96-22002 RESO RESOLUTION NO. 96-22002 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, DECLARING THAT A VALID PUBLIC EMERGENCY EXISTS, WAIVING THE COMPETITIVE BIDDING PROCESS, AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDMENT TO THE EXISTING AGREEMENT WITH RAMP ASSOCIATES TO INCLUDE PHASE II PREPARATION OF DETAILED CONSTRUCTION DRAWINGS AND ALL CONTRACT AND BID DOCUMENTS FOR THOSE ITEMS IDENTIFIED IN THE PHASE I STUDY THAT ARE AUTHORIZED FOR CONSTRUCTION BY THE CITY OF MIAMI BEACH, FOR THE AMOUNT OF SIX PERCENT OF CONSTRUCTION VALUE OF WORK, FOR THE CITY OWNED PARKING GARAGE LOCATED ON 42ND STREET. WHEREAS, on February 20, 1996, the City entered into an agreement with Ramp Associates, a division of Urbitran Associates(consultant), for a Phase I structural survey to be performed at the 42nd Street Parking Garage (Agreement); and WHEREAS, the Phase I survey has been completed and indicates the need for immediate structural repairs to the Garage in order to preserve and protect its structural integrity; and WHEREAS, based upon the information provided in the Phase I survey, the Mayor and City Commission herein declare that a valid public emergency exists, thereby necessitating a waiver of the competitive bidding process so that the consultant may proceed immediately with preparation of construction drawings and contract and bid documents for the structural repair of the garage; and WHEREAS, the Administration has negotiated the attached existing Agreement with Ramp Associates to include Phase II preparation of detailed drawings and contract and bid documents for the amount of six percent (6%) of construction value. . NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission herein declare that a valid public emergency exists with regard to the continued preservation and protection of the structural integrity of the 42nd Street Garage and, based upon information provided in the Phase I study by Ramp Associates, herein waive the competitive bidding process and authorize the Mayor and City Clerk to execute the attached amendment. I MAYOR PASSED AND ADOPTED this 5th day of June, 1996 ATTEST: ~oW-- ()~~ CITY CLERK FORM APPROVED Legal~ By /J11 Date S/?J,/9C CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139 COMMISSION MEMORANDUM NO. ~ TO: Mayor Seymour Gelber and Memben of the City Commission DA TE: June 5, 1996 FROM: Jose Garcia-Pedrosa Ji City Manager A RESOLUTION OF E MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, DECLARING THAT A VALID PUBLIC EMERGENCY EXISTS, W AMNG THE COMPETITIVE BIDDING PROCESS, AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AMENDMENT TO THE EXISTING AGREEMENT WITH RAMP ASSOCIATES TO INCLUDE PHASE II PREPARATION OF DETAILED CONSTRUCTION DRAWINGS AND ALL CONTRACT AND BID DOCUMENTS FOR THOSE ITEMS IDENTIFIED IN THE PHASE I STUDY THAT ARE AUTHORIZED FOR CONSTRUCTION BY THE CITY OF MIAMI BEACH, FOR THE AMOUNT OF SIX PERCENT OF CONSTRUCTION VALUE OF WORK ,FOR THE CITY OWNED PARKING GARAGE LOCATED ON 42ND STREET SUBJECT: ADMINISTRATION RECOMMENDATION: The Administration recommends the Mayor and City Commission declare that a valid public emergency exists and that an amendment to the existing contract with Ramp Associates and the City of Miami Beach be approved to include detailed construction drawings and all contract and bid documents for repairs and upgrades to the four-story City-owned Garage located on 42nd Street. BACKGROUND: Phase I study was performed at the request of the Parking Department in February 20, 1996. As stated in the report, this facility needs to be addressed immediately to preserve the structural integrity of the garage. Phase I condition survey report was completed for the amount of$15,000.00. ANALYSIS: The cost of services is as follows: A) Phase I - a detailed condition survey of the physical condition of the garage to include basic structure, expansion joints, control joints, lighting and electrical systems, elevators, interior and exterior painting, paint striping and markings, signage and graphics, drainage and other mechanical systems, security and man proofing. A detailed condition survey and preparation report that will present all findings and cost estimates for each category. $15,000.00 (COMPLETED) AGENDA ITEM C-1F (=-s -qL , CONTP19UED DATE Comm Memo (42nd Street Garage) June 5, 1996 Page II B) Phase II - preparation of detailed construction drawings, contract and bidding documents and technical specifications for those items identified in the Phase I study that are authorized for construction by the City of Miami Beach. Phase II cost of service will be 6% of construction value of the work. CONCLUSION: Based on the Phase I report by Ramp Associates, and the current condition of the facility, it has been determined that a valid public emergency exists, and the Administration recommends that the City Commission approve by resolution the request for an amendment to the existing contract between the City of Miami Beach and Ramp Associates for Phase II, to include the preparation of drawings and bidding documents for repairs and upgrading, for the amount of six(6) percent of construction value. JGP:JL:bb a:\tc3\garage.res AMENDMENT TO AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND RAMP ASSOCIATES, A DIVISION OF URBITRAN ASSOCIATES FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE RENOVATION OF A PARKING GARAGE LOCATED AT 17TH STREET AND LINCOLN LANE MIAMI BEACH, FLORIDA DATED MAY 27, 1996 1. The Agreement is amended on this 5th day of June, 1996 to include the Renovation of a parking Garage located at 42nd Street between Sheridan Avenue and Royal Palm Avenue, Miami Beach, Florida. 2. The following listed schedules in the Agreement shall apply to this amendment: Schedule A, paragraphs 11. 01 to 12.0 inclusive Schedule B, Entire Schedule schedule D, phase II payments only. 3. It is agreed that the fee set forth in schedule D, referenced above, be equal to six percent (6%) of the cost of the construction work, but shall not exceed the lump sum amount of One Hundred Eighteen Thousand Dollars ($118,000.00) . 4. A revised schedule C entitled SCHEDULE - TIME PERFORMANCE for the 42nd Street Garage is hereby added to this amendment. 5. All other terms and conditions of the Agreement shall apply to this amendment. IN WITNESS WHEREOF, the parties hereto have hereunto caused these presents to be signed in their names by their duly authorized officers and principals, attested by their respective witnesses and city Clerk on the day and year first hereinabove written. ATTEST: By: MAYOR RoLuO fHdPA CITY CLERK CONSULTANT: RAMP ASSOCIATES, A DIVISION OF URBITRAN ASSOCIATES -6li\~ By: President (Title) Michael s. Dimitri (Type Name of Person signing) WITNESS: C?~~~~~ (signature) rUI~li,~ {IF l , l. L' Carmela Pasqua By ~h~~ Date (~.//~/9r; (Type Name of Person signing) SCHEDULE C - TIME PERFORMANCE AMENDMENT TO AGREEMENT RENOVATION OF A PARKING GARAGE 42ND STREET BETWEEN SHERIDAN AVENUE AND ROYAL PALM AVENUE MIAMI BEACH, FLORIDA PHASE II WORK FOR BASIC SERVICES A. preliminary Design - 30% Documents 2 weeks Review and Approval by city 1 week B. Design Development - 50% Documents 2 weeks Review and Approval by city 1 week C. Construction Documents - 100% Documents 4 weeks Review and Approval by city 1 week TOTAL 8 weeks 3 weeks D. BID 5 weeks E. AWARD 2 weeks F. CONTRACT ADMINISTRATION 16 weeks '., ,. " . , . . 1 1. 2. 3. 4. Completion 5. Completion Limited to a. Revenue b. Traffic c. Impact d. 6. PHASE II SCHEDULE D SCHEDULE OF PAYMENT ~t!)E5 NOT APPLY of Lighting Package of Interior & Exterior Painting & Graphics Package 3,500 2,500 Stall Spacing & not 4,500 Garage 3,500 3,500 2,500 Department of Elevator Package of Expansion Joints Package preparation of contract and bidding documents for the above items of work authorized by the City of Miami Beach. The fee will be 6 percent (6%) of the dollar amount of the construction work payable as follows: 1. Upon submission and approval of: 10% plans reviewed & approved 60% plans reviewed & approved 90% plans reviewed & approved 100% plans reviewed & approved Bid documents issued & approved Monthly during the construction perLod in proportion to the con- tractors work progress Upon completion of construction and/or Certificate of Occupancy issued 10% - 15% - 15% - 25% 10% - 10% holdback 10% holdback 10% holdback 10% holdback 10% holdback 15% - 10% holdback -1Q! - and entire holdback TOTAL 100% (}MYfJ