2004-25654 Reso
RESOLUTION NO.
2004-25654
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, FOLLOWING A DULY
NOTED PUBLIC HEARING, GRANTING A CERTIFICATE OF
APPROPRIATENESS FOR DEMOLITION OF THE EXISTING
LIBRARY AT COLLINS PARK, A BUILDING DESIGNATED NON-
CONTRIBUTING, LOCATED AT 2100 COLLINS AVENUE, IN
ORDER TO RESTORE AND RENOVATE COLLINS PARK.
WHEREAS, on September 1998, the Mayor and City Commission adopted
Resolution No. 98-2904, authorizing the Mayor and City Clerk to execute an
Agreement with the firm of Robert A. M. Stern (the Agreement) for the design of
a new Regional Library (the Project); and
WHEREAS, on January 6, 1999, the Mayor and City Commission authorized
appropriation of the funding necessary for the Agreement, which included in the
Master Plan the demolition of the existing library at the completion of the
construction of the new building; and
WHEREAS, on April 10, 2002, the Mayor and City Commission adopted
Resolution No. 2002-24828, awarding the construction contract for the Project to
The Tower Group (Tower); and
WHEREAS, on May 13, 2002, Tower began construction of the Project, which is
currently expected to receive Final Certificate of Occupancy and Final
Completion in August, 2004; and
WHEREAS, on February 23, 2004, the City contracted with the firm of Edward
Lewis Architects (ELA), to prepare demolition documents of the existing library
and Rotunda conservation documents; and
WHEREAS, ELA completed the documents and presented them at the Historic
Preservation Board (HPB) meeting of May 11, 2004, where a recommendation
for the Mayor and City Commission to consider the granting of a Certificate of
Appropriateness for Demolition was adopted; and
WHEREAS, the City Commission, at its July 7, 2004 meeting, scheduled
a public hearing for July 28, 2004 to consider this issue, and said public hearing
has been held; and
WHEREAS, the City Commission agrees with the recommendation of the City's
Historic Preservation Board that a Certificate of Appropriateness for Demolition of
the existing library at Collins Park be granted; and
WHEREAS, the City would be in position to schedule the demolition of the
existing library in late August or early September, but may delay it until January
of 2005, due to the upcoming Art Basel event in December 2004; and
WHEREAS, the City intends to price the cost of the demolition with one of the
City's contractors under the Job Order Contract Program (JOC).
NOW THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and
City Commission, following a duly noticed public hearing, heretofore grant a
Certificate of Appropriateness for Demolition of the existing library at Collins
Park, a building designated non-contributing, located at 2100 Collins Avenue, in
order to restore and renovate Collins Park.
PASSED and ADOPTED this
28th
day of July
2004
ATTEST:
~ t__ ~~ul~
r CITY CLERK -
T:\AGENDA\2004\JuI2804\Consent\Rotunda Demolition Reso.doc
APPROVED AS 'TO
FORM & LANGUAGS
& FOR EXECUTION
7'ZiYcy
eate
CITY OF MIAMI BEACH
COMMISSION ITEM SUMMARY
m
Condensed Title:
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF MIAMI BEACH FLORIDA, FOLLOWING
A DULY NOTICED PUBLIC HEARING, GRANTING A CERTIFICATE OF APPROPRIATENESS FOR
DEMOLITION OF THE EXISTING LIBRARY AT COLLINS PARK.
Issue:
Shall the City Commission grant a Certificate of Appropriateness for Demolition of the existing library at
Collins Park?
Item Summary/Recommendation:
On September 23, 1998, the Mayor and City Commission adopted resolution No. 98-22904, authorizing the
Mayor and City Clerk to execute an Agreement with the firm of RobertA. M. Stern Architects (Stern) for the
architectural and engineering design of a new Regional Library. On April 10, 2002, the Mayor and City
Commission accepted a recommendation from the Administration and adopted Resolution No. 2002-24828
awarding the construction contract for the Project to The Tower Group. On May 13, 2002, The Tower
Group was given Notice to Proceed and construction began on the new library. At this time, the new library
is expected to obtain Final Certificate of Occupancy and Final Completion in August 2004. In preparation
for the completion of this project and the eventual need for the demolition of the existing library, the City
contracted with the firm of Edward Lewis Architects (ELA) on February 23,2004, to prepare demolition and
Rotunda conservation contract documents for after the demolition. ELA completed documents and
presented them to the Historic Preservation Board (HPB) to request the Certificate of Appropriateness for
Demolition of the existing library. The HPB reviewed the request at their May 11, 2004 meeting and issued
an Order approving the demolition with some minor provisions. The City intends to price the demolition of
the existing library and conservation of the Rotunda with one of the City's contractors under the Job Order
Contract Program (JOC) as soon as the final documents are completed and the City Commission approves
the Certificate of Appropriateness for Demolition consistent with the HPB Order. Because concerns have
been raised regarding the area being in construction during the Art Basel event in early December 2004,
the City is considering delaying the demolition and conservation of the Rotunda until after early January.
This decision will be made when all information regarding costs and schedules is finalized. The
Administration recommends that the Mayor and City Commission grant a Certificate of Appropriateness for
Demolition of the existina library at Collins Park.
Advisory Board Recommendation:
I N/A
Financial Information:
Source of
Funds:
Finance Depl.
Ci Clerk's Office Le islative Trackin
Jorge E. Chartrand
TH CMC
M- da-02-07282004-JECh
T:\AGENDA\2004\JuI2804\Consent\Rotunda Demolition Cover,doc
AGENDA ITEM 1(7 D
DATE 7-J.S-OLf
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
www.ci.miami-beach.fl.us
COMMISSION MEMORANDUM
From:
Mayor David Dermer and
Members of the City Commission
Jorge M. Gonza,eh
City Manager
A RESOLUTIO OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, FOLLOWING A DULY
NOTICED PUBLIC HEARING, GRANTING A CERTIFICATE OF
APPROPRIATENESS FOR DEMOLITION OF THE EXISTING
LIBRARY AT COLLINS PARK, A BUILDING DESIGNATED NON-
CONTRIBUTING, LOCATED AT 2100 COLLINS AVE., IN ORDER
TO RESTORE AND RENOVATE COLLINS PARK AND THE
ROTUNDA BUILDING.
Date: July 28, 2004
To:
Subject:
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
ANALYSIS
On September 23, 1998, the Mayor and City Commission adopted Resolution No.
98-22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of
Robert A. M. Stern Architects (Stern) for the architectural and engineering design of a
Regional Library, a 400-space Parking Garage, and Park and Streetscape Improvements
in the area surrounding Collins Park.
On January 6, 1999, the Mayor and City Commission authorized appropriation of the
funding necessary to implement the Agreement with Stern and authorized an amendment,
which reflected the change in scope, deleting the Parking Garage and adding the surface
lots. This Agreement included in the Master Plan the demolition of the existing library at
the completion of the new building.
On November 2,2001, the Regional Library documents were advertised for bid. Six bids
were received on December 19, 2001. On April 1 0,2002, The Mayor and City Commission
accepted a recommendation from the Administration and adopted Resolution No. 2002-
24828 awarding the construction contract for the Project to The Tower Group.
On May 13, 2002, The Tower Group was given Notice to Proceed and Construction began
on the new library. The Regional Library Project was granted a Temporary Certificate of
Occupancy in June 8, 2004 and the contractor is expected to be granted Substantial
Commission Memorandum
Existing Library Demolition
Page 2 of 3
Completion in July 2004. At this time the new library is expected to obtain a Final
Certificate of Occupancy and Final Completion in August 2004. In preparation for the
completion ofthis Project, and the eventual need for the demolition ofthe existing building,
the City contracted with the firm of Edward Lewis Architects, Inc. (ELA) on February 23,
2004, to prepare demolition documents and Rotunda conservation documents for after the
demolition has occurred.
ELA completed documents needed to be presented to the Historic Preservation Board
(HPB) to request the Certificate of Appropriateness for Demolition of the Existing Library.
The HPB reviewed the request at their May 11, 2004 meeting and issued an Order
approving the demolition with some minor provisions. ELA and the City are currently
addressing the comments made by the HPB In order to prepare final documents for
demolition.
The provisions are specifically described in the Final Order, File No. 2167, but in general
include the requirement to bring new design documents for Collins Park and the Rotunda
to the HPB once they are completed in the future; submittal to staff of the existing building
construction record drawings as well as current record photographs of the existing building;
an analysis of the history of the building submitted to staff prior to the issuance of a
construction permit for the new Collins Park and Rotunda Restoration documents; the
submittal to staff, at the time of demolition permit review, of the demolition and
conservation documents prepared by the consultant; and a report submitted to staff of the
result of efforts made to relocate, if possible, the loggia of the existing library. It has been
determined by staff that none of the provisions above and the timelines associated with
them prevents the granting of the Certificate of Appropriateness for Demolition by the
Mayor and City Commission at this time.
The preliminary estimate provided by the consultant is in the neighborhood of $300,000 for
the demolition and conservation. The City intends to price the demolition of the existing
library and conservation of the Rotunda with one of the City's contractors under the Job
Order Contract Program (JOC) as soon as the final documents are completed and the City
Commission approves the Certificate of Appropriateness for Demolition consistent with the
Order issued by the HPB.
The schedule for the demolition and conservation is currently estimated at four months. If
the City Commission grants the certificate, the City would be in position to schedule the
process of demolition sometime in late August or early September. Because Miami-Dade
Public Library anticipates a 90 day transition period into the new library and because
concerns have been raised regarding the area being in construction during the Art Basel
event in early December, the City is considering delaying the demolition and conservation
of the Rotunda until after early January. This decision will be made when all information
regarding costs and schedules are finalized.
Commission Memorandum
Existing Library Demolition
Page 3 of 3
CONCLUSION
The Administration recommends that the Mayor and City Commission grant the Certificate
of Appropriateness for Demolition, pursuant to Miami Beach City Code Section 118-563,
for the demolition of the existing library at Collins Park, a building designated non-
contributing, located at 2100 Collins Ave., in order to restore and renovate Collins Park
and the Rotunda building.
T:\AGENDA\2004\JuI2804IConsentIRotunda Demolition Memo,doc
'.--"............
,. n I THE ~:l- , I -;'-J~,jC' t", Y -.:,< ; .::) y~ \ N
_....--
it..
~
CITY OF MIAMI BEACH
NOTICE OF A PUBLIC HEARING
NOTICE IS HEREBY given that a public hearing will be held by the
Mayor and Cil'1 Commission of the Cil'1 of Miami Beach, Florida, in the
Commission Chambers, 3rd floor, Cil'1 Hall, 1700 Convention Center
Drive, Miami Beach, Florida, on Wednesday, July 28, 2004, at 11:00
a.m., pursuant to Miami Beach Cil'1 Code Section 118-564, to
consider granting a Certificate of Appropriateness for demolition of
the existing library at Collins Park, a building designated
noncontributing, located at 2100 Collins Avenue, in order to restore
and renovate Collins Park.
Inquiries may be directed to the Capital Improvement Projects
Department at (305) 673-7071.
INTERESTED PARTIES are invited to appear at this meeting, or be
represented by an agent, or to express their views in writing
addressed to the Cil'1 Commission, c/o the Cil'1 Clerk, 1700
Convention Center Drive, 1 st Floor, Cil'1 Hall, Miami Beach, Florida .
33139. This meeting may be continued and under such
circumstances additional legal notice would not be provided.
Robert E. Parcher, Cil'1 Clerk \
'.. lOil'1 of Miami Beach
pursuant to Section 286.0105, Fla. Stat., the Cil'1 hereby advises the
public that: if a person decides to appeal any decision made by the
City Commission with respect to any matter considered at its meeting
or its hearing, such person must ensure that a verbatim record of the
proceedings is made, which record includes the testimony and
evidence upon which the appeal is to be based. This notice does not \
constitute consent by the Cil'1 for the introduction or admission of
otherwise inadmissible or irrelevant evidence, nor does it authorize
challenges or appeals not otherwise allowed by law.
To request this material in accessible format, sign language
interpreters, information on access for persons with disabilities, and/
or any accommodation to review any document or participate in any
city-sponsored proceeding, please contact (305) 604-2489 (voice),
(305) 673-7218(TTY) five days in advance to initiate your request.
m users may also call 711 (Florida Relay Service).
(Ad #0270)
!