Storm Sewers_June 1953 to March 1954STORM SEWERS 24
Book Page
$800.00 allocated for extension of
storm sewer from 67th St. parking Area
across Indian Cr. Dr. to northeast car.
Ind. Cr. Dr. and 65th St.
6-10-53 34 328
$31,570.00 appropriated from 41st St.
Bridge Bond Fund to cover cost of
constructing 41st St. storm sewer
6-17-53 34 338
$33,000. allocation from Storm Sewer
Bonds approved for construction of
storm sewer in 72nd St. from waterway
west of Dickens Ave. to Abbott Ave.
7-15-53 34 397
STORM SEWERS 25
Book Page
Construction of storm sewer and
septic tank overflow in West Di Lido
Dr. from 3rd Terr. to 4th Terr.
authorized, $1,867.25 11-18-53 35 173
Construction of storm sewer in
Noremac Ave. from canal to Daytonia Rd.
together with 8" line south to 7806 Noremac
Ave. to act as septic tank overflow line,
$2,444.75 authorized 11-18-53 35 173
Construction of storm sewer in Blk 59,
Normandy GolfCburse Sub. from No. Shore
Dr. to Fairway Dr. authorized, $1,375.00
11-18-53 35 173
STORM SEWERS 26
Book Page
Construction of storm sewer in
Belle Isle, authorized, - from
pumping station overflow line
across park to Island Ave., $2,629.00
12-2-53 35 219
Construction of storm sewer in
East Rivo Alto Dr. authorized,
from approx. 50 feet south of
First Terr. to 2nd Terr., $3,382.50
12-2-53 35 219
Connecting syphon at Collins Ave.
& 87th Terr. to Harding Ave. storm
sewer authorized, $1,237.50
3-3-54 35 365