Loading...
2008-26963 ResoRESOLUTION NO. 2008-26963 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND THE CITY CLERK TO EXECUTE AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE CITY AND THE IBI GROUP, INC., DATED APRIL 2, 2007, PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 19-04105 FOR DESIGN, ENGINEERING, PERMITTING, AND CONSTRUCTION ADMINISTRATION SERVICES FOR THE DADE BOULEVARD BIKE PATH PROJECT, IN AN AMOUNT NOT TO EXCEED $94,321; SAID AMENDMENT FOR THE PROVISION OF ADDITIONAL DESIGN, PERMITTING, AND CONSTRUCTION FOR THE ADOPTION OF NECESSARY MODIFICATIONS TO THE DESIGN PLANS OF THE NORTHERN BANK OF COLLINS CANAL FROM THE VENETIAN CAUSEWAY TO 23r° STREET; WITH FUNDING FROM PREVIOUSLY APPROPRIATED CITY CENTER REDEVELOPMENT AGENCY (RDA) FUNDS. WHEREAS, on December 6, 2006 the Mayor and City Commission adopted Resolution No. 2006-26399 approving a professional services agreement with The IBI Group pursuant to RFQ 19-04105, for the Programming, Design, Construction Documents, Permitting, Bid and Award and Construction Management Services for the Bicycle/Pedestrian/Greenway Projects to be known as the AGN (the Agreement); and WHEREAS, the scope of services addresses two main items: item one includes an assessment of the existing Draft Bicycle Master Plan for functionality, mobility, and safety; item two consists of the design and engineering of the Dade Boulevard Bike Path and the development of its construction documents; and WHEREAS, the width of the Dade Boulevard corridor is constricted on the south by the Collins Canal and the existing cross section identifies some width limitations which warrant the stabilization of the Collins Canal embankment, since they cannot provide adequate soil support to the proposed bike path to ensure the safety of its users; and WHEREAS, as such, an embankment stabilization and subsequent restoration project are an integral component of the Dade Boulevard Bike Path project, since it provides the foundation necessary to ensure the structural integrity of the bike path; and WHEREAS, the development and survey of the proposed Dade Boulevard Bike Path has identified the need to continue the currently proposed design for the Collins Canal seawall between Allon Road and Meridian Avenue; and WHEREAS, the total cost to modify the Collins Canal Seawall plans, including construction administration services, is $94,321. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute Amendment No. 1 to the agreement between the City and The IBI Group, Inc., dated April 2, 2007, pursuant to Request For Qualifications No. 19-04105 for design, engineering, permitting, and construction administration services for the Dade Boulevard Bike Path Project, in an amount not to exceed $94,321; said amendment for the provision of additional design, permitting, and construction for the adoption of necessary modrfications to the design pans of the northern bank of Collins Canal from the Venetian Causeway to 23`0 Street; with funding from previously appropriated City Center Redevelopment Agency (RDA) Funds. PASSED and ADOPTED this l Ott,day of December , 2008. ATTEST: r: Robert Parcher Matti He era ower CITY CLERK MAYOR T~`.AGENDA'•20081December 10'~~Consent'•,Dada Blvtl Amendment No 1 - Reso_cl.doc APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION ^{ tl `f y omey,~.~ ~ to ' l''~~J