Loading...
NBCRA Zoning Presentation by Planning DepartmentNBCRA ADVISORY COMMITTEE April 14, 2021 www.GOMBInfo.com www.GOMBInfo.com 1 G.O. BOND PROJECTS WITHIN NORTH BEACH CRA CITYWIDE G.O. BOND PROJECTS WITHIN NORTH BEACH CRA www.GOMBInfo.com G.O. BOND PROJECTS WITHIN NORTH BEACH CRA Item GOB #Project Name Status GOB Budget Add'l Funding Total Budget Scope of Work 1 1 72nd St Complex Design 53,800,000$ 10,000,000$ 63,800,000$ New community facility at 72 Street between Collins Avenue and Harding Avenue that includes an olympic- sized roof-top swimming competition pool, a warm-up pool, a library/media center, a community room, an activated liner, a fitness gym with running track, green space and a multi-level parking garage. 2 12 North Beach Oceanside Park Beachwalk Contractor Award 2,000,000$ 2,200,000$ 4,200,000$ Construct an on-grade, ADA accessible and decorative paver pathway from streets 79 to 87, completing the final link of the city's entire beachwalk system. Redevelop the Beachwalk to expand path networks and dune systems, new landscaping and wayfinding signage and turtle-friendly lighting. 3 13 North Shore Park & Youth Center Various, Partial Completions 5,725,000$ N/A 5,725,000$ Improve park features and functions by adding two additional baseball fields with new artificial turf, LED lighting fixtures and more security cameras; replace the aged roof and construct a new walking/jogging pathway, install a generator to the facility, paint building interior, replace playground equipment, enhance park reforestation. 4 27 Log Cabin Future 1,076,000$ N/A 1,076,000$ Reconstruct the historic Log Cabin to restore and re-open for community use. 5 29 West Lots Pending 5,000,000$ N/A 5,000,000$ Re-develop and re-purpose the area known as the "West Lots" (8 blocks of city-owned land located across the street from North Shore Open Space Park) as cohesive mixed-use space for recreational/civic/ neighborhood activity. 6 30 Skate Park Design 750,000$ N/A 750,000$ Expand and improve the North Beach skate park by by adding an all-wheels track. 7 44 North Shore Neighborhood Above Ground Improvements Future 8,000,000$ N/A 8,000,000$ Beautify the North Shore neighborhood with new street lighting, sidewalks, upgraded landscaping, and a shady tree canopy. 8 46 Ocean Rescue Nobe Facility Future 5,000,000$ N/A 5,000,000$ Replace existing double-wide trailers and provide a permanent facility within North Beach Oceanside Park that includes a parks maintenance facility to serve as the Ocean Rescue sub-station for North Beach. TOTAL 81,351,000$ 12,200,000$ 93,551,000$ www.GOMBInfo.com CITYWIDE G.O. BOND PROJECTS WITHIN NORTH BEACH CRA Item GOB #Project Name Scope of Work 9 33 Urban Forestry Masterplan Increase the city's shady tree canopy coverage by reforesting and planting up to 5,000 new shade trees, as part of the city's Urban Forestry Master Plan. Completed in North Beach is: 279 in Normandy Isles/Normandy Shores; Additional locations to be scheduled. 10 34 Above Ground Improvements (North Beach Town Center) Improve aesthetic and functional elements in neighborhoods with planned stormwater and utility projects (Town Center, La Gorce Island, City Center, Indian Creek Parkway, Nautilus/Middle North Bay Road, Orchard Park, Normandy Isle South, South Pointe, Sunset Islands 1-2, Belle Isle) to include blue/green infrastructure, landscaping and lighting. 11 37 Sidewalk Improvements Renovate 25% of the city's sidewalks by replacing cracked and faulty sidewalk surfaces in areas citywide. 6,000 sq. ft.+ completed in North Beach. Additional locations to be scheduled. 12 38 Street Pavement Improve citywide roadway conditions by re-paving and applying pavement preservation strategies to cracked and deteriorated streets that have been identified to have a below marginal Pavement Condition Index ratings. Completed locations in North Beach include: Allison Rd from 63rd Street to the end. Additional locations to be scheduled. 13 39 Seawalls & Shorelines Raise public seawalls to the updated minimum height standard (5.7 NAVD) in areas most vulnerable to sea level rise and street flooding; incorporate living shorelines with natural vegetation, native species and other green infrastructure. North Beach locations in Design are: 7150 Indian Creek. Additional locations to be planned. 14 42 Traffic Calming (Normandy Isle Subproject)Implement traffic calming measures in the Normandy Isle neighborhood (71st Street). 15 47 License Plate Readers (71 Street Entrance Readers subproject)Install License Plate Readers (LPRs) to the 71 St. entrance to the city. 16 52 LED Lighting in Parks (North Shore Park)Upgrade sports and pathway lighting in Flamingo, North Shore, Normandy Isle, Tatum, Stillwater and Crespi Parks, to a modern LED technology system that illuminates outdoor areas while also saving energy. 17 50 Cameras - Business Districts (71 Street Corridor Cameras Subproject)Install new security cameras to the 71 St. corridor. THANK YOU! www.GOMBInfo.com www.GOMBInfo.com