St. Moritz Hotel Traffic Study
1"-'
....
;; ......
.,
SAI~T :\IORITZ HOTEL
TRAFFIC STL'DY
FINAL REPORT
Project #95156
Oct95/95156COV.02
Prepared by:
David Plummer & Associates, Inc.
1750 Ponce de Leon Boulevard
Coral Gables, FL 33134
December 29, 1995
:0,::
\.-
. TABLE OF CONTENTS
.
PaQe #
..
EXECUTIVE SUMMARY
1 . INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. 1
Project Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1
Study Area ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1
Study Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ;'. .. 1
2. PROJECT SITE INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . " 3
Project Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3
Parking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3
Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 5
3. 1997 TRAFFIC CONDITIONS WITHOUT PROJECT TRAFFIC . . . . . . . .. 6
Data Collection ....................................... 6
~-""~~-~-==-''"Exrsfir\gcondjt~'~-.~-:7:':::~:':":'.~:':'~':.".':' :':".: .. . . . . . . ~'. 6
Existing Pedestrian Volumes .............................. 7
1997 Background Traffic Without Project. . . . . . . . . . . . . . . . . . . . " 7
1997 Levels of Service Without Project . . . . . . . . . . . . . . . . . . . . . .. 8
4.
1997 TRAFFIC CONDITIONS WITH PROJECT TRAFFIC . . . . . . . . . . .. 16
Project Trip Generation .................................. 16
Project Trip Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 19
1997 Background and Project Traffic . . . . . . . . . . . . . . . . . . . . . . . . . 21
., 1997 Levels of Service With Background and Project Traffic . . . . . . . .. 21
1997 Pedestrian Volumes With Project ....................... 28
5.
SIGNAL WARRANT ANALYSIS ............................ 30
6.
CONCLUSIONS ....................................... 33
(:;,
_..
(E
.
LIST OF TABLES
Pace #
TABLE 1 - Pedestrians Crossing Collins Avenue at 16 Street ............. 7
TABLE 2 - ITE Trip Generation Rates ............................. 17
TABLE 3 - Trip-Types During Full Occupancy . . . . . . . . . . . . . . . . . . . . . . .. 18
TABLE 4 - Cardinal Distribution for TAZ 19 . . . . . . . . . . . . . . .. . . . . . . . .. 19
TABLE 5 - 1997 Intersection LOS's With and Without Project Traffic ....... 21
TABLE 6 - 1997 Pedestrian Volumes with Project Traffic. . . . . . . . . . . . . . .. 28
TABLE 7 - Summary of Signal Warrants Analysis. . . . . . . . . . . . . . . . . . . .. 32
LIST OF FIGURES
Pace #
Figure 1 - Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 2
'-Figure--2:'~p'roposed Project Access .............................. 4
Figure 3 - 1997 AM Peak Hour Turning Movements (No Project) .......... 9
Figure 4 - 1997 Midday Peak Hour Turning Movements (No Project) ........ 10
Figure 5 - 1997 PM Peak Hour Turning Movements (No Project) . . . . . . . . . .. 11
Figure 6 - 1997 AM Peak Hour Levels of Service (No Project) ............ 13
Figure 7 - 1997 Midday Peak Hour Levels of Service (No Project) . . . . . . . . .. 14
Figure 8 - 1997 PM Peak Hour Levels of Service (No Project) . . . . . . . . . . . .. 15
Figure 9 - Project Trip Distribution ............................... 20
Figure 10 - 1997 AM Peak Hour Turning Movements (With Project) ........ 22
Figure 11 - 1997 Midday Peak Hour Turning Movements (With Project) . . . . .. 23
Figure 12 - 1997 PM Peak Hour Turning Movements (With Project) . . . . . . . .. 24
Figure 13 - 1997 AM Peak Hour Levels of Service (With Project) .......... 25
Figure 14 - 1997 Midday Peak Hour Levels of Service (With Project) . . . . . . .. 26
Figure 15 - 1997 PM Peak Hour Levels of Service (with Project) . . . . . . . . , .. 27
@EJ
EXECUTIVE SUMMARY
In response to a request for proposals from the City of Miami Beach, the Saint Moritz
Hotel Corporation has entered an agreement with the City of Miami Beach
Redevelopment Agency to jointly develop a hotel on Collins Avenue (SR A 1 Al at 16
Street in Miami Beach, Florida. The project will consist of a hotel, ballrooms,
meeting/seminar rooms, restaurants, and retail space. The opening of the hotel is
slated for late 1997.
~efrafficimpacts'ofihe project on the ~'dj~~;~t-;ignali';~d-i~tersections on Collins
Avenue were analyzed. This analysis showed no significant difference in level of
service at these intersections in 1997 with project traffic.
A signal warrant study was also undertaken to determine if a traffic signal is
warranted at the proposed Collins Avenue/16 Street intersection (the main project
driveway) at project buildout. The results of this study reveal that a traffic signal is
warranted based on vehicular volumes and pedestrian volumes.
o
@E]
, . INTRODUCTION
Proiect Backaround
In response to a request for proposals from the City of Miami Beach, the Saint Moritz
Hotel Corporation has entered an agreement with the City of Miami Beach
Redevelopment Agency to jointly develop a hotel on Collins Avenue (SR A' A) at '6
Street in Miami Beach, Florida (see Figure '). The project will consist of a hotel,
ballrooms, meeting/seminar rooms, restaurants, and retail space. The opening of the
hotel is slated for late' 997.
Study Area
The study area, as determined in a pre-application meeting with the Florida
Department of Transportation (FDOT) District Six Permits Office, is Collins Avenue
from , 5 Street to Lincoln Road.
Studv Obiective
The objective of this study is two-fold. First, the impacts of the project on the
adjacent signalized intersections on Collins Avenue (15 Street to the south and Lincoln
Road to the north) were analyzed. Second, a traffic signal warrant study was
undertaken to determine if a traffic signal is justified at the proposed Collins
Avenue/'6 Street intersection.
Saint Moritz Hotel
Traffic Study
1
December, 1995
~
(Ad
@E)
ARTHUR GODFREY RD
JULIA TUTTLE CSWY
~
,,'.s.
LINCOLN RD
16TH ST
BISCAYNE
BAY
Cl
II:
Z
o
!:l
c
'IU
:.
~
~
~
"
~
~
CIC
f
IU
:.
~
;
..
..
8
ATLANTIC
OCEAN
5TH ST
[dps] LOEWS IIIAIII BEACH HOTEL
95156
FIGURE 1
LOCATION MAP
2
2. PROJECT SITE INFORMATION
Proiect Site
The project site is on the east side of Collins Avenue at 16 Street. As part of this
project. an extension of 16 Street is proposed between Washington Avenue and
Collins Avenue (see Figure 2). The project site will consist of the following:
· .!:!QNl - 800 rooms
· Grand Ballroom - 28.000 s.f.
· Junior Ballroom - 8.000 s. f.
· Seminar/Meetino rooms - 16.000 s.f.
· Laroe restaurant - 250 seats
· Small restaurant - 100 seats
· Retail - 6.500 s.f.
Parking
Parking will be provided on-site and off-site. The proposed on-site parking
(approximately 190 spaces) will be for valet use only. A 800-space parking garage
is proposed. as part of this development. on 16 Street between Collins Avenue and
Washington Avenue. This parking garage will be used for spillover valet parking and
self-parking for hotel patrons. This parking garage will also be open to the public (see
Figure 2).
Saint Moritz Hotel
Traffic Study
3
December. 1995
(:-',
@E)
NORTH SERVICE DWY
N. T .s.
PROPOSED
LOEWS MIAMI BEACH
HOTEL
SOUTH SERVICE DWY
FIGURE 2
PROPOSED PROJECT ACCESS
15151
. i
. I
I
"I .
,
J
1
I
J
I
I
)
I
IE
II.J
~.
z
o
...
e"
Z
-
:z:
.
~
III
~
(I)
lie
-
gl
c.J1
I I
1 I
1
PROPOSED 16TH ST
EXTENSION
PROPOSED
100 SPACE
PARKING GARAGE
J
I
/
I I
I J
-
<
...
<
-
L
---
LOEWS MIAMI BEACH HOTEL
Access
Access to the site will be provided via Collins Avenue (see Figure 2). The main
driveway will be in the center of the property. Additionally, there will be service
driveways on the north and south ends of the property. The south service driveway
will also provide emergency access to the beach.
Saint Moritz Hotel
Traffic Study
5
December, 1995
,t;\
~
3. 1997 TRAFFIC CONDITIONS WITHOUT PROJECT TRAFFIC
Data Collection
Data collection for this study included assembling a library of studies and reports by
the City of Miami Beach, the Florida Department of Transportation (FDOT), and other
entities that may affect this project. Geometric and roadway characteristics
information and traffic counts were collected. The traffic counts included 24-hour
approach counts on Collins Avenue at 16 Street (see Appendix A) and existing peak
hour turning movement counts on Collins Avenue at 15 Street, 16 Street, and Lincoln
Road (see Appendix B). Additionally, the FDOT furnished 1994 seasonal variation
factors for traffic volumes. Pedestrian counts were taken at the Collins Avenue/16
Street intersection.
Existina Conditions
Collins Avenue is a four-lane, undivided arterial roadway. The posted speed limit is
35 mph. 16 Street intersects the east side of Collins Avenue only. This section of
16 Street cul-de-sacs approximately 400-feet east of Collins Avenue and provides
metered, on-street parking.
The adjacent signalized intersection to the north of the project site on Collins Avenue
is Lincoln Road. All vehicle movements are allowed at the Lincoln Road approaches
Saint Moritz Hotel
Traffic Study
6
December, 1995
@E]
to Collins Avenue. The adjacent signalized intersection to the south of the project on
Collins Avenue is 15 Street. 15 Street intersects the east side of Collins Avenue only
and connects to Ocean Drive further east. The movements to Collins Avenue from 15
Street are left turn and right turn only.
Existina Pedestrian Volumes
Pedestrian counts were taken at 1 5 minute intervals from 11 am to 1 pm and from 4pm
to 6pm at the Collins Avenue/16 Street intersection. These two periods were
determined to be the peak periods for pedestrians based on the 1994 South Beach
Bicycle and Pedestrian Study prepared for the Dade County Metropolitan Planning
Organization. The 1995 pedestrian volumes crossing Collins Avenue at this
intersection are shown in Table 1.
TABLE 1 - Pedestrians Crossing Collins Avenue at 16 Street
Pedestrian Crossina 11 am - 120m 120m - 10m 40m - 50m 50m - 60m
Collins Ave. at 16 St. 38 55 53 55
1997 Backaround Traffic Without Proiect
The methodology for this study involved evaluating the impacts of this project based
on future traffic conditions at project buildout (1997). 1995 turning movement traffic
Saint Moritz Hotel
Traffic Study
7
December, 1 995
-~
"",)
~
counts during the am, midday, and pm peak periods were taken at the three
intersections under study (see Appendix B) and used as the starting point for
projecting 1997 traffic counts.
FOOT provided historical Average Daily Traffic (ADT) counts at two counting stations
on Collins Avenue (station #5159 and #5170). These ADT's were reviewed to
determine an average annual growth rate for the project area. The analysis indicated
that traffic volumes have fluctuated but generally have increased at a rate of 4% per
year. 1997 background traffic projections with and without the project were based
on a 4% annual growth rate.
Figure 3 through 5 show the projected 1997 traffic volumes without project traffic on
Collins Avenue at 15 Street, 16 Street, and Lincoln Road for the am, midday, and pm
peak hours.
1997 levels of Service Without Proiect
The 1997 background traffic volumes without project traffic were used to analyze the
level of service (LOS) for the project intersections. LOS for signalized intersections is
a measure of delay per vehicle in seconds. LOS is characterized with the letters A
through F. LOS A describes operations with very little delay (less than 5 seconds per
vehicle). LOS F describes operations with delay that is
Saint Moritz Hotel
Traffic Study
8
December, 1995
;~~~
-'
@E)
FIGURE 3
,
96439 32 t.-41
j 1 L <-- 45
r- 38
71 -.....J' LINCOLN RD
30-- 1 T r
53~ 38 257 29
t.- 3
585 1 r- 0
16 th ST 1 L 16 th ST
T r
283 1
.
t.- 63
507 52 r-24
1 L 15th ST
T r
215 14
-
cl:
-
LaJ cl:
> -
<
Z LaJ
>
0 cl:
l-
e> III
Z Z
- -
:I: ..J
III ..J
cl: 0
~ U
~.. IL'~ 1997 AM PEAK HOUR oPA 9~1 '56
[3 LOEWS MIAMI BEACH HOTEL TURNING MOVEMENTS
"- (NO PROJECT)
9
FIGURE 4
130 640 38
J 1 l
117---1'
43 --+
1 00 --.
16 th ST
678 4
1 L
,
t...- 58
+-- 28
~51
LINCOLN RD
1 T r
55481 55
t...- 4
~O
16 th ST
T r
541 0
t...- I I 4
546 90 ~27
1 L 15th ST
T r
395 31
-
<l:
LLJ -
> <l:
<l: -
Z
0 LLJ
I- >
<;) <l:
Z
- Vl
J: Z
Vl -
<l: ....l
~ ....l
0
U
[E
'10..
uta.
LOEWS MIAMI BEACH HOTEL
10
1997 MIDDAY PEAK HOUR
TURNING MOVEMENTS
(NO PROJECT)
OPA 95156
FIGURE 5
Il
I I 7 533 51 L- 65
j ! L +-- 38
r- 45 LINCOLN RD
100~ 1
32- T r
90 ---. 52 54948
L-I
596 0 .r- 0
16 th ST 1 L 16 th ST
T r
621 I
L-170
516 100 .r-47
1 L
15th ST
T r
429 20
~
<l:
-
<l:
I.!J -
>
<l:
I.!J
Z >
0 <l:
l-
e.:> VI
Z Z
- -
:I: ....J
VI ....J
<l: 0
~ U
_h 1I1I.Lo 1997 PM PEAK HOUR OPA 95156
[TJ LOEWS MIAMI BEACH HOTEL TURNING MOVEMENTS
(NO PROJECT)
'"
II
.
considered unacceptable to most drivers (in excess of 60 seconds). Highway Capacity
Software (HCS) was used in the analysis. The Lincoln Road and 15 Street
intersections with Collins Avenue were run with the signalized module of HCS. The
Collins Avenue/16 Street intersection was run with the unsignalized module of HCS.
Figures 6 through 8 show the projected 1997 LOS without project traffic on Collins
Avenue at 15 Street, 16 Street, and Lincoln Road for the am, midday, and pm peak
hours (see Appendix C for LOS worksheets). These levels of service will be used to
compared the 1997 traffic conditions with and without project traffic.
Saint Moritz Hotel
Traffic Study
12
December, 1995
@E1
FIGURE 6
-
LOS D
r~
~1
LOS A
16 th ST
-
r~
LINCOLN RD
16 th ST
Lo.I LOS C
> - 15th ST
oCt
z
0 r~
I- oCt
(:)
Z oCt
:I:
VI
oCt Lo.I
~ >
oCt
LEGEND. VI
Z
8 ...J
INTERSECTION LOS ...J
0
u
LOS B
- APPROACH LOS
NOTE. 16 STREET IS UNSIGNALIZED
[dpElI -.., LOEWS MI AMI BEACH HOTEL
rnu,
1997 AM PEAK HOUR
LEVELS OF SERVICE
(NO PROJECT>
13
OPA 9~15~
16 th ST
UJ
>
<(
z
o
.....
<.:l
Z
::c
III
<(
~
LEGI'ND.
~ INTERSECTION LOS
LOS B
----+ APPROACH LOS
NOTE. 16 STREET IS UNSIGNALIZED
[drill] """'h LOEWS MI AMI BEACH HOTEL
FIGURE 7
----+
LOS E
~l
<(
<(
UJ
>
<(
III
Z
..J
..J
o
U
IlTl.It
LOS 0
-
l~
LOS A
-
l~
LOS C
-
r~
1997 MIDDAY PEAK HOUR
LEVELS OF SERVICE
(NO PROJECT)
14
LINCOLN RD
16 th ST
15th ST
DPA 9~1~6
16 th ST
LLI
>
<(
z
o
I-
l:l
Z
:r:
III
<(
~
LEGEND.
z
..,
o
~ INTERSECTION LOS
LOS B
----+ APPROACH LOS
~
z
..,
~
~
~ NOTE. 16 STREET IS UNSIGNALIZED
~
o
o
o
~ [dpEll] -" LOEWS MI AMI BEACH HOTEL
FIGURE 8
----+
LOS E
~1
<(
<(
LLI
>
<(
III
Z
....J
....J
o
U
111U,
LOS E
-
r~
...J
LOS A
-
r~
LOS C
-
r~
1997 PM PEAK HOUR
LEVELS OF SERVICE
(NO PROJECT)
15
LINCOLN RD
16 th ST
15th ST
DPA 9!l156
4. 1997 TRAFFIC CONDITIONS WITH PROJECT TRAFFIC
Proiect Trio Generation
In order to analyze the impacts of the proposed hotel on Collins Avenue, an estimate
of the additional trip making that will be attracted to and from the project site needs
to be made. Institute of Transportation Engineers (lTE) Trip Generation rates were
used to estimate the additional trip making associated with the proposed development.
These rates are stated in trips per hotel room for the for an entire day, for the morning
peak hour, and for the afternoon peak hour.
At the pre-application meeting with the Florida Department of Transportation (FDOT)
District Six Permits Office, it was determined that Collins Avenue traffic would be
analyzed at full hotel occupancy. After the draft submittal of this report, the FDOT
requested that the Collins Avenue traffic be analyzed at 70% hotel occupancy.
Therefore, the ITE trip generation rate used for this analysis is 4,872 (6,960 X 70%)
trips per day. ITE also gives an am and pm peak hour of generator trip generation rate
for a hotel site. See Table 2 for trip generation rate information.
Although ITE furnishes a trip generation rate for the entire day, nothing is given for
distribution of the trips throughout the day (Le., hourly distributions). This is essential
for the signal warrant study that is discussed later in this document.
Saint Moritz Hotel
Traffic Study
16
December, 1995
..-;;,
''':-'
@E]
TABLE 2 - ITE Trip Generation Rates
Period Ava. Rate % Entering % Exiting
Weekday 8.70 50% 50%
AM Peak Hour 0.65 55% 45%
PM Peak Hour 0.76 57% 43%
Traffic count data for a hotel on Miami Beach with similar characteristics to the Saint
Moritz Hotel were unavailable. Because of the availability of the data, 24-hour
driveway traffic counts (1989) from the Sonesta Beach Hotel in Key Biscayne, Florida
were used as the basis for distributing the trips over the entire day for this hotel
project. The Sonesta Beach Hotel is an ocean front hotel with 300 hotel rooms,
21,000 s.f. of meeting/seminar space, 3 restaurants, and retail space. The ITE am
and pm peak hour of generator rates were incorporated into the trip distribution as
well. The 24-hour distribution used for this project and the Sonesta Beach Hotel
traffic counts are shown in Appendix D.
Because the traffic impacts of the site are to,be analyzed at 70% hotel occupancy, the
parking operations need to be addressed. The City of Miami Beach is requiring
approximately 800 parking spaces for this site. There will be approximately 190 valet-
only parking spaces provided on-site. A 800-space parking garage is also proposed
Saint Moritz Hotel
Traffic Study
17
December. 1995
:7\
@E)
as part of this project on 16 Street between Collins Avenue and Washington Avenue.
Therefore, 76% of the required parking spaces are off-site.
Assumptions needed to be made regarding trip-types to the site. The six basic trip-
types for this site were determined to be:
· Trips entering/exiting the site and vehicles valet parked on-site
· Trips entering/exiting the site and vehicles valet parked off-site
· Trips entering/exiting the site (dropoff) and vehicles self-parked off-site
· Trips self-parking off-site and walking to hotel
· Trips entering/exiting the site by taxi, shuttle bus, limo, etc.
· Trips entering/exiting the site for delivery/service to the hotel (not using main
driveway)
Table 3 shows the percentage of trip-types for the project site. See Appendix E for
additional detail on the calculation of trip-type percentage.
TABLE 3 - Trip-Types During Full Occupancy
Trio- Tvoe
Valet (On-Site Park)
Valet (Off-Site Park)
Dropoff and Self-Park
Self-Park and Walk to Site
Taxi/Shuttle Bus/Limo
Delivery/Service
T TAL
Percentaae
27%
47%
6%
4%
15%
1%
1 00
Saint Moritz Hotel 18
Traffic Study
December, 1995
@E1
The ITE trip generation rates allow for one trip entering the site and one trip exiting the
site per unit of development. Because of the high percentage of trips entering the
project site and then parking off-site, the project site is not "typical" for a hotel. The
trip generation rate for the project site needs to be adjusted to account for this.
Therefore, the valet (off-site parking) and dropoff (self-parking) trips were counted
twice (approximately 53% of all trips). Because of this, the trip generation for this
project is 7,406 trips per day (see Appendix D). It is also assumed that the 190 on-
site valet spaces will be used before any off-site valet spaces are used.
Proiect Trio Distribution
Project traffic was distributed and assigned to the study area using the Cardinal
'., '-' . -~~, :'--":''''~':;;:'''~'::c:---'':'---'-:'""
- Distrihutforr"dfit'afrieCffrbrfl1he Miami Urban Area Transportation Study (MUA TS). This
. distribution is shown in Table 4.-Figure 9 shOws the generalized trip distribution.
TABLE 4 - Cardinal Distribution for T AZ 19
Cardinal Directions
NNE
ENE
ESE
SSE
SSW
WSW
WNW
NNW
Percentage
13.27%
0%
0%
0%
10.11%
35.68%
19.42%
21.52%
1
Saint Moritz Hotel
Traffic Study
19
December, 1995
..-..
~ ->~,
-.'
@EJ
z
"
o
FIGURE 9
140% Il
LINCOLN RD
140%
(PROPOSED 16TH ST
EXTENSION) PROPOSED
16 th ST PROJECT
. . SITE
20%
PROPOSED 800
SPACE PARKING GARAGE
140%
15th ST
-
~
-
~ 140%
l.IJ -
>
~
l.IJ
Z >
0 ~
I-
<.:l II)
Z Z
- -
:x: ~
II) ~
~ 0
~ u
(E ~h ilia. [)pI. 951S6
LOEWS MIAMI BEACH HOTEL PROJECT TRIP DISTRIBUTION
20
1997 Backaround and Proiect Traffic
Using the methodology described above, the project traffic was combined with the
forecasted 1997 background traffic. Figures 10 through 12 show the 1997 am,
midday, and pm peak hour turning movements with background and project traffic.
1997 Levels of Service With Backaround and Proiect Traffic
A simulation of intersection operations using the 1997 background traffic volumes
without project traffic was conducted to analyze the level of service (LOS). Highway
"',""-"""''''',','' -",'.'c-::-:-.'-:--"_-c:c.. , . ,.,,_^.,~..; , '. _ '".......... . _,.,.~_;~;~~~~_~';7",:,'~'.~.~:.;;,;;:;;;;:;;~,;;;:-~~:'_-'-"-:~":'-'---'-
CaJ)aci!y__~oftwarE:!(HCS} was used in the analysis. The Uncoln Road, 16 Street, and
15 Street intersections with Collins Avenue were run with the signalized module of
HCS. The Collins Avenue/16 Street intersection was also run with the unsignalized
module of HCS.TheapprOath and intersection levels of service for the am, midday,
and pm peak hours are displayed in Figures 13 through 15 (see Appendix F for LOS
worksheets). A comparison of 1997 intersection LOS's are shown in Table 5.
TABLE 5 - 1997 Intersection LOS's With and Without Project Traffic
LOS Without Project LOS With Project
Sianalized Intersection AM MID PM AM MID PM
Collins Ave./Uncoln Rd. C C C C C C
Collins Ave./16 St. N/A N/A N/A B B B
Collins Ave./15 St. B B B B B B
Saint Moritz Hotel
Traffic Study
21
December. 1995
rdpa)
~
FIGURE 10
96 561 32 L-41 ,
j 1 L -45
r- 38
LI NCOLN RD
71 --" 1 r
30- T
53-. 38 357 29
3 586 124 L- 101
(PROPOSED 16TH STj 1 L - 48
- 'EXTENS I ON) r- 101 PROPOSED
16 th ST 3 --" PROJECT
1 r SITE
PROPOSED 800 57- T
SPACE PARKING 3-. 3 284 124
GARAGE
607 52 L- 63
1 L r- 24
15th ST
T r
337 14
-
<(
-
<(
l.LI -
>
<(
l.LI
Z >
0 <(
l-
e.:> Vl
Z Z
- -
:I: ...J
Vl ...J
<( 0
== U
[E -...U. 11IU. 1997 AM PEAK HOUR tlPA 950156
LOEWS MIAMI BEACH HOTEL TURNING MOVEMENTS
(WI TH PROJECT)
S1'S- "
22
FIGURE I I
I 30 732 38 t..- 5 e
J 1 L +-- 28
r- 51
117---1 LI NCOLN RD
43_ 1 i r
I 00 --. 55573 55
,
2 73393 t..- 93
P.&OP.oSEi}=.!6TH. STJ 1 L +-- 44
.- ~='"""""--~~'-"_~'.__~'''''':':'~''.''''''_-_:'';'N;';,~
EXTENSION) r-93 PROPOSED
16 th ST 2 ---1 PROJECT
1 r SITE
PROPOSED 800 44_ i
SPACE PARKING 2--. 2 54393
"'.. GARAGE
"-..--.-.."
t..-114
638 90 r-27
1 L r 15th ST
i
48731
~
<
-
W <
> -
<
Z I..LI
0 >
I- <
L')
Z VI
- Z
:J: -
VI ...J
< ...J
3: 0
u
fT) -.. IlIU. 1997 MIDDAY PEAK HOUR DPA 9'S156
LOEWS MIAMI BEACH HOTEL TURNING MOVEMENTS
(WI TH PROJECT)
23
~
FIGURE 12
I 17 680 51 L-65 I
J ! L -38
r- 45
LINCOLN RD
I 00 -1 1 r
32--- T
90-, 52 660 48
3597149 L-112
(PROPOSED 16TH ST J ! L -53
.. . .. _.. -. -.---... --- .__...._.._~ EXTENSION) ,r--112 PROPOSED
16 th ST PROJECT
3-1 SITE
PROPOSED 800 69___ 1 T r
SPACE PARKING 3-, 3 622 149
GARAGE !
L-170
627 100 r-47
1 l 15th ST
T r
576 20
-
<(
-
<(
UJ -
>
<(
UJ
Z >
0 <(
l-
e.:> Vl
Z Z
- -
:c: ..J
Vl ..J
<( 0
~ u
fE _h rll.... 1997 PM PEAK HOUR OPA 95156
LOEWS MI AMI BEACH HOTEL TURNING MOVEMENTS
(WI TH PROJECT)
z
"
'"
24
%
.,
o
fE
16 th ST
LLJ
>
<(
z
o
l-
e.:>
z
:I:
VI
<(
;t:
LEGEND.
~ INTERSECTION LOS
LOS B
----+ APPROACH LOS
NOTE. 16 STREET IS SIGNALIZED
FIGURE
. ..lPROPOSED 16. TH S T
EXTENSION)
PROPOSED 800
SPACE PARKING
GARAGE
LOEWS MIAMI BEACH HOTEL
25
----+
LOS 0
----+
LOS C
IIIL1.
13
LINCOLN RD
r~
~l
LOS C
-
PROPOSED
PROJECT
SITE
r~
-'
~l
LOS C
-
15th ST
r~
<(
<(
LLJ
>
<(
VI
Z
...J
...J
o
U
1997 AM PEAK HOUR
LEVELS OF SERVICE
( WI TH PROJECT)
OPA 95156
FIGURE 14
-
LOS E
(PROPOSED 16TH ST
EXTENSION)
16 th ST
-
LOS C
PROPOSED 800
SPACE PARKING
GARAGE
LOS D
-
LINCOLN RD
l~
~l
LOS C
-
PROPOSED
PROJECT
SITE
l~
W LOS C
> -
<[ 15th ST
z
0
I- l~
0
Z
J:
Vl
<[
~
<[
LEGEND. <[
8 W
INTERSECTION LOS >
<(
Vl
LOS C Z
- APPROACH LOS
...J
...J
0
U
NOTE, 16 STREET IS SIGNALIZED
[dpEl] -.. LOEWS MI AMI BEACH HOTEL
IllY,
26
1997 MIDDAY PEAK HOUR
LEVELS OF SERVICE
(WITH PROJECT!
DPA 9SIS'
FIGURE
-
LOS E
(PROPOSED 16TH ST
EXTENSION)
16 th ST
-
, LOS C
PROPOSED 800
SPACE PARKING
GARAGE
15
LI NCOLN RD
r~
--l
~1
PROPOSED
PROJECT
SITE
LOS C
-
r~
--l
w ~l
> LOS C
<( -
15th ST
z
0
I- r~
Cl
z
-
J: --l
III
<(
3:
<(
<(
LEGENO,
8 W
INTERSECTION LOS >
<(
III
LOS C Z
- APPROACH LOS ...J
...J
0
U
NOTE, 16 STREET IS SIGNALIZED
[dplll) -.. LOEWS MI AMI BEACH HOTEL
27
1997 PM PEAK HOUR
LEVELS OF SERVICE
(WI TH PROJECT)
DPA 9'5IS6
Table 5 shows that there are no significant changes in the levels of service at the
study area intersections with the project traffic.
The Collins Avenue/16 Street intersection was also analyzed as an unsignalized
intersection with 1997 background traffic volumes and project traffic. Using the HCS
unsignalized module, the westbound left turns are a LOS F during the' am peak hour.
During the midday and pm peak hours, the eastbound and westbound approaches
operate at a LOS F (see Appendix G for LOS worksheets).
1997 Pedestrian Volumes With Proiect
Because 74% of the parking spaces required for this project are off-site, a large
number of pedestrians will be crossing Collins Avenue at 16 Street. 1997 pedestrian
volumes were estimated based on background pedestrian counts, attraction from other
intersections, all employees parking off-site, valet parking off-site, and patrons self-
parking their vehicles (see Appendix H for additional detail on calculation of pedestrian
volumes). The 1997 pedestrian counts with project traffic at 70% hotel occupancy
are shown in Table 6.
TABLE 6 - 1997 Pedestrian Volumes with Project Traffic at 70% Hotel Occupancy
Pedestrian Crossina 11 am - 120m 120m - 10m 40m - 50m 50m - 60m
Collins Ave. at 16 St. 311 369 381 463
Saint Moritz Hotel
Traffic Study
28
December. 1995
Q,
'-'
@EJ
o
These volumes are comparable to the 1991 pedestrian volumes crossing Collins
Avenue at Lincoln Road in the 1994 South Beach Bicycle and Pedestrian Study
prepared for the Dade County Metropolitan Planning Organization.
Saint Moritz Hotel
Traffic Study
29
December, 1995
@EJ
5. SIGNAL WARRANT ANALYSIS
The 1997 background traffic volumes combined with the project traffic were used to
determine if a signal is warranted at the proposed Collins Avenue/16 Street intersection.
These traffic volumes were compared to the 11 signal warrants in the Manual on Uniform
Traffic Control Devices (MUTCD). However, Warrants 9 through 11 generally apply to
major traffic generators such as employment centers, so these warrants were not
analyzed. Fulfilling anyone of the warrants is sufficient to warrant a traffic signal. A
summary of the results for each warrant is discussed below. See Appendix I for the
signal warrant summary sheets.
Slonal Warrant 1 - Minimum Vehicular Volume
As required, the minimum volumes for the major street and minor street were satisfied
for at least eight hours during the day. This warrant is satisfied.
Sional Warrant 2 - Interruption of Continuous Traffic
As required, the minimum volumes for the major street and minor street were satisfied
for at least eight hours during the day. This warrant is satisfied.
Sional Warrant 3 - Minimum Pedestrian Volume
Because of the high elderly population, the City of Miami Beach uses a walking speed
Saint Moritz Hotel
Traffic Study
30
December, 1995
(*)
@EJ
of 2 feeUsecond for pedestrians. (This is the pedestrian speed used at the Collins
Avenue/Lincoln Road intersection.). Therefore, 50% of the criteria needs to met to satisfy
this warrant. A vehicle gap size study showed no more than three adequate gaps per
hour during the four hours studied. This warrant is satisfied. (Note: this warrant is nearly
satisfied using 1995 pedestrian counts at the Collins Avenue/16 Street intersection.).
Sional Warrant 4 - School Crossinos
This warrant is not applicable.
Slonal Warrant 5 - Prooressive Movement
This warrant should not be considered where the resultant signal spacing is less than
1000-feet. Because of the proximity of the signals at Lincoln Road and 15 Street, this
warrant is not fulfilled.
~'<i;,~.",..~~~~,,,,,~:d"~' ;....':"''C. <>;-
Slonal Warrant 6 - Accident Experience
Three years of accident data (1992, 1993, and 1994) were obtained from the FDOT on
Collins Avenue from Lincoln Road to 15 Street. One of the criteria for satisfying this
warrant is that five or more accidents, of types susceptible to correction by traffic signal
control, must have occurred within a 12-month period. Also, there needs to have been
an adequate trial of less restrictive remedies to reduced the accident frequency. Neither
of these criteria was met. This warrant is not satisfied.
Saint Moritz Hotel
Traffic Study
31
December, 1995
~
~
@EJ
..
Slonal Warrant 7 - Systems Warrant
This warrant is not applicable.
Sional Warrant 8 - Combination of Warrants
This warrant is not applicable.
Table 7 displays a summary of the analysis of the traffic signal warrants.
TABLE 7 - Summary of Signal Warrants Analysis
Warrant Number Warrant Description Status
1 Minimum Vehicular Volume Fulfilled
2 Interruption of Continuous Traffic Fulfilled
3 Minimum Pedestrian Volume Fulfilled
4 School Crossing Not Applicable
5 Progressive Movement Not Fulfilled
6 Accident Experience Not Fulfilled
7 Systems Warrant Not Applicable
8 Combination of Warrants Not Applicable
Total Warrants Satisfied 3
Saint Moritz Hotel
Traffic Study
32
December. 1995
--"
@EJ
'*'
6. CONCLUSIONS
Future traffic volumes on Collins Avenue at 16 Street are expected to increase as a
result of this project. There are three driveways proposed for this site that will provide
access for the hotel. The main driveway at 16 Street will provide primary access to
the site. The north and south project driveways will provide secondary access
(service/delivery vehicles) and emergency beach access.
At project buildout (1997), a traffic signal will be warranted at the Collins Avenue/16
Street intersection. The traffic signal is warranted based on traffic volumes and
pedestrian volumes at 70% hotel occupancy.
The levels of service on Collins Avenue at 15 Street, 16 Street, and Lincoln Road were
analyzed with and without project traffic (19971. These calculations show that the
level of service on Collins Avenue will not be degraded because of the project traffic.
Saint Moritz Hotel
Traffic Study
33
December, 1995
o
@EJ
APPENDIX A
1995 24-Hour Approach Traffic Counts at
Collins Avenue and 16 Street
@EJ
....
w
W
O:::cc
....&1)
(/)....
CCIt)
~i
==-<
....0..
....0
<,
0:::>
!!!.o
w::J
::J....
z(/)
wo
>-
<tt
(/)<
zO:::
:J....
..J
o
o
....
Z
::J
o
o
g
LL
LL
~
....
0:::
::J
o
:c
,
'It
N
o
W
....
(/)
::J
..,
o
<
>
..J
..J
<
Z
o
(/)
<
w
en
&I)
Q')
Q')
....
.e
u
lIS_
o ~
... ~
a....
a.0 0
<( ..... C\l <0 ..... C\l M <0 ,,.. It) 0 'V MOl,... 0 It) It) <0 M 'V It) 0 Ol 'V11t)
~ ~ ~~ ~~~~N~~ ~ ~~~~~I
- 0 ..
II) c:
~.-
.e:::E
.21
:J:
II)
~
.e-
u ~
lISf
0_ 1t).....'V,...<OMCOO.....,...iO,...It),... ,...
... (/)..... It) It) It) 0 <0 <0 <0 0 C\l 'V COIOl 0 M,... "",C\l M...-"" 0 CO M""
Q.Q. ... It) 'V 'VI<O ..... Ol CO 'V Ol 0 ..... C\lIM 'V M M C\l C\l M M ...- C\l ...-:,... S-
O CO <0 'V'C\l C\l "'-'M It) CO -I - - - - - - -IOl'M
<~ ~~T"""IT"""T"""T""".,...T"""T""",.-T"""T""",.-T""" N
.ellS
...:::E
o
1XI
'C
c:
::::I
o
~.....C\l<O...-C\lM<O<OIt)O'VMOl,...OIt)It)<oM
~ T""" T""" T"""T"""T"""T"""NT"""T""" T"""
:
~
o
'VIt)OOl'V1t)
T"""T"""T"""T"""N
'C
c:
::::I
O~~~~~~~~~~~~~~~~~~~~~~~~~
SZZZZZZZZZZZZZZZZZZZZZZZZZ
II)
lIS
W
'C
c:
::::I It)
~<OOlCOO""Ol""<O<OOC\lIt)Ol'V"'-C\lOlOlOC\l'VIt)'VOlM
.eOC\l...-MO ...-1t),...C\lCO'V,...OlOOlIt)C\lO<OC\lC\lC\lIt)...-
...'VMC\l..........OlC\lMIt)<O<O,...,...,...,...<OIt)It)<O<O<O<O<O'VC\l
::::I ...-
o
(/)
'C
c:
::::I C\l
~It)<O,...It)M,...OlO'VIt)OlOCOC\l...-<O...-...-<OCOMOC\l'V'VOl
'V.....C\lMO <OOl"'-OIt)'V...-...-MCO"'-OlM'VIt)CO<O"'-~
€'VMC\l..........Ol..........M'V'VIt)<O<O<O<O,...<O,...<OIt)It)It)It)~
o
Z
(/)
g ~
- ~
~OOOOOOOOOOOOOOOOOOOOOOOOO
WOOOOOOOOOOOOOOOOOOOOOOOO~
...-C\lM 'VIt)<O,...COOlO...-C\lM'V1t) <0,... CO OlO...-C\lM'V
~OOOOOOOOO""''''-'''''''''''''-''''''''-''''''''-'''-C\lC\lC\lC\lC\l
o
:J:
It)
Ol
Ol
...-
Ol
...-
a:::
UJ
CD
::E
UJ
I-
Cl..
UJ
(/)
(/)
I-
Z
::>
0
u
u
u::
l.L
<( 'V
a::: ~
I- 5
l.L ~
0 (j)
UJ (0
~ .....
......J
0
0 u
APPENDIX B
1995 Peak Hour Turning Movement Counts
-
.'" ~
@E]
C...J
z< CO~ CO'#"N COOlC"l
iHi co~ ~'#"~ co'#".....
'#"CO o~ ~~N
Cl~ ....~
I~ LI).. cocoo "00
'#"co C"l~C"l ~~~
,g ~~~
C
z Q:: Ol,#"LI) CO~O
::J COOl
0 NLI) C)CI)~ ~~('I')
Gl
~18 00 000 000
~
~ COC"l OlNLI) C"lOlO
~N C"lC"lN '#"C"l~
C/) I~
z I-
0 Z 00 000 000
W g
j:: :ii:
~ w C
> z Q::
0 ::J 00 000 000
D:: :ii: 0
0 Gl
W :r ~
Q. ..J III
U < 8
en (J ~ 00 000 000
:E w
Z GlLl)
~ W
> -Ol
~- ~
C <co 00 000 000
... _N
W ~a;
LL I- ...J
C/)
0 ~ ~ LI) ..... co~co ocoo
co~ NOlCO .....COC"l
... -, "W 0 NLI) COLl)LI) LI),#"~
C ~< ~
Z ~ C
W ~ UQ z
:E ::J a:: 00 000 000
..J 0
... ~ Gl
D:: z :r
0 ~
<( ::J ~ Ol Ol ~~:g .......N
C/) 0 NCO .....~~
Q. ~ III N'#" LI)LI)LI) '#"'#"~
W W
C C/)
LL ...J coco .....LI)C"l C"l.....CO
<( 0 C"l'#" CO CO CO Ol..... ~
C ~ ~
~ ...J
W <
~ W CON O.....'#" Ll)0C"l
0 :ii: a::: ~ .....~ OC"lOl ~"'O
0 ~N C"lC"lC"l '#"C"l~
..J :ii: ~ ~
III
LL ~ LI) C
C/) ~ z
- ::J a::: '#"C"l "'C"lOl ~~'"
W 0 ~~ ~NN
::l Gl
Z Z %:
W ;( ~ '#"Ol ~'#"CO .....~CO
~ a::: 0 ~ COOl CO~CO ~~Q)
, ~~ NC"lC"l
III >- Z
Z 0
:JW ::l
...J~<o ...J 00 000 000
o Q....J
UOOU
~~ ~~~ ~~~
z << Q.Q.Q. Q.Q.Q.
0 00 000 000
i= 00 000 000
com N';"':C\i u-;<i:j~
.. i5 w 00 ~OO 000
Z a::: ..z ~
o..wa:::o i= ~~ ~~~ ~~~
i=~~~U << <Q.Q. Q.Q.Q.
<zW~C 00 000 000
U::JIII < 00 000 000
OOGl~O r:...:iO ';"':N';"; .;,:u-;g
..JUO a::: 00 ~~O 00
...
l<:
~
en
LI)
..
...J
o
U
O..J
Z<( 000 000(0 ooO>N
~b NO ""ooM Nlioo
Il)oo CO);: :: N
01-
..J
<(
I- ... M ..,.0..,. ...... ...
0
I-
0
Z
:J a: ...M ..,.0..,. .....0 O'
0
aI
I-
1/1
W I- 00 000 000
;:
..J 00 000 0......
"
U) ..J
Z ... <(
0 Z I- 00 000 000
W 0
i= :::E I-
~ W 0
> Z a:
0 :J 00 000 000
0:: :::E 0
0 aI
W J: I-
Q. ..J 1/1
en 0 ~ <(I- 00 000 000
Z w
Z alll)
e( W
> -~
0:: c ~oo ..J 00 000 000
to- -C:!
w ~O>
U. ... ..J
U)
0 ::J :! NN ...... ... ......N
... ..,. ;:l;ooM Il)..,.M
to- ..., "w 0 Mil) 1l)(O Il)..,....
C ~~ I-
Z e( 0
W ~ (Jo Z
~ :J a: 00 000 000
..J 0
to- e( aI
a:: Z :J:
0 l-
e( :J I- ... ... ........... ......N
U) 0 ... ..,. MOON Il)..,.M
Q. e( 1/1 Mil) 1l)Il)(O Il)..,....
W w
C U)
e( U. ..J ... ... ..,.0..,. 000
0
C ~ I-
- ..J
a:: w :!
e( w .... M li....... (0....0>
0 :::E a: 0(0 00 ....N..,.
I- 0 NN M..,.1l) Il)Il) ...
..J :::E 1/1 I-
U. ::J (0 0
U) ... Z.
- :J a: ... ... 000 ...... ...
w 0
::> aI
Z Z :J:
W ;( Ii: l!ill;:l (0....... Il)(OOO
~ 0:: 0 I- 0> 0 0 ....N..,.
. NN M""1l) Il)Il) ...
1/1 >- Z
Z 0
:Jw ::>
..J~<O ..J 00 000 000
o a....J
0000
~~ ~~~ ~~~
Z a. a. a. a. a. a.
0 00 000 080
i= 00 000 o 0
coo; N~N ,;;~r-:
" .. is w 00 ...00 o 0
Z a:.. Z :e
o..wa:o i= :e~ ~~~ :e~~
i=~~~(J << <(a. a. a. a. a.
<(zwSo 00 000 080
(J:JI/I <( 00 000 o 0
OOal;:o ';"';0:) ';":N';": ~~g
..J(JO a: 00 ......0
..,.
~
:;=
ui
(0
...
...J
o
U
0-1
Zel: 00 N<":I..... 1000
~b OlIO .... ~<Xl ....<Xl<":l
COO lOCO <":I ~~C')
01- ~ ~~ ~
1-1
.el: <Xl~ ~<":I..,. NOO
I-
0 .....~ ~~CC ~::N
~
I-
0
Z
::J IX <Xl <Xl N..,...... g ~ CD.
0 N<":I ..,. 10 <":I
m
~II- <Xl~ <":I CO 10 ~~M
N..,. <":IN~
1-1 10 t/) Ol.......,. ;~O)
N'" ........ <":I
en -I
Z I- el: .....Ol ""..,.N 0<":1<":1
0 Z I- Ol<":l ~<":I0l ~~l.t)
W 0 ~ NN~
i= :::IE I-
~ W 0
> Z IX NOl o <":I CO "'~o
0 ::J ......,. 0l0l..... <Xl.....N
c::: :::IE 0
0 m
w ::c l-
n. ..J III
(J ~ el: I- ....<Xl .....00l O"'N
UJ W ~N <":I....N <":I'" ~
Z X mlO
<C W
> -Ol
::!:- ..,.<Xl",
c::: el:..... -I "'CO <":I 10 '"
l- e -C:! ....CO o)~CD OlOlN
W ::!:Ol
U. I- -I
en
0 :::l :: <Xl Ol OCO~ 0<":1.....
010 ONIO ~:8;!
I- .., "w 0 NIO ..........CO
e ~< I-
Z e( 0
w > Uo Z
:a ..J ::JIX "'Ol ~N~ <Xl"'.....
..J 0 CO <Xl ~~ ~~N
l- e( m
c::: Z :I:
0 I-
<C ::J I- ~8 .....N~ <":IOl....
en 0 100l..,. Ol<":l~
n. e( III N..,. 10 10 10 ..,.....~
W w
C en
LL 0 -I ....0 COIO..,. .....<Xl0
<C 0 el: N<":I ....<":1<":1 ...."'~
C ~ 0
- IX -I
c::: e( Z :: ..... ~ .....00 "'....0
0 :::IE -I ~Ol O"'CO <Xl~~
0 0 NN 1010.... IOIO~
..J :::IE Ll I-
U. :::l Z 0
en :J Z
- ::J IX ..... ..... ~:5l5l ;~co
w 0 NN
::J m
Z :x:
w I-
~ IX I- N<Xl NIO<Xl <Xl..,. <":I
0 .....<":1 <":I .... Ol OCOO
~N ..,...,.'" IO""~
III Z
Z 0::
:Jw ~
....JOel: -I 10 10 NOO ~~-.:r
Oel:Q.....J N<":I ....10....
UOOU
::!:::!: ::!:::!:::!: ::!:::!:::!:
Z el:el: Q.Q.Q. Q.Q.Q.
0 00 000 000
i= 00 000 000
O:;iai N';"':N .n~~
.. 2i w 00 ~OO o 0
Z IX"Z ::!:
o..WlXo i= ::!:::!: ::!:::!:::!: ::!:::!:::;
i=~~~U el:el: el:Q.Q. Q.Q.Q.
el:ZW~O 00 000 000
U::JIIl el: 00 000 000
OO~~O r'itj ';":N';": .q:u;~
-IU IX 00 ~~O 00
~
~
Z
:J
...J
o
Ll
APPENDIX C
1997 LOS Worksheets Without Project
.....'....
@EJ
=======================================================================
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 10-26-1995
Center For Microcomputers In Transportation
Streets: (E-W) 15 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
-----------------------------------------------------------------------
-----------------------------------------------------------------------
(N-S) COLLINS AVE
File Name: COL15FAM.HC9
10-26-95 AM PEAK
CONDITIONS WITHOUT PROJECT
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes > < 2 < 1 2
Volumes 24 63 215 14 52 507
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0
Grade 0 0 0
% Heavy Veh 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N
Bus Stops 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3
RTOR Vols 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru *
Right Right *
Peds Peds
WB Left * SB Left *
Thru Thru *
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
Yellow/AR 4.0 Yellow/AR 5.0
Cycle Length: 100 sees Phase combinat~on order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
WB LR 541 1502 0.168 0.360 16.6 C 16.6 C
NB TR 2141 3692 0.118 0.580 7.2 B 7.2 B
SB L 612 1056 0.090 0.580 7.1 B 7.8 B
T 2160 3725 0.260 0.580 7.9 B
Intersection Delay = 8.5 sec/veh Intersection LOS = B
Lost Time/cycle, L = 6.0 see critical v/c(x) = 0.225
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 10-26-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) 15 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COL15FMD.HC9
10-26-95 MIDDAY
CONDITIONS WITHOUT PROJECT
=======================================================================
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes > < 2 < 1 2
Volumes 27 114 395 31 90 546
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0
Grade 0 0 0
% Heavy Veh 2 2 2 2 2 2
Parking (YjN) N (YjN) N (Y jN) N
Bus Stops 0 0 0
Con. Peds 0 0 0 0
Ped Button (YjN) N (YjN) N (YjN) N
Arr Type 3 3 3 3 3 3
RTOR Vols 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru *
Right Right *
Peds Peds
WB Left * SB Left *
Thru Thru *
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
YellowjAR 4.0 YellowjAR 5.0
Cycle Length: 100 sees Phase combinat1on order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat vjc gjC Approach:
Mvrnts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
WB LR 536 1488 0.276 0.360 17.4 C 17.4 C
NB TR 2138 3686 0.220 0.580 7.7 B 7.7 B
SB L 416 717 0.228 0.580 7.8 B 8.0 B
T 2160 3725 0.280 0.580 8.0 B
Intersection Delay = 8.9 secjveh Intersection LOS = B
Lost TimejCycle, L = 6.0 see critical vjc(x) = 0.278
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 10-26-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) 15 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COL15FPM.HC9
10-26-95 PM PEAK
CONDITIONS WITHOUT PROJECT
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes > < 2 < 1 2
Volumes 47 170 429 20 100 516
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0
Grade 0 0 0
% Heavy Veh 2 2 2 2 2 2
Parking (YjN) N (YjN) N (YjN) N
Bus stops 0 0 0
Con. Peds 0 0 0 0
Ped Button (YjN) N (YjN) N (YjN) N
Arr Type 3 3 3 3 3 3
RTOR Vols 0 0 0
Lost Time -",-..._-_.".._y~-~,.......,.,...,~.--"~-~~_. 3.~00 __ 3.00 3.00 3.00 3.00 3.00
-----'.---Prop~.~SiiaFe -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2
-----------------------------------------------------------------------
=======================================================================
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru *
Right Right *
Peds Peds
WB Left * SB Left *
Thru Thru *
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
Yellow/AR 4.0 Yellow/AR 5.0
Cycle Length: 100 sees Phase combinat~on order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
WB LR 537 1491 0.425 0.360 18.7 C 18.7 C
NB TR 2148 3703 0.231 0.580 7.8 B 7.8 B
SB L 398 686 0.264 0.580 8.0 B 7.9 B
T 2160 3725 0.264 0.580 7.9 B
Intersection Delay = 9.6 secjveh Intersection LOS = B
Lost TimejCycle, L = 6.0 see Critical vjc(x) = 0.326
-----------------------------------------------------------------------
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
****************************************************************
File Name ................ COL16BAM.HCO
streets: (N-S) COLLINS AVE (E-W) 16 STREET
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. . . . . . . . . . . . . . . . . .. DPA
Date of Analysis.......... 10/26/95
Other Information......... 1997 BACKGROUND TRAFFIC WITHOUT PROJECT - AM PE
'< HOUR
Two-way stop-controlled Intersection
------------------------------------------------------------------------
------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0> 2< 0 0> 2< 0 0> 1< 0 0> 1< 0
Stop/Yield N N
Volumes 0 283 1 1 585 0 0 0 0 0 0 3
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's (%) 0 0 0 0 0 0 0 0 0 0 0 0
SU/RV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
'CV's(%}' - 0 0 0 0 0 0 0 0 0 0 0 0
PCE's 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
------------------------------------------------------------------------
------------------------------------------------------------------
Adjustment Factors
Critical
Gap (tg)
Follow-up
Time (tf)
Vehicle
Maneuver
Left Turn Ma~or Road
Right Turn M~nor Road
Through Traffic Minor Road
Left Turn Minor Road
5.50
5.50
6.50
7.00
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
****************************************************************
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
prob. of Queue-free State:
142
1173
1173
1. 00
292
985
985
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue-free State:
TH Saturation Flow Rate: (pcphpl)
- _d______ R'l'-SaturationFlow -Rate:- (P<::phlil )---
Major LT Shared Lane Prob.
of Queue-free State:
--------------------------------------------------------
284
1207
1207
1. 00
3400
- T7bb-
585
832
832
1. 00
3400
1700
1. 00
1. 00
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
Prob. of Queue-free State:
870
338
1. 00
338
1. 00
870
338
1. 00
338
1. 00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted Impedance Factor:
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
870
294
1. 00
1.00
868
295
1.00
1.00
1. 00
294
1.00
294
--------------------------------------------------------
Center For Microcomputers In Transportation
HCS: UnsignalizedIntersection Release 2.1 Page 3
****************************************************************
Intersection Performance Summary
FlowRate MoveCap SharedCap
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------
Avg.Total
Delay
LOS
Delay
By App
WB R
3
------------ ------ ---------
SB L
1
1173 > 1173
1207
>
3.1
> A
3.0
A
0.0
Intersection Delay = 0.0
"
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
****************************************************************
File Name ................ COL16BMD.HCO
streets: (N-S) COLLINS AVE (E-W) 16 STREET
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. . . . . . . . . . . . . . . . . .. DPA
Date of Analysis.......... 10/26/95
Other Information......... 1997 BACKGROUND TRAFFIC WITHOUT PROJECT - MIDDA
PEAK HOUR
Two-way stop-controlled Intersection
------------------------------------------------------------------------
------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0> 2< 0 0> 2< 0 0> 1< 0 0> 1< 0
stop/Yield N N
Volumes 0 541 0 4 678 0 0 0 0 0 0 4
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
-MC!s",{%). 0 0 0 0 0 0 0 0 0 0 0 0
SU/RV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
CV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
PCE's 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
------------------------------------------------------------------------
------------------------------------------------------------------
Adjustment Factors
Critical
Gap (tg)
Follow-up
Time (tf)
Vehicle
Maneuver
Left Turn Ma~or Road
Right Turn M~nor Road
Through Traffic Minor Road
Left Turn Minor Road
5.50
5.50
6.50
7.00
2.10
2.60
3.30
3.40
.
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
****************************************************************
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue-free State:
270
1010
1010
1.00
339
932
932
1.00
--------------------------------------------------------
Step 2: LT from Major street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
prob. of Queue-free state:
TH Saturation Flow Rate: (pcphpl)
RT saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue-free State:
541
878
878
1.00
3400
1700
678
741
741
1.00
3400
1700
0.99
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
prob. of Queue-free State:
1223
210
1223
210
0.99
209
1.00
0.99
209
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted Impedance Factor:
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
1223
175
0.99
1.00
1.00
174
1223
175
0.99
1.00
0.99
174
--------------------------------------------------------
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
****************************************************************
Intersection Performance Summary
-------- ------
FlowRate MoveCap Shared Cap
v(pcph) Cm(pcph) Csh(pcph)
Avg.Total
Delay
LOS
Delay
By App
Movement
SB L
4
4
------------ ------ ---------
WB R
1010 > 1010
878
>
3.6
> A
4.1
A
0.0
Intersection Delay = 0.0
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1 _
****************************************************************
File Name ................ COL16BPM.HCO
streets: (N-S) COLLINS AVE (E-W) 16 STREET
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. . . . . . . . . . . . . . . . . .. CPA
Date of Analysis.......... 10/26/95
Other Information......... 1997 BACKGROUND TRAFFIC WITHOUT PROJECT - PM PR
K HOUR
Two-way stop-controlled Intersection
========================================================================
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0> 2< 0 0> 2< 0 0> 1< 0 0> 1< 0
Stop/Yield N N
Volumes 0 621 1 0 596 0 0 0 0 0 0 1
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's (%) 0 0 0 0 0 0 0 0 0 0 0 0
SU/RV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
CV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
PCE's 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
------------------------------------------------------------------------
------------------------------------------------------------------
Adjustment Factors
Critical
Gap (tg)
FOllow-up
Time (tf)
Vehicle
Maneuver
Left Turn Ma~or Road
Right Turn M1nor Road
Through Traffic Minor Road
Left Turn Minor Road
5.50
5.50
6.50
7.00
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
****************************************************************
WorkSheet for TWSC Intersection
--------------------------------------------------------
step 1: RT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue-free State:
311
963
963
1.00
298
978
978
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
prob. of Queue-free State:
TH Saturation Flow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane prob.
of Queue-free State:
622
795
795
1.00
3400
1700
596
821
821
1.00
3400
1700
1.00
1.00
Step 3: TH from Minor street
--------------------------------------------------------
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
Prob. of Queue-free State:
1218
211
1.00
211
1.00
1218
211
1.00
211
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted Impedance Factor:
capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
--------------------------------------------------------
1218 1218
176 176
1.00 1.00
1.00 1.00
1.00 1.00
176 176
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
****************************************************************
Intersection Performance Summary
-------- ------
FlowRate MoveCap Sharedcap
v(pcph) Cm(pcph) Csh(pcph)
Avg.Total
Delay
LOS
Delay
By App
Movement
WB R
1
------------ ------ ---------
963 >
963
>
3.7
> A
Intersection Delay = 0.0
=======================================================================
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 10-26-1995
Center For Microcomputers In Transportation
Streets: (E-W) LINCOLN ROAD
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COLLNFAM.HC9
10-26-95 AM PEAK
CONDITIONS WITHOUT PROJECT
=======================================================================
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 1 1 1 < > 2 < > 2 <
Volumes 71 30 53 38 45 41 38 257 29 32 439 96
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) Y 20 (Y/N) Y 20 (Y/N) N (Y/N) N
Bus Stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds *
WB Left * SB Left * *
Thru * Thru * *
Right * Right * *
Peds Peds *
NB Right EB Right
SB Right WB Right
Green 19.0A Green 6.0A 66.0P 31.0A
Yellow/AR 5.0 Yellow/AR 3.0 5.0 0.0
Cycle Length: 135 sees Phase combinat1on order: #1 #5 #6 #7
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C
Mvmts Cap Flow Ratio Ratio Delay
LOS
Approach:
Delay LOS
EB L 179 1151 0.419 0.156 40.1 E 38.8 D
T 290 1863 0.110 0.156 37.2 D
R 246 1583 0.227 0.156 38.0 D
WB L 248 1592 0.162 0.156 37.6 D 39.2 D
TR 215 1383 0.418 0.156 39.9 D
NB LTR 1326 2632 0.271 0.504 14.7 B 14.7 B
SB LTR 2029 3557 0.309 0.570 11.5 B 11.5 B
Intersection Delay = 18.7 sec/veh Intersection LOS = C
Lost Time/Cycle, L = 6.0 see Critical v/c(x) = 0.253
-----------------------------------------------------------------------
=======================================================================
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 10-26-1995
Center For Microcomputers In Transportation
Streets: (E-W) LINCOLN ROAD
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COLLNFMD.HC9
10-26-95 MIDDAY
CONDITIONS WITHOUT PROJECT
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 1 1 1 < > 2 < > 2 <
Volumes 117 43 100 51 28 58 55 481 55 38 640 130
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) Y 20 (Y/N) Y 20 (Y/N) N (Y/N) N
Bus Stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru .
Right . Right .
Peds Peds .
WB Left . SB Left . .
Thru . Thru . .
Right . Right . .
Peds Peds .
NB Right EB Right
SB Right WB Right
Green 19.0A Green 6.0A 66.0P 3 1 . OA
Yellow/AR 5.0 YelloW/AR 3.0 5.0 0.0
Cycle Length: 135 secs Phase combinat1on order: #1 #5 #6 #7
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C
Mvmts Cap Flow Ratio Ratio Delay
LOS
Approach:
Delay LOS
EB L 179 1151 0.687 0.156 48.0 E 43.2 E
T 290 1863 0.155 0.156 37.5 D
R 246 1583 0.426 0.156 39.9 D
WB L 238 1528 0.227 0.156 38.0 D 39.3 D
TR 208 1338 0.432 0.156 40.1 E
NB LTR 1157 2297 0.564 0.504 18.1 C 18.1 C
SB LTR 2012 3528 0.444 0.570 12.8 B 12.8 B
Intersection Delay = 20.7 sec/veh Intersection LOS = C
Lost Time/cycle, L = 6.0 sec Critical v/c(x) = 0.377
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 10-26-1995
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (E-W) LINCOLN ROAD
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COLLNFPM.HC9
10-26-95 PM PEAK
CONDITIONS WITHOUT PROJECT
=======================================================================
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 1 1 1 < > 2 < > 2 <
Volumes 100 32 90 45 38 65 52 549 48 51 533 117
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) Y 20 (Y/N) Y 20 (Y/N) N (Y/N) N
Bus stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds *
WB Left * SB Left * *
Thru * Thru * *
Right * Right * *
Peds Peds *
NB Right EB Right
SB Right WB Right
Green 19.0A Green 6.0A 85.0P 31.0A
Yellow/AR 5.0 Yellow/AR 3.0 5.0 0.0
Cycle Length: 154 sees Phase combinat~on order: #1 #5 #6 #7
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat vie g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
EB L 129 946 0.814 0.136 70.0 F 57.1 E
T 254 1863 0.134 0.136 44.5 E
R 216 1583 0.440 0.136 47.4 E
WB L 216 1582 0.218 0.136 45.1 E 49.1 E
TR 184 1349 0.587 0.136 50.9 E
NB LTR 1350 2389 0.532 0.565 16.2 C 16.2 C
SB LTR 2146 3443 0.361 0.623 10.8 B 10.8 B
Intersection Delay = 21. 7 sec/veh Intersection LOS = C
Lost Time/Cycle, L = 6.0 see Critical v/c(x} = 0.350
-----------------------------------------------------------------------
APPENDIX D
24-Hour Traffic Distribution for a Hotel
@EJ
COLLINS AVENUE (SR A1A) /16 STREET
TRAFFIC STUDY - DPA #95156
1997 HOURLY DISTRIBUTION OF PROJECT TRAFFIC
BASED ON 70% HOTEL OCCUPANCY
BE
0000
0100
0200
0300
0400
0500
0600
0700
0800
0900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
0.""
HOURLY,. .' Fri..,
DISTRIBUTION"
1.2%
0.2%
0.2%
0.2%
0.3%
0.4%
1.3%
2.2%
4.3%
7.5%
4.5%
4.8%
6.2%
6.4%
6.5%
6.6%
7.1%
8.7%
7.0%
5.9%
3.9%
4.2%
6.7%
3.7%
100.0%
ENTERING
44
7
7
7
11
15
48
81
159
305
167
178
230
237
241
244
263
367
259
218
144
156
248
137
3776
EXITING
44
7
7
7
11
15
48
81
159
250
167
178
230
237
241
244
263
277
259
218
144
156
248
137
3630
* Based on 1989 driveway traffic counts at Sonesta Beach Hotel, Key Biscayne, FL.
ITE am and pm peak hour of generator rates incorporated into distribution.
** Off-site valet parking and off-site dropoff parking trips were doubled.
Delivery/service trips not included in the calculation.
TRIPGEN3. WK4
SONEST A BEACH HOTEL
DRIVEWAY TRAFFIC COUNTS
HOUR BEGINNING ENTRANCE 1 ENTRANCE 21 TOTAt~:!:li; J:ll.%OF TOTAL
0000 107 0 107 1.4%
0100 15 0 15 0.2%
0200 21 0 21 0.3%
0300 17 0 17 0.2%
0400 23 0 23 0.3%
0500 44 1 45 0.6%
0600 99 8 107 1.4%
0700 169 38 207 2.6%
0800 306 51 357 4.5%
0900 305 56 361 4.6%
1000 340 31 371 4.7%
1100 366 58 424 5.4%
1200 429 59 488 6.2%
1300 444 58 502 6.4%
1400 472 49 521 6.6%
1500 457 66 523 6.7%
1600 503 77 580 7.4%
1700 524 54 578 7.4%
1800 545 22 567 7.2%
1900 461 0 461 5.9%
2000 331 0 331 4.2%
2100 393 0 393 5.0%
2200 539 0 539 6.9%
2300 316 0 ~ 4.0%
7854
* Traffic counts taken January 6, 1989.
SON ESTA.WK4
APPENDIX E
Trip-Type Percentages
(!)
@EJ
TRIP-TYPES FOR SAINT MORITZ HOTEL
Six Basic Trio-Tvoes
· Trips entering/exiting the site and vehicles valet parked on-site
· Trips entering/exiting the site and vehicles valet parked off-site
· Trips entering/exiting the site (dropoff) and vehicles self-parked off~site
· Trips self-parking off-site and walking to hotel
· Trips entering/exiting the site by taxi, shuttle bus, limo, etc.
· Trips entering/exiting the site for delivery/service to the hotel (not using main
driveway)
ASSUMPTION OF SPLIT BY TYPE
Valet 74%
Taxi/Bus 15%
Self-Parking 10%
Service/Deliveries a
100%
VALET ON-SITE. VERSUS VALET OFF-SITE AT 70% OCCUPANCY
· City of Miami Beach requires 800 spaces
· 70% X 800 = 560 spaces (190 spaces on-site, remainder off-site)
· 560 spaces - 190 spaces = 370 spaces off-site
· 370 spaces - 370 (10% self parking) = 333 spaces off-site for valet
· 190/ (190 + 333) = 36% valet on-site
· 333 / (190 + 333) = 64% valet off-site
· 74% of total trips valet - 74% X 36% = 27% of total trips valet on-site
74% X 64% = 47% of total trips valet off-site
PERCENT OF TRIP-TYPES AT FULL OCCUPANCY
· Valet on-site 27%
· Valet off-site 47%
· Dropoff & Self-Park 6%
· Self-Park & Walk 4%
· Taxi/Bus 15%
· Delivery/Service a
Total 100%
* On-site parking spaces (valet only) will be used before going off-site to park.
T-TYPE.WP
APPENDIX F
1997 LOS Worksheets With Project
o
@EJ
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) 15 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COL15PAM.HC9
10-26-95 AM PEAK
CONDITIONS WITH PROJECT
=======================================================================
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes > < 2 < 1 2
Volumes 24 63 337 14 52 607
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0
Grade 0 0 0
% Heavy Veh 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N
Bus stops 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3
RTOR Vols 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru *
Right Right *
Peds Peds
WB Left * SB Left *
Thru Thru *
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
Yellow/AR 4.0 Yellow/AR 5.0
Cycle Length: 100 sees Phase combinat1on order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
WB LR 541 1503 0.168 0.360 16.6 C 16.6 C
NB TR 2148 3703 0.181 0.580 7.5 B 7.5 B
SB L 481 830 0.114 0.580 7.2 B 8.1 B
T 2160 3725 0.311 0.580 8.2 B
Intersection Delay = 8.6 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 see Critical v/c(x) = 0.256
-----------------------------------------------------------------------
=======================================================================
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
Streets: (E-W) 15 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COL15PMD.HC9
10-26-95 MIDDAY
CONDITIONS WITH PROJECT
=======================================================================
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes > < 2 < 1 2
Volumes 27 114 487 31 90 638
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0
Grade 0 0 0
% Heavy Veh 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N
Bus stops 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3
RTOR Vols 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru *
Right Right *
Peds Peds
WB Left * SB Left *
Thru Thru *
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
YelloW/AR 4.0 YelloW/AR 5.0
Cycle Length: 100 secs Phase combinat~on order: 11 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
WB LR 536 1488 0.276 0.360 17.4 C 17.4 C
NB TR 2141 3692 0.268 0.580 8.0 B 8.0 B
SB L 352 607 0.270 0.580 8.1 B 8.3 B
T 2160 3725 0.327 0.580 8.3 B
Intersection Delay = 9.0 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.307
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) 16 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND CONDITIONS
(N-S) COLLINS AVE
File Name: COL16FAM.HC9
10-26-95 AM PEAK
WITH PROJECT
=======================================================================
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 < 1 1 < > 2 < > 2 <
Volumes 3 57 3 101 48 101 3 284 124 124 586 3
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane width 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Bus stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds
WB Left * SB Left *
Thru * Thru *
Right * Right *
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
Yellow/AR 4.0 Yellow/AR 5.0
Cycle Length: 100 sees Phase combinat1on order: 11 15
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
EB L 393 1091 0.008 0.360 15.6 C 16.1 C
TR 666 1849 0.095 0.360 16.1 C
WB L 535 1485 0.198 0.360 16.8 C 17.1 C
TR 602 1673 0.261 0.360 17.2 C
NB LTR 1926 3321 0.236 0.580 7.8 B 7.8 B
SB LTR 1596 2751 0.494 0.580 9.6 B 9.6 B
Intersection Delay = 10.6 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 see Critical v/c(x) = 0.405
-----------------------------------------------------------------------
=======================================================================
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
Streets: (E-W) 16 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
=======================================================================
(N-S) COLLINS AVE
File Name: COL16FMD.HC9
10-26-95 MIDDAY
CONDITIONS WITH PROJECT
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 < 1 1 < > 2 < > 2 <
Volumes 2 44 2 93 44 93 2 543 ' 93 93 733 2
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Bus Stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds
WB Left * SB Left *
Thru * Thru *
Right * Right *
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 55.0P
Yellow/AR 5.0 Yellow/AR 5.0
Cycle Length: 100 secs Phase combinat~on order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C
Mvmts Cap Flow Ratio Ratio Delay
LOS
Approach:
Delay LOS
EB L 424 1145 0.005 0.370 15.1 C 15.5 C
TR 685 1852 0.070 0.370 15.5 C
WB L 572 1545 0.171 0.370 16.1 C 16.4 C
TR 619 1673 0.233 0.370 16.5 C
NB LTR 1941 3405 0.364 0.570 8.9 B 8.9 B
SB LTR 1464 2569 0.626 0.570 11.5 B 11.5 B
Intersection Delay = 11.3 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.471
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) 16 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
=====================================--=================================
(N-S) COLLINS AVE
File Name: COL16FPM.HC9
10-26-95 PM PEAK
CONDITIONS WITH PROJECT
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 < 1 1 < > 2 < > 2 <
Volumes 3 69 3 112 53 112 3 622 149 149 597 3
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Bus stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds
WB Left * SB Left * *
Thru * Thru * *
Right * Right * *
Peds Peds
NB Right EB Right
SB Right WB Right
Green 30.0A Green 5.0A 52.0P
Yellow/AR 5.0 Yellow/AR 3.0 5.0
Cycle Length: 100 sees Phase combinat~on order: #1 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C
Mvmts Cap Flow Ratio Ratio Delay
LOS
Approach:
Delay LOS
EB L 303 948 0.010 0.320 17.6 C 18.3 C
TR 593 1852 0.128 0.320 18.3 C
WB L 446 1395 0.264 0.320 19.3 C 19.6 C
TR 535 1673 0.325 0.320 19.7 C
NB LTR 1821 3372 0.470 0.540 10.9 B 10.9 B
SB LTR 1924 3103 0.430 0.620 7.6 B 7.6 B
Intersection Delay = 11.1 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 see Critical vjc(x) = 0.394
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) LINCOLN ROAD
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
-----------------------------------------------------------------------
(N-S) COLLINS AVE
File Name: COLLNPAM.HC9
10-26-95 AM PEAK
CONDITIONS WITH PROJECT
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 1 1 1 < > 2 < > 2 <
Volumes 71 30 53 38 45 41 38 357 29 32 561 96
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y/N) Y 20 (Y/N) Y 20 (Y/N) N (Y /N) N
Bus stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds *
WB Left * SB Left * *
Thru * Thru * *
Right * Right * *
Peds Peds *
NB Right EB Right
SB Right WB Right
Green 19.0A Green 6.0A 66.0P 31.0A
Yellow/AR 5.0 Yellow/AR 3.0 5.0 0.0
Cycle Length: 135 sees Phase combinat1on order: #1 #5 #6 #7
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
EB L 179 1151 0.419 0.156 40.1 E 38.8 D
T 290 1863 0.110 0.156 37.2 D
R 246 1583 0.227 0.156 38.0 D
WB L 248 1592 0.162 0.156 37.6 D 39.2 D
TR 215 1383 0.418 0.156 39.9 D
NB LTR 1256 2494 0.373 0.504 15.7 C 15.7 C
SB LTR 2037 3572 0.374 0.570 12.1 B 12.1 B
Intersection Delay = 18.4 sec/veh Intersection LOS = C
Lost Time/Cycle, L = 6.0 see Critical v/c(x) = 0.291
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) LINCOLN ROAD
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
=======================================================================
(N-S) COLLINS AVE
File Name: COLLNPMD.HC9
10-26-95 MIDDAY
CONDITIONS WITH PROJECT
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 1 1 1 < > 2 < > 2 <
Volumes 117 43 100 51 28 58 55 573 55 38 732 130
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (YjN) Y 20 (Y jN) Y 20 (YjN) N (Y jN) N
Bus stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (YjN) N (Y jN) N (YjN) N (YjN) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds *
WB Left * SB Left * *
Thru * Thru * *
Right * Right * *
Peds Peds *
NB Right EB Right
SB Right WB Right
Green 19.0A Green 6.0A 66.0P 31.0A
YellowjAR 5.0 YellowjAR 3.0 5.0 0.0
Cycle Length: 135 secs Phase combinatl.on order: 11 #5 #6 #7
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat vjc gjC
Mvmts Cap Flow Ratio Ratio Delay
LOS
Approach:
Delay LOS
EB L 179 1151 0.687 0.156 48.0 E 43.2 E
T 290 1863 0.155 0.156 37.5 D
R 246 1583 0.426 0.156 39.9 D
WB L 238 1528 0.227 0.156 38.0 D 39.3 D
TR 208 1339 0.432 0.156 40.1 E
NB LTR 1160 2303 0.651 0.504 19.7 C 19.7 C
SB LTR 2011 3525 0.495 0.570 13.4 B 13.4 B
Intersection Delay = 21.1 secjveh Intersection LOS = C
Lost TimejCycle, L = 6.0 sec Critical vjc(x) = 0.407
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
==========================================================--=====--======
Streets: (E-W) LINCOLN ROAD
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COLLNPPM.HC9
10-26-95 PM PEAK
CONDITIONS WITH PROJECT
==========================================================----=========
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 1 1 1 1 1 < > 2 < > 2 <
Volumes 100 J2 90 45 38 65 52 660 48 51 680 117
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0
Grade 0 0 0 0
% Heavy Veh 2 2 2 2 2 2 2 2 2 2 2 2
Parking (Y /N) Y 20 (Y/N) Y 20 (Y/N) N (Y/N) N
Bus stops 0 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y /N) N (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3 3 3 3 3 3 3
RTOR Vols 0 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2 -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * NB Left *
Thru * Thru *
Right * Right *
Peds Peds *
WB Left * SB Left * *
Thru * Thru * *
Right * Right * *
Peds Peds *
NB Right EB Right
SB Right WE Right
Green 19.0A Green 6.0A 85.0P 31.0A
Yellow/AR 5.0 Yellow/AR 3.0 5.0 0.0
Cycle Length: 154 sees Phase combinat~on order: 11 15 16 #7
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
EB L 129 946 0.814 0.136 70.0 F 57.1 E
T 254 1863 0.134 0.136 44.5 E
R 216 1583 0.440 0.136 47.4 E
WB L 216 1582 0.218 0.136 45.1 E 49.1 E
TR 184 1349 0.587 0.136 50.9 E
NB LTR 1331 2356 0.632 0.565 17.9 C 17.9 C
SB LTR 2148 3446 0.437 0.623 11.5 B 11.5 B
Intersection Delay = 21. 6 sec/veh Intersection LOS = C
Lost Time/Cycle, L = 6.0 see Critical v/c(x) = 0.399
-----------------------------------------------------------------------
APPENDIX G
1997 LOS Worksheets With 16 Street Unsignalized
e
@EJ
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
****************************************************************
File Name ................ COL16UAM.HCO
streets: (N-S) COLLINS AVE (E-W) 16 STREET
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. . . . . . . . . . . . . . . . . .. CPA
Date of Analysis.......... 10/24/95
Other Information......... FUTURE CONDITIONS - #95156 - AM PEAK HOUR
Two-way stop-controlled Intersection
============================================================- -========
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0> 2< 0 0> 2< 0 1 1< 0 1 1< 0
stop/Yield N N
Volumes 3 284 124 124 586 3 3 57 3 101 48 101
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's (%) 0 0 0 0 0 0 0 0 0 0 0 0
SU/RV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
CV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
PCE's 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
------------------------------------------------------------------------
------------------------------------------------------------------
Adjustment Factors
Critical
Gap (tg)
Follow-up
Time (tf)
Vehicle
Maneuver
Left Turn Ma~or Road
Right Turn M1nor Road
Through Traffic Minor Road
Left Turn Minor Road
5.50
5.50
6.50
7.00
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
****************************************************************
WorkSheet for TWSC Intersection
step 1: RT from Minor Street
--------------------------------------------------------
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Probe of Queue-free State:
--------------------------------------------------------
204
1091
1091
0.89
294
983
983
1.00
step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue-free State:
TH Saturation Flow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane prob.
of Queue-free State:
Step 3: TH from Minor Street
--------------------------------------------------------
408
1035
1035
0.86
3400
1700
0.83
589
828
828
1.00
3400
1700
1.00
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
Prob. of Queue-free State:
Step 4: LT from Minor Street
--------------------------------------------------------
1062
261
0.82
215
0.74
1122
241
0.82
198
0.67
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted Impedance Factor:
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
1086
214
0.55
0.65
0.64
138
1022
235
0.61
0.69
0.62
146
--------------------------------------------------------
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
****************************************************************
Intersection Performance Summary
FlowRate MoveCap Shared Cap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ------------ ------ ---------
EB L 3 146 25.2 D
EB T 66 198 > > > 26.4
EB R 3 983 > 205 > 26.4 > D
WB L 117 138 131.1 F
WB T 56 215 > > > 56.0
WB R 117 1091 > 470 > 12.1 > C
NB L 3 828 4.4 A 0.0
SB L 144 1035 4.0 A 0.7
Intersection Delay = 11.3
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
****************************************************************
File Name ................ COL16UMD.HCO
streets: (N-S) COLLINS AVE (E-W) 16 STREET
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. . . . . . . . . . . . . . . . . .. CPA
Date of Analysis.......... 10/26/95
Other Information......... 1997 BACKGROUND TRAFFIC WITH PROJECT - MIDDAY P
.K HOUR
Two-way stop-controlled Intersection
------------------------------------------------------------------------
------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0> 2< 0 0> 2< 0 1 1< 0 1 1< 0
stop/Yield N N
Volumes 2 543 93 93 733 2 2 44 2 93 44 93
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's (%) 0 0 0 0 0 0 0 0 0 0 0 0
SU/RV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
CV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
PCE's 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
------------------------------------------------------------------------
------------------------------------------------------------------
Adjustment Factors
Critical
Gap (tg)
Follow-up
Time (tf)
Vehicle
Maneuver
Left Turn Ma~or Road
Right Turn M1nor Road
Through Traffic Minor Road
Left Turn Minor Road
5.50
5.50
6.50
7.00
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
****************************************************************
WorkSheet for TWSC Intersection
Step 1: RT from Minor street
--------------------------------------------------------
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue-free State:
318
955
955
0.89
368
901
901
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Prob. of Queue-free State:
TH Saturation Flow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane prob.
of Queue-free State:
636
781
781
0.86
3400
1700
0.82
735
691
691
1.00
3400
1700
Step 3: TH from Minor Street
--------------------------------------------------------
1.00
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
Prob. of Queue-free State:
1420
161
0.81
131
0.61
1465
152
0.81
123
0.59
Step 4: LT from Minor Street
--------------------------------------------------------
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted Impedance Factor:
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
1440
127
0.48
0.59
0.58
74
1394
136
0.50
0.60
--------------------------------------------------------
0.53
73
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
****************************************************************
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ------------ ------ ---------
EB L 2 73 50.7 F
EB T 51 123 > > > 48.4
EB R 2 901 > 127 > 48.3 > F
WB L 108 74 * F
WB T 51 131 > > > 386.7
WB R 108 955 > 316 > 22.8 > D
NB L 2 691 5.2 B 0.0
SB L 108 781 5.3 B 0.6
Intersection Delay = 52.6
* The calculated delay was greater than 999.9 sec.
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
****************************************************************
File Name ................ COL16UPM.HCO
Streets: (N-S) COLLINS AVE (E-W) 16 STREET
Major street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. . . . . . . . . . . . . . . . . .. DPA
Date of Analysis.......... 10/26/95
Other Information......... 1997 BACKGROUND TRAFFIC WITH PROJECT - PM PEAK
lOR
Two-way stop-controlled Intersection
========================================================================
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0> 2< 0 0> 2< 0 1 1< 0 1 1< 0
stop/Yield N N
Volumes 3 622 149 149 597 3 3 69 3 112 53 112
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's (%) 0 0 0 0 0 0 0 0 0 0 0 0
SU/RV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
CV's (%) 0 0 0 0 0 0 0 0 0 0 0 0
PCE's 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
------------------------------------------------------------------------
------------------------------------------------------------------
Adjustment Factors
Critical
Gap (tg)
Follow-up
Time (tf)
Vehicle
Maneuver
Left Turn Major Road
Right Turn Minor Road
Through Traffic Minor Road
Left Turn Minor Road
5.50
5.50
6.50
7.00
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
****************************************************************
WorkSheet for TWSC Intersection
Step 1: RT from Minor Street
--------------------------------------------------------
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Probe of Queue-free State:
386
883
883
0.85
300
976
976
1.00
Step 2: LT from Major Street
--------------------------------------------------------
SB
NB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Movement Capacity: (pcph)
Probe of Queue-free State:
TH Saturation Flow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue-free State:
771
661
661
0.74
3400
1700
0.67
600
817
817
1.00
3400
1700
0.99
step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
Probe of Queue-free State:
Step 4: LT from Minor Street
--------------------------------------------------------
1448
155
0.67
103
0.40
1522
140
0.67
93
0.14
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
Major LT, Minor TH
Impedance Factor:
Adjusted Impedance Factor:
Capacity Adjustment Factor
due to Impeding Movements
Movement Capacity: (pcph)
1480
120
0.09
0.21
0.21
26
1400
135
0.27
0.40
--------------------------------------------------------
0.34
46
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
****************************************************************
Intersection Performance Summary
FlowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ------------ ------ ---------
EB L 3 46 83.7 F
EB T 80 93 > > > 182.6
EB R 3 976 > 96 > 186.2 > F
WB L 130 26 * F
WB T 62 103 > > > *
WB R 130 883 > 256 > 52.9 > F
NB L 3 817 4.4 A 0.0
SB L 173 661 7.4 B 1.5
Intersection Delay = 421. 5
* The calculated delay was greater than 999.9 sec.
APPENDIX H
Calculation of 1997 Pedestrian Volumes
@EJ
1997 PEDESTRIAN VOLUMES CROSSING COLLINS AVENUE
AT 16 STREET (WITH PROJECT)
1997 pedestrian volumes were estimated based on background pedestrian counts,
attraction from other intersections, all employees parking off-site, valet parking off-
site, and patrons self-parking their vehicles. Notes on the calculation of these
pedestrian counts are shown below.
· 1995 pedestrian counts were taken at Collins Avenue and 16 Street.
· A 5% attraction factor was used to capture pedestrians crossing Collins Avenue
at Lincoln Road and 15 Street. This is to account for pedestrians currently
using these intersections because 16 Street is unsignalized.
· All employees will be parking off-site. The ITE Trip Generation Manual uses a
factor of 0.9 employees per room for the hotel category. The manual goes on
to say that 49% of the employees work during daylight hours.
800 rooms X 0.9 = 720 employees
720 employees X 49% = 353 employees work during daylight hours
Assume daylight hours are from 6am to 7pm.
Because work shifts are unknown, assume employees arrivals/departures are
evenly distributed over the 13 daylight hours.
353 /13 = 27 employees/hour cross Collins Avenue.
Assume 80% cross Collins Avenue at 16 Street
27 X 80% = 22 employees/hour
· During 70% hotel occupancy, 57% of trips park off-site (valet & self-parking).
Use 1 ped crossing of Collins Avenue at 16 Street per trip of off-site parking.
1997 PEDESTRIANS CROSSING COLLINS AVENUE AT 16 STREET '
11am - 120m 120m - 10m 40m - 50m 50m - 60m
Background 53 55 38 55
Volumes
Peds Attracted from 33 30 21 19
Lincoln Rd. & 1 5 St
Employees 22 22 22 22
Off-site Parking ~ 262 ~ ~
Total 311 369 381 463
PEOS1.WP
APPENDIX I
Signal Warrant Worksheets
-
.il
@E]
Z
o
i=
~
0::
o
a.>
enc
Z:J
~...
...en
LL'"
OZ
...~
zo::
~~
~-J
<c<C
o.Z
wS2
Cen
<Co
c-
_LL
O::LL
O~
Li...
LL
o
W
...
~
en
- 0
X Z
- ~
w
:E (JJ
0 X ><
Z W
>-
:E N ~
a.. II)
....
.... ....
- - - ..
- - - 0
....
::E CD ~
Q)
U) 0 0 a.. N
II) ~ Z Z ....
<( !l.! ,...
a.. .... ,j,
0 ....
c: ::E II) ~
CD
.2 a.. ....
ii - ....
"5 X ~ 19
0. - - II)
0 W ~
-..: a.. :Ii C) ::E M
QI 8 M
QI :::I U) III z a.. N
c: ~ Z ....
.61 iIi c ..J >- II)
ii c' z ,
c: 0 ~
w 0 .... a
v > w
~ 0:: m ::E CD ~
M
.2 :s a:: a.. M
=' ::J ....
E 0 ,.
E :::I J: M
0 g
u - ~ ~
w ~ :z:: li ::E Q)
5! w il ::E a.. N
....
<V > 'i U) ~
0 "0 QI
.!!! :Ii W E
N N >. :::I (JJ ='
- ~ II) ~
c: :Ii - ::E (0
ill =' c: a.. M
ill 0 ~ ....
QI QI U Z ~ ~
c C <V
j j :Ii ~ ~ ....
~ ~ ::E II) ~
(.) (.) .. Q)
<V <V .... <( Q)
e e ~ c
0. 0. X d ....
~ ~ - Z ch
0 I- .,. ~~ ~~
z Z c !
~ ,... ~M
0 - -
..: f- E
0:: l~ ... 1-
~ .,. 0 f.PS "'c'
~ 13'><: C N OCD :(0'"
'- (.) C CO". ..~.
- ~<V .... :>:~ ::-.
<- ~m
....
<( III E.E ~ 00 ~[
a:: QI ~.,. It) CD
!e. >- ._0 ,... M~
W 111~ r- ....
::J ::E .,. 00 ~~
z -a.
~ 0 co
0 It)~
l- E ....
(JJ w 0
w '5
z a:: ~ U)
::J ^ U) QI-
I- J: QI ~ QI <Vlj
....J (JJ il - c ~ e eQl
0 (0 ~ c j ~....
u .... 8- QI eUS us
(JJ E ~ 0.... i.~
m ! () ~.~
.,. IV
'Ii li :i It) '5 e ~::E €.::E
QI QI ~ CD cr 0. oc ~c
... ... QI ~
CiS - ::E CiS a:: mo
(JJ 0
... ... ... 0
0 0 ~ 0 ~
.;;j c .;;j
::E ~ U ::E -
j
j
~
.
x
0,
o
Z
x
Z III
0 It:I ~ 0 0
< !i!! z z
- a..
I-- ....
0 ....
~ c: 0
0
:;:: u:
~ III
"5 LL X
0 Co ~
0
a.> L.: a..
Ql 0 t-
tJ)C Ql 0 en III III
c: ~ 0 ~ ~
Z:J '61 - 0- :J
c: III
~I-- w 0 .... 0
v :J
1--tJ) >. Z
-
'2 ~
u.1-- ~
E Z
OZ E 0
0
I--~ 0 0 ~
W ""Cl LL Gi
Z~ ~ Ql "i :E
(;j 0 IC '"
~~ 0 "0 Z '" Ql
.J!! :;:: E
N N ~ 0 III
en ~
1--.... ~ ~ c ~
ili = 0 a. III
~<( Ql 0 :J t: ~
c: c: ~ 0
<(Z III III 0: ClO
..J ..J 0: -
o.(!) .c .c
u u W
W_ III III t-
0tJ) e e
Co Co X z
<(0 ~ ~
..
O- N ~
_u. 0 d
~u. z
O~ Z
t-
~I-- z
~
U. ~ 1i-
<
0 .... 0: ~ Ql
< ~ ... l!!
'" N "'-
0:: .- '"
W Ql ~ "tI...
~ ~ >'0
I-- w "iii"nr
~ :J 5 E
z 0 '5i c:
~ .c '" 0
tJ) Co !e. o~
l- E
en w 0 c:=
Z W .,. ~~
0::
:3 I- ^
en J: "i -lII
III ...
0 co ~ c:-
0 .... 8- C)Ql
.- >
en '" '-
m u III
-; ... :E ~ 1El!!
41 It:I jg~
l!! l!! ~ ClO
- - :E .... <0. ~
en en en
... ... ... 0 0 i
0 0 0
'iij' c: ~ 'iij' ~ ~
:E :E 0 :E II
..
- 0
.. X
- Z
I-
W
0 ::EU) X
Z W x x x x
.., >-
- --
- -- I J
Z
foO i s
0 on ~ 00
~ S!? zz !i j
i= ....
c .... I ~
~ c: -i' ,Il
0 i j
0:: ~ - ~ ~
"3 x- - I!
0 0- W -- i -
0 .. i ~
0.>- L: Q. :E <:l
IU 0
me IU 8 :J _ rn foO Z It;
c: iIi ...J IU IU Z
Z:J 061 1ii c:i g ->->- z
c:
~t- w c .... c;
v 11 s
>- Z w ~ I !l
t-m lD::E .... ....
.." < M M
c: if!
u.t- ~ ~ a::Q. . .
E ~~
OZ E I- Jll~
t-~ 0 (I)
u W - 0
w -
"i c "i~ ::E CD
zo:: ~ W Q. M
~~ 1ii a. GJiCO on
~ ,
:a..1U .
N N i:- :E cacaE
:J 02 U) .2 ::E ....
~..J c: a- 0 on
Ui Ui ~ :E ~c:> Q. M
0 ~h~
IU IU U Z ....
<(<( c: c: -ca .
ca ca o~o N U
Q.Z ~ ~ :E z ~ .... 0;::
.J:; .J:; -05
wC) u u ::E .... IU
ca ca .. Q. 01 ..
eu; e [ - M N N >-
0- X d .... "3
~ ~ , '0
<(0 - .... c:
Z .... ~
e- II~I~~ -
_u. 0 I- J!if, on 0
c:
o::u. z Z EC:O M j
O~ ~ ~Eon v
EIU- c:
- .. ..
0::: C:O- c: 0
lit- ~~if, on 0- ON 0 ::=
- ~ ~~ (') 00 01 on ~ 'iii . ca
II ....00 .... .... ~ Eli u
L1. <" - ^ - - ~.!! ..2
>-
0 .... ~ 00 -go
-< 0 _0
C! rn .J:; caM US:t:
W ~ ~ lU- lU- ~ -c: -l!!
E.E E.E J! ca ca_
t- w - "i .2~ ~.... ~~ .9= --
c: ca 0
~ :J IU 8.u~tiS ~lK II) .. ~~
Z E Ii u.!!
~ .J:; ~ U)~C:6 c: 6 E~ 'il ..2
m 0- "3 .00: ::. .J! 'ii' cao~ ca .. u-
l- E 'C n:Ii ::'01 E'O
W IT ii!:-05::E -o5::E ca-' 1;) .!! !! ~
U) W 0 IU ~ 1U0l 1U0l 010
Z . C! 0> IU_ _ 0
~ 'Oc: 'Oc: .. IU ~.s
::::; ... ^ ~X IU- i'jii ca IU
~ en :r "i Q.x IU .. IU ca
0 Ul ~ V 0- Z-05 Ze.
u .... 8.
lD en
.;..; .;..; ::E if, ~ C C C
IU IU on 0 ~ z z
~ IU ~ 00 -< -<
..
tiS tiS ::E ....
U) ~
.. .. ..
0 0 ~ 0 ~
'iij' c: 'iij'
::E ~ U ::E
..
.
,",
Z
o
i=
i5
0:::
o
Q.>
enc
Z:J
~....
....en
LL....
OZ
....~
zo:::
~~
......J
0:::<
<Z
Q.(!)
W_
Cen
<0
C-
_LL
O:::LL
O~
ii....
LL
o
W
~
en
~
x
-
0
z
~ ~ ~
- - -
(/) 0 0
It') ~
< e! z z
a.. ....
c ....
c:
0
."
III ~ ~
[ - -
0
;.: a..
GI 8
GI (/) (/)
c: ii ~ ~
"a. - 0 C)
c: III
W C ... Z
v
>- en
-
"2 (I)
:l 0
E 0::
E
0 0
w U ..J "8
~ 'i 0 'i
- 0 'C
III l;:: 8-
~ :c "le
- GI
N N ~ 0 III E
II)
c: (I) - III
Ii i8 :l c:
0 !! "6
GI U ;:r
c: c: ... (/)
III III d ~ GI
..... ..... -
:l
-5 .c c:
(,) z "e
III III
~ S! ~ I- -
t x z 0
~ ...
- ~ .8
E
0 0:: :l
Z ~ c:
c:
III
.c
-
lB
~ ..!!
<" - GI
II)
.... :l
< -
~ 0
a:: "8'
II)
- "C
W 8-
~
z ~ a
~ .c X c:
Q. "C
l- E - :l
W "0
II) W 0 S.
z I!: ..
::::; ^ 1\1
a
..... II) :I: 'i GI
0 CD ~ -
u 8- w 1\1
.... ..... :l
II) ~ IT
II) GI
... ... 3E .,. U "0
GI GI It') 1\1
!! !! ~ CICl ::::; -
- - a.. 0
II) II) ::E Cii ~ ...
... ... ... .8
0 0 ~ 0 l- E
.- c: ii' 0
1\1 ~ :l
::E U ::E Z Z
i
!
Z
o
;::
~
a::
o
0.>
U)c
Z::J
~....
....U)
u.....
OZ
....~
Za::
~~
......J
a:: <
<Z
0.C)
w_
CU)
<0
c-
_u.
a::u.
o~
Li....
u.
o
w
S
U)
~ 0
X Z X X
- to-
W
::E II)
0 X
Z ~
~
~ X
- -
0 0 ~
< II) ~ z
~
a.. ....
c ....
c: ~
0
..
1II ~ ii 1ij
'3 c:
0. - 01 ;; e
0 Ci5
-.: a.. 1: -
III .... 'lS ! c:
III 8 z ~ ! ~ 1II 8
c: Ii 0
a w 1II - al
- ci III J!
c: 1II :::E 8.
w c .... z
0
v W ,g 0 0
~ > 8 w ! "0
02 0 c:
1II 1II
:s :::E c: 0
E 1II ii 01
'lS c:
E W a c: '2
0 ~ 01 0
(.) Oiii 0
W "0 rn C -
~ 1II
5! III rn i 8 0.
-
1II W 'Ii ~
c ~ 1II
0:: .. f ~
N N ii- C) 1II
II) II) c: III .
c: 0 C 0 oE
ij ij :s 0:: 'U III III
0 ~ C:J.
(.) Q. III .
c: c: ~ o!:: al III.
~ ~ "0 :2_
.. III~ ~ 1II
.c .c 10 eo _ c:
0 0 ols. 0..9
1II 1II 0 ~ _0
e e ~ e 0111
0. 0. X Z 00 c: >
0. 0. - lEe .g'il}
< < .... f!!
Z z _1II II) III
0 ~ oe iig,
z e ....
'Be .91 0.
0:: E8 ~1II
~ c: III
.cal 815
~ 'i8. 1II~
0~'lS
- - -OIl "Oe
< 111"0 1II8
.... ! e !
< C 'lS1II 111"0
0: 0 -01 j'3
~ u Oe
II) E lie _8
-
w III 1) III 0 III OIl
- III-
=> '3 _ 0 _ 1II
III 'lS1ij 0&
z .c ~ i u. >00.
w >0.-
~ 0. - 0: 8 ,~ ~~
to- E E o.
w l'l~
II) w 0 :s .... ![
z "" E
0: 00
:J to- ^ "2 ee
J: e III
..J II) al ::E Oe 00.
0 <0 ~ 8. w
(.) .... ..J
co II) ~
t ..... ~ C 0:
III ::E II) :J ~ 0
III ! ~ co
.... a..
ii5 - ::E ti5
II) ~
.... - ....
0 0 ~ 0 6
'CU- e ii'
::E ~ (.) ::E Z
~
j
Ii
.
~
....
Z
o
i=
~
~
o
Q..>
enc
Z::)
~....
....en
LL....
OZ
....~
Z~
~~
......J
~c(
c(z
Q..(!)
W_
Cen
c(o
C-
_LL
~LL
O~
Li....
LL
o
W
....
~
en
~ 0
X X X
- Z
~
w
:E lJ)
0
z w x x x x
~
~
~ X
- -
III 0
In II
< S!? ~ z
a. ....
c ....
c: (,)
.2 IE II
-
t'lI ~ 41 l! E
~ - E ~ ~
0 ~ III ~
l.: a. ~ ~
0
41 8 ~ c:
II W III - c: t'lI
c: .! ~ t'lI ~ 'C
'Ct c;j 0 "3 1;;
c: t'lI Z (,) 0 II
W C ..- :E () "i
v w ~ -
~ a: 0 a.
- c: >.
'2 c E E (,)
W ~ 0
~ ~ '5. ~ c
E Q. E 41
t'lI E ~
E >< ~ ~ '2
'2 - l:T
0 W - :E :
:E II
() ~
W "CI I- M -
~ Z "CI ..- c ii
II) N - 41
- W II) - C "CI c:
C t'lI I::: C c: l! '0 Cl
'0 C II) ca 'ii
.!! :;: t: l! - (,)
N N (3 ca ca t'lI t'lI (,)
t - ~
lJ) ~ t'lI B IE
0 - ~ - l!
~ c: 0 ~
= = 0 c:t ~ - ~ -
() 0 ca
c C t'lI
j j .. ~ ~ 0 >-
CO - .0
ii '5 "CI II
d I;: .!! :c
t'lI ca (,) J! t'lI
e ~ ~ Z IE U
0- X I- ~ II) ~
~ ~ - ca
Z 41 .r; 0
~ > II) (,)
'ji II) "8
0 i
z a:: !! "C
~ ~ E 8.
!! .r;
0- -
15. ~ c
0
~ - ~ 13 E
-
- 0 II) 'C ,
- - N
< c ';I. J!l '6 1;; ..-
..- 41 0 c: >- !! ca
< E co 41 iii
a:: .. 41 J!l E ~ IS c
~ - 0 :E
~ '3 41 41 "C .!! :1:
-
i II) '3 : - ~
w E 0
::I a:: l:T ~
- !! "0 ii
z ~ E c c 'C II)
~ .r; ~ 41 -
0- X ~ E j 41 "CI
~ E - E ~ - '8
~ ca
lJ) W 0 :s ~ ii ~ t'lI
W 41 l:T
Z g: ~ :E c: c II) In
::::i ^ 0 Cl ~ II
..J lJ) :r "i us ^
0 lD ~
() 8. w
.... ..J
co lJ) ~
... ... :E ';I. () c c c C
41 41 In ::::i z z z ~
41 41 < co < < <
- - a.
CiS CiS :E ...;
lJ) ~
- ... ...
0 0 ~ 0 ~
ii' c: 'Ii' 0
:E :E () :E Z
i
I
- .
i>
z
o
i=
~
0:::
o
0.>
rno
Z:J
~t;
........
LLZ
O~
....0:::
ffi<(
:!3:
....-1
O:::<C
<Cz
o.C)
w_
Orn
<Cu
0-
_LL
O:::LL
O~
it....
LL
o
W
~
....
rn
r
It)
< ~
Q. ....
Cl ....
L.:
Gl
Gl
C ii
'~ ni
w Cl
N
u u
C C
1lI 1lI
..J ..J
-5 -5
~ ~
a Q.
~ ~
;(
....
<
0::
~
W
:::J
Z
~
l/)
z
::::i
..J
a
u
...
Gl
Gl
-
CiS
- -
o g
I :i
N
I
C
o
..
1lI
'3
Q.
o
Q.
8
o.
....
v
-~
C
::J
E
E
o
u
W "i
~ ~
.!l
~
C
::J
o
U
~
W
0::
~
l/)
co
....
-a.
E
o
"I"
^
:r "i
~ 8-
CD l/)
'It
::iE It)
~ co
::iE US
-
o
~ I
'is
!!
CiS
x
o
Z
f4
~
o
z
- ...
z
- C2
a:
~
x
o
Z
f4
I)
>-
...
z
C2
a:
~
en
:IE
w
...
en
>
en
;.:.
x
o
Z
f4
~
11
l;:
f4
..
1lI
l/)
-
C
~
1lI
~
-
x
W
..J
~
::::i
Q.
~
b
z
a
z
tu
::iEl/)
W
>-
B
-5
e
Q.
~
1
E
::J
o
>
~
"C
Gl
C
W
-
o
E
::J
l/)
-
C
Gl
E
!!
'S
i
0::
E
::J
E
c
:i
B
__:2
::J~
~~
-
::J
o
~
.II:
1lI
8-
>-
1lI
~
Gl
;
~
'is.
;::
1lI
Cl
C
"C
::J
Cl
Cl
~
~-
Gl
-0
::J "_
o~
:r~
Ii
1lI
"
C
.... ::J
:: l/)
o 5
Q) :c
co C
N 1lI
....Ii:;
.!! 'E_f-
C ::J
l! 1;
- l/)
~ 1lI
~ '0
:! f!!f-I-
." ::J
f4 0
f4 ~
Gl It)
E ~
.a C__
o ."
> -
" 0
Gl ~
tl ~
"~ Gl
o
lS ~
!F .~
.;, Cl
L,-~ -
0::
a
-
::J
B 0
o :r
:c ~
~ ~
8 ~
o Oi:
.... ::J
"
o
z
l/)
~
N
Gl
-
::J
o
0::
z z z
....
Gl
-
::J
o
0::
>- >- >-
l31! ~
~ e ~ ~
;;;; ~ ~ "0
tU <> C)
~." 5 ~
~ ~ J; "e
cr:.... .... ~
< Gl.E ."
:I: c ~ ..=
u~ 0 0
W lQ ~
~GlGlC)
:::J - C "2
ani Gl Gl
0::- "is. c
'u Q)
C ...:
Ai: 0
Q. Gl
<II "
n:I Ow
~ ~
-~ ~
51 ~
E ~
Gl C)
~ ~
<II ."
>- €
~ .E
~ ::J
C) <II
::E .....
_ 0
o iii
1:: _
." ::J
Q. 0::
Cl
~
C
."
"is.
iii
"0
it:
o
C
."
C
o
Gl
:;
o
-
-
o
"m
E
<II
."
f!!
."
8-
Q.
<I
-
j
i
~
.
-j,.
I ~
,
Z
o
i=
~
0::
o
Q.>
t/)c
Z::J
~...
...t/)
11....
OZ
...~
zo::
~~
.....J
O::<c
<cz
Q.C)
w_
Ct/)
<cO
c-
_11.
0::11.
o~
~...
11.
o
W
...
~
t/)
~ 0
X Z
- I-
W
== UJ
0
Z ~
~ ~
- -
II) 0
It) ~
<( lZ! z
a. ...
0 ...
c:
,2
ii ~
'3 - ()
a- lE
L.; ~ ~ l!
G) 0 G) I-
G) 8 z :I E II)
c: ii
.~ ii > ::l ::l
- 0 ~ 0
III ::l
W 0 ... c:
v 0:= ... -=
~ ~ '" c:
'3 0
c: () (J
::l :c '0
E U. ~
E 0 c:
0
0 E a
(J z ::l
W '0 0 E ::l
~ G) '0 t:
ii i= G) '2 G)
I; -
0 j c:( iii ~ .s:
N N ~ Z ~
m CJ) ..... N
- C - C
;,,; ;,,; ::l ~ c: c:
0 ~ ~ l! ~
G) G) (J 0 ...
c: c: '" ~ III ~
j j 0 :: ::
"5 .c
() ..
III '" co
0 ~ ~
is. X d
~ ~ - Z
I-
0 Z
z ii
0:=
~ ~
<' -
:( iii 11
a:: ~ 'i
CJ)
- =
w
::) ~ .!!!
Z ~ C
~ .c X
a- G) ~
Iii E - E
UJ 0 _ G) ~
W cu.!:::
Z ~ ..,. G) ::l
3 ^ Ei G)
J: i c:
0 ~ iii ... 0
co 8- w c C G) 0
(J ..... ....I G) ~ ~ c:
w UJ ~ E :=
al
.... .... == '# l!! ~g i
G) G) It) 12 ':; ='# iii
l!! l!! ~ co i ::)
- U:i == Cii 00
UJ ~ a:: alco
... ... ... w
0 0 ~ 0 0 I-
'Ci' c: 'Ci' 0
== ~ (J == z z
i
I
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 12-29-1995
Center For Microcomputers In Transportation
=======================================================================
Streets: (E-W) 15 STREET
Analyst: DPA
Area Type: Other
Comment: 1997 BACKGROUND TRAFFIC
(N-S) COLLINS AVE
File Name: COL15PPM.HC9
10-26-95 PM PEAK
CONDITIONS WITH PROJECT
===================================================================--===
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ----
No. Lanes > < 2 < 1 2
Volumes 47 170 576 '20 100 627
PHF or PK15 0.95 0.95 0.95 0.95 0.95 0.95
Lane Width 12.0 12.0 12.0 12.0
Grade 0 0 0
% Heavy Veh 2 2 2 2 2 2
Parking (Y/N) N (Y/N) N (Y/N) N
Bus stops 0 0 0
Con. Peds 0 0 0 0
Ped Button (Y/N) N (Y/N) N (Y/N) N
Arr Type 3 3 3 3 3 3
RTOR Vols 0 0 0
Lost Time 3.00 3.00 3.00 3.00 3.00 3.00
Prop. Share -1 -1 -1 -1 -1 -1
Prop. Proto -2 -2 -2
-----------------------------------------------------------------------
Phase Combination Signal Operations
1 2 3 4 5 6 7 8
EB Left NB Left
Thru Thru *
Right Right *
Peds Peds
WB Left * SB Left *
Thru Thru *
Right * Right
Peds Peds
NB Right EB Right
SB Right WB Right
Green 35.0A Green 56.0P
Yellow/AR 4.0 Yellow/AR 5.0
Cycle Length: 100 secs Phase combinat1on order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ------- ----- ----- ----- -----
WB LR 537 1493 0.424 0.360 18.7 C 18.7 C
NB TR 2150 3707 0.306 0.580 8.2 B 8.2 B
SB L 296 510 0.355 0.580 8.8 B 8.3 B
T 2160 3725 0.321 0.580 8.3 B
Intersection Delay = 9.7 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec critical v/c(x) = 0.381
-----------------------------------------------------------------------