Loading...
Storm Sewers_June 1953 to March 1954STORM SEWERS 24 Book Page $800.00 allocated for extension of storm sewer from 67th St. parking Area across Indian Cr. Dr. to northeast car. Ind. Cr. Dr. and 65th St. 6-10-53 34 328 $31,570.00 appropriated from 41st St. Bridge Bond Fund to cover cost of constructing 41st St. storm sewer 6-17-53 34 338 $33,000. allocation from Storm Sewer Bonds approved for construction of storm sewer in 72nd St. from waterway west of Dickens Ave. to Abbott Ave. 7-15-53 34 397 STORM SEWERS 25 Book Page Construction of storm sewer and septic tank overflow in West Di Lido Dr. from 3rd Terr. to 4th Terr. authorized, $1,867.25 11-18-53 35 173 Construction of storm sewer in Noremac Ave. from canal to Daytonia Rd. together with 8" line south to 7806 Noremac Ave. to act as septic tank overflow line, $2,444.75 authorized 11-18-53 35 173 Construction of storm sewer in Blk 59, Normandy GolfCburse Sub. from No. Shore Dr. to Fairway Dr. authorized, $1,375.00 11-18-53 35 173 STORM SEWERS 26 Book Page Construction of storm sewer in Belle Isle, authorized, - from pumping station overflow line across park to Island Ave., $2,629.00 12-2-53 35 219 Construction of storm sewer in East Rivo Alto Dr. authorized, from approx. 50 feet south of First Terr. to 2nd Terr., $3,382.50 12-2-53 35 219 Connecting syphon at Collins Ave. & 87th Terr. to Harding Ave. storm sewer authorized, $1,237.50 3-3-54 35 365