AMENDMENT N0.3
TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN
THE CITY OF MIAMI BEACH, FLORIDA
AND
STA ARCHITECTURAL GROUP,
DATED MAY 10, 2006
FOR THE PROVISION OF ADDITIONAL PROFESSIONAL SERVICES IN AN
AMOUNT NOT-TO-EXCEED 623,682.50, FOR THE 10T" STREET AUDITORIUM /
BEACH PATROL HEADQUARTERS PROJECT.
This Ame ment No. 3 to the Agreement made and entered this ~v~ day of
L' , 2009, by and between the CITY OF MIAMI BEACH, a Municipal
Corporation existing under the laws of the State of Florida (hereinafter r~efen'ed to as CITI~,
having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139,
and STA ARCHITECTURAL GROUP, INC., a Florida corporation, having its offices at 3526
North Miami Avenue, Miami Florida, 33127 (hereinafter referred to as Consultant).
REC._
WHEREAS, pursuant to Request for Qualifications (RFQ) No. 41-99/00, the Mayor
and City Commission adopted Resolution No. 2006-26194 on May 10, 2006, approving
and authorizing the Mayor and City Clerk to execute an Agreement with the Consultant for
Professional Architecture and Engineering Services for the 10~' Street Auditorium /Beach
Patrol Headquarters Project (the Agreement); and
WHEREAS, the Agreement provides for the detailed planning, design, permitting,
bidding /award and cons#ruction administration services for the Project; and
WHEREAS, the Agreement was executed #or anot-to-exceed amount of $775,925;
and
WHEREAS, on November 20, 2008, the City approved Amendment No. 1 to the
Agreement, in the amount of $23,800, for the provision of a threshold inspector #o conduct
structural inspections, and augercast pile testing observations; and
WHEREAS, on December 17, 2008, the City approved Amendment No. 2 to the
Agreement, in the amount of $23,692.50, for design revisions associated with the
expansion of the Ocean Drive sidewalk, Information Technology (tT) requirements and
Value Engineering (VE) recommendations provided by the Construction Management at
Risk Firm; and
WHEREAS, the following Amendment No. 3 is for design revisions associated with
Structural and Civil design revisions as a result of unforeseen conditions, DEP permit
applica#ion fee reimbursement, and additional reimbursables allowance; and
WHEREAS, the aforestated work, as set forth in the following Amendment No. 3, is
for a not to exceed amount of $23,445.00.
NOW. THEREFORE, the parties hereto, and in consideration of the mutual
promises, covenants, agreements, terms, and conditions herein contained, and other
good and valuable consideration, the respect and adequacy are hereby acknowledged,
do agree as follows:
1. ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this
Amendment No. 3.
2. MODIFICATIONS
The Agreement is amended to include and incorporate the additional work, as set
forth in Schedule "A-3", attached hereto.
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged.
4. RATIFICATION.
The City and Consultant ratify the temps of the Agreemen#, as amended by this
Amendment No. 3.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 3, to
be executed in their names by their duly authorized officials as of the date first set forth
above.
ATTEST:
,'
City Clerk
Robert Percher
CITY OF MIAMI BEACH
L~~~--"'
By
Fred H. Beckmann, Interim Director
Capital Improvement Projects Office
ATTEST:
Signature
pia Qr~, ~ini~ ~ poi'
Print Name /Title
CONSULTANT:
STA ARCHITECTURA,L~ t3ROUP, INC.
Q~~ PR VED AS TO
Print Name Title GB
8~ F CUTION
3Za
' ~ ey
SCHEDULE A-3
1. SCOPE OF SERVICES
Schedule "A" entitled, Scope of Services", is amended as follows:
ADD the following under Task 6 -ADDITIONAL SERVICES
The CONSULTANT shall furnish additional services associated with the 10~' Street
Auditorium /Beach Patrol Headquarters Project (Project) as noted below.
Task 6.4.1-Structural Design Revisions
The CONSULTANT shall revise the Structural drawings as required to incorporate the
following:
1. Design of new concrete stab at ground level, connection details to existing pile
caps and grade beams.
2. Redesign of structural mat slab and footing, due to underground utility conflict.
3. Design of round windows reinforcement detail due to unforeseen condition.
The City negotiated an additional service fee of $3,370 for this additional work.
Task 6.4.2 -Underground Utility Conflict
The CONSULTANT shall revise the architectural, civil and landscape drawings as
required to reroute the existing lines in conflict with new design.
The City negotiated an additional service fee of $4,525 for this additional work.
Task 6.4.3 -Electrical Design for Lummus Park
The CONSULTANT shalt revise the electrical drawings to inGude new equipment for
Lummus Park lights.
The City negotiated an additional service fee of $3,750 for this additional work.
Task 6.4.4 -DEP Permit Application Fees
The total amount paid to DEP on April O6, 2007 and May 16, 2008 was $4,300.
Task 6.4.5 -Additional Reproduction Services and Travel & Subsistence
Reimbursables
The City negotiated an additional service fee of $7,500 for the remainder of the
Project. Unused amounts in this allowance shall be credited back to the City at the
completion of the Project.
2. TIME OF COMPLETION
The additional services contemplated by this Amendment No. 3 are anticipated to
be completed by September 2009.
3. PAYMENT AND COMPENSATION
The total fee proposed for the scope of work pursuant to this Amendment No. 3
shall be on anot-to-exceed basis, in the amount of $23,445.
Comaensa~ion:
• Original Agreement amount $775,925.
• Amendment No. 1 (Pile testing observation and review and threshold inspections)
amount 23 800.
• Amendment No. 2 (Design revisions) amount;23,692.50.
• Amendment No.3 (Design Revisions, DEP application fees reimbursement and
additional allowance #or reimbursables) amount $23,445.00
• Revised Agreement amount total X846.862.50,.
F:ICAPII$alnVlET1S-10AUDBPHQ~03-Contractual Docs1STA - AmendmentslS-10AUDBPHQ-03b-
Amendment No 3.doc
February 19, 2009
Title: Amendment #3
Date: January 20, 2009
ADDITIONAL , ORK AUTHORIZATIONS
10th Street Auditanum, Miami Beach
Scope of Services
New Slab"De ' t~ Gift Sho .$~ FQ. ;er
Proiec#ed Fee
Structural Design Hours
Design of new concrete slab at round level.
Connection details to ebsti PC 8 GB.
a ations as per code
Prinapal 1.0 $ 175 $175.00
ArchitectlEngineer 9.0 $ 100 $900.00
Technical staff 7.0 $ 85 $595.00
tote! Amounts-for New 51ab Des'lgn, 17.0
i~eliSotrttt;; Equ~~nent-Pad; Foundation
Structural review, Calculations. and DraRing Hou F
Design of footing in lieu of helical piles originally desgned
in order to eliminate UG util' conflict (Per RFI #033)
sign to stnrc~ura mat slab per >bon ou
on 10Vi6JOt3
Principal 1.0 $ 175 $175.00
Archilsct/Engineer 3.0 $ 100 $300.00
Technical staff 6.0 $ 85 $5.10.00
Total Amounts for BeltSouRM Equipment .:: ;; i0:0
BP Window Reinforcement
Structural review Calculations. and Drafting Hou Ra F
ign o rou vm ows rein roemen e i ue
unforeseen condition.
Prinrtipal 1.0 $ 175 $175.00
Architec~/Engineer 2.0 $ 100 SZ00.00
Technical staff 4.0 $ 85 $3/0.00
Togl Amounts for BR Window ReinforcemQnt 7.0 `
Page 1
Under rountl.litli Conflict
1
Field Verification Hours Ra Fe
Site visit of AIE to verify existi condition and equi nt
Ardtitact & Civil (CSI) -.10!24/08 site visit re: water/sewer
lines
6
rch-tect Landscape ( enn onato) -10/ 1 8 site
visit re: irrigation lines
6
0
Principal 3.0 $ 175 S5Zb.00
ArchitecUEngineer 9.0 $ 100 $800.00
Technical staff 0.0E 85 $0.00
12.0 51.425.00
E
Preparation of plans and specification
Drafting of proposed U/G rerouting weber, sewer, fire lines
that are in conflict with new design, including proposed
new meter and valves des' n. to
Drafting of proposed U/G rerouting irrigation lines that are
in conflict with new design. Review of proposed design
and providing new connections with Lummus Park syste
(eliminating unnecessary irrigation equipment). 10
ota
Principal i.o ~ '175 i77s.oo
ArchitecUEngineer 14.0 $ 100 ;1,400.00
Technical staff 5.0 S 85 $425.00
20.0 52.000.00
3
A!E Coordination
Coordination bJw architect (STA), Civil engineer (CSI),
Landscape (S&M) and Public Works Dept & Parks
8
ota
rnrrcipai a.u ~ i is ;7UU,UU
ArdtibectlEngineer 4.0 $ 100 E400.00
Technical staff 0.0 $ 85 $0.00
8.0 $1,700.00
Total Amounts for U/(~ ~~ity Gpn}~ict ~ 40A 5 ` ~~ ~,
Electrical'Detsii~n~fDr Lummu park:`>
Ho t2a F
Field Verification -Site visit of A/E to verify existing
condition and equipment 6. $125.00 $750.
Preparation of plans and spedfication -Research and
drafti of new equipment 16. $125.00 $2,000.
matron - oordination A, amm, ,
Parks. 8. $125.00 $1,000.
1
9
3
r otar wnoun~ rot uec~ oast n urmmus rant su.u
;r
DEPPermit.Applicati~nr> Fees
oaid.bv S7A on: beh~tf'of CMB.
1 Initial Pa rrt m Florida DF~ - Apr_ 6.2007
2 Ad itional Payment -May 6, 2008
Fee
$4,000.00
5300.00
:~~~!
Page 2
Extend Retprodu~Qn Sgrvtces = _
end Sraa~e{ _°~ Subsistence R~imbuisabfes
ices Cost for 2f3 of project =
pest is for an additional 113
Items 7.1 and 7.2 of Contract)
Total Amount for; Eifi
Fee
s~.soo.oo
~Granti Total fog Ar~nenc~m~nt #3 523,s:o
Authorization /Approval Date
STA Architectural Group
Page 3