Loading...
Sidewalks_February 1955 to June 1956SIDEWALKS 35 Book Page Relocation of sidewalk at All Souls Episcopal Church at 4023 Pine Tree Dr. approved, providing the necessary right- of-way is dedicated to the City and the church bears cost of the construction. 2-9-55 36 436 SIDEWALKS 36 Book Page Sidewalk construction authorized along north side of 71st St. from Trouville Espl. to Rue Granville, abutting Normandy Isle Park and Playground; also on on the west side of Trouville Espl. from 71st St. to Normandy Dr. and the south side of Normandy Dr. from Trouville Espl. to 280 feet west. Mr. Lapp's estimate of cost (as non -assessable project) $3,840.00. Appropriation from unappropriated current funds. 11-16-55 37 451 $4,491.30 appropriated for sidewalk construction west side Collins Ave. from 44th St to 1900' N. Funds from unappropriated current funds to be boreimbursed from Collins AvI,�-Wl d i g 409 SIDEWALKS Petition filed requesting sidewalk construction on west side of Pine Tree Dr. between Lot 21, Blk 32, Lakeview Sub. and W. 51st St. City Mgr. advises partial sidewalk construction would be dangerous; that sidewalk should be constructed from W.47th St. to W.51st St. Res. #9270 ordering SK -226 6-6-56 38 30 (Property owners to be notified re. hearing) Hearing re. sidewalk construction on west side of Pine Tree Dr. (SK -226). Mr. Lipp to help with driveway situation. Res. #9276 confirming resolution ordering SK -22b 6-20-56 38 243 37 Book Page