Loading...
2001-24466 RESO RESOLUTION NO. 2001-24466 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING FUNDS, IN THE AMOUNT OF $21,794, FROM THE $92 MILLION GENERAL OBLIGATION BOND PROGRAM (GO), SERIES 2000, FOR TESTING SERVICES AND ADDITIONAL SERVICES PERFORMED BY THE FIRMS OF MCHARRY ASSOCIATES AND WEINGERTER LABORATORIES, INC., FOR THE RENOVATION AND REHABILITATION OF FIRE STATION NO.4. WHEREAS, on January 20, 2000, Request for Qualifications (RFQ) No. 41-99/00 was issued for Architectural and Engineering services for design and construction administration services for the Rehabilitation of the Existing Historic Fire Station No.4 and an Addition to the building (the Project); and WHEREAS, at its regular meeting on July 12,2000, the Mayor and City Commission approved a Professional Services Agreement, in the amount of$165,636, with the firm of MCHarry & Associates, Inc. (MCHarry) for the Project; and WHEREAS, the scope was increased when General Obligation Bond Program (GO) funds became available, in the amount of$I,925,525, which have already been allocated to the Project; and WHEREAS, a portion of the allocated funds, in the amount of $43,864, was budgeted for survey and testing services and $21,794 is now needed for the structural analysis and evaluation, compression tests, chlorine content tests and load tests for the Project; and WHEREAS, the Administration is now requesting appropriation of the General Obligation Bond Program funds, allocated to Fire Station No.4, in the amount of $21,794, for the testing and additional services performed by MCHarry and Weingerter Laboratories, Inc. for the Project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein appropriate funds, in the amount of $21,794, from the $92 million General Obligation Bond Program (GO), Series 2000, for testing services and additional services performed by the firms of MCHarry Associates, Inc. and Weingerter Laboratories, Inc., for the Renovation and Rehabilitation of Fire Station No.4. PASSED and ADOPTED this ~ day of June , 2001. ~} PtUtb-- APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION a-~ VIU~-~OR ,-? ATTEST: CITY CLERK F:\WORK\$ALL\CHATRAND\FIREST AT\APROPRES,WPD ~~/ ty ~ \I"'~ CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 COMMISSION MEMORANDUM NO. 371-0/ TO: Mayor Neisen O. Kasdin and Members ofthe City Commission DATE: June 6, 2001 FROM: Jorge M. Gonzalez City Manager 0~ SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING FUNDS, IN THE AMOUNT OF $21,794, FROM THE $92 MILLION GENERAL OBLIGATION BOND PROGRAM (GO), SERIES 2000, FOR TESTING SERVICES AND ADDITIONAL SERVICES PERFORMED BY THE FIRMS OF MCHARRY ASSOCIATES AND WEINGERTER LABORATORIES, INC., FOR THE RENOVATION AND REHABILITATION OF FIRE STATION NO.4. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNDING: Funding is available from the $1,925,525 allocated in the $92 million General Obligation Bond Program (GO), Series 2000. Funds will be placed in Fund 375, Work Order 2286, Standing Order 15473, for Fire Station No.4. ANALYSIS: On January 20, 2000, Request for Qualifications (RFQ) No. 41-99/00 was issued for for Architectural and Engineering services for design and construction administration services for the rehabilitation of the existing historic Fire Station No.4 and an addition to the building (the Project). On May 24, 2000, the City Commission authorized the Administration to negotiate an agreement with the first ranked firm ofMCHarry & Associates, Inc. The Administration requested approval from the City Commission on July 12,2000, for a Professional Services Agreement, in the amount of$165,636, with the firm ofMC Harry & Associates, Inc. for design and construction administration services, for the rehabilitation of the existing Fire Station No.4 and an addition to the building to house dormitories and the fire apparatus. The Mayor and City Commission adopted the resolution approving the Professional Services Agreement, in the amount of $165,636, with the firm of MCHarry & Associates, Inc. for design and DATE C7T 6-6--0/ AGENDA ITEM Commission Memorandum June 6, 2001 Fire Station No.4, Construction Appropriation Page 2 construction administration services, for the rehabilitation of the existing Fire Station No.4 and an addition to the building to house dormitories and the fire apparatus. The scope of the project Was increased when GO funds became available, in the amount of$I,925,525, which have already been allocated for the Rehabilitation and Expansion of Fire Station No.4. The additional services for MCHarry are required due to the recent structural evaluation report and the testing performed at the existing building. The City has also tested, with Weingerter Laboratories, Inc., for concrete compression strength, for concrete chlorine content and has performed a load test in accordance with the South Florida Building Code. An engineering report and calculations were prepared by the firm of Bliss & Nyitray (B&N) for MCHarry which have shown that the existing building has structural deficiencies which must be addressed. B&N also participated in the load testing process and provided recommendations on the results obtained. The Administration is now requesting appropriation of General Obligation Bond Program funds, in the amount of$21, 794, for additional services for the firms ofMCHarry & Associates, Inc. and Weingerter Laboratories, Inc., for design and construction administration services and testing for the rehabilitation ofthe historic building and an addition to Fire Station No.4. I-lPP. JMGIMDB/RCMlJECh F:\WORK\$ALL\CHATRAND\FIRE$T AnAPROPMEM,WPD Attachments A . AMENDMENT NO.1 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN CITY OF MIAMI BEACH, FLORIDA AND MC HARRY ASSOCIATES INC., IN THE AMOUNT OF $21,794, FOR TESTING SERVICES AND ADDITIONAL SERVICES PERFORMED BY THE FIRMS OF MC HARRY ASSOCIATES AND WEINGERTER LABORATORIES, INC., FOR THE RENOV A nON AND REHABILITATION OF FIRE STATION NO.4. This Amendment No.1, dated as of June 6, 2001, to that certain Agreement (the "Agreement"), dated July 12,2000, by and between the CITY OF MIAMI BEACH, FLORIDA (City), and MC HARRY ASSOCIATES, INC. (Consultant). WHEREAS, on January 20, 2000, Request for Qualification (RFQ) No. 41-99/00, was issued for Architectural and Engineering services for design and construction administration for the rehabilitation of the existing building and an addition to Fire Station No.4; and WHEREAS, on May 24, 2000, the Mayor and City Commission accepted the City Manager's recommendation, and authorized the Administration to negotiate an Agreement with the first-ranked firm ofMC Harry Associates, Inc.; and WHEREAS, on July 12,2000, the Mayor and City Commission approved a Professional Services Agreement, in the amount of $160,636, plus a not to exceed amount of $5,000, for reimbursable expenses, with the firm of MC Harry Associates, Inc., for design and construction administration services, for the rehabilitation of the existing Fire Station No.4 and an addition to the building to house dormitories and fire apparatus; and WHEREAS, on July 12,2000, the Administration requested the appropriation of$165,636, from the $92 Million General Obligation Bond Program, for the Agreement with MC Harry Associates, Inc., and WHEREAS, on June 6, 2001, the Administration requested the appropriation of $21,794, from the $92 Million General Obligation Bond Program, for testing services and Additional Services performed by the firms ofMC Harry Associates, Inc., and Weingerter Laboratories, Inc., for the renovation and rehabilitation of Fire Station No.4; and WHEREAS, the appropriated amount of $21,794, is comprised of $13,774 to cover the fees for Additional Design Services for MC Harry Associates, Inc., and $8,020 to cover testing services; and WHEREAS, the City wishes to amend the Agreement with Consultant, and increase the contract by $21,794 available from the 1999, $92 Million General Obligation (G.O.) Bond to cover testing services and additional architectural and engineering fee for the Project. NOW, THEREFORE, the City and Consultant agree to amend the Agreement as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.1. 2. MODIFICATIONS The Agreement is amended to include the Additional Services, as described in Exhibit "A" entitled "Scope of Services/Compensation for Additional Services", attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No.1 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.1 to be executed in their names by their duly authorized officials as of the date first set forth above. CITY OF MIAMI BEACH By MAYOR ATTEST: ~~r~ CITY CLERK AFPROVEDM1O FORM&LANGUAGI & FOR EXECUTION ~ {oli%l CUr ~.fc'V .. CONSULTANT MC HARRY ASSOCIATES, INC. ~::: ~ ~ P SIDENT WITNESS: ~~ SEAL '/1'1 tal4-El.. Co. )JOL-I- ~ f'I?4I.Ak;H IT']>e:T Print Name and Title ' F:\WQRK\$ALL\DIXC\PARKPROJECTS\FlRE STATON #4\AMENDMNT.McHARRY.doc , Exhibit "An To Amendment No.1 Scope of Services/Compensation for Additional Services Scope of Services: The Scope of the Consultant's services shall include but are not limited to the following: . Structural Investigation: Based on concrete core test results taken on the existing Fire Station. Consultant shall provide a structural evaluation of the original Fire Station facility, leading to a recommendation for structural remediation measures. Lump Sum Fee: $4,531 . Load Test Oversight: Consultant shall provide a structural engineer to observe the load test performed by the City, through its consultant, and shall provide written reports of observations and findings. Lump Sum Fee: $5,403 . To study Alternate Site Schemes: Consultant shall provide architectural planning services to study alternative site ~chemes as directed by the City; attend workshops; and provide the graphics for approximately three (3) alternative site development schemes; provide conceptual cost estimate for each. Lump Sum Fee: $3,840 . Testing Services. Fee: $8,020 Compensation: Original Contract amount $165.636 Amendment No.1 (for the above-described services) $21.794. Revised Contract amount $187.430.