Theater Of The Performing Arts_October 1973 to November 1974THEATRE OF PERFORMING ARTS 15
Meeting Date
Councilman Magnes appointed Mrs. Sara Z.
Ross to Ad Hoc Committee 10/17/73
Memo 4298 -Discussion on possible advertising
for bids on heavy steel for above. Immediate
preparation of plans and specifications for
required structural steel and bidding and award
of same, approved as recommended by Administra-
tion.
Memo 4369:Presentation of bids for structural
steel for construction of Theatre of Perform-
ing Arts deferred to 1/23/74.
Memo 4369 -presentation of bids for structural
steel for construction of Theatre of Perf. Arts
THEATRE OF PERFORMING ARTS
deferred at request of City Mgr.
11/21/73
1/16/74
16
Meeting Date
1/23/74
Memo 4379 Steel for Theatre of Performing Arts
bids rejected and readvertise. authorized.
City Mar. rendered status report on future plans
for rc.idding and arrangements made re: use by
Symphony, Opera, etc. of Auditorium, resulting
from construction delay.
2/6/74
Discussion of any additional bond issue pro- 9/24/74
posals for placement on the 11/5/74 ballot,
re Theatre of Performing Arts, NO ACTION
TAKEN.
City Mgr. advised that architect has indicated
that specifications can be revised without
THEATRE OF PERFORMING ARTS
affecting the acoustics or basic nature of
the Theatre which, in addition to present
conditions in construction industry, should
bring in bids closer to original bond issue
and he recommended that no further bond
issue be placed on the 11/5/74 ballot for
this project.
17
Date
Memo #4833, Theatre for the Performing Arts, 11/6/74
PB -a81, Bid #150-74. Deferred to 11/20/74 at
11:00 a.m.
Architect Morris Lapidus requested to be
present to describe details of areas where
revisions were made in original plans.
City Mgr. to submit report on method of funding.