Loading...
R9 AA 2024-11-20_72STCOMPLEX_POWER POINT_COMMISSION MEETING_FINAL72 STREET COMMUNITY COMPLEX MEETING OF THE MAYOR AND CITY COMMISSION NOVEMBER 20, 2024 www .GO MBInfo .com THE SITE L ocated between 72nd and 73rd Streets, between Collins and Harding Avenues, currently a city- owned parking lot (P-92). 167,045 total SF (3.8 acres). NEIGHBORING ATTRACTIONS INCLUDE: •North Shore Park & Y outh Center •Mia mi Bea ch Ba ndshell •Public Beach Access •Ocean Terrace District •71 Street Commercial Corridor www .GO MBInfo .com P R O J E C T D E S C R I P T I O N THE ASK Build a new community complex at 72nd Street between Collins Avenue and Harding Avenue that includes a competition pool, a warm-up pool, a library/ media center, community space, a fitness gym, running track, green space and a multi-level parking garage. www.GO MBInfo .com POOL S LIBRARY GYM, GREEN SPACE & RUNNING TRACK PARKINGCOMMUNITY SPACE www .GO MBInfo .com FUNDI NG $101,742,327 On January 20, 2022 the City Commission approved the project budget. FUNDING SOURCE CURRENT FUTURE GO BOND $10,800,000 $ 43,000,000 PARKING FUNDING $14,700,000 $ 1,741,931 OCEAN TERRACE SETTLEMENT $ 1,000,000 FUTURE PARKING CAPITAL NOT BONDS $ 17,738,089 NORTH BEACH QUALITY OF LIFE $ 346,000 $ 1,955,045 PAY AS YOU GO $ 9,500,000 OLD COUNTY LIBRARY FUND $ 961,262 TOTALS $37,307,262 $64,435,065 SUMMARY / UPDATE www.GO MBInfo .com •We presented the conceptual plan to GOBOC in July 2024. The design concept exceeded the $70M construction budget target . Certain value engineering strategies, representing cost savings, were identified for implementation, should they be needed. City staff directed the consultant to proceed with the 30% schematic design phase. •The Consultant has submitted the 30% schematic design with renderings, and the CMAR has submitted the corresponding construction cost estimate. Preliminary review shows that the estimate is approximately 14% over the construction budget. Value engineering strategies, previously identified, could resolve the budget concerns, but the construction cost estimate is still being verified. www .GO MBInfo .com CO S T S A V I N G OP T I O N S POTENTIAL VALUE ENGINEERING STRATEGIES •ELIMINATE BLEACHER OVERHANG •50M CONCRETE POOL SHELL (CHANGE OF MATERIAL) •25M CONCRETE POOL SHELL (CHANGE OF MATERIAL) •REDUCE 25M POOL- 6 LANES TO 3 LANES •REDUCE SIZE OF MOVABLE FLOOR •ASSUME OWNER DIRECT PURCHASE •SHARE RESTROOMS/LOCKERS •REDUCE SPORTS LIGHTING AT MULTIPURPOSE FIELD (100fc to 50fc) •ELIMINATE GROUND LEVEL PAVERS AND KEEP GREY CONCRETE •ELIMINATE TRELLIS AT LIBRARY AND AQUATICS AREA •RECTANGULAR CONCRETE RECREATION POOL IN LIEU OF CONCRETE FREE FORM •REDUCE SIZE OF LIFE SAFETY GENERATOR •USE ALTERNATE PAVING MATERIAL AT POOL DECK PRELIMINARY REVIEW SHOWS THAT THE 30% CONSTRUCTION COST ESTIMATE IS APPROXIMATELY 14% OVER THE CONSTRUCTION BUDGET. BELOW VALUE ENGINEERING (VE) STRATEGIES COULD RESOLVE BUDGET CONCERNS, BUT THE ESTIMATE IS STILL BEING VERIFIED: www .GO MBInfo .com LEVEL 1 PLAN 30 % D E S I G N P L A N S FITNESS LOOP www .GO MBInfo .com LEVEL 2 PLAN 30 % D E S I G N P L A N S www .GO MBInfo .com LEVEL 3 PLAN 30 % D E S I G N P L A N S www .GO MBInfo .com LEVEL 4 PLAN 30 % D E S I G N P L A N S www .GO MBInfo .com ROOF PLAN 30 % D E S I G N P L A N S SOLAR PANELS www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S www .GO MBInfo .com 30 % D E S I G N RE N D E R I N G S TIMELINE www.GO MBInfo .com TIMELINE www.GO MBInfo .com THANK YOU! www.GO MBInfo .com