Loading...
Attachment 127 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 -''):\\ci.miami-beach.fJ.u& TO: FROM: SUBJECT: r- COMMISSION MEMORANDUM NO. <+13 - DD Mayor Neisen O. Kasdin and Members of the City Commission Lawrence A. Levy \ \ v' City Manager ~ DATE: May 24, 2000 A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, Accepting the Recommendation of the City Manager Pertaining to the Ranking of the Proposals Received in Response to the Request for Qualifications (RFQ) No. 41.99/00 for Architectural, Engineering, Landscape Architectural and Graphic Design Services for Various City Projects in Accordance with the November 2, 1999 General Obligation (GO) Bond Project List; Specifically for ArchitecturaIlEngineering Services to Develop Design and Construction Documents for the Altos Del Mar Park; and Authorizing the City Administration to Enter into Negotiations with the Top-Ranked Finn of Falcon & Bueno, Inc. to Develop Design and Construction Documents for the Proposed Facility and Authorizing the Administration to Negotiate with the Second Ranked Finn of Curtis & Rogers Design Studio, Should the Administration Not Be Able to Successfully Negotiate a Contract with the Top Ranked Firm. ADMINISTRATION RECOMMENDA nON: Adopt the Resolution. ANALYSIS: On November 2, 1999, the City of Miami Beach voters approved the issuance of an approximately $92 Million General Obligation (GO) Bond for Neighborhood, Parks and Beach, and Fire Safety Improvements. In an effort to begin the implementation of these Bond Projects, the City desires to contract with design professionals in accordance with Florida Statute 287.055 for planning and the preparation of the construction/bidding documents needed to undertake the work detailed in the Scope of Work for the above mentioned facilities. The selected finn will be responsible for reviewing existing City of Miami Beach Zoning Ordinances and Building Codes, and for incorporating the data into complete construction documents including final working drawings, maintenance expenses, construction estimates, specifications, and bid documents necessary for the bidding and construction of this project. r- AGENDA ITEM C1L DATE S-'2..\{--Ou RFQ No, 41-99/00 Page Two .r- May 24, 2000 ANALYSIS (continued) The firm will be responsible for obtaining all Federal, State and local permits necessary for the construction of the project, and may also be required to provide consulting services to the City on various matters which do not result in drawings or specifications. The design will be developed with the input of the City Administration, the various City Boards ani Committees, as well as area residents and other interested individuals and groups. The design team for this project will be headed by a Landscape Architect with park design experience and will include an Engineer and Architect with demonstrated knowledge and experience in Historic Preservation. The project will also require the services of a person qualified by education or experience to research and interpret historical information. The Project design will include conceptual planning, design, construction documents and construction administration services for a new park on a 2-acre undeveloped tract of oceanfront land located east of Collins Avenue between 76th and 77th Streets. The park site lies within the Harding Townsite/South Altos Del Mar Historic District, and is adjacent to the Altos Del Mar Historic District. The design services required for this park include restoration of the exterior of the buildings to their original exterior appearance, and adaptive reuse of the interior of the structures and the possible reconfiguration of the parking areas. On January 12, 2000, the Commission adopted a resolution authorizing the issuance of a Request for Qualifications (RFQ) for Architectural, Engineering, Landscape Architectural and Graphic Design Services for Various City Projects in Accordance with the November 2, 1999 General Obligation (GO) Bond Project List. The RFQ was issued on January 20, 2000, with an opening date of March 1,2000. Four-hundred- fifty-six (456) notices and one-hundred-sixteen specifications were issued, resulting in the receipt of five (5) responsive responses from the following firms: Beilinson Architects Bermelo, Ajamil & Partners Borrelli & Associates Curtis & Rogers Design Studio Falcon & Bueno Letter to Commission (LTC) No. 41-2000, dated March 22, 2000 established an Evaluation Committee consisting of the following individuals: Margueritte Ramos-Herrera, GO Bond Project Oversight Committee Member Kevin Smith, Director of Parks & Recreation Donald Shockey, North Beach Development Corporation Director Joyce Myers, Principal Planner Bruce Henderson, Environmental Specialist Amelia Johnson, Transportation Coordinator William Carey, Assistant Director of Planning r- ;- RFQ No. 41-99/00 Page Three May 24, 2000 ANALYSIS (continued) On March 27 2000, the Evaluation Committee met to review all the responses received. Joyce Myers was selected as the Committee Chairperson. Each committee member in attendance reviewed and evaluated all responses in accordance with the criteria listed in the RFQ, and submitted their individual score sheets to the Chairperson. The Committee was required, in accordance with the RFQ, to select a minimum of three of the top ranked firms. The Committee agreed to have each member shortlist by selecting their three top ranked firms. Below are the results: First Round: (all firms receiving votes) Firm MRH KS DS JM ID:! AJ WC Total Bermelo, Ajamil & Partners X X X X X X X 7 Borrelli & Associates X X X X 4 Curtis & Rogers Design Studio X X X X X X 6 Falcon & Bueno X X X X 4 The committee members' initials are as follows: ;- MRH: Margueritte Ramos-Herrera BH: Bruce Henderson KS: Kevin Smith JM: Joyce Myers DS: Donald Shockey AJ: Amelia Johnson WC: William Carey Based on the above results, the Committee agreed that since there was a tie for third place, between Borrelli & Associates, and Falcon & Bueno, and that these two (2) firms have limited or no prior experience with the City of Miami Beach, all committee members agreed to include both firms, and therefore shortlist the following four (4) top-ranked firms: Bermello, Ajamil & Partners Borrelli & Associates Curtis & Rogers Design Studio Falcon & Bueno On April 14, 2000, the four (4) top-ranked firms made oral presentations before the Evaluation Committee. The Committee's role was to evaluate and rank the firms based on the following criteria identified in the RFQ: Firm's Experience, Project Manager's Experience, Previous Similar Projects, Qualifications of Project Team, and Certified Minority Participation. r ~ RFQ No. 41-99/00 Page Four May 24. 2000 ANALYSIS (continued) The rankings listed below are the final results of the committees' evaluation(s) of each firm at the conclusion of the oral presentations. Amelia Johnson did not attend this meeting. Second Round: (four top-ranked firms) .fu!!! MRH KS DS JM BH WC Ill!!! Rank Bermello, Ajamil & Partners 3 2 4 4 3 3 19 4 Borrelli & Associates 4 4 3 I 2 2 16 3 Curtis & Rogers Design Studio 2 I 2 3 4 1 13 2 Falcon & Bueno 1 3 1 2 1 4 12 1 The committee members' initials are as follows: MRH: Margueritte Ramos-Herrera BH: Bruce Henderson KS: Kevin Smith 1M: Joyce Myers DS: Donald Shockey AJ: Amelia Johnson WC: William Carey ,- The committee ranked the firm of Falcon & Bueno, Inc. as the top-ranked firm, and Curtis & Rogers Design Stu~io as the second-ranked firm. Attached is the following additional information on the top-ranked firm (Falcon & Bueno): Attachment 1: Project Manager's Experience. Attachment 2: Previous Similar Projects. The Committee's recommendation was provided to the City Manager for his consideration. In accordance with the terms of the RFQ, the City Manager has reviewed the Evaluation Committee's recommendation and concurs with its ranking of responses. The Mayor and City Commissioners are not bound by either the City Manager's or the Evaluation Committee's recommendations. The City Manager recommends that the Mayor and Commission accept the ranking recommended by the Evaluation Committee, authorize the City Adrninisltalion to enter into negotiations with the top-ranked firm of Falcon & Bueno, and authorize the Administration to negotiate with the second- ranked firm of Curtis & Rogers Design Group, should the Administration not be able to successfully negotiate a contract with the top-ranked firm. LAL,~l:r F:\PURClSALL\JOHN\COMM\4I-FB990.WPD r- Afteraction Report May 24, 2000 City Commission Meeting City of Miami Beach C7L Commission Memorandum No. 413-00 ~ A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, Accepting the Recommendation of the City Manager Pertaining to the Ranking of the Proposals Received in Response to the Request for Qualifications (RFQ) No. 41-99/00 for Architectural, Engineering, Landscape Architectural and Graphic Design Services for Various City Projects in Accordance with the November 2, 1999 General Obligation (GO) Bond Project List; Specifically for Architectural/Engineering Services to Develop Design, and Construction Documents for the Altos Del Mar Park; and Authorizing the City Administration to Enter into Negotiations with the Top- Ranked Firm of Falcon & Bueno, Inc. to Develop Design and Construction Documents for the Proposed Facility and Authorizing the Administration to Negotiate with the Second Ranked Firm of Curtis & Rogers Design Studio, Should the Administration Not Be Able to Successfully Negotiate a Contract with the Top Ranked Firm. Administration Recommendation: Adopt the Resolution. (Parks Department) ACTION: Resolution No. 2000-23926 adopted. Mayra Diaz Buttacavoli and Michel Magliore to handle. r- r- Prepared by the City Clerk's Office Page 12 RESOLUTION NO. 2000-23926 A RESOLUTION OF TIlE MAYOR AND CITY COMMISSION OF TIlE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING TIlE RECOMMENDATION OF TIlE CITY MANAGER PERTAINING TO TIlE RANKING OF PROPOSALS RECEIVED IN RESPONSE TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 41-99/00 FOR ARCHITECTURAL, ENGINEERING, LANDSCAPE ARCHITECTURAL AND GRAPIDC DESIGN SERVICES FOR VARIOUS CITY PROJECTS IN ACCORDANCE WITH THE NOVEMBER 2,1999 GENERAL OBLIGATION (GO) BOND PROJECT NO.3, FOR ARCIDTECTURAUENGINEERING SERVICES TO DEVELOP DESIGN, AND CONSTRUCTION DOCUMENTS FOR ALTOS DEL MAR PARK; AUTHORIZING TIlE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH TIlE TOP-RANKED FIRM OF FALCON & BUENO TO DEVELOP DESIGN AND CONSTRUCflONDOCUMENTS FOR THE PROPOSED FACILITY; AND FURTHER AUTHORIZING THE ADMINISTRATION TO NEGOTIATE WITH THE SECOND RANKED FIRM OF CURTIS & ROGERS DESIGN STUDIO, INC. SHOULD TIlE ADMINISTRATION NOT BE ABLE TO SUCCESSFULLY NEGOTIATE A CONTRACT WITH TIlE TOP RANKED FIRM. WHEREAS, the City issued a Request for Qualifications (RFQ) No. 41-99/00 for providing architectural, engineering, landscaping architectural and graphic design services for various City projects in accordance with the November 2, 1999 General Obligation (GO) Bond project list; and WHEREAS,four-hundred fifty-six notices and one-hundred sixteen (116) specifications for RFQ No. 41.99/00 were issued, resulting in five (5) timely responses; and ~ WHEREAS, an Evaluation Committee recommended by the City Manager and approved by the Mayor and City Commission met on March 27, 2000, and agreed to short list the four (4) top-ranked firms and that they be invited for oral presentations before the Comm ittee; and WHEREAS, the Committee heard oral presentations on April 14, 2000, and unanimously voted to recommend negotiations with the top-ranked firm, Falcon & Bueno, and with the second-ranked firm of Curtis & Rogers Design Studio, Inc., should the Administration not be able to successfully negotiate a contract with the top-ranked firm; and WHEREAS, the City Manager has reviewed the recommendation of the Evaluation Committee and concurs with the Evaluation Committee's recommendation. NOW, TIlEREFORE, BE IT DULY RESOLVED BY TIlE MAYOR AND CITY COMMISSION OF TIlE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein accept the City Manager's recommendation pertaining to the ranking of proposals received in response to RFQ No. 41-99/00 and authorize the Administration to enter into negotiations with the top-ranked firm of Falcon & Bueno and with the second-ranked firm of Curtis & Rogers Design Studio, Inc. should the Administration not be able to successfully negotiate a contract with the top-ranked firm. tJ,,!EST: r-1 Uud' P tJl,t tkv-. CITY CLERK APPROVED fJoS TO FORM & lANGUAGE & FOR EXECUTION if MAYOR PASSED and ADOPTED this 24th day of May, 2000 r- ~~~ ~~--.-_. '.' ;f~ r- F A L C o N & 8 U E N o MINIMUM QUALIFICATION REQUIREMENTS planning landscape architecture urban destgn faleonbueno @atl.net Finn'. Experience The firm has twenty-two years of experience in providing landscape architectural services to government agencies. Professional registration licenses are attached. Project Manager'. Experience The Project Manager. Teresita Falc6n. RA. RLA. has twenty-two years of experience as project manager on dozens of similar projects ror the Miami-Dade County Department of Park and Recreation, Miami-Dade County Public Works Depanment, City or Coral Gables, City or North Miami Beach, US Depanment of Agriculture, and US Department of Labor. Pnvlous SImilar Project. Coral Gables Park and Open Space Master Plan David Barth, 222 Clemantis Street. West ?dm Beach, A, 33401, 561 659~552 Community planning and uman design Completion date: 2000 Fees: $15,000 ConstnlCtion cost $2,000,000 (acquisition) suite 557 Ul55 Ie jeune road coral gables Oorlda 33134 phone 30S 445 7575 fax 305 446 35SO r- Tropical Park Howard Gregg, 275 NW 2 Street, Fourth Floor, Miami, FL. 33128. 305 755-7860 Park planning and design Completion date: 1998 Fees: 35,000 ConstrUCtion cost: $2,500,000 Jaycee Park George Rey, 28S Arag6n A venue, Coral Gables, R.., 33134, 305 460-5002 Park design Completion date: 1989 Fees: 12,000 ConstrUCtion cost: $100,000 PnvlouslCurrent Projects for tbe City of MIami Beach None. QualUlcatloDS of Project T..... Falc6n & Bueno Teresita Falc6n, RA, RLA, Project Manager Juan Antonio Bueno, RLA, PE, Project Landscape Architect Allan T. Shulman Architect Allan T. Shulman, RA, Historic Preservation Architect, Historical Research & Interpretation Brill & Rodriguez Luis Rodriguez, PE, Historic Preservation Structural Engineer "",.- landscape ....hitecture Id9 R&iumc!s are attached. r- ... ..-'-.~.7'.~ r- PROPOSER'S QUALIFICATION STATEMENT ;- PROJECT NUMBER 3 PROJECT NAME Altos del Mar Park FIRM NAME (AS SHOWN ON CORPORATE SEAL) Falcon & Bueno ADDRESS OF PROPOSED OFFICE IN CHARGE 2655 I.e Jeune Read, Suite 557, Coral Gables, FL 33134 TELEPHONE NO. (305) .4A<;-7575 FACSIMILENO,(~n") 44"-~""n INDICATE SERVICES TO BE PROVIDED ON THIS PROJECT APPLICANT PROPOSED CONSULTANTS Servil:e5 FL State Corporate Minority Name or FL Stale Corponte Minority Offered License Cbl rter Certification Consultant License Charter Certification pe LC - )B[) 2000 " . ~chitecture l:."" . II-" <ff,"~ Allan T. ,,/2.1{.,:e. tN'" 1 +bt. !structural 502- ~"552'3 Brill & b' . r 2.~ r- PROPOSER'S QUALIFICATION STATEMENT ;- WORKLOAD FOR APPLICANT FIRM: (ONLY) Define each projecllbe APPLICANT is handling as of lbe deadI:ne for receipt of proposals (excluding portions of fees psid to Consultants). Specify number of all principles and technical staff in lbe fnn (excluding staff draftinglCAOD operator personnel and ConsultanU 1. . . Projects Fees on Hold Fe.. Remalnlnc USDA. Animal " Plant Health 13,500 I ,,--"'-- African Heri~~, CUltural Arts 600 ~,:,child ~e~t~~l Garden 8,000 Tropical Park 24,OPO I~" '. . . . .. TOTAL FEES S 0 S 46,100 TOTAL PERSONS (Prlaclpal '" Technical Stafl) 3 r- ,.+ -;-- Att~2. ;- PROPOSER'S QUAUFICATlON STATEMENT SPECIFIC RELATED EXPERIENCE fProiects of camp RIlle 1YII8, size and comPlexity): Project Contact Person Location Construction Completion Phase Telephone Cost Date FAcSimile No. USDA Carlos Alvarez Coral Gables 250,000 2001 Design ~imal & Plant Hea~h 305 443-2933 Florida Const doc Ilnspection Services 3D5 448-3748 Contract adm !African Herilaae Clvde Judson Miami, Florida 127,000 2001 Deslan Cu~ural Arts Center 305 755-9034 Const doc Music Hall 305 755-9945 Contract adm Miami Dade Wa~er Martinez Miami, Florida 25,000 1999 Desion CommunitY Colleoe 305 663-7301 Const doc Wolfson Campus I 305 663-5411 Contract adm Coral Gables David Barth West Palm na 2000 Plannina Par\( and Open Space 561659-6552 Beach Master Plan 561 833-1790 Florida Fairchild Trop Garden Chuck Hubbuch Coral Gables 100,000 Jun-OO Plannlna/deslan Caribbean Exhib~ 305667-1651 Aorida Const doc 305 661-8953 Contract adm Fairchild Trop Gallien Chuck Hubbuch Coral Gables 310,000 Dec-oo Desian Rainforest Exhibit 305 667-1651 Florida Cons! doc 305661-8953 Contract adm Fairchild Trop Garden Chuck Hubbuch Coral Gables 25,000 Mar-OO DeskIn h'eachlng Gartlen 305667-1651 Florida Const doc 305 661-8953 Contract adm ITroDical Par\( Howard Greoo Miami, Florida 4,500,000 1998 Plannina Master Plan 305 755-7860 305 755-7864 I ropical Par\( Howard GI1llIlI Miami, Florida 2,500,000 2000 ~ criterta Equestrian Center 305755-7860 Contract adm Arena 305 755-7864 r -;).s ./"" ~ r PROPOSER'S QUAUFICATlON STATEMENT SPECIFIC RELATED EXPERIENCE /Pr~ of CDmp8J'llble tvDe, size and comnle$ Project Con1act Person Location Constructlon Completion Phase Telephone Cost Dale Facsimile No. m,e Stertlno Buildino Sam Herzbelll Miami Beach 1,000,000 not built Historic Hotel, Theater, Patio 30567:>2731 Florida loreservation Restoration 305 67:>2731 consultant ArtCenter S Florida Garv Knioht Miami Beach 500,000 2002 SDIDDICD Facade Restoration & 305674-8278 Florida New Entrance 305 674-8772 Emoire Hotel Lobbv & Peter Maroolls Miami Beach 1,000,000 2000 Historic Facade Resloration 305 859-2112 Florida oreservation 3D5 859-7667 consultant Banana Reoublic Banana Miami Beach 1,000,000 1999 Historic Recublic Florida I Dreservation S. Bruno, CA consultant Ritz Cartton Mike Reinstein Miami Beach 80,000 H"lStoric Di Lido Hotel 305674-0112 Florida Dreservation consultant Saoamore Hotel Martin Taolln Miami Beach 2,000,000 Hisloric Renova1lon & 305 865-5760 Florida Dreserva1ion IExoansion consultant ,,, r- ~ r- PROPOSER'S QUAUFICATlON STATEMENT IISPECIFIC RELATED EXPERIENCE (Projects of comlNlfllllle type, size and complexit1 : Project Contact Person Location Construction Completion Phase Telephone Cost Date Facsimile No. Martah Brown House Clyde Judson Coconut Grove na on ooino Desion 305 755-9034 Florida Const doc 305 755-9945 Contrad adm Coconut Grove Dan Tinnev Coconut Grove 1,500,000 1999 DesIgn Woman's Club 305 755-9034 Florida Canst doc 305 755-9945 Contract adm Gerstein Metro-Dade Dan Tinnev Miami, Florida na 1999 Design Justice Bulldlno 305 755-9034 Const doc 3D5 755-9945 Contract adm BCClFAU Joint Use Dan Tinnev Broward CountY I 11,250,000 1995 Desion Library 305755-9034 Florida Const doc 305 755-9945 Contract adm UniversitY House Dan Tinnev Miami, Florida 9,200,000 Desion Florida Intemational 305 755-9034 Constdoc UniversitY 305 755-9945 Contract adm State & Countv Offices R. Schuster Marathon, na Desion 305 44$-7758 Florida Const doc Contract adm "Z1 ;- PROPOSER'S QUALIFICATION STATEMENT KEY PERSONNEL or PROPOSED TEAM TO BE USED ON THIS PROJECT * N.m. Disciplin. of Lic.nse/I'raininc City of Residence Annlic.nt's Princio.lls) -in-Ch.....e Teresita Falcon Landscape Architect Coral Gables, FL Juan Antonio Bueoo Landscape Architect Coral Gables, FL Prof.ssion.' !f..hoi..' Sllff Dlsclnlln. of LI.ense/I'ralnin.. City of Residence Dustin Mizell .Landscape Architect Loxahatchee, FL Intern Consultanl(s) Dlsciplin. of Lic.nse/I'l"!'inlnc City of Resld.nce Prin.lna/is)-in-Cba..... . Allan T. Shulman Architect Miami Beach, FL Louis Rodriguez Structural Engineer Miami, FL Consultant(s) Discipline of Llc.nse/I'raininc City of Resldene. . Professionavr..holcal Starr .;- r- . Attach additional sheets if necessary ~B