CITY COMMISSION Presentation 11-20-2024GOB PROJECT #40 MIAMI BEACH 41 STREET CORRIDOR REVITALIZATION PROJECT NOVEMBER 20, 2024 CITY COMMISSION MEETING November 14, 2024 / 41st St Corridor Revitalization 60% DESIGN SITE PLAN TO SOUTH BEACH TO SOUTH BEACH TO BEACH AL T O N RD . SH E R I D A N AV E . PI N E TR E E DR . PR A I R I E AV E . RO Y A L PA L M AV E . TO NORTH BEACH CH A S E AV E . ME R I D I A N A V E . N JE F F E R S O N AV E . GA R D E N AV E . Brooks + Scarpa Architects / 2 November 14, 2024 / 41st St Corridor Revitalization KIT OF PARTS Public Art Precast Seat WallsShade Trees Landscaping Branded ConcreteMiami Beach Red Concrete Bike Racks Trash Receptacles Benches Bus Stops Brooks + Scarpa Architects / 3 Contemporary Lighting Recommended by DRB November 14, 2024 /41st St Corridor Revitalization PROPOSED PLANTING PALETTE Live Oak Quercus virginiana Silver Buttonwood Conocarpus erectus Pigeon Plum Coccoloba diversifolia Wart Fern Phymatosorus scolopendria GR O U N D CO V E R S Autograph Tree Clusia rosea Gumbo Limbo Bursera simaruba Mahogany Tree Swietenia mahogani Wild Tamarind Lysiloma latisiliquum Philodendron 'Burle-Marx' Philodrendron burle-marxii Monstera Monstera deliciosa Dwarf palmetto Sabal minor Green Buttonwood Conocarpus erectusRoyal Palm Roystonea regia Spartina Grass Spartina Fakahatchee Grass Tripsacum dactyloides Green Buttonwood Conocarpus erectus Strangler Fig Ficus aurea Muhly Grass Muhlenbergia capillaris Milkweed Asclepias syriaca ME D I U M CA N O P Y LA R G E CA N O P Y EX I S T I N G CA N O P Y Perennial Peanut Arachis glabrata IF THE ROOT OF AN EXISTING ROYAL PALM ARE AT GRADE, THEN METAL GRATING BECOMES THE PRIMARY TOOL TO PROTECT THE TREE AND EXPAND THE WALKS Brooks + Scarpa Architects / 4 EXISTING PROPOSED November 14, 2024 / 41st St Corridor Revitalization CURRENT DESIGN - ALTON ROAD Brooks + Scarpa Architects / 5 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 6 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 7 DRB 24-1023 / 41st St Corridor Revitalization41st St Corridor Revitalization LIGHTING OPTION Brooks + Scarpa Architects / 8 41st St Corridor Revitalization LIGHTING OPTION WITH CONTEMPORARY LIGHTING FIXTURE IN LIEU OF EXISTING ACORN LIGHTING Brooks + Scarpa Architects / 9 DRB 24-1023 / 41st St Corridor RevitalizationCURRENT DESIGN Brooks + Scarpa Architects / 10 41st St Corridor Revitalization CURRENT DESIGN - PINE TREE DRIVE AND HENRY LEIBMAN SQUARE Brooks + Scarpa Architects / 11 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 12 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 13 DRB 24-1023 / 41st St Corridor Revitalization Brooks + Scarpa Architects / 14 Brooks + Scarpa Architects / 15 Construction: Construction will be executed in conjunction with the replacement of existing water transmission and distribution lines along 41 st Street. Current Budget:$15,000,000 (All 2018 GOB) Estimated Construction Cost:$10,000,000 (excluding electrical improvements for palm tree lighting, infrastructure for LPR cameras and replacing existing acorn lights) Thank you