Loading...
173-2001 LTC CITY OF MIAMI BEACH Office of the City Manager Letter to Commission No. r73--2 On I m To: From: Subject: Mayor Neisen O. Kasdin and Members of the City commiss~f Jorge M. Gonzalez \ r 0 City Manager 0 Additional Information Regarding Venetian Islands Neighborhood Improvements Date: July 24, 2001 Item C7F, a Resolution amending Urban Resource Group's scope of services for the design of V enetian Islands Neighborhood hnprovements, was deferred from the July 18th Commission Agenda at the request of Commissioner Liebman so that the Administration could provide additional information requested regarding the history of the project. The current Professional Services Agreement with Urban Resource Group (URG) was authorized by the City Commission on April 12, 2000 based on a construction budget of $12,490,100. This budget was derived solely from an opinion of probable cost developed by URG and was not reconciled with actual or anticipated project funding. In addition, the $12,490,100 total did not include design and construction management costs, the incorporation of which would have resulted in a significantly higher total project cost. The request to amend URG's scope of services to reflect actual project funding has apparently raised a concern among some neighborhood residents that funding dedicated to the Venetian Islands is being reduced. This is not the case. As noted above, the current approximately $12.4 million dollar URG scope of services is based solely on cost estimates rather than identified funding. Actual funding specifically earmarked for the project through the G.O., Stormwater, and Water and Sewer Bonds is approximately $ 11.7 million, which is only marginally below the $12.4 million amount that has been incorrectly perceived to be funding committed to the project. A comparison of construction costs for currently funded improvements with improvements previously plarmed but not funded as well as bond funding allocations is as follows: Actual Current Construction Budget Roadway improvements, lighting, landscaping $3,280,412 Associated Bond Funding Allocations $3,280,412 GO Bond Stormwater improvements $1,688,588 $3,156,295 SW Bond Water line reptacement $3.340.200 $2.094.890 WS Bond Subtotal $8,309,200 $8,531,597 contingency $1,000,000 $1,000,000 AlE & PM $2.390.800 $2.168.403 TOTAL $11,700,000 $11,700,000 (1) Projected total cost based on construction estimates -qot tied to funding. 4/12/00 Master Plan Cost Estimate $6,086,898 $4,090,755 $2.312.384 $12,490,037 $1,000,000 $2.551.714 $16,041,751(1) Roadway improvements: The level of roadway improvements has been significantly reduced to reflect the actual available G.O. Bond funding and because community input received to date has not been supportive of the extensive road widening and introduction of sidewalks - similar to that which would be evident in a newly built suburban development - called for by the Venetian Master Plan. Lighting and landscaping: The lighting component has remained approximately the same while the landscaping and beautification component has been significantly increased. Stormwater improvements: The level of stormwater improvements has also been reduced. When new curbs and gutters, sidewalks, and asphalt are constructed, the Miami-Dade Department of Environmental Resources Management requires that the associated runoff created be mitigated. The bulk of the original $4,090,755 stormwater estimate was intended to address this need rather than to address street flooding issues. In fact, the Venetian Islands were not identified in the City's 1997 Storm Water Master Plan as a priority basin for stormwater improvements. The Venetian Islands did receive a funding allocation in the 2000 Stormwater Bond Issue but the allocation was based on the needs generated by extensive contemplated roadway improvements rather than documented drainage needs. Because the level of roadway improvements has been reduced, the associated stormwater needs generated by the improvements have also been reduced. Water line replacement: As design of the project has progressed, it has been necessary to increase the scope of water line improvements in order to meet minimum fireflow requirements. In summary, total available project funding is approximately $11.7 million including a construction budget of approximately $8.5 million, a construction contingency of approximately $1 million, and soft costs including design and program management fees. This amount is not sufficient to fund the full implementation of the improvements envisioned in the Venetian Master Plan which have been estimated to exceed $16 million dollars in cost. Some of the originally envisioned improvements, such as street widening and sidewalk construction, are actually opposed by some residents because they conflict with the existing character of the area. Others are simply not feasible because they would trigger a need for prohibitively expensive stormwater improvements. Current project funding is sufficient to provide an adequate level of needed infrastructure improvements as well as a significantly enhanced level of visible above ground landscaping, lighting, and beautification. Based on the foregoing, the Administration recommends approval of Amendment 3 to the URG scope of services for Venetian Island hnprovements as detailed in Commission Memorandum No. 450-01. JM~~~ C:\My Documents\CIPWenetian\july231tc.doc