21-012-01 Amici Engineering Contractors LLC Fully Executed 3-8-2021CONTRACT NO. 21-012-01
City of Miami Beach,1755 Meridian Avenue, 3rd Floor, Miami Beach, Florida 33139, www.miamibeachfl.gov
PROCUREMENT DEPARTMENT
Tel: 305-673-7490, Fax: 786-394-4235
SENT VIA E-MAIL TO: juanb@amiciec.com
March 4, 2021
Juan Barrenche
Amici Engineering Contractors, LLC
10621 SW 139th Street
Miami, FL 33176
Phone: 954-650-4699
RE: NOTICE OF AWARD OF CONTRACT PURSUANT TO INVITATION TO BID (ITB) NO.
2021-012-WG ROUTINE AND EMERGENCY REPAIR SERVICES TO WATER SEWER
AND STORMWATER SYSTEMS
Dear Mr. Barrenche:
On November 26, 2020, Amici Engineering Contractors, LLC., (the “Contractor”) submitted to the
City of Miami Beach, Florida (the “City”) a request to be prequalified for future projects in response
to the above-referenced ITB. The ITB stipulates, pursuant to Section 0200, Sub-Section 16,
Binding Contract, that the approval of the City Manager’s recommendation by the Mayor and City
Commission shall constitute a binding Contract between the City and the awarded bidder.
Accordingly, this letter shall serve as official notice from the City that the Mayor and Commission,
at its February 10, 2021 meeting, approved the City Manager’s recommendation, pursuant to the
ITB, to prequalify the Contractor to be eligible to provide services to the City for routine and
emergency repairs to water, sewer and stormwater systems. When requesting department(s)
requires services, it may seek quotes from prequalified contractors and may select the contractor
it deems to be in the best interest of the City. All work will be awarded and must be performed in
accordance with the ITB and any supplemental project plans, specifications and instructions. No
services may be performed until such time as the City has issued a Purchase Order.
If you have any questions regarding notification of award, you may contact Valerie Velez,
Contract Analyst, Procurement Department, at ValerieVelez@miamibeachfl.gov or at
305.673.7490. Otherwise, all other questions should be addressed to the Contract Manager for
this contract, Rodolfo De La Torre, Infrastructure Division Director, Public Works at
RodolfoDeLaTorre@miamibeachfl.gov or (305) 673-7080 Ext. 26243.
Sincerely,
Alex Denis
Director Procurement Department
AD/ME/AG
ATTACHMENT A
RESOLUTION & COMMISSION AWARD MEMO
ATTACHMENT B
ADDENDA AND ITB SOLICITATION
PROCUREMENT DEPARTMENT
1755 Meridian Avenue, 3rd Floor
Miami Beach, Florida 33139
www.miamibeachfl.gov
1 ADDENDUM NO. 1
INVITATION TO BID 2021-012-WG
ROUTINE AND EMERGENCY SERVICES POOL OF PREQUALIFIED CONTRACTORS
ADDENDUM NO. 1
INVITATION TO BID NO. 2021-012-WG
ROUTINE AND EMERGENCY SERVICES POOL OF PREQUALIFIED CONTRACTORS
November 11, 2020
This Addendum to the above-referenced ITB is issued in response to questions from prospective proposers, or other
clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are
shown by strikethrough and additions are underlined).
I. REVISION:ITB DUE DATE AND TIME. The deadline for the electronic receipt of bids is extended until 3:00
p.m., on Friday, November 13, 2020.
All bids received and time stamped through BidSync, prior to the bid submittal deadline shall be accepted as
timely submitted. Bids will be opened promptly at the time and date specified. Hard copy bids or bids
received electronically, either through email or facsimile, submitted prior to or after the deadline for receipt of
bids are not acceptable and will be rejected. Late bids cannot be submitted, bidders are cautioned to plan
sufficiently. The City will in no way be responsible for delays caused by technical difficulty or caused by any
other occurrence.
II. RESPONSES TO QUESTIONS RECEIVED:
Q1: Am I understanding the requirements correctly that if we do not carry the LGBT Business Enterprise
Certification from NGLCC we are not eligible to bid this project?
A1: LGBT Business Enterprise Certification is not a requirement of this ITB. The City is only
gathering data pursuant to LGBT Business Enterprise Certification.
Any questions regarding this Addendum should be submitted in writing to the Procurement Management
Department to the attention of the individual named below, with a copy to the City Clerk’s Office at
RafaelGranado@miamibeachfl.gov
Contact:
William Garviso, CPPB
Telephone:
305-673-7000 ext. 7490
Email:
WilliamGarviso@miamibeachfl.gov
Proposers are reminded to acknowledge receipt of this addendum as part of your ITB submission. Potential
proposers that have elected not to submit a response to the ITB are requested to complete and return the “Notice to
Prospective Bidders” questionnaire with the reason(s) for not submitting a proposal.
Sincerely,
William Garviso for
Alex Denis
Procurement Director
means
means
SECTION 0100: GENERAL INFORMATION & SCOPE OF WORK
1. PURPOSE.The City of Miami Beach faces the challenge of maintaining an aging infrastructure.
Occasionally pipe/valve failure lead to unanticipated disruption of water, sewer or storm drainage
systems and often result in health hazards to the public and significant consequential damages to
roads, structures and the environment.
The City of Miami Beach is seeking applications from qualified contractors who wish to participate in a
pre-qualification pool that will be used to perform routine and emergency repairs to water, sewer and
stormwater systems on short notice on neede as specified herein. Interested contractors
may submit an application indicating its intent to become prequalified. All contractors which meet or
exceed the criteria established in this solicitation shall be placed on a pre-qualification list that may be
accessed by various City departments to obtain price quotations for emergency response services.
The City utilizes BidSync (www.bidsync.com) for automatic notification of solicitation opportunities and
document fulfillment. Any prospective bidder who has received this ITB by any means other than
through BidSync is solely responsible for registering immediately with BidSync to assure it receives any
addendum issued to this ITB. Additionally, prior to submittal of the bid, bidder shall verify that it has
received and complied with all addenda issued. Failure to receive an addendum, or comply with an
addendum requirement, may result in disqualification of bid submitted.
To be considered for the pool of pre-qualified contractors, interested parties must submit a
complete Bidder Pre-Qualification Application (Appendix A).
SCOPE OF WORK
The prospective bidder shall provide all supervision, labor, equipment, materials, rental of equipment
and supplies necessary to provide services including but not limited to routine improvements and
emergency repairs to the City s water, sanitary sewer, and storm water systems, including but not
limited to: pump stations; potable water pipes, sanitary sewer main/lateral pipes and valves, storm
water drainage pipes; trenchless point repairs; rehabilitation of sanitary sewer and storm water
manholes. Pre-qualified contractors will be contacted in accordance with the road map procedures
included in the special conditions.
1. OVERVIEW OF PREQUALIFICATION PROCESS.The figure below is a general overview of the
process that the City will utilize to award work pursuant to the prequalification process.
2. PROCUREMENT CONTACT.Any questions or clarifications concerning this solicitation shall be
submitted to the Procurement Contact noted below. The Bid title/number shall be referenced on all
correspondence.
Procurement Contact:Telephone:Email:
William Garviso, CPPB 305-673-7000 x26650 WilliamGarviso@miamibeachfl.gov
The City Clerk is to be copied on all communications via e-mail at: RafaelGranado@miamibeachfl.gov;
or via facsimile: 786-394-4188.
3. APPROVAL OF PREQUALIFIED STATUS.Following the review of applications, the responsive,
responsible bidder(s) meeting all terms and conditions of the ITB will be recommended for award, as
deemed in the best interest of the City, to the City Manager for his consideration. After considering the
staff recommendation for award, the City Manager shall exercise his due diligence and recommend to
the Mayor and City Commission the bid that the City Manager deems to be in the best interest of the
City. The City Commission shall consider the City Manag ove or
reject mmendation(s). The City Commission may also reject all bids
received. In addition to the criteria established in the application, pursuant to Section 2-369 of the City
Code, the City may consider the following:
The ability, capacity and skill of the bidder to perform the Contract.
Whether the bidder can perform the Contract within the time specified, without delay or
interference.
The character, integrity, reputation, judgment, experience and efficiency of the bidder.
The quality of performance of previous contracts.
The previous and existing compliance by the bidder with laws and ordinances relating
to the Contract.
PREQUALIFIED STATUS IS VALID FOR FIVE (5) YEARS FROM DATE OF THE NOTICE OF
PREQUALIFICATION ISSUED BY THE CITY, OR AS OTHERWISE APPROVED BY THE CITY
MANAGER.
4. ADDITIONAL PREQUALIFIED FIRMS TO BE ADDED TO POOL.At any time, the City, through the
approval of the City Manager, may accept applications and add additional firms to the list of
prequalified firms.
5. SERVICE DELIVERY EXPECTATIONS.The City places an emphasis on excellent customer service
delivery and expects the prequalified bidder to provide the best possible customer service to any and
all awarded projects throughout the term of the contract. The project manager is
responsible for monitoring the customer service provided to City by prequalified bi s staff, sales
and support teams, and employing, as necessary, corrective measures, to ensure that the prequalified
bidder will provide and maintain the highest quality of customer service possible during completion of
the project(s). Project-specific deliverables and expectations shall be defined on a project-by-project
basis, as specified in each ITQ.
6. VOLUME OF WORK TO BE RECEIVED BY BIDDER. No promise of work is given, or should be
understood, as a result of a pre-qualification.The City reserves the right to purchase any goods
and/or services awarded from any resulting agreement, or another governmental contract, or on an as-
needed basis through the Cit rket purchase provisions.
7. STANDARD TERMS AND CONDITIONS.The City s Standard Terms and Conditions for
Construction Contracts (available at https://www.miamibeachfl.gov/city- hall/procurement/standard-
terms-and-conditions/) are referenced and incorporated herein.
8. BINDING AGREEMENT.By virtue of submitting an application for eration, the
bidder agrees that the application shall be considered an offer on the part of the bidder, which offer
shall be deemed accepted upon approval of bidder n status by City Manager or City
Commission. Further, bidder agrees that, tion by the City Manager
or City Commission, a binding Agreement shall be established between the City and the approved
contractor. The Agreement shall be comprised of the following documents, and in the following order:
First, the Purchase Order issued by the City; then,
Second, the signed Contractor Service Order; then,
Third, the Invitation to Quote (ITQ) awarded to the vendor; then,
Fourth,the Executed Agreement
Fifth the ITB, including all documents released in connection with the ITB, including
all appendixes, whether included herein or released under separate cover.
In case of default on the part of the Successful Bidder, after said award, the City may take such action
as it deems appropriate, including legal action, for damages or specific performance.
9. INSURANCE REQUIREMENTS.Bidders shall furnish to the City Certificates of Insurance or
endorsements evidencing capacity to meet the City s minimum insurance coverage specified herein,
with its bid, or within three (3) days from request by the City.
This document sets forth the minimum levels of insurance that the contractor is required to maintain
throughout the term of the contract and any renewal periods.
1. Workers' Compensation and Employer's Liability per the Statutory limits of the state of
Florida.
2. Comprehensive General Liability (occurrence form), limits of liability $ 1,000,000.00 per
occurrence for bodily injury property damage to include Premises/ Operations; Products,
Completed Operations and Contractual Liability. Contractual Liability and Contractual
Indemnity (Hold harmless endorsement exactly as written in "insurance requirements" of
specifications).
3. Automobile Liability - $1,000,000 each occurrence - owned/non-owned/hired automobiles
included.
4. The City must be named as and additional insured on the liability policies; and it must be
stated on the certificate.
5. Thirty (30) days written cancellation notice required.
6. The certificate must state the proposal number and title
7. Acceptability of Insurers Insurance must be placed with insurers with a current A.M. Best
rating of A:VII or higher. If not rated, exceptions may be made for members of the Florida
Insurance Funds (i.e. FWCIGA, FAJUA). Carriers may also be considered if they are licensed
and authorized to do insurance business in the State of Florida.
The City of Miami Beach is self-insured. Any and all claim payments made from self-insurance
are subject to the limits and provisions of Florida Statute 768.28, the Florida Constitution, and
any other applicable Statutes.
Certificate Holder:
CITY OF MIAMI BEACH
c/o PROCUREMENT DEPARTMENT
1755 MERIDIAN AVENUE, 3RD FLOOR
MIAMI BEACH, FL 33139
Special Risks or Circumstances.The City of Miami Beach reserves the right to modify these
requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or
other special circumstances on a project by project basis.
Waiver of Subrogation. Contractor hereby grants to City of Miami Beach a waiver of any right to
subrogation which any insurer of the Contractor may acquire against the City of Miami Beach by virtue
of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that
may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether
or not the City of Miami Beach has received a waiver of subrogation endorsement from the insurer.
APPENDIX A
________________________________________________________________________
Prequalification
Application
________________________________________________________________________
2021-012-WG
ROUTINE AND EMERGENCY SERVICES
POOL OF PREQUALIFIED
CONTRACTORS
PROCUREMENT DEPARTMENT
1755 Meridian Avenue, 3rd Floor
Miami Beach, Florida 33139
Prequalification Application Instructions
Section 1. ELECTRONIC RESPONSES (ONLY).Electronic responses shall only be considered for this ITB
and are to be submitted through BidSync until the date and time as indicated in this document. It is the sole
responsibility of the Bidder to ensure its application reaches BidSync before the Solicitation closing date
and time. There is no cost to the Bidder to submit an application in response to a City of Miami Beach
solicitation via BidSync. Electronic application submissions may require the uploading of electronic
attachments. The submission of attachments containing embedded documents or proprietary file extensions
is prohibited. All documents should be attached as separate files (proposal format indicated below). All
applications received and time stamped through BidSync, prior to the submittal deadline shall be accepted
as timely submitted. Applications will be opened promptly at the time and date specified. The City will in no
way be responsible for delays caused by technical difficulty or caused by any other occurrence.
Section 2. SUBMITTAL INSTRUCTIONS.The Prequalification Application will not be considered until it
has been electronically submitted completed and executed by a principal of the bidder. Incomplete
applications cannot be processed. If requested information is not applicable, please indicate ''N/A'' or
''None. '' If answers to questions are lengthier than the spaces that are provided in the application, the
answers may be provided on additional pages, which must be attached to the electronic application. All
requested documents must also be attached to the electronic application submittal via t
tab in BidSync. Failure to attach all requested documents will delay review and approval of the application
The City reserves the right to request clarifications or additional information as deemed necessary to
evaluate a bidder ations. When clarifications or additional information is requested by the City,
bidder will have three (3) business days to provide, in full, all the requested information. Failure to provide
the information within the prescribed time will delay the review process and may result in denial of
prequalification.
Section 3. DEADLINE FOR SUBMITTAL.There is no deadline for the submittal of applications.
However, the initial review of applications shall take place 21 days after issuance of this ITB. Applications
submitted after this date will be reviewed periodically on an on-going basis. The City will endeavor to
complete the review of each application within 60 days of receipt.
Section 4. MINIMUM ELIGIBILITY REQUIREMENTS.The Minimum Eligibility Requirements for this
solicitation are listed below. Bidders that fail to comply with minimum requirements shall be deemed non-
responsive and shall not have its bid submittal considered.
1.Licensure. Bidder in order to be considered must be State of Florida Certified General Contractor
or Certified Underground Utility and Excavation Contractor or Certified Plumbing Contractor, or
Miami-Dade County Registered Contractor by the State of Florida, Division of Business and
Professional Regulations.
2.Project References for the Bidder (proposing firm).Submit at least three (3) projects within the
last three years that document experience with repairs for water, sanitary sewer, and storm water
systems, such as pump stations; water pipes, sanitary sewer main/lateral pipes and valves, storm
water drainage pipes; trenchless point repairs; rehabilitation of sanitary sewer and storm water
manholes.
Submittal Requirement:For each similar project reference, submit the following: project name
and description, client name, client contact, contact telephone & email, and project date(s). For
each project, identify whether the experience is for the bidder or for a principal (include name of
principal).
3. Bonding Capacity. Submit proof of bonding capacity of no less than $1,000,000.
Submittal Requirement:Proof of bonding capacity letter shall be from an A rated Financial Class
V Surety Company, at a minimum.
Section 5. NON-RESPONSIVENESS. Failure to submit the following requirements shall result in a
determination of non-responsiveness. Non-responsive applications will not be considered.
1. Prequalification Application (submitted electronically).
[THE REMAINDER OF THIS PAGE IS LEFT INTENTIONALLY BLANK]
Part A General Bidder Information.
FIRM NAME:
NO. OF YEARS IN BUSINESS: NO. OF YEARS IN BUSINESS
LOCALLY:
NO. OF EMPLOYEES:
OTHER NAME(S) BIDDER HAS OPERATED UNDER IN THE LAST 10 YEARS:
FIRM PRIMARY ADDRESS (HEADQUARTERS):
CITY:
STATE: ZIP CODE:
TELEPHONE NO.:
TOLL FREE NO.:
FAX NO.:
FIRM LOCAL ADDRESS:
CITY:
STATE: ZIP CODE:
PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT:
ACCOUNT REP TELEPHONE NO.:
ACCOUNT REP TOLL FREE NO.:
ACCOUNT REP EMAIL:
FEDERAL TAX IDENTIFICATION NO.:
BIDDER IS:
_____CORPORATION / _____PARTNERSHIP / _____SOLE PROPRIETORSHIP / _____OTHER (If other, specify:________________________)
Part B Operational & Management Information.
1.Provide the names of each owner (stockholder, sole proprietor, and partner), director, or officer of the
company,below. Submit additional names on a separate sheet if required.
Owner Ownership percentage Directorship/Office type
2.Provide three (3) clients for which the bidder has provided the referenced services in the last five (5) years.
Project Description of Work Project Reference
Name:
Email:
Telephone:
Name:
Email:
Telephone:
Name:
Email:
Telephone:
3.Is the bidder currently barred by a governmental agency, from bidding as a prime or subcontractor?
YES NO
If yes, state debarment period and the reason(s)for debarment?
4.Has the bidder or any of its owners, directors, officers, or agents been convicted of a crime or had a
claim that was filed in a court and mediated or arbitrated during the last five (5) years?
11.YES NO
If yes, why?
5.Is an affiliate of the bidder prequalified by the City of Miami Beach for any work?
YES NO
If yes, state the name of the affiliate?
6.Is the bidder a parent, subsidiary, or holding company for another company?
YES NO
Iftheanswer is "yes," identify the companyand type ofrelationship(s), below:
Company Type of affiliation (parent or subsidiary)Period of affiliation
7.Is an owner, director, officer, or agent of the bidder affiliated with another company?
12.YES NO
If the answer is "yes," provide the following information for each individual and the affiliated company.
Individual´s name Affiliated company´s name Period of
affiliation
Type of affiliation (e.g.
officer,director,owneror
employee)
8.Is the bidder currently the debtor in a bankruptcy case or file for bankruptcy during the last five (5) years?
11.YES NO
If yes, explain and attach,as applicable,the relevant case and court documents, including (but not
limited to): the original petition, including the case number and the date that the petition was filed; a
copy of the bankruptcy court's discharge order, and any other document that ended the case, if no
discharge order was issued.
9.Has any owner, director, officer, or agent for the bidder, or has any business organization in which any
such person was an owner, director, officer, or agent filed for or been discharged in bankruptcy within the
past five (5) years?
11.YES NO
If yes, explain and attach a copy of the discharge order, order confirming plan and ifa Corporate
Chapter 7 case, a copy of the notice ofcommencement.
10.Has any owner, director, officer, or agent of the bidder owned or managed a company under any other
name in the last five (5) years?
11.YES NO
If yes, explain.
11.Has the bidder been assessed or paid any fines on any contract during the past five (5) years, whether the
project waspublicly or privately owned?
11.YES NO
If yes, explain.
12.Are there currently any liens, suits, or judgments of record pending against any owner, director,
officer, oragent for the company that is related tothe business activities of abusiness organization?
11.YES NO
If yes, explain.
13.Has the bidder or any of its owners, officers, or partners ever been convicted (criminal) or found liable
(civil) for making either a false claim or material misrepresentation to any public agency or entity?
11.YES NO
If yes, explain.
14.Has the bidder or any of its owners, officers, or partners ever been convicted of any a federal or
state crime?
12.YES NO
If yes, explain.
15.Is any officer, director, employee or agent, or immediate family member (spouse, parent, sibling, and child) of
any officer, director, employee or agent, an employee of the City of Miami Beach?
YES NO
If yes, state name, title and share of ownership
Name Title Share (%) of Ownership
16.Has the bidder, or any officer, director, employee or agent, contributed to the campaign either directly or
indirectly, of a candidate who has been elected to the office of Mayor or City Commissioner for the City
of Miami Beach?
YES NO
If yes,provide details.
17. Equal Benefits for Employees with Spouses and Employees with Domestic Partners.Purchases
hereunder are subject to the requirements of Equal Benefits for Domestic Partners Ordinance 2005-3494 that
requires bidders with more than 51 employees and City volume greater than $100,000 to
Benefits their employees with domestic partners, as they provide to employees with spouses. The Ordinance
applies to all employees of a bidder who works within the City limits of the City of Miami Beach, Florida; and the
Contractor mployees located in the United States, but outside of the City of Miami Beach limits, who are
directly performing work on the contract within the City of Miami Beach.
A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of
employees?
YES NO
B. Does your company provide or offer access to any benefits to employees with (same or opposite sex)
domestic partners* or to domestic partners of employees?
YES NO
C. Please check all benefits that apply to your answers abo ection any additional benefits not
already specified. Note: some benefits are provided to employees because they have a spouse or domestic
partner, such as bereavement leave; other benefits are provided directly to the spouse or domestic partner, such
as medical insurance.
BENEFIT Company Provides
for Employees with
Spouses
Company Provides
for Employees with
Domestic Partners
Company does not
Provide Benefit
Health
Sick Leave
Family Medical Leave
Bereavement Leave
18.Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi.Pursuant
to Resolution 2016-29375, the City of Miami Beach, Florida prohibits the purchase of goods or services sourced in North
Carolina and Mississippi. Are any of the products for which the bidder is seeking to be prequalified sourced in North
Carolina or Mississippi?
YES NO
If yes, which brands.
19. Safety Record: he previous three (3) full calendar
years on a firm-wide bas
Company s Experience Modification Rate.______________________Rate( attach required documentation)
BIDDER AFFIDAVIT
The undersigned agrees that s/he: 1) is a principal of the bidder duly authorized to execute the foregoing
Contractor Prequalification Certification Application, and that the contents of said document(s) are complete, true,
and correct to the best of his/her knowledge and belief; 2) s/ certifies that the application and supporting
documents include all of the material information necessary to validate the status of the company for
prequalification purposes; 3) s/ shall notify the Procurement Department within fifteen (15) days and provide a
notarized statement whenever a change occurs in the ownership, management, or financial condition of
the company. Further, any prequalified contractor, including its principal(s), director(s), and any affiliate, who
is a party to any misrepresentation to obtain business or contracts with the City of Miami Beach shall be
declared delinquent and have its certificate suspended or revoked and will be subject to debarment and any
other penaltiesprescribed by law.
The undersigned affirms that the bidder agrees: 1) to complete and unconditional acceptance of the terms and
conditions of this document, inclusive of attachments, exhibits and appendices; 2) that it has not colluded, nor
will collude, with any other bidder; 3) that all information contained herein is part of the public domain as defined
by the State of Florida Sunshine and Public Records Laws; 4) that all responses, data and information contained
in the bid are true and accurate.
Name:Title (must be a principal of the bidder):
Signature:Date:
[THE REMAINDER OF THIS PAGE IS LEFT INTENTIONALLY BLANK]
APPENDIX B
________________________________________________________________________
Special Conditions
________________________________________________________________________
2021-012-WG
ROUTINE AND EMERGENCY SERVICES
POOL OF PREQUALIFIED
CONTRACTORS
PROCUREMENT DEPARTMENT
1755 Meridian Avenue, 3rd Floor
Miami Beach, Florida 33139
SPECIAL CONDITIONS
1. METHOD OF PAYMENT. The City shall provide periodic payments for services rendered by the
Contractor. In order for the City to provide payment, the Contractor shall submit a fully documented
invoice within thirty (30) calendar days after the service has been rendered. It shall be understood that
such invoices shall not be submitted for payment until such time as the service has been completed
and a City representative has reviewed and approved the service.
2. USE OF PREMISES.The Contractor shall confine his/her equipment, apparatus, the storage of
materials, and the operation of his/her workmen to the limits indicated by law, ordinances, permits, or
direction of the authorized City representative, and shall not unreasonably encumber the premises with
his/her materials.
3. CLEAN-UP.All unusable materials and debris shall be removed from the site at the end of each
workday and disposed of in an appropriate manner. Upon final completion, the Contractor shall
thoroughly clean up all areas, as mutually agreed with the City, where work was performed.
4. BACKGROUND CHECKS/CONTRACTOR'S PERSONNEL. The Contractor shall conduct a full
criminal background check at its own expense on each of its employees engaged in providing services
under this ITB or any resulting Agreement prior to the commencement of said services. No Contractor
employee shall be eligible to perform services, pursuant to this ITB or resulting Agreement if he or she:
(1) has been convicted of or was placed in a pre-trial diversion program for any crime involving
dishonesty or breach of trust; embezzlement; drug trafficking; forgery; burglary; robbery; theft; perjury;
possession of stolen property; identity theft; fraud; money laundering; shoplifting; larceny; falsification
of documents and/or (2) has been convicted of any sex, weapons, or violent crime including but not
limited to homicide; attempted homicide; rape; child molestation; extortion; terrorism or terrorist threats;
kidnapping; assault; battery; and illegal weapon possession, sale or use. The Contractor shall defend,
indemnify and hold the City, its officers, employees, and agents harmless from and against any and all
liability, loss, expense (including reasonable a or claims for injury or damages arising out of
its failure to comply with this requirement.
Contractor shall employ personnel competent to perform the work specified herein. The City reserves the
right to request the removal of the Contrac from performing maintenance on the City's
grounds where the emplo s performance or actions are obviously detrimental to the program.
s personnel must wear photo identification at all times.
5. UNIFORMS. All personnel furnished to the City of Miami Beach must be uniformed. Each employee
supplied by the Contractor will wear a uniform bearin ame. Uniforms must be provided at
the Contr expense and may not be charged to the employee or deducted from the e
paycheck, therefore reducing the hourly pay rate to less than the living wage rate required by this
solicitation.
6. FIELD MEASUREMENTS. Unless specifically instructed otherwise by the City, in writing, the Contractor
shall be responsible for the location and layout of all work and shall be responsible for all field
measurements that may be required for execution of the work. In the case of dimensions, field dimensions,
etc. it shall be the responsibility to field measure, obtain and verify same.
7. SAFETY.The Successful Bidder shall be responsible for initiating, maintaining and supervising all
safety precautions and programs in connection with the work. The Successful Bidder shall comply with the
rules and regulations of the Florida Department of Commerce regarding industrial safety (Fla Statutes
Section 440.56) and with the standards set forth in the Occupational Safety and Health Act of 1970 (OSHA)
and its amendments.
8. UNFORESEEN CONDITIONS.Occasionally, repairs or restoration of facilities or property as a result of
effecting repairs will require a specialty contractor for completion. The awarded Contractor shall notify the
City and identify the construction materials and/or methods required. The Contractor shall be responsible
for scheduling and job management through successful completion.
If, or when, unforeseen conditions occur, the Contractor shall furnish a proposal for all additional services
and/or materials not covered by the contract, as needed, by the City. The City also reserves the right to
add, delete or change the scope of the work, as needed. The Contractor shall receive approval prior to any
changes and prices will be negotiated accordingly. After award of this proposal, all questions or concerns
shall be directed to the City's designated representative.
9. ROADMAP FOR PROJECTS AWARDED PURSUANT TO POOL OF PRE-QUALIFIED
CONTRACTORS FOR ROUTINE IMPROVEMENTS.The project/contract manager may request
quotes from contractors authorized to participate in the Pre-Qualified Bidder Pool. Responsive,
responsible bidders eligible to participate in the Pre-Qualified Bidder Pool, shall at their own expense,
visit the site and prepare a lump sum detailed quotation (inclusive of all labor, materials, and all other
costs. Each quote prepared by the contractor shall include an acceptable description of the nature,
extent and character of the work required, as well as performance and delivery schedules. In the
alternative, project managers may require an itemized breakdown of the lump sum amounts.
9.1 For projects with an estimated cost up to the amount specified in City Procedure PO16.02,
Threshold Category 1 (currently $15,000 or as amended), the project/contract manager may select
the contractor deemed to be best qualified.
9.2 For projects with an estimated cost exceeding the amount specified in City Procedure
PO16.02, Threshold Category 2 (currently $15,000.01 or as amended), the project/contract
manager shall solicit quotes from all prequalified bidders.
9.3 In determining the lowest and best contractor for the project, in addition to price, there shall
be considered the following:
(1) The ability, capacity and skill of the bidder to perform the contract.
(2) Whether the bidder can perform the contract within the time specified, without delay or
interference.
(3) The character, integrity, reputation, judgment, experience and efficiency of the bidder.
(4) The quality of performance of previous contracts.
(5) The previous and existing compliance by the bidder with laws and ordinances relating
to the contract.
10. ROADMAP FOR PROJECTS AWARDED PURSUANT TO POOL OF PRE-QUALIFIED
CONTRACTORS FOR EMERGENCY SERVICES.In lieu of routine repairs (Para. 9), the
project/contract manager may under emergency situations select a contractor from the prequalified
pool in response for emergency service. The Pre-Qualified Bidder, shall at their own expense, visit the
site and prepare a lump sum detailed quotation (inclusive of all labor, materials, and all other costs.
Each quote prepared by the contractor shall include an acceptable description of the nature, extent and
character of the work required, as well as performance and delivery schedules. In the alternative,
project managers may require an itemized breakdown of the lump sum amounts.
10.1 In determining the best contractor for the project, the following may be considered:
(1) The ability, capacity and skill of the bidder to perform the contract.
(2) Whether the bidder can perform the contract within the time specified, without delay or
interference.
(3) The character, integrity, reputation, judgment, experience and efficiency of the bidder.
(4) The quality of performance of previous contracts.
(5) The previous and existing compliance by the bidder with laws and ordinances relating
to the contract.
11. RESPONSE REQUIREMENTS FOR EMERGENCY SERVICE.Pre-qualified Contractor(s) will
provide the City with evening, weekend, and holiday service, as necessary, to cope with an emergency
which threatens public health and safety, as determined by the City. Contractor(s) shall be immediately
available via a twenty-four (24) hour, seven (7) days per week telephone service. It is expected that
non-scheduled request for service (emergency calls, etc.) shall be responded to within one (1) hour
after the call is made to the service or directly to the Contractor. Contractor(s) shall supply the name
and telephone numbers, cellular and office, of at least two (2) company individuals with the authority to
make management decisions and who can be reached at any time.
The pre-qualified Contractor, upon the issuance of a purchase order, shall mobilize within 24 hours.
The contractor shall call for underground locates (Sunshine 811) a minimum of 48-hours before
demolition/excavation activities. In some cases such as a sewer main break and after meeting on-site
to discuss the repairs of the water or sewer main break, the Contractor may be required to mobilize
immediately as directed by the Department of Public Works Director, Infrastructure (Operations)
Director, or his designee.
12. RESPONSE REQUIREMENTS FOR ROUTINE/NON-EMERGENCY OR PLANNED WORK.The
pre-qualified Contractor, upon the issuance of a Purchase Order (PO) shall schedule a Pre-
Construction meeting with the respective City department within 48 hours and, within a reasonable time
frame, the Contractor shall provide a work schedule which will be mutually agreed upon. Upon receipt
of NTP the Contractor shall commence scheduling meetings, activities, permit applications and other
preconstruction activities deemed necessary to complete the work. The Notice to Proceed will not be
issued until Contractor's submission to City of all required documents (including but limited to: Payment
and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties.
The contractor shall call for underground locates (Sunshine 811) a minimum of 48-hours before
demolition/excavation activities begin and shall mobilize within 24-hours of the previously agree
mits, shop drawings, and any other necessary documents required
by this provision shall be submitted to the City before mobilizing.
13. MAINTENANCE OF TRAFFIC.Work shall be conducted in such a manner that all streets shall be
open to traffic at night. Approved and sufficient barricades, signs and lighting shall be maintained at all
times for the safety of the public and traffic, and to ensure that no traffic will pass over the placed
material until the material is cured.
Work areas must be barricaded by the Contractor 24 hours prior to commencement of the work.
It will be the responsibility of the Contractor to provide all barricades, signs, and lighting in accordance
with the above stated requirements. The Contractor shall be responsible for providing an off-duty
police officer, if necessary, to complete the job.
14. PERMITS.Contractor shall be responsible for attaining permits for any work which requires
permits. The City will only reimburse for initial review and one resubmission. Costs associated with
additional re-submissions will not be reimbursed. Contractor shall not include permit fees on Cost
Proposal Form. All licenses required by municipality, governmental agency, or political subdivision
shall be obtained by and paid for by the Contractor. Damages, penalties and or fines imposed on the
City or the Contractor for failure to obtain required licenses, permits or fines shall be borne by the
Contractor.
15. WARRANTY/GUARANTEE.Contractor warrants the materials supplied and the work performed
under this contract conform to warranty materials provided and work performed for one (1) year from
date of completion. For new installations, Contractor shall additionally provide full manufacturer
warranty to the City.
In addition to all other warranties that may be supplied by the Contractor, the Contractor shall warrant
its products and/or service against faulty labor and/or defective material for a minimum period of one
(1) year after the date of acceptance of the labor, materials and/or equipment by the City. This
warranty requirement shall remain in force for the full one (1) year period; regardless of whether the
Contractor is under contract with the City at the time of the defect. Any payment by the City on behalf
of the goods or services received from the Contractor does not constitute a waiver of these warrant
provisions.
16. LIMITATION OF PROJECT.There shall be no limits to projects awarded pursuant to this ITB.
However, projects in excess of $300,000 shall require City of Miami Beach Commission approval.
17. ESTIMATES.The project/contract manager may require the contractor to provide an estimate prior
to the commencement of work. Any actual charges that exceed estimate amounts must be pre-
approved by the project/contract manager.
18 PERFORMANCE BOND AND PAYMENT BOND.Projects in excess of $200,000.00 will require
performance and payment bond, in the full amount of the value of the project .The Contractor shall,
within ten (10) business days of notification by the City, furnish and deliver to the City a payment bond
and a performance bond, in a form to be provided by the City, issued by sureties licensed and
authorized to do business in the State of Florida, covering the faithful performance and completion of
the Project pursuant to the Contract Documents, including the performance and completion of those
services provided by Subcontractors of any tier and covering the payment of all obligations arising
hereunder including but not limited to, the payment for all materials used in the performance of the
Project in accordance with the Contract Documents, and for all labor and services performed under the
Contract Documents (including materials, labor and/or services provided by Subconsultants and
Subcontractors of any tier), whether by Subcontractors or otherwise. Each of the aforesaid bonds
(collectively herein referred to as the "Performance Bond and Payment Bond") shall have a penal
amount equal to the Contract Price, unless otherwise approved by the City and to the extent permitted
by law. Each bond shall be increased in the amount of any change to the Contract Price. Each bond
shall continue in effect for one (1) year after Final Completion of the Work.
The Performance Bond and Payment Bond and the sureties issuing such bonds shall meet all the
requirements set forth in the Contract Documents and the Performance Bond and Payment Bond shall
each be in the form attached hereto or shall otherwise be acceptable to the City in its reasonable
discretion. If any of the sureties on the Performance Bond and Payment Bond at any time fails to meet
said requirements, or is deemed to be insufficient security for the penalty of said bond, then the City
may, on giving thirty (30)
additional bond(s) in the above amounts with such sureties thereon being licensed and authorized to
do business in the State of Florida and as shall be satisfactory to the City. The Contractor shall pay all
costs of compliance with this Article as part of the Contract Price.
Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time
to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public
records of Miami-Dade County and provide City with evidence of such recording.
18.1. Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond, Contractor may
furnish alternate forms of security which may be in the form of cash, money order, certified check,
cashier's check or unconditional letter of credit in the form attached hereto, which shall be in
accordance with Section 255.05, Florida Statutes. Such alternate forms of security shall be subject to
the prior approval of City and for same purpose and shall be subject to the same conditions as those
applicable above and shall be held by City for one year after completion and acceptance of the Work.
18.2. Qualification of Surety: Bid Bonds, Performance Bonds and Payment Bonds over Five Hundred
Thousand Dollars ($500,000.00):
18.2.1. Each bond must be executed by a surety company of recognized standing, authorized to do
business in the State of Florida as surety, having a resident agent in the State of Florida and having
been in business with a record of successful continuous operation for at least five (5) years.
18.2.2. The surety company shall hold a current certificate of authority as acceptable surety on federal
bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the
amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the
net retention of the surety company shall not exceed the underwriting limitation in the circular, and the
excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with
Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further,
the surety company shall provide City with evidence satisfactory to City, that such excess risk has been
protected in an acceptable manner.
18.2.3. The City will accept a surety bond from a company with a rating of A or better for bonds up to
$2 million, provided, however, that if any surety company appears on the watch list that is published
quarterly by Intercom of the Office of the Florida Insurance Commissioner, the City shall review and
either accept or reject the surety company based on the financial information available to the City. A
surety company that is rejected by the City may be substituted by the Bidder or proposer with a surety
company acceptable to the City, only if the bid amount does not increase. The following sets forth, in
general, the acceptable parameters for bonds:
Policy- Financial holder's Size
Amount of Bond Ratings Category
500,001 to 1,000,000 B+ Class I
1,000,001 to 2,000,000 B+ Class II
2,000,001 to 5,000,000 A Class III
5,000,001 to 10,000,000 A Class IV
10,000,001 to 25,000,000 A Class V
25,000,001 to 50,000,000 A Class VI
50,000,001 or more A Class VII
18.2.4. For projects of $500,000.00 or less, City may accept a Bid Bond, Performance Bond and
Payment Bond from a surety company which has twice the minimum surplus and capital required by
the Florida Insurance Code at the time the invitation to bid is issued, if the surety company is otherwise
in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a
currently valid certificate of authority issued by the United States Department of the Treasury under
Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The
Certificate and Affidavit so certifying should be submitted with the Bid Bond and also with the
Performance Bond and Payment Bond.
18.2.5. Unless more stringent surety requirements of any grantor agency are set forth within the
Supplemental Conditions, the provisions of this Article shall apply.
APPENDIX C
________________________________________________________________________
Sample Contract
________________________________________________________________________
2021-012-WG
ROUTINE AND EMERGENCY SERVICES
POOL OF PREQUALIFIED
CONTRACTORS
ATTACHMENT C
SUNBIZ & PROPOSAL RESPONSE TO ITB
Contractor's Name
Amici Engineering Contractors, LLC.
Address
10621 SW 139 ST, Miami, FL 33176
E mail Addresses
JuanB@amiciec.com Juan Barreneche South Florida Manager
NelsonL@amiciec.com Nelson Liberti Florida General Superintendent
ChrisL@amiciec.com Christopher Lazzari Central Florida Manager
Phone Numbers
954 650 4699 Juan Barreneche South Florida Manager
786 682 0192 Nelson Liberti Florida General Superintendent
954 895 0741 Christopher Lazzari Central Florida Manager
FEIN
47 4185194
Declaration of Company Organization
Amici Engineering Contractors, LLC. is an S Corp and filed with state as of 05/11/2015
Signature of Authorized Agent
Printed name of Authorized Agent/Title
Juan Barreneche, Managing Member
CONTENTS:
1)Licenses
2)Key Personnel Resumes
3)Company Key Project Experience
LICENSES
ECHECK-20-2471193Worker(s)
7187057
AMICI ENGINEERING
CONTRACTORS LLC
10621 SW 139TH ST
MIAMI, FL 33176
75.00
7468017
196
SEPTEMBER 30, 2021
CUC1224698
SPECIALTY
ENGINEERING
CONTRACT
RENEWAL
09/21/2020
AMICI ENGINEERING
CONTRACTORS LLC
C/O JUAN J BARRENECHE MGR
RESUMES
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 1
Juan Barreneche, P.E. – Managing Member
Mr. Barreneche, Sr, Project Manager for Amici Engineering Contractors., has experience in
transmission pipelines installations, roadway and infrastructure since 2003. Mr. Barreneche has
experience in civil engineering, construction management and cost estimating in the field of
underground utility construction. As Senior Project Manager and Estimator his experience
developed around projects involving the installation of water mains, drainage improvements,
and sanitary sewer construction. He has obtained further specialization in neighborhood
improvement projects, design-build projects, directional drilling, PCCP, box culvert construction,
pump stations, treatment plants and sewer force mains for various publicly bid projects for
municipalities throughout South Florida. As a Civil Engineer, he has combined technical
knowledge and design thought processes with underground construction experience, thereby
ensuring the success of design-build partnerships and broadening the capabilities of his
company.
Recent Project Experience
Waters Edge Residential and River Ridge Golf Course Reclaimed Water Transmission Main,
Pasco County, FL – The installation of a 16-inch DIP (approx.. 11,000 LF) reclaimed water main
for Pasco County was a critical project that had strict funding deadlines. Working together with
our directional drilling subcontractor, Centerline Directional Drilling Services, we redesigned the
HDD alignments with the County’s design consultant to reconfigure the drills to benefit the
project timeline and minimize traffic impacts. This project consisted of the installation of 19,000
lineal feet of 16- inch reclaimed water main to serve the River Ridge Golf Course and the Waters
Edge Community. The project began at the intersection of Starkey Boulevard and DeCubellis
Road connected to the existing 16-inch reclaimed watermain and continued along DeCubellis
Road, crossing Ridge Road, then along Moon Lake Road terminating at the Waters Edge
irrigation pond at Belle Haven Drive. The proposed reclaimed watermain was metered and
discharge into the irrigation pond. The meter assembly contained an automatic flow control valve
actuated by float control to refill the pond as necessary for irrigation.
WWTP 24” Effluent Force Main and Yard Piping, Seminole Tribe of Florida – Hollywood Reservation, FL This project consisted of
redesigning and installing a 24” force main across the Florida Turnpike (inside a 36” HDPE Casing) and through the Seminole Tribe
Hollywood Reservation to the Injection Well Site. The work was performed as a subcontractor to Wharton-Smith who was the G.C. hired
to complete the WWTP Construction. By working with the engineering firm hired by STOF, we effectively redesigned the open cut portion
of the work through a newly constructed segment of the reservation neighborhood to be installed via HDD, thereby reducing impacts to
the reservation roadways and residents. Once again, we worked closely with our directional drilling subcontractor, Centerline Directional
Drilling, to complete these directional drills (1st shot across Turnpike was 1,250 of 36” HDPE Casing with 24” Carrier, 2nd shot was 1,400
LF of 24’ HDPE). The project also included open cut installation of approx.. 13,500 LF of 24” to 8” piping for force main, sewer, and
drainage piping.
East Water Treatment Plant Renovations Raw Water & Concentrate Main, City of Miramar, FL. This design-build project was a critical for
the City of Miramar’s East WTP Expansion. Working as a subcontractor to Wharton-Smith, we assisted the engineer with the design
and construction of this directional drill/open cut project. The project consisted of the installation of parallel 16” PVC Raw
Water Main (approx. 4,000 LF incl. 18” HDPE HDDs) and a 12” PVC Reject Water Main (approx. 6,000 LF incl. 14” HDPE HDDs) from
Years of Experience
•15 years
•Design Build experience since
2005 with an emphasis on large
diameter directional drills, open
cut, pump stations, MOT & all
facets of construction
Registrations & Certifications
•Licensed Professional Civil
Engineer in the State of
Florida, PE#67662
•Certified Underground
Utility and Excavation
Contractor, CUC1224698
Education
•University of Florida
Bachelor in Science in
Civil Engineering,
May 2003
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 2
Juan Barreneche, P.E. – Managing Member
the WTP to a downstream pump station and to 3 new production wells. By working closely with the engineering firm hired by Wharton-
Smith, we effectively designed the parallel directional drills to enter and exit and points of minimal impact to the nearby residents and
traffic patterns. We had to work closely to avoid impacting a nearby Community Center and in order to maintain access via flagman to
some critical roadways. Once again, we worked closely with our directional drilling subcontractor, Centerline Directional Drilling, to
complete these directional drills within the project timeframe and budget. This project is yet another example of our commitment to work
closely with project owners to provide the best possible solution to the project challenges we come across.
City-Wide High Tide Mitigation Project, City of Miami Beach, FL. Project Manager for this $3.3 million project which
consisted of the installation of approximately 200 inline check valves on the drainage outfall system throughout the City of Miami Beach.
Some areas required design-build solutions to ensure protection from tidal flooding prior to the October King Tide. Project also included
the installation of over 13 drainage structures, 400 LF of 30” RCP, and repairs to drainage force mains.
McKinley Street Interceptor Project, City of Hollywood, FL. - Project Manager for this $11.5 million gravity sewer project. Preliminary
investigations and utility relocations were critical to ensuring that the 7,460 LF of 66” PCCP gravity sewer could be installed without
delay. The project includes two 96” steel casings installations under FDOT and FEC Railroad via sand-shield tunnel. Varying soil and
groundwater conditions proved to be the major challenges of this project.
Belcher Road 48” Water Main Replacement, Pinellas County, FL. - Project Manager for this $7.5 million water main replacement project.
The project included installation of 15,000 LF of 42” DIP and 12”/16” DIP parallel high line in the same trench. The project includes a jack
and bore installation of a 60” steel casings under FDOT roadway. Dividing work and MOT into 5 phases and working within 10 ft of
existing deteriorating 48” PCCP water main proved to be the greatest challenges of this project.
Sunset Islands 1 & 2 Neighborhood Improvements, City of Miami Beach, FL The project includes water and storm water improvements,
including the renovation of storm water outfalls and the installation of valley gutters with full roadway reconstruction in a high-end
exclusive community. Major challenges to this unit price contract were extensive conflicts with existing utilities and a high-water table.
Nautilus Neighborhood Improvement, City of Miami Beach, FL. This project consisted of 40,000 Linear feet of 8” water main, 20,000
linear feet of drainage piping ranging from 15 inch to 48 inch in diameter, drainage structures, (6) storm water pump stations, (36)
injection wells, (20) gravity wells, milling and overlay. Extensive coordination and resident coordination.
Biscayne Point Neighborhood Improvements Project, City of Miami Beach, FL. A $17.7 million neighborhood improvement project. The
project began as a standard straight bid unit price contract ($10.9) and was converted into a design-build project by the City after a
series of deficiencies with design were exposed and corrected by our team thereby adding value to the neighborhood. Project
improvements consist of water and stormwater improvements, including pump stations, and above ground improvements to lighting,
sidewalks, curb gutter, and roadway
Horizontal Direction Drill 30-Inch Force Main Across Miami River, Miami Dade County, FL. Project consisted of the installing 1,400 LF
OF 30" DIP Directional Drill Design Build.
Replacement of 48” Force Main Design-Build Project, Broward County, FL. This $4.4 million design/build project included over 5,000’ of
replacement of existing 48” PCCP in DOT ROW relocated and replaced with 48” Ductile Iron Pipe in Broward County ROW. Met
aggressive 8 month schedule including design, permits and construction by working closely with Civil Engineering Subcontractor
(Chen and Associates). Performed constructability reviews and assisted with permit acquisition. Project included a 48” subaqueous
crossing.
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 1
Nelson Liberti II – Managing Member
Mr. Liberti, General Superintendent for Amici Engineering Contractors., has experience in
transmission pipelines installations, roadway and infrastructure since 1999. Mr. Liberti has
successfully completed over $50 Million Dollars’ worth of projects per year. These projects
include Construction/ design build, sanitary sewers, water mains, force mains, drainage pump
stations, directional drilling, jack and bores, and micro tunnels. Mr. Liberti II has successfully
completed a long list of projects within an urban environment throughout South Florida that
include the installation of transmission water mains (PCCP, PVC & DIP), transmission force
mains (PCCP, PVC & DIP), sanitary sewers, storm sewers, pump stations, jack and bores, micro
tunnels, directional drills, roadways, sub-aqueous crossings and neighborhood improvement
projects over the past two decades.
Recent Project Experience
MDWASD Installation of 42-Inch DIP Water Main and 10-Inch Force Main to Port of Miami and
PS 9141 Replacement, Miami-Dade County, FL. Miami-Dade Water and Sewer Department
(MDWASD) installation of 9,740 linear feet of 42-inch ductile iron pipe (DIP) and fittings; 42-inch
mechanical joint resilient seated wedge gate valve; Venturi meter (including valve and fittings,
manhole frame and cover, valve box quick disconnect, and concrete support slab); 260 linear
feet of micro tunneling under existing Florida East Coast (FEC) railroad right- of-way (including
steel casing, drill shafts, and proposed area of construction); 4,600 linear feet of twin 30-inch
high density polyethylene pipe (HDPE) horizontal directional drilling (HDD) subaqueous channel
crossing along Biscayne Bay from Bayside to Port of Miami; replacement of Pump Station (PS)
9141 (including existing eight-inch cast iron pipe (CIP) force main connecting to wastewater
collection and transmission system); and installation of approximately 5,000 linear feet of 10-inch
replacement force main pipeline between PS 9141 and a point of connection on the mainland.
City of Miami Beach/Florida Department of Transportation (FDOT) Indian Creek Storm Water Drainage Improvements, Miami-Dade County,
FL. Installation of approximately 2,400 linear feet of 72-inch pipe, 400 linear feet of 36-inch pipe, and 32 drainage structures, traffic control,
and all ancillary and miscellaneous work. Infrastructure improvements include new stormwater drainage system, pump station, and seawall.
The existing roadway, curbs, gutters, and sidewalks were elevated to meet new flood elevation requirements of 3.7 feet North American
Vertical Datum (NAVD). Driveways, light poles, signals, signage, and pavement markings were replaced to match the new roadway
alignment and configuration.
FDOT Alton Road 5th Street to Michigan Avenue (T6290), Miami-Dade County, FL. Construction in Miami Beach of approximately 15,000
linear feet of six-inch to 20-inch water main, 12-inch to 72-inch storm sewer, three storm water pump stations (20,000 GPM axial flow
pumps each station), 36-inch stormwater force main, removal of contaminated material, restoration of FDOT roadway, outfall connection
to Biscayne Bay, box culverts, and multiple excavations 25 feet deep and greater. Three stormwater pump stations were relocated from
Alton Road to street ends as a cost-saving initiative with FDOT.
MDWASD Norris Cut, Miami-Dade County, FL. Design-build project in Virginia Key including deep shaft excavation over 95 feet and
installation of ring beam, topper slab, leveling slab, thrust wall, and seal wall. The project included installation of approximately 2,100 linear
feet of 60-inch prestressed concrete cylinder pipe (PCCP) force main and 1,000 linear feet of high-density polyethylene pipe (HDPE)
directional drill on Fisher Island.
Years of Experience
•20 years
•Design Build experience since
2005 with an emphasis on large
diameter PCCP, PVC and DIP
transmission mains, HDD, MOT &
all facets of construction
Registrations & Certifications
OSHA 1O Hour Training
Certification # 00190 9709
OSHA Permit-Required Confined
Space Entry
OSHA29 CFR 1910. 146
Hydrogen Sul fide Safety C our se
OSHA 29 CFR l 9 10.1000
fall Protection Course
OSHA Subpart M 1926.500-503
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 2
Nelson Liberti II – Managing Member
Sunset Islands 1 & 2 Neighborhood Improvements, City of Miami Beach, FL The project includes water and storm water improvements,
including the renovation of storm water outfalls and the installation of valley gutters with full roadway reconstruction in a high-end
exclusive community. Major challenges to this unit price contract were extensive conflicts with existing utilities and a high-water table.
Nautilus Neighborhood Improvement, City of Miami Beach, FL. This project consisted of 40,000 Linear feet of 8” water main, 20,000
linear feet of drainage piping ranging from 15 inch to 48 inch in diameter, drainage structures, (6) storm water pump stations, (36)
injection wells, (20) gravity wells, milling and overlay. Extensive coordination and resident coordination.
Biscayne Point Neighborhood Improvements Project, City of Miami Beach, FL. A $17.7 million neighborhood improvement project. The
project began as a standard straight bid unit price contract ($10.9) and was converted into a design-build project by the City after a
series of deficiencies with design were exposed and corrected by our team thereby adding value to the neighborhood. Project
improvements consist of water and stormwater improvements, including pump stations, and above ground improvements to lighting,
sidewalks, curb gutter, and roadway
54-Inch Redundant Sewer Force Main, City of Miami Beach, FL. The project involved the installation of approximately 5,300 LF of
54-inch force main commencing at the existing 48-inch plug valve located at the intersection of Washington Avenue and Commerce
Street, extending northerly in the right-of-way of Washington to the intersection of Euclid Avenue; approximately 4,200 LF of horizontal
directional drilling along the urban corridor between Euclid Avenue and Washington Avenue; approximately 1,000 LF of open cut pipe
installation along 11th Street and in Washington Avenue to accomplish final connections to the 30-inch discharge PS No.1 and the
existing 48-inch plug valve in the intersection of Commerce and Washington Avenue. The 54-inch pipe replaces the existing
force main sanitary line that was constructed in 1977 and served as the sole means on wastewater conveyance through Miami Beach.
54-Inch Water Main Subaqueous Crossing, Miami Dade County, FL. This deep subaqueous crossing appx. 300 LF of 54" DIP,was
constructed alongside a bridge where (2) canals intersect to facilitate widening by the FDOT. The minimal tolerances of this pipeline and
the deep complex installation within the canal were major challenges to this project.
Horizontal Direction Drill 30-Inch Force Main Across Miami River, Miami Dade County, FL. Project consisted of the installing 1,400 LF
OF 30" DIP Directional Drill Design Build.
Pump Stations for City of Miami Beach, City of Miami Beach, FL. - This Design-Build Project included the installation of (2) Stormwater
Pump Stations at the street end of 14th & 10th street along Biscayne Bay. Projects included the installation of wet well approximately 25’
in depth, drainage defender box, grate box, valve vault, dissipator box and all miscellaneous piping. Installation was performed in a tight
corridor at the street end of 14th & 10th Street along Biscayne Bay.
Convention Center Pump Station, City of Miami Beach, FL. - This Design-Build of (2) Stormwater pump stations consisted of 4-20,000
gallons per minute (GPM) with a 18 feet total design head axial pumps, control panels, VFD's, (2) wet wells, (2) Water treatment quality
units, trash rack, dissipator structure and new seawall.
City of Hollywood Water Main Replacement Phase I & 2, City of Hollywood, FL. This project consisted of the installing 53,825 Linear feet
of 8” PVC watermain, 604 rear to front conversions, 352-meter relocations, restoration and asphalt overlay. This project had extensive
coordination with homeowners as well as the FDOT.
City of Hollywood Water Main Replacement Phase 3, City of Hollywood. This project consisted of 25,600 Linear feet of 8” PVC
watermain, 340 Rear to front conversions, multiple meter relocations, restoration and asphalt overlay. This project had extensive
coordination with homeowners as well as the FDOT
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 3
Nelson Liberti II – Managing Member
Water Main & Force Main Intracoastal Waterway Crossings at Las Olas Blvd., Fort Lauderdale, FL. This project includes the installation
of a 20” diameter water main and a new 16” diameter subaqueous force main on the south of Las Olas Blvd. Bridge to provide additional
redundancy to the Las Olas area. The City had selected the horizontal directional drilling (HDD) method for construction of the proposed
subaqueous crossings.
11th Street Water Main, Sanitary Sewer, Drainage & Road Reconstruction, City of Miami Beach, FL. This design build project which
extended from Alton road to Washington Ave. consisted of installing a new 12” water main, drainage pipe ranging from 15” to 36” in
diameter, 12” sanitary PVC gravity main, signalization, landscaping, concrete sidewalks and full road reconstruction. This project was
very challenging since the new road was being raised by 1.5’ and all the existing buildings required to be harmonized. Extensive public
outreach and coordination with building owners.
Crespi Blvd, City of Miami Beach, FL. This Design Build Project included the Installation of Water Main and Storm Sewer System
along Crespi Blvd between 85TH street and 79TH Street. The project also includes the installations of over 2500 LF of Water Main, over
2800 LF of Storm Sewer collection system, Installations of pollution Control Structure, Installation of (1) Storm Sewer Pump Station,
construction of seawall and landscaping along a residential neighborhood.
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 1
Christopher Lazzari – Managing Member
Mr. Lazzari has over 30 years of experience in accounting, construction management, Design-
Build and cost estimating in the field of underground utility, roadwork and all facets of civil
construction. As Sr. Project Manager, Chief Estimator and Design Build Manager. Mr. Lazzari’s
experience developed around projects involving the installation of force and water mains ranging
in size from 6” to 60”, drainage improvements, roadwork, sanitary sewer and bridge construction.
He has obtained further specialization in directional drilling, prestressed concrete cylinder pipe
(PCCP), box culvert construction, pump stations, treatment plants and sewer force mains on
publicly bid, private and design-build projects for municipalities throughout Florida, New York
and Texas.
Recent Project Experience
MDWASD Installation of 42-Inch DIP Water Main and 10-Inch Force Main to Port of Miami and PS 9141 Replacement, Miami-Dade
County, FL. Miami-Dade Water and Sewer Department (MDWASD) installation of 9,740 linear feet of 42-inch ductile iron pipe (DIP) and
fittings; 42-inch mechanical joint resilient seated wedge gate valve; Venturi meter (including valve and fittings, manhole frame and cover,
valve box quick disconnect, and concrete support slab); 260 linear feet of micro tunneling under existing Florida East Coast (FEC) railroad
right- of-way (including steel casing, drill shafts, and proposed area of construction); 4,600 linear feet of twin 30-inch high density
polyethylene pipe (HDPE) horizontal directional drilling (HDD) subaqueous channel crossing along Biscayne Bay from Bayside to Port of
Miami; replacement of Pump Station (PS) 9141 (including existing eight-inch cast iron pipe (CIP) force main connecting to wastewater
collection and transmission system); and installation of approximately 5,000 linear feet of 10-inch replacement force main pipeline between
PS 9141 and a point of connection on the mainland (City of Miami).
City of Miami Beach/Florida Department of Transportation (FDOT) Indian Creek Storm Water Drainage Improvements, Miami-Dade County,
FL. Installation of approximately 2,400 linear feet of 72-inch pipe, 400 linear feet of 36-inch pipe, and 15 drainage structures, traffic control,
and all ancillary and miscellaneous work. Infrastructure improvements include new stormwater drainage system, pump station, and seawall.
The existing roadway, curbs, gutters, and sidewalks were elevated to meet new flood elevation requirements of 3.7 feet North American
Vertical Datum (NAVD). Driveways, light poles, signals, signage, and pavement markings were replaced to match the new roadway
alignment and configuration.
FDOT Alton Road 5th Street to Michigan Avenue (T6290), Miami-Dade County, FL. Construction in Miami Beach of approximately 15,000
linear feet of six-inch to 20-inch water main, 12-inch to 72-inch storm sewer, three storm water pump stations (20,000 GPM axial flow
pumps each station), 36-inch stormwater force main, removal of contaminated material, restoration of FDOT roadway, outfall connection
to Biscayne Bay, box culverts, and multiple excavations 25 feet deep and greater. Three stormwater pump stations were relocated from
Alton Road to street ends as a cost-saving initiative with FDOT.
MDWASD Norris Cut, Miami-Dade County, FL. Design-build project in Virginia Key including deep shaft excavation over 95 feet and
installation of ring beam, topper slab, leveling slab, thrust wall, and seal wall. The project included installation of approximately 2,100 linear
feet of 60-inch prestressed concrete cylinder pipe (PCCP) force main and 1,000 linear feet of high-density polyethylene pipe (HDPE)
directional drill on Fisher Island.
Sunset Islands 1 & 2 Neighborhood Improvements, City of Miami Beach, FL The project includes water and storm water improvements,
including the renovation of storm water outfalls and the installation of valley gutters with full roadway reconstruction in a high-end exclusive
community. Major challenges to this unit price contract were extensive conflicts with existing utilities and a high-water table
Years of Experience
•30 years
Education
•B.S. - Accounting
Registrations & Certifications
•Qualified Appliance Inspector
of Stormwater (QCIS)
Certification #4470793
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 2
Christopher Lazzari – Managing Member
Biscayne Point Neighborhood Improvements Project, City of Miami Beach, FL. A $17.7 million neighborhood improvement project. The
project began as a standard straight bid unit price contract ($10.9) and was converted into a design-build project by the City after a
series of deficiencies with design were exposed and corrected by our team thereby adding value to the neighborhood. Project
improvements consist of water and stormwater improvements, including pump stations, and above ground improvements to lighting,
sidewalks, curb gutter, and roadway.
54-Inch Redundant Sewer Force Main, City of Miami Beach, FL. The project involved the installation of approximately 5,300 LF of
54-inch force main commencing at the existing 48-inch plug valve located at the intersection of Washington Avenue and Commerce
Street, extending northerly in the right-of-way of Washington to the intersection of Euclid Avenue; approximately 4,200 LF of horizontal
directional drilling along the urban corridor between Euclid Avenue and Washington Avenue; approximately 1,000 LF of open cut pipe
installation along 11th Street and in Washington Avenue to accomplish final connections to the 30-inch discharge PS No.1 and the
existing 48-inch plug valve in the intersection of Commerce and Washington Avenue. The 54-inch pipe replaces the existing
force main sanitary line that was constructed in 1977 and served as the sole means on wastewater conveyance through Miami Beach.
Crespi Blvd. Water Transmission Main, Storm Sewer Collection System & Pump Station, Miami Dade County, FL.Installation of Water
Main and Storm Sewer System along Crespi Blvd between 85TH street and 79TH Street. The project Includes the installations of over
2500 LF of water main, over 2800 LF of Storm Sewer collection system, Installations of pollution Control Structure, Installations of Storm
Sewer Pump Station, construction of seawall and landscaping along a residential neighborhood.
Sweetwater Storm Sewer Improvements Phase IIB, Miami Dade County, FL. Installation of about 6000 LF of storm sewer collection
system and two (2) storm sewer pump stations with capacity of 5500 GPM along a residential neighborhood
48” Force Transmission Main Along N. Miami Ave, Miami Dade County FL Project included Furnishing and installing approximately
12,700 linear feet of 48-inch Prestressed Concrete Cylinder Pipe (PCCP), Furnishing and installing approximately 5,600 linear feet of
12-inch ductile iron water main to replace an existing 6-inch water main, including valves, fittings, cleaning and disinfection.
Central Regional Reclaimed Pipeline, West Palm Beach, FL Project included construction of a pipeline that transports reclaimed water
from the Palm Beach County WWTP to the Florida Power & Light power plant. The pipeline consisted of two sections, eastern and
western. Mr. Lazzari was the PM on the eastern section which parallels State Road 704 and ends at the FP&L power plant near State
Road 80. The pipeline consisted of 37,000 LF of 36" ductile iron pipe along SR 704 and over 9,000 LF of HOPE Directional Drilling thru a
highly environmental sensitive area and a Jack and Bore under the Florida Turnpike. The project included multiple directional drills,
jack & bore under Florida Turnpike including a horizontal directional drill using 36" HOPE to cross a wetland. The right-of-way
included a number of roads, canal, and wetland crossings. Well pointing and sock were used to dewater the pipe route.
Pump Stations for City of Miami Beach, City of Miami Beach, FL. - This Design-Build Project included the installation of (2) Stormwater
Pump Stations at the street end of 14th & 10th street along Biscayne Bay. Projects included the installation of wet well approximately 25’
in depth, drainage defender box, grate box, valve vault, dissipator box and all miscellaneous piping. Installation was performed in a tight
corridor at the street end of 14th & 10th Street along Biscayne Bay.
Convention Center Pump Station, City of Miami Beach, FL. - This Design-Build of (2) Stormwater pump stations consisted of 4-20,000
gallons per minute (GPM) with a 18 feet total design head axial pumps, control panels, VFD's, (2) wet wells, (2) Water treatment quality
units, trash rack, dissipator structure and new seawall.
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 3
Christopher Lazzari – Managing Member
City of Hollywood Water Main Replacement Phase I & 2, City of Hollywood, FL. This project consisted of the installing 53,825 Linear feet
of 8” PVC watermain, 604 rear to front conversions, 352-meter relocations, restoration and asphalt overlay. This project had extensive
coordination with homeowners as well as the FDOT.
City of Hollywood Water Main Replacement Phase 3, City of Hollywood. This project consisted of 25,600 Linear feet of 8” PVC
watermain, 340 Rear to front conversions, multiple meter relocations, restoration and asphalt overlay. This project had extensive
coordination with homeowners as well as the FDOT
Water Main & Force Main Intracoastal Waterway Crossings at Las Olas Blvd., Fort Lauderdale, FL. This project includes the installation
of a 20” diameter water main and a new 16” diameter subaqueous force main on the south of Las Olas Blvd. Bridge to provide
additional redundancy to the Las Olas area. The City had selected the horizontal directional drilling (HDD) method for construction of the
proposed subaqueous crossings.
11th Street Water Main, Sanitary Sewer, Drainage & Road Reconstruction, City of Miami Beach, FL. This design build project which
extended from Alton road to Washington Ave. consisted of installing a new 12” water main, drainage pipe ranging from 15” to 36” in
diameter, 12” sanitary PVC gravity main, signalization, landscaping, concrete sidewalks and full road reconstruction. This project was
very challenging since the new road was being raised by 1.5’ and all the existing buildings required to be harmonized. Extensive public
outreach and coordination with building owners.
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 1
Cody Cook – Superintendent
Mr. Cook, Superintendent for Amici Engineering Contractors., has experience in transmission
pipelines installations, roadway and infrastructure since 2009.These projects include
Construction/ design build, sanitary sewers, water mains, force mains, drainage pump stations,
directional drilling, jack and bores, and micro tunnels. Mr. Cook has successfully completed a
long list of projects within an urban environment throughout South Florida that include the
installation of transmission water mains (PCCP, PVC & DIP), transmission force mains (PCCP,
PVC & DIP), sanitary sewers, storm sewers, pump stations, jack and bores, micro tunnels,
directional drills, roadways sub-aqueous crossings and neighborhood improvement projects
over the past decade..
Recent Project Experience
Turnpike Feeder @ Indrio Road Water Main Extension, St. Lucie Constructing approximately
27,390 LF of 12" water main and 90 LF of 6" water main along Turnpike Feeder Road, US
Highway #1, and Indrio Road in St. Lucie County, Florida. The 12" and 6" water mains will
include Fire Hydrants, Gate Valves, and all other appurtenances necessary for the construction
of this project.
Indrio Road Utility Extension, St. Lucie FL Constructing approximately 10,000' of both 12" PVC
sanitary Force main and 16" PVC Watermain along Indrio Rd from Emerson Ave. to Koblegard
Rd.
Hobe Sound 8” FM Utility Extension, Hobe Sound, FL.Extension of 7,300 linear feet of 8-inch
force main on US-1 in Hobe Sound
FDOT Alton Road 5th Street to Michigan Avenue (T6290), Miami-Dade County, FL.Construction in Miami Beach of approximately 15,000
linear feet of six-inch to 20-inch water main, 12-inch to 72-inch storm sewer, three storm water pump stations (20,000 GPM axial flow
pumps each station), 36-inch stormwater force main, removal of contaminated material, restoration of FDOT roadway, outfall connection
to Biscayne Bay, box culverts, and multiple excavations 25 feet deep and greater. Three stormwater pump stations were relocated from
Alton Road to street ends as a cost-savinginitiative with FDOT.
MDWASD Norris Cut, Miami-Dade County, FL. Design-build project in Virginia Key including deep shaft excavation over 95 feet and
installation of ring beam, topper slab, leveling slab, thrust wall, and seal wall. The project included installation of approximately 2,100 linear
feet of 60-inch prestressed concrete cylinder pipe (PCCP) force main and 1,000 linear feet of high-density polyethylene pipe (HDPE)
directional drill on Fisher Island.
Sunset Islands 1 & 2 Neighborhood Improvements, City of Miami Beach, FL The project includes water and storm water improvements,
including the renovation of storm water outfalls and the installation of valley gutters with full roadway reconstruction in a high-end
exclusive community. Major challenges to this unit price contract were extensive conflicts with existing utilities and a high-water table.
Nautilus Neighborhood Improvement, City of Miami Beach, FL. This project consisted of 40,000 Linear feet of 8” water main, 20,000
linear feet of drainage piping ranging from 15 inch to 48 inch in diameter, drainage structures, (6) storm water pump stations, (36)
injection wells, (20) gravity wells, milling and overlay. Extensive coordination and resident coordination.
Years of Experience
•11 Years
•Design Build experience since
2009 with an emphasis on large
diameter PCCP, PVC and DIP
transmission mains, HDD, MOT &
all facets of construction
Registrations & Certifications
OSHA 1O Hour Training
OSHA 30 Hour Training
OSHA Permit-Required Confined
Space Entry
OSHA29 CFR 1910. 146
Hydrogen Sulfide Safety Course
OSHA 29 CFR l 9 10.1000
fall Protection Course
OSHA Subpart M 1926.500-503
AMICI ENGINEERING CONTRACTORS
AMICI ENGINEERING CONTRACTORS 2
Cody Cook – Superintendent
Biscayne Point Neighborhood Improvements Project, City of Miami Beach, FL.A $17.7 million neighborhood improvement project. The
project began as a standard straight bid unit price contract ($10.9) and was converted into a design-build project by the City after a
series of deficiencies with design were exposed and corrected by our team thereby adding value to the neighborhood. Project
improvements consist of water and stormwater improvements, including pump stations, and above ground improvements to lighting,
sidewalks, curb gutter, and roadway
54-Inch Redundant Sewer Force Main, City of Miami Beach, FL. The project involved the installation of approximately 5,300 LF of
54-inch force main commencing at the existing 48-inch plug valve located at the intersection of Washington Avenue and Commerce
Street, extending northerly in the right-of-way of Washington to the intersection of Euclid Avenue; approximately 4,200 LF of horizontal
directional drilling along the urban corridor between Euclid Avenue and Washington Avenue; approximately 1,000 LF of open cut pipe
installation along 11th Street and in Washington Avenue to accomplish final connections to the 30-inch discharge PS No.1 and the
existing 48-inch plug valve in the intersection of Commerce and Washington Avenue. The 54-inch pipe replaces the existing
force main sanitary line that was constructed in 1977 and served as the sole means on wastewater conveyance through Miami Beach.
54-Inch Water Main Subaqueous Crossing, Miami Dade County, FL. This deep subaqueous crossing appx. 300 LF of 54" DIP,was
constructed alongside a bridge where (2) canals intersect to facilitate widening by the FDOT. The minimal tolerances of this pipeline and
the deep complex installation within the canal were major challenges to this project.
Pump Stations for City of Miami Beach, City of Miami Beach, FL. - This Design-Build Project included the installation of (2) Stormwater
Pump Stations at the street end of 14th & 10th street along Biscayne Bay. Projects included the installation of wet well approximately 25’
in depth, drainage defender box, grate box, valve vault, dissipator box and all miscellaneous piping. Installation was performed in a tight
corridor at the street end of 14th & 10th Street along Biscayne Bay.
Convention Center Pump Station, City of Miami Beach, FL. - This Design-Build of (2) Stormwater pump stations consisted of 4-20,000
gallons per minute (GPM) with a 18 feet total design head axial pumps, control panels, VFD's, (2) wet wells, (2) Water treatment quality
units, trash rack, dissipator structure and new seawall.
City of Hollywood Water Main Replacement Phase I & 2, City of Hollywood, FL. This project consisted of the installing 53,825 Linear feet
of 8” PVC watermain, 604 rear to front conversions, 352-meter relocations, restoration and asphalt overlay. This project had extensive
coordination with homeowners as well as the FDOT.
City of Hollywood Water Main Replacement Phase 3, City of Hollywood. This project consisted of 25,600 Linear feet of 8” PVC
watermain, 340 Rear to front conversions, multiple meter relocations, restoration and asphalt overlay. This project had extensive
coordination with homeowners as well as the FDOT
Crespi Blvd, City of Miami Beach, FL. This Design Build Project included the Installation of Water Main and Storm Sewer System
along Crespi Blvd between 85TH street and 79TH Street. The project also includes the installations of over 2500 LF of Water Main, over
2800 LF of Storm Sewer collection system, Installations of pollution Control Structure, Installation of (1) Storm Sewer Pump Station,
construction of seawall and landscaping along a residential neighborhood.
48” Force Transmission Main Along N. Miami Ave, Miami Dade County FL Project included Furnishing and installing approximately
12,700 linear feet of 48-inch Prestressed Concrete Cylinder Pipe (PCCP), Furnishing and installing approximately 5,600 linear feet of
12-inch ductile iron water main to replace an existing 6-inch water main, including valves, fittings, cleaning and disinfection.
KEY PROJECT
EXPERIENCE
INSTALLATION OF 54-INCH HDPE/PCCP FORCE MAIN
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $18 MILLION
ALTON ROAD SR 907 FROM MICHIGAN TO 5TH STREET
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $13 MILLION
BISCAYNE POINT NEIGHBORHOOD IMPROVEMENTS
*W *Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $18 MILLION
.
Water & Concentrate Main
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $2,350,885.00
NAUTILUS NEIGHBORHOOD IMPROVEMENTS
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $33.6 MILLION
48-INCH PCCP FORCE MAIN ALONG NORTH MIAMI AVENUE
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $22 MILLION
.
sidential and River Ridge Golf
Course Reclaimed Water Transmission Main
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $2,826,605.00
42-INCH DIP WATER MAIN AND 10-INCH FORCE MAIN AT PORT OF
MIAMI
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $22.8 MILLION
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $3,886,000.00
SUNSET ISLANDS 1 & 2
*Work Performed by AMICI Key Personnel
CONTRACT AMOUNT $6.5 MILLION
10/30/2020
Frank H. Furman, Inc.
1314 East Atlantic Blvd.
P. O. Box 1927
Pompano Beach FL 33061
Sharon R. Myers, AAI, CRIS
(954)943-5050 (954)942-6310
sharonm@furmaninsurance.com
Amici Engineering Contractors LLC
10621 SW 139 Street
Miami FL 33176
United Specialty Ins Co 12537
Evanston Insurance Company 35378
FCCI Insurance Co 10178
Wilshire Insurance Company 13234
2020 Master w/o endt
A
X
X
X
LIG0067800 1/1/2020 1/1/2021
1,000,000
50,000
10,000
1,000,000
2,000,000
2,000,000
C X CA10005453700 1/20/2020 1/20/2021
1,000,000
10,000
B
X X
X 10,000 MKLV2EUL103792 1/1/2020 1/1/2021
5,000,000
5,000,000
C N 001WC20A79040 1/1/2020 1/1/2021
X
500,000
500,000
500,000
D Excess Umbrella Liability XL00018262 1/1/2020 1/1/2021 $5,000,000
Following Form $5,000,000
30 days NOC applies except 10 days for non payment of premium.
Miami-Dade County
111 NW 1st Street
Suite 2340
Miami, FL 33128
Dirk DeJong/CBA