Pipes And Fittings_December 1972 to October 1974PIPES AND FITTINGS
Clay Sewer Pipe for 5th St. Widening
to Griffin Pipe Products $5,826.06.
Memo 4072 -ABS or PVC pipe and fittings bid
awarded Johns Manville Sales Corp -$11,982.08
Memo 4093 -Concrete pipe for storm sewer on
South Coconut Lane awarded to United States
Concrete Pipe Co. $5,371.
Memo 4130, awarded lowest bidders, American
Cast Iron Pip e Co. $7,399 for pipe; B & H
Sales $3,345 for fittings.
3
Meetina_Date
12/6/72
6/29/73
7/18/73
8/8/73
PIPES AND FITTINGS CONTRACTS 4
Meeting Date
Memo 4279 -Clay sewer pipe, sanitary
sewer replacement, Alton Ct. -15 St.
to Lincoln Rd. awarded Griffin Pipe Prods.
for $8,651.17. 11/21/73
Memo 4376. Galvanized pipe and bronze gate
valves for 5th St. sprinkler system to
Bond Plumbing Supply,Inc. $4,187.86 (pipe)
and Peninsular Supply $1,217.11 (Valves)
Memo 4528- Cast iron pipe and fittings (Water
line to Normandy Shores) to U.S.Pipe &
Foundry Co. $17,772.88 plus $1. per ton for
ea $1. per ton published increase for scrap. 5/1/74
2/6/74
PIPES AND FITTINGS CONTRACTS
Memo 4599 15",12",18" Reinforced Concrete Pipe
for Storm Sewer Projects awarded to Florida
Concrete Pipe Inc.,quoting $14,782.72. 6/5/74
5
Cast iron pipe and fittings(Bid #104-74),awarded 8/7/74
Hughes Supply Inc., quoting $46,167.74(Memo #4683).
Memo #4783, Assorted Cast Iron Fittings & 10/16/74
Valves, Bid #134-74, awarded, Items 1 thru
11, Hughes Supply Co., $8,894.00; Items 12
& 13, Sav-On Utility Supplies Inc., $4,650.00.