Loading...
Attachment A CITY OF MIAMI BEACH Of Plea OF THE CITV MANAGER 1'I!LIPHQNE; (305) 673-7010 COMMISSION MEMORANDUM NO. .31:')-ceL ~~ m-m' TO: Mayor Seymour Gelber and Members of the CIty Commlsslon DATE: April 20, 1994 FROM: Roger M. eaJJ...,~ 1.-.- City Manag8mt!~~ SUBJECT: A lU:~.RRAL 'fa A JOINT XBBTIXG OJ' TD l'I!OUIICZ UID OPI'lAL IXPROVJlKD1'1'S COIDII'f'l'BES 1'0a DISCUSSIOIl Oil 'fHE :raSUUCB 01' GBJdDL OBUcm'fXOJI BOWS 11101' '1'0 EXCEED $(,0,000,000 I'Oll PAD DOROVEJIZJI'1'S 'l'O BB PLACED OK 'I'D JfOVEDER, 1"" BALLOT . ~JU:)tI81'D'l'l:0. ItECOJDdNDA'1'1:0N: The Administration recommends that the city commission refer to a joint meeting of the Finance and Capital Improvements committees the discussion of the issuance of General Obligation Bonds, to be placed before the voters this Fall, not to exceed $40,000,000 for Parks Improvements and establish a maintenance fund. BACJtGJlOUJm: In the past several years the City of Miami Beach has witnessed the slow deterioration of its parks, beaches, boardwalk, playgrounds, ballfields and recreation facilities in general. This has transpired as a result ot a declining tax base, Shifting median age of our residents, a reduction in touriS1ll and economic development as well as an increased demand for City services other than those provided by Parks and Recreation. The most siqnificant statistic which dramatically and clearly indicates the need for a complete and comprehensive renovation of the City of Miami Beach park and recreation system is the rapidly changinq median age of our residents. In 1980 the median age was 65.3, in 1990 it was 49.5, and if current trendS continue, the projected median age 1n 1995 will be 46.5, and in the year 2000, 43.7. This drop in the median age places a much greater demand on the park and recreation system. First, the average resident will be more likely to have active recreational interests such as biking, swi1lllDing, jogging, skating, volleyball, softball, baseball, basketball or golf. Additionally, their demand for passive, cultural and family oriented activities will also increase. Even more importantly, it is a safe assumption that these younger residents will have families with children. Accordinq to available statistics in 1980 only 6.5% of the Beach's 96,298 residents were , 14 years of aqe or younger. In 1990 this number increased to 12. ot of 92,639 residents and is projected to be 20.6% of 95,881 residents in the year 2000. This represents 19,751 children who potentially will be looking to the city of Miami Beach to meet their leisure time needs. 4 AGI~:~R -~-c;, ~-20-q4 DATE CODlJllission Memo t 315 -q~ R.Q~ April 20, 1994 page 2 The value of this bond issue has. been recognized by both the Administration and the city's Recreation Centers and Parks Facilities Board. The concepts, benefits of, and need tor a bond issue were discussed .xtensively at several of the Recreation Centers and Parks Facilities Board meetings, with the end result being the Board's unaniDOUs approval of the issue. Attached is a copy of the Board's resolution expressing support of the bond issue. DE PROJBC'1'S: The attached Capital Improvements projects list reflects 22 individual park projects plus four (4) City-wide projects in the amount of $25,000,000 located throughout the City of Miami Beach. There are major park renovations as well as beautification and urban reforestation projects. Most importantly, a $10,000,000 trust fund will be established, the earnings of which will provide for maintenance of the facilities. The potential for the trust fund is under review by bond counsel. ~YSIS: The City commission and this Administration have clearly recognized the need to improve our park and recreation facilities. This commitment has been demonstrated by the allocation of $1,150,000 in Capital Improvements to the Recreation, CUlture and Parks Depart1ll.ent1s FY 93-94 budget. An additional cOJllJllitment was made in January of 1994, with the allocation of $2,122,500 for various Citywide Streetscape and Landscape capital Projects. A nuDber of these capital projects are currently in various stages of development and our residents and guests are now enjoying the benefits of these improvements. However, it must also be pointed out that if the attached list of proposed capital improvements were to be implemented on our current timeline it would take approximately 10 years to accomplish, if the funds to do so were available, which is not a certainty. Should the City Commission decide to place a question on the Fall ballot asking for the authority to issue up to $40 million for improvements and a maintenance fund for the Parks system, this debt issuance may be acc01llpl ished without an increase in the millaqe rate for debt service. By structuring the bonds into three series, the city will be able to take advantage of the declining annual costs for the existing General Obligation Bonded Debt (which is completely amortized in 2003) and layer the cost of aJIlortizing these new bonds on the current annual cost with the ability to fund the additional cost by maintaining the current debt SQrvice millage rate of 2.3 mills beyond 2003. The Administration will explore alternative financing methods with the Finance and Budget Advisory Committees, to determine Which best accomplishes this goal. CONCLUSIOR: The Administration recommends that the City Commission refer this issue to a joint meeting of the Finance and capital Improvements committees for further discussion. 5 April 15, 1994 Mr. Roger Carlton City Manager 2700 Convention Center Drive Miami Beach, PI 33139 Dear Roger: ~he Recreation and parks Facility Board has been frustrated by budgetary constraints the past 20 to 15 years as we watched the quality of the facilities and programing dete- riorate. The past two years we have been encouraged as our budget in- creased slightly and funds were allocated to correct a few problems. Th. demographics of our City bas changed dramatically since 1980. There are more young families with pre-SChool and school age children than ever before in our City'S history. It is imperative that our City address this "quality of life" issue immediately. Host of the buildings in our park system need total renova- tion or replacement. Some parks do not even have water foun- tains or bathrooms. Modest incremental increases in the budget will not, in opinion of our Board, resolve the problems in a timely nero the man- ~he Board, therefore, passed a resolution at our April 6th, 1994, meeting recommending that a General Obligation Bond is- sue be placed on the ballot this fall for voter approval in an amount not to exceed $3S,OOO,OOo...with the funds to be spent for parkS and recreation facilities. Approval by the voters would assure our City o~ having first-class recreatiQnal and park zacilitles through out the City with sufficient funds for maintance and operations by ~he year 2000. 6 Hr. Roger Carlton c.ity Manager April 15, 1994 page '2 A copy of the proposed improvements is attached to the resolution. The list is comprehensive; but not cast in stone. AS our City changes some additians and modificatioDR might be necessary to meet the needs of our residents and visitors. Our Board is committed to a successful campaign to inform the voters in our city so they can make an informed, positive de- cision in the fall. Sincerely, k~ paul A. Whitebrook Chairman Recreation << parks Facility Advisory Board PAW/ten 7 A Resolution of the Recreation Centers and Park$ Facilities Soard approving In concept of recommending a Park Improvements bond Issue In an amount not to exceed $35,000,000 to be Issued as needed for the Improvements proposed In the Recreation, CultUre and Parks Depanment Capital ProjeCtS list. To be effective In November. 1994. ~Ui.!B~ 8 Revise4 3/14/9. ex," 01' KIaJa BEACH uc:REATXOB, CUL1'UU UD PAlUCS DZPARTJmN'l' PROPOSED CAPITAL PROJECTS LIST FY 93 - 98 llPRTlI DISTltICT ~r.sDi Park security lighting New Restroomsjstorage Landscaping Resurface Basketball Court Park signage/Site furnishings 'fOTAL painay Park New Recreation Center w/parking lot Field Renovations/Irrigation Ballfield installation w/lights Park SignagejSite Furnishings Tennis court Resurfacing Basketball Resurfacing Landscaping TOTAL LaGorc. park Playground ImprovementS/Fencing Park Signage/Site Furnishings Landscaping/Irrigation TOTAL Norman4v Isle Park Field Renovations/Irrigation/Lighting New Pool/Lockerrooms Park signagejSite Furnishings TOTAL $ 50,000 100,000 25,000 20,000 10.000 $ 205,000 $ 225,000 275,000 10,000 60,000 20,000 15.00C! $ 605,000 $ 35,000 5,000 10.000 50,000 . $ 75,000 1,000,000 10.000 $1,085,000 .. nnUOTES PROJBC'1' IS J'UlQ)BD DI I':ISCAL YEAR 1993/94 9 worth Shore Park Activity Center Renovations New Recreation Center New Tennis Center Builu1ng Tennis court Replacement Landscaping/Irrigation Park Signaqe/Site Furnishings 'rOTAL sti11"ater parl: New Recreation Building Baseketball court Renovations Field Renavations/lrriqation Landscaping security Lighting Park siqnage/Site ~urnishings TOTAL '1'atum l'ark New Recreation Building Basketball Court Renovations Tot-Lot Field Renovations/Irrigation Landscapinq Security Lighting Park Siqnaqe/Site Furnishings TOTAL KID BEaCH DISTRIC'1' "i.her Park Park Siqnage and Site Furnishings Decorative Access Contral Fencing tor park perimeter TOTAL DSS Park Basketball Court Renovation Tennis Court Renovation Enclose Building TOnI. $ 8!5,000 2,750,000 100,000 250,000 "60,000 10.000 $3,255,000 $ 150,000 20,000 60,000 20,000 50,000 10.000 $ 310,000 $ 150,000 20,000 35,000 40,000 15,000 50,000 10.000 $ 320,000 $ 10,000 35.000 $ 45,000 $ 20,000 30,000 75.000 $ 125,000 .10 z'-ne Tree ~arJt parking Lot Improvements Security Liqhtinq Landscaping/Native Plant Hammock Nature centerjRestroolUJ Playfield/lrrigation Installation Park signage/Park Furnishings 'fO'l'JU, ,cott Rakow youth center Conversion of Par 3 Golf Course to Multi-Purpose Ballfield complex site demolition and preparation construction of tour (4) field complex including tencinq, lighting, irrigation concession/restrooms/storage/meetinq rooms Parking lot improvements Playground equi~ent Access control fencing Expansion of High School Fields "Central Park" Theme Youth Center entrance reconfiquration Ice Rink refrigeration equipment (Compressors, piping. brine system) Boards around rink to include plexiglass for hockey programs, replacement of rubber flooring Lockerroom renovations (Benches. lockers, ADA compliance, ventilation system) Redesign and renovation of interior (both upstairs and downstairs) for better space utilization, including painting, new carpet, etc. Enclosing the Zambon! storage shed, inClude hot water heater painting exterior Landscaping pool improvements (Heater modifications, blanket, resurfacinq) TOTAL 25,000 50,000 135,000 150,000 75,000 10.000 . .U,OOO $ 225,000 1,245,000 250,000 200,000 75,000 100,000 600,000 150,000 100,000 175,000 30,000 50,000 65,000 45,000 30,000 25,000 30.000 $3,tt5,000 11 ,arkS Division Yar4 Hazardous chemical storage and containment building Greenhouse renovations Installation of garage doors security Lignting TOTAL 80tJ'l'll BEACB DIS'l'RIC'l' Island View Park Landscaping/Playground/Irrigation Park Signaqe/Site Furnishings '1'O'1'~L Garden center NeY auditorium complex New conservatory structure Conservatory horticultural material Irrigation Exterior garden areas including site enclosure and furnishings 'f()'1'~L J'lam.inqo ParJt Tennis Court Renovations/Replacement Handball/Racquetball Court Renova- tions/Basketball Pool Renovations - conversion to aqua tie complex Teen Center Renovations Friendship Corner Improvements Landscaping TO'rAL l-mnftlua Park New Restroom Buildings AutomatiC Irrigation Playground Improvements Install additional volleyball/ beach soccer fields, eourts Landscaping, including area vest of dune Signage/Park FurniShings TOTAL $ 75,000 25,000 70,000 15.000 , 185,000 $ $ 20,000** 35,000 5.000 25,000 $ 250,000 250,000 100,000 100,000 300.000 $1,000,000 $ 225,000 190,000** 60,000 1,000,000 100,000 50,000 75.000 $1,'40,000 $ 300,000 100,000 100,000 75,000 400,000 85.000 $1,0'0,000 12 Q$:eall I'rotlt AuditoriUII Renovations/Expansion ,outh Shore COJllDlunitv Cente.r BUilding Renovations, a/c replacement, painting, furnishing., and flooring Landscaping Siqnage/Furnishings '1'O'J!AL south pointe Park Re-design entrance and traffic flow, observation towers, lighting and restrooms Automatic Irrigation Playground Equipment Landscaping signagejFurnishings Pier Renovations Renovate equestrian area Expanded Field Electrical system '1'OTAL Palm Island Park Playground Equipment Court Resurfacing Automatie Irrigation Park Signage/Site Furnishings TOTAL Beach Lan4scapinq Re-landscaping public beach areas from South pointe to North Shore Open Space Park Boardwalk a.tlOvatiODS Repair/replace as necessary, worn/ damaged portions of boardwalk $ 500,000 $ 150,000 10,000 5.000 $ 165,000 $ 900,000 50,000 30,000 80,000 25,000 50,000 150,000 25.000 $1,310,000 $ 30,000 50,000 25,000 5.000 $ 110,000 $3,000,000 S 900,000 :1.3 .asbin9~OD park/Yri.nd.bi~ COrDer SUildin9 Renovations Playground Equipment Remove shuffleboard courts, re-sod Landscaping Park siqnage/Site Furnishings '1'O'nL North SbOre ODen Space Park Recreation Facilities Boardwalk Renovations Building Renovations/Restrooms Maintenance Yard Renovations TO'l'AL Citvvide Plav9round ear.tv surracin9 citvvide LandscapinalUrban Forestry proaraa N'fAL Trust Fund ror Maintenance or Be. Facilities 1'O1'~ $ 100,000 30,000 5,000 10,000 5.000 , 150,000 $ 150,000 100,000 US,OOO 40.000 , 415,000 $ 600,000 53 .SOO. 000. $25,000,000 $10,000,000 $35,000,000 14