Loading...
LTC 088-2009 Update on Public Baywalk Along West Avenue~-- ~ ~-- [i~~9 AI~~ - I 9~ 5 ( - m MIAMI BEACH ~~r ~~~ ~.>>:®~ rF ~F: OFFICE OF THE CITY MANAGER NO. LTC # oas-ZOOS LETTER TO COMMISSION TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Jorge M. Gonzalez, City Manager DATE: March 30, 2009 SuB.JECT: Update on Public Baywalk Along West Avenue The purpose of this LTC is to update the Mayor and City Commission on the status of public bay walks at the rear of the properties along West Avenue. from 5th Street to Lincoln Road. 1. 520 - 540 West Avenue: Bentley Bav Condominium (DRB File 9802) A baywalk has been constructed upland and is accessible, but it is not connected to the Floridian property to the north due to existing wall. According to building permit plans on file, this baywalk is publicly accessible. Discussions with project representatives are ongoing to provide the connection and confirm public accessibility. 2. 650 West Avenue: Floridian Condominium (DRB File 5517) A bay walk has been constructed upland and is accessible, but it is not connected to the neighboring properties. According to the plans approved by the County's Shoreline Development Review Committee, this baywalk is publicly accessible. Regarding the connection to the south, such SDRC plans show an anticipated connection to the south, but see discussion about wall above. To the north, no baywalk presently exists. 3. 800 West Avenue: South Bay Club Condominium No development order on this property was ever imposed as it pre-dates the creation of the design review process, and no bay walk exists. Staff has evaluated the feasibility of a baywalk in this location and it appears that an overwater, as opposed to upland, connection would be the most feasible option at some point in the future. 4. 900 West Avenue: Southgate Towers Apartments (Rentals) No development order on this property was ever imposed as it pre-dates the creation of the design review process, and no bay walk exists. Owners have begun discussions with the Planning Department regarding an upland public baywalk connection through their property, as part of a larger renovation project. However, there is no timetable for such renovation project. 5. Western Terminus of Tenth Street Construction documentation for a proposed new streetscape, seawall and landscape project, with public bay walk access, has been completed and is waiting additional funding. Such funding was part of the design review approval provided as part of the Mondrian Hotel project (in the event their overwater baywalk was not approved by the State, and an upland baywalk were not approved by the adjoining condominium properties). This funding is presently also being challenged by the Mondrian Hotel on appeal to the City Commission (expected to be heard at the April City Commission meeting). LTC -Update on Public Baywalk Along West Avenue Date: March 20, 2009 Page: 2 of 3 6. 1000-1200 West Ave: Mondrian Hotel/Mirador Condos Pursuant to the Final Order for DRB File 20181, an overwater public bay walk has been designed and is part of the permit plans for the Mondrian Hotel project. The proposed overwater baywalk is currently going through the County & State permit review process, which is exceedingly complicated, and subject to strict state legislative standards for approval, and there is no indication that it will receive approval for construction. Alternatively, an upland baywalk east of the seawall is provided for in the DRB Final Order, yet this is subject to the approval of the immediately abutting condominium associations to the north and south of the Mondrian Hotel. 7. 1228 West Avenue: Bav View Terrace (Condo) As part of a recent Conditional Use approval by the Planning Board for the reconstruction of a pier and dock lost during a hurricane, the Condominium Association agreed to design their replacement pier and dock so that it can accommodate an overwater baywalk connection behind its property. No arrangements were made for private funding of this connection. 8. 1250 West Avenue: Bav Garden Manor (Condo) No development order on this property was ever imposed as it pre-dates the creation of the design review process, and no bay walk exists. Staff has evaluated the feasibility of a baywalk at this location and it appears that an overwater, as opposed to upland, connection would be the most feasible option. There is no timetable for this to be part of any future project. 9. Monad Terrace: Single Family Homes No development order on this property was ever imposed as it pre-dates the creation of the design review process, and no bay walk exists. While these properties are single family homes, the properties are zoned for multi-family residential. Any future aggregation of the bayfront lots for a larger new development along the water would present an opportunity for an upland public baywalk that could connect directly to the property to the immediate north (Waverly). Staff has evaluated the feasibility of a baywalk at this location absent the aggregation of the bayfront lots and it appears that an overwater, as opposed to upland, connection would be the most feasible option, with cooperation by the homeowners. 10. 1330 West Avenue: Waverly (DRB File 9024) An upland public bay walk has been constructed, pursuant to Design Review Board and County Shoreline Development Review Committee Orders. Litigation with the condominium association regarding public access has concluded in favor of the City, and the association has completed repairs to the seawall. The baywalk is now open to the public. 11. Western Terminus of Fourteenth (14th) Street Public Park and accessible public bay walk are completed and open. 12. 1500 Bav Road: Flamingo (DRB File 9191) The Grand Flamingo project was approved by the Design Review Board (DRB) on November 4, 1997. Since the original approval, the subject project has become legal non- conforming in terms of overall height, FAR, parking, and with regard to the parking pedestal design. Condition 9 of the Final Order for the project states the following: LTC -Update on Public Baywalk Along West Avenue Date: March 20, 2009 Page: 3 of 3 A baywalk extension, from the south side of the property north into the future park area, shall be required. Although the bay walk was constructed, with direct access from the 14th Street Park, the above noted condition has not been complied with as a fence has been constructed along the north and south property lines prohibiting public access to the bay walk, as required by the DRB Final Order. The owners of the Flamingo have sued the City on issues involving public baywalk access and the case is pending in Federal Court. The City has retained outside counsel and is actively defending the case. 13. 1445 16th Street & 1491 Lincoln Terrace: Mae Capri Condominium (DRB File 17716) Pursuant to the Final Design Review Board Order, an upland public bay walk has been completed and is open to the public. The public bay walk is operating independent of any north or south connections. 14. 1450 Lincoln Road: Lincoln Bay Towers Condominium No development order on this property was ever imposed as it pre-dates the creation of the design review process, and no bay walk exists. The existing rear pool deck extends over the seawall and projects into the bay. Consequently the only method of connection from the western street-end of Lincoln Road to the north side of the Mae Capri baywalk is to construct an overwater connection. The Public Works Department is working with an environmental consultant to determine the feasibility of and preliminarily design this option. 15. Lincoln Road Street End Permitting is complete and construction of street end is anticipated to be completed by September 2009. 16. Bavwalk Master Plan A Notice to Proceed (NTP) was issued to Coastal Systems International on March 9th, 2009 to engage in the development of a Baywalk Master Plan that will include the above properties between 5th Street and Lincoln Road. In addition, a conceptual design for the specific connection between the Lincoln Road Street-end and the Mae Capri Condominium baywalk will be developed after ascertaining permitting feasibility from the appropriate regulatory agencies. JMG: JGG:TRM F:\PL \$ALL\CM RESP\Baywalk Update March 2009.Itc.doc ATTACHMENT C: Jose Smith, City Attorney Gary Held, First Assistant City Attorney Bob Parcher, City Clerk Robert Middaugh, Assistant City Manager Fernando Vazquez, City Engineer Jorge G. Gomez, Planning Director Thomas R. Mooney, Design and Preservation Manager Lisa Botero, Environmental Resource Manager c 0 ~ ~ o °- ~ ~ ~ o ~ ~ ~ c ~ a~ ~ a~ O ~ ~ Y ~C +L-• ca ca ~ _U (6 (6 ~ m m ~ f4 fB ~ ~ ~ C C C ~, ~ ~ ~ O O ~X ~ ~ W sx