n
c
h
l
i
s
t
fo
r
pa
v
e
m
e
n
t
and curb/gutter was transmitted to
Tr
a
n
s
Fl
o
r
i
d
a
fo
r
it
e
m
s
th
a
t
ne
e
d
corrections. Page 40 of 45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
11
i
f
g
r
.
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
So
u
t
h
Be
a
c
h
Di
x
o
n
,
C.
Pr
o
j
e
c
t
Na
m
e
Su
n
s
e
t
Ha
r
b
o
r
I
Pu
r
d
y
Av
e
.
Ga
r
a
g
e
TO
P
A
Ph
a
s
e
Il
l
71
2
/
2
0
1
2
5:
2
1
:
3
2
PM
Mo
n
t
h
~
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Ac
q
u
i
s
i
t
i
o
n
an
d
co
n
s
t
r
u
c
t
i
o
n
of
an
ap
p
r
o
x
i
m
a
t
e
l
y
46
0
-
sp
a
c
e
pa
r
k
i
n
g
ga
r
a
g
e
ov
e
r
re
t
a
i
l
to
be
ow
n
e
d
by
a
pr
i
v
a
t
e
pa
r
t
n
e
r
.
Pr
i
v
a
t
e
pa
r
t
n
e
r
is
re
s
p
o
n
s
i
b
l
e
fo
r
ap
p
r
o
x
i
m
a
t
e
l
y
18
%
of
co
n
s
t
r
u
c
t
i
o
n
co
s
t
s
fo
r
re
t
a
i
l
po
r
t
i
o
n
.
Th
e
or
i
g
i
n
a
l
co
n
t
r
a
c
t
am
o
u
n
t
fo
r
co
n
s
t
r
u
c
t
i
o
n
is
$9
.
2
7
M
(i
n
c
l
u
d
i
n
g
pr
i
v
a
t
e
pa
r
t
n
e
r
sh
a
r
e
)
.
Th
e
ca
p
i
t
a
l
bu
d
g
e
t
sh
e
e
t
re
f
l
e
c
t
s
th
e
Ci
t
y
'
s
co
n
s
t
r
u
c
t
i
o
n
al
l
o
c
a
t
i
o
n
.
Co
m
m
e
n
c
e
m
e
n
t
da
t
e
fo
r
de
m
o
l
i
t
i
o
n
wa
s
Ma
r
c
h
15
,
20
1
1
.
Or
i
g
i
n
a
l
pr
o
j
e
c
t
du
r
a
t
i
o
n
is
12
mo
n
t
h
s
.
So
u
t
h
me
z
z
a
n
i
n
e
le
v
e
l
ba
r
Co
n
s
t
r
u
c
t
i
o
n
Status
3/
1
5
/
2
0
1
1
:
A
li
m
i
t
e
d
NT
P
II
fo
r
th
e
de
m
o
l
i
t
i
o
n
and test pile program was issued to
BC
B
E
on
3/
1
5
/
2
0
1
1
.
A
fu
l
l
NT
P
II shall not be issued until the main
bu
i
l
d
i
n
g
pe
r
m
i
t
is
-
r
e
c
e
i
v
e
d
.
4/
2
6
/
2
0
1
1
:
Th
e
te
s
t
pi
l
e
s
an
d
de
m
o
l
i
t
i
o
n
ha
v
e
been completed except for the
de
m
o
l
i
t
i
o
n
of
th
e
Tr
e
m
o
n
t
Lo
t
.
The project is on hold (starting on
4/
1
5
/
2
0
1
1
)
un
t
i
l
Sc
o
t
t
Ro
b
i
n
s
ev
i
c
t
s
Tremont Towing from the Tremont
Lo
t
.
6/
8
/
2
0
1
1
:
Tr
e
m
o
n
t
To
w
i
n
g
va
c
a
t
e
d
th
e
lo
t
completely on 5/23/2011. Change
Or
d
e
r
#1
to
BC
B
E
fo
r
de
l
a
y
da
m
a
g
e
s
($36,994) was executed on
5/
1
9
/
2
0
1
1
an
d
in
c
l
u
d
e
d
a
45
da
y
extension to the Contract time.
8/
3
0
/
2
0
1
1
:
2n
d
Fl
o
o
r
sl
a
b
-
fi
r
s
t
pour complete. 2nd Floor slab
sc
h
e
d
u
l
e
d
to
be
co
m
p
l
e
t
e
by
th
e
end of September.
11
/
2
/
2
0
1
1
:
1s
t
fl
o
o
r
-
3r
d
fl
o
o
r
st
r
u
c
t
u
r
e
co
m
p
l
e
t
e
d
.
4th floor slab final pour
sc
h
e
d
u
l
e
d
fo
r
11
-
1
1
-
1
1
.
11
/
3
0
/
1
1
:
1s
t
fl
o
o
r
-
4t
h
fl
o
o
r
st
r
u
c
t
u
r
e
co
m
p
l
e
t
e
d
.
5th floor slab final pour
sc
h
e
d
u
l
e
d
fo
r
12
/
0
6
/
1
1
.
Cr
a
n
e
scheduled to come down starting
12
/
1
4
/
1
1
.
03
/
0
7
/
1
2
:
Bu
i
l
d
i
n
g
sh
e
l
l
co
m
p
l
e
t
e
d
.
Wi
n
d
o
w
s
and doors currently being installed.
Me
t
a
l
pa
n
e
l
s
cu
r
r
e
n
t
l
y
be
i
n
g
in
s
t
a
l
l
e
d
.
FPL underground transfer work
st
a
r
t
e
d
03
.
0
6
.
1
2
.
6/
2
9
/
1
2
Wo
r
k
i
n
g
to
w
a
r
d
TC
O
.
Wo
r
k
ha
s
be
e
n
co
m
p
l
e
t
e
d
by
Li
v
e
Nation, per the terms of their
ag
r
e
e
m
e
n
t
wi
t
h
th
e
Ci
t
y
.
Th
e
Ci
t
y
has requested back-up documents for
co
s
t
s
in
c
u
r
r
e
d
by
Li
v
e
Na
t
i
o
n
in
order to provide reimbursement. Back-
up
do
c
u
m
e
n
t
s
we
r
e
fi
n
a
l
l
y
re
c
e
i
v
e
d
on November 9, 2009. CIP
co
m
p
l
e
t
e
d
th
e
re
v
i
e
w
of
th
e
do
c
u
m
e
n
t
s
submitted on April 28,2010. CIP
su
b
m
i
t
t
e
d
re
q
u
e
s
t
fo
r
ad
d
i
t
i
o
n
a
l
information to Live Nation for supporting
do
c
u
m
e
n
t
a
t
i
o
n
.
To
da
t
e
,
no
re
s
p
o
n
s
e
received. Page41 of45
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
Pr
o
j
e
c
t
Na
m
e
Ve
n
e
t
i
a
n
Is
l
a
n
d
s
-
Ve
n
e
t
i
a
n
Ca
u
s
e
w
a
y
BP
13
0
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
71
2
1
2
0
1
2
5:
2
1
:
3
2
PM
A1
o
n
t
h
~
v
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
St
r
e
e
t
s
c
a
p
e
im
p
r
o
v
e
m
e
n
t
s
fo
r
th
e
Ve
n
e
t
i
a
n
Ca
u
s
e
w
a
y
,
fr
o
m
Da
d
e
Bo
u
l
e
v
a
r
d
in
t
e
r
s
e
c
t
i
o
n
to
th
e
Ci
t
y
Li
n
e
.
Im
p
r
o
v
e
m
e
n
t
s
to
in
c
l
u
d
e
si
d
e
w
a
l
k
,
cu
r
b
an
d
gu
t
t
e
r
,
li
g
h
t
i
n
g
,
la
n
d
s
c
a
p
i
n
g
,
tr
a
f
f
i
c
co
n
t
r
o
l
de
v
i
c
e
im
p
r
o
v
e
m
e
n
t
s
,
an
d
ga
t
e
w
a
y
tr
e
a
t
m
e
n
t
.
Co
n
s
t
r
u
c
t
i
o
n
St{ttus
1 )O
n
Ja
n
u
a
r
y
10
,
20
1
1
,
Co
m
m
u
n
i
t
y
Asphalt stated to install
Ma
i
n
t
e
n
a
n
c
e
of
Tr
a
f
f
i
c
at
Ri
v
o
Alto. The work was postpone due to the
lN
G
Ma
r
a
t
h
o
n
ta
k
i
n
g
pl
a
c
e
on
January 30, 2011. Work will resume on
Fe
b
r
u
a
r
y
4,
20
1
1
.
Co
n
s
t
r
u
c
t
i
o
n
of stormwater infrastructure is taking
pl
a
c
e
at
Ri
v
o
Al
t
o
an
d
Di
l
i
d
o
Is
l
a
n
d
s
.
2)
On
Se
p
t
e
m
b
e
r
20
1
1
,
th
e
Co
u
n
t
y
reported that the overall status of
th
e
pr
o
j
e
c
t
wa
s
35
%
.
3)
0
n
No
v
e
m
b
e
r
20
1
1
,
th
e
Co
u
n
t
y
reported that the overall status of the
pr
o
j
e
c
t
wa
s
40
%
.
01
/
2
3
/
2
0
1
2
:
On
De
c
e
m
b
e
r
20
1
1
,
th
e
Co
u
n
t
y
reported that the overall status of the
pr
o
j
e
c
t
wa
s
45
%
.
03
/
0
6
/
2
0
1
2
:
On
Fe
b
r
u
a
r
y
24
,
20
1
2
,
th
e
Co
u
n
t
y
reported that the overall status of the
pr
o
j
e
c
t
wa
s
at
63
%
.
04
/
2
5
/
2
0
1
2
:
On
Ap
r
i
l
4,
20
1
2
,
th
e
Co
u
n
t
y
re
p
o
r
t
e
d
that the overall status of the
pr
o
j
e
c
t
wa
s
at
70
%
.
05
/
2
3
/
2
0
1
2
:
Th
e
Co
u
n
t
y
is
st
i
l
l
wo
r
k
i
n
g
on
completing work on the outfall of San
Ma
r
i
n
o
an
d
co
o
r
d
i
n
a
t
i
n
g
wi
t
h
FPL to remove existing Cobra head street
li
g
h
t
s
.
Th
e
Co
u
n
t
y
re
p
o
r
t
e
d
th
a
t
they should be substantially completed
by
Ju
l
y
20
1
2
.
Th
e
la
n
d
s
c
a
p
e
of
the mediums will take place after the
st
r
e
e
t
s
c
a
p
e
pr
o
j
e
c
t
is
co
m
p
l
e
t
e
d
.
6/
2
7
/
2
0
1
2
:
Th
e
Co
u
n
t
y
is
st
i
l
l
wo
r
k
i
n
g
on
completing work on the outfalls.
Un
f
o
r
e
s
e
e
n
co
n
d
i
t
i
o
n
s
ar
e
im
p
a
c
t
i
n
g
the installation of the outfall in Rivo
Al
t
o
.
Th
e
Co
u
n
t
y
is
wo
r
k
i
n
g
on
a
revised schedule to project the actual
co
m
p
l
e
t
i
o
n
of
wo
r
k
on
th
e
Ve
n
e
t
i
a
n
Islands. P{lge 42 of 45
r
-
-
-
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
So
u
t
h
Be
a
c
h
Ro
d
r
i
g
u
e
z
,
R.
Pr
o
j
e
c
t
Na
m
e
Ve
n
e
t
i
a
n
Is
l
a
n
d
s
BP
-
1
3
C
1
-
Ve
n
e
t
i
a
n
Ca
u
s
e
w
a
y
Cr
o
s
s
St
r
e
e
t
Wa
t
e
r
Ma
i
n
71
2
1
2
0
1
2
5:
2
1
:
3
2
P
M
A1
(
m
t
h
{
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
~
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Th
i
s
pr
o
j
e
c
t
is
pa
r
t
of
BP
-
1
3
C
St
r
e
e
t
s
/
S
i
d
e
w
a
l
k
s
Im
p
r
o
v
e
m
e
n
t
s
an
d
ta
r
g
e
t
s
wa
t
e
r
ma
i
n
re
p
l
a
c
e
m
e
n
t
s
at
Ve
n
e
t
i
a
n
Ca
u
s
e
w
a
y
Cr
o
s
s
St
r
e
e
t
s
,
at
Sa
n
Ma
r
i
n
o
,
Di
Li
d
o
,
an
d
Ri
v
o
Al
t
o
Is
l
a
n
d
s
,
pr
i
o
r
to
Mi
a
m
i
-
D
a
d
e
Co
u
n
t
y
Ca
u
s
e
w
a
y
co
n
s
t
r
u
c
t
i
o
n
ac
t
i
v
i
t
y
.
Co
n
s
t
r
u
c
t
i
o
n
Status
On
Au
g
u
s
t
20
,
20
1
0
,
Ri
c
-
M
a
n
International (RMI) began the notification
to
re
s
i
d
e
n
t
s
th
a
t
wo
r
k
wa
s
be
g
i
n
n
i
n
g
on the Venetian Causeway to
up
g
r
a
d
e
ex
i
s
t
i
n
g
wa
t
e
r
ma
i
n
s
.
On August 30, 2010, RMI began to
mo
b
i
l
i
z
e
to
Ri
v
o
Al
t
o
Is
l
a
n
d
an
d
started on Rivo Alto on August 31,
20
1
0
.
By
Se
p
t
e
m
b
e
r
17
,
20
1
0
,
RMI had completed the four tapping
co
n
n
e
c
t
i
o
n
s
to
ex
i
s
t
i
n
g
16
"
wa
t
e
r
mains. All 8" water main installation at
th
e
so
u
t
h
si
d
e
of
Ea
s
t
an
d
We
s
t
Rivo Alto Drive was completed and the
in
s
t
a
l
l
a
t
i
o
n
of
th
e
8"
wa
t
e
r
ma
i
n
s
that cross the Venetian Causeway are
co
m
p
l
e
t
e
d
.
RM
I
is
sc
h
e
d
u
l
e
d
to
complete the balance of the 8" water
ma
i
n
in
s
t
a
l
l
a
t
i
o
n
on
th
e
no
r
t
h
side of East and West Rivo Alto Drive
du
r
i
n
g
th
e
we
e
k
of
Se
p
t
e
m
b
e
r
20 through 24.
On
Se
p
t
e
m
b
e
r
27
,
20
1
0
,
wo
r
k
began at Dilido Island. On October 4,
20
1
0
,
RM
I
co
m
p
l
e
t
e
d
th
e
pr
o
p
o
s
e
d
tapping connections to the existing
20
"
ca
s
t
ir
o
n
wa
t
e
r
ma
i
n
.
On
October 5, 2010, RMI began the
in
s
t
a
l
l
a
t
i
o
n
of
th
e
pr
o
p
o
s
e
d
8"
DIP water mains located at the
in
t
e
r
s
e
c
t
i
o
n
s
of
an
d
Ea
s
t
Di
Li
d
o
Drive and West Di Lido Drive and
Ve
n
e
t
i
a
n
Ca
u
s
e
w
a
y
(V
e
n
e
t
i
a
n
Di Lido Way)
On
Oc
t
o
b
e
r
6,
20
1
0
,
RM
I
be
g
a
n
to chlorinate the new water mains at
Ri
v
o
Al
t
o
Is
l
a
n
d
.
On
Oc
t
o
b
e
r
11, 2010, samples of the water were taken
fo
r
ba
c
t
e
r
i
o
l
o
g
i
c
a
l
te
s
t
i
n
g
.
Re
s
u
l
t
s
will be transmitted within a week.
On
Oc
t
o
b
e
r
26
,
20
1
0
,
pr
e
s
s
u
r
e
test were conducted at DiLido Island
an
d
ap
p
r
o
v
e
d
.
RM
I
is
sc
h
e
d
u
l
e
d
to start at San Marino Island on
No
v
e
m
b
e
r
1,
20
1
0
.
Th
e
wa
t
e
r
ma
i
n
th
a
t
ru
n
s
fr
o
m
Station Point STA 4+20 E to Station
Po
i
n
t
ST
A
1+
1
9
W,
(A
p
p
r
o
x
.
56
5
L.F.) was completed on November 12,
20
1
0
.
RM
I
is
wo
r
k
i
n
g
on
th
e
la
t
e
r
a
l
connections on the south side of the
Ca
u
s
e
w
a
y
on
we
s
t
an
d
ea
s
t
Sa
n
Marino Drive.
On
De
c
e
m
b
e
r
15
,
20
1
0
,
RM
I
passed the bacteriological test on the last
is
l
a
n
d
(S
a
n
Ma
r
i
n
o
)
.
Fi
n
a
l
do
m
e
s
t
i
c
water connections to individual
re
s
i
d
e
n
c
e
s
ar
e
ta
k
i
n
g
pl
a
c
e
in
Rivo Alto and Dilido Islands.
On
De
c
e
m
b
e
r
20
,
20
1
0
,
RM
I
tr
a
n
s
m
i
t
t
e
d
a request for rain delays,
un
f
o
r
e
s
e
e
n
un
d
e
r
g
r
o
u
n
d
co
n
d
i
t
i
o
n
s
that impacted production schedule
an
d
PW
D
re
q
u
e
s
t
to
de
l
a
y
th
e
connection of new water mains and
ca
p
p
i
n
g
an
d
ab
a
n
d
o
n
i
n
g
ex
i
s
t
i
n
g
water mains until the end of the
ho
l
i
d
a
y
se
a
s
o
n
.
Th
i
s
ti
m
e
ex
t
e
n
s
i
o
n
request is for days only and will not
in
c
u
r
ad
d
i
t
i
o
n
a
l
co
s
t
to
th
e
Ci
t
y
.
Additionally, the requested time will not
in
t
e
r
f
e
r
e
wi
t
h
th
e
Mi
a
m
i
-
D
a
d
e
County Venetian Causeway Streetscape
pr
o
j
e
c
t
.
CI
P
is
cu
r
r
e
n
t
l
y
re
v
i
e
w
i
n
g
the request and will inform RMI of the
ac
t
u
a
l
da
y
s
th
a
t
wi
l
l
be
ap
p
r
o
v
e
d
.
CI
P
Of
f
i
c
e
is
wo
r
k
i
n
g
cl
o
s
e
l
y
with Public Works Department to schedule
al
l
th
e
ne
c
e
s
s
a
r
y
wa
t
e
r
ma
i
n
sh
u
t
d
o
w
n
s
in order to complete the
pr
o
j
e
c
t
.
Th
e
sc
h
e
d
u
l
e
wi
l
l
al
s
o
be impacted by the lNG Marathon event Page 43 of 45
r
-
~
·
-
·
-
-
-
1
Di
s
t
r
i
c
t
Pr
o
j
e
c
t
Mg
r
.
71
2
1
2
0
1
2
5:
2
1
:
3
2
Pl
'
r
l
Pr
o
j
e
c
t
Na
m
e
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
Ju
~
v
2,
20
1
2
Sc
o
p
e
o
f
Wo
r
k
Co
n
s
t
r
u
c
t
i
o
n
Status
oc
c
u
r
r
i
n
g
on
Ja
n
u
a
r
y
30
,
20
1
1
.
Fi
n
a
l
cu
t
/
c
a
p
an
d
ab
a
n
d
o
n
of
ex
i
s
t
i
n
g
line at Rivo Alto Island is being
co
o
r
d
i
n
a
t
e
d
wi
t
h
FP
L
.
FP
L
ha
s
an existing pole that is in conflict and
en
c
r
o
a
c
h
i
n
g
wi
t
h
th
e
pr
o
p
o
s
e
d
work. The FPL pole is schedule to be
re
m
o
v
e
d
an
d
FP
L
is
cu
r
r
e
n
t
l
y
re
m
o
v
i
n
g
the existing lines to new poles.
Co
n
t
r
a
c
t
o
r
su
b
m
i
t
t
e
d
a
ch
a
n
g
e
order proposal for additional water main
in
s
t
a
l
l
a
t
i
o
n
at
We
s
t
Ri
v
o
Al
t
o
.
Th
e
proposed point of connection, with
th
e
ex
i
s
t
i
n
g
wa
t
e
r
ma
i
n
,
oc
c
u
r
r
e
d
next to several large Ficus trees. In
or
d
e
r
to
av
o
i
d
da
m
a
g
i
n
g
th
e
tr
e
e
s
,
the contractor was directed to extend
th
e
wa
t
e
r
ma
i
n
an
ad
d
i
t
i
o
n
a
l
60
linear feet to the south in order to avoid
th
e
tr
e
e
s
.
On
No
v
e
m
b
e
r
3,
-2
0
1
1
,
th
e
co
n
t
r
a
c
t
o
r
was able to complete the final
cu
t
/
c
a
p
co
n
n
e
c
t
i
o
n
th
a
t
wa
s
pe
n
d
i
n
g
.
Contractor is completing the as-
bu
i
l
t
do
c
u
m
e
n
t
s
in
or
d
e
r
to
sc
h
e
d
u
l
e
an acceptance inspection.
01
/
2
3
/
2
0
1
2
:
Co
n
t
r
a
c
t
o
r
su
b
m
i
t
t
e
d
th
e
as
-
b
u
i
l
t
for review. Once the documents are
ve
r
i
f
i
e
d
an
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
will be coordinated.
03
/
0
6
/
2
0
1
2
:
Pr
o
j
e
c
t
de
l
a
y
by
th
e
Co
u
n
t
y
ha
s
made it difficult to conduct final
in
s
p
e
c
t
i
o
n
of
th
e
wa
t
e
r
m
a
i
n
.
03
/
2
9
/
2
0
1
2
:
In
s
p
e
c
t
i
o
n
of
th
e
wa
t
e
r
ma
i
n
wi
l
l
take place by Apri113, 2012.
04
/
2
5
/
2
0
1
2
:
In
s
p
e
c
t
i
o
n
is
pe
n
d
i
n
g
an
d
a
wa
l
k
t
h
r
o
u
g
h
will need to be conducted with
Ri
c
-
M
a
n
to
se
e
ho
w
th
e
Co
u
n
t
y
project affected the work.
05
/
2
3
/
2
0
1
2
:
In
s
p
e
c
t
i
o
n
wa
l
k
-
t
h
r
o
u
g
h
fo
r
th
e
water main is scheduled for May 30,
20
1
2
.
On
c
e
th
e
in
s
p
e
c
t
i
o
n
is
pe
r
f
o
r
m
e
d
an acceptance inspection will
be
pe
r
f
o
r
m
e
d
wi
t
h
Pu
b
l
i
c
Wo
r
k
s
Department.
06
/
2
7
/
2
0
1
2
:
On
Ju
n
e
4,
20
1
2
,
an
in
s
p
e
c
t
i
o
n
walk-through was conducted with Ric-
Ma
n
In
t
e
r
n
a
t
i
o
n
a
l
an
d
nu
m
e
r
o
u
s
items were noted and a punch-list was
ge
n
e
r
a
t
e
d
.
Co
n
t
r
a
c
t
o
r
wa
s
gi
v
e
n
to July 16, 2012 to complete pending
it
e
m
s
be
f
o
r
e
sc
h
e
d
u
l
i
n
g
Pu
b
l
i
c
Works Department to perform
ac
c
e
p
t
a
n
c
e
in
s
p
e
c
t
i
o
n
.
Page 44 of 45
Di
s
t
r
i
c
t
.P
r
o
j
e
c
t
Mg
1
~
So
u
t
h
Be
a
c
h
Si
n
n
e
s
,
A.
Mo
n
t
h
l
y
Co
n
s
t
r
u
c
t
i
o
n
Re
p
o
r
t
St
a
t
u
s
th
r
o
u
g
h
.J
u
l
y
2,
20
1
2
Pr
o
j
e
c
t
Na
m
e
Sc
o
p
e
t~f
Wo
r
k
Wa
s
h
i
n
g
t
o
n
Co
u
r
t
Se
a
w
a
l
l
Re
n
o
v
a
t
i
o
n
Re
c
o
n
s
t
r
u
c
t
i
o
n
of
31
5
Lf
of
se
a
w
a
l
l
us
i
n
g
vi
n
y
l
sh
e
e
t
pi
l
l
i
n
g
wi
t
h
a
re
i
n
f
o
r
c
e
d
co
n
c
r
e
t
e
ca
p
71
2
/
2
0
1
2
5:
2
1
:
3
2
P
k
f
Co
n
s
t
r
u
c
t
i
o
n
Status
10
/
1
1
/
2
0
1
0
:
Sh
e
e
t
pi
l
i
n
g
in
s
t
a
l
l
a
t
i
o
n
is
60
%
complete.
Es
t
i
m
a
t
e
d
co
m
p
l
e
t
i
o
n
of
Pr
o
j
e
c
t
:
January 10, 2011.
10
/
2
7
/
2
0
1
0
:
Sh
e
e
t
pi
l
e
in
s
t
a
l
l
a
t
i
o
n
co
m
p
l
e
t
e
.
Contractor commenced with excavation
an
d
fo
r
m
w
o
r
k
of
th
e
se
a
w
a
l
l
ca
p
.
11
/
1
5
/
2
0
1
0
:
Th
e
fi
r
s
t
10
0
l.
f
.
of
se
a
w
a
l
l
ca
p
was poured on 11/9/2010. The second
se
c
t
i
o
n
is
be
i
n
g
fo
r
m
e
d
.
An
t
i
c
i
p
a
t
e
d
second pour date by 11/23/2010.
12
/
1
5
/
2
0
1
0
:
Se
a
w
a
l
l
Ca
p
is
co
m
p
l
e
t
e
.
Fo
r
m
s
are being removed on the last 100 If
se
c
t
i
o
n
.
Ba
c
k
f
i
l
l
i
n
g
op
e
r
a
t
i
o
n
s
on-going. Project completion anticipated
fo
r
12
/
3
0
/
2
0
1
0
.
1/
6
/
2
0
1
1
:
Ma
n
a
t
e
e
Gr
a
t
e
in
s
t
a
l
l
a
t
i
o
n
pending as well as temp fence
re
m
o
v
a
l
.
Bu
i
l
d
i
n
g
De
p
a
r
t
m
e
n
t
fi
n
a
l
inspections scheduled for the week
of
1/
1
0
/
2
0
1
1
.
DE
R
M
fi
n
a
l
in
s
p
e
c
t
i
o
n
to follow.
1/
1
2
/
2
0
1
1
:
Bu
i
l
d
i
n
g
Fi
n
a
l
ob
t
a
i
n
e
d
.
1/
2
6
/
2
0
1
1
:
Pr
o
j
e
c
t
co
n
s
t
r
u
c
t
i
o
n
complete. DERM requested minor
re
m
o
v
a
l
of
ex
i
s
t
i
n
g
de
b
r
i
s
in
ca
n
a
l
.
1/
2
7
/
2
0
1
1
:
Co
n
t
r
a
c
t
o
r
su
b
m
i
t
t
e
d
close out documents. Page45 of45
REPORT OF THE ITEMIZED REVENUES AND
EXPENDITURES OF THE
l
MIAMI BEACH REDEVELOPMENT AGENCY'S
CITY CENTER DISTRICT
&
SOUTH POINTE
(PRE-TERMINATION CARRY FORWARD BALANCES)
l.: ------~--· ------
FOR THE MONTH OF
MAY 2012
Agenda Item LTC
Date 7-18-2012
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
REDEVELOPMENT AGENCY MEMORANUM
TO: Chairperson and Members of the
FROM:
Miami Beach Redevelopment Agency ~~ ~
Kathie Brooks, Interim Executive Director/~ / ,
July 18, 2012 DATE:
SUBJECT: Report of the Itemized Revenues and Expenditures of the Miami Beach
Redevelopment Agency's City Center District and the South Pointe (Pre-
Termination Carry Forward Balances) for the Period Ended May 31, 2012.
On July 15, 1998 the Chairman and Members of the Board of the Miami Beach
Redevelopment Agency resolved that an itemized report of the revenues and
expenditures of the Miami Beach Redevelopment Agency, with respect to each
redevelopment area, would be made available to the Chairman and Members of the
Board of the Miami Beach Redevelopment Agency at the end of each month. Further, it
was resolved that such report would be made available no later than five days prior to
the second regularly scheduled Redevelopment Agency meeting in the month
immediately following the month for which such report is prepared and that the report
would be placed on the Redevelopment Agency Agenda for the second meeting of each
month as a discussion item. Because the distribution date for the second Commission
meeting of some months falls prior to our receipt of bank statements for the month, we
advised on October 21, 1998, that beginning with the report for the month ending
October 31, 1998 all monthly Redevelopment Agency reports would henceforth be
included as part of the agenda for the first Commission meeting of each month.
As of September 30, 2005, the South Pointe Redevelopment District ceased to be a
redevelopment area within the Miami Beach Redevelopment Agency's jurisdiction. At
that point, the City of Miami Beach assumed the responsibilities for the South Pointe
Area. This report will continue to summarize the capital expenditures incurred for the
South Pointe construction projects that have been appropriated as of September 30,
2005 and that are being paid from the remaining RDA South Pointe TIF balance.
The attached material includes the following:
Section A-South Pointe (Pre-Termination Carry Forward Balances)
• Summary of Cash Basis Transactions by Project and by Expenditure Type for the
Fiscal Years Ended September 30, 1988 through 2011 and the Period ended
May 31, 2012
• Check and Wire Transfer Register Sorted by Project and Type of Expenditure for
the Period Ended May 31 , 2012
• Narrative of Major Projects Planned and/or Underway
Section 8 -City Center District
• Summary of Cash Basis Transactions by Project and by Expenditure Type for the
Fiscal Years Ended September 30, 1988 through 2011 and the Period ended
May31,2012
• Check and Wire Transfer Register Sorted by Project and Type of Expenditure for
the Period Ended May 31, 2012
• Narrative of Major Projects Planned and/or Underway
SOUTH POINTE
(PRE-TERMINATION CARRY FORWARD BALANCES)
FINANCIAL INFORMATION
FOR THE MONTH ENDED
MAY 31, 2012
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
REDEVELOPMENT AGENCY MEMORANUM
TO: Kathie Brooks, Interim City Manager
DATE:
Patricia D. Walker, Chief Financial ~
July 18,2012 ~ 'Y"
FROM:
SUBJECT: South Pointe Financial Information for the Month Ended May 31,2012
At the July 15, 1998 Commission/Redevelopment Agency meeting a request was made for
monthly financial information for the South Pointe Redevelopment District. As of September
30, 2005, the South Pointe Redevelopment District ceased to be a redevelopment area
within the Miami Beach Redevelopment Agency's jurisdiction. However, this report will
continue to summarize the capital expenditures incurred for the South Pointe construction
projects that have been appropriated as of September 30, 2005 and that are being paid from
the remaining RDA South Pointe TIF balance (pre-termination carry forward balances). The
information has been compiled and is attached.
Historical Cash Basis Financial Information
The summary report included in the attached material reflects that during the period from
October 1, 1987 through May 31, 2012 approximately $119,987,000 of revenues were
received in the South Pointe Area.
The primary sources of these revenues included:
Incremental Ad Valorem tax
Bond proceeds
Land sale
Interest income
Rental income
Loan from the City of Miami Beach
State grant
Various sources
$ 94,048,269
6,860,000
5,187,944
8,176,486
3,169,547
1,000,000
350,000
1,194,504
$ 119,986,750
The opening cash balance for October 1, 1987 was approximately $1 ,042,000; therefore,
the total amount of funds available for the period was $120,999,000.
We are committed to providing excellent public service and safety to all who live, work, and play in our vibrant, tropical, historic community.
On the expenditure side, approximately $111,150,000 has been expended from October 1,
1987 through May 31, 2012.
These approximate expenditures were primarily made in the following areas:
Cobb/Courts Project $ 16,384,670
14,028,441
12,330,291
36,962,236
Debt Service Payments
Portofino Project
South Pointe Streetscape/Park
Administrative Costs
SSDI Project
Marina Project
Community Policing
Washington Avenue
Garner-Mason Settlement and Other Reimbursements
Miami Beach Community Development Corporation Funding
Agreement-530 Meridian Building -Affordable Housing
Other Project Costs
7,357,359
6,446,941
5,913,256
2,465,482
1,541,983
1,044,733
1,500,000
5,174,746
$ 111 , 150, 138
The cash balance as of May 31, 2012 is approximately $9,878,342 consisting of cash and
investments.
KB:PDW:sp
We are committed to providing excellent public service and safety to all who live, work, and play in our vibrant, tropical, historic community.
SUMMARY OF
CASH BASIS TRANSACTIONS
FOR THE MONTH ENDED
MAY 31, 2012
RDA-South Pointe Pre-Termination Balances
Summary of Cash Basis Transactions by Project
Fiscal Years 1988-2012
RDA-South Pointe
Pre-Termination
RDA-South Pointe Balances Carry Forward
Prior Years FY 2012
OPENING CASH/INVSTMT BALANCE $ 1,041,730 $ 10,322,773
REVENUE
-Tax increment-City 55,162,212
-Tax increment-County 37,562,671
-Tax increment (Interest) -County 26,627
-Tax increment-Children's Trust 1,296,759
-Bond proceeds 6,860,000
-Cobb Partners -Closing Parcel 1, 2 5,187,944
-Marina rental income 3,169,547
-Interest income 8,147,501 28,985
-Loan from City 1,000,000
-Grants (Fla. Inland Navig.; shoreline restore.) 350,000
-Other Grants 5,000
-St. sales tax (receipt-income for pmt. to St) 209,358
-Daughters of Israel contrib.-reloc. Mikvah 28,000
-Consulting fee refund-Rahn S. Beach 27,026
-Olympus Hldg.-reimb. Portofino advertsg. 24,405
-Mendelson environ. reimb./refund 10,000
-Regosa Engineering refund -Marina 8,500
-Portofino DRI Payment from Greenberg T. 121,531
-Payment received from Greenberg T. for CMB 23,500
-Payment received from Olympus Holdings, Inc. 96,276
-Payment received from Marquesa, Inc. 2,000
-Contribution from Continuum II for S. Pointe Park 200,000
-Cost of asbestos remediation reimb.-Cobb 5,800
-Miscellaneous income 8,267
-Galbut & Galbut contrib.-reloc. Mikvah 3,500
-Murano Two, Ltd-Cash Bond per Agreement 242,000
-Other (void ck; IRS refund; Am. Bonding) 178,215 1,126
Total Revenues 119,956,639 30,111
Total
Rev./Expend.
$ 55,162,212
37,562,671
26,627
1,296,759
6,860,000
5,187,944
3,169,547
8,176,486
1,000,000
350,000
5,000
209,358
28,000
27,026
24,405
10,000
8,500
121,531
23,500
96,276
2,000
200,000
5,800
8,267
3,500
242,000
179,341
$ 119,986,750
RDA-South Pointe Pre-Termination Balances
Summary of Cash Basis Transactions by Project
Fiscal Years 1988-2012
RDA-South Pointe
Pre-Termination
RDA-South Pointe Balances Carry Forward
Prior Years FY 2012
EXPENDITURES
PROJECTS
Cobb/Courts (16,384,670)
Marina (5,913,256)
Portofino (12,330,291)
South Pointe Streetscape (36,549,830) (412,406)
SSDI (6,446,941)
Fifth St. Beautification (300,000)
Beach Colony (l'scape/stscape/site imprvmt) (80,912)
Marriott (53,061)
Washington Ave. (1,541,983)
Washington Ave Surface Lot (280, 790. 00)
Design guidelines (43,708)
MBTMA/Mobility (32,225)
S. Pointe Zoning (20,819)
Alaska Baywalk (218,323)
Victory/Community Gardens (174,477)
Washington Park (50,590)
Water/Sewer Pump Station Upgrade (1 ,062,751) (1 ,269)
FlamingoS. Bid A R.O.W. (394,548) (8,091)
Flamingo Neigh-Lummus (428,246)
Potamkin Project (318,525)
Lummus Park (103,916)
Wayfinding Projcet (176,481)
Jewish Museum of Florida (500,000)
MBCDC Loan -530 Meridian Bldg. (1 ,500,000)
6th & Lenox Infrastructure Project (770,438) (2,013)
Beachwalk II Project (63,795) (29,636)
Miscellaneous (60, 132)
Total Projects (85,800,708) (453,415)
ADMINISTRATIVE (7,336,232) (21 '127)
DEBT SERVICE/LOAN REPAYMENT (14,028,441)
Total
Rev./Expend.
(16,384,670)
(5,913,256)
(12,330,291)
(36,962,236)
(6,446,941)
(300,000)
(80,912)
(53,061)
(1,541,983)
(280,790)
(43,708)
(32,225)
(20,819)
(218,323)
(174,477)
(50,590)
(1,064,020)
(402,639)
(428,246)
(318,525)
(103,916)
(176,481)
(500,000)
(1 ,500,000)
(772,451)
(93,431)
(60, 132)
(86,254, 123)
(7,357,359)
(14,028,441)
RDA-South Pointe Pre-Termination Balances
Summary of Cash Basis Transactions by Project
Fiscal Years 1988-2012
MISCELLANEOUS
Carner Mason settlement
City of Miami Beach (reimburse water main)
Miscellaneous
COMMUNITY POLICING
TOTAL EXPENDITURES
RDA-South Pointe
Prior Years
(946, 163)
(74,067)
(24,503)
(1 ,044,733)
(2,465,482)
(110,675,596)
lENDING CASHIINVSTMT. BALANCE =$============= 10,322,773
RDA-South Pointe
Pre-Termination
Balances Carry Forward
FY 2012
(474,542)
$ 9,878,342
Total
Rev./Expend.
(946, 163)
(74,067)
(24,503)
(1 ,044,733)
(2,465,482)
$ (111,150,138)
RDA-South Pointe Pre-Termination Balances
Summary of Cash Basis Transactions by Expenditure Type
Fiscal Years 1988 -2012
RDA-South Pointe
Pre-Termination
RDA-South Pointe Balances Carry Forward
Prior Years FY 2012
OPENING CASH/INVSTMT BALANCE $ 1,041,730 $ 10,322,773
REVENUE
-Tax increment-City 55,162,212
-Tax increment-County 37,562,671
-Tax increment (Interest)-County 26,627
-Tax increment-Children's Trust 1,296,759
-Bond proceeds 6,860,000
-Cobb Partners-Closing Parcel 1, 2 5,187,944
-Marina rental income 3,169,547
-Interest income 8,147,501 28,985
-Loan from City 1,000,000
-Grants (Fla. Inland Navig.; shoreline restore.) 350,000
-Other Grants 5,000
-St. sales tax (receipt-income for pmt. to St) 209,358
-Daughters of Israel contrib.-reloc. Mikvah 28,000
-Consulting fee refund-Rahn S. Beach 27,026
-Olympus Hldg.-reimb. Portofino advertsg. 24,405
-Mendelson environ. reimb./refund 10,000
-Regosa Engineering refund -Marina 8,500
-Portofino DRI Payment from Greenberg T. 121,531
-Payment received from Greenberg T. for CMB 23,500
-Payment received from Olympus Holdings, Inc. 96,276
-Payment received from Marquesa, Inc. 2,000
-Contribution from Continuum II for S. Pointe Park 200,000
-Cost of asbestos remediation reimb.-Cobb 5,800
-Miscellaneous income 8,267
-Galbut & Galbut contrib.-reloc. Mikvah 3,500
-Murano Two, ltd-Cash Bond per Agreement 242,000
-Other (void ck; IRS refund; Am. Bonding) 178,215 1,126
Total Revenues 119,956,639 30,111
Expenditures
Land acquisition (9,444,065)
Legal fees/costs (9,392,304)
Professional services (17,797,700) (153,274)
Construction (30,67 4,379) (300,141)
Utilities relocation (1 ,873,213)
Environmental (416,044)
Submerged land lease (2,017,803)
Lease agreements (6,863,371)
Miscellaneous (3,500, 194)
Property Taxes (389,260)
Common Area Maintenance (131,140)
Administration (7,336,232) (21,127)
Debt Service/loan repayment (14,028,441)
Refund of Cash Bond (242,000)
Miscellaneous Project Costs (2,103,968)
Grant (500,000)
MBCDC Loan -530 Meridian Bldg. (1 ,500,000)
Community Policing (2,465,482)
(110,675,596) (474,542)
lENDING CASH/INVSTMT. BALANCE $ 10,322,773 $ 9,878,342
Total
Rev./Ex12end.
$ 55,162,212
37,562,671
26,627
1,296,759
6,860,000
5,187,944
3,169,547
8,176,486
1,000,000
350,000
5,000
209,358
28,000
27,026
24,405
10,000
8,500
121,531
23,500
96,276
2,000
200,000
5,800
8,267
3,500
242,000
179,341
$ 119,986,750
(9,444,065)
(9,392,304)
(17,950,974)
(30,974,520)
(1 ,873,213)
(416,044)
(2,017,803)
(6,863,371)
(3,500,194)
(389,260)
(131,140)
(7,357,359)
(14,028,441)
(242,000)
(2, 1 03,968)
(500,000)
(1 ,500,000)
(2,465,482)
$ (111,150,138)
CHECK & WIRE TRANSFER
REGISTER
SORTED BY
PROJECT & TYPE OF
EXPENDITURE
FOR THE MONTH ENDED
MAY 31,2012
11ffil'i1!;1 •WIW Payee ACH 10/04/11 Fiduciary Trust International ACH 01/05/12 Fiduciary Trust International Auto ded. 10/11/11 Fiduciary Trust International Auto ded. 11/30/11 Fiduciary Trust International ACH 01/23/12 Suntrust Operating Ace ACH 02/21/12 Suntrust Operating Ace ACH 03/20/12 Suntrust Operating Ace 297 11/15/11 Cutwater Investor Services 298 11/29/11 Cutwater Investor Services 301 12/29/11 Cutwater Investor Services 312 03/06/12 Cutwater Investor Services 314 03/13/12 Cutwater Investor Services 320 04/24/12 Cutwater Investor Services ACH 04/19/12 Suntrust Operating Ace 322 05/01/12 Cutwater Investor Services 326 05/31/12 Cutwater Investor Services ACH 05/18/12 Suntrust Operating Ace Auto ded. 05/04/12 Fiduciary Trust International TOTAL ADMINISTRATION 296 11/08/11 Chen and Associates 296 11/08/11 Chen and Associates 299 12/13/11 Chen and Associates 304 01/24/12 Chen and Associates 316 03/27/12 Chen and Associates 299 12/13/11 Chen and Associates 304 01/24/12 Chen and Associates 299 12/13/11 Chen and Associates 304 01/24/12 Chen and Associates 309 02/16/12 Chen and Associates 309 02/16/12 Chen and Associates 318 04/17/12 Chen and Associates 318 04/17/12 Chen and Associates 324 05/17/12 Chen and Associates 324 05/17/12 Chen and Associates 324 05/17/12 Chen and Associates 325 05/29/12 Chen and Associates 293 10/13/11 Wolfberg Alvarez & Partners 303 01/17/12 Mediation Solutions Inc. 310 02/21/12 Mediation Solutions Inc. 319 04/17/12 Mediation Solutions Inc. 306 01/26/12 Horizon Contractors 315 03/15/12 Horizon Contractors TOTALS. POINTE STREETSCA
P
E
292 10/13/11 Harbour Construction 305 01/24/12 Harbour Construction 305 01/24/12 Harbour Construction
-
o
u
t
o
m
e
r
e
-
e
r
m
m
a
t
1
o
n
C
h
e
c
k
&
W
i
r
e
T
r
a
n
s
f
e
r
R
e
g
i
s
t
e
r
b
y
P
r
o
j
e
c
t
&
T
y
p
e
o
f
E
x
p
e
n
s
e
F
i
s
c
a
l
Y
e
a
r
2
0
1
2
A
m
o
u
n
t
T
y
p
e
o
f
E
x
p
e
n
s
e
3
4
9
.
3
2
Q
u
a
r
t
e
r
l
y
F
e
e
6
/
3
0
/
2
0
1
1
-
9
/
3
0
/
2
0
1
1
3
5
0
.
7
5
Q
u
a
r
t
e
r
l
y
F
e
e
9
/
3
0
/
2
0
1
1
-
1
2
/
3
1
/
2
0
1
1
6
,
2
0
5
.
9
5
A
c
c
r
u
e
d
i
n
t
e
r
e
s
t
o
n
i
n
v
e
s
t
m
e
n
t
p
u
r
c
h
a
s
e
9
,
2
9
5
.
0
8
A
c
c
r
u
e
d
i
n
t
e
r
e
s
t
o
n
i
n
v
e
s
t
m
e
n
t
p
u
r
c
h
a
s
e
1
9
.
3
2
A
c
c
o
u
n
t
A
n
a
l
y
s
i
s
F
e
e
3
4
.
4
0
A
c
c
o
u
n
t
A
n
a
l
y
s
i
s
F
e
e
1
2
4
.
1
5
A
c
c
o
u
n
t
A
n
a
l
y
s
i
s
F
e
e
4
1
6
.
6
4
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
f
o
r
S
e
p
t
e
m
b
e
r
2
0
1
1
1
,
5
4
5
.
7
4
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
f
o
r
O
c
t
o
b
e
r
2
0
1
1
4
2
1
.
6
9
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
N
o
v
e
m
b
e
r
2
0
1
1
4
2
1
.
3
9
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
D
e
c
e
m
b
e
r
2
0
1
1
4
1
8
.
6
6
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
J
a
n
u
a
r
y
2
0
1
2
4
1
8
.
0
7
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
F
e
b
r
u
a
r
y
2
0
1
2
4
9
.
3
5
A
c
c
o
u
n
t
A
n
a
l
y
s
i
s
F
e
e
4
1
6
.
4
5
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
M
a
r
c
h
2
0
1
2
4
1
3
.
3
2
A
s
s
e
t
m
a
n
a
g
e
m
e
n
t
f
e
e
s
A
p
r
i
l
2
0
1
2
4
8
.
6
9
A
c
c
o
u
n
t
A
n
a
l
y
s
i
s
F
e
e
1
7
8
.
2
4
A
c
c
r
u
e
d
i
n
t
e
r
e
s
t
o
n
i
n
v
e
s
t
m
e
n
t
p
u
r
c
h
a
s
e
2
1
,
1
2
7
.
2
1
2
1
,
1
2
7
.
2
1
1
0
8
.
9
8
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
2
5
,
4
1
3
.
5
9
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
2
7
,
7
1
5
.
7
2
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
9
,
1
5
4
.
9
8
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
1
3
,
1
6
4
.
4
9
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
1
5
,
2
2
8
.
4
8
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
7
9
.
0
0
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
1
,
1
8
1
.
7
4
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
2
0
7
.
5
0
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
7
,
9
2
5
.
7
5
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
4
6
0
.
6
2
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
1
5
,
7
9
7
.
3
3
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
5
1
.
1
8
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
8
,
8
7
3
.
0
7
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
2
1
1
.
9
0
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
9
7
4
.
2
4
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
2
1
,
5
8
8
.
7
4
P
r
o
f
e
s
s
i
o
n
a
l
s
e
r
v
i
c
e
s
-
P
l
a
n
n
i
n
g
,
e
n
g
i
n
e
e
r
i
n
g
,
a
d
m
i
n
i
s
t
r
a
t
i
v
e
1
4
8
,
1
3
7
.
3
1
1
,
6
3
7
.
0
0
P
r
o
f
e
s
s
i
o
n
a
l
S
e
r
v
i
c
e
s
P
h
.
2
1
,
0
0
0
.
0
0
P
r
o
f
e
s
s
i
o
n
a
l
S
e
r
v
i
c
e
s
P
h
.
2
1
,
5
0
0
.
0
0
P
r
o
f
e
s
s
i
o
n
a
l
S
e
r
v
i
c
e
s
P
h
.
2
1
,
0
0
0
.
0
0
P
r
o
f
e
s
s
i
o
n
a
l
S
e
r
v
i
c
e
s
P
h
.
2
5
,
1
3
7
.
0
0
1
3
1
,
6
8
8
.
1
3
C
o
n
s
t
r
u
c
t
i
o
n
S
e
r
v
i
c
e
s
-
R
i
g
h
t
o
f
W
a
y
l
n
f
r
a
s
t
r
a
c
t
u
r
e
1
1
8
,
7
4
5
.
1
3
C
o
n
s
t
r
u
c
t
i
o
n
S
e
r
v
i
c
e
s
-
R
i
g
h
t
o
f
W
a
y
l
n
f
r
a
s
t
r
a
c
t
u
r
e
2
5
0
,
4
3
3
.
2
6
4
0
3
,
7
0
7
.
5
7
5
,
5
6
1
.
7
2
C
o
n
s
t
r
u
c
t
i
o
n
S
e
r
v
i
c
e
s
-
B
e
a
c
h
S
h
o
w
e
r
2
,
5
1
9
.
1
6
C
o
n
s
t
r
u
c
t
i
o
n
S
e
r
v
i
c
e
s
-
B
e
a
c
h
S
h
o
w
e
r
6
1
7
.
9
7
C
o
n
s
t
r
u
c
t
i
o
n
S
e
r
v
i
c
e
s
-
B
e
a
c
h
S
h
o
w
e
r
P
r
o
j
e
c
t
o
r
N
/
A
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
A
d
m
i
n
i
s
t
r
a
t
i
o
n
2
3
3
4
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
V
2
3
3
5
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
V
2
3
3
3
-
S
,
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
l
l
2
3
3
3
-
S
,
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
l
l
2
3
3
3
-
S
,
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
l
l
2
3
3
4
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
V
2
3
3
4
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
V
2
3
3
5
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
V
2
3
3
5
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
V
2
3
3
4
-
S
O
U
T
H
P
O
I
N
T
E
R
D
A
P
H
1
1
1
-
V
2
3
3
5
-
S
O
U
T
H
P
O
I
N
T
E
R
D
A
P
H
1
1
1
-
V
2
3
3
3
-
S
,
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
l
l
2
3
3
4
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
V
2
3
3
3
-
S
,
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
l
l
2
3
3
4
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
V
2
3
3
5
-
S
O
U
T
H
P
O
I
N
T
E
R
D
A
P
H
1
1
1
-
V
2
3
3
3
-
S
,
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
l
l
2
3
3
2
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
2
3
3
2
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
2
3
3
2
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
2
3
3
2
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
2
3
3
2
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
2
3
3
2
-
S
.
P
o
i
n
t
e
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
2
1
7
1
-
s
.
P
o
i
n
t
e
P
a
r
k
2
1
7
1
-
S
.
P
o
i
n
t
e
P
a
r
k
2
1
7
1
-
S
.
P
o
i
n
t
e
P
a
r
k
1
l!ffililllll ••nnw Payee TOTALS. POINTE PARK 295 11/08/11 Camp Dresser & McKee, Inc TOTAL WATER/SEWER PUMP
S
T
A
T
I
O
N
U
P
G
R
A
D
E
300 12/15/11 AGC Electric 313 03/06/12 The Gordian Group TOTAL FLAMINGOS. BID A/R.
O
.
W
.
308 02/09/12 Wingerter Laboratorie TOTAL 6TH & LENOX INFRAST
R
U
C
T
U
R
E
P
R
O
J
E
C
T
294 10/18/11 Coastal Systems International
302 01/04/12 Coastal Systems Internatio
n
a
l
307 02/02/12 Coastal Systems Internatio
n
a
l
311 02/23/12 Coastal Systems Internatio
n
a
l
Wire 03/16/12 Legal Impress Account 317 04/03/12 Coastal Systems Internatio
n
a
l
321 05/01/12 Coastal Systems Internatio
n
a
l
323 05/03/12 Florida Department of Envir
o
n
m
e
n
t
TOTAL BEACHWALK II PROJE
C
T
REPORT TOTAL
-
o
u
o
m
e
r
e
-
e
r
m
m
a
t
1
o
n
C
h
e
c
k
&
W
i
r
e
T
r
a
n
s
f
e
r
R
e
g
i
s
t
e
r
b
y
P
r
o
j
e
c
t
&
T
y
p
e
o
f
E
x
p
e
n
s
e
F
i
s
c
a
l
Y
e
a
r
2
0
1
2
A
m
o
u
n
t
T
y
p
e
o
f
E
x
p
e
n
s
e
8
,
6
9
8
.
8
5
8
,
6
9
8
.
8
5
1
,
2
6
9
.
1
6
D
e
s
i
g
n
1
,
2
6
9
.
1
6
1
,
2
6
9
.
1
6
7
,
9
3
6
.
2
2
E
l
e
c
t
r
i
c
i
t
y
f
o
r
s
t
r
e
e
t
l
i
g
h
t
s
a
t
L
e
n
n
o
x
A
v
e
.
a
n
d
6
t
h
S
t
r
e
e
t
1
5
4
.
7
6
E
l
e
c
t
r
i
c
i
t
y
f
o
r
s
t
r
e
e
t
l
i
g
h
t
s
a
t
L
e
n
n
o
x
A
v
e
.
a
n
d
6
t
h
S
t
r
e
e
t
8
,
0
9
0
.
9
8
8
,
0
9
0
.
9
8
2
,
0
1
2
.
5
0
p
r
o
f
e
s
s
i
o
n
a
l
e
n
g
r
g
&
t
e
s
t
i
n
g
2
,
0
1
2
.
5
0
2
,
0
1
2
.
5
0
2
,
9
8
2
.
0
5
P
r
o
f
e
s
s
i
o
n
a
l
A
r
c
h
i
t
e
c
t
u
r
a
l
/
E
n
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
1
,
1
4
3
.
3
0
P
r
o
f
e
s
s
i
o
n
a
l
A
r
c
h
i
t
e
c
t
u
r
a
l
/
E
n
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
4
,
9
4
9
.
8
2
P
r
o
f
e
s
s
i
o
n
a
l
A
r
c
h
i
t
e
c
t
u
r
a
l
/
E
n
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
5
,
9
8
0
.
3
9
P
r
o
f
e
s
s
i
o
n
a
l
A
r
c
h
i
t
e
c
t
u
r
a
l
/
E
n
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
1
0
5
.
0
0
L
e
g
a
l
5
,
2
1
5
.
4
4
P
r
o
f
e
s
s
i
o
n
a
l
A
r
c
h
i
t
e
c
t
u
r
a
l
/
E
n
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
7
,
9
6
0
.
2
2
P
r
o
f
e
s
s
i
o
n
a
l
A
r
c
h
i
t
e
c
t
u
r
a
l
/
E
n
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
1
,
3
0
0
.
0
0
P
e
r
m
i
t
2
9
,
6
3
6
.
2
2
2
9
,
6
3
6
.
2
2
$
4
7
4
,
5
4
2
.
4
9
P
r
o
j
e
c
t
o
r
N
/
A
2
3
1
2
-
M
a
s
t
e
r
S
e
w
e
r
P
u
m
p
S
t
a
t
i
o
n
S
o
u
t
h
P
o
i
n
t
e
2
3
3
0
-
F
l
a
m
i
n
g
o
N
e
i
g
h
b
o
u
r
h
o
o
d
S
o
u
t
h
2
3
3
0
-
F
l
a
m
i
n
g
o
N
e
i
g
h
b
o
u
r
h
o
o
d
S
o
u
t
h
6
t
h
&
L
e
n
o
x
l
n
f
r
a
s
t
.
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
5
4
1
-
B
e
a
c
h
w
a
l
k
I
I
P
r
o
j
e
c
t
2
ATTACHMENT ''A''
SUMMARY OF MAJOR
PROJECTS
SOUTH POINTE PROJECTS (Planned and/or Underway)
South Pointe
South Pointe Streetscape Improvements Phase IT
This project includes the replacement of existing water lines to
enhance the water pressure and water flow, new stormwater
infrastructure to meet the Master Plan recommended level of service
throughout the project area as well as streetscape improvements
including traffic calming measures and enhanced pedestrian access.
The project area encompasses the entire Right-of-Way of Lenox
Avenue, Michigan Court, Jefferson Court, Jefferson Avenue,
Meridian Court, Meridian Avenue, Euclid Court and Euclid Avenue
between 5111 St. and 2nd St. (excluding 3rd St. east ofMichigan).
Project Management Department: CIP Office
Total Project Cost: $16,225,067
Total CRA participation: $8,254,725
Source: Pg. 341 -Capital Improvement Plan and FY 08/09 Capital
Budget
South Pointe Streetscape Improvements Phase lll-V
South Pointe Park
This project includes the installation of new stormwater
infrastructure within priority Basin 1 to meet the Master Plan
recommended level of service. The project limits are bounded by
Ocean Drive to the East and Alton Road to the West, and includes:
1st Street between Alton and Ocean, Commerce Street from Alton to
Washington, Ocean Drive, Ocean Court from 5111 to South Pointe
Drive, Collins Avenue and Collins Court from 5th to South Pointe
Drive, South Pointe Drive, Jefferson Avenue between South Pointe
Drive and 15
\ and other adjacent alleys, roadways and rights ofway.
Project Management Department: CIP Office
Total Project Cost: $25,603,389
Total CRA participation: $4,927,566
Source: Pg. 343 -Capital Improvement Plan and FY 08/09 Capital
Budget
This project includes improvements to the 17 acre regional park per
the City of Miami Beach Parks Master Plan, 1996. Elements
include: redesigned park entrance, new restroom building, pedestrian
paving, site lighting, playgrounds, signage, landscaping and
irrigation. Improvements to the park will provide a memorable and
safer park experience. The park is now open to the public and a
grand opening ceremony was held March 22, 2009.
Project Management Department: CIP Office
Total Project Cost: $28,246,772
Total CRA participation: $12,657,580
Source: Pg. 253 -Capital Improvement Plan and FY 08/09 Capital
Budget
Page 1 of2
South Pointe
Coast Guard Booster Wastewater Pump Station-South Pointe
Beachwalk II
This project is for a new master in-line wastewater booster station to
be located at 151 Street and Jefferson A venue location. It is an
integral part of the city-wide wastewater pump station upgrades that
are currently under construction under the 1995 Water and Sewer
bond.
Project Management Department: CIP Office
Total Project Cost: $24,431,281
Total CRA participation: $1,442,348
Source: Pg. 420 -Capital Improvement Plan and FY 08/09 Capital
Budget
The Beachwalk II project will establish a southern link between
Lummus Park and South Pointe Park. Beachwalk II will be a 0.6
mile path running North-South, west of the dune system and east of
Ocean Drive. The project will include an extensive dune
enhancement component including use of turtle friendly
lighting, removal of invasives, planting of native plants, dune
fill, rope and post, and sand fencing. Additional objectives of
the project includes physical improvements to support
multimodal transportation, link bicycle and pedestrian
destinations, increase pedestrian and bicycle safety, improve
trail network connectivity, eliminate barriers that prevent
bicycle trips, and develop future bikeway corridors.
Project Management Department: Public Works
Total Project Cost: $4,736,731
Total CRA participation: $2,800,600
Source: Pg. 455-Capital Improvement Plan and FY 09/10 Capital Budget
Page 2 of2
CITY CENTER
REDEVELOPMENT DISTRICT
FINANCIAL INFORMATION
FOR THE MONTH ENDED
MAY 31, 2012
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
REDEVELOPMENT AGENCY MEMORANUM
TO:
FROM:
DATE:
SUBJECT:
Kathie Brooks, Interim City Manager
Patricia D. Walker, Chief Financia/~o/
July 18.2012 I\ r
City Center Redevelopment District Financial Information
For the Period Ended May 31, 2012
At the July 15, 1998 Commission/Redevelopment Agency meeting a request was made
for monthly financial information for the City Center Redevelopment District. The
information has been compiled and is attached.
Historical Cash Basis Financial Information
The summary report included in the attached material, reflects that during the period
from October 1, 1993 through May 31, 2012 approximately $599,168,000 of revenues
were received in the City Center District of the Redevelopment Agency ("RDA"). The
primary sources of these revenues included approximately:
Ad Valorem tax
Bond proceeds
Loews Hotel Exercise Option
Resort tax contributions
Draws from the line of credit from the City of Miami Beach
Anchor Garage receipts
Pennsylvania Garage receipts
Royal Palm Land Sale
Interest income
Loews Ground Lease receipts
Anchor Shops receipts
Pennsylvania Shops receipts
Loan from the City of Miami Beach
Contributions from GMCVB toward debt service payments
Reimbursements from other state and local agencies
Contribution from CMB Parking Department
RDP Royal Palm Ground Lease receipts
Contribution from New World Symphony
Cost of Issuance Proceeds-Series 2005.
From Various Sources
Total Re\ienues
$ 304,687,533
108,779,453
27,498,975
43,109,450
19,190,000
29,631,977
955,997
12,562,278
19,936,536
8,234,784
7,488,024
220,176
3,000,000
2,700,000
1,975,762
700,000
470,222
250,000
402,221
7,374,791
$ 599,168,179 ___ ____;_....;...._
On the expenditure side, approximately $511,177,000 has been expended from October
1, 1993 through May 31, 2012.
These approximate expenditures were primarily made in the following areas:
Debt Service Payments $
Conwntion Center Hotel Project (Loews Hotel)
Lincoln Road/Bass Museum Loan Repayment to CMB
Hotel Garage Project
African-American Hotel Project
Collins Park Cultural Center
Colony Theater
Anchor Garage Operations
Pennsylvania Garage Operations
Pennsylvania Shop Operations
Administratiw Costs
Beachwalk Project
Miami City Ballet
Community Policing
Secondary Pledge Repayments (Resort Tax)
Washington Awnue Streetscapes
Lincoln Road Project
Water & Wastewater Pump Station
R.O.W. lmprowments
New World Symphony Grant-In-Aid
Capital Projects Maintenance
City Center Greenspace Management
South Beach Area Property Management
Anchor Shops Operations
Cost of Issuance-Series 2005A&B
Movie Theater Project
Purchase of the Barclay, the Allen and the London House for
MBCDC
Washington Awnue Bridge Restoration Loan ($630,987 -
Refunded)
Other Project Costs
159,751,247
61,516,007
30,467,142
18,247,976
12,968,666
17,324,578
6,554,191
19,925,175
542,678
94,422
19,503,258
5,233,711
5,493,106
22,248,623
2,385,000
3, 198,183
1,443,063
1,228,541
2,356,207
15,000,000
12,349,980
191,837
2,440,646
1,970,814
375,047
182,200
14,154,643
700,000
73,329,709
Total Expenditures $ 511,176,650 ____ ..;...._ __ _
The cash balance as of May 31, 2012 is approximately $87,992,000. This balance
consisted of the following amounts:
Cash Balance
lnwstments Balance
Debt Service Reserws
KB:PDW:sp
$ 29,350,859
50,129,242
8,511,428
$ ____ 87~,_99_1....;.,5_2_9_
SUMMARY OF
CASH BASIS TRANSACTIONS
FOR THE MONTH ENDED
MAY 31, 2012
Redevelopment Agency -City Center/Historic Convention Village
Summary of Cash Basis Transactions by Project
Fiscal Years 1994-2012
PriorY ears FY 2012
OPENING CASH/INVESTMENT BALANCE $ $ 68,824,841
REVENUE
-Tax increment-County 122,025,423 12,924,079 $
-Tax increment-City 143,918,095 15,628,347
-Tax increment (Interest)-County 19,057
-Tax increment-Children's Trust 8,700,231 1,472,301
-Bond proceeds 108,779,453
-Rental income 258,482 15,417
-Anchor Garage receipts 27,358,557 2,116,128
-Anchor Garage deposit card receipts 30,788
-Anchor Shops rental income 6,928,408 471,375
-Anchor Shops rental deposits 88,241
-Pennsylvania Garage receipts 465,661 490,096
-Pennsylvania Garage deposit card receipts 230 10
-Pennsylvania Shops rental income 48,794
-Pennsylvania Shops rental deposits 25,000 146,382
-Legal settlement 100,000
-Loews Facility Use/Usage Fee 126,504
-Loews Ground Lease Receipts 8,234,784
-Loew Hotel -exercise option 27,498,975
-RDP Royal Palm Ground Lease Receipts 470,222
-RDP Royal Palm -Sale of Land 12,562,278.00
-New World Symphony Contribution 250,000.00
-Interest income 19,808,094 128,442
-Resort tax contributions 39,743,496 3,365,954
-Cost of Issuance Proceeds-Series 2005 402,221
-Bid deposits -hotels 375,000
-Bid deposits -cinema 100,000
-Loan from City 3,000,000
-Line of credit from City 19,190,000
-Cultural Campus 1,975,762
-St. Moritz Hotel -refund/reimbursement 925,450
-Reimbursements (GMCVB/RE taxes/Grants) 3,864,530
-St. sales tax (receipt-income for pmt. to St) 2,354,029 17,532
-Miami City Ballet environmental clean-up 31,698
-Anchor Garage insurance reimbursement 26,170
-Real Estate taxes refund 264,261 34,795
-Refund from Dept. of Mgmt Services 139,239 15,674
-Refund -Loews -Water/Sewer Impact Fees 331,241 17,078
-Refund -Police Salaries and Wages 698,677 93,986
-Miscellaneous/Prior Year Refunds & Voids 1,107,949 3,583
TOTAL REVENUE 562,178,206 36,989,973 $
EXPENDITURES
PROJECTS
African-American Hotel (12,968,666)
Convention Hotel (61 ,516,007)
Hotel Garage -Construction (18,247,976)
Movie Theater Project (182,200)
Lincoln Road (1 ,443,063)
Beachwalk (5,233, 711)
Collins Park Cultural Center (16,819,308) (505,270)
Bus Prop. Ctr. (159)
Total
Rev./Ex12end.
134,949,502
159,546,442
19,057
10,172,532
1 08,779,453
273,899
29,474,685
30,788
7,399,783
88,241
955,757
240
48,794
171,382
100,000
126,504
8,234,784
27,498,975
470,222
12,562,278
250,000
19,936,536
43,109,450
402,221
375,000
100,000
3,000,000
19,190,000
1,975,762
925,450
3,864,530
2,371,561
31,698
26,170
299,056
154,913
348,319
792,663
1 '111 ,532
599,168,179
(12,968,666)
(61 ,516,007)
(18,247,976)
(182,200)
(1 ,443,063)
(5,233,711)
(17,324,578)
(159)
Redevelopment Agency -City Center/Historic Convention Village
Summary of Cash Basis Transactions by Project
Fiscal Years 1994-2012
Prior Years FY 2012
Chamber of Commerce Relocation Study (2,000)
Colony Theater (6,512,868) (41,323)
Construction of Library (14,586)
East/West Corridor (88)
Electrowave (3,161)
Garden Center (93)
Guidelines (12,450)
Old City Hall (499)
17th Street Surface Lot (256,887)
1 OA Surface Lot-Lennox (382,854)
Streets capes (324,849)
6th Street Streetscape (577)
Botanical Gardens (209,879) (132,897)
Transportation Mobility Study (32,225)
Convention Center Storm Water Improve. (1 ,821 ,297) (72, 119)
New World Symphony (21 ,308,476)
New World Symphony Park Project (14,408,904) (29,109)
Washington Avenue Streetscape (3, 198, 183)
Rotunda (101,122)
R.O.W. Improvements (2,356,207)
Flamingo (16 St. Corridor) (4,721)
Flamingo Neigh. South -Bid A (10,186)
Flamingo Neigh. Lummus-Bid B (456,047)
Flamingo Bid C -N/E/W Neigh. (13,877)
Beachfront Restrooms (431 '147)
Water & Wastewater Pump Station (1,228,541)
Miami City Ballet (5,487,984) (5,122)
Wayfinding Project (324,219) (6,600)
West Ave/Bay Road Neigh. Improve. (687,720)
Multi-Purpose Building Adj. City Hall (14,661,410) (16,412)
Bass Museum (488,175)
Purchase of the Barclay, the Allen and the
London House for MBCDC (14, 154,643)
Alleyway Restoration Program (221,632)
Lincoln Road Between Lennox and Alton (6, 151,71 0)
Lincoln Road Between Collins/Washington (263,725) (536,146)
Lincoln Road Fountain (4,484)
Little Stage Complex (287,813)
Preferred Parking Surface Lot (526,649)
Tree Wells Pilot Project (409,571)
Washington Ave. Bridge Restoration Loan (700,000)
Collins Canal Enhancement Project (178,361) (158,622)
CCHV Neighborhood Improvements (7,095,516) (770,655)
Animal Waste Dispensers & Receptacles (25,000)
Pedestrian Countdown Signals (54,868)
Maze Project-21st Street & Collins (135,000)
Directory Signs in City Center ROW (4,500) (6, 112)
24" PVC Sanitary Sewer Improvements (275,587)
Bicycle Parking Project (9,013}
Total Projects (221 ,645,91 0) (2,284,871)
NEW WORLD SYMPHONY GRANT-IN-AID (15,000,000.00}
CAPITAL PROJECTS MAINTENANCE (11 ,251 ,992.00} (1 ,097,988}
Total
Rev./Ex~end.
(2,000)
(6,554, 191)
(14,586)
(88)
(3,161)
(93)
(12,450)
(499)
(256,887)
(382,854)
(324,849)
(577)
(342,776)
(32,225)
(1,893,416)
(21 ,308,476)
(14,438,013)
(3, 198, 183)
(101,122)
(2,356,207)
(4,721)
(10,186)
(456,047)
(13,877)
(431,147)
(1,228,541)
(5,493,106)
(330,819)
(687,720)
(14,677,822)
(488,175)
(14, 154,643)
(221,632)
(6, 151 ,71 0)
(799,871)
(4,484)
(287,813)
(526,649)
(409,571)
(700,000)
(336,983)
(7 ,866,171)
(25,000)
(54,868)
(135,000)
(10,612)
(275,587)
(9,013}
(223,930,781)
(15,000,000}
(12,349,980}
Redevelopment Agency -City Center/Historic Convention Village
Summary of Cash Basis Transactions by Project
Fiscal Years 1994-2012
Prior Years FY 2012
CITY CENTER GREEN SPACE
MANAGEMENT {191,837}
SOUTH BEACH AREA PROPERTY
MANAGEMENT (2,009,214) (431 ,432)
ADMINISTRATION (17,302,242} (2,201,016}
COST OF ISSUANCE-SERIES 2005A&B (375,047}
DEBT SERVICE/LOAN REPAYMENT (155,555,580) (6,580,667)
CITY OF MIAMI BEACH/LOAN REPAYMENT (30,467, 142}
ANCHOR GARAGE OPERATIONS (18,329,045} (1 ,596, 130}
ANCHOR SHOPS OPERATIONS (1,841,577} (129,237}
PENNSYLVANIA GARAGE OPERATIONS (274,211) (268,467)
PENNSYLVANIA SHOPS OPERATIONS (94,422)
COMMUNITY POLICING (19,301 ,405} (2,947,218}
TOTAL EXPENDITURES (493,353,365) (17,823,285) $
ENDING CASH/INVSTMT. BALANCE $ 68,824,841 $ 87,991,529
Total
Rev./Ex~end.
(191 ,837}
(2,440,646)
(19,503,258}
(375,047}
(162,136,247)
(30,467,142}
(19,925,175}
(1 ,970,814}
(542,678)
(94,422)
(22,248,623}
(511, 176,650)
Redevelopment Agency -City Center/Historic Convention Village
Summary of Cash Basis Transactions by Expenditure Type
Fiscal Years 1994-2012
PriorY ears FY 2012
OPENING CASH/INVESTMENT BALANCE $ $ 68,824,841
REVENUE
-Tax increment-County 122,025,423 12,924,079 $
-Tax increment-City 143,918,095 15,628,347
-Tax increment (Interest)-County 19,057
-Tax increment-Children's Trust 8,700,231 1,472,301
-Bond proceeds 108,779,453
-Rental income 258,482 15,417
-Anchor Garage receipts 27,358,557 2, 116,128
-Anchor Garage deposit card receipts 30,788
-Anchor Shops rental income 6,928,408 471,375
-Anchor Shops rental deposits 88,241
-Pennsylvania Garage receipts 465,661 490,096
-Pennsylvania Garage deposit card receipts 230 10
-Pennsylvania Shops rental income 48,794
-Pennsylvania Shops rental deposits 25,000 146,382
-Legal settlement 100,000
-Loews Facility Use/Usage Fee 126,504
-Loews Ground Lease Receipts 8,234,784
-Loew Hotel -exercise option 27,498,975
-RDP Royal Palm Ground Lease Receipts 470,222
-RDP Royal Palm-Sale of Land 12,562,278
-New World Symphony Contribution 250,000
-Interest income 19,808,094 128,442
-Resort tax contributions 39,743,496 3,365,954
-Cost of Issuance Proceeds-Series 2005 402,221
-Bid deposits -hotels 375,000
-Bid deposits -cinema 100,000
-Loan from City 3,000,000
-Line of credit from City 19,190,000
-Cultural Campus 1,975,762
-St. Moritz Hotel -refund/reimbursement 925,450
-Reimbursements (GMCVB/RE taxes/Grants) 3,864,530
-St. sales tax (receipt-income for pmt. to St) 2,354,029 17,532
-Miami City Ballet environmental clean-up 31,698
-Anchor Garage insurance reimbursement 26,170
-Real estate taxes refund 264,261 34,795
-Refund from Dept. of Mgmt Services 139,239 15,674
-Refund -Loews-Water/Sewer Impact Fees 331,241 17,078
-Refund -Police Salaries and Wages 698,677 93,986
-Miscellaneous/Prior Year Refunds & Voids 1,107,949 3,583
TOTAL REVENUE 562,178,206 36,989,973 $
EXPENDITURES
Administrative fees (31,684)
Appraisal fees (125,368)
Bid refund (230,000)
Board up (60,758)
Bond costs (211 ,440)
Building permit fees (173,269)
Construction (54,404,243) (505,270)
Delivery (2,995)
Demolition (203,195)
Electric service (1,976)
Environmental (354,908)
Equipment rental (55,496)
Hotel negotiation consultant (849,243)
Total
Rev ./Exeend.
134,949,502
159,546,442
19,057
10,172,532
108,779,453
273,899
29,474,685
30,788
7,399,783
88,241
955,757
240
48,794
171,382
100,000
126,504
8,234,784
27,498,975
470,222
12,562,278
250,000
19,936,536
43,109,450
402,221
375,000
100,000
3,000,000
19,190,000
1,975,762
925,450
3,864,530
2,371,561
31,698
26,170
299,056
154,913
348,319
792,663
1 '111 ,532
599,168,179
(31,684)
(125,368)
(230,000)
(60,758)
(211 ,440)
(173,269)
(54,909,513)
(2,995)
(203,195)
(1 ,976)
(354,908)
(55,496)
(849,243)
Redevelopment Agency -City Center/Historic Convention Village
Summary of Cash Basis Transactions by Expenditure Type
Fiscal Years 1994-2012
Prior Years FY 2012
Hotel selection/study (263,357)
Land acquisition (41,240,564)
Legal fees/costs (2,770,339)
Lighting (60,805)
Lot clearing (34,771)
Maintenance (245,288)
Miscellaneous (762,046)
Owner's representative fee & expenses (1 ,823,466)
Postage, printing & mailing (27,855)
Professional services (6,872,046)
Public notice/advertisement · (26,472)
Purchase of the Barclay, the Allen and the
London House for MBCDC (14,154,643)
Refund of deposits (185,000)
Reimburse closing costs to C.M.B. (3,000,000)
Reimbursements (78,041)
Relocation (131 ,784)
Revitalization (960,522)
Security guard service (277,825)
Streets cape (401,312)
Temporary staffing (69,158)
Title insurance (25,271)
Traffic parking study (8,600)
Training, conferences & meetings (3,268)
Travel & related expenses (28,730)
Utilities (420,289)
Washington Ave. Bridge Restoration Loan (700,000)
Water/Sewer (impact fees) (25,240)
Total (131 ,301 ,267) (505,270)
-Miscellaneous Projects (90,344,643) (1,779,601)
Total Projects (221 ,645,91 0) (2,284,871)
NEW WORLD SYMPHONY GRANT-IN-AID (15,000,000)
CAPITAL PROJECTS MAINTENANCE (11 ,251 ,992) (1,097,988)
CITY CENTER GREENSPACE
MANAGEMENT (191,837)
SOUTH BEACH AREA PROPERTY
MANAGEMENT (2,009,214) (431 ,432)
COST OF ISSUANCE-SERIES 2005A&B (375,047)
ADMINISTRATION (17,302,242) (2,201 ,016)
DEBTSERWC&LOANREPAYMENT (155,555,580) (6,580,667)
CITY OF MIAMI BEACH/LOAN REPAYMENT (30,467, 142)
ANCHOR GARAGE OPERATIONS (18,329,045) (1 ,596, 130)
ANCHOR SHOPS OPERA T/ONS (1,841,577) (129,237)
PENNSYLVANIA GARAGE OPERATIONS (274,211) (268,467)
PENNSYLVANIA SHOPS OPERATIONS (94,422)
COMMUNITY POLICING (19,301 ,405) (2,947,218)
Total
Rev./Ex12end.
(263,357)
(41,240,564)
(2,770,339)
(60,805)
(34,771)
(245,288)
(762,046)
(1 ,823,466)
(27,855)
(6,872,046)
(26,472)
0
(14,154,643)
(185,000)
(3,000,000)
(78,041)
(131,784)
(960,522)
(277,825)
(401,312)
(69,158)
(25,271)
(8,600)
(3,268)
(28,730)
(420,289)
(700,000)
(25,240)
(131 ,806,537)
(92, 124,244)
(223,930, 781)
(15,000,000)
(12,349,980)
(191 ,837)
(2,440,646)
(375,047)
(19,503,258)
(162, 136,247)
(30,467, 142)
(19,925,175)
(1 ,970,814)
(542,678)
(94,422)
(22,248,623)
Redevelopment Agency-City Center/Historic Convention Village
Summary of Cash Basis Transactions by Expenditure Type
Fiscal Years 1994-2012
Prior Years FY 2012
Total
Rev./Expend.
TOTAL EXPENDITURES (493,353,365) (17,823,285) $ (511,176,650)
ENDING CASH/INVSTMT. BALANCE $ 68,824,841 ~$==8=7=,9=9~1 ·=52=9=
CHECK & WIRE TRANSFER
REGISTER
SORTED BY
PROJECT & TYPE OF
EXPENDITURE
FOR THE MONTH ENDED
MAY 31,2012
E
D
I
•
•
m
r
e
w
Wi
r
e
11
/
1
5
/
1
1
Wi
r
e
11
/
1
5
/
1
1
J/
E
02
/
0
1
/
1
2
28
4
2
.1
0
/
0
4
/
1
1
28
4
3
10
/
0
4
/
1
1
28
7
1
10
/
1
3
/
1
1
28
7
2
10
/
1
3
/
1
1
28
4
8
10
/
0
6
/
1
1
29
2
8
12
/
0
8
/
1
1
29
9
5
01
/
1
2
/
1
2
30
3
4
01
/
3
1
1
1
2
30
5
0
02
/
0
9
/
1
2
32
7
6
05
/
2
2
/
1
2
29
0
8
11
/
1
5
/
1
1
29
7
7
12
/
2
9
/
1
1
29
7
8
12
/
2
9
/
1
1
29
7
9
12
/
2
9
/
1
1
30
4
2
02
/
0
2
/
1
2
30
7
5
02
/
2
3
/
1
2
31
0
4
03
/
0
6
/
1
2
31
1
3
03
/
1
3
/
1
2
31
9
7
04
/
2
4
/
1
2
32
2
1
05
/
0
1
/
1
2
32
8
9
05
/
3
1
/
1
2
Au
t
o
12
/
3
1
/
1
1
Au
t
o
01
/
2
3
/
1
2
Au
t
o
02
/
2
1
/
1
2
Au
t
o
03
/
2
0
/
1
2
Au
t
o
04
/
1
9
/
1
2
Wi
r
e
10
/
0
4
/
1
1
Au
t
o
05
/
1
8
/
1
2
WI
R
E
10
/
1
1
/
1
1
WI
R
E
03
/
2
9
/
1
2
US
Ba
n
k
,
NA
US
Ba
n
k
,
NA
Pa
y
e
e
Co
r
r
e
c
t
i
o
n
-
Cr
e
a
t
e
d
Du
e
to
/
F
r
o
m
Fo
r
m
t
e
c
Wa
t
e
r
Pr
o
d
u
c
t
s
Of
f
i
c
e
Ma
x
Bl
o
o
m
&
Mi
n
s
k
e
r
Ja
c
o
b
15
3
5
Pr
o
p
e
r
t
i
e
s
,
In
c
.
In
t
e
r
n
a
t
i
o
n
a
l
Da
t
a
De
p
o
s
i
t
o
r
y
In
t
e
r
n
a
t
i
o
n
a
l
Da
t
a
De
p
o
s
i
t
o
r
y
In
t
e
r
n
a
t
i
o
n
a
l
Da
t
a
De
p
o
s
i
t
o
r
y
In
t
e
r
n
a
t
i
o
n
a
l
Da
t
a
De
p
o
s
i
t
o
r
y
In
t
e
r
n
a
t
i
o
n
a
l
Da
t
a
De
p
o
s
i
t
o
r
y
In
t
e
r
n
a
t
i
o
n
a
l
Da
t
a
De
p
o
s
i
t
o
r
y
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
St
r
a
t
e
g
i
c
Ad
v
i
s
o
r
y
Gr
o
u
p
St
r
a
t
e
g
i
c
Ad
v
i
s
o
r
y
Gr
o
u
p
St
r
a
t
e
g
i
c
Ad
v
i
s
o
r
y
Gr
o
u
p
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Cu
t
w
a
t
e
r
In
v
e
s
t
o
r
Se
r
v
i
c
e
s
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Fi
d
u
c
i
a
r
y
Tr
u
s
t
In
t
e
r
n
a
t
i
o
n
a
l
Su
n
t
r
u
s
t
Fi
d
u
c
i
a
r
y
Tr
u
s
t
In
t
e
r
n
a
t
i
o
n
a
l
Fi
d
u
c
i
a
r
y
Tr
u
s
t
In
t
e
r
n
a
t
i
o
n
a
l
TO
T
A
L
AD
M
I
N
I
S
T
R
A
T
I
O
N
28
6
5
10
/
1
3
/
1
1
Th
e
Ch
i
l
d
r
e
n
'
s
Tr
u
s
t
28
8
4
10
/
2
5
/
1
1
Th
e
Ch
i
l
d
r
e
n
'
s
Tr
u
s
t
28
5
4
10
/
1
3
/
1
1
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
28
6
1
10
/
1
3
/
1
1
Mi
a
m
i
-
D
a
d
e
Co
u
n
t
y
OM
B
TO
T
A
L
IN
T
E
R
L
O
C
A
L
AG
R
E
E
M
E
N
T
AD
M
.
FE
E
S
29
3
4
12
/
0
8
/
1
1
Th
e
Go
r
d
i
a
n
Gr
o
u
p
29
3
7
12
/
1
3
/
1
1
Co
u
n
t
r
y
Bi
l
l
La
w
n
Ma
i
n
t
e
n
a
n
c
e
29
4
1
12
/
1
3
/
1
1
Jo
e
Bl
a
i
r
Ga
r
d
e
n
Su
p
p
l
y
29
4
2
12
/
1
3
/
1
1
Lu
k
e
s
Sa
w
g
r
a
s
s
La
n
d
s
c
a
p
e
29
4
6
12
/
1
3
/
1
1
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
29
4
9
12
/
1
3
/
1
1
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
29
5
3
12
/
1
5
/
1
1
Co
u
n
t
r
y
Bi
l
l
La
w
n
Ma
i
n
t
e
n
a
n
c
e
29
5
9
12
/
1
5
/
1
1
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
29
6
3
12
/
1
5
/
1
1
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
29
9
2
01
/
1
0
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
29
9
4
01
/
1
0
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
30
1
1
01
/
1
9
/
1
2
Lu
k
e
s
Sa
w
g
r
a
s
s
La
n
d
s
c
a
p
e
30
1
6
01
/
1
9
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
~e
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
'!
m
t
i
i
i
T
i
l
5,
0
0
0
.
0
0
75
0
.
0
0
(5
,
7
5
0
.
0
0
)
0.
0
0
77
4
.
4
5
18
9
.
0
6
96
3
.
5
1
12
,
3
5
0
.
4
8
7,
5
0
0
.
0
0
19
,
8
5
0
.
4
8
18
7
.
6
5
94
.
0
8
59
.
5
4
47
.
0
4
68
.
1
1
47
.
5
5
50
3
.
9
7
2,
4
1
4
.
0
4
1,
1
2
9
.
0
4
1,
1
2
5
.
5
3
72
,
0
0
2
.
0
4
25
,
5
3
7
.
4
6
26
,
8
7
0
.
5
5
1,
1
2
7
.
9
1
1,
1
2
0
.
5
9
1,
1
1
9
.
0
6
2,
0
1
0
.
6
8
2,
2
1
8
.
7
2
64
5
.
8
4
28
2
.
1
5
58
3
.
3
2
68
4
.
1
4
84
1
.
5
1
93
6
.
2
3
74
7
.
7
8
14
1
,
3
9
6
.
5
9
9,
5
7
7
.
5
3
78
,
5
5
4
.
0
8
88
,
1
3
1
.
6
1
25
0
,
8
4
6
.
1
6
1,
4
7
4
,
8
3
0
.
0
0
25
.
0
0
1 ,4
7
4,
8
5
5
.
0
0
25
3
,
5
3
1
.
3
5
22
1
,
7
8
2
.
4
3
47
5
,
3
1
3
.
7
8
1,
9
5
0
,
1
6
8
.
7
8
35
7
.
9
6
90
.
0
0
67
.
8
1
41
.
6
2
27
6
.
1
6
75
0
.
0
0
90
.
0
0
27
6
.
1
6
25
,
4
8
0
.
9
0
6,
4
8
3
.
0
0
1,
3
2
7
.
8
0
41
.
6
2
13
,
8
8
4
.
3
0
Ty
p
e
o
f
Ex
p
e
n
s
e
Tr
u
s
t
e
e
Fe
e
s
20
0
5
Se
r
i
e
s
A
&
B
Tr
u
s
t
e
e
F es
s
re
f
u
n
d
i
n
g
se
r
i
e
s
19
9
6
A
an
d
19
9
8
B
Bo
n
d
s
Co
r
r
e
c
t
i
o
n
-
Cr
e
a
t
e
d
Du
e
to
/
F
r
o
m
Of
f
i
c
e
Su
p
p
l
i
e
s
Of
f
i
c
e
Ma
x
-
O
f
f
i
c
e
Su
p
p
l
i
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Le
g
a
l
Se
r
v
i
c
e
s
-
Re
:
Ja
c
o
b
15
3
5
Po
p
e
r
t
i
e
s
,
In
c
.
Se
t
t
l
e
m
e
n
t
Ag
r
e
e
m
e
n
t
Fi
l
e
St
o
r
a
g
e
Fi
l
e
St
o
r
a
g
e
Fi
l
e
St
o
r
a
g
e
Fi
l
e
St
o
r
a
g
e
Fi
l
e
St
o
r
a
g
e
Fi
l
e
St
o
r
a
g
e
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
Fo
r
Se
p
t
e
m
b
e
r
20
1
1
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
Fo
r
No
v
e
m
b
e
r
20
1
1
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
Fo
r
Oc
t
o
b
e
r
20
1
1
St
r
a
t
e
g
i
c
Ad
v
i
s
r
o
t
Gr
o
u
p
fo
r
co
n
s
u
l
t
i
n
g
se
r
v
i
c
e
s
re
l
a
t
i
v
e
tt
o
th
e
ex
p
a
n
s
i
o
n
St
r
a
t
e
g
i
c
Ad
v
i
s
r
o
t
Gr
o
u
p
fo
r
co
n
s
u
l
t
i
n
g
se
r
v
i
c
e
s
re
l
a
t
i
v
e
tt
o
th
e
ex
p
a
n
s
i
o
n
St
r
a
t
e
g
i
c
Ad
v
i
s
r
o
t
Gr
o
u
p
fo
r
co
n
s
u
l
t
i
n
g
se
r
v
i
c
e
s
re
l
a
t
i
v
e
tt
o
th
e
ex
p
a
n
s
i
o
n
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
Fo
r
De
c
e
m
b
e
r
20
1
1
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
Fo
r
Ja
n
20
1
2
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
Fo
r
Fe
b
r
u
a
r
y
20
1
2
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
fo
r
Ma
r
c
h
20
1
2
Ad
v
i
s
o
r
y
Se
r
v
i
c
e
s
-
fo
r
Ap
r
i
l
20
1
2
Ba
n
k
An
a
l
y
s
i
s
Fe
e
s
-
De
c
e
m
b
e
r
Ba
n
k
An
a
l
y
s
i
s
Fe
e
s
-
Ja
n
u
a
r
y
Ba
n
k
An
a
l
y
s
i
s
Fe
e
s
-
Fe
b
r
u
a
r
y
Ba
n
k
An
a
l
y
s
i
s
Fe
e
s
-
Ma
r
c
h
Ba
n
k
An
a
l
y
s
i
s
Fe
e
s
-
Ap
r
i
l
Qu
a
r
t
e
r
l
y
Se
r
v
i
c
e
Fe
e
Ba
n
k
An
a
l
y
s
i
s
Fe
e
s
-
Ma
y
Ac
c
r
u
e
d
in
t
e
r
e
s
t
on
in
v
e
s
t
m
e
n
t
s
pu
r
c
h
a
s
e
d
Ac
c
r
u
e
d
in
t
e
r
e
s
t
on
in
v
e
s
t
m
e
n
t
s
pu
r
c
h
a
s
e
d
Re
i
m
b
u
r
s
e
m
e
n
t
fo
r
Pa
y
m
e
n
t
-
FY
20
0
1
0
/
1
1
Re
i
m
b
u
r
s
e
m
e
n
t
fo
r
St
o
p
Pa
y
m
e
n
t
Fe
e
Fi
s
c
a
l
Ye
a
r
11
Ad
m
i
n
.
Fe
e
(l
n
t
e
r
l
o
c
a
l
)
Fi
s
c
a
l
Ye
a
r
10
Ad
m
i
n
.
Fe
e
(l
n
t
e
r
l
o
c
a
l
)
ln
s
t
a
l
l
a
t
i
o
n
o
f
th
e
HT
F
S
Li
n
c
o
l
n
Rd
fr
o
m
Dr
e
x
e
l
to
Mi
c
h
i
g
a
n
Oc
t
o
b
e
r
Ma
i
n
t
a
n
e
n
c
e
Eq
u
i
p
m
e
n
t
Re
p
a
i
r
&
Se
r
v
i
c
i
n
g
Oc
t
o
b
e
r
Ma
i
n
t
a
n
e
n
c
e
Oc
t
o
b
e
r
Ma
i
n
t
a
n
e
n
c
e
Sp
e
c
i
a
l
Ev
e
n
t
s
@
So
u
n
d
s
c
a
p
e
No
v
e
m
b
e
r
Ma
i
n
t
e
n
a
n
c
e
Mo
w
i
n
g
se
r
v
i
c
e
fo
r
So
u
t
h
Be
a
c
h
La
n
d
s
c
a
p
e
Bo
a
r
d
w
a
l
k
an
d
So
u
n
d
s
c
a
p
e
Mo
w
i
n
g
se
r
v
i
c
e
fo
r
So
u
t
h
Be
a
c
h
Gr
o
u
n
d
Ma
i
n
t
e
n
a
n
c
e
Gr
o
u
p
C
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
RD
A
Sp
o
i
l
s
Gr
o
u
p
B
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Project or N/A
-1
6
8
-
1
9
8
5
RD
A
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
RD
A
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
RD
A
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
RD
A
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
RD
A
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
36
5
-
8
0
0
0
Ad
m
i
n
i
s
t
r
a
t
i
o
n
36
5
-
8
0
0
0
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
Ad
m
i
n
i
s
t
r
a
t
i
o
n
16
8
-
1
9
8
5
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
36
5
-
8
0
0
0
Ad
m
i
n
i
s
t
r
a
t
i
o
n
36
5
-
8
0
0
0
Ad
m
i
n
i
s
t
r
a
t
i
o
n
36
5
-
8
0
0
0
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ad
m
i
n
i
s
t
r
a
t
i
o
n
Ac
c
r
u
e
d
In
v
e
s
t
.
In
t
e
r
e
s
t
Ac
c
r
u
e
d
In
v
e
s
t
.
In
t
e
r
e
s
t
ln
t
e
r
l
o
c
a
l
Ag
r
e
e
m
e
n
t
ln
t
e
r
l
o
c
a
l
Ag
r
e
e
m
e
n
t
ln
t
e
r
l
o
c
a
l
Ag
r
e
e
.
Ad
m
.
Fe
e
s
ln
t
e
r
l
o
c
a
l
Ag
r
e
e
.
Ad
m
.
Fe
e
s
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
1
E
m
i
l
•
•
m
l
!
W
30
2
1
01
1
2
4
/
1
2
"!!c~o
·
u
~
n
t
~
r
y
~
B
~
i
~
I
I
'
!
'
L
I
I
I
I
a
w
01 n Ma
i
n
t
e
n
a
n
c
e
Pa
y
e
e
30
2
3
01
/
2
4
/
1
2
Jo
e
Bl
a
i
r
Ga
r
d
e
n
Su
p
p
l
y
30
2
6
01
1
2
4
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
30
3
3
01
/
3
1
/
1
2
ln
t
e
r
g
r
a
t
e
d
Tu
r
f
Ca
r
e
30
3
6
01
/
3
1
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
30
3
7
01
1
3
1
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
30
5
7
02
/
1
4
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
30
5
9
02
/
1
4
/
1
2
Co
u
n
t
r
y
Bi
l
l
La
w
n
Ma
i
n
t
e
n
a
n
c
e
30
6
3
02
/
1
4
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
30
6
6
02
/
1
6
/
1
2
ln
t
e
r
g
r
a
t
e
d
Tu
r
f
Ca
r
e
30
7
0
02
/
1
6
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
30
8
3
02
/
2
8
/
1
2
Fl
o
r
i
d
a
La
w
n
Se
r
v
i
c
e
30
8
4
02
/
2
8
/
1
2
Jo
e
Bl
a
i
r
Ga
r
d
e
n
Su
p
p
l
y
30
8
6
02
/
2
8
/
1
2
Le
h
m
a
n
Pi
p
e
&
Pl
u
m
b
i
n
g
30
8
7
02
/
2
8
/
1
2
Lu
k
e
s
Sa
w
g
r
a
s
s
La
n
d
s
c
a
p
e
30
9
8
02
/
2
8
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
31
0
5
03
/
0
6
/
1
2
Ev
e
r
g
l
a
d
e
s
En
v
i
r
o
n
m
e
n
t
31
0
8
03
/
0
6
/
1
2
To
t
a
l
Pa
c
k
,
In
c
31
1
2
03
/
1
3
/
1
2
Co
u
n
t
r
y
Bi
l
l
La
w
n
Ma
i
n
t
e
n
a
n
c
e
31
1
5
03
/
1
3
/
1
2
ln
t
e
r
g
r
a
t
e
d
Tu
r
f
Ca
r
e
31
1
6
03
/
1
3
/
1
2
Lu
k
e
s
Sa
w
g
r
a
s
s
La
n
d
s
c
a
p
e
31
3
0
03
/
2
2
/
1
2
Fl
o
r
i
d
a
La
w
n
Se
r
v
i
c
e
31
3
6
03
/
2
2
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
31
3
7
03
/
2
2
/
2
0
1
2
1
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
31
6
2
04
/
0
5
/
1
2
Ev
e
r
g
l
a
d
e
s
En
v
i
r
o
n
m
e
n
t
31
6
3
04
/
0
5
/
1
2
ln
t
e
r
g
r
a
t
e
d
Tu
r
f
Ca
r
e
31
6
4
04
/
0
5
/
1
2
Le
h
m
a
n
Pi
p
e
&
Pl
u
m
b
i
n
g
31
6
5
04
/
0
5
/
1
2
Lu
k
e
s
Sa
w
g
r
a
s
s
La
n
d
s
c
a
p
e
31
6
8
04
/
0
5
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
31
7
0
04
/
0
5
/
1
2
To
t
a
l
Pa
c
k
,
In
c
31
7
1
04
/
0
5
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
31
8
5
04
/
1
7
/
1
2
Co
u
n
t
r
y
Bi
l
l
La
w
n
Ma
i
n
t
e
n
a
n
c
e
31
8
7
04
/
1
7
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
31
8
8
04
/
1
7
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
32
3
5
05
/
1
0
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
32
3
7
05
/
1
5
/
1
2
Di
a
m
o
n
d
R
Fe
r
t
i
l
i
z
e
r
Co
32
4
0
05
/
1
5
/
1
2
Jo
e
Bl
a
i
r
Ga
r
d
e
n
Su
p
p
l
y
32
4
1
05
/
1
5
/
1
2
Lu
k
e
s
Sa
w
g
r
a
s
s
La
n
d
s
c
a
p
e
32
4
6
05
/
1
5
/
1
2
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
32
4
8
05
/
1
5
/
1
2
To
t
a
l
Pa
c
k
,
In
c
32
5
0
05
/
1
5
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
32
8
0
05
/
2
9
/
1
2
Co
u
n
t
r
y
Bi
l
l
La
w
n
Ma
i
n
t
e
n
a
n
c
e
32
8
3
05
/
2
9
/
1
2
ln
t
e
r
g
r
a
t
e
d
Tu
r
f
Ca
r
e
32
8
4
05
/
2
9
/
1
2
Jo
e
Bl
a
i
r
Ga
r
d
e
n
Su
p
p
l
y
32
8
5
05
/
2
9
/
1
2
Le
h
m
a
n
Pi
p
e
&
Pl
u
m
b
i
n
g
32
8
7
05
/
2
9
/
1
2
To
t
a
l
Pa
c
k
,
In
c
32
8
8
05
/
2
9
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
32
9
1
05
/
3
1
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
28
4
7
28
5
3
28
7
8
29
1
1
29
3
5
30
0
3
30
0
4
30
1
7
30
1
7
30
1
9
30
2
8
30
5
7
30
5
8
30
5
8
30
6
5
30
7
2
31
2
1
31
3
5
31
5
3
31
4
2
31
8
0
10
/
0
4
/
1
1
10
/
1
1
/
1
1
10
/
1
8
/
1
1
11
/
2
2
/
1
1
12
/
0
8
/
1
1
01
/
1
7
/
1
2
01
/
1
7
/
1
2
01
/
1
9
/
1
2
01
1
1
9
/
1
2
01
/
1
9
/
1
2
01
/
2
6
/
1
2
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
2
1
/
1
2
03
/
1
5
/
1
2
03
/
2
2
/
1
2
03
/
2
9
/
1
2
03
/
2
7
/
1
2
04
/
1
2
/
1
2
TO
T
A
L
GR
E
E
N
S
P
A
C
E
MA
N
A
G
E
M
E
N
T
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
i
n
g
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
De
p
t
.
of
Co
m
m
u
n
i
t
y
Af
f
a
i
r
s
Fl
o
r
i
d
a
Re
d
e
v
e
l
o
p
m
e
n
t
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
ln
t
e
r
n
a
t
i
o
n
Da
t
a
De
p
o
s
i
t
o
r
y
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Of
f
i
c
e
De
p
o
t
ln
t
e
r
n
a
t
i
o
n
Da
t
a
De
p
o
s
i
t
o
r
y
St
r
a
t
e
g
i
c
Ad
v
i
s
o
r
y
Of
f
i
c
e
De
p
o
t
Fa
c
c
h
i
n
a
Co
n
s
t
r
u
c
t
i
o
n
ln
t
e
r
n
a
t
i
o
n
Da
t
a
De
p
o
s
i
t
o
r
y
Re
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
r!
1
'
i
i
'
T
i
1
l
1
i
'
l
45
.
0
0
21
4
.
7
0
1,
5
0
0
.
0
0
1,
1
9
0
.
0
0
27
6
.
1
6
17
,
7
4
3
.
8
3
15
,
0
5
2
.
7
6
45
.
0
0
2,
5
9
3
.
2
0
95
.
0
0
5,
1
2
1
.
1
2
1,
4
4
9
.
5
0
20
6
.
5
4
83
5
.
5
0
83
.
2
4
2,
7
3
1
.
2
8
3,
0
8
2
.
1
9
1,
1
0
8
.
1
9
45
.
0
0
95
.
0
0
41
.
6
2
77
5
.
0
0
2,
5
9
3
.
2
0
2,
7
5
2
.
7
5
94
0
.
5
0
95
.
0
0
14
6
.
4
9
41
.
6
2
13
8
.
0
8
68
7
.
7
1
5,
1
8
7
.
2
4
90
.
0
0
2,
8
6
9
.
3
6
1,
0
8
0
.
0
0
75
0
.
0
0
51
0
.
0
0
60
2
.
8
0
41
.
6
2
2,
5
9
3
.
2
0
91
7
.
9
6
64
,
7
2
1
.
0
3
45
.
0
0
95
.
0
0
26
3
.
1
0
56
.
3
8
34
.
0
2
97
5
.
0
0
11
2
.
5
0
19
1
,
8
3
6
.
7
2
19
1
,
8
3
6
.
7
2
10
,
7
7
1
.
6
6
28
,
3
2
9
.
8
1
10
,
5
7
7
.
6
0
13
,
8
5
8
.
2
6
27
,
9
2
7
.
0
0
20
0
.
0
0
59
5
.
0
0
95
2
,
3
7
5
.
7
7
61
5
.
4
0
38
6
.
8
3
94
.
0
8
3,
4
3
1
.
9
3
24
2
.
0
0
4,
3
5
4
.
7
4
20
5
.
9
3
32
9
.
6
4
47
.
5
5
7,
6
9
4
.
9
9
28
5
.
0
0
5,
5
8
3
.
9
7
47
.
5
5
Ty
p
e
of
Ex
p
e
n
s
e
De
c
e
m
b
e
r
Ma
i
n
t
a
n
c
e
Eq
u
i
p
m
e
n
t
Re
p
a
i
r
&
Se
r
v
i
c
i
n
g
La
n
d
s
c
a
p
e
Bo
a
r
d
w
a
l
k
an
d
So
u
n
d
s
c
a
p
e
So
u
n
d
s
c
a
p
e
Fe
r
t
i
g
a
t
i
o
n
Sy
s
t
e
m
in
s
t
a
l
l
a
t
i
o
n
fo
r
T
ur
f
Mo
w
i
n
g
se
r
v
i
c
e
fo
r
So
u
t
h
Be
a
c
h
Gr
o
u
n
d
Ma
i
n
t
e
n
a
n
c
e
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
1
an
d
2
(J
A
N
-
2
0
1
2
)
Mo
w
i
n
g
se
r
v
i
c
e
Mi
d
d
l
e
Be
a
c
h
-
3
RD
A
si
t
e
s
De
c
e
m
b
e
r
20
1
1
-
Ma
i
n
t
a
n
c
e
So
u
n
d
s
c
a
p
e
Fe
r
t
i
g
a
t
i
o
n
Sy
s
t
e
m
in
s
t
a
l
l
a
t
i
o
n
fo
r
Tu
r
f
Gr
o
u
n
d
Ma
i
n
t
e
n
a
n
c
e
Pu
r
c
h
a
s
e
Pl
a
n
t
Ma
t
e
r
i
a
l
Li
n
c
o
l
n
Rd
Ma
l
l
Eq
u
i
p
m
e
n
t
Re
p
a
i
r
&
Se
r
v
i
c
i
n
g
Pu
r
c
h
a
s
e
of
lr
r
i
g
pa
r
t
s
/
S
u
p
p
l
i
e
s
In
h
o
u
s
e
Ja
n
&
Fe
b
/2
0
1
2
Ma
i
n
t
e
n
a
n
c
e
Ja
n
u
a
r
y
20
1
2
-
Ma
i
n
t
a
n
c
e
Pl
a
n
t
s
Ma
t
e
r
i
a
l
fo
r
Li
n
c
o
l
n
Ro
a
d
Pa
c
k
i
n
g
su
p
p
l
i
e
s
Mo
w
i
n
g
se
r
v
i
c
e
Mi
d
d
l
e
Be
a
c
h
-
3
RD
A
si
t
e
s
So
u
n
d
s
c
a
p
e
Fe
r
t
i
g
a
t
i
o
n
Sy
s
t
e
m
in
s
t
a
l
l
a
t
i
o
n
fo
r
Tu
r
f
Gr
o
u
p
C
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
RD
A
Sp
o
i
l
s
Pu
r
c
h
a
s
e
Pl
a
n
t
Ma
t
e
r
i
a
l
Li
n
c
o
l
n
Rd
Ma
l
l
Gr
o
u
p
A
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
RD
A
Be
a
c
h
w
a
l
k
Ir
r
i
g
a
t
i
o
n
Re
p
a
i
r
-
Me
r
i
d
i
a
n
Li
n
c
o
l
n
La
n
e
s
Pl
a
n
t
s
Ma
t
e
r
i
a
l
fo
r
Li
n
c
o
l
n
Ro
a
d
So
u
n
d
s
c
a
p
e
Fe
r
t
i
g
a
t
i
o
n
Sy
s
t
e
m
in
s
t
a
l
l
a
t
i
o
n
fo
r
Tu
r
f
Pu
r
c
h
a
s
e
of
lr
r
i
g
pa
r
t
s
/
S
u
p
p
l
i
e
s
In
ho
u
s
e
Gr
o
u
p
C
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
RD
A
Sp
o
i
l
s
Mo
w
i
n
g
Se
r
v
i
c
e
fo
r
So
u
t
h
Be
a
c
h
29
Si
t
e
s
Pa
c
k
i
n
g
su
p
p
l
i
e
s
Ad
d
i
t
i
o
n
a
l
la
b
o
r
at
So
u
n
d
s
c
a
p
e
Pa
r
k
Mo
w
i
n
g
se
r
v
i
c
e
Mi
d
d
l
e
Be
a
c
h
-
3
RD
A
si
t
e
s
Gr
o
u
p
A
La
n
d
s
c
a
p
i
n
g
an
d
Mo
w
i
n
g
Se
r
v
i
c
e
fo
r
So
u
t
h
Be
a
c
h
29
Si
t
e
s
Gr
o
u
p
B
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
So
u
n
d
s
c
a
p
e
-
Wa
l
l
c
a
s
t
Pu
r
c
h
a
s
e
:
Pe
s
t
i
c
i
d
e
s
/
H
e
r
b
i
c
i
d
e
s
/
F
e
r
t
i
l
z
e
r
Eq
u
i
p
m
e
n
t
Re
p
a
i
r
&
Se
r
v
i
c
i
n
g
CM
B
#
35
-
0
9
/
1
0
Sp
o
i
l
s
Ci
t
y
w
i
d
e
La
n
d
s
c
a
p
e
Ap
r
i
l
Ma
i
n
t
.
Be
a
c
h
w
a
l
k
Pu
r
c
h
a
s
e
Ja
n
i
t
o
r
i
a
l
Su
p
p
l
i
e
s
Ma
i
n
t
e
n
a
n
c
e
So
u
n
d
s
c
a
p
e
Ap
r
i
l
Mo
w
i
n
g
Ap
r
i
l
Se
r
v
i
c
e
s
Eq
u
i
p
m
e
n
t
Re
p
a
i
r
&
Se
r
v
i
c
i
n
g
Pu
r
c
h
a
s
e
of
Ir
r
i
g
a
t
i
o
n
Pa
r
t
s
/
S
u
p
p
l
i
e
s
In
h
o
u
s
e
Pu
r
c
h
a
s
e
Ja
n
i
t
o
r
i
a
l
Su
p
p
l
i
e
s
Ge
n
e
r
a
l
Re
p
a
i
r
s
-
So
u
n
d
s
c
a
p
e
/
l
r
r
i
g
a
t
i
o
n
La
b
o
r
Sp
e
c
i
a
l
Ev
e
n
t
at
So
u
n
d
s
c
a
p
e
pa
r
k
4/
1
9
/
2
0
1
2
Ma
i
n
t
e
n
a
n
c
e
of
th
e
11
0
0
Bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
as
pr
o
v
i
d
e
d
in
Se
c
t
i
o
n
52
-
So
u
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
Ma
i
n
t
e
n
a
n
c
e
of
th
e
11
0
0
Bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
as
pr
o
v
i
d
e
d
in
Se
c
t
i
o
n
52
-
Ma
i
n
t
e
n
a
n
c
e
of
th
e
11
0
0
Bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
as
pr
o
v
i
d
e
d
in
Se
c
t
i
o
n
52
-
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
0
0
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
Du
e
s
&
Me
m
b
e
r
s
h
i
p
s
(
Sp
e
c
i
a
l
Di
s
t
r
i
c
t
Fe
e
s
)
FR
A
Re
n
e
w
a
l
Sa
n
i
t
a
t
i
o
n
(A
p
r
i
l
-
S
e
p
t
)
an
d
Gr
e
e
n
S
p
a
c
e
Ma
n
a
g
e
m
e
n
t
Ch
a
r
g
e
s
Ce
n
t
r
a
l
Se
r
v
i
c
e
Ch
a
r
g
e
b
a
c
k
s
Se
l
f
Fu
n
d
e
d
Me
d
i
c
a
l
&
De
n
t
a
l
Su
b
s
i
d
y
FY
20
1
1
ID
D
St
o
r
a
g
e
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
1
an
d
2
(J
A
N
-
2
0
1
2
)
Pe
n
s
i
o
n
ch
a
r
g
e
s
De
c
/
1
1
Pr
o
p
.
Mg
m
t
.
ch
a
r
g
e
s
Se
p
-
O
c
t
-
N
o
v
/
2
0
1
1
Ce
n
t
r
a
l
Se
r
v
i
c
e
Ch
a
r
g
e
b
a
c
k
s
-
JE
03
-
0
1
9
De
c
20
1
1
(R
D
A
)
Of
f
i
c
e
su
p
p
l
i
e
s
fo
r
pr
o
g
r
a
m
of
f
i
c
e
ID
D
St
o
r
a
g
e
Co
n
s
u
l
t
i
n
g
S
e
r
v
i
c
e
s
(R
D
A
)
Of
f
i
c
e
su
p
p
l
i
e
s
fo
r
pr
o
g
r
a
m
of
f
i
c
e
Ex
p
l
o
r
a
t
i
o
n
of
th
e
50
1
Li
n
c
o
l
n
Rd
4
in
c
h
wa
t
e
r
se
r
v
i
c
e
va
l
u
e
ID
D
St
o
r
a
g
e
Project or N/A
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
G
r
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
16
8
-
9
9
6
6
Ci
t
y
Ce
n
t
e
r
Gr
e
e
n
s
p
a
c
e
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
2
28
5
1
29
0
1
29
3
5
29
3
8
29
8
3
29
8
7
29
8
8
29
9
3
29
9
9
30
1
7
30
1
7
30
1
7
30
1
8
30
1
9
30
4
8
30
5
4
30
5
5
30
5
7
30
5
8
30
5
8
30
8
1
31
0
9
31
2
8
31
5
9
31
6
1
31
8
3
32
3
1
32
3
8
32
5
3
32
5
4
32
5
9
28
4
4
28
4
5
28
5
9
28
6
4
28
8
0
28
8
1
28
8
5
28
9
0
28
9
4
29
0
0
29
1
6
29
2
5
29
2
7
29
2
9
29
4
5
29
6
6
29
6
7
29
6
8
29
7
4
29
9
0
30
0
2
30
0
8
30
1
7
30
1
7
30
1
7
30
1
7
30
1
8
30
1
9
30
2
4
30
3
2
30
3
9
10
/
1
1
/
1
1
11
/
0
8
/
1
1
12
/
0
8
/
1
1
12
/
1
3
/
1
1
01
/
0
4
/
1
2
01
/
0
5
/
1
2
01
/
1
0
/
1
2
01
/
1
0
/
1
2
01
/
1
2
/
1
2
01
/
1
9
/
1
2
01
1
1
9
/
1
2
01
1
1
9
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
02
/
0
9
/
1
2
02
/
0
9
/
1
2
02
/
0
9
/
1
2
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
2
8
/
1
2
03
/
0
8
/
1
2
03
/
2
0
/
1
2
04
/
0
3
/
1
2
04
/
0
5
/
1
2
04
/
1
2
/
1
2
05
/
0
8
/
1
2
05
/
1
5
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
10
/
0
4
/
1
1
10
/
0
4
/
1
1
10
/
1
3
/
1
1
10
/
1
3
/
1
1
10
/
2
0
/
1
1
10
/
2
0
/
1
1
10
/
2
6
/
1
1
10
/
2
7
/
1
1
11
/
0
1
/
1
1
11
/
0
8
/
1
1
11
1
2
9
/
1
1
12
/
0
6
/
1
1
12
/
0
8
/
1
1
12
/
0
8
/
1
1
12
/
3
1
/
1
1
12
/
2
0
/
1
1
12
/
2
0
/
1
1
12
/
2
0
/
1
1
12
/
2
2
/
1
1
01
/
1
0
/
1
2
01
/
1
7
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
01
/
1
9
/
1
2
01
/
2
4
/
1
2
01
/
2
7
/
1
2
02
/
0
2
/
1
2
Ch
r
i
s
t
i
n
a
De
l
v
a
t
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
y
e
e
TO
T
A
L
CA
P
I
T
A
L
MA
I
N
T
E
N
A
N
C
E
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
Ki
n
g
Pu
m
p
s
,
In
c
.
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
Ci
l
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
Sw
a
g
e
T
-S
h
i
r
t
s
,
In
c
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
Di
a
m
o
n
d
R.
Fe
r
t
i
l
i
z
e
r
Co
.
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
UI
A
Ma
n
a
g
e
m
e
n
t
,
LL
C
El
Ta
r
o
Ex
t
e
r
m
i
n
a
t
o
r
Co
r
p
.
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
TO
T
A
L
SO
U
T
H
BE
A
C
H
AR
E
A
PR
O
P
E
R
T
Y
MG
M
T
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Mi
a
m
i
Be
a
c
h
Bi
c
y
c
l
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Ne
x
t
e
i
/
S
p
r
i
n
t
Ve
r
i
z
o
n
Wi
r
e
l
e
s
s
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Ve
r
i
z
o
n
Wi
r
e
l
e
s
s
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ad
v
a
n
c
e
Pu
b
l
i
c
Sa
f
e
t
y
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ku
s
t
o
m
Si
n
g
a
l
s
,
In
c
.
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Mi
a
m
i
Be
a
c
h
Bi
c
y
c
l
e
Ne
x
t
e
i
/
S
p
r
i
n
t
Ra
d
i
o
t
r
o
n
i
c
s
In
c
.
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ne
x
t
e
i
/
S
p
r
i
n
t
Ne
x
t
e
i
/
S
p
r
i
n
t
Ma
t
t
h
e
w
Be
n
d
e
r
&
Co
m
p
a
n
y
,
In
c
.
Re
d
e
v
e
l
o
p
m
e
n
t
A
g
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
'!
T
i
i
t
i
l
l
l
i
l
59
.
5
5
29
,
3
5
6
.
0
5
61
7
.
7
9
1,
0
9
7
,
9
8
8
.
1
0
1,
0
9
7
,
9
8
8
.
1
0
19
0
.
0
0
2,
5
2
5
.
0
0
6,
5
7
3
.
0
0
38
0
.
0
0
38
.
0
0
2,
3
4
4
.
5
5
15
2
.
0
0
10
,
3
0
2
.
3
3
22
,
0
2
8
.
8
4
10
,
3
6
0
.
1
9
1,
7
7
6
.
5
1
38
4
.
6
4
1,
8
2
5
.
7
0
4,
6
9
0
.
5
7
19
0
.
0
0
1,
3
4
4
.
0
0
10
,
2
5
4
.
1
6
29
,
2
4
8
.
4
7
4,
8
9
6
.
7
5
11
1
,
6
8
1
.
3
1
44
8
.
8
6
19
0
.
0
0
17
,
7
9
4
.
2
6
19
0
.
0
0
16
0
.
0
0
10
,
2
6
9
.
9
8
10
,
2
5
4
.
1
6
19
0
.
0
0
15
5
,
7
1
0
.
7
9
13
,
5
5
4
.
6
4
1,
4
8
3
.
7
9
43
1
,
4
3
2
.
5
0
43
1
,
4
3
2
.
5
0
55
,
9
4
2
.
3
9
13
,
6
9
6
.
7
7
82
.
0
0
6,
9
1
0
.
6
6
22
6
.
1
3
56
0
.
1
4
22
5
.
6
2
13
,
9
2
0
.
1
1
56
0
.
1
4
26
4
,
2
4
5
.
3
9
15
7
,
0
1
8
.
2
9
2,
7
5
0
.
0
0
16
6
,
2
1
0
.
8
4
2,
2
5
0
.
0
0
40
,
2
5
8
.
7
3
19
9
.
9
9
22
5
.
9
3
40
0
.
0
0
16
,
6
7
7
.
0
0
41
,
8
4
5
.
5
0
18
5
,
3
4
4
.
2
7
57
1
,
1
7
3
.
7
4
33
,
6
2
3
.
1
3
22
,
5
7
6
.
0
2
1,
7
3
3
.
3
1
1,
0
5
1
.
3
2
4,
1
8
3
.
9
6
83
.
8
4
22
9
.
2
5
22
5
.
9
7
21
8
.
7
2
Ty
p
e
o
f
Ex
p
e
n
s
e
Re
i
m
b
.
E
x
p
-
RF
P
#1
4
-
1
1
1
1
2
Li
n
c
o
l
n
La
n
e
Ci
t
y
Ce
n
t
e
r
Ba
l
l
e
t
Ce
n
t
r
a
l
Se
r
v
i
c
e
Ch
a
r
g
e
b
a
c
k
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Re
p
a
i
r
s
an
d
Ma
i
n
t
e
n
a
n
c
e
70
0
Bl
o
c
k
-
Li
n
c
l
o
n
Ro
a
d
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
0
0
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
-
Bu
y
b
a
c
k
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
0
0
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
An
n
u
a
l
Ma
i
n
t
e
n
a
n
c
e
pr
o
g
r
a
m
Wo
r
k
e
r
s
Ca
m
p
-
Li
a
b
i
l
i
t
y
In
s
u
r
a
n
c
e
Cl
e
a
r
Du
e
to
/
f
r
o
m
Fl
e
e
t
Mg
m
t
Ch
a
r
g
e
b
a
c
k
s
Se
p
t
-
N
o
v
"1
1
Co
m
m
u
n
.
/
R
a
d
i
o
/
C
o
m
p
u
t
e
r
Ch
a
r
g
e
b
a
c
k
s
Se
l
f
Fu
n
d
e
d
Me
d
i
c
a
l
&
De
n
t
a
l
Su
b
s
i
d
y
FY
20
1
1
Se
l
f
Fu
n
d
e
d
Me
d
i
c
a
l
&
De
n
t
a
l
Su
b
s
i
d
y
FY
20
1
1
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Un
i
f
o
r
m
s
pe
r
Un
i
o
n
Re
q
u
i
r
e
m
e
n
t
s
fo
r
RD
A
Li
n
c
o
l
n
Ro
a
d
Em
p
l
o
y
e
e
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
0
0
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
1
an
d
2
(J
A
N
-
2
0
1
2
)
Pe
n
s
i
o
n
ch
a
r
g
e
s
De
c
/
1
1
Cl
e
a
r
Du
e
to
/
f
r
o
m
Pr
o
p
.
Mg
m
t
Ch
a
r
g
e
b
a
c
k
s
Se
p
t
-
O
c
t
-
N
o
v
/
2
0
1
1
Fl
e
e
t
Mg
m
t
Ch
a
r
g
e
b
a
c
k
s
Se
p
t
-
N
o
v
"1
1
J/
E
03
-
0
0
1
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
0
0
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Pe
s
t
i
c
i
d
e
s
/
H
e
r
b
i
c
i
d
e
s
/
F
e
r
t
i
l
i
z
e
r
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
0
0
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
Ma
i
n
t
e
n
a
n
c
e
fo
r
th
e
11
00
bl
o
c
k
of
Li
n
c
o
l
n
Ro
a
d
Ex
t
e
r
m
i
n
a
t
o
r
Se
r
v
i
c
e
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
Ch
a
r
g
e
s
fo
r
Se
r
v
i
c
e
s
Wo
r
k
e
r
s
Ca
m
p
-
Li
a
b
i
l
i
t
y
In
s
u
r
a
n
c
e
Fl
e
e
t
Ma
n
a
g
e
m
e
n
t
Fu
e
l
/
M
a
i
n
t
e
n
a
n
c
e
Ch
a
r
g
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
Se
c
u
r
i
t
y
Se
r
v
i
c
e
Bi
c
y
c
l
e
Re
p
a
i
r
s
an
d
Ma
i
n
t
e
n
a
n
c
e
Se
c
u
r
i
t
y
Se
r
v
i
c
e
Ne
x
t
e
i
/
S
p
r
i
n
t
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
Ai
r
c
a
r
d
s
Re
i
m
b
.
C
M
B
-V
i
s
a
:
Sp
r
i
n
t
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
Ai
r
ca
r
d
s
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
18
,
1
9
,
an
d
20
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
21
an
d
22
An
n
u
a
l
Ma
i
n
t
e
n
a
n
c
e
of
11
po
c
k
e
t
ci
t
a
t
i
o
n
s
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
23
an
d
24
Ex
t
e
n
d
e
d
Wa
r
r
a
n
t
y
fo
r
5
pr
o
la
s
e
r
s
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
Ma
i
n
t
e
n
a
n
c
e
an
d
Re
p
a
i
r
s
of
RD
A
CC
po
l
i
c
e
bi
k
e
s
Pa
t
r
o
l
RD
A
ce
l
l
ph
o
n
e
s
fo
r
No
v
e
m
b
e
r
20
1
1
Ce
r
t
i
f
i
c
a
t
i
o
n
s
of
14
La
s
e
r
s
Un
i
t
an
d
6
Ra
d
a
r
s
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
25
an
d
26
Pe
n
s
i
o
n
Ch
a
r
g
e
s
,
Ov
e
r
t
i
m
e
,
O
P
E
B
Wo
r
k
e
r
s
Ca
m
p
-
Li
a
b
i
l
i
t
y
In
s
u
r
a
n
c
e
Cl
e
a
r
Du
e
to
/
f
r
o
m
Fl
e
e
t
Mg
m
t
Ch
a
r
g
e
b
a
c
k
s
Se
p
t
-
N
o
v
"1
1
Co
m
m
u
n
.
/
R
a
d
i
o
/
C
o
m
p
u
t
e
r
Ch
a
r
g
e
b
a
c
k
s
Sa
l
a
r
i
e
s
Ov
e
r
t
i
m
e
Se
l
f
Fu
n
d
e
d
Me
d
i
c
a
l
&
De
n
t
a
l
Su
b
s
i
d
y
FY
20
1
1
Se
l
f
Fu
n
d
e
d
Me
d
i
c
a
l
&
De
n
t
a
l
Su
b
s
i
d
y
FY
20
1
1
Pa
t
r
o
l
RD
A
ce
l
l
ph
o
n
e
s
fo
r
De
c
e
m
b
e
r
20
1
1
Sp
r
i
n
t
Wi
r
e
l
e
s
s
-
Vi
s
a
Ma
r
t
h
a
Jo
a
n
FL
La
w
En
f
o
r
c
e
m
e
n
t
Ha
n
d
b
o
o
k
Project or N/A
16
8
-
1
9
8
5
Ca
p
i
t
a
l
Ma
i
n
t
e
n
a
n
c
e
16
5
-
1
9
8
5
Ci
t
y
Ce
n
t
e
r
Op
e
r
a
t
i
o
n
16
5
-
1
9
8
5
Ci
t
y
Ce
n
t
e
r
Op
e
r
a
t
i
o
n
So
u
t
h
Be
a
c
h
Ar
e
a
Pr
o
p
e
r
t
y
Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
9
9
6
4
So
u
t
h
Be
a
c
h
Property Management
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
3
.
E
m
l
l
-
·
m
-
30
5
1
30
5
7
30
5
8
30
6
1
30
6
7
30
7
1
30
7
4
30
8
1
30
9
9
31
1
4
31
2
7
31
2
9
31
3
4
31
3
9
31
5
0
31
5
8
31
6
0
31
7
6
31
8
2
31
8
6
31
9
6
32
0
0
32
0
1
32
1
7
32
1
9
32
3
0
32
4
2
32
7
7
32
8
6
32
5
2
32
6
6
32
5
4
32
5
9
32
6
5
32
2
8
32
9
0
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
1
4
/
1
2
02
/
1
6
/
1
2
02
/
2
1
/
1
2
02
/
2
1
/
1
2
02
/
2
8
/
1
2
02
/
2
8
/
1
2
03
/
1
3
/
1
2
03
/
2
0
/
1
2
03
/
2
2
/
1
2
03
/
2
2
/
1
2
03
/
2
3
/
1
2
03
/
2
9
/
1
2
04
/
0
3
/
1
2
04
/
0
3
/
1
2
04
/
1
0
/
1
2
04
/
1
2
/
1
2
04
/
1
7
/
1
2
04
/
2
4
/
1
2
04
/
2
4
/
1
2
04
/
2
4
/
1
2
04
/
3
0
/
1
2
04
/
3
0
/
1
2
05
/
0
8
/
1
2
05
/
1
5
/
1
2
05
/
2
2
/
1
2
05
/
2
9
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
05
/
1
7
/
1
2
05
/
3
1
/
1
2
Ra
d
o
t
r
o
n
i
c
s
,
l
n
c
.
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Mi
a
m
i
Be
a
c
h
Bi
c
y
c
l
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Ne
x
t
e
i
/
S
p
r
i
n
t
UD
T
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ve
r
i
z
o
n
Wi
r
e
l
e
s
s
De
l
l
Ma
r
k
e
t
i
n
g
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
De
l
l
Ma
r
k
e
t
i
n
g
Ch
a
r
Ro
d
r
i
g
u
e
z
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
De
l
l
Ma
r
k
e
t
i
n
g
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Ch
a
r
Ro
d
r
i
g
u
e
z
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Ra
d
o
t
r
o
n
i
c
s
,
In
c
.
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ne
x
t
e
i
/
S
p
r
i
n
t
Ra
d
o
t
r
o
n
i
c
s
,
In
c
.
Ve
r
i
z
o
n
Wi
r
e
l
e
s
s
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
MR
.
R,
IN
C
.
Ve
r
i
z
o
n
Wi
r
e
l
e
s
s
Mi
a
m
i
Be
a
c
h
Bi
c
y
c
l
e
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Pa
y
e
e
TO
T
A
L
CO
M
M
U
N
I
T
Y
PO
L
I
C
I
N
G
WI
R
E
12
/
0
1
/
1
1
US
Ba
n
k
WI
R
E
12
/
0
1
1
1
1
US
Ba
n
k
WI
R
E
12
/
0
1
/
1
1
US
Ba
n
k
WI
R
E
12
/
0
1
/
1
1
US
Ba
n
k
WI
R
E
12
/
0
1
/
1
1
US
Ba
n
k
TO
T
A
L
DE
B
T
SE
R
V
I
C
E
30
8
0
02
/
2
3
/
1
2
An
c
h
o
r
GA
Pe
t
t
y
Ca
s
h
28
6
4
10
/
1
3
/
1
1
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
29
2
6
12
/
0
6
/
1
1
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
29
5
8
12
/
1
5
/
1
1
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
29
8
5
01
/
0
4
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
29
9
0
01
/
1
0
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
30
4
0
02
/
0
2
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
30
5
3
02
/
0
9
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
30
7
3
02
/
2
1
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
31
2
3
03
/
1
5
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
31
6
0
04
/
0
3
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
32
4
3
05
/
1
5
/
1
2
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
WI
R
E
10
/
1
7
/
1
1
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Au
t
o
11
/
3
0
/
1
1
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Au
t
o
12
/
3
1
/
1
1
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Au
t
o
01
/
2
5
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Au
t
o
02
/
1
7
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Re
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
_
.
.
!
m
T
i
i
i
T
i
l
25
0
.
0
0
11
9
,
0
4
8
.
0
3
61
,
4
7
2
.
8
3
19
,
1
8
2
.
0
5
33
,
4
4
8
.
5
0
22
9
.
2
5
1,
1
9
0
.
0
0
6,
3
0
1
.
1
9
56
0
.
1
4
38
1
.
0
4
33
,
4
9
8
.
0
0
9,
4
0
7
.
2
0
1,
4
3
9
.
5
0
9.
9
9
28
,
5
6
2
.
7
1
15
5
,
0
2
2
.
6
7
16
,
8
2
5
.
5
0
1,
4
3
9
.
5
0
8,
3
6
1
.
0
0
10
0
.
0
0
28
9
,
7
4
2
.
6
2
22
8
.
6
8
38
5
.
0
0
56
0
.
1
4
22
6
.
9
7
33
,
4
1
2
.
5
0
98
0
.
0
0
56
0
.
1
4
16
0
.
0
0
26
2
,
4
9
9
.
1
9
2,
5
1
6
.
5
2
45
,
3
8
0
.
0
0
19
,
3
7
0
.
4
9
2,
7
0
1
.
5
6
17
0
,
3
4
9
.
0
7
16
,
7
6
7
.
0
0
2,
9
4
7
,
2
1
8
.
1
4
2,
9
4
7
,
2
1
8
.
1
4
33
4
,
0
0
0
.
0
0
55
2
,
5
5
0
.
0
0
1,
0
3
4
,
1
1
7
.
5
0
3,
1
4
0
,
0
0
0
.
0
0
1,
5
2
0
,
0
0
0
.
0
0
6,
5
8
0
,
6
6
7
.
5
0
6,
5
8
0
,
6
6
7
.
5
0
25
0
.
0
0
25
0
.
0
0
23
,
9
1
9
.
8
4
20
,
8
5
6
.
6
0
13
,
0
1
6
.
1
2
12
,
3
7
1
.
1
0
8,
2
4
5
.
9
9
4,
2
8
6
.
4
0
13
,
0
9
8
.
5
7
4,
1
2
4
.
4
0
18
,
2
4
8
.
1
0
4,
6
1
0
.
4
0
34
,
8
9
9
.
1
2
15
7
,
6
7
6
.
6
4
2,
4
9
2
.
7
5
2,
6
1
6
.
0
9
2,
9
3
1
.
5
4
2,
2
5
0
.
4
7
2,
6
3
1
.
8
3
Ty
p
e
o
f
Ex
p
e
n
s
e
Ce
r
t
i
f
i
c
a
t
i
o
n
s
of
14
La
s
e
r
s
Un
l
t
an
d
6
Ra
d
a
r
s
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
PP
#
1
an
d
2
(J
A
N
-
2
0
1
2
)
Pe
n
s
i
o
n
Ch
a
r
g
e
s
,
De
c
/
1
1
Ma
i
n
t
e
n
a
n
c
e
an
d
Re
p
a
i
r
s
of
RD
A
CC
po
l
i
c
e
bi
k
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Pa
t
r
o
l
RD
A
ce
l
l
ph
o
n
e
s
fo
r
Ja
n
u
a
r
y
20
1
2
Fi
n
g
e
r
p
r
i
n
t
Re
a
d
e
r
Fl
e
e
t
Mg
m
t
Ch
a
r
g
e
b
a
c
k
s
De
c
"1
1
J/
E
03
-
0
0
1
Ai
r
C
a
r
d
Se
r
v
i
c
e
s
La
p
t
o
p
s
&
De
s
k
t
o
p
Re
p
l
a
c
e
m
e
n
t
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
La
p
t
o
p
s
&
De
s
k
t
o
p
Re
p
l
a
c
e
m
e
n
t
Pa
y
r
o
l
l
De
d
u
c
t
i
o
n
Re
j
e
c
t
Re
i
m
b
-
V
i
s
a
Of
f
i
c
e
Su
p
p
l
i
e
s
(o
f
f
i
c
e
De
p
o
t
)
La
p
t
o
p
s
&
De
s
k
t
o
p
Re
p
l
a
c
e
m
e
n
t
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
Pa
y
Pe
r
i
o
d
01
/
1
6
/
1
2
-
0
2
/
1
2
/
1
2
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
Pa
y
r
o
l
l
De
d
u
c
t
i
o
n
Re
j
e
c
t
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
Ce
r
t
i
f
i
c
a
t
i
o
n
s
of
14
La
s
e
r
s
Un
i
t
an
d
6
Ra
d
a
r
s
Sa
l
a
r
i
e
s
an
d
Be
n
e
f
i
t
s
Pa
y
Pe
r
i
o
d
02
/
1
3
/
1
2
-
0
3
/
1
1
/
2
0
1
2
Pa
t
r
o
l
RD
A
ce
l
l
ph
o
n
e
s
fo
r
Ma
r
c
h
20
1
2
Ce
r
t
i
f
i
c
a
t
i
o
n
s
of
14
La
s
e
r
s
Un
i
t
an
d
6
Ra
d
a
r
s
Ai
r
C
a
r
d
Se
r
v
i
c
e
s
Re
i
m
b
-
V
i
s
a
Sp
r
i
n
t
Wi
r
e
l
e
s
s
Ma
r
t
h
a
Jo
a
n
Se
c
u
r
i
t
y
De
t
a
i
l
fo
r
RD
A
Ci
t
y
Ce
n
t
e
r
Ne
w
Ba
l
a
n
c
e
Tr
a
i
n
i
n
g
Sh
o
e
/
M
o
d
e
l
#
8
1
3
Ai
r
C
a
r
d
Se
r
v
i
c
e
s
Ma
i
n
t
e
n
a
n
c
e
an
d
Re
p
a
i
r
s
of
RD
A
CC
po
l
i
c
e
bi
k
e
s
Po
l
i
c
e
De
p
a
r
t
m
e
n
t
Pa
y
r
o
l
l
Po
l
i
c
e
OT
Wo
r
k
m
a
n
s
Co
m
p
Fl
e
e
t
Ma
n
a
g
e
m
e
n
t
Fu
e
l
/
M
a
i
n
t
e
n
a
n
c
e
Ch
a
r
g
e
s
Ph
o
n
e
Ch
a
r
g
e
b
a
c
k
s
Pa
y
r
o
l
l
Re
i
m
b
u
r
s
e
m
e
n
t
Se
c
u
r
i
t
y
De
t
a
i
l
fo
r
RD
A
Ci
t
y
Ce
n
t
e
r
19
9
8
A
Si
n
k
i
n
g
fu
n
d
in
t
e
r
e
s
t
20
0
5
B
In
t
e
r
e
s
t
fu
n
d
20
0
5
A
In
t
e
r
e
s
t
fu
n
d
20
0
5
A
Pr
i
n
c
i
p
a
l
fu
n
d
20
0
5
B
Pr
i
n
c
i
p
a
l
fu
n
d
An
c
h
o
r
GA
Pe
t
t
y
Ca
s
h
-
F
u
n
d
s
in
Ca
s
h
ac
c
o
u
n
t
10
2
0
5
5
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
De
t
a
i
l
in
Li
n
c
o
l
n
Rd
.
1
&
2
an
d
Be
a
c
h
w
a
l
k
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Project or N/A
16
8
-
1
1
2
4
-
C
o
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
16
8
-
1
1
2
4
Co
m
m
u
n
i
t
y
Po
l
i
c
i
n
g
De
b
t
Se
r
v
i
c
e
Pa
y
m
e
n
t
De
b
t
Se
r
v
i
c
e
Pa
y
m
e
n
t
De
b
t
Se
r
v
i
c
e
Pa
y
m
e
n
t
De
b
t
Se
r
v
i
c
e
Pa
y
m
e
n
t
De
b
t
Se
r
v
i
c
e
Pa
y
m
e
n
t
46
3
-
7
0
0
0
-
1
0
2
0
5
5
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations 4
E
m
l
l
•
•
m
r
r
-
Au
t
o
03
/
2
0
/
1
2
Au
t
o
04
/
2
0
/
1
2
Au
t
o
05
/
1
7
/
1
2
28
8
9
10
/
2
7
/
1
1
29
1
9
11
/
2
9
/
1
1
30
4
6
02
/
0
7
/
1
2
30
5
2
02
/
0
9
/
1
2
30
5
2
02
/
0
9
/
1
2
32
1
2
04
/
2
6
/
1
2
29
1
8
11
/
2
9
/
0
1
1
28
7
7
10
/
1
8
/
1
1
29
2
0
11
/
2
9
/
1
1
29
6
2
12
/
1
5
/
1
1
29
9
8
01
/
1
2
/
1
2
30
6
9
02
/
1
6
/
1
2
31
2
6
03
/
1
5
/
1
2
32
0
4
04
/
2
4
/
1
2
32
4
9
05
/
1
5
/
1
2
28
4
6
10
/
0
4
/
1
1
29
5
9
12
/
1
5
/
1
1
29
6
9
12
/
2
0
/
1
1
30
0
5
01
/
1
7
/
1
2
30
6
8
02
/
1
6
/
1
2
31
0
1
03
/
0
1
/
1
2
31
1
9
03
/
1
3
/
1
2
31
7
7
04
/
1
0
/
1
2
32
3
4
05
/
1
0
/
1
2
30
7
7
02
/
2
3
/
1
2
32
1
6
04
/
3
0
/
1
2
31
4
9
03
/
2
9
/
1
2
31
9
1
04
/
1
9
/
1
2
32
2
7
05
/
0
3
/
1
2
28
7
4
10
/
1
4
/
1
1
28
7
4
10
/
1
4
/
1
1
29
0
6
11
/
1
0
/
1
1
29
0
6
11
/
1
0
/
1
1
29
0
4
11
/
1
0
/
1
1
29
0
4
11
/
1
0
/
1
1
29
5
0
12
/
1
4
/
1
1
30
0
0
01
/
1
2
/
1
2
30
0
1
01
/
1
2
/
1
2
30
0
1
01
/
1
2
/
1
2
30
1
7
01
/
1
9
/
1
2
30
1
7
01
/
1
9
/
1
2
30
1
7
01
/
1
9
/
1
2
30
1
7
01
/
1
9
/
1
2
30
5
8
02
/
1
4
/
1
2
30
7
8
02
/
2
3
/
1
2
30
7
8
02
/
2
3
/
1
2
30
7
8
02
/
2
3
/
1
2
30
6
5
02
/
1
6
/
1
2
31
2
2
03
/
1
5
/
1
2
31
3
8
03
/
2
3
/
1
2
31
4
1
03
/
2
7
/
1
2
32
1
8
04
/
3
0
/
1
2
32
7
8
05
/
2
2
/
1
2
32
5
5
05
/
1
7
/
1
2
32
5
6
05
/
1
7
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Pa
y
e
e
42
0
Li
n
c
o
l
n
Ro
a
d
As
s
o
c
i
a
t
i
o
n
42
0
Li
n
c
o
l
n
Ro
a
d
As
s
o
c
i
a
t
i
o
n
RE
V
P
A
R
G
U
R
U
BR
I
G
H
T
S
T
A
R
CO
R
P
O
R
A
T
I
O
N
BR
I
G
H
T
S
T
A
R
CO
R
P
O
R
A
T
I
O
N
Jo
r
g
e
Je
r
e
z
Mi
a
m
i
-
D
a
d
e
Ta
x
Co
l
l
e
c
t
o
r
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Tr
a
n
s
v
a
l
u
e
,
In
c
.
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Su
p
e
r
i
o
r
La
n
d
s
c
a
p
i
n
g
&
La
w
n
Of
f
i
c
e
m
a
x
In
c
.
Of
f
i
c
e
m
a
x
In
c
.
Cu
m
m
i
n
s
-
A
l
l
i
s
o
n
Co
r
p
o
r
a
t
i
o
n
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Re
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
-
-
!
T
i
i
t
i
l
m
l
2,
7
6
6
.
5
2
2,
5
1
1
.
2
1
2,
0
6
5
.
0
1
20
,
2
6
5
.
4
2
21
4
.
0
0
10
7
.
0
0
40
.
0
0
30
8
.
4
1
21
.
5
9
2.
0
0
69
3
.
0
0
32
7
,
8
7
5
.
3
3
32
7
-
;
-
8
7
5
.
3
3
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
48
5
.
3
3
3,
8
8
2
.
6
4
76
5
.
0
0
17
0
.
0
0
17
0
.
0
0
85
.
0
0
32
4
.
0
0
87
.
9
2
85
.
0
0
85
.
0
0
17
0
.
0
0
1,
9
4
1
.
9
2
29
.
3
9
36
6
.
9
9
39
6
.
3
8
55
5
.
0
0
55
5
.
0
0
5,
0
0
1
.
2
0
8,
8
9
1
.
0
2
13
,
8
9
2
.
2
2
44
.
9
8
16
4
.
3
9
15
0
.
3
5
44
.
9
8
27
5
.
0
0
75
.
0
0
77
5
.
0
0
30
2
.
9
2
15
5
.
1
4
16
0
.
0
0
48
,
5
4
6
.
1
3
25
,
3
4
5
.
9
5
2,
0
3
0
.
0
0
27
,
9
2
3
.
8
4
16
,
3
9
5
.
0
0
26
8
.
2
3
15
0
.
4
9
89
.
9
6
1,
4
9
8
.
0
0
10
.
0
0
50
6
.
4
0
1,
4
2
5
.
0
0
47
3
.
8
9
16
1
.
2
2
40
,
1
2
0
.
6
4
35
,
6
0
2
.
6
8
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Ut
i
l
i
t
y
Bi
l
l
i
n
g
Re
f
u
n
d
fo
r
Tw
o
ca
r
d
s
Re
f
u
n
d
i
n
g
fo
r
ov
e
r
ch
a
r
g
i
n
g
Ac
c
e
s
s
Ca
r
d
Re
f
u
n
d
Ty
p
e
o
f
Ex
p
e
n
s
e
Pr
e
-
p
a
i
d
Pe
r
m
i
t
s
fo
r
G-
4
Ga
r
a
g
e
Re
t
u
r
n
e
d
Pr
e
-
p
a
i
d
Pe
r
m
i
t
s
fo
r
G-
4
Ga
r
a
g
e
Re
t
u
r
n
e
d
Pa
r
k
i
n
g
Re
f
u
n
d
20
1
1
Ad
Va
l
o
r
e
m
Ta
x
e
s
-
An
c
h
o
r
Ga
r
a
g
e
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
Se
p
t
e
m
b
e
r
11
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
Oc
t
o
b
e
r
11
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
No
v
e
m
b
e
r
11
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
De
c
e
m
b
e
r
11
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
Ja
n
u
a
r
y
12
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
Fe
b
r
u
a
r
y
12
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
Ma
r
c
h
12
Ar
m
o
r
Ca
r
Se
r
v
i
c
e
s
-
Ap
r
12
We
e
k
l
y
La
n
d
s
c
a
p
e
-
Au
g
u
s
t
&
Se
p
t
e
m
b
e
r
'1
1
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
-
Oc
t
o
b
e
r
11
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
-
No
v
e
m
b
e
r
11
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
-
De
c
e
m
b
e
r
11
Re
p
l
a
c
e
m
e
n
t
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
La
w
n
Ma
i
n
t
e
n
a
n
c
e
to
An
c
h
o
r
Of
f
i
c
e
su
p
p
l
y
Of
f
i
c
e
su
p
p
l
y
Je
t
s
c
a
n
an
d
Je
t
s
o
r
t
Ma
i
n
t
.
o
f
pa
r
k
i
n
g
de
p
a
r
t
m
e
n
t
16
St
r
e
e
t
Pa
r
k
i
n
g
Ga
r
a
g
e
Fa
s
c
a
d
e
Re
p
a
i
r
16
St
r
e
e
t
Pa
r
k
i
n
g
Ga
r
a
g
e
Fa
s
c
a
d
e
Re
p
a
i
r
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
A
T
I
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
A
T
I
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
Vi
s
a
-
Se
r
v
i
c
e
ca
l
l
15
5
7
Wa
s
h
i
n
g
t
o
n
Av
e
n
u
e
Vi
s
a
-
Re
p
l
a
c
e
el
e
c
t
r
i
c
lo
c
k
s
an
d
E-
c
o
m
b
i
n
a
t
i
o
n
Vi
s
a
re
i
m
b
.
fo
r
At
t
ph
o
n
e
,
EZ
Pa
y
an
d
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
Vi
s
a
re
i
m
b
.
Fo
r
WM
EZ
Pa
y
Vi
s
a
re
i
m
b
.
Fo
r
Of
f
i
c
e
Su
p
p
l
i
e
s
#
22
9
4
Yo
r
k
Lo
c
k
An
d
Ke
y
Co
In
c
Cl
e
a
r
Du
e
To
/
F
r
o
m
-
A
d
m
i
n
i
s
t
r
a
t
i
v
e
/
M
a
n
a
g
e
m
e
n
t
Fe
e
s
-
S
e
p
t
-
N
o
v
'1
1
Cl
e
a
r
Du
e
To
/
F
r
o
m
-
P
r
o
p
e
r
t
y
M
a
n
a
g
e
m
e
n
t
Du
e
to
5t
h
&
Al
t
o
n
Ga
r
a
g
e
Li
a
b
i
l
i
t
y
In
s
u
r
a
n
c
e
Cl
e
a
r
Du
e
To
/
F
r
o
m
-
A
d
m
i
n
i
s
t
r
a
t
i
v
e
/
M
a
n
a
g
e
m
e
n
t
Fe
e
s
-
D
e
c
'1
1
Vi
s
a
re
i
m
b
.
Fo
r
WM
EZ
Pa
y
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
A
T
I
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
Vi
s
a
re
i
m
b
.
fo
r
At
t
ph
o
n
e
,
EZ
Pa
y
an
d
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
Du
e
to
/
f
r
o
m
-
J
E
03
-
0
2
6
(M
o
n
e
y
de
p
o
s
i
t
e
d
in
An
c
h
o
r
Ba
n
k
be
l
o
n
g
s
to
Pk
g
.
Ac
c
e
s
s
Ca
r
d
Re
f
u
n
d
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
A
T
I
an
d
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
An
n
u
a
l
El
e
v
a
t
o
r
Bi
l
l
i
n
g
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
A
T
I
an
d
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
Re
i
m
b
.
C
M
B
-
V
i
s
a
:
A
T
I
an
d
At
l
a
n
t
i
c
Br
o
a
d
b
a
n
d
-
Co
m
m
u
n
i
c
a
t
i
o
n
s
De
p
a
r
t
m
e
n
t
a
l
Ch
a
r
g
e
s
fo
r
Se
r
v
i
c
e
s
Li
a
b
i
l
i
t
y
In
s
u
r
a
n
c
e
Project or NIA
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
7
0
0
0
46
3
-
8
0
0
0
46
3
-
7
0
0
0
46
3
-
7
0
0
0
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
7
0
0
0
46
3
-
7
0
0
0
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations 5
JI
D
l
l
l
•
•
m
l
E
W
32
6
0
05
1
1
7
1
1
2
32
6
2
05
1
1
7
1
1
2
32
6
9
05
1
1
7
1
1
2
28
6
2
10
1
1
3
1
1
1
28
8
3
10
1
2
5
1
1
1
28
9
8
11
1
0
3
1
1
1
29
2
3
12
1
0
1
1
1
1
29
3
0
12
1
0
8
1
1
1
29
9
7
01
1
1
2
1
1
2
30
4
5
02
1
0
7
1
1
2
30
8
8
02
1
2
8
1
1
2
31
0
0
03
1
0
1
1
1
2
31
7
5
04
1
1
0
1
1
2
32
2
6
05
1
0
3
1
1
2
Au
t
o
12
1
3
1
1
1
1
Au
t
o
01
1
3
1
1
1
2
Au
t
o
01
1
3
1
1
1
2
Au
t
o
02
1
2
8
1
1
2
Au
t
o
03
1
3
1
1
1
2
Au
t
o
04
1
3
0
1
1
2
Au
t
o
05
1
3
0
1
1
2
29
1
7
11
1
2
9
1
1
1
29
2
2
12
1
0
1
1
1
1
29
5
6
12
1
1
5
1
1
1
29
8
4
01
1
0
4
1
1
2
30
0
9
01
1
1
9
1
1
2
30
4
4
02
1
0
7
1
1
2
32
7
4
05
1
2
2
1
1
2
28
6
7
10
1
1
3
1
1
1
29
1
0
11
1
2
2
1
1
1
29
2
4
12
1
0
1
1
1
1
29
6
1
12
1
1
5
1
1
1
31
5
5
03
1
2
9
1
1
2
31
7
8
04
1
1
0
1
1
2
32
4
7
05
1
1
5
1
1
2
28
9
5
11
1
0
3
1
1
1
29
2
1
12
1
0
1
1
1
1
29
8
9
01
1
1
0
1
1
2
30
2
7
01
1
2
6
1
1
2
30
7
9
02
1
2
3
1
1
2
31
3
1
03
1
2
2
1
1
2
31
9
8
04
1
2
4
1
1
2
32
8
2
05
/
2
9
/
1
2
28
7
6
10
1
1
8
1
1
1
29
0
3
11
1
0
8
1
1
1
31
7
4
04
1
1
0
1
1
2
28
5
2
10
1
1
1
1
1
1
28
8
6
10
1
2
7
1
1
1
28
9
9
11
1
0
8
1
1
1
30
4
1
02
1
0
2
1
1
2
30
6
2
02
1
1
4
1
1
2
31
9
3
04
1
1
9
1
1
2
32
4
5
05
1
1
5
1
1
2
30
6
4
02
1
1
6
1
1
2
31
1
1
03
1
1
3
1
1
2
31
8
9
04
1
1
9
1
1
2
32
3
2
05
1
1
0
1
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Sh
e
e
t
Me
t
a
l
Ex
p
e
r
t
s
,
In
c
.
Wa
s
t
e
Ma
n
a
g
e
m
e
n
t
,
In
c
.
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Ha
i
g
'
s
Se
r
v
i
c
e
Co
r
p
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
Th
y
s
s
e
n
k
r
u
p
p
El
e
v
a
t
o
r
FP
L
FP
L
FP
L
FP
L
FP
L
FP
L
FP
L
FP
L
Pa
y
e
e
Mi
a
m
i
Be
a
c
h
Re
d
e
v
e
l
o
p
m
e
n
t
,
In
c
Mi
a
m
i
Be
a
c
h
Re
d
e
v
e
l
o
p
m
e
n
t
,
In
c
Mi
a
m
i
Be
a
c
h
Re
d
e
v
e
l
o
p
m
e
n
t
,
In
c
lm
p
a
r
k
Im
p
e
r
i
a
l
Pa
r
k
i
n
g
(i
m
p
a
r
k
)
St
a
n
d
a
r
d
Pa
r
k
i
n
g
St
a
n
d
a
r
d
Pa
r
k
i
n
g
St
a
n
d
a
r
d
Pa
r
k
i
n
g
St
a
n
d
a
r
d
Pa
r
k
i
n
g
St
a
n
d
a
r
d
Pa
r
k
i
n
g
St
a
n
d
a
r
d
Pa
r
k
i
n
g
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
.
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
.
Re
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
-
-
!
'
f
i
i
T
i
T
1
T
i
l
16
,
3
9
5
.
0
0
4,
7
1
8
.
1
7
99
.
5
2
22
3
,
9
0
7
.
8
8
6,
4
5
9
.
3
3
36
4
.
0
0
26
5
.
3
2
6,
4
6
0
.
0
0
6,
4
6
0
.
0
0
6,
4
6
0
.
0
0
6,
4
6
0
.
0
0
3,
8
2
1
.
0
0
6,
4
6
0
.
0
0
6,
4
6
0
.
0
0
6,
4
6
0
.
0
0
56
,
1
2
9
.
6
5
5,
2
2
8
.
1
9
7,
6
0
1
.
7
6
18
2
.
5
2
8,
5
5
9
.
7
8
1,
7
7
7
.
6
0
10
,
5
2
8
.
1
8
4,
2
4
6
.
2
8
38
,
1
2
4
.
3
1
75
0
.
0
0
75
0
.
0
0
81
5
.
0
0
18
7
.
5
0
70
.
1
2
55
5
.
0
0
75
0
.
0
0
3~
7
7
.
6
2
9,
1
6
7
.
0
0
4,
6
0
7
.
1
1
41
3
.
0
0
27
,
7
9
5
.
0
0
4,
7
9
1
.
3
9
29
5
.
0
0
4,
7
9
1
.
3
9
51
,
8
5
9
.
8
9
2,
7
0
1
.
0
7
2,
3
4
8
.
3
0
2,
2
4
3
.
6
3
2,
3
8
7
.
2
8
2,
1
6
7
.
8
7
2,
0
2
8
.
6
1
2,
2
7
6
.
7
9
2,
4
1
7
.
0
3
18
,
5
7
0
.
5
8
18
8
,
0
7
3
.
8
3
72
,
2
3
6
.
2
5
11
8
,
7
5
5
.
6
1
37
9
,
0
6
5
.
6
9
8,
0
5
9
.
4
6
2,
7
8
1
.
3
7
27
,
2
2
5
.
3
6
52
,
4
0
9
.
6
6
24
,
1
4
3
.
0
0
24
,
9
5
2
.
1
2
25
,
2
4
1
.
9
2
16
4
,
8
1
2
.
8
9
39
0
.
0
0
39
0
.
0
0
39
0
.
0
0
39
0
.
0
0
Ty
p
e
o
f
Ex
p
e
n
s
e
En
t
e
r
p
r
i
s
e
Fu
n
d
Ch
a
r
g
e
s
Pa
r
k
i
n
g
Op
e
r
a
t
i
o
n
s
Ch
a
r
g
e
b
a
c
k
s
Fl
e
e
t
Ma
n
a
g
e
m
e
n
t
Ch
a
r
g
e
b
a
c
k
Pr
e
s
s
u
r
e
Cl
e
a
n
i
n
g
An
c
h
o
r
Ga
r
a
g
e
Dr
a
i
n
Pa
n
s
fo
r
NC
Un
i
t
s
An
c
h
o
r
Sh
o
p
s
wa
s
t
e
se
r
v
i
c
e
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Oc
t
o
b
e
r
20
1
1
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
No
v
e
m
b
e
r
20
1
1
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
De
c
e
m
b
e
r
20
1
1
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Ja
n
20
1
2
Pr
e
s
s
u
r
e
Cl
e
a
n
i
n
g
at
An
c
h
o
r
Ga
r
a
g
e
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Fe
b
20
1
2
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Ma
r
20
1
2
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Ap
r
i
l
2
0
1
2
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Ch
e
c
k
Or
d
e
r
Fe
e
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Al
a
r
m
Ma
i
n
t
e
n
a
n
c
e
Oc
t
o
b
e
r
1
th
r
u
De
c
e
m
b
e
r
31
,
20
1
1
Fi
r
e
Al
a
r
m
Ma
i
n
t
e
n
a
n
c
e
Ja
n
u
a
r
y
th
r
o
u
g
h
Ma
r
c
h
20
1
2
Fi
r
e
Al
a
r
m
Sy
s
t
e
m
Re
p
a
i
r
s
&
Se
r
v
i
c
e
Be
y
o
n
d
th
e
Sc
o
p
e
of
Ma
i
n
t
e
n
a
n
c
e
.
Fi
r
e
Al
a
r
m
Sy
s
t
e
m
Re
p
a
i
r
s
&
Se
r
v
i
c
e
Be
y
o
n
d
th
e
Sc
o
p
e
of
Ma
i
n
t
e
n
a
n
c
e
.
Fi
r
e
Al
a
r
m
Sy
s
t
e
m
Re
p
a
i
r
s
&
Se
r
v
i
c
e
Be
y
o
n
d
th
e
Sc
o
p
e
of
Ma
i
n
t
e
n
a
n
c
e
.
Fi
r
e
Al
a
r
m
Sy
s
t
e
m
Re
p
a
i
r
s
&
Se
r
v
i
c
e
Be
y
o
n
d
th
e
Sc
o
p
e
of
Ma
i
n
t
e
n
a
n
c
e
.
Fi
r
e
Al
a
r
m
Ma
i
n
t
e
n
a
n
c
e
Ap
r
th
r
o
u
g
h
Ju
n
e
20
1
2
El
e
v
a
t
o
r
Re
p
a
i
r
at
An
c
h
o
r
Ga
r
a
g
e
FY
10
1
1
1
-1
s
t
&
2n
d
In
s
t
a
l
l
m
e
n
t
El
e
v
a
t
o
r
Re
p
a
i
r
s
an
d
Ma
i
n
t
e
n
a
n
c
e
fo
r
No
v
20
1
1
-J
a
n
.
20
1
2
El
e
v
a
t
o
r
Re
p
a
i
r
s
El
e
v
a
t
o
r
Re
p
a
i
r
s
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
El
e
v
a
t
o
r
Re
p
a
i
r
s
El
e
v
a
t
o
r
Ma
i
n
t
e
n
a
n
c
e
-
Ma
y
20
1
2
-
Ju
l
y
20
1
2
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
El
e
c
t
r
i
c
i
t
y
Fa
c
i
l
i
t
y
Us
e
I
Us
a
g
e
F
e
e
-
Ja
n
-
M
a
r
c
h
20
1
1
Fa
c
i
l
i
t
y
Us
e
I
Us
a
g
e
F
e
e
-
Ju
l
y
-
Se
p
t
e
m
b
e
r
20
1
1
Fa
c
i
l
i
t
y
Us
e
I
Us
a
g
e
Fe
e
-O
c
t
o
b
e
r
-
De
c
e
m
b
e
r
20
1
1
Sa
l
a
r
y
Re
i
m
b
u
r
s
e
m
e
n
t
s
Sa
l
a
r
y
Re
i
m
b
u
r
s
e
m
e
n
t
s
-
Ca
s
h
i
e
r
Se
r
v
i
c
e
s
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
-
Se
p
t
e
m
b
e
r
20
1
1
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
-
Se
p
i
O
c
U
N
o
v
20
1
1
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
-
De
c
.
2
0
1
1
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
-
Ja
n
.
2
0
1
2
Ca
s
h
i
e
r
i
n
g
Se
r
v
i
c
e
s
-
F
e
b
r
u
a
r
y
20
1
2
Ma
i
n
!
fo
r
Vi
d
e
o
Mo
n
i
t
o
r
Ma
i
n
t
.
o
f
Vi
d
e
o
Mo
n
i
t
o
r
i
n
g
Eq
u
i
p
m
e
n
t
Ma
i
n
!
.
of
Vi
d
e
o
Mo
n
i
t
o
r
i
n
g
Eq
u
i
p
m
e
n
t
Ma
i
n
!
.
of
Vi
d
e
o
Mo
n
i
t
o
r
i
n
g
Eq
u
i
p
m
e
n
t
Project or N/A
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
19
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations 6
.
E
a
-
·
m
~
Pa
y
e
e
29
7
5
12
/
2
7
/
1
1
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
29
8
2
01
/
0
4
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
30
3
8
02
/
0
2
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
30
4
3
02
/
0
7
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
30
8
2
02
/
2
8
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
31
4
8
03
/
2
9
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
31
9
0
04
/
1
9
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
32
0
7
04
/
2
6
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
WI
R
E
10
/
2
0
/
1
1
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Wi
r
e
01
/
2
0
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Wi
r
e
02
/
1
7
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Wi
r
e
03
/
2
0
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Wi
r
e
04
/
1
6
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Wi
r
e
05
/
2
1
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
TO
T
A
L
AN
C
H
O
R
GA
R
A
G
E
OP
E
R
.
28
4
9
10
/
0
6
/
1
1
Mi
a
m
i
Be
a
c
h
Co
m
m
u
n
i
t
y
De
v
e
l
o
p
m
e
n
t
Co
r
p
28
8
8
10
/
2
7
/
1
1
Mi
a
m
i
Be
a
c
h
Co
m
m
u
n
i
t
y
De
v
e
l
o
p
m
e
n
t
Co
r
p
31
1
7
03
/
1
3
/
1
2
Mi
a
m
i
Be
a
c
h
Co
m
m
u
n
i
t
y
De
v
e
l
o
p
m
e
n
t
Co
r
p
31
7
3
04
/
1
0
/
1
2
Mi
a
m
i
Be
a
c
h
Co
m
m
u
n
i
t
y
De
v
e
l
o
p
m
e
n
t
Co
r
p
29
0
2
11
/
0
8
/
1
1
Ma
s
t
e
r
Me
c
h
a
n
i
c
a
l
Se
r
v
i
c
e
29
5
2
12
/
1
5
/
1
1
CD
I
En
t
e
r
p
r
i
s
e
.
LL
C
30
1
7
01
/
1
9
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
30
1
7
01
/
1
9
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
30
1
7
01
/
1
9
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
30
5
8
02
/
1
4
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
32
6
1
05
/
1
7
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
32
6
4
05
/
1
7
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
WI
R
E
10
/
2
0
/
1
1
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
WI
R
E
01
/
2
0
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
WI
R
E
02
/
1
7
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
WI
R
E
03
/
2
0
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
WI
R
E
04
/
1
6
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
WI
R
E
05
/
2
1
/
1
2
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
TO
T
A
L
AN
C
H
O
R
SH
O
P
S
OP
E
R
.
30
8
0
02
/
2
3
/
1
2
Pe
n
n
Ga
r
a
g
e
Pe
t
t
y
Ca
s
h
29
2
3
12
/
0
1
/
1
1
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
s
29
3
0
12
/
0
8
/
1
1
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
s
29
5
1
12
/
1
4
/
1
1
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
29
7
5
12
/
2
7
/
1
1
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
29
7
6
12
/
2
7
/
1
1
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
29
8
2
01
/
0
4
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
29
9
6
01
/
1
2
/
1
2
Ka
n
e
,
In
c
29
9
7
01
/
1
2
/
1
2
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
s
30
0
7
01
/
1
9
/
1
2
AT
C
In
t
e
r
n
a
t
i
o
n
a
l
30
2
9
01
/
2
6
/
1
2
Ko
n
e
,
In
c
30
3
0
01
1
2
6
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
30
3
8
02
/
0
2
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
30
4
1
02
/
0
2
/
1
2
St
a
n
d
a
r
d
Pa
r
k
i
n
g
Co
r
p
.
30
4
5
02
/
0
7
/
1
2
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
s
30
4
9
02
/
0
7
/
1
2
FP
&
L
30
5
6
02
/
0
9
/
1
2
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
30
6
2
02
/
1
4
/
1
2
St
a
n
d
a
r
d
Pa
r
k
i
n
g
Co
r
p
.
30
8
2
02
/
2
8
/
1
2
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
Re
d
e
v
e
l
o
p
m
e
n
t
A
g
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
W
i
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
_
.
!
l
i
i
T
i
l
1
T
i
l
.
1,
5
6
0
.
0
0
4,
6
3
7
.
5
0
1,
4
6
2
.
5
0
1,
4
6
2
.
5
0
35
8
.
7
5
1,
4
6
2
.
5
0
1,
4
6
2
.
5
0
1,
9
1
5
.
4
4
1,
4
6
2
.
5
0
14
,
2
2
4
.
1
9
15
,
2
7
9
.
8
4
14
,
1
2
3
.
5
6
27
,
3
3
1
.
2
2
11
,
4
9
2
.
8
0
25
,
3
1
2
.
8
1
23
,
0
2
8
.
1
2
11
6
,
5
6
8
.
3
5
1,
5
9
6
,
1
2
9
.
6
0
7,
6
6
7
.
2
3
3,
7
7
7
.
9
3
19
,
2
6
9
.
4
1
5,
4
2
5
.
8
9
36
,
1
4
0
.
4
6
17
,
9
7
0
.
0
0
5,
0
2
4
.
0
0
22
,
9
9
4
.
0
0
9,
5
8
0
.
9
6
13
,
2
0
4
.
4
5
6,
9
1
3
.
5
0
3,
4
5
6
.
7
5
13
,
7
0
9
.
6
8
3,
4
5
6
.
7
5
50
,
3
2
2
.
0
9
1,
6
0
7
.
9
5
3,
6
7
4
.
3
7
2,
2
0
5
.
7
4
6,
3
9
5
.
3
6
3,
2
9
1
.
1
7
2,
6
0
6
.
2
0
19
,
7
8
0
.
7
9
12
9
,
2
3
7
.
3
4
25
0
.
0
0
25
0
.
0
0
8,
2
0
0
.
0
0
8,
2
0
0
.
0
0
1,
9
7
5
.
0
0
7,
7
5
0
.
0
0
2,
3
8
0
.
2
2
2,
5
0
0
.
0
0
3,
8
3
5
.
4
9
8,
2
0
0
.
0
0
25
0
.
0
0
80
0
.
0
0
1,
2
0
9
.
6
2
2,
5
0
0
.
0
0
26
,
8
7
3
.
8
9
8,
2
0
0
.
0
0
2,
7
1
9
.
3
2
1,
2
0
9
.
6
2
11
,
8
9
6
.
1
4
2,
5
0
0
.
0
0
Ty
p
e
o
f
Ex
p
e
n
s
e
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Oc
t
,
No
v
,
De
c
.
20
1
1
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Fe
b
20
1
2
1 DO
Ac
e
s
s
Ca
r
d
s
An
c
h
o
r
Ga
r
a
g
e
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Ma
r
c
h
20
1
2
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Ap
r
i
l
2
0
1
2
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Ma
y
20
1
2
Ma
i
n
t
e
n
a
n
c
e
an
d
Se
r
v
i
c
e
of
Re
v
e
n
u
e
Co
n
t
r
o
l
Pa
r
k
i
n
g
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
ta
x
Mo
n
t
h
l
y
Fe
e
s
-
Au
g
u
s
t
20
1
1
Mo
n
t
h
l
y
Fe
e
s
-
Se
p
t
e
m
b
e
r
20
1
1
Mo
n
t
h
l
y
Fe
e
s
-
Oc
t
20
1
1
-J
a
n
20
1
2
Mo
n
t
h
l
y
Fe
e
s
-
Fe
b
r
u
a
r
y
20
1
2
HV
A
C
Re
p
l
a
c
e
m
e
n
t
-
An
c
h
o
r
Sh
o
p
s
In
s
t
a
l
l
a
t
i
o
n
,
se
r
v
i
c
e
an
d
re
m
o
v
a
l
of
20
1
1
Ho
l
i
d
a
y
Se
a
s
o
n
Li
g
h
t
i
n
g
Se
l
f
In
s
u
r
a
n
c
e
Ch
a
r
g
e
b
a
c
k
s
-
Se
p
t
-
N
o
v
'1
1
Pr
o
p
e
r
t
y
Ma
n
a
g
e
m
e
n
t
Ch
a
r
g
e
b
a
c
k
s
Se
p
t
e
m
b
e
r
20
1
1
Cl
e
a
r
Du
e
To
/
F
r
o
m
-
A
d
m
i
n
i
s
t
r
a
t
i
v
e
/
M
a
n
a
g
e
m
e
n
t
Fe
e
s
-
Oc
t
-
N
o
v
"1
1
Cl
e
a
r
Du
e
To
/
F
r
o
m
-
A
d
m
i
n
i
s
t
r
a
t
i
v
e
/
M
a
n
a
g
e
m
e
n
t
Fe
e
s
-
De
c
"1
1
Li
a
b
i
l
i
t
y
In
s
u
r
a
n
c
e
Ch
a
r
g
e
b
a
c
k
Le
a
s
i
n
g
En
t
e
r
p
r
i
s
e
Ch
a
r
g
e
b
a
c
k
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Pe
n
n
Ga
r
a
g
e
Pe
t
t
y
Ca
s
h
-
Fu
n
d
s
in
Ca
s
h
ac
c
o
u
n
t
10
2
0
5
5
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Oc
t
o
b
e
r
20
1
1
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
No
v
e
m
b
e
r
20
1
1
Re
i
m
b
u
r
s
e
m
e
n
t
-V
i
s
a
fo
r
Yo
r
k
Lo
c
k
An
d
Ke
y
Co
In
c
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Oc
t
,
No
v
,
De
c
.
20
1
1
La
n
d
s
c
a
p
e
r
Ma
i
n
t
.
Oc
t
o
b
e
r
an
d
No
v
e
m
b
e
r
20
1
1
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Ja
n
.
2
0
1
2
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
De
c
e
m
b
e
r
20
1
1
Re
p
a
i
r
Vi
d
e
o
Mo
n
i
t
o
r
Eq
u
i
p
m
e
n
t
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
La
n
d
s
c
a
p
e
r
Ma
i
n
t
.
De
c
e
m
b
e
r
20
1
1
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Fe
b
.
2
0
1
2
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
-
Se
p
/
O
c
U
N
o
v
20
1
1
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Ja
n
u
a
r
y
20
1
2
Ja
n
12
-1
6
6
1
Pe
n
n
A
v
e
#
Ho
u
s
e
La
n
d
s
c
a
p
e
r
Ma
i
n
t
.
Ja
n
u
a
r
y
20
1
2
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
-
De
c
.
2
0
1
1
Re
v
e
n
u
e
&
Ac
c
e
s
s
Ma
i
n
t
.
Fo
r
Mr
a
c
h
.
2
0
1
2
Project or N/A
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-A
n
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
-
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Ga
r
a
g
e
Op
e
r
a
t
i
o
n
s
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
46
3
-
1
9
9
0
An
c
h
o
r
Ga
r
a
g
e
Operations
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
46
5
-
1
9
9
5
An
c
h
o
r
Sh
o
p
s
Oper.
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
46
5
An
c
h
o
r
Sh
o
p
s
Op
e
r
.
46
7
-
7
0
0
0
-
1
0
2
0
5
5
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations 7
EZ
J
~
•
•
m
r
e
w
30
8
5
02
/
2
8
/
1
2
30
8
8
02
/
2
8
/
1
2
31
0
0
03
/
0
1
1
1
2
32
2
6
05
/
0
3
/
1
2
31
0
6
03
/
0
6
/
1
2
31
1
1
03
/
1
3
/
1
2
31
4
8
03
/
2
9
/
1
2
31
5
1
03
/
2
9
/
1
2
31
5
2
03
/
2
9
/
1
2
31
5
6
03
/
2
9
/
1
2
31
5
7
03
/
2
9
/
1
2
31
6
7
04
/
0
5
/
1
2
31
7
2
04
/
0
5
/
1
2
31
7
5
04
/
1
0
/
1
2
31
7
9
04
/
1
2
/
1
2
31
8
9
04
/
1
9
/
1
2
31
9
0
04
/
1
9
/
1
2
31
9
4
04
/
1
9
/
1
2
31
9
9
04
/
2
4
/
1
2
32
0
6
04
/
2
6
/
1
2
32
0
7
04
/
2
6
/
1
2
32
1
5
04
/
2
6
/
1
2
32
3
2
05
/
1
0/
1
2
32
3
3
05
/
1
0
/
1
2
32
3
6
05
/
1
0
/
1
2
32
4
5
05
/
1
5
/
1
2
32
7
0
05
/
1
7
/
1
2
32
7
2
05
/
2
2
/
1
2
32
6
8
05
/
1
7
/
1
2
29
8
5
01
/
0
4
/
1
2
29
8
6
01
1
0
4
/
1
2
29
9
1
01
/
1
0
/
1
2
30
4
0
02
/
0
2
/
1
2
30
5
3
02
/
0
9
/
1
2
30
7
3
02
/
2
1
/
1
2
31
2
3
03
/
1
5
/
1
2
31
6
0
04
/
0
3
/
1
2
31
6
6
04
/
0
5
/
1
2
31
8
2
04
/
1
2
/
1
2
32
1
3
04
/
2
6
/
1
2
32
4
4
05
/
1
5
/
1
2
Au
t
o
12
/
3
1
/
1
1
Au
t
o
01
/
3
1
1
1
2
Au
t
o
01
1
3
1
/
1
2
Au
t
o
02
/
2
8
/
1
2
Au
t
o
03
/
3
1
/
1
2
Au
t
o
04
/
3
0
/
1
2
Au
t
o
05
/
3
0
/
1
2
30
1
5
01
/
1
9
/
1
2
30
9
5
02
/
2
8
/
1
2
29
3
1
12
/
0
8
/
1
1
30
9
1
02
/
2
8
/
1
2
30
9
7
02
/
2
8
/
1
2
29
1
5
11
/
2
3
/
1
1
29
3
3
12
/
0
8
/
1
1
30
9
2
02
/
2
8
/
1
2
29
5
7
12
/
1
5
/
1
1
29
1
3
11
/
2
3
/
1
1
30
4
7
02
/
0
7
/
1
2
30
9
0
02
/
2
8
/
1
2
29
1
2
11
/
2
3
/
1
1
30
8
9
02
/
2
8
/
1
2
30
9
4
02
/
2
8
/
1
2
29
1
4
11
1
2
3
/
1
1
30
9
3
02
/
2
8
/
1
2
30
9
6
02
/
2
8
/
1
2
29
3
2
12
/
2
8
/
1
1
Ka
n
e
,
In
c
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
s
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
s
FP
&
L
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
Pa
y
e
e
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
Ka
n
e
,
In
c
Ka
n
e
,
In
c
De
p
a
r
t
m
e
n
t
of
Bu
s
i
n
e
s
s
De
p
a
r
t
m
e
n
t
of
St
a
t
e
St
a
n
d
a
r
d
Pa
r
k
i
n
g
Co
r
p
.
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
Om
a
r
c
i
o
Cl
e
a
n
i
n
g
Se
r
v
i
c
e
FP
&
L
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
Cl
e
r
k
of
Ci
r
c
u
i
t
&
Co
u
r
t
Ka
n
e
,
In
c
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
Aw
a
r
e
Di
g
i
t
a
l
,
In
c
FP
&
L
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
St
a
n
d
a
r
d
Pa
r
k
i
n
g
Co
r
p
.
Ka
n
e
,
In
c
Co
n
s
o
l
i
d
a
t
e
d
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Se
c
u
r
i
t
y
Al
l
i
a
n
c
e
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
Su
n
t
r
u
s
t
AP
S
Ch
a
n
g
e
Re
f
u
n
d
G9
Ga
r
a
g
e
CA
R
O
L
HE
D
S
T
R
O
M
Cl
a
r
i
t
a
F.
Fl
a
m
e
n
c
o
CR
E
S
T
E
R
TA
B
A
R
E
S
DA
V
I
D
MI
L
L
E
R
Di
l
l
i
o
n
Pa
t
e
l
Fi
d
e
l
Pr
i
d
a
HA
S
S
S
A
N
EL
HA
J
J
A
J
I
Hi
n
e
s
-A
t
t
n
:
Ma
t
t
Ba
r
r
y
Ji
n
g
Ze
n
g
JO
R
G
E
FE
L
I
X
MA
R
I
A
E.
LA
C
A
Y
O
Ma
r
i
a
Ra
m
o
s
MI
C
H
A
E
L
JE
A
N
NI
C
O
L
A
S
BO
G
A
D
O
Ni
d
i
a
Ma
r
t
i
n
e
z
RO
N
OH
A
N
A
SA
R
A
H
LI
U
Ti
a
g
o
Ra
m
o
s
Re
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
_
.
!
f
i
f
[
i
]
l
f
f
i
ao
o
.
o
o
3,
2
2
1
.
0
0
8,
2
0
0
.
0
0
8,
2
0
0
.
0
0
2,
4
9
3
.
3
0
45
0
.
0
0
2,
5
0
0
.
0
0
80
0
.
0
0
63
1
.
8
7
25
0
.
0
0
70
.
0
0
12
,
8
6
0
.
5
1
1,
1
3
1
.
5
8
8,
2
0
0
.
0
0
2,
5
7
2
.
4
3
45
0
.
0
0
2,
0
8
8
.
9
4
59
6
.
5
0
80
0
.
0
0
1,
9
0
0
.
0
0
2,
5
0
0
.
0
0
1,
1
3
1
.
5
8
45
0
.
0
0
2,
4
5
5
.
8
6
1,
2
4
8
.
6
4
13
,
0
4
7
.
6
4
80
0
.
0
0
2,
5
0
0
.
0
0
21
0
.
1
0
18
3
,
7
5
9
.
2
5
13
,
8
9
6
.
7
7
3,
7
9
8
.
7
6
1,
9
8
6
.
9
8
1,
1
1
3
.
7
0
3,
6
3
3
.
9
5
1,
4
5
1
.
2
0
6,
2
7
7
.
3
0
1,
4
5
5
.
7
0
2,
7
1
5
.
8
5
1,
0
9
0
.
4
1
2,
6
5
0
.
4
0
3,
4
8
8
.
4
2
43
,
5
5
9
.
4
4
2,
7
6
8
.
5
6
1,
2
0
3
.
7
5
18
2
.
5
2
82
0
.
0
7
7,
8
4
7
.
6
5
1,
0
9
3
.
5
7
1,
0
8
1
.
0
5
14
,
9
9
7
.
1
7
5.
0
0
5.
0
0
16
.
0
0
17
.
0
0
2.
0
0
5.
0
0
5.
0
0
8.
0
0
10
.
0
0
9.
0
0
5.
0
0
19
.
0
0
17
.
0
0
74
.
9
0
5.
0
0
7.
0
0
5.
0
0
3.
0
0
9.
3
0
Ty
p
e
o
f
Ex
p
e
n
s
e
El
e
v
a
t
o
r
Ma
i
n
t
Fe
b
.
2
0
1
2
Pr
e
s
s
u
r
e
Cl
e
a
n
i
n
g
Ma
i
n
t
.
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-
Fe
b
20
1
2
Ja
n
i
t
o
r
i
a
l
Se
r
i
v
c
e
s
-
Ap
r
i
l
20
1
2
Fe
b
12
-
1
6
6
1
Pe
n
n
Av
e
#
Ho
u
s
e
Ma
i
n
t
.
o
f
Vi
d
e
o
Mo
n
i
t
o
r
i
n
g
Eq
u
i
p
m
e
n
t
Ma
i
n
t
e
n
a
n
c
e
an
d
Se
r
v
i
c
e
of
Re
v
e
n
u
e
Co
n
t
r
o
l
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
El
e
v
a
t
o
r
Ma
i
n
t
20
1
2
El
e
v
a
t
o
r
Re
p
a
i
r
Fi
l
i
n
g
Fe
e
co
n
d
o
m
i
n
i
u
m
i
z
a
t
i
o
n
of
th
e
Pe
n
n
Ga
r
a
g
e
Fi
l
i
n
g
Fe
e
co
n
d
o
m
i
n
i
u
m
i
z
a
t
i
o
n
of
th
e
Pe
n
n
Ga
r
a
g
e
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
FY
11
/
1
2
As
pe
r
Re
s
o
#
20
1
1
-
2
7
6
5
8
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
Pe
n
n
Ga
r
a
g
e
FY
11
/
1
2
Co
n
t
r
a
c
t
Ja
n
i
t
o
r
i
a
l
Se
r
v
i
c
e
s
-M
a
r
20
1
2
Ma
r
12
-
16
6
1
Pe
n
n
Av
e
#
Ho
u
s
e
Ma
i
n
t
.
o
f
Vi
d
e
o
Mo
n
i
t
o
r
i
n
g
Eq
u
i
p
m
e
n
t
Ma
i
n
t
e
n
a
n
c
e
an
d
Se
r
v
i
c
e
of
Re
v
e
n
u
e
Co
n
t
r
o
l
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
RD
A
Fi
l
i
n
g
Fe
e
El
e
v
a
t
o
r
Re
p
a
i
r
An
n
u
a
l
El
e
v
a
t
o
r
Bi
l
l
i
n
g
Ma
i
n
t
e
n
a
n
c
e
an
d
Se
r
v
i
c
e
of
Re
v
e
n
u
e
Co
n
t
r
o
l
Pa
r
k
i
n
g
Eq
u
i
p
m
e
n
t
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
Pe
n
n
Ga
r
a
g
e
FY
11
/
1
2
Co
n
t
r
a
c
t
Ma
i
n
t
.
o
f
Vi
d
e
o
Mo
n
i
t
o
r
i
n
g
Eq
u
i
p
m
e
n
t
Ap
r
12
-
1
6
1
1
Pe
n
n
Av
e
#
Ho
u
s
e
La
n
d
s
c
a
p
e
Ma
i
n
t
e
n
a
n
c
e
Pe
n
n
Ga
r
a
g
e
-
Ap
r
20
1
2
Ca
s
h
i
e
r
i
n
g
se
r
v
i
c
e
s
FY
11
/
1
2
As
pe
r
Re
s
o
#
20
1
1
-
2
7
6
5
8
El
e
v
a
t
o
r
Ma
i
n
t
Ma
i
n
t
e
n
a
n
c
e
an
d
Se
r
v
i
c
e
of
Re
v
e
n
u
e
Co
n
t
r
o
l
Pa
r
k
i
n
g
Pe
n
n
Ga
r
a
g
e
Ch
a
r
g
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Se
c
u
r
i
t
y
Se
r
v
i
c
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Ch
e
c
k
Or
d
e
r
Fe
e
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Cr
e
d
i
t
Ca
r
d
fe
e
s
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Project or N/A
45
7
:
1
9
9
5
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
8
0
0
0
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations 8
ll
i
!
D
-
·
F
.
I
~
31
5
4
32
0
B
32
0
9
32
1
0
32
1
1
32
7
9
WI
R
E
WI
R
E
WI
R
E
WI
R
E
WI
R
E
WI
R
E
29
0
5
29
6
0
30
1
7
32
6
3
31
9
2
29
7
2
2B
5
B
2B
7
0
29
6
5
30
0
B
31
4
4
31
4
7
04
/
2
6
1
1
2
04
/
2
6
1
1
2
04
/
2
6
1
1
2
04
1
2
6
/
1
2
05
1
2
2
/
1
2
10
/
2
0
1
1
1
01
/
2
0
1
1
2
02
/
1
7
1
1
2
03
1
2
0
/
1
2
04
/
1
6
1
1
2
05
1
2
1
1
1
2
11
1
1
0
/
1
1
12
1
1
5
1
1
1
01
1
1
9
1
1
2
05
/
1
7
1
1
2
04
/
1
9
1
1
2
12
1
2
0
1
1
1
10
/
1
3
1
1
1
10
/
1
3
1
1
1
12
/
2
0
1
1
1
01
1
1
9
1
1
2
03
1
2
7
1
1
2
03
/
2
9
1
1
2
Pa
y
e
e
Dr
e
i
l
i
n
g
M
e
d
i
c
a
l
Ma
n
a
g
e
m
e
n
t
Ed
w
a
r
d
Gl
a
d
k
o
w
s
k
i
Ga
r
y
Re
s
s
l
e
r
Al
l
e
n
Me
j
u
t
o
Re
i
n
a
l
d
o
Ma
r
t
i
n
Vi
s
a
Ra
m
o
s
,
Lu
p
i
t
a
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
Fl
o
r
i
d
a
De
p
a
r
t
m
e
n
t
of
Re
v
e
n
u
e
TO
T
A
L
PE
N
N
S
Y
L
V
A
N
I
A
GA
R
A
G
E
OP
E
R
A
T
I
O
N
S
Th
e
Ko
n
v
i
e
r
St
e
r
n
Gr
o
u
p
Te
w
s
Ca
r
d
e
n
a
s
LL
P
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
TO
T
A
L
PE
N
N
S
Y
L
V
A
N
I
A
SH
O
P
S
OP
E
R
A
T
I
O
N
S
Mi
a
m
i
St
a
g
e
C
r
a
f
t
,
In
c
TO
T
A
L
CO
L
O
N
Y
T
ST
A
G
E
LI
G
H
T
I
N
G
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Me
t
r
o
Ex
p
r
e
s
s
Me
t
r
o
Ex
p
r
e
s
s
Me
t
r
o
Ex
p
r
e
s
s
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Me
t
r
o
Ex
p
r
e
s
s
AT
&
T
TO
T
A
L
CO
L
L
I
N
S
PA
R
K
CU
L
T
U
R
A
L
CE
N
T
E
R
2B
6
3
10
/
1
3
1
1
1
Ra
y
m
o
n
d
Ju
n
g
l
e
s
,
In
c
.
2B
9
3
11
1
0
1
/
1
1
Th
e
Go
r
d
i
a
n
Gr
o
u
p
2B
9
6
11
/
0
3
/
1
1
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
2B
9
7
11
/
0
3
/
1
1
Th
e
Go
r
d
i
a
n
Gr
o
u
p
29
4
3
12
/
1
3
/
1
1
Ra
y
m
o
n
d
Ju
n
g
l
e
s
,
In
c
.
29
4
4
12
1
1
3
1
1
1
Ra
y
m
o
n
d
Ju
n
g
l
e
s
,
In
c
.
30
0
B
01
1
1
9
/
1
2
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
30
2
2
01
1
2
4
1
1
2
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
31
1
0
03
/
0
B
/
1
2
Ra
y
m
o
n
d
Ju
n
g
l
e
s
,
In
c
.
31
2
5
03
/
1
5
1
1
2
Th
e
Go
r
d
i
a
n
Gr
o
u
p
31
4
3
03
/
2
7
1
1
2
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
31
4
5
03
1
2
7
1
1
2
Ra
y
m
o
n
d
Ju
n
g
l
e
s
,
In
c
.
31
B
1
04
1
1
2
1
1
2
Ra
y
m
o
n
d
Ju
n
g
l
e
s
,
In
c
.
32
0
3
04
/
2
4
1
1
2
Th
e
Go
r
d
i
a
n
Gr
o
u
p
32
2
9
05
/
0
B
/
1
2
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
TO
T
A
L
BO
T
A
N
I
C
A
L
GA
R
D
E
N
S
PR
O
J
E
C
T
31
3
2
03
1
2
2
1
1
2
Ha
l
l
Fo
u
n
t
a
i
n
s
,
In
c
TO
T
A
L
LI
N
C
O
L
N
RO
A
D
FO
U
N
T
A
I
N
2B
7
5
10
/
1
B
/
1
1
At
k
i
n
s
No
r
t
h
Am
e
r
i
c
a
,
In
c
.
Re
d
e
v
e
l
o
p
m
e
n
t
A
g
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
-
-
!
'
f
i
"
i
'
M
'
'
'
T
i
1
22
4
.
7
0
5.
0
0
5.
0
0
5.
0
0
5.
0
0
19
.
6
2
49
1
.
5
2
2,
7
0
4
.
1
4
5,
B
6
4
.
5
B
2,
7
1
0
.
4
5
4,
2
0
1
.
4
7
6,
0
2
0
.
B
B
3,
9
0
B
.
5
6
25
,
4
1
o
.
m
3
26
8
,
4
6
7
.
4
6
B1
,
6
4
B
.
7
9
3,
B
6
3
.
6
0
B5
,
5
1
2
.
3
9
4,
4
5
4
.
B
4
4,
4
5
4
.
B
4
B,
9
0
9
.
6
B
94
,
4
2
2
.
0
7
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Pa
r
k
i
n
g
re
f
u
n
d
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Sa
l
e
s
Ta
x
Ty
p
e
o
f
Ex
p
e
n
s
e
25
%
Le
a
s
e
co
m
m
i
s
s
i
o
n
fo
r
Gi
g
i
l
Pe
n
n
Sh
o
p
s
Le
g
a
l
fe
e
s
as
s
o
c
i
a
t
e
d
wi
t
h
th
e
re
c
e
n
t
l
y
ex
e
c
u
t
e
d
Pe
n
n
Ga
r
a
g
e
Le
a
s
e
an
d
Ad
m
i
n
i
s
t
r
a
t
i
v
e
/
M
a
n
a
g
e
m
e
n
t
Fe
e
s
-
Oc
t
-
N
o
v
"1
1
Ad
m
i
n
i
s
t
r
a
t
i
v
e
/
M
a
n
a
g
e
m
e
n
t
Fe
e
s
--
-
-
-
-
"
4
;
.
;
1
.
.
;
,
3
,
;
2
,
;
3
:
:
;
.
2
;
;
5
;
.
.
Fu
r
n
i
s
h
al
l
la
b
o
r
.
ma
t
e
r
i
a
l
,
e
q
u
i
p
,
su
p
e
r
v
i
s
i
o
n
fo
r
st
a
g
e
li
g
h
t
i
n
g
41
,
3
2
3
.
2
5
41
,
3
2
3
.
2
5
5B
.
9
7
5B
.
9
7
2,
5
5
0
.
5
4
12
6
,
B
7
7
.
B
O
14
4
,
6
6
4
.
2
1
14
6
,
1
4
B
.
1
9
21
,
2
5
0
.
0
0
63
,
7
2
0
.
0
0
50
5
,
2
1
0
.
7
4
50
5
,
2
6
9
.
7
1
3,
1
2
5
.
0
0
67
0
.
9
B
5B
,
4
1
4
.
B
1
1,
1
7
7
.
2
2
B,
B
7
5
.
0
0
3,
1
2
5
.
0
0
29
,
2
4
0
.
4
4
6,
4
9
0
.
5
4
1,
6
5
0
.
0
0
29
0
.
9
B
13
,
4
3
0
.
1
5
29
5
.
0
0
50
0
.
0
0
12
B
.
0
5
5,
4
B
3
.
9
5
13
2
,
B
9
7
.
1
2
13
2
,
8
9
7
.
1
2
th
e
sc
o
p
e
of
wo
r
k
in
c
l
u
d
e
s
th
e
co
n
s
t
r
u
c
t
i
o
n
of
an
ad
d
i
t
i
o
n
a
l
AD
A
Ra
m
p
on
Co
l
l
i
n
s
Pa
r
k
&
Ro
t
u
n
d
a
Im
p
r
o
v
e
m
e
n
t
s
Co
l
l
i
n
s
Pa
r
k
&
Ro
t
u
n
d
a
Im
p
r
o
v
e
m
e
n
t
s
pa
r
t
i
a
l
re
t
a
i
n
a
g
e
re
l
e
a
s
e
Me
t
r
o
Co
l
l
i
n
s
Pa
r
k
Ca
p
i
t
a
l
-
C
M
B
Co
n
s
t
r
u
c
t
i
o
n
Ma
n
a
g
e
m
e
n
t
Co
n
s
t
r
u
c
t
i
o
n
of
AD
A
Ra
m
p
on
Pa
r
k
Av
e
Ut
i
l
i
t
y
Co
n
s
t
r
u
c
t
i
o
n
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Go
r
d
a
i
n
fe
e
fr
o
m
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Pr
o
j
e
c
t
.
Co
n
s
t
r
u
c
t
i
o
n
Co
n
s
t
r
u
c
t
i
o
n
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Ra
y
m
o
n
d
Ju
n
g
l
e
s
fo
r
Mi
a
m
i
Be
a
c
h
Bo
t
a
n
i
c
a
l
pr
o
f
e
s
s
i
o
a
n
l
se
r
v
i
c
e
Ra
y
m
o
n
d
Ju
n
g
l
e
s
Ca
p
i
t
a
l
-
C
M
B
Co
n
s
t
r
u
c
t
i
o
n
Ma
n
a
g
e
m
e
n
t
Co
n
s
t
r
u
c
t
i
o
n
pr
o
f
e
s
s
i
o
a
n
l
se
r
v
i
c
e
Ra
y
m
o
n
d
Ju
n
g
l
e
s
Co
n
s
t
r
u
c
t
i
o
n
Co
n
s
t
r
u
c
t
i
o
n
Pr
o
f
e
s
s
i
o
a
n
l
S
e
r
v
i
c
e
-
B
o
t
a
n
i
c
a
l
Ga
r
d
e
n
Pr
o
f
e
s
s
i
o
n
a
l
se
r
v
i
c
e
Ra
y
m
o
n
d
Ju
n
g
l
e
s
Co
n
s
t
r
u
c
t
i
o
n
Co
n
s
t
r
u
c
t
i
o
n
--
-
-
-
-
-
:
i
4
'
-
:
,
4
;
.
;
B
;
.
;
4
.
o
;
.
O
;
.
;
O
;
.
.
Re
n
o
v
a
t
i
o
n
an
d
Ma
i
n
!
.
of
Fo
u
n
t
a
i
n
s
on
Li
n
c
o
l
n
Ro
a
d
4,
4
B
4
.
0
0
4,
4
8
4
.
0
0
1
,3
6
2
.
0
6
Si
g
n
a
l
Mo
d
i
f
i
c
a
t
i
o
n
Pl
a
n
s
Project or NIA
46
7
-B
O
O
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
O
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
O
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
O
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
D
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-
1
9
9
6
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
D
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
D
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
D
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
O
D
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
7
-B
D
O
O
Pe
n
n
s
y
l
v
a
n
i
a
Garage Operations
46
6
-
1
9
9
7
Pe
n
n
s
y
l
v
a
n
i
a
Shops Operations
46
6
-
1
9
9
7
Pe
n
n
s
y
l
v
a
n
i
a
Shops Operations
46
6
-
1
9
9
7
Pe
n
n
s
y
l
v
a
n
i
a
Shops Operations
46
6
-
1
9
9
7
Pe
n
n
s
y
l
v
a
n
i
a
Shops Operations
36
5
-
2
0
5
7
Co
l
o
n
y
T
St
a
g
e
Lighting
36
5
-
2
3
9
B
Co
l
l
i
n
s
Pa
r
k
Cultural Center
Co
l
l
i
n
s
Pa
r
k
Cu
l
t
u
r
a
l
Ce
n
t
e
r
Co
l
l
i
n
s
Pa
r
k
Cu
l
t
u
r
a
l
Ce
n
t
e
r
36
5
-
2
3
9
B
Co
l
l
i
n
s
Pa
r
k
Cultural Center
36
5
-
2
3
9
B
Co
l
l
i
n
s
Pa
r
k
Cultural Center
36
5
-
2
3
9
B
Co
l
l
i
n
s
Pa
r
k
Cultural Center
36
5
-
2
3
9
B
Co
l
l
i
n
s
Pa
r
k
Cultural Center
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
1
4
4
Ga
r
d
e
n
Ce
n
t
e
r
Renovations
36
5
-
2
6
0
B
Li
n
c
o
l
n
Rd
.
M
a
l
l
Fountain Pump
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
Pa
r
k
Project 9
~
•
•
m
l
E
W
28
7
9
1 0/
2
0
/
1
1
31
0
3
03
/
0
6
/
1
2
28
6
0
10
/
1
3
/
1
1
28
7
3
10
/
1
3
/
1
1
28
4
1
10
/
0
4
/
1
1
28
5
0
10
/
1
1
/
1
1
29
3
9
12
/
1
3
/
1
1
29
4
0
12
/
1
3
/
1
1
29
5
5
12
/
1
5
/
1
1
29
6
4
12
/
2
0
/
1
1
29
6
4
12
/
2
0
/
1
1
29
7
3
12
/
2
2
/
1
1
30
1
0
01
/
1
9
/
1
2
31
2
4
03
/
1
5
/
1
2
31
4
0
03
/
2
7
/
1
2
32
0
2
04
/
2
4
/
1
2
28
6
6
10
/
1
3
/
1
1
28
4
0
10
/
0
4
/
1
1
29
4
7
12
/
1
3
/
1
1
32
8
1
05
/
2
9
/
1
2
28
5
5
10
/
1
3
/
1
1
28
6
9
10
/
1
3
/
1
1
28
9
1
10
/
2
7
/
1
1
29
0
9
11
/
2
2
/
1
1
29
3
6
12
/
1
3
/
1
1
29
7
3
12
/
2
2
/
1
1
29
8
0
12
/
2
9
/
1
1
30
0
8
01
/
1
9
/
1
2
30
2
0
01
/
2
0
/
1
2
31
0
2
03
/
0
1
/
1
2
32
0
5
04
/
2
4
/
1
2
31
6
9
04
/
0
5
/
1
2
29
0
4
11
/
1
0
/
1
1
29
5
4
12
/
1
5
/
1
1
29
8
1
01
/
0
4
/
1
2
30
6
0
02
/
1
4
/
1
2
31
0
7
03
/
0
6
/
1
2
31
4
6
03
/
2
7
/
1
2
32
2
0
05
/
0
1
/
1
2
32
2
2
05
/
0
1
/
1
2
32
7
5
05
/
2
2
/
1
2
28
4
1
10
/
0
4
/
1
1
28
5
0
10
/
1
1
/
1
1
28
6
8
10
/
1
3
/
1
1
29
4
8
12
/
3
1
/
1
1
At
k
i
n
s
No
r
t
h
Am
e
r
i
c
a
,
In
c
.
At
k
i
n
s
No
r
t
h
Am
e
r
i
c
a
,
In
c
.
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
Pa
y
e
e
TO
T
A
L
NW
S
LI
N
C
O
L
N
PA
R
K
PR
O
J
E
C
T
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
En
v
i
r
o
w
a
s
t
e
Se
r
v
i
c
e
s
Gr
o
u
p
En
v
i
r
o
w
a
s
t
e
Se
r
v
i
c
e
s
Gr
o
u
p
En
v
i
o
r
w
a
s
t
e
Se
r
v
i
c
e
s
Gr
o
u
p
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Th
e
Go
r
d
i
a
n
Gr
o
u
p
CO
N
V
E
N
T
I
O
N
CE
N
T
E
R
ST
R
E
E
T
S
C
A
P
E
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Be
r
m
a
n
,
Re
n
n
e
r
,
Vo
g
e
l
&
Ma
n
d
l
e
r
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Fi
r
e
an
d
El
e
c
t
r
i
c
a
l
Sy
s
t
e
m
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
TO
T
A
L
MU
L
T
I
-
P
U
R
P
O
S
E
BU
I
L
D
.
A
D
J
.
C
I
T
Y
H.
Ce
n
t
r
a
l
Co
n
c
r
e
t
e
Su
p
e
r
m
i
x
,
In
c
.
Ce
n
t
r
a
l
Co
n
c
r
e
t
e
Su
p
e
r
m
i
x
,
In
c
.
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Se
r
v
i
c
e
s
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
M.
Vi
l
a
&
As
s
o
c
i
a
t
e
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Se
r
v
i
c
e
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Se
r
v
i
c
e
s
TO
T
A
L
LI
N
C
O
L
N
RD
BT
W
.
CO
L
L
I
N
S
AN
D
Th
e
Go
r
d
i
a
n
Gr
o
u
p
TO
T
A
L
MI
A
M
I
CI
T
Y
BA
L
L
E
T
HV
A
C
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Gl
e
n
n
Da
l
e
En
g
l
e
h
a
r
d
t
A
&
P
Co
n
s
u
l
t
i
n
g
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Th
e
Go
r
d
i
a
n
Gr
o
u
p
At
k
i
n
s
No
r
t
h
Am
e
r
i
c
a
,
IN
C
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
Ha
r
b
o
u
r
Co
n
s
t
r
u
c
t
i
o
n
TO
T
A
L
CO
L
L
I
N
S
CA
N
A
L
EN
H
A
N
C
E
M
E
N
T
PR
O
J
E
C
T
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Sc
i
e
n
c
e
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Sc
i
e
n
c
e
s
Re
d
e
v
e
l
o
p
m
e
n
t
A
g
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
o
f
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
_
.
!
'
f
i
i
T
i
1
1
l
i
l
-
3,
9
3
8
.
8
5
5,
2
3
4
.
9
6
10
,
5
3
5
.
8
7
94
0
.
0
0
17
,
6
3
3
.
0
0
18
,
5
7
3
.
0
0
29
,
1
0
8
.
8
7
1,
4
4
7
.
4
4
16
3
.
9
4
1,
6
3
6
.
6
4
18
1
.
8
2
2,
9
5
2
.
7
0
83
1
.
4
5
15
,
8
8
5
.
2
4
36
4
.
7
5
33
,
1
1
7
.
1
5
71
7
.
5
3
14
,
2
9
4
.
6
3
52
5
.
3
7
72
,
1
1
8
.
6
6
72
,
1
1
8
.
6
6
19
8
.
9
5
70
0
.
0
0
51
7
.
1
4
4,
4
5
0
.
0
0
5,
8
6
6
.
0
9
10
,
2
0
2
.
8
6
34
3
.
6
0
10
,
5
4
6
.
4
6
16
,
4
1
2
.
5
5
6,
5
4
8
.
5
0
3,
0
4
3
.
9
4
19
,
0
7
8
.
7
5
6,
1
0
7
.
2
1
3,
2
6
8
.
0
0
74
,
1
9
1
.
9
6
42
3
,
3
6
5
.
8
8
44
2
.
0
0
10
0
.
0
0
53
6
,
1
4
6
.
2
4
53
6
,
1
4
6
.
2
4
Si
g
n
a
l
Mo
d
i
f
i
c
a
t
i
o
n
Pl
a
n
s
Si
g
n
a
l
Mo
d
i
f
i
c
a
t
i
o
n
Pl
a
n
s
Ty
p
e
o
f
Ex
p
e
n
s
e
Re
i
m
b
.
Re
q
u
e
s
t
fo
r
Pa
r
k
-
Re
s
54
3
-
2
0
0
7
,
55
2
-
2
0
0
7
Re
i
m
b
.
Re
q
u
e
s
t
fo
r
Ad
d
i
t
i
o
n
a
l
l
m
p
r
o
v
.
-
Re
s
54
3
-
2
0
0
7
,
55
2
-
2
0
0
7
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
En
v
i
r
o
w
a
s
t
e
Fe
e
s
fo
r
Cu
l
v
e
r
t
-
in
s
p
e
c
t
i
o
n
En
v
i
r
o
w
a
s
t
e
Fe
e
s
fo
r
Cu
l
v
e
r
t
-
in
s
p
e
c
t
i
o
n
En
v
i
r
o
w
a
s
t
e
Fe
e
s
fo
r
Cu
l
v
e
r
t
-
in
s
p
e
c
t
i
o
n
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
-
S
i
d
e
w
a
l
k
re
p
l
a
c
e
m
e
n
t
Co
n
s
t
r
u
c
t
i
o
n
-
S
i
d
e
w
a
l
k
re
p
l
a
c
e
m
e
n
t
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
In
s
t
a
l
l
a
t
i
o
n
of
11
Re
m
o
v
a
b
l
e
Ba
r
r
i
e
r
s
at
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
JO
G
Fe
e
s
fo
r
fi
r
s
t
fl
o
o
r
br
e
a
k
ro
o
m
Me
d
i
a
t
i
o
n
Co
s
t
s
JO
G
Fe
e
s
fo
r
fi
r
s
t
fl
o
o
r
br
e
a
k
ro
o
m
El
e
c
t
r
i
c
a
l
Wo
r
k
in
Co
i
n
Ro
o
m
-
M
P
K
G
F
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Di
r
e
c
t
Pa
y
m
e
n
t
fo
r
co
n
c
r
e
t
e
Di
r
e
c
t
Pa
y
m
e
n
t
fo
r
co
n
c
r
e
t
e
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
v
i
d
e
co
n
s
t
r
u
c
t
i
o
n
ma
t
e
r
i
a
l
s
te
s
t
i
n
g
se
r
v
i
c
e
s
Ca
p
i
t
a
i
-
C
M
B
Co
n
s
t
r
u
c
t
i
o
n
Ma
n
a
g
e
m
e
n
t
Co
n
s
t
r
u
c
t
i
o
n
Si
t
e
Pr
e
p
a
r
a
t
i
o
n
Pr
o
v
i
d
e
co
n
s
t
r
u
c
t
i
o
n
ma
t
e
r
i
a
l
s
te
s
t
i
n
g
se
r
v
i
c
e
s
Pr
o
v
i
d
e
co
n
s
t
r
u
c
t
i
o
n
ma
t
e
r
i
a
l
s
te
s
t
i
n
g
se
r
v
i
c
e
s
_
_
_
_
..
;
;
5
.
.
.
;
,
1-=
2
2
;
:
·
.
.
;
.
:
1
9
;
.
.
.
.
NC
Re
p
l
a
c
e
m
e
n
t
5,
1
2
2
.
1
9
5,
1
2
2
.
1
9
5,
2
2
7
.
3
6
1,
0
0
0
.
0
0
5,
6
5
1
.
1
0
5,
5
6
9
.
6
0
27
4
.
0
8
7,
2
8
4
.
3
5
15
,
3
7
0
.
0
0
29
,
4
0
9
.
7
0
88
,
8
3
5
.
7
5
15
8
,
6
2
1
.
9
4
15
8
,
6
2
1
.
9
4
25
,
4
3
2
.
6
6
14
,
9
7
9
.
9
9
63
5
.
0
0
1,
4
4
1
.
0
0
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Su
p
p
l
e
m
e
n
t
a
r
y
Fi
e
l
d
In
s
p
e
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
u
l
t
i
n
g
&
En
g
i
n
e
e
r
s
Da
d
e
bl
v
d
bi
k
e
pa
t
h
ad
d
i
t
i
o
n
a
l
wo
r
k
Da
d
e
bl
v
d
bi
k
e
pa
t
h
ad
d
i
t
i
o
n
a
l
wo
r
k
Da
d
e
bl
v
d
bi
k
e
pa
t
h
ad
d
i
t
i
o
n
a
l
wo
r
k
Te
m
p
o
r
a
r
y
Tr
a
n
s
p
o
r
t
a
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Ge
o
t
e
c
h
n
i
c
a
l
an
d
La
b
o
r
a
t
o
r
y
Te
s
t
i
n
g
Se
r
v
i
c
e
s
Project or N/A
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
Park Project
36
5
-
2
6
4
2
Ne
w
Wo
r
l
d
Symphony Park Project
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
Park Project
Ne
w
Wo
r
l
d
Sy
m
p
h
o
n
y
Park Project
Co
n
v
e
n
t
i
o
n
Ce
n
t
e
r
St
r
e
e
t
s
c
a
p
e
-ROW
Co
n
v
e
n
t
i
o
n
Ce
n
t
e
r
St
r
e
e
t
s
c
a
p
e
-ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
36
5
-
2
3
2
7
Co
n
v
e
n
t
i
o
n
Center Streetscape ROW
Mu
l
t
i
-
P
u
r
p
o
s
e
Bu
i
l
d
.
A
d
j
.
C
i
t
y
Hall
Mu
l
t
i
-
P
u
r
p
o
s
e
Bu
i
l
d
.
A
d
j
.
C
i
t
y
Hall
36
5
-
2
4
4
8
Mu
l
t
i
-
P
u
r
p
o
s
e
Build.Adj.City Hall
36
5
-
2
4
4
8
Mu
l
t
i
-
P
u
r
p
o
s
e
Build.Adj.City Hall
Mu
l
t
i
-
P
u
r
p
o
s
e
Bu
i
l
d
.
A
d
j
.
City Hall
Mu
l
t
i
-
P
u
r
p
o
s
e
Bu
i
l
d
.
A
d
j
.
C
i
t
y
Hall
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
6
4
Li
n
c
o
l
n
Ro
a
d
Between Collins & Wash.
36
5
-
2
6
4
9
Mi
a
m
i
Ci
t
y
Ba
l
l
e
t
-
r
r
m
m
i
a
m
i
c
b
36
5
-
2
9
5
0
-C
o
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
36
5
-
2
9
5
0
Co
l
l
i
n
s
Ca
n
a
l
Enhancement Project
CC
H
V
Ne
i
g
h
.
lm
p
r
o
v
.
-
Historic Dis!.
CC
H
V
Ne
i
g
h
.
lm
p
r
o
v
.
-
Historic Dis!.
CC
H
V
Ne
i
g
h
.
lm
p
r
o
v
.
-
Historic Dis!.
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dis!. BP9A 10
.
_
w
.
m
r
s
w
29
6
4
12
/
2
0
/
1
1
31
4
0
03
/
2
7
/
1
2
31
1
8
03
/
1
3
/
1
2
31
8
4
04
/
1
2
/
1
2
31
9
5
04
/
2
4
/
1
2
32
1
4
04
/
2
6
/
1
2
32
2
3
05
/
0
1
/
1
2
32
5
1
05
/
1
7
/
1
2
32
7
1
05
/
1
7
/
1
2
32
8
8
05
/
2
9
/
1
2
28
5
7
10
/
1
3
/
1
1
29
7
0
12
/
2
0
/
1
1
29
7
1
12
/
2
0
/
1
1
31
2
0
03
/
1
3
/
1
2
30
0
6
01
/
1
7
/
1
2
30
1
6
01
/
1
9
/
1
2
30
2
5
01
/
2
4
/
1
2
30
3
1
01
/
2
7
/
1
2
30
6
5
02
/
1
6
/
1
2
30
7
6
02
/
2
3
/
1
2
30
8
1
02
/
2
8
/
1
2
31
3
3
03
/
2
2
/
1
2
32
0
5
04
/
2
4
/
1
2
32
5
7
05
/
1
7
/
1
2
30
0
8
01
/
1
9
/
1
2
28
5
6
10
/
1
3
/
1
1
30
0
8
01
/
1
9
/
1
2
32
2
4
05
/
0
1
/
1
2
32
3
9
05
/
1
5
/
1
2
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Ri
d
g
w
a
y
'
s
LL
C
Pa
y
e
e
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Sc
i
e
n
c
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
U.
S
Le
g
a
l
Su
p
p
o
r
t
In
c
Na
t
i
o
n
a
l
Re
p
o
r
t
i
n
g
Se
r
v
i
c
e
s
Ch
e
n
&
As
s
o
c
i
a
t
e
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Sc
i
e
n
c
e
s
Va
l
l
e
y
c
r
e
s
t
La
n
d
s
c
a
p
e
M.
Vi
l
a
&
As
s
o
c
i
a
t
e
s
,
In
c
.
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Th
e
Go
r
d
i
a
n
Gr
o
u
p
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Va
l
l
e
y
Cr
e
s
t
La
n
d
s
c
a
p
e
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Pa
y
P
a
l
Sa
f
e
t
y
Sy
s
t
e
m
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Me
t
r
o
Ex
p
r
e
s
s
Un
i
v
e
r
s
a
l
En
g
i
n
e
e
r
i
n
g
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
TO
T
A
L
CC
H
V
NE
I
G
H
B
O
R
H
O
O
D
IM
P
R
O
V
E
M
E
N
T
S
Id
e
a
l
Ar
c
h
i
t
e
c
t
u
r
a
l
De
s
i
g
n
,
PA
Ci
t
y
of
Mi
a
m
i
Be
a
c
h
Th
e
Go
r
d
i
a
n
Gr
o
u
p
TO
T
A
L
DI
R
E
C
T
O
R
Y
SI
G
N
S
IN
TH
E
CI
T
Y
CE
N
T
E
R
RO
W
Fo
u
n
d
De
s
i
g
n
LL
C
TO
T
A
L
WA
Y
F
I
N
D
I
N
G
SI
G
N
A
G
E
&
MA
P
S
UP
D
A
T
E
S
RE
P
O
R
T
TO
T
A
L
Re
d
e
v
e
l
o
p
m
e
n
t
Ag
e
n
c
y
-
Ci
t
y
Ce
n
t
e
r
Di
s
t
r
i
c
t
Ch
e
c
k
&
Wi
r
e
Tr
a
n
s
f
e
r
Re
g
i
s
t
e
r
by
Pr
o
j
e
c
t
&
Ty
p
e
of
Ex
p
e
n
s
e
Fi
s
c
a
l
Ye
a
r
20
1
2
_
.
!
f
f
i
i
i
i
i
T
i
l
Ty
p
e
o
f
Ex
p
e
n
s
e
$
3,
5
7
0
.
0
1
64
,
0
8
9
.
0
4
1,
4
6
5
.
4
2
70
0
.
0
0
17
,
2
8
0
.
2
1
92
4
.
7
5
95
.
0
0
22
,
3
0
3
.
2
9
50
0
.
0
0
25
0
.
0
0
15
3
,
6
6
6
.
3
7
46
3
,
8
3
8
.
7
7
6,
7
5
3
.
8
0
2,
1
9
7
.
9
3
12
,
6
4
7
.
1
8
10
0
.
0
0
52
6
.
8
1
91
5
.
0
0
41
1
.
3
5
42
5
.
5
2
61
0
.
0
0
10
,
1
6
0
.
0
0
57
,
1
5
6
.
8
2
50
0
.
0
0
34
,
9
0
5
.
9
5
59
1
,
1
4
9
.
1
3
25
,
8
3
9
.
3
9
25
,
8
3
9
.
3
9
77
0
,
6
5
4
.
8
9
1,
5
4
8
.
0
0
3,
3
0
3
.
9
5
1,
2
5
9
.
5
8
6,
1
1
1
.
5
3
6,
1
1
1
.
5
3
6,
6
0
0
.
0
0
6,
6
0
0
.
0
0
6,
6
0
0
.
0
0
17
,
8
2
3
,
2
8
5
.
3
2
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Ge
o
t
e
c
h
n
i
c
a
l
an
d
La
b
o
r
a
t
o
r
y
Te
s
t
i
n
g
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Le
g
a
l
Su
p
p
o
r
t
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
Re
l
o
c
a
t
e
Tr
e
e
/
I
r
r
i
g
a
t
i
o
n
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Pu
b
l
i
c
Wo
r
k
s
Ch
a
r
g
e
b
a
c
k
(i
n
v
e
n
t
o
r
y
)
J/
E
03
/
0
0
5
-D
e
c
20
1
1
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Pu
b
l
i
c
Wo
r
k
s
Ch
a
r
g
e
b
a
c
k
J/
E
03
-
0
2
9
In
s
t
a
l
l
a
t
i
o
n
of
18
Fi
r
e
Hy
d
r
a
n
t
s
Co
n
s
t
r
u
c
t
i
o
n
Se
r
v
i
c
e
s
Pu
b
l
i
c
Wo
r
k
Ch
a
r
g
e
b
a
c
k
J/
E
06
-
0
2
1
Ca
p
i
t
a
i
-
C
M
B
Co
n
s
t
r
u
c
t
i
o
n
Ma
n
a
g
e
m
e
n
t
Pr
o
f
e
s
s
i
o
n
a
l
Se
r
v
i
c
e
s
-
De
s
i
g
n
Se
r
v
i
c
e
s
Ca
p
i
t
a
i
-
C
M
B
Co
n
s
t
r
u
c
t
i
o
n
Ma
n
a
g
e
m
e
n
t
Ca
p
i
t
a
i
-
C
M
B
Co
n
s
t
r
u
c
t
i
o
n
Ma
n
a
g
e
m
e
n
t
Wa
y
f
i
n
d
i
n
g
Si
g
n
a
g
e
an
d
Ma
p
s
Up
d
a
t
e
s
Project or N/A
36
5
-
2
6
1
6
C
C
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
CC
H
V
Ne
i
g
h
.
lm
p
r
o
v
.
-
Historic Dist.
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
6
1
6
CC
H
V
Ne
i
g
h
.
lmprov. Historic Dist. BP9A
36
5
-
2
3
6
5
St
o
r
m
w
a
t
e
r
Pi
p
e
Repairs
36
5
-
2
7
0
0
Di
r
e
c
t
o
r
y
Si
g
n
s
in the City Center ROW
36
5
-
2
7
0
0
Di
r
e
c
t
o
r
y
Si
g
n
s
in the City Center ROW
36
5
-
2
7
0
0
Di
r
e
c
t
o
r
y
Si
g
n
s
in the City Center ROW
36
5
-
2
4
2
2
Wa
y
f
i
n
d
i
n
g
Si
g
n
a
g
e
& Maps Updates 11
s~~3rOHd
HOrYII\I :10 AHYINII\InS
,,y,, ~N311\1H~Y~~y
REDEVELOPMENT PROJECTS (Planned and/or Underway)
City Center
Collins Park/Streetscape/Rotunda
This project is for the renovation and redesign of Collins Park on the
west side of Collins Avenue (approx. 4.5 acres) per Cultural Campus
Master Plan after the demolition of the existing library. This project
does not include Collins Park improvements on the east side of
Collins Avenue (approx. 3.3 acres), for which design and
construction are to be coordinated with the streetscape improvements
and beach walk improvements.
Project Management Department: CIP Office
Total Project Cost: $10,342,106
Total CRA participation: $8,522,106
Source: Pg. 312 -Capital Improvement Plan and FY 08/09 Capital
Budget
Collins Park Children's Feature
Colony Theatre Renovation
This project is for the construction of a child oriented art/interactive
feature as part of the Collins Park project. The project will
complement the previously approved Collins Park project and will
provide a needed children's space within the Collins
Park/Oceanfront Neighborhood.
Project Management Department: CIP Office
Total Project Cost: $150,000
Total CRA participation: $150,000
Source: Pg. 289 -Capital Improvement Plan and FY 09/10 Capital
Budget
This project is for the renovation of the ex1stmg ground floor
restrooms of the Colony Theatre to comply with the Americans with
Disabilities Act (ADA), and to provide a remote trash disposal
enclosure at an adjacent City owned surface parking lot. These
projects are not going to be done concurrently.
Project Management Department: CIP Office
Total Project Cost: $734,690
Total CRA participation: $734,690 ($500,000 Grant Funded)
Source: Pg. 117 -Capital Improvement Plan and FY 08/09 Capital
Budget
Page 1 of6
City Center
City Center Right-of-Way Improvement Project (City Center-Commercial District BP9B)
This project includes the restoration and enhancement of right-of
ways/streetscapes throughout the City Center, including roadway,
sidewalks, curb and gutter, landscape, streetscape, irrigation,
lighting, potable water, and storm drainage infrastructure as needed.
The project limits include Drexel Avenue from Lincoln Lane to
Lincoln Lane North, Pennsylvania Avenue from 16th to 1 ih Street,
Euclid Avenue from Lincoln Lane to Lincoln Road Mall, Meridian
Avenue from 16th to 1 i\ Jefferson Avenue from Lincoln Lane to
1 ih St., Michigan A venue from 16th to 17th, Lenox A venue from 16th
to 17th, Lenox Court, Lincoln Lane to 16th, Lincoln Lane from Drexel
to Alton Rd., Lincoln Lane North from Washington to Alton,
Washington to Dade Blvd, Convention Center Drive and 19th Street.
Project Management Department: CIP Office
Total Project Cost: $13,209,842
Total CRA participation: $13,209,842
Source: Pg. 310 -Capital Improvement Plan and FY 08/09 Capital
Budget
New World Symphony Garage Project
This project is for The Frank Gehry-designed Pennsylvania Avenue
public parking garage just west of the New World Symphony. This
fully self-serve garage features 550 parking spaces and
approximately 8,000 square feet of first class retail space. The garage
provides access to the New World Symphony via a third floor
covered walkway and is illuminated with LED lights at night that
coordinate in color with lights on the protruding sunshade from New
World Symphony's north fa<;ade.
Project Management Department: RDA
Total Project Cost: $15,210, 185
Total CRA participation: $15,210,185
Source: Pg. 199 -Capital Improvement Plan and FY 08/09 Capital
Budget
New World Symphony Park Project
This project is for a new park which is an integral component of the
overall Master Plan involving the New World Symphony Sound
Space Project. The partnership between the City and the New World
Symphony (the "Symphony") has resulted in the New World Center;
a new, state of the art performance and recording facility which
opened in February 2011 on City-owned land, with the adjacent City
owned 2.85 acre park, SoundScape, which features a 7,000 square
foot projection wall on the eastern front of the New World building.
Complete with a world-class audio system, ExoStage after dark
provides a canvas for video art, music, film and simulcasts of
concerts playing inside the New World Center. This facility is a
technological wonder designed by celebrity architect Frank Gehry
and the first of its kind in the world.
Page 2 of6
City Center
New World Symphony Park Project cont'd ...
Project Management Department: RDA
Total Project Cost: $22,300,000
Total CRA participation: $22,300,000
Source: Pg. 273 -Capital Improvement Plan and FY 08/09 Capital
Budget
Multi-Purpose Municipal Parking Facility
This project is a seven level parking facility having 651 parking
spaces, approximately 32,000 sq. ft. of commercial office space
facing Meridian A venue and associated site improvements. The
project is located on the East side of Meridian A venue at 17th Street
in the City of Miami Beach Florida behind City Hall. The project is
to be constructed in five separate construction phases: Demolition,
Piling, Underground Utilities, Garage & Office Complex and Tenant
Build-Out. The garage and office complex contract was awarded to
the Tower Group. This project is currently in Phase 4 which
includes construction of the main building structure as well as site
improvements such as landscaping and the new plaza area, street
resurfacing, sidewalks, etc.
Project Management Department: CIP Office
Total Project Cost: $40,140,255
Total CRA participation: $19,653,098
Source: Pg. 192 -Capital Improvement Plan and FY 08/09 Capital
Budget and Page 10 of CIP's Bi-Weekly Construction Report dated
January 15, 2010
Lincoln Road between Collins & Washington
This project is between the Lincoln Road Mall and the Beachfront
Area, and will be designed to address the needs of the commercial
and retail area as well as the pedestrian, private and public vehicular
access. The project includes roadway reconfiguration to
accommodate uniform traffic lanes throughout, installation of a
landscaped center median with uplighting, sidewalk replacement,
installation of a brick paver crosswalk with ADA curb ramps,
installation of a bump out to formalize the parking area and reduce
the crosswalk distance, installation of street furniture and resurfacing
of the asphalt pavement.
Project Management Department: CIP Office
Total Project Cost: $2,488,093
Total CRA participation: $2,488,093
Source: Pg. 324 -Capital Improvement Plan and FY 08/09 Capital
Budget
Page 3 of6
L
City Center
Collins Canal Enhancement Project
Little Stage Complex
The Collins Canal Enhancement Project includes the development of
the Dade Blvd. Bike path, which is a recreational greenway that will
connect to the Venetian Causeway Bike Path and the Beachwalk, as
well as seawall restoration for the north bank of the canal. The
major bikeway artery will tie into a regional network of planned
recreational trails/alternative transportation routes, called the Atlantic
Greenway Network, connecting five public parks, eight beach access
areas, and seven regional parking facilities in Miami Beach. This
project is part of the larger Atlantic Greenway Network which aims
to promote the use of alternative transportation and reduce traffic
congestion. The Collins Canal Project will provide environmental,
social and human health benefits to the community.
Project Management Department: Public Works
Total Project Cost: $8,555,127
Total CRA participation: $1,600,000
Source: Pg. 94 -Capital Improvement Plan and FY 08/09 Capital
Budget
The Little Stage Complex project scope includes planning,
programming, design, bid and award and construction
administration, restoration and/or rehabilitation of the Little Stage
Theater (Acorn Theater), Carl Fisher Clubhouse, Outdoor Dance
Plaza I Bandshell (proposed to be demolished), and associated
walkway areas adjacent to these facilities to accommodate pedestrian
circulation and limited vehicular routes as necessary.
Project Management Department: CIP Office
Total Project Cost: $7,937,392
Total CRA participation: $637,200
Source: Pg. 121 Capital Improvement Plan and FY 08/09 Capital
Budget
West Avenue/Bay Road Improvements
The West Avenue/ Bay Road Improvements project is an area-wide
street improvement which may include street resurfacing, swale
restoration, repair of sidewalks, street lighting upgrades, enhanced
landscaping and entryway features. The scope of this project
includes West Avenue and Bay Road from 5th St. to Collins Canal,
east/west side streets west of Alton Road from 6th to Lincoln Road
and Lincoln Court, integrated with drainage improvements to Basins
7, 8, 11, 12, and 13 per the Stormwater Master Plan.
Project Management Department: CIP Office
Total Project Cost: $25,735,556
Total CRA participation: $750,000
Source: Pg. 357 -Capital Improvement Plan and FY 08/09 Capital
Budget
Page 4 of6
City Center
CCHC Neighborhood Improvements-Historic District
This project includes improvements to the stormwater collection and
disposal system upgrades, water distribution center upgrades,
roadway resurfacing and streetscape enhancements, landscaping,
traffic calming installations, additional pedestrian lighting, and
enhanced pedestrian linkages. The project limits are bounded by
Washington Avenue to the west, Collins Avenue to the east, Lincoln
Road to the South, and Dade Blvd to the north, and includes James,
Park and Liberty Avenue, 17th, 18t\ 19th and 20th Streets, and 21st
Street west of Park A venue. The City entered into an agreement
with Chen and Associates for the design of the project.
Project Management Department: CIP Office
Total Project Cost: $18,502,024
Total CRA participation: $18,463,939
Source: Pg. 309 -Capital Improvement Plan and FY 08/09 Capital
Budget
Botanical Garden (Garden Center)
This project is for Phase II of renovations to the Garden Center.
Phase I improvements, which are complete, included new fencing,
new roof with related asbestos abatement, restroom renovations,
exterior paint, new doors, trash cans, benches and other site
furnishings. The Phase II project will include renovations to the
building, entry, patio roof, pergola, maintenance area, site
improvements, lighting, signage, planting, irrigation, interior
renovations and interior acoustic improvements. Raymond Jungles,
Inc. was ranked first by the committee as the firm to develop the
concept plan prior to proceeding to design development.
Project Management Department: CIP Office
Total Project Cost: $1,851,925
Total CRA participation: $351,925
Source: Pg. 91 -Capital Improvement Plan and FY 08/09 Capital
Budget
Pedestrian Countdown Signals
This project is to provide pedestrian countdown signals at key
intersections. Pedestrian countdown signals provide an extra level of
public safety. Pedestrians crossing an intersection can visually see
how many seconds are left before the traffic light changes. Phase I
of the program will provide for pedestrian countdown signals in
thirty-two intersections.
Project Management Department: Public Works
Total Project Cost: $496,000
Total CRA participation: $56,000
Source: Pg. 480 -Capital Improvement Plan and FY 09/10 Capital
Budget
Page 5 of6
L
City Center
Directory Signs in the City Center ROW
This project is for the installation of Monument Directory signs
within the City Center neighborhood rights of way, in vicinity of
City Hall, and on City Hall Campus Buildings to direct residents and
visitors to City offices and services.
Project Management Department: CIP Office
Total Project Cost: $108,268
Total CRA participation: $108,268
Source: Pg. 434 -Capital Improvement Plan and FY 10/11 Capital
Budget
24" PVC Sanitary Sewer Improvements
This Sanitary Sewer Main Improvements project includes installing
approximately 960 linear feet of 24-inch PVC C905 and 1190 linear
feet of 8-inch PVC C900 pipe and fittings; 7 manholes, traffic
control and all ancillary and miscellaneous work. As a result of
added development within this sewer shed, the capacity of this
Sanitary Sewer distribution system will need to be increased to
convey the increased floor.
Project Management Department: Public Works
Total Project Cost: $646,031
Total CRA participation: $646,031 Reallocated-Reso# 568-2010
Source: Pg. 568 -Capital Improvement Plan and FY 11/12 Capital
Budget
Page 6 of6