HomeMy WebLinkAboutAmendment No. 3 to PSA w/ STA Architectural GroupC 7 C~ , -~~ o~~ AMENDMENT N0.3 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND STA ARCHITECTURAL GROUP, DATED MAY 10, 2006 FOR THE PROVISION OF ADDITIONAL PROFESSIONAL SERVICES IN AN AMOUNT NOT-TO-EXCEED 623,682.50, FOR THE 10T" STREET AUDITORIUM / BEACH PATROL HEADQUARTERS PROJECT. This Ame ment No. 3 to the Agreement made and entered this ~v~ day of L' , 2009, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter r~efen'ed to as CITI~, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and STA ARCHITECTURAL GROUP, INC., a Florida corporation, having its offices at 3526 North Miami Avenue, Miami Florida, 33127 (hereinafter referred to as Consultant). REC._ WHEREAS, pursuant to Request for Qualifications (RFQ) No. 41-99/00, the Mayor and City Commission adopted Resolution No. 2006-26194 on May 10, 2006, approving and authorizing the Mayor and City Clerk to execute an Agreement with the Consultant for Professional Architecture and Engineering Services for the 10~' Street Auditorium /Beach Patrol Headquarters Project (the Agreement); and WHEREAS, the Agreement provides for the detailed planning, design, permitting, bidding /award and cons#ruction administration services for the Project; and WHEREAS, the Agreement was executed #or anot-to-exceed amount of $775,925; and WHEREAS, on November 20, 2008, the City approved Amendment No. 1 to the Agreement, in the amount of $23,800, for the provision of a threshold inspector #o conduct structural inspections, and augercast pile testing observations; and WHEREAS, on December 17, 2008, the City approved Amendment No. 2 to the Agreement, in the amount of $23,692.50, for design revisions associated with the expansion of the Ocean Drive sidewalk, Information Technology (tT) requirements and Value Engineering (VE) recommendations provided by the Construction Management at Risk Firm; and WHEREAS, the following Amendment No. 3 is for design revisions associated with Structural and Civil design revisions as a result of unforeseen conditions, DEP permit applica#ion fee reimbursement, and additional reimbursables allowance; and WHEREAS, the aforestated work, as set forth in the following Amendment No. 3, is for a not to exceed amount of $23,445.00. NOW. THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 3. 2. MODIFICATIONS The Agreement is amended to include and incorporate the additional work, as set forth in Schedule "A-3", attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the temps of the Agreemen#, as amended by this Amendment No. 3. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 3, to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: ,' City Clerk Robert Percher CITY OF MIAMI BEACH L~~~--"' By Fred H. Beckmann, Interim Director Capital Improvement Projects Office ATTEST: Signature pia Qr~, ~ini~ ~ poi' Print Name /Title CONSULTANT: STA ARCHITECTURA,L~ t3ROUP, INC. Q~~ PR VED AS TO Print Name Title GB 8~ F CUTION 3Za ' ~ ey SCHEDULE A-3 1. SCOPE OF SERVICES Schedule "A" entitled, Scope of Services", is amended as follows: ADD the following under Task 6 -ADDITIONAL SERVICES The CONSULTANT shall furnish additional services associated with the 10~' Street Auditorium /Beach Patrol Headquarters Project (Project) as noted below. Task 6.4.1-Structural Design Revisions The CONSULTANT shall revise the Structural drawings as required to incorporate the following: 1. Design of new concrete stab at ground level, connection details to existing pile caps and grade beams. 2. Redesign of structural mat slab and footing, due to underground utility conflict. 3. Design of round windows reinforcement detail due to unforeseen condition. The City negotiated an additional service fee of $3,370 for this additional work. Task 6.4.2 -Underground Utility Conflict The CONSULTANT shall revise the architectural, civil and landscape drawings as required to reroute the existing lines in conflict with new design. The City negotiated an additional service fee of $4,525 for this additional work. Task 6.4.3 -Electrical Design for Lummus Park The CONSULTANT shalt revise the electrical drawings to inGude new equipment for Lummus Park lights. The City negotiated an additional service fee of $3,750 for this additional work. Task 6.4.4 -DEP Permit Application Fees The total amount paid to DEP on April O6, 2007 and May 16, 2008 was $4,300. Task 6.4.5 -Additional Reproduction Services and Travel & Subsistence Reimbursables The City negotiated an additional service fee of $7,500 for the remainder of the Project. Unused amounts in this allowance shall be credited back to the City at the completion of the Project. 2. TIME OF COMPLETION The additional services contemplated by this Amendment No. 3 are anticipated to be completed by September 2009. 3. PAYMENT AND COMPENSATION The total fee proposed for the scope of work pursuant to this Amendment No. 3 shall be on anot-to-exceed basis, in the amount of $23,445. Comaensa~ion: • Original Agreement amount $775,925. • Amendment No. 1 (Pile testing observation and review and threshold inspections) amount 23 800. • Amendment No. 2 (Design revisions) amount;23,692.50. • Amendment No.3 (Design Revisions, DEP application fees reimbursement and additional allowance #or reimbursables) amount $23,445.00 • Revised Agreement amount total X846.862.50,. F:ICAPII$alnVlET1S-10AUDBPHQ~03-Contractual Docs1STA - AmendmentslS-10AUDBPHQ-03b- Amendment No 3.doc February 19, 2009 Title: Amendment #3 Date: January 20, 2009 ADDITIONAL , ORK AUTHORIZATIONS 10th Street Auditanum, Miami Beach Scope of Services New Slab"De ' t~ Gift Sho .$~ FQ. ;er Proiec#ed Fee Structural Design Hours Design of new concrete slab at round level. Connection details to ebsti PC 8 GB. a ations as per code Prinapal 1.0 $ 175 $175.00 ArchitectlEngineer 9.0 $ 100 $900.00 Technical staff 7.0 $ 85 $595.00 tote! Amounts-for New 51ab Des'lgn, 17.0 i~eliSotrttt;; Equ~~nent-Pad; Foundation Structural review, Calculations. and DraRing Hou F Design of footing in lieu of helical piles originally desgned in order to eliminate UG util' conflict (Per RFI #033) sign to stnrc~ura mat slab per >bon ou on 10Vi6JOt3 Principal 1.0 $ 175 $175.00 Archilsct/Engineer 3.0 $ 100 $300.00 Technical staff 6.0 $ 85 $5.10.00 Total Amounts for BeltSouRM Equipment .:: ;; i0:0 BP Window Reinforcement Structural review Calculations. and Drafting Hou Ra F ign o rou vm ows rein roemen e i ue unforeseen condition. Prinrtipal 1.0 $ 175 $175.00 Architec~/Engineer 2.0 $ 100 SZ00.00 Technical staff 4.0 $ 85 $3/0.00 Togl Amounts for BR Window ReinforcemQnt 7.0 ` Page 1 Under rountl.litli Conflict 1 Field Verification Hours Ra Fe Site visit of AIE to verify existi condition and equi nt Ardtitact & Civil (CSI) -.10!24/08 site visit re: water/sewer lines 6 rch-tect Landscape ( enn onato) -10/ 1 8 site visit re: irrigation lines 6 0 Principal 3.0 $ 175 S5Zb.00 ArchitecUEngineer 9.0 $ 100 $800.00 Technical staff 0.0E 85 $0.00 12.0 51.425.00 E Preparation of plans and specification Drafting of proposed U/G rerouting weber, sewer, fire lines that are in conflict with new design, including proposed new meter and valves des' n. to Drafting of proposed U/G rerouting irrigation lines that are in conflict with new design. Review of proposed design and providing new connections with Lummus Park syste (eliminating unnecessary irrigation equipment). 10 ota Principal i.o ~ '175 i77s.oo ArchitecUEngineer 14.0 $ 100 ;1,400.00 Technical staff 5.0 S 85 $425.00 20.0 52.000.00 3 A!E Coordination Coordination bJw architect (STA), Civil engineer (CSI), Landscape (S&M) and Public Works Dept & Parks 8 ota rnrrcipai a.u ~ i is ;7UU,UU ArdtibectlEngineer 4.0 $ 100 E400.00 Technical staff 0.0 $ 85 $0.00 8.0 $1,700.00 Total Amounts for U/(~ ~~ity Gpn}~ict ~ 40A 5 ` ~~ ~, Electrical'Detsii~n~fDr Lummu park:`> Ho t2a F Field Verification -Site visit of A/E to verify existing condition and equipment 6. $125.00 $750. Preparation of plans and spedfication -Research and drafti of new equipment 16. $125.00 $2,000. matron - oordination A, amm, , Parks. 8. $125.00 $1,000. 1 9 3 r otar wnoun~ rot uec~ oast n urmmus rant su.u ;r DEPPermit.Applicati~nr> Fees oaid.bv S7A on: beh~tf'of CMB. 1 Initial Pa rrt m Florida DF~ - Apr_ 6.2007 2 Ad itional Payment -May 6, 2008 Fee $4,000.00 5300.00 :~~~! Page 2 Extend Retprodu~Qn Sgrvtces = _ end Sraa~e{ _°~ Subsistence R~imbuisabfes ices Cost for 2f3 of project = pest is for an additional 113 Items 7.1 and 7.2 of Contract) Total Amount for; Eifi Fee s~.soo.oo ~Granti Total fog Ar~nenc~m~nt #3 523,s:o Authorization /Approval Date STA Architectural Group Page 3