Exhibit D Amendment 1 to PSA w/ IBI GroupExhibit D C 7 y ~ _, ~,2~~0/D$~
AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY
I BE LORIDA (CITY) AND THE IBI GROUP (CONSULTANT), DATED APRIL
2, 2007, FOR THE PROGRAMMING, DESIGN, CONSTRUCTION DOCUMENTS,
PERMITTINGE/PEDESTR AN GREENWAYY PROJECTSO O BE K OWN AS THE ATLANTOIC~
THE BICYCL
GREENWAY NETWORK.
THIS AMENDMENT N0.1 TO THE AGREEMENT, dated April 2, 2007, and by an
between the CITY OF MIAMI BEACH, a Florida municipal corporation, having its principal offic
at 1700 Convention Center Drive, Miami Beach, Florida, (City), and THE IBI GROUP, INC.,
Florida Corporation, with offic s at 100 S„gy.~th Olive Avenue, West Palm Beach, Florida,
(Consultant), is entered this ?~ay of ~~,~u 0~9
WITNESSETH:
WHEREAS, on December 6, 2006, the Mayor and City Commission adopted Resolution
No. 2006-26399, approving a Professional Services Agreement with The IBI Group in the
amount of $ 94,321, pursuant to, Request For Qualifications (RFQ) No. 19-04/05, for the
Programming, Design, Construction Documents, Permitting, Bid and Award and Construction
Management Services for the Bicycle/Pedestrian/Greenway Projects to be known as the Atlantic
Greenway Network (AGN) (the Agreement);
WHEREAS, the scope of services in the Agreement addresses two main items: 1.) an
assessment of the existing D~ aftof'thel Dade tBo uevardrBike tPath I and thel'development of is
2.) the design and enginee g
construction documents; and
WHEREAS, the width of the Dade Blvd corridor is constricted on the south by the Collins
Canal and the existing cross section identifies some width limitations which warrant the
stabilization of the Collins Canal embankment; and
WHEREAS, as such, an embankment stabilization and subsequent restoration _--~
project are an integral component of the Dade Boulevard Bike Path, since it provides t
foundation necessary to ensure the structural integrity of the bike path; and
WHEREAS, the Collins Canal seawall plans require a modification so that the seawall
will be designed to structurally support the bike path; and
WHEREAS, accordingly the Administration would recommend. that the Agreement be
amended to provide for the aforstated professional services, in and not to exceed amount
$94, 321. ,.
NOW THEREFORE, the parties hereto, and in consideration of the mutual promises,
covenants, agreements, terms, and conditions herein contained, and other good and valuable
consideration, the respect and adequacy are hereby acknowledged, do agree as follows:
ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this
Amendment No. 1.
2. MODIFICATIONS
Schedule "A" of the Agreement, entitled "Scope of Services", is amended to incorporate
Attachment 1, attached and incorporated hereto.
3. RATIFICATION
The City and Consultant ratify the terms of the Agreement, as amended by this
Amendment No. 1.
IN WITNESS WHEREOF. the parties hereto have caused this Amendment No. 1 to be
executed in their names by their duly authorized officials as of the date first set forth above.
ATTEST:
CITY OF MIAMI BEACH, FLORIDA
~,u.,a v~
Robert Parcher
CITY CLERK
ATTEST:
Secretary /Signature
Print Name
Matti Herre a
MAYOR
THE IBI GROUP, INC.
~~ - _ ...
resident I Signature
~,..
~~
Print Name
1~:11<iI~NDA_'i?081Dcc~a~nber 10`,Convcnt+iJadc 131~d.4nrendmem NG~ 1 -rlmendmcnt.dvc
l
APPROVED AS TO
FORM LANGUAGE
& P ~~XEOUTION
y oma Ir.,, ate
~'
'~