Sidewalks_February 1955 to June 1956SIDEWALKS 35
Book Page
Relocation of sidewalk at All Souls
Episcopal Church at 4023 Pine Tree Dr.
approved, providing the necessary right-
of-way is dedicated to the City and
the church bears cost of the construction.
2-9-55 36 436
SIDEWALKS 36
Book Page
Sidewalk construction authorized along
north side of 71st St. from Trouville Espl.
to Rue Granville, abutting Normandy Isle Park
and Playground; also on on the west side
of Trouville Espl. from 71st St. to Normandy
Dr. and the south side of Normandy Dr. from
Trouville Espl. to 280 feet west. Mr. Lapp's
estimate of cost (as non -assessable project)
$3,840.00. Appropriation from unappropriated
current funds. 11-16-55 37 451
$4,491.30 appropriated for sidewalk construction
west side Collins Ave. from 44th St to 1900' N.
Funds from unappropriated current funds to be
boreimbursed from Collins AvI,�-Wl d i g 409
SIDEWALKS
Petition filed requesting sidewalk
construction on west side of Pine Tree Dr.
between Lot 21, Blk 32, Lakeview Sub. and
W. 51st St. City Mgr. advises partial
sidewalk construction would be dangerous;
that sidewalk should be constructed from
W.47th St. to W.51st St. Res. #9270
ordering SK -226 6-6-56 38 30
(Property owners to be notified re. hearing)
Hearing re. sidewalk construction on
west side of Pine Tree Dr. (SK -226).
Mr. Lipp to help with driveway situation.
Res. #9276 confirming resolution ordering
SK -22b 6-20-56 38 243
37
Book Page