Loading...
John Moriarty & Associates of Florida, Inc Contract00600. CONTRACT: CONTRACT THIS IS A CONTRACT, by and between the City of Miami Beach, a political subdivision of the State of Florida, hereinafter referred to as City, and John Moriarty & Associates of Florida, Inc., hereinafter referred to as Contractor. W I T N E S S E T H, that Contractor and City, for the considerations hereinafter named, agree as follows: ARTICLE 1 SCOPE OF WORK Contractor hereby agrees to furnish all of the labor, materials, equipment services and incidentals necessary to perform all of the work described in the Contract Documents and related thereto for the Project. ARTICLE 2 CONTRACT TIME 2.1 Contractor shall be instructed to commence the Work by written instructions in the form of a Standing Order issued by the City's Procurement Director and a Notice to Proceed issued by the Contract Administrator. Two (2) Notices to Proceed will be issued for this Contract. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after the Project Initiation Date, which shall be the same as the date of the first Notice to Proceed. The first Notice to Proceed and Purchase Order will not be issued until Contractor's submission to City of all required documents (including but limited to: Payment and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties. 2.1.1. The receipt of all necessary permits by Contractor and acceptance of the full progress schedule in accordance with technical specifications section, submittal schedule and schedule of values is a condition precedent to the issuance of a second Notice to Proceed to mobilize on the Project site and commence with physical construction of the work. The Contractor shall submit all necessary documents required by this provision within twenty-one (21) calendar days of the issuance of the first Notice to Proceed. 2.2 Time is of the essence throughout this Contract. This project shall be substantially completed within three hundred and sixty-five (365) calendar days from the issuance of the second Notice to Proceed, and completed and ready for final payment in accordance with Article 5 within thirty (30) calendar days from the date certified by Consultant as the date of Substantial Completion. 2.3 Upon failure of Contractor to substantially complete the Contract within the specified period of time, plus approved time extensions, Contractor shall pay to City the sum of one thousand dollars ($1,000) for each calendar day after the time specified in Section 2.2 above, plus any approved time extensions, for Substantial Completion. After Substantial Completion should Contractor fail to complete the remaining work within the time specified in Section 2.2 above, plus approved time extensions thereof, for completion and readiness for final payment, Contractor shall pay to City the sum of one thousand dollars ($1,000) for each calendar day after the time specified in Section 2.2 above, plus any approved extensions, for completion and readiness for final payment. These amounts are not penalties but are liquidated damages to City for its inability to obtain full beneficial occupancy and/or use of the Project. Liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Contract on time. The above-stated liquidated damages shall apply separately to each portion of the Project for which a time for completion is given. 2.4 City is authorized to deduct liquidated damages from monies due to Contractor for the Work under this Contract or as much thereof as City may, in its sole discretion, deem just and reasonable. 2.5 Contractor shall be responsible for reimbursing City, in addition to liquidated damages, for all costs incurred by Consultant in administering the construction of the Project beyond the completion date specified above, plus approved time extensions. Consultant construction administration costs shall be pursuant to the contract between City and Consultant, a copy of which is available upon request of the Contract Administrator. All such costs shall be deducted from the monies due Contractor for performance of Work under this Contract by means of unilateral credit change orders issued by City as costs are incurred by Consultant and agreed to by City. ARTICLE 3 THE CONTRACT SUM n This is a Unit Price Contract:" 3.1 City shall pay to Contractor the amounts determined for the total number of each of the units of work completed at the unit price stated in the schedule of prices bid. The number of units contained in this schedule is an estimate only, and final payment shall be made for the actual number of units incorporated in or made necessary by the Work covered by the Contract Documents. 3.2 Payment shall be made at the unit prices applicable to each integral part of the Work. These prices shall be full compensation for all costs, including overhead and profit, associated with completion of all the Work in full conformity with the requirements as stated or shown, or both, in the Contract Documents. The cost of any item of work not covered by a definite Contract unit price shall be included in the Contract unit price or lump sum price to which the item is most applicable. [ X ] This is a Lump Sum Contract:* 3.1 City shall pay to Contractor for the performance of the Work described in the Contract Documents, the total price stated as awarded. 3.2 Payment shall be at the lump sum price stated in the Contract. This price shall be full compensation for all costs, including overhead and profit, associated with completion of all the work in full conformity with the requirements as stated or shown, or both, in the Contract Documents. The cost of any item of work not covered by a definite Contract lump sum should be included in the lump sum price to which the item is most applicable. *Note: Some Projects include both unit prices and lump sums in which case both sections shall apply to the Work identified for each type of Contract. ARTICLE 4 PROGRESS PAYMENTS 4.1 Contractor may make Application for Payment for work completed during the Project at intervals of not more than once a month. Contractor's application shall show a complete breakdown of the Project components, the quantities completed and the amount due, together with such supporting evidence as may be required by Consultant. Contractor shall include, but same shall be limited to, at Consultant's discretion, with each Application for Payment, an updated progress schedule acceptable to Consultant as required by the Contract Documents and a release of liens and consent of surety relative to the work which is the subject of the Application. Each Application for Payment shall be submitted in triplicate to Consultant for approval. City shall make payment to Contractor within thirty (30) days after approval by Consultant of Contractor s Application for Payment and submission of an acceptable updated progress schedule. 4.2 Ten percent (10%) of all monies earned by Contractor shall be retained by City until Final Completion and acceptance by City in accordance with Article 5 hereof, except that after ninety percent (90%) of the Work has been completed, the Contract Administrator may reduce the retainage to five percent (5%) of all monies previously earned and all monies earned thereafter. Any reduction in retainage shall be in the sole discretion of the Contract Administrator, shall be recommended by Consultant and Contractor shall have no entitlement to a reduction. Any interest earned on retainage shall accrue to the benefit of City. All requests for retainage reduction shall be in writing in a separate stand alone document. 4.3 City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 4.3.1 Defective work not remedied. 4.3.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. 4.3.3 Failure of Contractor to make payments properly to Subcontractors or for material or labor. 4.3.4 Damage to another contractor not remedied. 4.3.5 Liquidated damages and costs incurred by Consultant for extended construction administration. 4.3.6 Failure of Contractor to provide any and all documents required by the Contract Documents. When the above grounds are removed or resolved satisfactory to the Contract Administrator, payment shall be made in whole or in part. ARTICLE 5 ACCEPTANCE AND FINAL PAYMENT 5.1 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, Consultant shall, within ten (10) calendar days, make an inspection thereof. If Consultant and Contract Administrator find the Work acceptable, the requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate of Payment (Form 00926) shall be issued by Consultant, over its signature, stating that the requirements of the Contract Documents have been performed and the Work is ready for acceptance under the terms and conditions thereof. 5.2 Before issuance of the Final Certificate for Payment, Contractor shall deliver to Consultant a complete release of all liens arising out of this Contract, receipts in full in lieu thereof; an affidavit certifying that all suppliers and subcontractors have been paid in full and that all other indebtedness connected with the Work has been paid, and a consent of the surety to final payment; the final corrected as- builtdrawings; and the final bill of materials, if required, and invoice. 5.3 If, after the Work has been substantially completed, full completion thereof is materially delayed through no fault of Contractor ,and Consultant so certifies, City shall, upon certificate of Consultant, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. 5.4 Final payment shall be made only after the City Manager or his designee has reviewed a written evaluation of the performance of Contractor prepared by the Contract Administrator, and approved the final payment. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the General Conditions and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 6 MISCELLANEOUS 6.1 This Contract is part of, and incorporated in, the Contract Documents as defined herein. Accordingly, all of the documents incorporated by the Contract Documents shall govern this Project. 6.2 Where there is a conflict between any provision set forth within the Contract Documents and a more stringent state or federal provision which is applicable to this Project, the more stringent state or federal provision shall prevail. 6.3 Public Entity Crimes In accordance with the Public Crimes Act, Section 287.133, Florida Statutes, a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two purchases for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor debarment. 6.4 Independent Contractor Contractor is an independent contractor under this Contract. Services provided by Contractor pursuant to this Contract shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. This Contract shall not constitute or make the parties a partnership or joint venture. 6.5 Third Party Beneficiaries Neither Contractor nor City intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third party beneficiaries to this Contract and that no third party shall be entitled to assert a claim against either of them based upon this Contract. The parties expressly acknowledge that it is not their intent to create any rights or obligations in any third person or entity under this Contract. 6.6 Notices Whenever either party desires to give notice to the other, such notice must be in writing, sent by certified United States Mail, postage prepaid, return receipt requested, or by hand-delivery with a request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is intended at the place last specified. The place for giving notice shall remain the same as set forth herein until changed in writing in the manner provided in this section. For the present, the parties designate the following: For Ci Charles Carreno, CIP Director Capital Improvements Projects (CIP) Office 777 17t Street, 3' Floor Miami Beach Florida 33139 With copies to: City Attorney City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 For Contractor: John Leete. Executive Vice President John Moriarty & Associates of Florida, Inc. 1942 Tyler Street Hollywood, Florida 33020 6.7 Assianment and Performance Neither this Contract nor any interest herein shall be assigned, transferred, or encumbered by either party. In addition, Contractor shall not subcontract any portion of the work required by this Contract except as authorized by Section 27 of the General Conditions. Contractor represents that all persons delivering the services required by this Contract have the knowledge and skills, either by training, experience, education, or a combination thereof, to adequately and competently perform the duties, obligations, and services set forth in the Scope of Work and to provide and perform such services to City's satisfaction for the agreed compensation. Contractor shall perform its duties, obligations, and services under this Contract in a skillful and respectable manner. The quality of Contractor 's performance and all interim and final product(s) provided to or on behalf of City shall be comparable to the best local and national standards. 6.8 6.9 6.10 6.11 Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Contract and, therefore, is a material term hereof. City's failure to enforce any provision of this Contract shall not be deemed a waiver of such provision or modification of this Contract. A waiver of any breach of a provision of this Contract shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Contract. Severance In the event a portion of this Contract is found by a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be effective unless City or Contractor elects to terminate this Contract. An election to terminate this Contract based upon this provision shall be made within seven (7) days after the finding by the court becomes final. Applicable Law and Venue This Contract shall be enforceable in Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. By entering into this Contract, Contractor and City hereby expressly waive any rights either party may have to a trial by jury of any civil litigation related to, or arising out of the Project. Contractor, shall specifically bind all subcontractors to the provisions of this Contract. Amendments No modification, amendment, or herein shall be effective unless the same or similar formality as Contractor. 6.12 Prior Agreements alteration in the terms or conditions contained contained in a written document prepared with this Contract and executed by the Board and This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, and understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of this Contract that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless set forth in writing in accordance with Section 6.11 above. IN WITNESS WHEREOF, the parties have set #heir hands and seals the day and year first above written. ATTE T: THE CITY OF MIA BE CH ~~ City Clerk M or Contractor MUST EXECUTE THI5 CONTRACT AS INDICATED BELOW. USE CORPORATION OR NONCORPORATION FORMAT, AS APPLICABLE. [If incorporated sign below.] Contractor ATTEST: Ca~LJ~- L4. ~,~p~.~v~ (Secretary} (Corporate Seal) (If not Incorporated sign below.] WITNESSES: ay: ontractor (Name of Firm} By: (Signature) (Print Name and Title) day of , 20_ CITY REQUIRES FOUR (4) FULLY-EXECUTED CONTRACTS, FOR DISTRIBUTION. f i ~L- ~~~ . ~ Pis. APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION i ~~ _~ ~ p ~ t,,, ~t to Y~j"~ ~" ,C ,~~ay of ~`~~, 20,~. 00708. FORM CERTIFICATE OF INSURANCE A form Certificate of Insurance will be attached here. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 79 DATE(MM/DD/YYYY) A CORDrM CERTIFICATE OF LIA BILITY INSURANCE 06/10/2009 PROnucER Aon Risk services, Inc. of Massachusetts THIS CER'ClF'ICATE [S ISSUED AS A MATTER OF INFORMATION ONLY One Federal Street AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS Boston MA 02110 USA CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # PHONE- 866 283-7122 FAX- 847 953-5390 rnsuRED wsuRERn: Liberty Mutual Fire Ins Co 23035 John Moriarty & Associates, Inc. IxsuaER6: Liberty Insurance Corporation 42404 of Florida Inc 1942 Tyler St INSURER C: Everest National Insurance Co 10120 Holl wood FL 33020 u5A y INSUaERD: Allied world Assurance Company (us) Inc 19489 INSURER E- THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO "I'HE INSURED NAMED ABOVE, FOR THE POLICY PERIOD INDICATED. NO'LWI"FHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHIG H THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,'LHE INSURANCE AFFORDED BY THE POLICIES DESCRIBED H EREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS ANU CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LIMITS SHOWN ARE AS REQUESTED INSR LTR ADD' INS TVPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS DATE(MM\DD\YY) D.4TE(MM\DD\YY) A ENERAL LIABILITY 762611257933028 10/31/08 10/31/09 EACH OCCURRENCE $2,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $Z 50 , 000 PREMISES (Ea occurence) CLAIMS MADE ~ OCCUR M Anv one person) PERSONAL & ADV INJURY $ Z , 000 , 000 GENERAL AGGREGATE $4,000,000 GEN'L AGGREGATE LIMIT PPLIES PER A : PRODUC'TS -COMP/OP AGG $4 , 000 , 000 ^ POLICY ~ PRO- ^ X LOC' JECT A AUTOMOBILE LIABILITY g5Z611257933018 10/31/0$ 10/31/09 COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $1, 000 , 000 ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS ~ (Per person) X X HIRED AUTOS NON OWNED AUTOS i ~ /f~ ~ BODILY INJURY (Per accident) X Gomprehensi ve Ded. $500 ~ PROPERTY DAMAGE X collision Deductible $500 (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT ANY"AUTO e OTHER THAN EA AC'C AUTO ONLY: AGG C EXCESS /UMBRELLA LIABILITY 7108000172081 10/31/0$ EACH OCCURRENCE , , OCCUR ^ C'LAIMS MADE AGGREGATE $10,000,000 DEDUCTIBLE RETENTION WORKERS COMPENSATION AND wq7 D 5 WC' STATU- OTH- EMPLOYERS' LIABILITY T RY LI ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L. EACH ACCIDENT $1,000,000 OFFICERiMEMBER EXCLUDED? E. L. DISEASE-EA EMPLOYEE $1,000,000 If yes, describe under SPEC'[AL PROVISIONS E.L. DFSEASE-POLICY LIMIT $1, 000, 000 below OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHIC'LESiEXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Project: Normandy Shores. City of Miami Beach is included as additional insured with respect to general liability where required by written contract. Cl ty Of Miami Beach 1700 Convention Center Drive SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE C'ANCELLEU BEFORE THE 4:XPIRATION Ml dml Beach FL 33139 USA DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO M1IL 3U DAYS WRITTEN NOTICE TO THE CERTIFJC'ATE HOLDER NAMED TO THE LEFJ, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE ~~~«" °~~~a+~~'•~~ gG~AGaaeae/s~raalle- ar xA ;v > w c d 0 x n 01 Q1 V M O 0 s~s =l "L1 s Attachment to ACORD Certificate for John Moriarty & Associates, Inc. The terms, conditions and provisions noted below are hereby attached to the captioned certificate as additional description of the coverage afforded by the insurer(s). This attachment does not contain all terms, conditions, coverages or exclusions contained in the policy. INSURED John Moriarty & Associates, inc. of Florida Inc 1942 Tyler st Hollywood FL 33020 USA INSURER INSURER INSURER INSURER INSURER ADDITIONAL POLICIES If a policy below does not include limit information, refer to the corresponding policy on the ACORD certificate form for policy limits. INSR LTR ADD'L INSRD TYPE OF INSURANCE POLICY NUMBER POLICY DESCRIPTION POLICY EFFECTIVE DATE POLICY EXPIRATION DATE LIMITS EXCESS LIABILITY p sT00815001 10/31/08 10/31/09 A99regate 815,000,000 Each occurrence X15,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHIC'LES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Certificate No : 570034929978 TO: Jeannette Sichtermann Jeannette Sichtermannna,ars.aon.com Vincent Ze ers(cr~ars.aon.com Barbara~iscitelli(c~ars.aon.com COMPANY: Aon Risk Services Central, Inc Policy Number: 121 1 19544 001 Re: FROM: Jim Norman Jim.Norman(n~ace-ina.com DATE SENT: 06/12/2009 PHONE: 312-775-7901 John Moriarty & Associates of Florida, [nc. Subs, and City of Miami Thank you for submitting the captioned account. Please review this Binder carefully as the terms and conditions may be different than requested. This binder is valid for 60 days from the date send. Kindly contact me after that time and contact me with any questions you may have. Effective Date: 06/12/2009 Expiration Date: 06/12/2010 Company: ACE American Insurance Company -Admitted Coverage: Builder's Risk Coverage Form(s): ACE Builders Risk XTRA Coverage Form BB-SW60b (10-2005) Covered Perils: Risks of direct physical loss or damage subject to the terms, conditions and exclusions in the polio forms and as specified below excluding Earth Movement and Named Storm windstorm, but including Flood. Valuation: Replacement Cost Coinsurance: None. Job Site Location: 2401 Biarritz Drive, Miami Beach, FL 33141 foisted Masonry, 1 story building 6,416 sf, and an exterior covered terrace /entrance porch 1,685 sf, exterior asphalt parking area with drainage and access driveways with sidewalks, ramps and entry Construction: ways around the building. Intended Occupancy: Club House Page 1 of 4 PDF created with pdfFactory Pro trial version www.pdffactory.com Limits of Insurance: All covered causes of loss in any one occurrence: $2,200,000 Sublimity: Covered Property at Scheduled Location: Covered Property While in Transit: Covered Property While at Temporary Location(s): Debris Removal: Pollutant Cleanup (Aggregate Limit): Fire Department Service Charges: Valuable Papers and Records: Installed Trees and Shrubs per item: Installed Trees and Shrubs per occurrence: Water Damage, Other Liquids, Powder or Molten Material Damage: Sidewalks, Curbs, Gutters, Streets or Parking Lots: Expediting Expense: Soft Costs Coverage: Loss of Rents Coverage: Business Income Coverage: Earth Movement in any One Occurrence: Earth Movement Annual Aggregate: Flood in any One Occurrence: Flood Annual Aggregate: $2,200,000 $250,000 $250,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 250 $ 25,000 $ Included in Policy Limit $ 25,000 $ 10 ,000 Not Covered Not Covered Not Covered $Not Covered $Not Covered $ 2,200,000 $ 2,200,000 Sublimity of Insurance are part of and not in addition to the overall occurrence limit of insurance. Page 2 of 4 PDF created with pdfFactory Pro trial version www.pdffactorv.com Deductibles: Earth Movement: Not Covered Flood: $500,000 per occurrence Soft Costs: Not Covered Business Income: Not Covered Loss of Rents: Not Covered All Other Covered Causes of Loss: $ 5,000 Extensions: If construction is not complete by the expiration date listed above and an extension is requested and approved, we may change terms, conditions and rates. Premium:: $20,000 TRIA Premium: rejected Total Minimum Premium: $20,000 Any applicable taxes, surcharges or countersignature fees etc. are in addition to the above stated premium. Commission: 15% Page 3 of 4 PDF created with pdfFactory Pro trial version www.pdffactory.com Subject to our loss control inspection and insured's compliance with mandatory Terms & recommendations, if any. Conditions: Mandatory All policy form exclusions including, but not limited to Pollution & Contamination, Exclusions and Asbestos, Electronic Data/Cyber risk, Mold/Fungus, and Nuclear, Biological and Amendments: Chemical exclusions. Remarks: Attached please find a Disclosure Notice required by the Federal Terrorism Risk Insurance Extension Act of 2007 ("Extension Act"). The premium charge for the terrorism coverage is set forth on the Disclosure Notice. This forms part of the overall premium stated above for the Company's participation. Please be advised that we do not review Certificates of Insurance issued by you, or by any party, relating to this policy of insurance either for content or accuracy. Accordingly, we request that you do not provide copies of certificates to us for review or for our records. Authority is granted to you for the limited purpose of issuing unmodified ACORD Certificates (ACORD 25-5 for Casualty and ACORD 24 for Property and Inland Marine) only. [t is your responsibility to see that any Certificate provides an accurate representation of the coverage form and endorsements applicable to this policy at the time the Certificate is issued. Any modification of the approved ACORD forms specifically set forth above, or the issuance of anon-approved Certificate of Insurance ACORD or other is prohibited. Certificates of Insurance may only be issued as a matter of information. You have no authority by virtue of a Certificate or otherwise, to amend, extend or otherwise alter coverage afforded under this policy. Certificates of Insurance are never recognized as endorsements or policy change requests. You must submit a separate written request if an endorsement or policy change (including but not limited to adding additional insureds, loss payees and mortgagees and/or alteration of notice requirements for cancellation) is requested. In the event a policy change is requested, the underwriter will advise if the request is acceptable to the Company. Page 4 of 4 PDF created with pdfFactory Pro trial version www.pdffactorv.com FRONT PAGE CONTRACTOR'S PERFORMANCE AND PAYMENT BOND (Public Work) Bond No.: 012015393 Contractor Name: John Moriarty & Associates of FL., Inc. Contractor Address: 1942 Tyler Street, Hollywood, FL 33020 Contractor Phone No.: (954) 920-8550 Surety Company: '' Liberty Mutual Insurance Company Owner Name: City of Miami Beach Owner Address: 1700 Convention Center Drive, Miami Beach, FL 33139 Owner Phone No.: 305-673-7610 (If different from property Owner, or Dual Obligee) Obligee Address: Same as above Obligee Phone No.: Same as above Bond Amount: $2,127,870.00 Contract No. (if applicable) #21-08/09 Description of Work: Contract #21-08/09 Construction Improvements for the City of Normandy Shores Golf Course Club House, Miami Beach, FL Project Location: Legal Description: Various This Bond has been furnished to comply with the requirements of F.S. 255.05. This bond is hereby amended such that all provisions and limitations, including conditions, notice and time limitations of F.S. 255.05 are incorporated herein by reference. Any provision of this bond which conflicts with or purports to grant broader or more expanded coverage in excess of the minimum of the applicable statute shall be deemed deleted herefrom. This bond is a statutory bond, not a common law bond. This is the front page of the Performance/Payment Bond(s) regardless of preprinted numbers on other pages issued in compliance with Florida Statufe 255.05. n/share/bonds/frontpag Bond No. 012015393 00710. FORM OF PERFOR~IJANCE BOND BY THIS BOND, We John Moriarty & Associates of FL., Inc. as Principal, hereinatiercalied Contractor ,and Liberty Mutual Insurance Company ~ ~ Surety, are bound to the City of Miami Reach, Florida, as Obligee, heretnalter calved City, in the amount of Two Million One Hundred Twenty Seven Thousand 2,127,$7.00 Eght Hundred Seventy and 001100 Dollars ($, __) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, admkllstrators, successors and assigns, Jolntlyr and severally. WHEREAS, Contractor has by wriften agreement entered Info a Contract, BidlContract No.: 21-08/09 ,awarded the 13th day ~ MaY , 20 09 ,with Gity which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract"; THE CONDITION OF THIS BOND is that ff Contractor 1. Perfomu the Contract between Contractor and City for construction of * the Contract being made a part of this Bond by reference, at the times and in the manner prescribed in the Contract; and * Construction Improvements for the City of Normandy Shores Golf Course Club House 2. Pays City all bsses, liquidated damages, expenses, costs and a#torney's fees indudtng appe8ate proeeedklgs, that City sustains as a result of default by Contractor under the Contract; and 3. Performs the guarantee of alt work and mater~ls famished under the Contract for the time specified kt the Contract; then THIS BOND IS VOID, OTWERWISE IT REMAINS IN FULL FORCE AND EFFECT. Whenever Contractor shall be, and declared by City to be, in default under the Contract, City having performed City obligations thereunder, the Surety may promptry remedy the default, or shall promptly: . 3.9. Complete the Project in accordance with the terms and conditions of the Contract Documents; or 3.2. Obtain a bid or bids for completing the Protect in accordance with the terms and conditions of the Contract Documents, and upon determination by Surety of the lowest responsible Bidder, or, if Cily elects, upon determination by City and Surety jointly of the lowest responsible Bidder, arrange for a contract between such Bidder and City, and make available as work progresses (even though there should be a default or a succession of dafaulb under the Contras FORM OF PERFQ(2MANCE BONA (Continued) BtD No: 21-08109 CITY OF MIAMI BEACH DATE: Apr118, 2009 B0 or Contracts of comptetiori arranged under this paragraph) sufficient funds to pay the cost of oomptation less the balance of the •Cor~tract Prig; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth (n the first paragraph hereof. The term "balance of the Contract Price," as used in this paragraph, shell mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor Na r+ght of action shalt accrue on this bond to or for the use of any person or corporation other than City named herein. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompiiancs with any formalities connected with the Contract or the changes does not affect Surety's obligation underthis Bond. Signed and sea~d this 9th day ~:~ June 20 09 ylliTNESSES: John Moriarty & Associates of FL. Inca ~~ (!Name of Corporation) Secretary ~~- By: (Signs (CrJFtf'ORATE SEAt_) (17rint Name and tie) IN THE PRESi^I~Ci= OF: INSURANCE t',~?MPANY: ~~~~ ' CG4~.,~_ ~ Liberty Mutp~ Insurance company +~ A ay. Z ' act •'auset; Lupsr<i ent and Attorney - ~,,, ~ ~,) ~.ff~iQL~.-~k-~-1-~~4~~ Attorney-Ir.-~ act Ave., Ste. 340 Address: 75 Second ) Needham He~ghtrts~,tMA 02494 (CitylState/Zip Code} 781-449-0013 Telephone fdo.: r Countersigned By: -- Peter F. Jones, Licensed Resident ent for the State of Florida BID N0: 21-08109 CITY OF MIAMI SEAGH DATE: April 6, 2Q09 81 2446386 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint THOMAS BEAN, SUSAN LUPSKI, GERARD S. MACHOLZ, CAMILLE MAITLAND, ROBERT T. PEARSON, RITA SAGISTANO, GEORGE O. BREWSTER, ALL OF THE CITY OF GARDEN CITY, STATE OF NEW YORK ........... ............................................................................................................................................................................................... each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding """"'"`**"'"" "'`'`**` DOLLARS ($ 250,000,000.00*"*"* )each, and the :es and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE XIII -Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: Pursuant to Article XIII, Section 5 of the By-Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 21st day of November , C y LIBERTY MUTUAL INSURANCE COMPANY Qj O c ~, By~ -~ i,/_ ~~ C ~ Garnet W. Elliott, Assistant Secretary ~ : COMMONWEALTH OF PENNSYLVANIA ss -- ~ ~; COUNTY OF MONTGOMERY By ~ David M. Carey, Assi . fit Secretary 4 ~F~ t ,:., 4: ~ _./ On this 21st day of November 2008 ,before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. ~~~,"~-, IN TESTIMONY WHF~3~~ 'V~ ~rsunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year ~ayCa=;x +'3 O ... first above written ~ ~~' ~ °' ~ v~~;5 ~.~ ~ C~P~~sa~~T"i ?titJ~~YS.11Aiy4A a° f°~ r'~1 . h a t~3'g ~.tt7sf7 B ~~~ ~~t~ r y ~, y ~~ ~ ~ ~ ~~~~ ~,~ ~ Ter sa Pastella, Notary Public P` 4~v: ~~~, ~. a'+YvvVZ. C"6.~t;t'£=b SdPFYt # < s^ °~:Et:F3 .~ .1<^aP3?I~b ~.~~x~~~ CERTIFICATE ~.~ ~ I, the undersigned, Assista `secretary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys-in-fact as provided in Articls XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this 9th day of June , 20~_ . ~ ACKNOWLEDGEMENT OF PRINCIPAL - IF A CORPORATION STATE OF :~~.Cic~C1.....1.} SS COUNTY OF.~f.-t.1~..r,C:ISG.'l.} On this... -J. !.~ ............... day of...~SJ,~ ........,off.. -~-~'I . before me personally appeared •~~~1 ~ ..~ .~~ .................. to be known, who, being by me dul sworn, did de o`~e and y; that he/she Fesides at ................................. that he/she is the Es:.t61.~.,. ~... .. :... t1.3`.'I~.~~c~C :~~~~ ~=a=G?C. the corporation described in and which executed the within insurance instrument; that lie/she knows the seal of said corporation; that the seal affixed to said instrument is such corporate seal; that is was so affixed by the Board of Directors of said corporation; and that hefshe signed his/her name thereao by like order. ~,CKNOWLEDGEMENT FOR PRINCIPAL, IF LIMITED LIABILITY COMPAIJY STATE OF .........................} SS COUNTY OF .......................} On this ............................. day of .............................---...., ................ before me personally appeared .......................................................................... to me known and known to me to be the ...........................................................of .............................................---..........................., a Limited Liability Company, described in and who executed the foregoing insurance instrument and acknowledged to me that he/she executed the foregoing insurance instrument and acknowledged to me that he/she executed the same as and for the act and deed of said Limited Liability Company. ACKNOWLEDGMENT OF SURETY COMPANY STATE OF . , ,New York } SS COUNTY OF ...Nassau , . , ... } June 9, 2009 Susan Lupski On this ................................. before me personally came.................................................. to me known, who, being by me duly sworn, did depose and say; that he/she resides in Nassau County ., State of ....New York .......at he/she is the Attorney-In-Fact ............................ of the ......4iberty Mutual Insurance Company .........................the corporation described in which executed the above instrument; that he/she knows the seal of said corporation; that the seal affixed to said instrument is such corporate seal; that is was so affixed by order of the Board of Directors of said corporation; and that he/she signed his/her name thereto by like order; and the affiant did further depose and say that the Superintendent of Insurance of the State of New York, has, pursuant to Section 1111 of the Insurance Law of the State of New York, issued to ............ l.ihertX M.utual.lnsuranc~ company ..............................(Surety) his/her certificate of qualification evidencing the qualification of said Company and its sufficienc any law of the State of New York as surety and guarantor, and the propriety of acceptin ov' it as such; and that such certificate has nog: been revoked. GRACE ACKERSON Notary 11C Notary Public, State of New York No. OlAC6111590 NY acknowledgment Qualified in Nassau County Commission Expires June 14, 2012 a~,r„I Tema-I t~, uw roar sae ~ ~r~ uw~ u~wm I,,.wan« c>~wnt LIABILITIES, SURPLUS AND OTHER rrUNDS - ---- -- - --- --- -~ - --I - - _ ____ _ -~_- _~rrenl Year Prrar Year I. tL55C] (?:n Z5, Lare 7;, Ctumn 6 - -~ -~ - 2. Re~mwaxe Dayeda rn Dad lwas arw bsn adjuwnm, n.psnaa 12,661 675J5E 12591.762757 J. lava utMenl a amenaea (Pen iA. lin<75. Calamn 9 '2046125 106,915131 a. Commvcm ^+ Daf-nMt, anongrnl mmm'mran end olM enter dter0<s 2488 4]5556 2.SR,655,tr6 i Cktr ezpmea (vd,gFy :ivea, kxnae aM fersl 96 0976N3 134 988,81 d fi Sa+e z. 9mxet arM leee (e~cLn9 redera' ana loagn nrs~ne aQa 790,527.655 at1,N6.B91 7.1 CummkOerd and bre qn raceme larss (N~ry S 0 on reap r~mlN gam (IDUef 11 t5E.823,74a 36 150.630.676 .1 lae~ otmrred laarowar .105.175 6' Fwraw.aJ mmeyl 490 file eM :m ~.at e~.~emf 145]1 ~ 9. UneamM prem:~ma (Par11A L'na 7!. Cdlmn 5) (efler eoMcOng tayemae pramiiana br cedeC 5(75212 1,515.126 ..... reu~suanm olf 7,178.736,515 ane ~tlWtag uamnly rasami dS q lo. Ptlvarax Draetirm -. 3320,719.e]7 7 ,679E~,193 t I. f>h4k Ja CMarM aM pnpatl: 11 1 SlotlUtdder e0,012,65f I J9596,JB0 . a 111 PvlicyNCbetp .. ...... 12. Ceeee muaranu per;pvnb wYeme (rat a<t lrg mnmubnt. t,196A56 .... 12 .. ~Z661 +J. P,,,da~ M m^R~am7 tndr tei~muan¢ Oaeoas IOmedWe F, Pon 3. Cdumn t 91 e5a,nas,>rs ... este7s,ua .. . 11. nmwna wnnat! nr rnarce W maoenv~ acmes r Dmem .... t,eo7z71,oe1 .. I,e7e.lei76p .. - ts. RememneeeaM M1ertm na abtalea ..... - .. Iss,703129 ...63243111E t0. Awsu ba,tietaarcz fSCheNeF. van 7) _..~. ... _. __ _ _ _.. ~. ...... .. 17. Ntl .... ...... ... aepnunems n assets aN lmbdiies olaa b kro ryn aadun9e rams 73$87,&71 119,583561 .... ... .. IS OrAn DUatandng .... ...... ...... ... .. ... ... .... . ..... ' "' - I9. FHame b DaretA. aubreanes and eINWIM ...... ... - 292,965,747 ....... - .. .... 296,358 _ _. A. S`aNat br tewr~tiea ..... ................. .. 72 TS 12 A. A e/a~1,~Ee. . _ _.... _.._ _. n. uaamrbrarno-.rm n.b we« rn«euroa p.m . _. .... _. IsIS7 2 .97. . .. ?LEe3,e9s zz cw'al waa f ... o rod oeeren Unrtepn s .. .. ... _ _ .... o ... _. .. ._ 71 Aggregam mllartefv liaa9ties ~ - ... .. ... . ... .. ... .. ..... ..._......_........... 71. iaW ...... .................. Moel94s edWylg promUed Deq IamYBea (Llros I IMVUpn 231 a959363b , 769,a3 25. vratmta a9laDWlea . .... ... .. .... .. ....... ... ..?;215,055.769 ... _??A05,901.61E ........ ... 26. iwl fnb184t (UnN ll arq 251 .... .. .. ... .......... ' n. - . ....... . ..... ..... ..... ... ~94roWm ntlla+aa br SDeG*al tuTlua firaada ......... . 22 15ASe 768 h 9a 19 2a. comn,aacwn,lsbac ss~,uiS~L 91e.e7s4o2 ... _.._."_........ 29. vMbnO caD1a1 tlpef _ ........... . ,t0,000A00 "_ 10.000.000 ........... 70. M9te0~aaasins kr o9Hr Wnep«ial axvSs M1aaa .... .. ... ... . 31. 9u0M noes . .................. ...... . ....... .. ........ . ..?750.000 ..... .........1250.000 . 3L G6ass ..~......... paN In avq coNrblaled aorta _ .. - ... _ ..... ............. .. _ ...682,071.090 . . .... .......69!596,161 33. ~+alipbaLM3pRrglm) ...................................... ........ . ...... <,?2s,?r?.?e5 .... !.6!a..9sl.in K. lea .. ........ ....... .... .... .. Veanry tmdl, BI WK ............... .. . ... 2,13,9r2E>,174 . . .... ..... 0.612.252,216 34.1 ... ... O, anamt tOnfitln (S'aYl btlOdldb Unl75 f ...... ......... sae _ .... nape t++ta ialsaaaa In l;m 1A s P1 -~ _._ . , _ _ _ ... .. ....... ............. 35 59r{'ut az aa4arhWllliKSnb93,ku34)(Paya 1.LM .. ~ H. iaak (Pgaz 1n: 26.Ctl. 31 .. • ...... .. .. ... ••... .. 10 732179 11523299.95/ DF'fNL9 OF Y/RITE4N LINE9 _ 2301. Otlw9ah01iGe . 7307. FNroaclM rtinsuvrct nudvn .................... ....... .. .. ......... . ... ... .. ..... ...4249/7876 .. ... .379,171,978 2703. 1nnuNa load urNx uannx+e .. .. ..... !~?. .. f153?,574,740) .... ..... ......... ....__ 1 731 709 036 I (• .... .... 2190. 6umelaryaromaYlip.laain br lire 239an ovanlar pe8e ..... 591.997.189 ... 566100 7 ........ ..... 2399. TaN6 UM11301 2303 ut 259 Une 2]above . .. .. ........ .. ..... SY7Ae5b15 257229359 2101_ sQ,D,I . ... ,!a.ptu imi. nlr?.dr. rt,Mu~anu 7esw fn ~99az ~~ ...... ............:................_ ..... ._ ........ 27N. n91. 3laauary dawidnp 6t10eam b l r lw . ............................. ....... . ........ .. r n. n mm wv r 1799. Tdabrtivt 27a «.._..,,~„_.._....__. ~ ....... ................... . ........ ..... ....__ _. ................ 3001. Gnpa9116Rd. 907921571 919 9101 ............ . 3002. ...._........-.. _ ........ ..... ..... 1250. ..... .............. .. , .649 ............ J,?6?A9o 3003. ..... .. ... .... ..... ........... ..................... .. 3099. Oamq .................. . ........ ......... ..... .. ....... ryanmalnip witrM falM Sb flan waawr _ ...... ........ ...... . DaB~ ... .................... 3098. Ttlell9.Mee saif a..,.... an, .._ ,.,... ,.. ......... . .. . 1 ~nrd ,su7bp., ., a a 9n~~irtenaaowata ale.y ewee~asdua ekn aom. t,e tyner eae~..9. enme.a eaa„ d.da rwara~q..+n. aro uan,n rat nnaren wrba nxe+e,,. as bgt0ao- aalt refaad earr5 abW1a 0rcpartyd9u W0 RPo'Sep erMt, heeanerLarkom eery fam atla4ro Mann aaaplaalwd•taad. anQ9rtl 0ea rttlrlsy ~__.._ .. 9F and taBSataGon aMMrnmm~N. arnmedo M.~..aw a, ta._..._+..__.... .._ ._... oars'^NUaWNaM1MMamt at WmPeM Sao ._., ~-~~e~- ~ 15fTnaanr -~ ~ Sa. EO Id frarict NN lRaoe Nano! k- Ot,nar ea~mel t,.waroa Yana 1. Qanba anMf Cbi«andMa eneN PrnManla GEO ~ 7' 7. mal vn. ~.d>r4`1 s~ IRriw vice 9rtaken. a Tro,etaer ae( - SufaWgane remobebro me Na - [4~• - hd data ,z101 3(' ~ ~ ~!Ey ''•:,. a.mlhla an aylnd 8'm97 (%IYet I INo _. p e. n m: t. wm me.ewnan.n wnar _ .- -`':. ;r,-y~`-~;cf,r.;~, xwnaer er c.m•ama~ta ... T.. i C{{~ ... _. __ .N .. {f :wp.-7UY~ ~. ..' .... G: ? /.:_. ., d Annual Statement fa the year 20v8 of ~^~P Liberty Mutual Insurance Company ASSETS ~,rrarl vo_, - -7-- I Assets 2 Nona dmine~ 1>SS2LS 3 ~, v,4,a Ne: AnmiJe~; Assets wet ~LdmiUea (Cols. l • 21 Ass¢{s 1. Bonds(SU+edtile0) 2. Stocks tSchedtde D): 77,057,669.507 t 7,057,669,501 75,335.083.671 2.1 Pre7erred stocks 2.2 Commonslocks 757,319,706 757,379,706 322,986839 3. Mortgage loans rN real estate (Schedule 8): 7,879,613,320 309.742.0)0 7,570477.320 7,377.050.947 i_1 c~Kl l~e;5 3.2 Other than first liens 548,091,252 548.091.252 A29.255,70t 4. Real estate (Schedule A): 4.1 IhoperlleS occupied by the company (lass $ 0 encumbrances) 425 989 666 4.2 Propenles held for the producilon of Inoome (less $ 0 encumbrances) , , 7 039 982 425,989.166 418,561,083 4.3 Propedie5 held Sor sale (less $ 0 encrmbrancs) , , 1,039.982 1,069,882 5. ~~ (3 175,663,037, SchedWe E .Pan 11, cash equivalents {3 123,333,313, Schedule E -Part 2), and stwn•{erm investments ($ 1,050,309,166, Schedule DA; 1 349 305 516 6. Contract loans (including 5 0 premium rsolas) , , , 7.349,305.516 828,119,827 7. 01her invested assets (Schedule 13A) 8. Receivables fOr seariGes 5,132,261,123 971910 5,131,343213 4,642,652,171 9. Aggregate wrile•ir7s for Invested assets 2,9.056 2,859,056 13,535,760 10. Subtotals, rash and invested assets (Lines 1 l0 9) 11. TiOa entsiess S p ... 0 charged off (tor T'4Se insurers only) 27.154,154,622 ~ 310,085,910 ...... T6,844,p88,712 .. 29,368,315,281 12. investment income due and accrued 13. Wremiums and consideratlons~ 140,188,757 . .... 1x0,188.757 175,281,336 13,1 Urwnleeted premiums and agents' balances In the course of coderdio n 13.2 DaSened emiums, fx agents balances and inslal4nents booked bvt deterred 1,087,061,486 15,162262 ~ ~ ~ 1,077,899,224 928,137,397 and not yetdue (including $ ... .. 0 earned but unbilled premiums) 5 594 927J50 13.3 Acau77d reVOSpedlve premiums _ _ , , 1,594,927,150 1,638,534,970 14. Rai7surance: 404,104,551 40410,454 ., 363,694,D97 38?,689,632 14.1 Amounts recoverable Irom reinsurers .. ' 142 Funds f7eld by pr deposited vvN7 reinsured companies ~ 300,803 ... ..... ... 560,300.803 685,885,885 14.3 Olheramountsreceivableunderrelnwranceconirecis 17,294,633 17,294,633 28,022,871 15. Amounts receivade relating to uninsured plans 16.1 Curtenl lederet and foreign income lax recoverable and interest thereon ~ 177,917 2802 1?5,315 159.994 161 Net deferred lax asset 118948 060 ' 17. Guargnly forces receivable w on deposit ~ 1469501,048. 622,710,792 848,790,258 630,160,137 ..... 18. Elaolronic data pl»eessing equipment end software 3Z 559 328 ' • 32 559,328 .. 29 552,d5B 19. Funllure end a gtdpment, lnduding he9lth care delivery assets ($ ~) 289 ~ d47 239,393,443 50 291,004 ~ 49 406,529 . 20. Nel adjustment in assets and Ilabilities due b forel~n exchange rates 82645 678 82,845.678 21. Receivabes from parent, subsidiaries and aNtlieles ( 22. lieadh care 5 0}and other amaunls receivable .355,899,160 3,740,554 312,158,606 238,286,862 23. Aggregate write-ins far other then Invested assets .....,.. . 24. Iota! assets exdudng Separate Aarounls, Se9re9aled Accounts and . 767441418 52,021 117 715,420 301 550 843,268 Protected Ce! Accounts (lines 1010 23} 25. From S ass . e4ar Aticounls, 5eglegated P,oeouMs and Protected Cet4 Accourhs 33,915,940,998 _1,356,152,812. , • 32 549,768,586 34,829,204,572 26. Tvta! ir7es 24 and 25 33 915,940 998 1,366,152.812 32 549 788,186 34,829.204.57? OF WWTE•IN ONES 0902. .... ...... ....... .. .. ............. 0903.. . . .. . ............. ........ ................................... 0998. Surt7maryoln;mainingwrik-In;iortb7e981romaref4owpage . .. .. 0999. Totals Ines 0901 Ihr h 0903 sus 0998 Lira 09 above 2301. gtlterassess ... .. 02. Cash surtender value life irtturanoa . 206,481.848 40,884,448 185,597,198 2303. EQui4es and deposits in pools and assaia0ons 348,631,523 .. ~ 48 631,523 • 04 685,583 2396. Summary of remaining write-ins for Late 231rom overflow pa e 36.042,093 ... ... 36,042,093 32,235.326 g 2399. Totals n mac nn1 rw.,,Mti 4orY, ..._ ~•,~o, „ ~ 176285,156 11,136;668 165 too ear .,a ,ate ~r-. FRONT PAGE CONTRACTOR'S PERFORMANCE AND PAYMENT BOND (Public Work) Bond No.: 012015393 Contractor Name: John Moriarty & Associates of FL., Inc. Contractor Address: 1942 Tyler Street, Hollywood, FL 33020 Contractor Phone No.: (954) 920-8550 Surety Company: Liberty Mutual Insurance Company Owner Name: City of Miami Beach Owner Address: 1700 Convention Center Drive, Miami Beach, FL 33139 Owner Phone No.: 305-673-7610 (If different from property Owner, or Dual Obligee) Obligee Address: Same as above Obligee Phone No.: '' Same as above Bond Amount: $2,127,870.00 Contract No. (if applicable) #21-08/09 Description of Work: Contract #21-08/09 Construction Improvements for the City of Normandy Shores Golf Course Club House, Miami Beach, FL Project Location: Legal Description: Various This Bond has been furnished to comply with the requirements of F.S. 255.05. This bond is hereby amended such that all provisions and limitations, including conditions, notice and time limitations of F.S. 255.05 are incorporated herein by reference. Any provision of this bond which conflicts with or purports to grant broader or more expanded coverage in excess of the minimum of the applicable statute shall be deemed deleted herefrom. This bond is a statutory bond, not a common law bond. This is the front page of the Performance/Payment Bond(s) regardless of preprinted numbers on other pages issued in compliance wifh Florida Statute 255.05. n/share/bonds/frontpag Bond No. 012015393 00720. FORM OF PAYMENT BOND BY THIS BOND, We John Moriarty & Associates of FL., Inc. as Prlndpal, hereinafter called Contractor .and Liberty Mutual Insurance Company ~ as Surety, are bound to the City of Miami Beach, Florida, as Obligee, hereinafter tailed City, In the amount of Two Million One Hundred Twenty Seven Thousand /_ @ aII,~ Eight Hundred Seventy and 00/100 Dollars ($ 2,127,870'00 ~ faC U1e payment whereof Contractor and Surety bind themselves, their heirs, executors, admtnistra#ors, successors and assigns, jointly and severally. WHEREAS, Contrador has by written agreement entered into a Contract, Bid/Contract No.: 21-08/09 .awarded the 13th day of . May , 20 09 , with City which Contract Documents are by reference Incorporated herein and made a part hereof, and specifically include provision for Iiquldated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract"; Construction Improvements for the City of Normandy Shores Golf Course Club House THE CONDITION OF THIS BOND is that ifi Contractor 1. Pays City all losses, liquida#ed damages, expenses, costs and attorney's fees including appellate proceedings, that Clty sustains because of default by Contractor under the Contract; and 2. Promptly makes payments to all claimants as defined by Florida Statute 2.ri5.05(1) for all labor, materials and supplies used directly or indirectly by Contractor in the performance of the Contract; THEN Contractor 'S OBLIGATION ShiALL 8E VOID; OTHERWISE, !T SHALL REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO THE FOLLOWING CONDITIONS: 2.1. A claimant, except a Faborer, who is no# in privity with Contractor and who has not received payment for its tabor, materials, or supplies shall, within forty-five (45) days after beginning to furnish labor, materials, or supplies for the prosecution of the work, fumish to Contractor a notice that he intends to took th the bond for protection. 22. A claimant who is not in privity with Contractor end who has not received payment for its labor, materials, or supplies shall, within ninety (90) days after performance of the labor or after complete delivery of the materials or supplies, deliver to Contractor and to the Surety, written notice of the performance of the labor or delivery of the materiaRs or supplies and of the nonpayment. 2.3. No action for the labor, materials, or supplies may be instituted against Contractor or the Surety unless the notices stated under the preceding conditions (2.1) and (2.2) have been given. BID N0: 21-OBfOB C11Y OF MIAMI BEACH L1ATE: April 8, 2009 B2 2.4. Any action under this Bond must be instituted in accordance with the Notice and Time Limitations provlslons prescalbed in Section 285.05{2), Fiorlda Statutes. The Surety hereby waives notice of and agrees that any changes In or under the Contract Docurnentg and compllanoe or noncompliance with any formalities connected with the Contract or the changes does not aflaa the Surety's obligation under tl-is Bond. Signed and sealed this 9th day of,_ June 20 09 o r or ATTEST: John Moriarty & Associates of FL., Inc. {Name o C oration) (51~cretary) {Sig ure) ~~1 f l L~~ , ~X ~C . V \C~ 'P~t~'~ . (Carporate Seal) (Print Name and Till ) r~ IN THE PRE5EN O INSURANCIr C(yMPANY: /~ ~ Liberty Mutuail,Xnsuranc~'Gomp~any (~ ~ By. / ~ ent end A me In a~ r`Susan Lupski ~~ ~~~ Attorrey_In-Fact Address: 75 Second Ave., Ste. 340 (Street) _.__ Needham Heights, MA 02494 {City/StatefZip Code) Telephone No.: 781-449-0013 nn Countersigned By: j ~ ~ ~, (.~- , Peter F. Jones, Licensed Resident Agerif for the State of Florida $Ip ~; ~.~~ CITY OF MIAMI BEACH DATE: Apd! 6, 2009 ~ 2446389 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint THOMAS BEAN, SUSAN LUPSKI, GERARD S. MACHOLZ, CAMILLE MAITLAND, ROBERT T. PEARSON, RITA SAGISTANO, GEORGE O. BREWSTER, ALL OF THE CITY OF GARDEN CITY, STATE OF NEW YORK ........... ............................................................................................................................................................................................... each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, anyy and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding TWO HUNDRED FIFTY MILLION AND 00/100************* ****** DOLLARS ($ 250,000,000.00***** )each, and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE XIII -Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such y attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their p signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be Q- as binding as if signed by the president and attested by the secretary. .Q ~ ~ By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: .~ ~ Pursuant to Article XIII, Section 5 of the By-Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby L authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and ~ ~ deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. L 3 That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. ~ j IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of ~ - Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 21st day of November , ~ ~ 2008 _~ ~ LIBERTY MUTUAL INSURANCE COMPANY L ~/ c'~0 ~~<~ Garnet W. Elliott, Assistant Secretary .,., COMMONWEALTH OF PENNSYLVANIA ss - d COUNTY OF MONTGOMERY On this 21st day of November 2008 ,before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged •- that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above ai Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. L ~ 'G, A IN TESTIMONY WH~1~E~3~,~ ~~ve fl~reunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year ~ first above written ~`~°' ~~ ~ ~.i K~ s~ ~' ~7~~~s,~~§$LUi°'ttHy d.M '`r'em ~ y ~ ~ .;~~ ~ ~~;~ ~ ~ ~ ~~ ~~ ~ Ter sa Pastella, Notary Public CERTIFICATE ~",~~~ ~,~:~ ~~ ~''`"~~'~_~~~ m ~~~~~r=ta.~ ~ r,,;.r gart~nc~s I, the undersigned, Assistant ecretary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys-in-fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this 9th day of June ,2009 rn VJ C .N 7 v ,H,^^ ~Vl d W C O C. Q~ o a' d C 3~ O ~ a~ N O t0 of F -' ~ ~ ~ ,< B :, y ~'~;;/ David M. Carey, Ass' fit Secretary ACKNOWLEDGEMENT OF PRINCIPAL - IF A CORPORATION STATE OF .~` D.C' l.C1tC~.... } SS COUNTY OFC'~'~f~~~••} . , ... , , , _ . • • . , ... before me personally appeared ,. On this.......~~~~ .... day of...:,~.~A~V1: ...., .4:~C~~ ... ~ ~?~C! fl ...~~.,~2..:~ .............. to be known, who, being by me duly sworn, did depo` ~e and ay; that. he/she resides at .................................. that , he/she is the .~ u.-~.l :d'f:.. u .1.C~:' ..~:a, l.~fi~ of ~hR .~~f:l~~C~\-~:y: ~. ~~,~.C~.. • the corporation described in and which executed the within insurance instrument; that lie/she knows the seal of said corporation; that the seal affixed to said instrument is such corporate seal; that is was so affixed by the Board of Directors of said corporation; and that he,~she signed his/her name thereto by like order. ACKNOWLEDGEMENT FOR PRINCIPAL, IF LIMITED LIABILITY COMPANY STATE OF .........................} SS COUNTY OF .......................} On this ............................. day of ......---..........................., ................ before me personally appeared .......................................................................... to me known and known to me to be the ...........................................................of ..........................................................................., a Limited Liability Company, described in and who executed the foregoing insurance instrument and acknowledged to me that he/she execute~~ the foregoing insurance instrument and acknowledged to me that he/she executed the same as and for the act and deed of said Limited Liability Company. ACKNOWLEDGMENT OF SURETY COMPANY STATE OF .,.New York } SS COUNTY OF ...Nassau,,,,,,} June 9, 2009 Susan Lupski On this ................................. before me personally came.................................................. to me known, who, being by me duly sworn, did depose and say; that he/she resides in Nassau County ,,......~ State of ....New York ....,.at he/she is the Attorney-In-Fact ........ of the ......Liberty Mutual Insurance Company ..........................the corporation described in which executed the above instrument; that he/she knows the seal of said corporation; that the seal affixed to said instrument is such corporate seal; that is was so affixed by order of the Board of Directors of said corporation; and that he/she signed his/her name thereto by like order; and the affiant did further depose and say that the Superintendent of Insurance of the State of New York, has, pursuant to Section 1111 of the Insurance Law of the State of New York, issued to ............l.ilzertXM.utual.lnsuranca Gom~any ..............................(Surety) his/her certificate of qualification evidencing the qualification of said Company and its sufficiency under any law of the State of New York as surety and guarantor, and the propriety of accept' an ~ g it as such; and that such certificate has not been revoked. ~RAC~ Aacer:soN Not Pub c ~Y ~~k, State of New yrp* No. p1AC6111590 NY acknowledgment ~~' En Nassau county xPires June 14, 2012 w.rrai Sbierreei 1v uw yau:CGe cl r.< UDerty 4uluN irounore C7npany LIABILITIES, SURPLUS AND OTHER ,~UNDS I. In <a (?an 1l.,Lm 75,Cmunn 8l _ 7_6G.615)SE -~-!2534 ie275f 2. R<~~nwa.-n (ayede m vatl lw as arW bsn ~ejuslmmt nrpene. 'i.01E ~ZS IpB 9151.71 7. lou aqulc,yme.penttl(Pa12A. fi1x 75. Crz;,mn 91 to%p75,555 7.572655 t+E a. Gwnnvcs:ons prYa Me, py,cngcnl mmmmiav end doer sa.~lar de~g<s 35.057 p27 111 9F5 BI3 i ~~~~I"~~`'~~'~"`81 vA 1ttsl 79~92).SSS 11 e,1e6 B91 fi. lees. licase5 and kes (eN~Sng lade?' and loge r)n ~c~ns<Uasl 25:.42) 111 250.6:V.915 7.1 CuivM k0erd and (oregn'rmme larsz (h Cudinp ] 0 an reaWed uylal qmn IlCyse411 ]F,105,IJ5 T1 Mel oehrred ki bG/ryy o. donoueJ money ] 190 8JB aM i,nr.y Plarem f IQ 5~< ~ 505 212 I I t .15 726 9. Uneamtl prtnlacu (P-an 1A Lhe ]e. CoUrrvl 5) taller daMcfing wvemad p.wruune br cedee . n:n[uand o<] I,17B.7?B.515 an0 ~n0u0ug vramnly rnservar di _. % 3720,179.871 7,ctlBA9,49J 10. Adrerrt lxev~:z: 80017.651 )9.996;.470 n. oMUVIw dDaarea aro unpan: 17.7 axxrwan,~a _.. tt) Pvr,<)+,adtra .. _._. _ _ _. C1?5656 7zD126u ,2 cae,am;nz,ray,dpran,e~+awreua(nalor<rmry,p,,,m~<abnal f ismp, AW q' mlryurry Inds ni~m.irarm Ira+Cai 19v+AAa f Pon 3 (;damn r9 1 ew,~sNS al.e7s,ut ... , , _ _ . _ f/. Tmounb alhAell ar rNain,d bl mnveoy CX etmWDl amws 1,B0717a,roa I,e 78,182.260 .. _ 15. Remtlr,nde a1W n,m, not abcale0 155,7071z9 672AJI710 .. 7tl Novsion fa wriurarcr (Sdwgle F, Pan 7) .. .. 17. Nd a,AlnVnerYS h assek aro Ibbdi6q duo b bnipn euNnpa 2kt .. 73,981,601 113,SBO,BN .. ... 16 Grab oJat'nd'ng ... .... .. .... .... ......... .. _ 19. PryaDb b Dam ruteinaAes mA enLaea 192 965.747 - . lB6,iE` ,848 ...... _......... ._ _ _ 70. 74wm.kr[ewts, ne75,e12 ei3i7,,3e 71. G ......__.. .... a3vl0.y Iv anspnk hsa wrier M;.wrea plan is451~7 91,ee3,ees ' n capta we, 6 _ . _ _ . o aro Daere,I dsenM ] 0 _ 23 A992gekwn~hsrDelhNDDas ... .... _ _ ... !/ r .... _ _ . ~ I,7dasa ndudeg prdttl,d trq ImbxDts 0.A1,a 1 7tsmu9n gal so e ?z 75. vrattlM dnlpDWn ss,7s n __. ?3oos,ea.e e .... 2i idq fab164[ (UnM 2a aN 75) .. _ . _ . ... ... . n 22 t5A55 T68 23 904 t6 . M91ePab,ni7eil,rwapxal]uTlwiwm 7/. common <gdlm a7edl ..". 957,977s77 .. .." 51e,ns,Im . .. _---. _. _. _. _._ ... _... .. ..... 29. 7iNerrnd apAal [InU 10000A00 .. 740Q0,000 ... ... ~ A99rn9ale+.rb+ne Asr Ddkr Wnapria7 sarvlis Arm .. ]1. 6Yryha Iitl05 .. ..... .. . ....7150000 ]L (YDdd {ntl hand WNrbAed a,p1A .... ... .. ... .. . .. ., ... ...... .. _....... ..... ]. ur,nenned ]mas Wrylus) .. ., E,33S,7T2,1BJ .... /,3de,951,t7A ........ ............ K. 4p ... .. ...... ..... O'aenry [bcA, a told .......... .. ... A!?4?1~1?4. ... . ........ 6.b72,.257175 ~ I ... 0. [Aare[ tO1M1Dn (Nlu/ htludld A7 Una 28 f .. ... . ..0 ........ .... .. 313 _.... (vyw hv,rdd In tan 283 ]5 S ..__ -... . kyhrt of rapudt pDlc;tggeas lLAxs Zl t131,bu34}(pag[/. Lhe 381, ....... 16 Ta[h 7Y . ..... .. .. ... 10 732411 i1 13 19995/ . 11 M Cd. a? 9788186 31 2 DETNL9 OF t01UTE1N LIe~3 . _ 7301. OU Viv bhYlee . .. ......... .... :...... 7302. RNmxMn rtinsur[m rewwe . - ... . .... 421p17p76 ....... .. .. 279,in,B)9 . . ....... ... .. ......... ...................... ........... ......... 2303. MV1rILL AeW e!d!r unlnsvM pWS .. ....... ... ....... .. ... .... (1.682311.710) ... .......... (7.731166.0381 .. ... .. .. .. ..... ..... .... ... ..... ... ... ........... bummq d nmehhg IaWbin br the 23 Aem ovardav a e 581,9y7,199 ..... .... ... .._.. ...f66~100,J59 ... p g ...... 2799. Tatl] Wse1230 ...... ... .. 79TA/5F15 7S717p 358 1 230] u[Ti91 lheD a0we ~1. SP!~?I.!!FV!Lar wlme/f;v. yt1{unno .. .......... 4nsu Y 7 n9 a2 ... .. ....... .. ... ...... .... ... .. ... .. .......... ..... .. 6 .927A71 . 941 ........ ..... a75~i02 .. ........ ZR73. ....................... ..... A91. Tdremeedn w18r•ils f li h . ........... .. e a re Z7 om av9w page T757 Taky 2/0 - ..... .... ..................... . ...... . s 1 h 1107 y7 2l above 7001. Cwinh Mdl,.,_ 961927,671 011 510] ........... 700Q. .. ............. . . ...........1250.000 . ..... ...... ~~A00 ... .... .. ... ... ....... ...... 700]. .. deemeimy tlt6eiq fa lM 90 firm wnl e ' . ............... ... . 0a peg ...... 7099. iaek .... ...................... ]W7 h 3003 7096 30 a6o1e 7 50.070 1 .000 skl, a IMnartue~....... calnryd ,Sulldl„ .. itar,Airs d tln npa6np,M7T Idp Bury wpn tW depd, ,nd,gn,I Mr an k endlwe dfKm d aril r,Wrlnp rMy. a the Ileeh ae[tabee alDe7e nee d,t It89dux popery d4, ak rtpatnp amk/, heeand Nar 9om wy bro n tlehs fwraan b9,11er NF rettladahah, edebJn and eJmrunnm daieYl<mw,d, n,la}td a rderrd b, A a M,rtl Itm [tikm[M a al atdnnlcRM-0ldfeeMOtedwe~wa.M<kaaie _.__-___~,._....._... ,,,,,,~„w~.y .,.,, an t~aa lmnpnr raeuaW o19 m,Yh to D'/Yaruls kbn in buaph adJlM bNtm e4kaseal / /) _ l ~ a_ A 7"~~~1.~.. ____ 13~bn1 1~.-- hm rb M/rMCe 6Mx ~ DtnH Reeed 0eaw rlrnd) lrunkl Y,Ap I. m,1 Q'm40 rn,l Lbim,n d0v 6wN7elddnma GEO Yw ~1{8W= dq t) ]. 9tl:err pm,47tnar1.,e1.a d,) s~s,rre.a,b,.,mberb,mta, - `r •. t ~!Eyo., 11d aa7a Fatrua .:001 ~(' - a.uatwDdmr„In~7 (x(n[ i I71o , , D.nro: 7. ]bk m. emenan.dlw,le,< _ _ ~ ..yi ~~.,y, . . ]. w.es erwmtanaaed ~ J t.g < . . \` s •'srnf ~ .o ' m. G - _ :. /.:: 7 annual5talemenl ly me year 2,hi8 of ire l.icerty Mutual Insuranrr Company ASSETS n1 Ye~~ 2 Pnor Year d Ne; kd.1>dJe:; j Assets Nonadmided Asszts Assets wet +~m~ueo 1 Bonds (SU,edule O) (Ools, 1 • 2) pub 2. Stocks (Schedule DJ: 11.057,669.501 11,057,669.501 15,735,083 671 2.1 Pr6lerred alOt*a , - - 2.2 Common stocks 757,319,706 757,319,706 322 986 839 3. Mortgage loans on real estate (Schedule 8): 7,879,613,320 309,1x2,000 7,570471.320 , . 7,377 050 947 3 1 r~Kr mere . . 3.2 Olherthanfirslliens 548,091,252 548,09L252 429 255 101 4. Real estate (Schedule A): , , 4.1 PropeNes occupied by the company (HSS $ 0 encumbrances ) 4 4 2 Prvpenks held for the praductlon o` Income (kss $ 0 encumbrances) 25,989.166 1 425,989.166 a 18,561,083 4.3 Pmpedies held for sale (less S 0 enwmbrances ) ,039,982 1,039,962 1 069 882 5. ~~ (S 175,(;63,037, Schedule E • Pan 1), aash equivalents {$ 123 x33 313 , , , , , Schedule E -Part 2J, a nd Stton•lerm investments ($ 1,050,309,166, Schedule DA) 1 6. Contract loans (including b 0 premium notes) ,349,305,516 1,349,305.516 628 119 827 7. Other invested assets (Schedule OA) , , 8. ReaivaWes br sewriGes 5,132,267,123 923,910 5,131,343,213 4,642,652 171 9. Aggregate wrile•irls 1dr Invested assets .. .....?,859,056 .... ~ _ ...2.859,056 , 13 535 76p 10. Subtotals, cash and invested assets (Lines 1 l0 9) , , 11. TiUa pants less $ 0 charged olt (tor T'~1Se 4nsmers only) 27,154,154,622 310,065,910 26,fiax,pg8,712 29,368.315 281 12. Irnestment income due and accrued , 13. Premiums and consideratbns: 140,188,757 140 188.751 , 175 261 336 13.1 Urwrolected premiums and agents' balances In the course otcodection ... , , 13.2 Oetened premiums, agents' balances and InraalYnenls booked but deferred 1.087,061,486 15,162.262 . 1 071,899,224 928,137,391 and ^~ yet due (including $ _ 0 earned but unbryled premiums) 13.3 Acaued retrospective premiums 1,59x,921,150 1 594 927 150 14, ReclSUrance: 404,104,551 40,410,454 , , 363,694.097 1,638,534,970 387,689,632 14.1 Amounts recoverable Irom reinsurers .. 14.2 Funds held b r de '''' y o posited with reinsured companies 560,300,803 ~ 560,300,803 685 885 885 14.3 Otheramoun~sreceivableundarreNsurartcemntrecls 17294,633 17,294,633 , , 26 022 871 15. Amounts receivade relaling to unirlgured plans .. . . , , 16.1 Cunenl kdaral end for ' n income e19 tax recoverable and Interest Thereon 177,911 2,802 .. 175,315 159 994 16.2 Net deferred lax asset . 17. Guaranty (uMS receivable w an dapwil f 469 501,048 .. 6'22,710,192 .... 846,790,258 118948,060 630160 137 18, Electronic data protessin9 equipment and software 32 559,328 . 32 559,328 , 29 552 458 19. Fumilure erxl equipment, Induding heatfh care delivery assets ($ p ) 289 ~ 447 219,393443 50 291,004 49 4t>G 629 20. Nel adjustment in as~ets,uld Ilabilitks due to lore)§n exchange rates .82,645,618 82,845,678 , , 21. Receivadas from parent, sutisidiarles and affiiate s 22. Healthcare (b 0) and other amounts receivable 315899,160 ,. 3,740554 ... 312,158,606 238 286 862 23. Aggregate lrr8e-ins for other then Invested assets , , 24. Totat assets exdud ..... ng Separate Accounts, Segregated Accowls and 767441418 52,021 117 715,420 301 550,843 266 Protected CeN Actaunts (tines 10 to 23) , 25. From S rate ' ' ' ' ' • •- epa Accounts, Segregated P,ceauMs and ProleUed Ce11 Accou,rts . . x,915,940,998 . . 1,366,152,812. .......... ' 32,549,788,186 ..... 29 204 572 x 26, Total {Lines 24 and 251 • • • ... ....... . , , , . OETAIt,S OF WPoTI?-IN LINES 0902. .. ... ..... ..... . --~ 0803. .. ... .. ...... ..... _. -.................. ... .... .. ...................... 0998. Summa otremaini .. . h ng wsik-,ns for lhle U9 hom we ... ...... . rAowpega..... ............. ......... ... ............ 0999, Gals (Lines 0901 Ilttouah 0903 nxrc naoa, n :.. nn .~_. _. - ztut. Omer assets ......x 2302, Cash surrender value life insurance ' ' ' ' ' ' ' 2303. Equities and deposits in pools.and associaUcns .. . 2399. Summa of remainin wrileins tar Lhe 23 from overflow .... .. 3 ry 9 page . .. 17 1399. Totals (L'mes 2301 Uxeueh 2303 n~,~ nn~, n ;..,..,•, _,._. _, ... ...... 348,631,523 204,675,583 36 042 093 .... •:; :;,:..:.: ~. , .~... .....32.235.326 00721. CERTIFICATE AS TO CORPORATE PRINCIPAL I Ca -~b ` C . ~ta~ ~ ~,tir~ ,certify that I am the Secretary of the corporation named as Principal in the foregoing Performance and Payment Bond (Performance Bond and Payment Bond}; that ~ (~ ~ D ,who signed the Bonds} on behalf of the Principal, was then _ of said corporation; that I know his/her signature; and his/her signature thereto is genuine; and that said Bond(s) was (were) duty signed, sealed and attested to on behalf of said corporation by authority of its governing body. Secretary (on behalf of) ~~ ~~ M o et o~-~ ¢j P~sso Corporation (SEAL} STATE OF FLORIDA ) SS COUNTY OF MIAMI-DARE } Before me, a Notary Public duly commissioned, qualified and acting personally, appeared C'~~~ QO to me well known, who being by me first duly sworn upon oath says that he/she has been authorized to execute the foregoing Performance and Payment Bond (Performance Bond and Payment Bond) on behalf of Contractor named therein in favor of City. Subscribed and Sworn to before me this ay of 2oQ~. My commission expires: /^ ` I ~~ 1 ~> Nota ublic, ate of Florida at Large Bonded by ` „~~ 9-. ,~. •r a. •ss.. era. seeoow~-~ . w"""fc. '~ b.: ~ Few (~.4't?'f11/ DD052d10i Expires 3/1!2010 .......~ :;.: f::: ~:o:.:..f BID NO: 24-08109 CITY OF MIAMI BEACH DATE: April 6, 2009 84 00800. GENERAL CONDITIONS: Project Manual: 1.1. The Project Manual includes any general or special Contract conditions or specifications attached hereto. 1.2. The Project Manual, along with all documents that make up and constitute the Contract Documents, shall be followed in strict accordance as to work, performance, material, and dimensions except when Consultant may authorize, in writing, an exception. 1.3. Dimensions given in figures are to hold preference over scaled measurements from the drawings; however, all discrepancies shall be resolved by Consultant. Contractor shall not proceed when in doubt as to any dimension or measurement, but shall seek clarification from Consultant. 1.4. Contractor shall be furnished three (3) copies, free of charge, of the Project Manual; two of which shall be preserved and always kept accessible to Consultant and Consultant's authorized representatives. Additional copies of the Project Manual may be obtained from City at the cost of reproduction. 2. Intention of City: It is the intent of City to describe in the Contract Documents a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents and in accordance with all codes and regulations governing construction of the Project. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied by Contractor whether or not specifically called for. When words which have swell-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals, or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of bids and Contractor shall comply therewith. City shall have no duties other than those duties and obligations expressly set forth within the Contract Documents. Preliminary Matters: 3.1. Within five (5) calendar days prior to the pre-construction meeting described in Section 3.2, Contractor shall submit to Consultant for Consultant's review and acceptance: 3.1.1. A progress schedule in the indicated form: [ ]Bar Chart [ ]Modified CPM [ ]CPM BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 87 [X] Computerized CPM (CPM shall be interpreted to be generally as outlined in the Association of General Contractors (AGC) publication, "The Use of CPM in Construction.") The progress schedule shall indicate the start and completion dates of the various stages of the Work and shall show an activity network for the planning and execution of the Work. Included with the progress schedule shall be a narrative description of the progress schedule. The progress schedule must be updated monthly by Contractor ,submitted as part of each Application for Payment and shall be acceptable to Consultant. 3.1.2. A preliminary schedule of Shop Drawing submissions; and 3.1.3. In a lump sum contract or in a contract which includes lump sum bid items of Work, a preliminary schedule of values for all of the Work which will include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of work which will be confirmed in writing by Contractor at the time of submission. [ ]Such prices shall be broken down to show labor, equipment, materials and overhead and profit. 3.1.4. After award but prior to the submission of the progress schedule, Consultant, Contract Administrator and Contractor shall meet with all utility owners and secure from them a schedule of utility relocation, provided, however, neither Consultant nor City shall be responsible for the nonperformance by the utility owners. 3.2. At a time specified by Consultant but before Contractor starts the work at the Project site, a conference attended by Contractor ,Consultant and others as deemed appropriate by Contract Administrator, will be held to discuss the schedules referred to in Section 3.1, to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. 3.3. Within thirty-five (35) days from the Project Initiation Date set forth in the Notice to Proceed, a conference attended by Contractor ,Consultant and others, as appropriate, will be held to finalize the schedules submitted in accordance with Section 3.1. Within forty-five (45) days after the Project Initiation Date set forth in the Notice to Proceed, the Contractor shall revise the original schedule submittal to address all review comments from the CPM review conference and resubmit for Consultant review. The finalized progress schedule will be accepted by Consultant only as providing an orderly progression of the Work to completion within the Contract Time, but such acceptance shall not constitute acceptance by BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 88 City or Consultant of the means or methods of construction or of the sequencing or scheduling of the Work, and such acceptance will neither impose on Consultant or City responsibility for the progress or scheduling of the Work nor relieve Contractor from full responsibility therefore. The finalized schedule of Shop Drawing submissions must be acceptable to Consultant as providing a workable arrangement for processing the submissions. The finalized schedule of values pursuant to Section 3.1.3 above must be acceptable to Consultant as to form and substance. 4. Performance Bond and Payment Bond: Within fifteen (15) calendar days of being notified of the award, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond attached hereto as forms 00710 and 00720. 4.1. Each Bond shall be in the amount of one hundred percent (100%) of the Contract Price guaranteeing to City the completion and performance of the work covered in such Contract as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project. Each Bond shall be with a surety company which is qualified pursuant to Article 5. 4.2. Each Bond shall continue in effect for one year after Final Completion and acceptance of the work with liability equal to one hundred percent (100%) of the Contract sum, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Contract. 4.3. Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public records of Miami-Dade County and provide City with evidence of such recording. 4.4. Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate forms of security which may be in the form of cash, money order, certified check, cashier's check or unconditional letter of credit in the form attached hereto as Form 00735. Such alternate forms of security shall be subject to the prior approval of City and for same purpose and shall be subject to the same conditions as those applicable above and shall be held by City for one year after completion and acceptance of the Work. 5. Qualification of Surety 5.1. Bid Bonds, Performance Bonds and Payment Bonds over Five Hundred Thousand Dollars ($500,000.00): 5.1.1. Each bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 89 business with a record of successful continuous operation for at least five (5) years. 5.1.2. The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the net retention of the surety company shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further, the surety company shall provide City with evidence satisfactory to City, that such excess risk has been protected in an acceptable manner. 5.1.3. The City will accept a surety bond from a company with a rating of B+ or better for bonds up to $2 million, provided, however, that if any surety company appears on the watch list that is published quarterly by Intercom of the Office of the Florida Insurance Commissioner, the City shall review and either accept or reject the surety company based on the financial information available to the City. A surety company that is rejected by the City may be substituted by the Bidder or proposer with a surety company acceptable to the City, only if the bid amount does not increase. The following sets forth, in general, the acceptable parameters for bonds: Policy- Financial holder's Size Amount of Bond Ratings Category 500,001 to 1,000,000 B+ Class I 1,000,001 to 2,000,000 B+ Class II 2,000,001 to 5,000,000 A Class III 5,000,001 to 10,000,000 A Class IV 10,000,001 to 25,000,000 A Class V 25,000,001 to 50,000,000 A Class VI 50,000,001 or more A Class VII 5.2. For projects of $500,000.00 or less, City may accept a Bid Bond, Performance Bond and Payment Bond from a surety company which has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued, if the surety company is otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The Certificate and Affidavit so certifying (Form 00722) should be submitted with the Bid Bond and also with the Performance Bond and Payment Bond. 5.3. More stringent requirements of any grantor agency are set forth within the Supplemental Conditions. If there are no more stringent requirements, the provisions of this section shall apply. BID NO: 21-08109 CITY OF MIAMI BEACH DATE: April 6, 2009 90 6. Indemnification 6.1 Contractor shall indemnify and hold harmless City, its officers, agents, directors, and employees, from liabilities, damages, losses, and costs, including, but not limited to reasonable attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of this Agreement. Except as specifically provided herein, this Agreement does not require Contractor to indemnify City, its employees, officers, directors, or agents from any liability, damage, loss, claim, action, or proceeding. These indemnifications shall survive the term of this Agreement. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor shall, upon written notice from City, resist and defend such action or proceeding by counsel satisfactory to City. 6.2 The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by Section 6.1 above which may be brought against City whether performed by Contractor , or persons employed or utilized by Contractor . 7. Insurance Reauirements: 7.1. Without limiting any of the other obligations or liabilities of Contractor ,Contractor shall provide, pay for, and maintain in force until all of its work to be performed under this Contract has been completed and accepted by City (or for such duration as is otherwise specified hereinafter), the insurance coverages set forth herein. 7.1.1. Workers' Compensation insurance to apply for all employees in compliance with the "Workers' Compensation Law" of the State of Florida and all applicable federal laws. In addition, the policy(ies) must include: 7.1.1.1. Employers' Liability with a limit of One Million Dollars ($1,000,000.00) Dollars ($) each accident. 7.1.1.2. If any operations are to be undertaken on or about navigable waters, coverage must be included for the U.S. Longshoremen & Harbor Workers Act and Jones Act. 7.1.2. Comprehensive General Liability with minimum limits of One Million Dollars ($1,000,000.00) per occurrence, combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the latest edition of the Comprehensive General Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: [ X ] 7.1.2.1. Premises and/or Operations. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 91 [ X ] 7.1.2.2.Independent Contractors. [ X ] 7.1.2.3. Products and/or Completed Operations for contracts over Fifty Thousand Dollars ($50,000.00) Contractor shall maintain in force until at least three years after completion of all work required under the Contract, coverage for Products and Completed Operations, including Broad Form Property Damage. [ X ] 7.1.2.4.Explosion, Collapse and Underground Coverages. (X ] 7.1.2.5. Broad Form Property Damage. [ X ] 7.1.2.6. Broad Form Contractual Coverage applicable to this specific Contract, including any hold harmless and/or indemnification agreement. [ ] 7.1.2.7. Personal Injury Coverage with Employee and Contractual Exclusions removed, with minimum limits of coverage equal to those required for Bodily Injury Liability and Property Damage Liability. [ X ] 7.1.2.8.City is to be expressly included as an Additional Insured with respect to liability arising out of operations performed for City by or on behalf of Contractor or acts or omissions of Contractor in connection with general supervision of such operation. 7.1.3. Business Automobile Liability with minimum limits of One Million Dollars ($1,000,000.00) per occurrence, combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the latest edition of the Business Automobile Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: 7.1.3.1. Owned Vehicles. 7.1.3.2. Hired and Non-Owned Vehicles. 7.1.3.3. Employers' Non-Ownership. (Not Applicable to this bid) [ X ] 7.1.4. Builder's Risk insurance for the construction of and/or addition to aboveground buildings or structures is/is not required. The coverage shall be "All Risk" coverage for 100 percent of the completed value, covering City as a named insured, with a deductible of not more than Five Thousand Dollars ($5,000.00) each claim. 7.1.4.1. Waiver of Occupancy Clause or Warranty--Policy must be specifically endorsed to eliminate any "Occupancy Clause" BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 92 or similar warranty or representation that the building(s), addition(s) or structure(s) in the course of construction shall not be occupied without specific endorsement of the policy. The Policy must be endorsed to provide that the Builder's Risk coverage will continue to apply until final acceptance of the building(s), addition(s) or structure(s) by City. [ ] 7.1.4.2. Flood Insurance--When the buildings or structures are located within an identified special flood hazard area, flood insurance must be afforded for the lesser of the total insurable value of such buildings or structures, or, the maximum amount of flood insurance coverage available under the National Flood Program. [ ] 7.1.5. Installation Floater for the installation of machinery and/or equipment into an existing structure is/is not required. The coverage shall be "All Risk" coverage including installation and transit for 100 percent of the "installed replacement cost value," covering City as a named insured, with a deductible of not more than Five Thousand Dollars ($5,000.00) each claim. 7.1.5.1. Cessation of Insurance--Coverage is not to cease and is to remain in force (subject to cancellation notice) until final acceptance by City. 7.1.5.2. Flood Insurance--When the machinery or equipment is located within an identified special flood hazard area, flood insurance must be afforded for the lesser of the total insurable value of such buildings or structure, or, the maximum amount of flood insurance coverage available under the National Flood Program. 7.2. If the initial insurance expires prior to the completion of the work, renewal copies of policies shall be furnished at least thirty (30) days prior to the date of their expiration. 7.3. Notice of Cancellation and/or Restriction--The policy(ies) must be endorsed to provide City with at least thirty (30) days notice of cancellation and/or restriction. 7.4. Contractor shall furnish to the City's Risk Manager Certificates of Insurance or endorsements evidencing the insurance coverage specified above within fifteen (15) calendar days after notification of award of the Contract. The required Certificates of Insurance shall name the types of policies provided, refer specifically to this Contract, and state that such insurance is as required by this Contract. The Certificate of Insurance shall be in form similar to and contain the information set forth in Form 00708. 7.5. The official title of the Owner is the City of Miami Beach, Florida. This official title shall be used in all insurance documentation. BID NO: 21-08109 CITY OF MIAMI BEACH DATE: April 6, 2009 93 8. Labor and Materials: 8.1. Unless otherwise provided herein, Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. 8.2. Contractor shall at all times enforce strict discipline and good order among its employees and subcontractors at the Project site and shall not employ on the Project any unfit person or anyone not skilled in the work to which they are assigned. 9. Royalties and Patents: All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the construction of the Work or appurtenances, are hereby included in the prices stipulated in this Contract for said work. 10. Weather: Extensions to the Contract Time for delays caused by the effects of inclement weather shall be submitted as a request for a change in the Contract Time pursuant to Article 40. These time extensions are justified only when rains or other inclement weather conditions or related adverse soil conditions prevent Contractor from productively performing controlling items of work identified on the accepted schedule or updates resulting in: (1) Contractor being unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates due to adverse weather conditions; or (2) Contractor must make major repairs to the Work damaged by weather. Providing the damage was not attributable to a failure to perform or neglect by Contractor ,and providing that Contractor was unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates. 11. Permits. Licenses and Impact Fees: 11.1. Except as otherwise provided within the Supplemental Conditions, all permits and licenses required by federal, state or local laws, rules and regulations necessary for the prosecution of the Work undertaken by Contractor pursuant to this Contract shall be secured and paid for by Contractor . It is Contractor 's responsibility to have and maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for the jurisdiction in which the Work is to be performed for all persons working on the Project for whom a Certificate of Competency is required. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 94 11.2. Impact fees levied by the City and/or Miami-Dade County shall be paid by Contractor . Contractor shall be reimbursed only for the actual amount of the impact fee levied by the municipality as evidenced by an invoice or other acceptable documentation issued by the municipality. Reimbursement to Contractor in no event shall include profit or overhead of Contractor . 12. Resolution of Disputes: 12.1 To prevent all disputes and litigation, it is agreed by the parties hereto that Consultant shall decide all questions, claims, difficulties and disputes of whatever nature which may arise relative to the technical interpretation of the Contract Documents and fulfillment of this Contract as to the character, quality, amount and value of any work done and materials furnished, or proposed to be done or furnished under or, by reason of, the Contract Documents and Consultant's estimates and decisions upon all claims, questions, difficulties and disputes shall be final and binding to the extent provided in Section 12.2. Any claim, question, difficulty or dispute which cannot be resolved by mutual agreement of City and Contractor shall be submitted to Consultant in writing within twenty-one (21) calendar days. Unless a different period of time is set forth herein, Consultant shall notify City and Contractor in writing of Consultant's decision within twenty- one (21) calendar days from the date of the submission of the claim, question, difficulty or dispute, unless Consultant requires additional time to gather information or allow the parties to provide additional information. All nontechnical administrative disputes shall be determined by the Contract Administrator pursuant to the time periods provided herein. During the pendency of any dispute and after a determination thereof, Contractor ,Consultant and City shall act in good faith to mitigate any potential damages including utilization of construction schedule changes and alternate means of construction. 12.2 In the event the determination of a dispute under this Article is unacceptable to either party hereto, the party objecting to the determination must notify the other party in writing within ten (10) days of receipt of the written determination. The notice must state the basis of the objection and must be accompanied by a statement that any Contract Price adjustment claimed is the entire adjustment to which the objecting party has reason to believe it is entitled to as a result of the determination. Within sixty (60) days after Final Completion of the Work, the parties shall participate in mediation to address all objections to any determinations hereunder and to attempt to prevent litigation. The mediator shall be mutually agreed upon by the parties. Should any objection not be resolved in mediation, the parties retain all their legal rights and remedies provided under State law. A party objecting to a determination specifically waives all of its rights provided hereunder, including its rights and remedies under State law, if said party fails to comply in strict accordance with the requirements of this Article. 13. Inspection of Work: 13.1. Consultant and City shall at all times have access to the Work, and Contractor shall provide proper facilities for such access and for inspecting, measuring and testing. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 95 13.1.1. Should the Contract Documents, Consultant's instructions, any laws, ordinances, or any public authority require any of the Work to be specially tested or approved, Contractor shall give Consultant timely notice of readiness of the Work for testing. If the testing or approval is to be made by an authority other than City, timely notice shall be given of the date fixed for such testing. Testing shall be made promptly, and, where practicable, at the source of supply. If any of the Work should be covered up without approval or consent of Consultant, it must, if required by Consultant, be uncovered for examination and properly restored at Contractor 's expense. 13.1.2. Reexamination of any of the Work may be ordered by Consultant with prior written approval by the Contract Administrator, and if so ordered, the Work must be uncovered by Contractor . If such Work is found to be in accordance with the Contract Documents, City shall pay the cost of reexamination and replacement by means of a Change Order. If such Work is not in accordance with the Contract Documents, Contractor shall pay such cost. 13.2. Inspectors shall have no authority to permit deviations from, nor to relax any of the provisions of, the Contract Documents nor to delay the Contract by failure to inspect the materials and work with reasonable promptness without the written permission or instruction of Consultant. 13.3. The payment of any compensation, whatever may be its character or form, or the giving of any gratuity or the granting of any favor by Contractor to any inspector, directly or indirectly, is strictly prohibited, and any such act on the part of Contractor will constitute a breach of this Contract. 14. Superintendence and Supervision: 14.1. The orders of City are to be given through Consultant, which instructions are to be strictly and promptly followed in every case. Contractor shall keep on the Project during its progress, a full-time competent English speaking superintendent and any necessary assistants, all satisfactory to Consultant. The superintendent shall not be changed except with the written consent of Consultant, unless the superintendent proves to be unsatisfactory to Contractor and ceases to be in its employ. The superintendent shall represent Contractor and all directions given to the superintendent shall be as binding as if given to Contractor and will be confirmed in writing by Consultant upon the written request of Contractor . Contractor shall give efficient supervision to the Work, using its best skill and attention. 14.2. Daily, Contractor 's superintendent shall record, at a minimum, the following information in a bound log: the day; date; weather conditions and how any weather condition affected progress of the Work; time of commencement of work for the day; the work being performed; materials, labor, personnel, equipment and subcontractors at the Project site; visitors to the Project site, including representatives of Consultant, regulatory representatives; any special or unusual conditions or occurrences encountered; and the time of termination of BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 96 work for the day. All information shall be recorded in the daily log in ink. The daily log shall be kept on the Project site and shall be available at all times for inspection and copying by City and Consultant. 14.3. The Contract Administrator, Contractor and Consultant shall meet at least weekly or as determined by the Contract Administrator, during the course of the Work to review and agree upon the work performed to date and to establish the controlling items of work for the next two weeks. The Consultant shall publish, keep, and distribute minutes and any comments thereto of each such meeting. 14.4. If Contractor in the course of prosecuting the Work, finds any discrepancy between the Contract Documents and the physical conditions of the locality, or any errors, omissions, or discrepancies in the Project Manual, it shall be Contractor 's duty to immediately inform Consultant, in writing, and Consultant will promptly review the same. Any work done after such discovery, until authorized, will be done at Contractor 's sole risk. 14.5. Contractor shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. 15. City's Right to Terminate Contract: 15.1. If Contractor fails to begin the Work within fifteen (15) calendar days after the Project Initiation Date, or fails to perform the Work with sufficient workers and equipment or with sufficient materials to insure the prompt completion of the Work, or shall perform the Work unsuitably, or cause it to be rejected as defective and unsuitable, or shall discontinue the prosecution of the Work pursuant to the accepted schedule or if Contractor shall fail to perform any material term set forth in the Contract Documents or if Contractor shall become insolvent or be declared bankrupt, or commit any act of bankruptcy or insolvency, or shall make an assignment for the benefit of creditors, or from any other cause whatsoever shall not carry on the Work in an acceptable manner, Contract Administrator may give notice in writing to Contractor and its Surety of such delay, neglect or default, specifying the same. If Contractor , within a period of five (5) calendar days after such notice, shall not proceed in accordance therewith, then City may upon written certificate from Consultant of the fact of such delay, neglect or default and Contractor 's failure to comply with such notice, terminate the services of Contractor ,exclude Contractor from the Project site and take the prosecution of the Work out of the hands of Contractor ,and appropriate or use any or all materials and equipment on the Project site as may be suitable and acceptable. In such case, Contractor shall not be entitled to receive any further payment until the Project is completed. In addition City may enter into an agreement for the completion of the Project according to the terms and provisions of the Contract Documents, or use such other methods as in City's sole opinion shall be required for the completion of the Project according to the terms and provisions of the Contract Documents, or use such other methods as in City's sole opinion shall be required for the completion of the Project in an BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 97 acceptable manner. All damages, costs and charges incurred by City„ together with the costs of completing the Project, shall be deducted from any monies due or which may become due to Contractor . In case the damages and expenses so incurred by City shall exceed the unpaid balance, then Contractor shall be liable and shall pay to City the amount of said excess. 15.2. If after notice of termination of Contractor 's right to proceed, it is determined for any reason that Contractor was not in default, the rights and obligations of City and Contractor shall be the same as if the notice of termination had been issued pursuant to the Termination for Convenience clause as set forth in Section 15.3 below. 15.3. This Contract may be terminated for convenience in writing by City upon ten (10) days written notice to Contractor (delivered by certified mail, return receipt requested) of intent to terminate and the date on which such termination becomes effective. In such case, Contractor shall be paid for all work executed and expenses incurred prior to termination in addition to termination settlement costs reasonably incurred by Contractor relating to commitments which had become firm prior to the termination. Payment shall include reasonable profit for work/services satisfactorily performed. No payment shall be made for profit for work/services which have not been performed. 15.4. Upon receipt of Notice of Termination pursuant to Sections 15.1 or 15.3 above, Contractor shall promptly discontinue all affected work unless the Notice of Termination directs otherwise and deliver or otherwise make available to City all data, drawings, specifications, reports, estimates, summaries and such other information as may have been required by the Contract Documents whether completed or in process. 16. Contractor's Riaht to Stop Work or Terminate Contract: Should Consultant fail to review and approve or state in writing reasons for nonapproval of any Application for Payment within twenty (20) days after it is presented, or if City fails either to pay Contractor within thirty (30) days after presentation by Consultant of any sum certified by Consultant, or to notify Contractor and Consultant in writing of any objection to the Application for Payment, then Contractor may, give written notice to City and Consultant of such delay, neglect or default, specifying the same. If City or Consultant (where applicable), within a period of ten (10) calendar days after such notice shall not remedy the delay, neglect, or default upon which the notice is based, then Contractor may stop work or terminate this Contract and recover from City payment for all work executed and reasonable expenses sustained therein plus reasonable termination expenses. Any objection made by City to an Application for Payment shall be submitted to Consultant in accordance with the provisions of Article 12 hereof. 17. Assianment: Neither party hereto shall assign the Contract or any subcontract in whole or in part without the written consent of the other, nor shall Contractor assign any monies due or to become due to it hereunder, without the previous written consent of the Mayor and City Commission. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 98 18. Rights of Various Interests: Whenever work being done by City's forces or by other contractors is contiguous to or within the limits of work covered by this Contract, the respective rights of the various interests involved shall be established by the Contract Administrator to secure the completion of the various portions of the work in general harmony. 19. Differing Site Conditions: In the event that during the course of the Work Contractor encounters subsurface or concealed conditions at the Project site which differ materially from those shown on the Contract Documents and from those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents; or unknown physical conditions of the Project site, of an unusual nature, which differ materially from that ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, Contractor ,without disturbing the conditions and before performing any work affected by such conditions, shall, within twenty-four (24) hours of their discovery, notify City and Consultant in writing of the existence of the aforesaid conditions. Consultant and City shall, within two (2) business days after receipt of Contractor 's written notice, investigate the site conditions identified by Contractor . If, in the sole opinion of Consultant, the conditions do materially so differ and cause an increase or decrease in Contractor 's cost of, or the time required for, the performance of any part of the Work, whether or not charged as a result of the conditions, Consultant shall recommend an equitable adjustment to the Contract Price, or the Contract Time, or both. If City and Contractor cannot agree on an adjustment in the Contract Price or Contract Time, the adjustment shall be referred to Consultant for determination in accordance with the provisions of Article 12. Should Consultant determine that the conditions of the Project site are not so materially different to justify a change in the terms of the Contract, Consultant shall so notify City and Contractor in writing, stating the reasons, and such determination shall be final and binding upon the parties hereto. No request by Contractor for an equitable adjustment to the Contract under this provision shall be allowed unless Contractor has given written notice in strict accordance with the provisions of this Article. No request for an equitable adjustment or change to the Contract Price or Contract Time for differing site conditions shall be allowed if made after the date certified by Consultant as the date of substantial completion. 20. Plans and Working Drawings: City, through Consultant, shall have the right to modify the details of the plans and specifications, to supplement the plans and specifications with additional plans, drawings or additional information as the Work proceeds, all of which shall be considered as part of the Project Manual. In case of disagreement between the written and graphic portions of the Project Manual, the written portion shall govern. BID NO: 21-08109 CITY OF MIAMI BEACH DATE: Apri16, 2009 99 21. Contractor to Check Plans. Specifications and Data: Contractor shall verify all dimensions, quantities and details shown on the plans, specifications or other data received from Consultant, and shall notify Consultant of all errors, omissions and discrepancies found therein within three (3) calendar days of discovery. Contractor will not be allowed to take advantage of any error, omission or discrepancy, as full instructions will be furnished by Consultant. Contractor shall not be liable for damages resulting from errors, omissions or discrepancies in the Contract Documents unless Contractor recognized such error, omission or discrepancy and knowingly failed to report it to Consultant. 22. Contractor 's Responsibility for Damages and Accidents: 22.1. Contractor shall accept full responsibility for the Work against all loss or damage of whatsoever nature sustained until final acceptance by City, and shall promptly repair any damage done from any cause whatsoever, except as provided in Article 29. 22.2. Contractor shall be responsible for all materials, equipment and supplies pertaining to the Project. In the event any such materials, equipment and supplies are lost, stolen, damaged or destroyed prior to final acceptance by City, Contractor shall replace same without cost to City, except as provided in Article 29. 23. Warranty: Contractor warrants to City that all materials and equipment furnished under this Contract will be new unless otherwise specified and that all of the Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by Consultant, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the provisions of Article 25 herein. 24. Supplementary Drawinas: 24.1. When, in the opinion of Consultant, it becomes necessary to explain the Work to be done more fully, or to illustrate the Work further, or to show any changes which may be required, supplementary drawings, with specifications pertaining thereto, will be prepared by Consultant. 24.2. The supplementary drawings shall be binding upon Contractor with the same force as the Project Manual. Where such supplementary drawings require either less or more than the original quantities of work, appropriate adjustments shall be made by Change Order. 25. Defective Work: 25.1. Consultant shall have the authority to reject or disapprove work which Consultant finds to be defective. If required by Consultant, Contractor shall promptly either BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 100 correct all defective work or remove such defective work and replace it with nondefective work. Contractor shall bear all direct, indirect and consequential costs of such removal or corrections including cost of testing laboratories and personnel. 25.2. Should Contractor fail or refuse to remove or correct any defective work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by Consultant, City shall have the authority to cause the defective work to be removed or corrected, or make such repairs as may be necessary at Contractor 's expense. Any expense incurred by City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor , or may be charged against the Performance Bond. In the event of failure of Contractor to make all necessary repairs promptly and fully, City may declare Contractor in default. 25.3. If, within one (1) year after the date of substantial completion or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents, or by any specific provision of the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, Contractor ,after receipt of written notice from City, shall promptly correct such defective or nonconforming Work within the time specified by City without cost to City, to do so. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to, Article 23 hereof and any claim regarding latent defects. 25.4. Failure to reject any defective work or material shall not in any way prevent later rejection when such defect is discovered, or obligate City to final acceptance. 26. Taxes Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. 27. Subcontracts: 27.1. Contractor shall not employ any subcontractor against whom City or Consultant may have a reasonable objection. Contractor shall not be required to employ any subcontractor against whom Contractor has a reasonable objection. 27.2. Contractor shall be fully responsible for all acts and omissions of its subcontractors and of persons directly or indirectly employed by its subcontractors and of persons for whose acts any of them may be liable to the same extent that Contractor is responsible for the acts and omissions of persons directly employed by it. Nothing in the Contract Documents shall create any contractual relationship between any subcontractor and City or any obligation on the part of City to pay or to see the payment of any monies due any BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 101 subcontractor. City or Consultant may furnish to any subcontractor evidence of amounts paid to Contractor on account of specific work performed. 27.3. Contractor agrees to bind specifically every subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of City. [ ] 27.4. Contractor shall perform the Work with its own organization, amounting to not less than 15% percent of the Contract Price. 28. Separate Contracts: 28.1. City reserves the right to let other contracts in connection with this Project. Contractor shall afford other persons reasonable opportunity for the introduction and storage of their materials and the execution of their work and shall properly connect and coordinate this Work with theirs. 28.2. If any part of Contractor's Work depends for proper execution or results upon the work of any other persons, Contractor shall inspect and promptly report to Consultant any defects in such work that render it unsuitable for such proper execution and results. Contractor 's failure to so inspect and report shalt constitute an acceptance of the other person's work as fit and proper for the reception of Contractor 's Work, except as to defects which may develop in other contractor's work after the execution of Contractor 's. 28.3. Contractor shall conduct its operations and take all reasonable steps to coordinate the prosecution of the Work so as to create no interference or impact on any other contractor on the site. Should such interference or impact occur, Contractor shall be liable to the affected contractor for the cost of such interference or impact. 28.4. To insure the proper execution of subsequent work, Contractor shall inspect the work already in place and shall at once report to Consultant any discrepancy between the executed work and the requirements of the Contract Documents. 29. Use of Completed Portions: 29.1. City shall have the right at its sole option to take possession of and use any completed or partially completed portions of the Project. Such possession and use shall not be deemed an acceptance of any of the Work not completed in accordance with the Contract Documents. If such possession and use increases the cost of or delays the Work, Contractor shall be entitled to reasonable extra compensation, or reasonable extension of time or both, as recommended by Consultant and approved by City. 29.2. In the event City takes possession of any completed or partially completed portions of the Project, the following shall occur: 29.2.1. City shall give notice to Contractor in writing at least thirty (30) calendar days prior to City's intended occupancy of a designated area. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 102 29.2.2. Contractor shall complete to the point of Substantial Completion the designated area and request inspection and issuance of a Certificate of Substantial Completion in the form attached hereto as 00925 from Consultant. 29.2.3. Upon Consultant's issuance of a Certificate of Substantial Completion, City will assume full responsibility for maintenance, utilities, subsequent damages of City and public, adjustment of insurance coverage's and start of warranty for the occupied area. 29.2.4. Contractor shall complete all items noted on the Certificate of Substantial Completion within the time specified by Consultant on the Certificate of Substantial Completion, as soon as possible and request final inspection and final acceptance of the portion of the Work occupied. Upon completion of final inspection and receipt of an application for final payment, Consultant shall issue a Final Certificate of Payment relative to the occupied area. 29.2.5. If City finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion thereof, such occupancy or use shall not commence prior to a time mutually agreed upon by City and Contractor and to which the insurance company or companies providing the property insurance have consented by endorsement to the policy or policies. Insurance on the unoccupied or unused portion or portions shall not be canceled or lapsed on account of such partial occupancy or use. Consent of Contractor and of the insurance company or companies to such occupancy or use shall not be unreasonably withheld. 30. Lands for Work: 30.1. City shall provide, as may be indicated in the Contract Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by City or the use of Contractor . 30.2. Contractor shall provide, at Contractor 's own expense and without liability to City, any additional land and access thereto that may be required for temporary construction facilities, or for storage of materials. Contractor shall furnish to City copies of written permission obtained by Contractor from the owners of such facilities. 31. Legal Restrictions and Traffic Provisions: Contractor shall conform to and obey all applicable laws, regulations, or ordinances with regard to labor employed, hours of work and Contractor 's general operations. Contractor shall conduct its operations so as not to close any thoroughfare, nor interfere in any way with traffic on railway, highways, or water, without the prior written consent of the proper authorities. BID NO: 21-08109 CITY OF MIAMI BEACH DATE: April 6, 2009 103 32. Location and Damage to Existing Facilities Equipment or Utilities: 32.1. As far as possible, all existing utility lines in the Project area have been shown on the plans. However, City does not guarantee that all lines are shown, or that the ones indicated are in their true location. It shall be the Contractor '. 'S responsibility to identify and locate all underground and overhead utility lines or equipment affecting or affected by the Project. No additional payment will be made to the Contractor because of discrepancies in actual and plan location of utilities, and damages suffered as a result thereof. 32.2. The Contractor shall notify each utility company involved at least ten (10) days prior to the start of construction to arrange for positive underground location, relocation or support of its utility where that utility may be in conflict with or endangered by the proposed construction. Relocation of water mains or other utilities for the convenience of the Contractor shall be paid by the Contractor . All charges by utility companies for temporary support of its utilities shall be paid for by the Contractor . All costs of permanent utility relocation to avoid conflict shall be the responsibility of the utility company involved. No additional payment will be made to the Contractor for utility relocations, whether or not said relocation is necessary to avoid conflict with other lines. 32.3. The Contractor shall schedule the work in such a manner that the work is not delayed by the utility providers relocating or supporting their utilities. The Contractor shall coordinate its activities with any and all public and private utility providers occupying the right-of-way. No compensation will be paid to the Contractor for any loss of time or delay. 32.4. All overhead, surface or underground structures and utilities encountered are to be carefully protected from injury or displacement. All damage to such structures is to be completely repaired within a reasonable time; needless delay will not be tolerated. The City reserves the right to remedy such damage by ordering outside parties to make such repairs at the expense of the Contractor . All such repairs made by the Contractor are to be made to the satisfaction of the utility owner. All damaged utilities must be replaced or fully repaired. All repairs are to be inspected by the utility owner prior to backfilling. 33. Value Engineering: Contractor may request substitution of materials, articles, pieces of equipment or any changes that reduce the Contract Price by making such request to Consultant in writing. Consultant will be the sole judge of acceptability, and no substitute will be ordered, installed, used or initiated without Consultant's prior written acceptance which will be evidenced by either a Change Order or an approved Shop Drawing. However, any substitution accepted by Consultant shall not result in any increase in the Contract Price or Contract Time. By making a request for substitution, Contractor agrees to pay directly to Consultant all Consultant's fees and charges related to Consultant's review of the request for substitution, whether or not the request for substitution is accepted by Consultant. Any substitution submitted by Contractor must meet the form, fit, function and life cycle criteria of the item proposed to be replaced and there must be a net dollar savings including Consultant review fees and charges. If a substitution is approved, the BID NO: 21-08!09 CITY OF MIAMI BEACH DATE: April 6, 2009 104 net dollar savings shall be shared equally between Contractor and City and shall be processed as a deductive Change Order. City may require Contractor to furnish at Contractor 's expense a special performance guarantee or other surety with respect to any substitute approved after award of the Contract. 34. Continuing the Work: Contractor shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with City, including disputes or disagreements concerning a request for a Change Order, a request for a change in the Contract Price or Contract Time. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. 35. Chanaes in the Work or Terms of Contract Documents: 35.1. Without invalidating the Contract and without notice to any surety City reserves and shall have the right, from time to time to make such increases, decreases or other changes in the character or quantity of the Work as may be considered necessary or desirable to complete fully and acceptably the proposed construction in a satisfactory manner. Any extra or additional work within the scope of this Project must be accomplished by means of appropriate Field Orders and Supplemental Instructions or Change Orders. 35.2. Any changes to the terms of the Contract Documents must be contained in a written document, executed by the parties hereto, with the same formality and of equal dignity prior to the initiation of any work reflecting such change. This section shall not prohibit the issuance of Change Orders executed only by City as hereinafter provided. 36. Field Orders and Supplemental Instructions: 36.1. The Contract Administrator, through Consultant, shall have the right to approve and issue Field Orders setting forth written interpretations of the intent of the Contract Documents and ordering minor changes in Work execution, providing the Field Order involves no change in the Contract Price or the Contract Time. 36.2. Consultant shall have the right to approve and issue Supplemental Instructions setting forth written orders, instructions, or interpretations concerning the Contract Documents or its performance, provided such Supplemental Instructions involve no change in the Contract Price or the Contract Time. 37. Change Orders: 37.1. Changes in the quantity or character of the Work within the scope of the Project which are not properly the subject of Field Orders or Supplemental Instructions, including all changes resulting in changes in the Contract Price, or the Contract Time, shall be authorized only by Change Orders approved in advance and issued in accordance with the provisions of the City. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 105 37.2. All changes to construction contracts must be approved in advance in accordance with the value of the Change Order or the calculated value of the time extension. All Change Orders with a value of $25,000 or more shall be approved in advance by the Mayor and City Commission. All Change Orders with a value of less than $25,000 shall be approved in advance by the City Manager or his designee. 37.3. In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Price or Contract Time, and a Change Order has not been issued, City reserves the right at its sole option to either terminate the Contract as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or submit the matter in dispute to Consultant as set forth in Article 12 hereof. During the pendency of the dispute, and upon receipt of a Change Order approved by City, Contractor shall promptly proceed with the change in the Work involved and advise the Consultant and Contract Administrator in writing within seven (7) calendar days of Contractor 's agreement or disagreement with the method, if any, provided in the Change Order for determining the proposed adjustment in the Contract Price or Contract Time. 37.4. On approval of any Contract change increasing the Contract Price, Contractor shall ensure that the performance bond and payment bond are increased so that each reflects the total Contract Price as increased. 37.5. Under circumstances determined necessary by City, Change Orders may be issued unilaterally by City. 38. Value of Change Order Work: 38.1. The value of any work covered by a Change Order or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways: 38.1.1. Where the work involved is covered by unit prices contained in the Contract Documents, by application of unit prices to the quantities of items involved, subject to the provisions of Section 38.7. 38.1.2. By mutual acceptance of a lump sum which Contractor and City acknowledge contains a component for overhead and profit. 38.1.3. On the basis of the "cost of work," determined as provided in Sections 38.2 and 38.3, plus a Contractor 's fee for overhead and profit which is determined as provided in Section 38.4. 38.2. The term "cost of work" means the sum of all direct costs necessarily incurred and paid by Contractor in the proper performance of the Work described in the Change Order. Except as otherwise may be agreed to in writing by City, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in Section 38.3. BID NO: 21-08109 CITY OF MIAMI BEACH DATE: April 6, 2009 106 38.2.1. Payroll costs for employees in the direct employ of Contractor in the performance of the work described in the Change Order under schedules of job classifications agreed upon by City and Contractor . Payroll costs for employees not employed full time on the work covered by the Change Order shall be apportioned on the basis of their time spent on the work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay application thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing the work after regular working hours, on Sunday or legal holidays, shall be included in the above to the extent authorized by City. 38.2.2. Cost of all materials and equipment furnished and incorporated in the work, including costs of transportation and storage thereof, and manufacturers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless City deposits funds with Contractor with which to make payments, in which case the cash discounts shall accrue to City. All trade discounts, rebates and refunds, and all returns from sale of surplus materials and equipment shall accrue to City and Contractor shall make provisions so that they may be obtained. Rentals of all construction equipment and machinery and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City with the advice of Consultant and the costs of transportation, loading, unloading, installation, dismantling and removal thereof, all in accordance with the terms of said agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the work. 38.2.3. Payments made by Contractor to Subcontractors for work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from Subcontractors acceptable to Contractor and shall deliver such bids to City who will then determine, with the advice of Consultant, which bids will be accepted. If the Subcontract provides that the Subcontractor is to be paid on the basis of cost of the work plus a fee, the Subcontractor's cost of the work shall be determined in the same manner as Contractor 'S cost of the work. All Subcontractors shall be subject to the other provisions of the Contract Documents insofar as applicable. 38.2.4. Cost of special consultants, including, but not limited to, engineers, architects, testing laboratories, and surveyors employed for services specifically related to the performance of the work described in the Change Order. 38.2.5. Supplemental costs including the following: BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 107 38.2.5.1. The proportion of necessary transportation, travel and subsistence expenses of Contractor 's employees incurred in discharge of duties connected with the work except for local travel to and from the site of the work. 38.2.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workmen, which are consumed in the performance of the work, and cost less market value of such items used but not consumed which remains the property of Contractor . 38.2.5.3. Sales, use, or similar taxes related to the work, and for which Contractor is liable, imposed by any governmental authority. 38.2.5.4. Deposits lost for causes other than Contractor 's negligence; royalty payments and fees for permits and licenses. 38.2.5.5. The cost of utilities, fuel and sanitary facilities at the site. 38.2.5.6. Receipted minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the work. 38.2.5.7. Cost of premiums for additional bonds and insurance required because of changes in the work. 38.3. The term "cost of the work" shall not include any of the following: 38.3.1. Payroll costs and other compensation of Contractor 's officers, executives, principals (of partnership and sole proprietorships), general managers, engineers, architects, estimators, lawyers, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by Contractor whether at the site or in its principal or a branch office for general administration of the work and not specifically included in the agreed- upon schedule of job classifications referred to in Section 38.2.1., all of which are to be considered administrative costs covered by Contractor 's fee. 38.3.2. Expenses of Contractor 's principal and branch offices other than Contractor 's office at the site. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 108 38.3.3. Any part of Contractor 's capital expenses, including interest on Contractor 's capital employed for the work and charges against Contractor for delinquent payments. 38.3.4. Cost of premiums for all Bonds and for all insurance whether or not Contractor is required by the Contract Documents to purchase and maintain the same, except for additional bonds and insurance required because of changes in the work. 38.3.5. Costs due to the negligence or neglect of Contractor, any Subcontractors, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective work, disposal of materials or equipment wrongly supplied and making good any damage to property. 38.3.6. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in Section 38.2. 38.4. Contractor's fee allowed to Contractor for overhead and profit shall be determined as follows: 38.4.1. A mutually acceptable fixed fee or if none can be agreed upon, 38.4.2. A fee based on the following percentages of the various portions of the cost of the work: 38.4.2.1. For costs incurred under Sections 38.2.1 and 38.2.2, Contractor's fee shall not exceed ten percent (10%). 38.4.2.2. For costs incurred under Section 38.2.3, Contractor 's fee shall not exceed seven and one half percent (7.5%); and if a subcontract is on the basis of cost of the work plus a fee, the maximum allowable to the Subcontractor as a fee for overhead and profit shall not exceed ten percent (10%); and 38.4.2.3. No fee shall be payable on the basis of costs itemized under Sections 38.2.4 and 38.2.5, (except Section 38.2.5.3), and Section 38.3. 38.5. The amount of credit to be allowed by Contractor to City for any such change which results in a net decrease in cost, will be the amount of the actual net decrease. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any, however, Contractor shall not be entitled to claim lost profits for any Work not performed. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 109 38.6. Whenever the cost of any work is to be determined pursuant to Sections 38.2 and 38.3, Contractor will submit in a form acceptable to Consultant an itemized cost breakdown together with the supporting data. 38.7. Where the quantity of any item of the Work that is covered by a unit price is increased or decreased by more than twenty percent (20%) from the quantity of such work indicated in the Contract Documents, an appropriate Change Order shall be issued to adjust the unit price, if warranted. 38.8. Whenever a change in the Work is to be based on mutual acceptance of a lump sum, whether the amount is an addition, credit or no change-in-cost, Contractor shall submit an initial cost estimate acceptable to Consultant and Contract Administrator. 38.8.1. Breakdown shall list the quantities and unit prices for materials, labor, equipment and other items of cost. 38.8.2. Whenever a change involves Contractor and one or more Subcontractors and the change is an increase in the Contract Price, overhead and profit percentage for Contractor and each Subcontractor shall be itemized separately. 38.9. Each Change Order must state within the body of the Change Order whether it is based upon unit price, negotiated lump sum, or "cost of the work." 39. Notification and Claim for Change of Contract Time or Contract Price: 39.1. Any claim for a change in the Contract Time or Contract Price shall be made by written notice by Contractor to the Contract Administrator and to Consultant within five (5) calendar days of the commencement of the event giving rise to the claim and stating the general nature and cause of the claim. Thereafter, within twenty (20) calendar days of the termination of the event giving rise to the claim, written notice of the extent of the claim with supporting information and documentation shall be provided unless Consultant allows an additional period of time to ascertain more accurate data in support of the claim and such notice shall be accompanied by Contractor's written notarized statement that the adjustment claimed is the entire adjustment to which the Contractor has reason to believe it is entitled as a result of the occurrence of said event. All claims for changes in the Contract Time or Contract Price shall be determined by Consultant in accordance with Article 12 hereof, if City and Contractor cannot otherwise agree. IT IS EXPRESSLY AND SPECIFICALLY AGREED THAT ANY AND ALL CLAIMS FOR CHANGES TO THE CONTRACT TIME OR CONTRACT PRICE SHALL BE WAIVED IF NOT SUBMITTED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION. 39.2. The Contract Time will be extended in an amount equal to time lost on critical Work items due to delays beyond the control of and through no fault or negligence of Contractor if a claim is made therefor as provided in Section 39.1. Such delays shall include, but not be limited to, acts or neglect by any separate contractor employed by City, fires, floods, labor disputes, epidemics, abnormal weather conditions or acts of God. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 110 40. No Damages for Delay: No claim for damages or any claim, other than for an extension of time, shall be made or asserted against City by reason of any delays except as provided herein. Contractor shall not be entitled to an increase in the Contract Price or payment or compensation of any kind from City for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable; provided, however, that this provision shall not preclude recovery of damages by Contractor for actual delays due solely to fraud, bad faith or active interference on the part of City or its Consultant. Otherwise, Contractor shall be entitled only to extensions of the Contract Time as the sole and exclusive remedy for such resulting delay, in accordance with and to the extent specifically provided above. 41. Excusable Delay; Comoensable~ Non-compensable: 41.1 Excusable Delay. Delay which extends the completion of the Work and which is caused by circumstances beyond the control of Contractor or its subcontractors, suppliers or vendors is Excusable Delay. Contractor is entitled to a time extension of the Contract Time for each day the Work is delayed due to Excusable Delay. Contractor shall document its claim for any time extension as provided in Article 39 hereof. Failure of Contractor to comply with Article 39 hereof as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. Excusable Delay may be compensable or non-compensable: (a) compensable Excusable Delay. Excusable Delay is compensable when (i) the delay extends the Contract Time, (ii) is caused by circumstances beyond the control of the Contractor or its subcontractors, suppliers or vendors, and (iii) is caused solely by fraud, bad faith or active interference on the part of City or its agents. In no event shall Contractor be compensated for interim delays which do not extend the Contract Time. Contractor shall be entitled to direct and indirect costs for compensable Excusable Delay. Direct costs recoverable by Contractor shall be limited to the actual additional costs allowed pursuant to Article 38 hereof. City and Contractor recognize and agree that the amount of Contractor 's precise actual indirect costs for delay in the performance and completion of the Work is impossible to determine as of the date of execution of the Contract Documents, and that proof of the precise amount will be difficult. Therefore, indirect costs recoverable by the Contractor shall be liquidated on a daily basis for each day the Contract Time is delayed due to a compensable Excusable BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 111 Delay. These liquidated indirect costs shall be paid to compensate Contractor for all indirect costs caused by a Compensable Excusable Delay and shall include, but not be limited to, all profit on indirect costs, home office overhead, acceleration, loss of earnings, loss of productivity, loss of bonding capacity, loss of opportunity and all other indirect costs incurred by Contractor . The amount of liquidated indirect costs recoverable shall be four hundred dollars ($400) per day for each calendar day the Contract is delayed due to a Compensable Excusable Delay. (b) Non-Compensable Excusable Delay. When Excusable Delay is (i) caused by circumstances beyond the control of Contractor, its subcontractors, suppliers and vendors, and is also caused by circumstances beyond the control of the City or Consultant, or (ii) is caused jointly or concurrently by Contractor or its subcontractors, suppliers or vendors and by the City or Consultant, then Contractor shall be entitled only to a time extension and no further compensation for the delay. 42. Substantial Completion: When Contractor considers that the Work, or a portion thereof designated by City pursuant to Article 29 hereof, has reached Substantial Completion, Contractor shall so notify City and Consultant in writing. Consultant and City shall then promptly inspect the Work. When Consultant, on the basis of such an inspection, determines that the Work or designated portion thereof is substantially complete, it will then prepare a Certificate of Substantial Completion in the form attached hereto as Form 00925 which shall establish the Date of Substantial Completion; shall state the responsibilities of City and Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance; and shall list all Work yet to be completed to satisfy the requirements of the Contract Documents for Final Completion. The failure to include any items of corrective work on such list does not alter the responsibility of Contractor to complete all of the Work in accordance with the Contract Documents. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to City through the Contract Administrator and Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. 43. No Interest: Any monies not paid by City when claimed to be due to Contractor under this Agreement, including, but not limited to, any and all claims for contract damages of any type, shall not be subject to interest including, but not limited to prejudgment interest. However, the provisions of City's prompt payment ordinance, as such relates to timeliness of payment, and the provisions of Section 218.74(4), Florida Statutes (1989) as such relates to the payment of interest, shall apply to valid and proper invoices. 44. Shop Drawings: 44.1. Contractor shall submit Shop Drawings as required by the Technical Specifications. The purpose of the Shop Drawings is to show the suitability, BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 112 efficiency, technique of manufacture, installation requirements, details of the item and evidence of its compliance or noncompliance with the Contract Documents. 44.2. Within thirty (30) calendar days after the Project Initiation Date specified in the Notice to Proceed, Contractor shall submit to Consultant a complete list of preliminary data on items for which Shop Drawings are to be submitted and shall identify the critical items. Approval of this list by Consultant shall in no way relieve Contractor from submitting complete Shop Drawings and providing materials, equipment, etc., fully in accordance with the Contract Documents. This procedure is required in order to expedite final approval of Shop Drawings. 44.3. After the approval of the list of items required in Section 44.2 above, Contractor shall promptly request Shop Drawings from the various manufacturers, fabricators, and suppliers. Contractor shall include all shop drawings and other submittals in its certification. 44.4. Contractor shall thoroughly review and check the Shop Drawings and each and every copy shall show this approval thereon. 44.5. If the Shop Drawings show or indicate departures from the Contract requirements, Contractor shall make specific mention thereof in its letter of transmittal. Failure to point out such departures shall not relieve Contractor from its responsibility to comply with the Contract Documents. 44.6. Consultant shall review and approve Shop Drawings within twenty-one (21) calendar days from the date received, unless said Drawings are rejected by Consultant for material reasons. Consultant's approval of Shop Drawings will be general and shall not relieve Contractor of responsibility for the accuracy of such Drawings, nor for the proper fitting and construction of the work, nor for the furnishing of materials or work required by the Contract Documents and not indicated on the Drawings. No work called for by Shop Drawings shall be performed until the said Drawings have been approved by Consultant. Approval shall not relieve Contractor from responsibility for errors or omissions of any sort on the Shop Drawings. 44.7. No approval will be given to partial submittals of Shop Drawings for items which interconnect and/or are interdependent where necessary to properly evaluate the design. It is Contractor 's responsibility to assemble the Shop Drawings for all such interconnecting and/or interdependent items, check them and then make one submittal to Consultant along with its comments as to compliance, noncompliance, or features requiring special attention. 44.8. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop Drawings, any additional information or changes on such drawings shall be typewritten or lettered in ink. 44.9. Contractor shall submit the number of copies required by Consultant. Resubmissions of Shop Drawings shall be made in the same quantity until final approval is obtained. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 113 44.10. Contractor shall keep one set of Shop Drawings marked with Consultant's approval at the job site at all times. 45. Field Layout of the Work and Record Drawings: 45.1. The entire responsibility for establishing and maintaining line and grade in the field lies with Contractor . Contractor shall maintain an accurate and precise record of the location and elevation of all pipe lines, conduits, structures, maintenance access structures, handholes, fittings and the like and shall prepare record or "as-built" drawings of the same which are sealed by a Professional Surveyor. Contractor shall deliver these records in good order to Consultant as the Work is completed. The cost of all such field layout and recording work is included in the prices bid for the appropriate items. All record drawings shall be made on reproducible paper and shall be delivered to Consultant prior to, and as a condition of, final payment. 45.2. Contractor shall maintain in a safe place at the Project site one record copy of all Drawings, Plans, Specifications, Addenda, written amendments, Change Orders, Field Orders and written interpretations and clarifications in good order and annotated to show all changes made during construction. These record documents together with all approved samples and a counterpart of all approved Shop Drawings shall be available at all times to Consultant for reference. Upon Final Completion of the Project and prior to Final Payment, these record documents, samples and Shop Drawings shall be delivered to the Contract Administrator. 45.3. Prior to, and as a condition precedent to Final Payment, Contractor shall submit to City, Contractor 's record drawings or as-built drawings acceptable to Consultant. 46. Safetv and Protection: 46.1. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Project. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 46.1.1. All employees on the work site and other persons who may be affected thereby; 46.1.2. All the work and all materials or equipment to be incorporated therein, whether in storage on or off the Project site; and 46.1.3. Other property at the Project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 114 46.2. Contractor shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and utilities when prosecution of the work may affect them. All damage, injury or loss to any property referred to in Sections 46.1.2 and 46.1.3 above, caused directly or indirectly, in whole or in part, by Contractor ,any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by Contractor . Contractor 's duties and responsibilities for the safety and protection of the work shall continue until such time as all the Work is completed and Consultant has issued a notice to City and Contractor that the Work is acceptable except as otherwise provided in Article 29 hereof. 46.3. Contractor shall designate a responsible member of its organization at the Work site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to City. [ X ] 47.Final Bill of Materials: Contractor shall be required to submit to City and Consultant a final bill of materials with unit costs for each bid item for supply of materials in place. This shall be an itemized list of all materials with a unit cost for each material and the total shall agree with unit costs established for each Contract item. A Final Certificate for Payment cannot be issued by Consultant until Contractor submits the final bill of materials and Consultant verifies the accuracy of the units of Work. 48. Payment by City for Tests: Except when otherwise specified in the Contract Documents, the expense of all tests requested by Consultant shall be borne by City and performed by a testing firm chosen by Consultant. For road construction projects the procedure for making tests required by Consultant will be in conformance with the most recent edition of the State of Florida, Department of Transportation Standard Specifications for Road and Bridge Construction. The cost of any required test which Contractor fails shall be paid for by Contractor . 49. Project Sign: Any requirements for a project sign shall be as set forth within the Technical Specifications section. 50. Hurricane Precautions: 50.1. During such periods of time as are designated by the United States Weather Bureau as being a hurricane warning or alert, the Contractor, at no cost to the City, shall take all precautions necessary to secure the Project site in response to all threatened storm events, regardless of whether the City or Consultant has given notice of same. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 115 50.2. Compliance with any specific hurricane warning or alert precautions will not constitute additional work. 50.3. Additional work relating to hurricane warning or alert at the Project site will be addressed by a Change Order in accordance with Section 37, General Conditions. 50.4. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the City has directed such suspension, will entitle the Contractor to additional Contract Time as noncompensable, excusable delay, and shall not give rise to a claim for compensable delay. 51. Cleaning Up; City's Right to Clean Up: Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of the Project, Contractor shall remove all its waste materials and rubbish from and about the Project as well as its tools, construction equipment, machinery and surplus materials. If Contractor fails to clean up during the prosecution of the Work or at the completion of the Work, City may do so and the cost thereof shall be charged to Contractor . If a dispute arises between Contractor and separate contractors as to their responsibility for cleaning up, City may clean up and charge the cost thereof to the contractors responsible therefore as Consultant shall determine to be just. 52. Removal of Eauioment: In case of termination of this Contract before completion for any cause whatever, Contractor if notified to do so by City, shall promptly remove any part or all of Contractor 's equipment and supplies from the property of City, failing which City shall have the right to remove such equipment and supplies at the expense of Contractor . 53. Nondiscrimination. Eaual Employment Opportunity and Americans with Disabilities Act: Contractor shall not unlawfully discriminate against any person in its operations and activities or in its use or expenditure of funds in fulfilling its obligations under this Agreement. Contractor shall affirmatively comply with all applicable provisions of the Americans with Disabilities Act (ADA) in the course of providing any services funded by City, including Titles I and II of the ADA (regarding nondiscrimination on the basis of disability), and all applicable regulations, guidelines, and standards. In addition, Contractor shall take affirmative steps to ensure nondiscrimination in employment against disabled persons. Contractor 's decisions regarding the delivery of services under this Agreement shall be made without regard to or consideration of race, age, religion, color, gender, sexual orientation, national origin, marital status, physical or mental disability, political affiliation, or any other factor which cannot be lawfully used as a basis for service delivery. Contractor shall not engage in or commit any discriminatory practice in violation of City of Miami Beach Ordinance No 92.2824 in performing any services pursuant to this Agreement. BID NO: 21-08109 CITY OF MIAMI BEACH DATE: April 6, 2009 116 54. Project Records: City shall have the right to inspect and copy, at City's expense, the books and records and accounts of Contractor which relate in any way to the Project, and to any claim for additional compensation made by Contractor ,and to conduct an audit of the financial and accounting records of Contractor which relate to the Project and to any claim for additional compensation made by Contractor Contractor shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three (3) years following Final Completion of the Project. During the Project and the three (3) year period following Final Completion of the Project, Contractor shall provide City access to its books and records upon seventy-two (72) hours written notice. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 117 00900. SUPPLEMENTARY SPECIFICATIONS (Not Applicable) BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 118 00920. ADDITIONAL ARTICLES: [ ] 1. Prevailing Wage Rate Ordinance. This Project is not federally funded. City of Miami Beach Ordinance No, 94-2960 provides that in all non-federally funded construction contracts in excess of one million dollars to which the City of Miami Beach is a party, the rate of wages and fringe benefits, or cash equivalent, for all laborers, mechanics and apprentices employed by any contractor or subcontractor on the work covered by the contract, shall not be less than the prevailing rate of wages and fringe benefit payments or cash equivalence for similar skills or classifications of work, as established by the Federal Register, in the City of Miami Beach, Florida. The provisions of this Ordinance shall not apply to the following projects: a. water, except water treatment facilities and lift stations; b. sewer, except sewage treatment facilities and lift stations; c. storm drainage; d. road construction, except bridges or structures requiring pilings; and e. beautification projects, which may include resurfacing new curbs, gutters, pavers, sidewalks, landscaping, new lighting, bus shelters, bus benches and signage. ['`NOTE: INSERT IF APPLICABLE] [ ] 2. Federal Grant Projects: (N/A) 2.1. By virtue of the fact that the funding of this Project will be delivered in full or in part from the United States government through federal assurances must follow the grant application in addition to any and all supervening assurances set forth in Rules and Regulations published in Federal Register or CFR. 2.2. Clauses, terms or conditions required by federal grantor agency are hereby attached and made a part of this Project Manual. BID NO: 21-08/09 CITY OF MIAMI BEACH DATE: April 6, 2009 119 00922. STATEMENT OF COMPLIANCE (PREVAILING WAGE RATE ORDINANCE NO. 94-2960 Contract No. No. Project Title The undersigned Contractor hereby swears under penalty of perjury that, during the period covered by the application for payment to which this statement is attached, all mechanics, laborers, and apprentices, employed or working on the site of the Project, have been paid at wage rates, and that the wage rates of payments, contributions, or costs for fringe benefits have not been less than those required by City of Miami Beach Ordinance No. 94-2960 and the applicable conditions of the Contract. Dated , 20 (Contractor) By: (Signature) By: (Print Name and Title) STATE OF ) SS COUNTY OF ) The foregoing instrument was acknowledged 20_, by personally known to me or who has produced identification and who did/did not take an oath. day of who is as WITNESS my hand and official seal, this day of , 20 (NOTARY SEAL) (Signature of person taking acknowledgment) (Name of officer taking acknowledgment) (typed, printed or stamped) (Title or rank) (Serial number, if any) My commission expires: before me this CITYOF MIAMI BEACH BID NO: 21-08/09 120 DATE: April 6, 2009 00923. STATEMENT OF COMPLIANCE (DAVIS BACON ACT) No. Contract No. ProjectTitle The undersigned Contractor hereby swears under penalty of perjury that, during the period covered by the application for payment to which this statement is attached, all mechanics, laborers, and apprentices, employed or working on the site of the Project, have been paid at wage rates, and that the wage rates of payments, contributions, or costs for fringe benefits have not been less than those required by the Davis Bacon Act and the applicable conditions of the Contract. Dated 20 Contractor By: (Signature) By: STATE OF ) SS COUNTY OF ) The foregoing instrument was acknowledged before me this day of 20_, by who is personally known to me or who has produced as identification and who did/did not take an oath. WITNESS my hand and official seal, this day of , 20 (NOTARY SEAL) (Signature of person taking acknowledgment) (Name of officer taking acknowledgment) (typed, printed or stamped) (Print Name and Title) (Title or rank) My commission expires: BID NO: 21-08/09 DATE: April 6, 2009 (Serial number, if any) CITYOF MIAMI BEACH 121 00925. CERTIFICATE OF SUBSTANTIAL COMPLETION: PROJECT: (name, address) TO (City): DATE OF ISSUANCE: Consultant: BID/CONTRACT NUMBER: Contractor CONTRACT FOR: NOTICE TO PROCEED DATE: PROJECT OR DESIGNATED PORTION SHALL INCLUDE: The Work performed under this Contract has been reviewed and found to be substantially complete and all documents required to be submitted by Contractor under the Contract Documents have been received and accepted. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or portion thereof designated by City is the date certified by Consultant when all conditions and requirements of permits and regulatory agencies have been satisfied and the Work, is sufficiently complete in accordance with the Contract Documents, so the Project is available for beneficial occupancy by City. A Certificate of Occupancy must be issued for Substantial Completion to be achieved, however, the issuance of a Certificate of Occupancy or the date thereof are not to be determinative of the achievement or date of Substantial Completion. A list of items to be completed or corrected, prepared by Consultant and approved by City, is attached hereto. The failure to include any items on such list does not alter the responsibility of Contractor to complete all work in accordance with the Contract CITYOF MIAMI BEACH BID NO: 21-08/09 122 DATE: April 6, 2009 Documents. The date of commencement of warranties for items on the attached list will be the date of final payment unless otherwise agreed in writing. Consultant BY DATE In accordance with Section 2.2 of the Contract, Contractor will complete or correct the work on the list of items attached hereto within from the above Date of Substantial Completion. Consultant BY DATE City, through the Contract Administrator, accepts the Work or portion thereof designated by City as substantially complete and will assume full possession thereof at (time) on (date). City of Miami Beach, Florida By Contract Administrator Date The responsibilities of City and Contractor for security, maintenance, heat, utilities, damage to the work and insurance shall be as follows: CITYOF MIAMI BEACH BID NO: 21-08/09 123 DATE: April 6, 2009 00926. FINAL CERTIFICATE OF PAYMENT: PROJECT: (name, address) Consultant: BID/CONTRACT NUMBER: TO (City): Contractor CONTRACT FOR: NOTICE TO PROCEED DATE: DATE OF ISSUANCE: All conditions or requirements of any permits or regulatory agencies have been satisfied. The documents required by Section 5.2 of the Contract, and the final bill of materials, if required, have been received and accepted. The Work required by the Contract Documents has been reviewed and the undersigned certifies that the Work, including minor corrective work, has been completed in accordance with the provision of the Contract Documents and is accepted under the terms and conditions thereof. Consultant BY DATE City, through the Contract Administrator, accepts the work as fully complete and will assume full possession thereof at (date). City of Miami Beach, Florida (time) By Contract Administrator Date CITYOF MIAMI BEACH BID NO: 21-08/09 124 DATE: Aprit 6, 2009 00930. FORM OF FINAL RECEIPT: [The following form will be used to show receipt of final payment for this Contract.] FINAL RECEIPT FOR CONTRACT NO. Received this day of , 20 ,from City of Miami Beach, Florida, the sum of Dollars ($ ) as full and final payment to Contractor for all work and materials for the Project described as: This sum includes full and final payment for all extra work and material and all incidentals. Contractor hereby indemnifies and releases City from all liens and claims whatsoever arising out of the Contract and Project. Contractor hereby certifies that all persons doing work upon or furnishing materials or supplies for the Project have been paid in full. In lieu of this certification regarding payment for work, materials and supplies, Contractor may submit a consent of surety to final payment in a form satisfactory to City. Contractor further certifies that all taxes imposed by Chapter 212, Florida Statutes (Sales and Use Tax Act), as amended, have been paid and discharged. [If incorporated sign below.] Contractor ATTEST: (Secretary) (Corporate Seal) (Name of Corporation) By: (Signature) (Print Name and Title) day of 20 CITYOF MIAMI BEACH BID NO: 21-08/09 125 DATE: April 6, 2009 [If not incorporated sign below.] WITNESSES: Contractor (Name of Firm) By: (Signature} (Print Name and Title) day of , 20_ CITYOF MIAMI BEACH BID NO: 21-08/09 126 DATE: April 6, 2009 [ X ] 00950. PLANS AND SPECIFICATIONS The Plans and Specifications for Construction Improvements for the City of Normandy Shores Golf Course Clubhouse Facility have been prepared by: Architeknics, Inc. 7450 S.W. 48th Street Miami, Florida 33155 Phone: 305-661-5392 Fax: 305-661-5832 [ X ] 00950. DRAWINGS INDEX: SHEETS INDEX OF DRAWINGS TITLE SHEET I -1 ABBREVIATIONS /GENERAL NOTES /INDEX OF DRAWINGS S-1 SURVEY CIVIL COVER C.H. OVERALL CIVIL SITE PLAN PROPOSED C-1 C.H. EXISTING CONDITIONS C-2 C.H. SITE PLAN C-3 C.H. PAVING,GRADING & DRAINAGE PLAN C-4 C.H. WATER & SEWER PLAN C-5 C.H. SIGNAGE PLAN D-1 C.H. PAVING,GRADING & DRAINAGE DETAILS D-2 C.H. WATER & SEWER PLAN LANDSCAPE EX-1 EXISTING TREE PLAN L-1 LANDSCAPE PLAN L-2 LANDSCAPE NOTES & DETAILS IR-1 IRRIGATION PLAN IR-2 IRRIGATION NOTES & DETAILS LIFE SAFETY LS-1 PARTIAL SITE PLAN -LIFE SAFETY LS-2 FLOOR PLAN -LIFE SAFETY LS-3 CHECK LIST -LIFE SAFETY ARCHITECTURAL A-1.1 OVERALL SITE PLAN -NEW A-1.2 PARTIAL SITE PLAN -DEMOLITION CITYOF MIAMI BEACH BID NO: 21-08/09 127 DATE: April 6, 2009 A-1.3 PARTIAL SITE PLAN A-1.4 PARTIAL SITE PLAN -PARKING A-1.5 PARTIAL SITE PLAN -PARKING A-2.1 FLOOR PLAN A-2.2 FLOOR PLAN -SECTION 1 A-2.3 FLOOR PLAN -SECTION 2 A-2.4 REFLECTED CEILING PLAN A-2.5 ROOF PLAN A-3.1 ELEVATIONS A-4.1 SECTIONS A-5.1 WALL SECTIONS A-5.2 WALL SECTIONS A-5.3 WALL SECTIONS A-7.1 INTERIOR ELEVATIONS A-8.1 DETAILS A-8.2 DETAILS A-8-3 DETAILS A-8.4 DETAILS A-8.5 DETAILS A-8.6 DETAILS A-8.7 DETAILS A-9.1 DOOR SCHEDULE A-9.2 WINDOW & FINISH SCHEDULE STRUCTURAL S-1 FOUNDATION PLAN S-2 GROUND FLOOR FRAMING PLAN S-3 ROOF FRAMING PLAN S-4 SECTIONS & DETAILS S-5.0 SECTIONS & DETAILS S-5.1 SECTIONS & DETAILS S-5.2 SECTIONS & DETAILS S-5.3 SECTIONS & DETAILS S-5.4 SECTIONS & DETAILS S-6 STRUCTURAL NOTES & SCHEDULES S-7 STRUCTURAL WIND LOADS MECHANICAL M-1 MECHANICAL -FLOOR PLAN M-2 MECHANICAL -GENERAL NOTES M-3 MECHANICAL -DETAILS M-4 MECHANICAL -DETAILS PLUMBING P-1 FLOOR PLAN P-2 ENLARGED PLAN -TOILET ROOMS -PLUMBING CITYOF MIAMI BEACH BID NO: 21-08/09 1Y8 DATE: April 6, 2009 P-2.1 ENLARGED PLAN - KITCHEN- SAN ITARY PLAN -KITCHEN- WATER & GAS P-3 WATER & GAS PIPING ISOMETRICS P-3.1 SANITARY ISOMETRICS P-4 PLUMBING, SCHEDULES, NOTES & DETAILS P-5 PLUMBING -DETAILS ELECTRICAL E1.0 SIMBOL & FIXTURES SCHEDULE E2.0 OVERALL SITE E3.0 FLOOR PLAN-LIGHTING E4-0 FLOOR PLAN-POWER E4.1 KITCHEN ELECTRICAL PLAN E5.0 FLOOR PLAN -SYSTEMS E6.0 ELECTRICAL PANEL SCHEDULE E6.1 RISERS LEGEND AND GENERAL NOTES KITCHEN FS-1.1 EQUIPMENT PLAN AND SCHEDULE FS-1.2 PLUMBING PLAN AND SCHEDULE FS-1.3 ELECTRICAL PLAN AND SCHEDULE FS-1.4 SPECIAL CONDITIONS PLAN AND SCHEDULE FS-1.5 REFRIGERATION PLAN AND SCHEDULE FS-1.6 EXHAUST VENTILATOR PLAN FS-1.7 FIRE SUPPRESSION SYSTEM PLAN P-2.2 ENLARGED Plans and specifications for this project are available and can be purchased for $20.00 at The City of Miami Beach Procurement Division; 1700 Convention Center Drive, 3~d Floor, Miami Beach, Florida, 33139, Call 305.673.7000 ext. 6230 or E-mail theocarrascola~miamibeachfl.gov to secure your copy of the plans and specifications for this bid. CITYOF MIAMI BEACH BID NO: 21-08/09 129 DATE: April 6, 2009 01000. ADDENDA AND MODIFICATIONS: All addenda and other modifications made prior to the time and date of bid opening shall be issued as separate documents identified as Addendums to the Contract Documents. (Please see page 17.) CITYOF MIAMI BEACH BID NO: 21-08109 130 DATE: April 6, 2009 02000. TECHNICAL SPECIFICATIONS: BID NO. 21-08/09 FOR CONSTRUCTION IMPROVEMENTS FOR THE CITY OF NORMANDY SHORES GOLF COURSE CLUB HOUSE FACILITY (RE-BID) SPECIFICATIONS TABLE OF CONTENTS INTRODUCTORY PAGES: 00001 COVER PAGE 00002 PROJECT DIRECTORY 00005 TABLE OF CONTENTS DIVISION 0 - BIDDDING REQUIREMENTS. CONTRACT FORMS AND CONDITIONS (issued b_y City of Miami Beach): 00850 LIST OF DRAWINGS DIVISION 1 -GENERAL REQUIREMENTS: 01011 SUMMARY OF THE WORK 01025 SCHEDULE OF VALUES 01043 MECHANICAL AND ELECTRICAL COORDINATION 01050 FIELD ENGINEERING 01200 PROJECT MEETINGS 01312 CONSTRUCTION SCHEDULE CRITICAL PATH METHOD (CPM) 01340 SHOP DRAWINGS, PRODUCT DATA & SAMPLES 01510 TEMPORARY UTILITIES 01520 CONSTRUCTION AIDS 01530 BARRIERS 01590 FIELD OFFICES AND SHEDS 01600 MATERIALS AND EQUIPMENT 01700 CONTRACT CLOSEOUT 01730 OPERATING AND MAINTENANCE DATA 01740 WARRANTIES DIVISION 2 -SITE WORK: 02011 SOIL INVESTIGATION DATA 02072 REMOVALS 02200 EARTHWORK 02221 EXCAVATING, BACKFILLING AND COMPACTION FOR UTILITIES 02280 SOIL TREATMENT 02511 ASPHALTIC CONCRETE PAVING 02529 CONCRETE SIDEWALKS, STRAIGHT CURBS, CURBS, GUTTERS AND WHEELSTOPS CITYOF MIAMI BEACH BID NO: 21-08/09 131 DATE: April 6, 2009 02580 PAVEMENT MARKING 02660 WATER SYSTEMS 02720 STORM DRAINAGE SYSTEM 02731 SANITARY SEWER SYSTEM 02810 IRRIGATION SYSTEM 02840 SIGNAGE 02900 LANDSCAPING 02931 TREE AND PLANT PROTECTION 02935 SODDING DIVISION 3 -CONCRETE: 03100 CONCRETE FORMWORK 03200 CONCRETE REINFORCEMENT 03301 CAST-IN-PLACE CONCRETE 03312 CONCRETE TESTING 03600 GROUT DIVISION 4 -MASONRY: 04230 REINFORCED UNIT MASONRY DIVISION 5 -METALS: 05400 LIGHT GAGE METAL FRAMING 05500 METAL FABRICATING 05520 METAL HANDRAILS DIVISION 6 -WOOD AND PLASTICS: 06100 CARPENTRY 06190 WOOD TRUSSES 06300 WOOD TREATMENT 06400 ARCHITECTURAL WOODWORK DIVISION 7 -THERMAL AND MOISTURE PROTECTION: 07190 VAPOR/RADON BARRIER 07210 BUILDING INSULATION 07270 FIRESTOPPING AND FIRE AND SMOKE BARRIER CALKING 07324 CONCRETE TILE ROOFING 07525 SBS MODIFIED BITUMEN MINERAL SURFACED ROOFING 07600 FLASHING AND SHEET METAL 07900 JOINT SEALERS DIVISION 8 -DOORS AND WINDOWS: 08110 STEEL DOORS AND FRAMES 08210 WOOD DOORS 08300 TRAFFIC DOORS CITYOF MIAMI BEACH BID NO: 21-08/09 132 DATE: April 6, 2009 08305 ACCESS PANELS 08331 OVERHEAD COILING DOORS 08520 ALUMINUM WINDOWS 08710 FINISH HARDWARE 08800 GLASS AND GLAZING DIVISION 9 -FINISHES: 09200 METAL STUDS, LATH, SUSPENION CEILING, PLASTER AND STUCCO 09250 GYPSUM WALLBOARD 09310 CERAMIC TILE 09510 ACOUSTICAL CEILINGS 09660 RESILIENT TILE 09682 CARPET 09730 EPOXY RESIN FLOORING 09901 PAINTING 09905 EPOXY RESIN WALL FINISH DIVISION 10 -SPECIALTIES: 10170 SOLID TOILET PARTITIONS 10200 ARCHITECTURAL LOUVERS 10350 FLAGPOLES 10400 IDENTIFYING DEVICES 10500 LOCKERS 10522 FIRE EXTINGUISHERS 10710 COLONIAL SHUTTERS 10800 TOILET ROOM ACCESSORIES DIVISION 11 -EQUIPMENT: 11400 FOODSERVICE EQUIPMENT DIVISION 12 -FURNISHINGS: NOT USED DIVISION 13 -SPECIAL CONSTRUCTION: NOT USED DIVISION 14 -CONVEYING SYSTEMS: NOT USED DIVISION 15 -MECHANICAL: 15000 BASIC MECHANICAL REQUIREMENTS 15010 GENERAL PROVISIONS 15023 CODES AND STANDARDS CITYOF MIAMI BEACH BID NO: 21-08/09 133 DATE: April 6, 2009 15073 MINOR MECHANICAL DEMOLITION 15140 SUPPORTS, BASES, AND ANCHORS 15170 MOTORS 15190 MECHANICAL IDENTIFICATION 15242 VIBRATION ISOLATION 15260 PIPING INSULATION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM 15412 SOLID AND WASTE SYSTEMS 15420 PLUMBING PIPING 15430 PLUMBING SPECIALTIES 15440 PLUMBING FIXTURES & ACCESSORIES 15450 PLUMBING EQUIPMENT 15510 PIPING (HVAC) 15535 REFRIGERATION PIPING AND SPECIALTIES 15671 AIR COOLED AIR CONDITIONING CONDENSING UNITS 15817 ELECTRIC RESISTANCE DUCT HEATERS 15821 FANS 15855 AIR HANDLING UNITS 15870 POWER VENTILATORS 15885 AIR FILTERS 15890 DUCTWORK 15895 DUCTWORK ACCESSORIES 15936 GRILLES, REGISTERS, DIFFUSERS 15990 START-UP REQUIREMENTS FOR HEATING, VENTILATING & AIR CONDITIONING (HVAC) SYSTEMS 15991 TESTING, ADJUSTING AND BALANCING (TAB) OF HEATING, VENTILATING & AIR CONDITIONING (HVAC) SYSTEMS 15992 TEST-PIPING SYSTEMS DIVISION 16 -ELECTRICAL: 16010 BASIC ELECTRICAL REQUIREMENTS 16020 WORK INCLUDED 16025 CODES, FEES, AND STANDARDS 16050 BASIC MATERIALS AND METHODS 16111 CONDUIT 16123 BUILDING WIRE AND CABLE 16130 BOXES 16141 WIRING DEVICES 16180 EQUIPMENT WIRING SYSTEMS 16190 SUPPORTING DEVICES 16195 ELECTRICAL IDENTIFICATION 16440 DISCONNECT SWITCHES 16450 GROUNDING 16470 PANELBOARDS 16476 ENCLOSED CIRCUIT BREAKERS 16510 INTERIOR LUMINARIES 16721 FIRE ALARM SYSTEM CITYOF MIAMI BEACH BID NO: 21-08/09 134 DATE: April 6, 2009 04000. ACKNOWLEDGEMENT OF ADDENDA Invitation for Bid No. 21-08/09 FOR CONSTRUCTION IMPROVEMENTS FOR THE CITY OF NORMANDY SHORES GOLF COURSE CLUB HOUSE FACILITY (RE-BID) Directions: Complete Part I or Part II, whichever applies. Part I: Listed below are the dates of issue for each Addendum received in connection with this Bid: Addendum No. 1, Dated _~w~~l 27, 2ao y Addendum No. 2, Dated ~P~` ~ ~i Zvo~ Addendum No. 3, Dated ~/~~ ~ 7, Zav/ Addendum No. 4, Dated Addendum No. 5, Dated Part II: No addendum was received in connection with this Bid. Verified with Procurement staff ~~o ~GL ~Y~aS~v ~p'`° I ~ 2do~ Name of Staff r Date ~- ~Gl ~/lO~ ~,o~~~~ ~~ Zr~ %' ders- Name Date ,% ignature CITYOF MIAMI BEACH BID NO: 21-08/09 135 DATE: April 6, 2009 05000. CUSTOMER REFERENCE LISTING General Contractor (and/or Sub-Contractors) shall furnish the names, addresses, telephone, fax numbers and a-mail addresses of a minimum of 8 references of a minimum of four (4) separate completed projects. 1) Company Name TV1{{, t~2~~~~'c.~ ~ ~W ~`~. Address 3tS 5 ~ISL~i~t'1~.~1vC~ !mil 1 ~rvt i ~L .313 1 Contact Person/Contract Amount(:a,~ts.{1~~, C(~.Y~~-~C ~ ~ ~~ ~"~ 2C~, y - Z, - I CU.'1 B~' ~LkC ~~ Telephone: 3~t~ - ~ fit; - ` c1 Lk~ Fax:.~C:;'~ - N Ic~G -- ~~cl 1 1 E-mail: LLt~V V~+~ G ~~ 1C~.~~ G •-'~~~~ . CC'~Yr? 2) Company Name ^TF1-~ ''P~Y~~}eCl C~v'~~=p Address ;~i5 ~. 3i`~c.is.~n-~ ~i~c~, p~~t~mt FL 3.131 Contact Person/ContractAmount~C:+.~C-~ k:~utt:~t'v"'~ 3 ~`~i, 1~~fi, `i~~'~ -~i~'v:~np - , IT, JJ~ Telephone:'~oS-t-ll~C - ~~lc.,~ Fax: ~`=S -~~G -• ~J~{ ( 1 E-mail:~i-,~~'}SC:~,'1 ~. R~lc~.-~-~~c;(~,u}~• CC=~'~'1 3) Company Name ~\}C~~f~1(~ t~S , ~,~,~, Address 2~~SZ tv. CLf ~t~'S5 C r~~~ R~, ~{- LCit/()-~.~C~c~EF J ~L 333U~j Contact Person/Contract Amount ~'L~~"-k ~~C~~i ~~t~ S '~ iN, ~5~ -'~i~.~ ~v,'+ Telephone:q"=`-~-'Z1t/-~t{~{~j Fax: E-mail: 4) Company Name ~(~'1f 'cS(._ ~~Y'U:%~ L~ ~< <~~1Cc~1~~ ~ ~1C~.~~ Address ~-l~-t iA~r ~;('t- i~,C,{, } 1.~~~~f ~~ 'k. , -~~: C~Z ~~(c Contact Person/Contract Amount±~~'C~n1c... ~r~Ma-E' 1Ey ~ SI, 575, 77S ~ j(;;ccc~~Ct.z,~, Telephone:'-(Ui - ? ~ `d -~-~ c=~'1 Fax: ~-t(~l -' % ~ L - ~ E-mail: CITYOF MIAMI BEACH BID NO: 21-08109 136 DATE: April 6, 2009 5) Company Name Address Contact Person/Contract Amount_L~~ ~~Y~[aC S ~7(c, ~~`~~', Z-~~=` ~~~-~~ Cl~'~ ~ Telephone: ~ Sic ~ 21 L -• Zl~ 33 Fax: E-mail: L ~` 1e.:~.hoc:~c~~ S ~~ 1~~~-rnu ~ 1~ Culp 6) Company Name 0 ~yh'1 ~t tt p~ v~~~ ~ I ~~ U Address ~~~ ~ rJW 1 1~7 ~~.-~~ 1-},~ ~-~~~-.~ F L 33c~1(~~ Contact Person/Contract Amount IZ~,r°~ -~ ~,~t'~I-t'Z. ~' C~1 ~-) UU UDG Telephone: ~~CS - 6Zl - ~1 f 1 Fax: ~~~`~ ' ~ Z 1 - S"3~~ E-mail: f_~~+'Yt-~-rl-~Z t~ ~~..~vt~T~~(u~-~rnt~ ('1~' ~ 7) Company Name ~UfUY~ ~~~~~~ Address ~LL~ ~Y tC~t) ~ J i~t(~Nii ~l- 3313) Contact Person/Contract Amount5~l~~t ~f~~~Sk~ I ~ 15C;, Z7~ ~~ i - ~t~r~c_~r'i; ~,~c:nc~~1 Lin ~-~ Telephone:_3~`~ - X15 5`' `1 ~7~ Fax: E-mail:_`t ~'P ~~-~ ~ ~- .~i~c~rt G~~C~+ )i~ ~ (.'C)~1 .~ 8} Company Name ~l~'1f ~-e`(.~.~`C~ ~lt~ ~;~~ Address Contact Person/Contract Amount~[~1~+'1 ~-~(.~DI~"'~){1~ ~ ~7' 3 . (n~~ -1, ~l S 1 - 3~~U~~~ --~ Telephone : 7~S(~ -yuL- 3~Sz I Fax: E-mail: )~It;~L~ ~n ~!~ 7 l~~ 1 ~ ~ 15~~.)-~ , ~'}1a T~ CITYOF MIAMI BEACH BID NO: 21-08/09 137 DATE: April 6, 2009 06000. SUB-CONTRACTOR LISTING INFORMATION BID NO. 21-08/09 FOR CONSTRUCTION IMPROVEMENTS FOR THE CITY OF NORMANDY SHORES GOLF COURSE CLUB HOUSE FACILITY (RE-BID) SUB-CONTRACTORS PROVIDING SERVICES TO THIS PROJECT (Telephone and fax no.l Name: ~ ~ ,~~ Tel: 30.x' S/2 . ~?3 S Name: ~~ti Z~ Tel: 3vs 2 ¢~, 32Z 3 Fax: ~oS. 24G, ocF~l Name: ~s ~u~,r Tel: 3l~J ,, 32S o 3'30 Fax: 3oJ .. ~ ZS~. vG~ ~ Name: Ti~1~ Tel: / 5~. ~ Zo. dSS :~ Fax: !.~¢ • ~~• JS ~(i Name:,~GO~S~~t Tel: 3~S• gzz . Z ~4-~ Fax: 3oS : ~z2. 5Z~ b' ~"'r ` ,~ Name: Tel: SS~~ . 7d',~ ~~GG Fax: 5,~¢ , Z b~l~, $y~ S~~f Gvl/c~~i" Gvj%LcIG4~o~ ~, /•e S ~~G~/ /''1 i ~ ~ . ~" J ~f~ l5 (Attach additional forms if necessary) /3 f 5~~~ 3 ~~ ~s~~ / !o 3 ~~ CITYOF MIAMI BEACH BID NO: 21-08109 138 DATE: April 6, 2009 06000. SUB-CONTRACTOR LISTING INFORMATION BID NO. 21-08/09 FOR CONSTRUCTION IMPROVEMENTS FOR THE CITY OF NORMANDY SHORES GOLF COURSE CLUB HOUSE FACILITY (RE-BID) SUB-CONTRACTORS PROVIDING SERVICES TO THIS PROJECT (Telephone and fax no.) Name: ~ , ~ ~''~~,/.~'7 Tel: `~ S4. 7 ~'d'• Olli~i Fax: 9~~ • ~YY..~~~ Name:~~~ f v~1 Tel: S!v/. ll,r(,~, !~'ZZ Fax: .S7i/• ~ZZ. ,~'~'( Name: ~-~ ~~t. Tel:~IS~. 3 1> ~s~UD Fax: `'/TQ • 327, ~i7~1 Name: d (Y~.~..~ ~ ~S Tel: J'Os~, (. ° ! Fax: 3vs .. ~zl. 5333 ~I /~ Name: /va~~~r Tel: ,~~, SSA, >¢ZL Fax: ~, Ss~i . oSb'7 Name: 'J~Sc y Tel: SGl- 732. 0.~~ Fax: ~l/(• ~ 32 . l6 ~~ ~~~~~~ ~~ ~~~~ ~~~~ ~~s~ ~l~~ ~ ~ `z°G ~"~ C ~/ (Attach additional forms if necessary) l ~ y~ / / ~o ~ 5~ ~~o 71 CITYOF MIAMI BEACH BID NO: 21-08109 138 DATE: April 6, 2009 m MIAMIBEACH City of Miami Beath, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov PROCUREMENT DIVISION Tel: 305-673-7490, Fax: 786-394-4235 Invitation To Bid (ITB) NO. 09-08/09 (Revised) Addendum No. 1 December 19, 2008 Notice to All Vendors 2. The updated drawings are available in digital format on CDs. Please call Theo Carrasco at 305.673.7000 ext. 6230, or a-mail theocarrascoCa~miamibeachfl.gov to secure a CD set of the Plans and Specifications. The CD is free to any vendor that already purchased the plans and specifications CD. Otherwise, the cost for these CDs is $20. Company checks and cash accepted, no credit cards please. The CDs can be picked up in the Procurement Division, 3rd Floor, City Hall. 3. The ITB deadlines have been updated as follows: Deadline for receipt of questions January 12, 2009 at 5:00 p.m. Deadline for receipt of BIDS January 30, 2009 at 3:00 p.m. Evaluation process February 2009 Contract Award February 2009 Projected Project Initiation Start Date March 2009 All past performance surveys need to be submitted by the client directly to the City no later than January 30, 2009. All surveys are to be emailed directly by the client to Theo Carrasco at theocarrasco(c~miamibeachflgov or faxed to 786-394-4235. 4. The Administration will rank all responsive bidders and submit their recommended ranking to the City Manager. The evaluation and scoring process to determine the ranking of bidders will be as follows: • (15 points) -RAP /VAS Submittal - A Preliminary Project Schedule should be attached to the RAP /VAS. The description for the risks identified in the RAP should not include any additional cost or time. These are risks that the contractor may not have direct control over but will try to minimize. Value Added Submittals (VAS) may increase /decrease project cost or time. • (5 points) -Past performance based on number and quality of the Performance Evaluation Surveys received. • (20 points) -Presentation and Interview of Key personnel. CITYOF MIAMI BEACH BID NO: 21-08/09 139 DATE: April 6, 2009 (60 points) -Base Bid Price -All bidders shall be required to include, as part of the submittal, a breakdown of the Lump Sum (base bid) amount, with sub-totals for Divisions 1 through 16, as listed in Section 00407, on page 50. A proportional amount for overhead and profit should be separately listed in each Division. The pricing information, will be shared with the Administration at the evaluation meeting prior to the interviews of the key members of the contractor's team. 5. Revisions have been made to the verbiage of "Section 00408 SCHEDULE OF PRICES BID" (Page 49-50) so as to clarify the City's intent to base the Cost Component of the evaluation and scoring on the Grand Total Bid, inclusive of Lump Sum Bid, plus Allowances, plus any Alternates. The revised pages are provided in the CD for this Addendum. Questions and Answers Q1. Are the fireplaces "real working" masonry fireplaces? If so, please provide the sections/details of the fire block and box design. A. Yes they are real. Additional information will not be available until after January 9, 2009. Q2. In Drawings 1/A5-2, 5/A5-2, 6/A5-2, 7/A5-2, and 8/A5-2, please provide details and specifications of the exterior cornice and molding finish. A. Cornice /moldings can be wood or pre-fab vinyl. See revised drawings, dated 12- 17-08. Q3. Please provide details and specifications of the roofing and bay windows. A. See revised Wall Section 5/A5-2. Q4. In page 54 of the bid document, item 27 notes "re-install and re-shape existing wood beams." Please explain. A. There are existing "historic" wood beams on the site that were removed from the previous clubhouse building that need to be re-installed in the Covered Outdoor Dining area roof. The beams will need to be cut down to size, sanded, re-finished and re-installed in new roof area. Q5. In Drawings C=-1 and A-1.3, please clarify if the finish floor elevation is +12.17 or +11.00. A. Floor finish is +11.00'. Q6. Please provide details and specifications of the brick veneer. A. There is no specification section, see details in revised sheet A8-1. Q7. Please provide details and specifications of the architectural louvers. CITYOF MIAMI BEACH BID NO: 21-08109 140 DATE: April 6, 2009 A. See attached Specification Section 10200. Q8. Please provide details and specifications of the colonial shutters. A. See attached Specification Section 10710. Q9. Please provide details and specifications of the lockers. A. See attached Specification Section 10500. Q10. Please provide details and specifications of the fire alarm system. A. See attached Specification Section 16721. Q11. Please provide details and specifications of the security alarm system. A. There is no security alarm system to be provided under this contract. Q12. Please provide details and specifications related to the fencing surrounding the relocated palm trees. A. See Specification Section 02931. Q13. What are the weight limits on both bridges accessing the island? A. Bridge #876728 located at Bay Drive over Normandy Waterway Operating Load Rating is 61 Tons. Bridge #876729 located at Biarritz Drive over Normandy Waterway Operating Load Rating is 75 Tons. The above respective load ratings are determined by truck axle and weight configurations - If your transport vehicle including inventory GVW is less than the above Operating Load Rating you may proceed - However a Right of Way Permit will be required. Q14. The specifications only state hardware sets 1 and 2. Please provide hardware sets 3-16 per A-9.1 door schedule. A. This information will not be available until after January 9, 2009. Q15. In Drawing M-1, is it the intent to use the north fireplace in the lounge as a chase for air conditioning ductwork? Currently there is a 16 x 14 duct shown inside the fireplace. A. Yes. Q16. In Drawing M-2, "A/C mounted detail" incorrectly shows a steel bar joist system. Please provide a revised detail for a wood truss system. A. This information will not be available until after January 9, 2009. CITYOF MIAMI BEACH BID NO: 21-08/09 141 DATE: April 6, 2009 Q17. In Drawing A-8.2, please clarify what interior partitions need sound attenuation batt. For example, the partition between the corridor and men's toilet (detail 18/A- 8.2) ask S.A.B. and the partition between corridor and women's toilet (detail 18/A- 8.2) does not show S.A.B. A. Has been revised, see revised sheet A-2.2. Q18. Please clarify the insulation R-Valve for ceilings (plans show R=20 and specs R=30). A. All drawings have been revised to R=30. Q19. Ceiling insulation at some areas is not covered with drywall (as per plans) attached between bottom chord or trusses and at 2' - 4' above acoustical ceilings. Please clarify the material specifications for that insulation. A. Batt insulation laid on ceiling or attached to trusses. Documents Contained in CD 1. December 9, 2008 Pre-Bid Conference Sign-In Sheet 2. Bid Breakdown Sheet -Updated 12.19.08 (excel worksheet) 3. 06159-E3.0-Layout1 4. 06159-P-1-Layout1 5. 06159-P-3-Layout1 6. 06159-P-4-Layout1 7. 06159-P-5-Layout1 8. A8-1 9. A8-2 10. A8-4 11. A8-7 12. A9-1 13. A9-2 14. A-1.5 15. A-2.1 16. A-2.2 17. A-2.3 18. A-2.4 19. A-2.5 20. A-3.1 21. A-4.1 22. A-5.1 23. A-5.2 24. C-3 -Clubhouse Site Paving Grading & Drainage Plan - 05 25. C-4 -Clubhouse Water & Sewer Plan - 02 26. D-2 -Clubhouse Water & Sewer Details - 02 - D-2 Water & Sewer Details 27. I-1 28. L-S.2 29. Section 10200 30. Section 10500 CITYOF MIAMI BEACH BID NO: 21-08/09 142 DATE: April 6, 2009 31. Section 10710 32. Section 16721 CITY OF MIAMI BEACH ~~, Gus Lopez, CPPO Procurement Director CITYOF MIAMI BEACH BID NO: 21-08/09 143 DATE: April 6, 2009 m MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov PRC?CUREMENT DIVISION Tel: 305-673-7490, Fax: 786.394-4235 Invitation To Bid (ITB) NO. 09-08/09 (Revised) Addendum No. 2 December 24, 2008 Questions and Answers Q1. Please provide specifications for window shutters shown on building elevations. A. They were provided as part of Addenda No. 1, specification Section 10710. Q2. Drawing A-1.3 shows separate phases to be performed. Phases I and II are shown in A-1.5 and A-1.4 respectively. Please confirm and explain. A. Project has to be performed in 2 phases, Phase 1 first and then Phase 2. The Owner is operating a temporary clubhouse from the existing North parking area and that must remain in use until the new clubhouse building is complete and the owner can move in. Then the Contractor can start Phase 2. The area of Phase 2 must be barricaded from the construction site by a 6'-0" high temporary chain link fence with a visual barrier. The entire construction area must also be provided with the same type of temporary barrier. Q3. Details on A-8.6 calls for cornice and exterior molding finish to be indicated on the specifications. However, this information could not be located. Please indicate whether these can be made with foam and plaster finish. A. Addenda No. 1 clarified this condition. And yes, they can be made with foam and plaster finish. Q4. Please provide details and specifications for the augercast piles in the PSI. A. All pile information is provided in the structural drawings and the PSI report for installation procedures. Q5. Please confirm that this project does not have a General Contractor appointed. A. This project does not have a General Contractor appointed. The purpose of this bid is to select the General Contractor. Q6. Please provide detailed drawing and specifications for custom cabinet and countertop to the following rooms: • Bar Room 014 -Item B-1 on Spec page 11400-77 • Bar Room 014 -Item B-15 on Spec page 11400-82 • Bar Room 014 -Item B-17 on Spec page 11400-83 • Bar Room 014 -Item B-19 on Spec page 11400-84 • Bar Room 014 -Item B-21 on Spec page 11400-85 • Pro Shop Room 007 CITYOF MIAMI BEACH BID NO: 21-08/09 144 DATE: April 6, 2009 A. Bar are details to be provided in Addendum to be issued in January. Pro Shop will not have any built-in cabinetry under this contract. Q7. The elevations and sections show a brick veneer called out as a Brick-it System. Local suppliers are indicating that local ordinances may require a jumbo brick to match other buildings in the area. Please clarify. A. Not required. Brick-it type (brick veneer) system has been approved by City of Miami Beach, DRB. Q8. Page A-1.2 in the civil drawings indicates to demo an asphalt parking area with curbs. The site has a newly paved parking area to the left of the entry. Page C-3 states to mill and resurface. Is this to be demoed or just the old curbs? Please clarify. A. Sheet A-1.2 to be revised to call out same as in C-3, mill and re-surface only. For curbs, see response below. Q9. Sheet C-2 shows a D-curb at all locations in and throughout the parking lot. If the D-curb is correct, shall it stop at the property line or continue onto Biarritz Drive? Please confirm and clarify. A. The only new D-curb is at the edge of the pedestrian sidewalk in front of the new clubhouse. The existing curb in the main entrance island is to remain. All other existing curbs are to be removed. Q10. Please clarify the "limits of construction" and what is meant by Phase I and Phase ll. A. See response to Q2. Q11. In regards to the geotechnical study, will the owner be responsible for soil remediation if any hazardous materials are encountered during excavation or as a by product of the auger pile spoils material? A. The owner will not be responsible for any work. It is know that the existing soils are contaminated with carcinogenic material and ALL disturbed soils or excavated soils will need TO REMAIN ON-SITE. No soil can be removed. Excavated soils will need to be distributed to raise the areas around the clubhouse and any/all islands or areas of landscape. Q12. In regards to the geotechnical study, has an environmental assessment for the presence or absence of hazardous or toxic materials (naturally or other) in the soil and groundwater been done? A. See response to question above. Q13. Please provide specifications on the weather resistant barrier required before the installation of brick veneer to exterior walls. A. That was clarified in drawings issued in Addenda No. 1. Q14. Are the bid breakdown items for addition or deductions? CITYOF MIAMI BEACH BID NO: 21-08109 145 DATE: April 6, 2009 A. The unit quantity breakdown is provided FOR INFORMATIONAL PURPOSES ONLY. Bidders shall rely on their own quantity take-offs in the development of their lump sum prices. Cost component of award will be based on the Grand Total Bid (Lump Sum Base Bid, plus Allowances, plus none, any, or all Alternates which will be selected at the City's sole discretion and based on funding availability). Bidders must include the unit quantity in order for their bid to be deemed responsive. Bidders are able to add items to the breakdown sheet. NO ITEMS CAN BE DELETED. If an item is not applicable to this project, the bidder must total it at zero or not "NlA." Q15. The suppliers of lighting fixtures cannot send prices by items, only by packages. What should the bidder do in this case? A. Regardless of how supplies price their materials, the bidder is responsible for providing a unit price for each good and service itemized for this bid to justify the grand total bid. Q16. Please clarify the type and size of the baseboards. A. There are four types of baseboards in the project, as follows: 1. Ceramic tile, to be provided in rooms with ceramic floor the (all toilet rooms only). 2. Rubber (6"), to be provided in rooms with resilient floor tile. 3. Epoxy Resin, to be provided in rooms with epoxy resin floor finish. 4. Wood base (6"j, to be provided in rooms with carpet and ceramic the other than the toilet rooms). Q17. Please clarify the color and size of the hinges (4" or 4.5"). A. This will be clarified with a revised Hardware Schedule to be issued in new Addenda for January. Q18. Please provide the details and specifications of the interior and exterior door frames. A. Details are provided in the drawings Sheets A-8 (detail sheets) and specifications provided in Division 8. Q19. In the Kitchen and Dining Room, please provide the details and specifications for the hinges (regular, floor, spring hinges). (#16 and #17) A. See attached specification Section 08300 for kitchen traffic doors. Q20. Please provide the details and specifications for the metal doors with wood frames with 12" glass. (#18 and #20) A. See revised drawings and schedule issued under Addenda No. 1. Q21. Please provide the details and specifications for the wood door and frame with the "B" label. (#24) A. See revised drawings and schedule issued under Addenda No. 1. Q22. Can the past performance evaluations submitted ITB 04-08/09 for the construction improvements for the cart barn storage facility for this ITB? A. Yes, the surveys submitted for ITB 04-08/09 can apply for this bid. CITYOF MIAMI BEACH BID NO: 21-08/09 146 DATE: April 6, 2009 CITY OF MIAMI BEACH ~~ Gus Lopez, CPPO Procurement Director Attachments 1. 08300 Traffic Door CITYOF MIAMI BEACH BID NO: 21-08/09 147 DATE: April 6, 2009 m MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov PROCUREMENT DIVISION Tel: 305-673-7490, Fax: 786-394-4235 Invitation To Bid (ITB) NO. 09-08/09 (Revised) Addendum No. 3 January 16, 2009 Notice to Potential Vendors 1. Revised section 08710, pending from a prior Addendum is attached. 2. The revised drawings attached with this addendum can be downloaded at the following site: http:/1web.miamibeachfl.govlprocurementlscroll.aspx?id=40768. In case the files are not available online, please contact Theo Carrasco at 305-673- 7000 ext. 6230 or theocarrasco(a~miamibeachfl.gov. Questions and Answers Q1. The section through the bar cabinet in A-8.7 shows a granite countertop. Please provide species and thickness. A. s/4" Surf Green, see revised Detail Sheet A8.7. Q2. In reference to A-9.2, the finish schedule calls for ceramic the at rooms # 002, 004, 007, and 012. However, the material information could not be located. Please provide specifications for ceramic the at each of these rooms, including but not limited to: manufacturer, size, material type, installation package, etc. A. Bathroom Wall Tiles -Dal Tile -Semi-gloss 4'/4" x 4'/4" mix of Group 1 and Group 4 Colors 50 / 50 mix pattern to be determined. Bathroom Floor Tiie -Dal Tile -Mountain Peak Colorbody Procelain 12" x 12", Spruce MP03 with coordinating Cove Base #SC36C9t 6" X 12" and Corner Trim #SC36C9T. Q3. In reference to A-9.2, the finish schedule calls for carpet at room # 001, 003, 005, 006, 008, 015, and 017. However, the carpet material selection could not be located. Please provide specifications for carpet, including but not limited to: manufacturer, type, color, weight, etc. A. Carpet to be as manufactured by "Cambridge" installed over'/4" flat rubber pad as follows: Locker Rooms, Office and Corridor to Locker Rooms: Concord, style #6CND Pra Shop: Chesapeake style #6CSP Dining: Newport style #6NPT CITYOF MIAMI BEACH BID NO: 21-08109 148 DATE: April 6, 2009 Q4. Please provide details and specifications for the concrete pavers. A. Outdoor Dining Area and Entry Loggia Floor -Dal Tile -Quarry Tile, Price Group 2, 6" x 6" x 3/8" with coordinating Cove Base and appropriate trims: Cove P-3665 6" x 6", Cove Corner PCR-L-3665 6" x 6", Inside Cove Corner PB-3665 ~/4" x 6". Q5. What is to be done at the conflict S-3 and the existing sanitary line? Please advise. A. The structure for S-3 is acting as a conflict structure in order to accommodate the existing sanitary line. Q6. Will the sanitary manholes be painted? Please advise. A. Yes, they should be painted with epoxy paint on the inside. Q7. The hallway between the kitchen (019) and Dining Area (015) has (1') Fixture type "N" and is shown to need an emergency ballest. This is an incandescent fixture therefore not applicable. Should there be an emergency light placed in this area? A. Yes. Provide an emergency light fixture type "A". Q8. Please provide clarification on quantity and fixture types for the monument signs. A. Refer to updated fixture schedule type "T" for fixture information. Q9. There is no CT Cabinet shown in the drawings. Please provide the location to know where it needs to be installed on the exterior wall of the electric room. A. Install FP8~L meter on exterior wall of Electrical Room, with a 1 '/4" conduit to FP8~L transformer Q10. On Sheet E-6.1, General Note #4 clearly identifies the manufacturer to be Siemens Building Technologies. On Sheet E-5, the fire alarm riser diagram shows a conventional design (zones) rather than an addressable system. This type of system is geared for larger structures and facilities. It is assumed that the intent is to use an addressable system due to its obvious benefits. Is it acceptable to provide an alternate manufacturer gear to this size of project instead of the Siemens system since the cost for this manufacture is extremely high and proprietary in many factors, programming, parts and devices, as well as monitoring services? Alternate manufacturing can provide lower cost on equipments as well as manageable systems. A. Provide an addressable system Siemens, Simplex or EST. Q11. In the Project Manual, Division 13 indicates "Not Used." However, in the bid breakdown form, the City requests pricing information on fire and security alarms. Question 11 of Addendum 1 replied that there is no security system provided under this contract. Please clarify. A. It is not used, there is no security and F/A is under Division 16. Q12. On the revised bid breakdown form, cell H31 "subtotal of all divisions" is being included in the General Conditions and being added again in cell H23. Please clarify. A. Please disregard. An updated bid breakdown sheet is provided in this addendum. CITYOF MIAMI BEACH BID NO: 21-08109 149 DATE: April 6, 2009 Q13. In regards to Drawing A-8.2 and A-9.2, Detail 16/A8.2 shows the suspended ceiling with one coat veneer plaster at the toilet room. The finish schedule in page A-9.2 shows gypsum wall board. Please clarify. A. Drawing A-8.2 has been revised, see attached. Ceiling to be moisture resistant gypsum wallboard. Q14. Does the Contractor have to use imported structural fill to bring the building pad to the required elevation? What kind of fill material and compaction can be used? A. No, structural fill is not required. The fill is only to use to form the slab. Q15. Why is metal lathe used on the block walls? A. The metal lathe is being installed as part of the "thick application" as recommended by the manufacturer. This is the application to be used. Q16. What size are the bricks? Are the bricks to be painted after completion? A. The bricks are to be Brick-it, Golden Bluff, size 4x12x1/2". They are to be painted "white". Q17. What size firebox is to be used in the fireplace? Are fire places standard fire boxes in the runnier board? Are clay place liners to be used? A. See new Sheet A-5.3 with Chimney Section and all required specifications. Q18. In regards to Question 11 of Addendum 2, what exactly is the carcinogenic material on-site and how cancer-causing is it? To what level of concentration is the contamination? Where on-site are the contaminated soils stockpiled? A. The environmental study is available at the City of Miami Beach for your review. Please contact Humberto Cabanas at 305-673-7000 ext. 4105 or humbertocabanasCa?miamibeachfl.gov. Q19. Is there an environmental study available for review? A. See response to Q18. Q20. What is the protocol to store and handle the contaminated material? A. There is no protocol, however you can verify with the environmental study as indicated in Q18. Q21. What will the finish grades be within the proposed cart storage area north of the new proposed clubhouse and new cart path on east project limits? A. Drawing will be revised and issued with next Addendum. Q22. Please provide the window schedule for the sills. A. All windows, except K, J, & L have brick /concrete sills as indicated 47/AS-S. Windows K,J & L are indicated in revised Details 45 8~ 46/A-8.5 attached to this Addenda. Q23. Please provide the finish schedule for the columns and moldings. The painted finish would apply to which specie wood? A. There is no schedule, all columns and moldings throughout are to be painted. Species to be either clear pine, clear fir or red oak. CITYOF MIAMI BEACH BID NO: 21-08/09 150 DATE: April 6, 2009 Q24. What is the finish for the toilet rooms? A. Ceramic tile, see response to question Q2. Q25. For Office #017, what is the finish to be applied? Is this for the countertops only? A. Office finish as indicated in Schedule to be gypsum wallboard painted. Countertop is plastic laminate. Q26. Please provide the elevation, millwork details, equipment and finish schedule for the bar. A. Elevation and details provided in Sheet A-7.2 and 56/A8-7. Equipment indicated in FS Sheets and Specification Section No. 11400, finish of this equipment to be stainless steel. Q27. Please provide the elevation, millwork details, equipment and finish schedule for the kitchen. A. There is no millwork in the kitchen. The requirements for the Custom Fabricated Stainless Steel Equipment are clearly spelled out in the Foodservice Section 11400 Specifications. The specifications also include a Standard Details Section showing typical elevation of the stainless steel equipment. If the bidders require additional information regarding the stainless steel fabrication, please forward a written RFI and we wilt respond to their specific questions. Q28. In regards to the bar, does the countertop extend into the bay window? Are cabinets millwork or stainless steel and alternate for wood? A. Elevation and details provided in Sheet A-7.2 and 56/A8-7. Equipment indicated in FS Sheets and Specification Section No. 11400. Q29. In regards to the bar top, A-8.7 shows granite on the bar top. What type of granite and thickness is to be used for this material? A. See response to Q1. Q30. On Sheet E-2.0, the momentum signs refer to civil drawings for fixture catalog numbers for the lighting. This fixture was left off of the fixture schedule and the civil drawing is not available. Please advise. A. Refer to the architectural drawings for details on the monument signs. The light fixtures have now been added to the fixture schedule E-0. Q31. In regards to the drawings provided in Addendum 1, there exists a conflict between the answer to Question 1 and Question 15. If the fireplace is working properly, it would be incorrect to place an AC duct inside of it. Please clarify. A. The fireplace is pre-fab, see new Sheet A-5.3. The duct can run through the masonry space built for the pre-fab flute. There is ample room to run both. Q32. Please provide the specifications and materials needed for the wells. A. Please explain. There are no wells in this project. CITYOF MIAMI BEACH BID NO: 21-08/09 151 DATE: April 6, 2009 Q33. In regards to the entrance sign, A-8.7 shows both coral stone and granite to be used. What is the material spec for these finishes (size, supplier, color, etc.)? A. See revised detail. Q34. In regards to the exterior, the exterior elevations and details show quarry keystone being used on the exterior walls. What is the material spec for this finish (size, supplier, color, etc.)? A. That was revised in Addenda No. 2 sheets. Q35. In regards to the walk-in cooler, the specifications call for quarry the to be used and the ramp leading to the cooler. What is the material spec for these finishes (size, supplier, color, etc.)? A. Not just in the ramp, the entire cooler/freezer has a quarry the floor. See Specifications attached. Q36. In regards to the lounge, the finish schedule calls for the to be used on the floor. What is the material spec for these finishes (size, supplier, color, etc.)? Additionally, is there a floor plan available showing the layout for this finish? A. The lounge area will have a concrete tile, two colors: Dark Sea Green, VE-040 and Arabian Green VE-015 as manufactured by Villa Lagoon Tile. There will be a border (2-3 the width) and the interior will be at diagonal. Q37. Please verify the brick veneer needed for this project. A. It is specified in all building wall sections. Q38. Please provide the circuitry information and fan control diagram for exhaust fans 1 and 2 located on the roof over the men's and women's restrooms. A. Wired to bathroom light switches (120v.) Refer to mechanical fan schedules and Revision #3 Q39. What are the limits of the chair rails and moldings in the interior of the building? A. In all walls of lounge and dining only. Q40. In regards to the flagpole, is it to have internal or external halyard? What is the finish? A. External halyard, anodized finish. Q41. In Sheet A-2.2, lockers are indicated at the locker rooms, however, there are no room elevations, details, and specifications for the lockers. Please clarify. A. No elevations or detail needed, specifications were issued as part of Addendum No. 1. Q42. Please provide the specifications for the identification devices (signage). A. See Section 10400. Q43. Please provide the specifications for the millwork items listed within the food service equipment. A. New details have been added, see sheets in this Addendum. CITYOF MIAMI BEACH BID NO: 21-08/09 152 DATE: April 6, 2009 Q44. Are doors #16 and 17 traffic doors? The floor plan and door schedule do not indicate that they swing both in and out. Please clarify. A. Yes, they are traffic doors. Specifications were issued in Addendum 2. Q45. In reference to doors # 18 and 20, the door schedule shows that they are steel doors with a wood frame. However, detail 32 on Sheet 8.3 shows a metal frame. Please clarify. A. They are steel frames, see revised schedule, Sheet A-9.1. Q46. For bid purposes, should one include (2) 4" PVC raceways from the existing FPL transformer to the new FPL transformer location? Or is FPL going to provide new routing from another location? A. For bid purposes include (2) 5" PVC raceways to the pole indicated in sheet E2.0. Q47. The plan shows 175A main circuit breakers in panels K-1 and K-2. Should these panels be main lug panels because of the branch breakers in panel DP feeding them? A. No. Panels shall remain as M.C.B. panels. Q48. The fault current ratings for the main is listed at 65k, along with the other panels except for panel K-3 at 10k. Can the panels be series rated after the main or are all of the panels rated at 65k? A. Provide current ratings as shown on drawings. Q49. The riser diagram does not show metering for this building. Should one include a TUV meter can and assume the transformer will be connected or provide a CT cabinet? A. Provide meter can on exterior wall of the electrical room, with a 1 '/4" conduit to FP&L transformer. See revised drawing. Q50. Sheet A2.1 of Addendum #1, rev 3 does not indicate railing at the entrance steps. The original sheet A2.1 shows railings at the steps and the sections and elevation still show the railings (section b-b/A4.1 and detail 38/A8.4). Please clarify. A. They are part of the "site", so they are indicated in Sheet A-1.5 and are required. Q51. Please provide the size and quantity of the existing wood beams to be used in the project. Are there enough beams to do the job? A. There are approximately 20 existing 4x12 (approx.) existing wood beams, we need 36, therefore for bidding purposes assume 20 new beams (size as required by structural drawings} Q52. What are the limits to the chair rail and moldings in the interior of the building? A. See Response to Q39. Q53. Although the electrical roof plan is provided, there are equipments on the roof and no service receptacle is provided. Please clarify. A. Receptacles not required on roof. CITYOF MIAMI BEACH BID NO: 21-08/09 153 DATE: April 6, 2009 Q54. In Sheet E2.0, the symbol legend clearly defines luminaries to be in normal or in emergency battery pack. Please clarify. A. Refer to sheet E1.0. Q55. Light fixtures on sheet E3.0 calls for fixture type, however, there are fixtures with half-shaded that as per symbol legend and note #1 shall have emergency batteries. The fixture schedule on sheet E1.0 does not show a model number. Please clarify. A. Refer to lighting manufacturer for model number of fixture with emergency battery. Q56. Sheet E5.0 is addressing that a lightning protection system shall be provided, however, there is no design information to generate bill of materials. Please clarify. A. Provide system based on performance requirements indicated in E5.0. Q57. Is the intent to have the lightning protection system as a line item and cost be adjusted later since there is no information to bid? Please advise if the system can be left out and priced later. A. In regards to the bid breakdown sheet, a bidder may add any item deemed necessary to the list. All costs proposed are final once the bid opening deadline has passed. The system cannot be left out, it must be included in the bid based on the performance requirements indicated in E5.0. Q58. In Sheet E1.0, the symbol legend does not address a symbol for data. Please advise. A. Has been revised. Q59. Sheet E4.0 shows locations for telephones as per symbol legend, but there are no provisions for data outlets. Please advise. A. Has been revised and added, see drawings. Q60. Is the Contractor to provide a data port adjacent to each telephone jack shown in the plans? A. See revised drawings. Q61. In Sheet E6.1, the telephone riser diagram shows that each homerun shall be routed in ~/4" empty from port to the telephone room and board. Is this the intent since there is an acoustical ceiling? Is the Contractor to provide only 6" stub-up A.F.C. with bushings and strings only? A. No provide the homeruns and follow the drawings for telephone installation. Q62. The fire alarm in Sheet E5.0 does not show duct smoke detectors. Are duct detectors required (no HVAC set provided)? A. Yes, refer to Revision #2. Q63. Although there is an ansul system, is the Contractor to provide connections to solenoid valves for shut down upon fire alarm activation or should ansul system be the only system to cut off gas supply upon its activation? A. Fire alarm system to monitor ansul system, shut down by ansul system activation. CITYOF MIAMI BEACH BID NO: 21-08/09 154 DATE: April 6, 2009 Q64. Please provide the specifications for the electrical meter can or metering device. A. Check with FP&L representative. Q65. Please provide the specifications for the rigid conduit underground. Is the use of PVC for underground feeders permissible? A. PVC below grade and rigid conduit above grade. Q66. Although specifications strictly enforces the use of rigid conduit for underground feeders, please clarify due to the area and environmental conditions if the PVC would be acceptable for underground and applications, and if exposed, the Contractor would not be subject to mechanical injuries. Please advise. A. PVC below grade & rigid conduit above grade. Q67. Is the General Contractor to hire the kitchen equipment or if the kitchen equipment contractor will be hired by the City of Miami Beach and coordinate the work with the GC? A. General Contractor will be responsible to hire, install and provide all equipment as indicated in Bid Documents. Q68. Please clarify what is meant by NIKEC and Remote in the remark section of the kitchen equipment schedule. Please provide further detail on which pieces of equipment one is to provide. A. NIKEC stands for Not In Kitchen Equipment Contract. In other words these items are to be provided by others i.e., General Contractor, Vendor, Owner, etc. Refer to the written Foodservice Section 11400 Specifications for details. They are shown on our drawings for coordination purposes only, the exact utilities should be confirmed with the supplier. Remote means the unit is to be serviced by Remote Refrigeration. This is detailed in the Foodservice Section 11400 Specifications and shown on the Refrigeration Drawing, Sheet FS-1.5. Q69. Please provide the number and locations of the ansul devices. A. Item 13, the Ansul Fire Suppression System, is clearly marked on the Foodservice Section 11400 Plans and the requirements for this system are clearly indicated in the Foodservice Section 11400 Specification. There is no other type of fire suppression for this project. Q70. Please provide the number and locations of the A/C dampers. A. Refer to mechanical drawings. Q71. Please provide the number and locations of the duct detectors. A. Refer to mechanical drawings. Q72. Will ADT supply the duct detectors? A. See mechanical schedule and specifications. Q73. Please provide the specifications for the security (burglar alarm) system. A. Not required. CITYOF MIAMI BEACH BID NO: 21-08/09 155 DATE: April 6, 2009 Q74. Please provide the specifications for a CCTV surveillance system. A. Not required. Q75. Please provide the specifications for electronic access control. A. Not required. Q76. Was there a previous bid submitted on this project? A. The following cost proposal was submitted by Coastal Construction prior to the City issuing the bid for this project. Division Total Sitework $ 685,125 Concrete $ 383,000 Mason $ 0 Metals $ 21,500 Car entr $ 178,621 Thermal/Moisture Protection $ 70,795 Doors & Windows $ 88,028 Finishes $ 264,885 S ecialties $ 91,349 E ui ment $ 282,000 Mechanical $ 202,000 Electrical $ 151,000 General Conditions $ 273, 054 General Liabilit Insurance $ 25,000 Overhead and Fee $ 200,000 Permittin $ 5,000 Payment and Performance Bond $ 28,644 Builder's Risk Insurance $ 65,000 Grand Total $ 3,015,001 CITY OF MIAMI BEACH ~~ Gus Lopez, CPPO Procurement Director CITYOF MIAMI BEACH BID NO: 21-08/09 156 DATE: April 6, 2009 m MIAMIBEACH City of Miami Beath, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov PROCUREMENT DIVISION Tel: 305-673-7490, Fax: 786-394-d235 Invitation To Bid (ITB) NO. 09-08/09 (Revised) Addendum No. 4 January 23, 2009 Notice to Potential Bidders 1. The bid submission deadline has been extended to Friday, February 6, 2009, at 3 p.m. All past performance surveys need to be submitted by the client directly to the City no later than February 6, 2009. All surveys are to be emailed directly by the client to Theo Carrasco at theocarrasco(a~miamibeachfl.gov or faxed to 786-394- 4235. 2. For more information on Question 21 of Addendum 3, please refer to Drawing C-3 issued in Addendum 1. 3. To receive the updated bid breakdown sheet noted in Question 12 of Addendum 3, please contact Theo Carrasco at 305-673-7000 ext. 6230 or theocarrasco(a~miamibeachfl.gov. 4. In response to Questions 18 and 19 of Addendum 3, the environmental study is available for review through the Procurement Division office in City Hall. Please contact Theo Carrasco for more information. 5. The revised quarry the specification requested in Question 35 of Addendum 3 is provided in this addendum. 6. The revised drawings attached with this addendum can be downloaded at the following site: http://web.miamibeachfl.gov/procurement/scroll.aspx?id=41016. In case the files are not available online, please contact Theo Carrasco at 305-673- 7000 ext. 6230 or theacarrasco cCr~miamibeachfl.gov. Questions and Answers Q1. What will the finish grades be within the proposed cart storage area north of the new proposed clubhouse and new cart path on east project limits? A. See revised drawing C-3. Q2. Please advise on window types to be used on this project. As for now, the windows are single hung and fixed with applied vertical and horizontal mutins. A. Look at window schedule for window types and sizes, Sheet A9-2. CITYOF MIAMI BEACH BID NO: 21-08/09 157 DATE: April 6, 2009 Q3. According to Specification Section 08520, aluminum windows are to be missile impact louvered windows; however the specified manufacturer is CGI and PGT, both which do not manufacture an impact resistant louvered window. Please advise if windows will remain as single hung and fixed OR will they be louvered? A. No they are not to be louvered, see revised attached specifications section 08520. Q4. Specification Section 08710 (Hardware) shows hardware sets 1 and 2 only. Doors # 5, 11, 12, and 13 on the door schedule calls for sets 3, 9, and 10. Please provide the specifications for sets 3, 9, and 10. A. Revised and issued under Addendum No. 3. Q5. In regards to the Epoxy Flooring Section 09730, please provide the finish schedule and the list of rooms where it is to be installed. A. See Finish Schedule, Sheet A9-2 (Last revision Addendum 3). Q6. What type of brick are the "Brickit" bricks? Please provide information on the manufacturer, color (mortar color or regular grey), type, size, and where they might be found. A. That is the manufacturer, see Addendum 3 for all information. Q7. Is there an equivalent type to the "Brickit" brick that can be purchased from a local supplier such as Florida Silica Sand Co. or Airport Brick? A. If they match the bricket specifications and sizes, yes. Q8. Brickwork shows a thin paver brick to be installed on most of the building and a full-size brick in false windows. Please confirm. A. Confirmed, there are some full size bricks for window sills throughout not just in false windows. Q9. Are the fireplaces real brick or manufactured? If real, are the flues metal or clay? A. Yes. See last Addendum No. 3 for all requirements and details. Q10. What is the exact size of the fireplace? A. See Addendum No. 3. Q11. Will there be a flue cap? If so, what type? A. See response to Q.10. Q12. Will there be masonry interior veneer around the fireplace? If so, what material? A. See response to Q.10. Q13. On Sheet A 2-2 of the Addendum 3 set, there is a section noted for the fire places. Please provide Section 1 / Sheet A 5-3. A. See response to Q.10. Q14. Please provide details and material specifications for the shutters on window types A, B, C, and D. A. Specifications were issued in Addendum No. 1. Q15. Please provide the gauge for the UC3 copper panels at the bay windows. CITYOF MIAMI BEACH BID NO: 21-08/09 158 DATE: April 6, 2009 A. There is only one bay window. 16 oz. copper panels. Q16. Is site lighting at the exterior parking lots to be included in the base bid? If so, please provide a drawing with the site lighting locations. A. Site lighting is not part of this scope of work. Q17. Does the LP tank need a containment enclosure? If so, please provide specifications and details for the enclosure. A. Not required. Q18. On Sheet S-6, Note 2A calls for all concrete mix to be a minimum of 5,000 psi. Note G calls for the water cement ratio to not exceed 0.40 which is 6,000 psi mix. The specifications call for 3,000 psi for exterior slabs, 4,000 psi for Grade Beams, Beams, Slabs, and Columns, and 3,000 psi for unspecified concrete. Please clarify which is the correct psi for the concrete mix to be used in the project. A. Follow the drawing specifications. Minimum requirements for this project are: • Fc - 5000 psi • Water/cement ratio of 0.4 Q19. The model number for Item B-9 Task Light by Alkco is incomplete (L2F-_-HO- 120-AL-CS3B). The missing information will advise the manufacturer the "type of lamp" needed and the "length of the fixture." Please provide the missing model number information. A. The complete model number for the Underbar Task Light is Alkco L2F-2-HO-120AL- CS3B. Q20. On Sheet L-S.2, there are only two (2) fire extinguishers found (one in each mechanical room). Please indicate if more are needed to meet City Code and Fire requirements. A. See L-5-2 revised in Addendum No. 2 for more information. Q21. For scheduling purposes, will the General Contractor be allowed to begin Phase II after substantial completion and prior to punch list completion and CMB final acceptance of Phase I? A. General Contractor will not be able to begin Phase II until CMB can move into the new clubhouse and remove the temporary facility that they are currently operating the clubhouse from. Therefore, CMB final acceptance will be required so they can operate from the new facility. Q22. Condensate hood (item #66) on the food service drawings are not reflected on the mechanical drawings. Please provide the mechanical requirements. A. The food service drawings show a Condensate Hood for the Corner Dishmachine: 10" x 10" Size, 450 CFMs, 0.25 SP. However, please be aware the Dishmachine, Item 65, is listed incorrectly on the equipment schedule. This unit is to be specified as NIKEC/by Vendor and should be listed on the equipment schedule a NIKEC. After contract award, contractor to verify the exact model number of the Dishmachine to be supplied to ensure proper coordination of the MEPs. Q23. Please provide the television conduit requirements (if any). A. Has been added, see revised Sheet E4.0. CITYOF MIAMI BEACH BID NO: 21-08/09 159 DATE: April 6, 2009 Q24. On Sheet E4.1, Note 22 states that the electrical contractor shall provide an empty conduit between the waste pulping unit and the waste extractor unit for low voltage wiring. Please provide the location of the waste pulping and extractor units. A. What is actually specified in the FS drawings is a Disposer w/control panel, Item 63. Q25. Civil drawings provide proposed elevations and elevations prior to demolition. Please provide the current elevations of the site after demolition. A. Please see the updated survey attached. Q26. Please provide the parking signage requirements and locations. A. Has been added, see revised civil drawing. Q27. Section 9310 of the specification manual provides a required dimension of 12" for submission samples. Please confirm that the ceramic the is to be 12" x 12" throughout. A. See ceramic the sizes as specified in Addendum No. 3 submit that size sample. Q28. Please provide information for the attic access equipment, details, and associate requirements. A. Access at gypsum wallboard ceilings in toilet rooms and kitchen, provide minimum 12" x 12" or larger access panel as per Specification Section 08305 as required to provide proper operation of maintenance. Q29. Please confirm if food service or any other conduit below the new slab is to be supported by the slab. A. Verify the thickness of the slab with the Architect. Since the beer /beverage conduit requires 24" minimum radius bends it will most likely be installed in ground below slab. Attached are Standard Details SD-2.1 and SD-2.3 as examples of a typical Beverage Sleeve installation. Most of the conduit will be suspended above the finished ceilings. Q30. Please provide the date in which Phase I parking area will be vacated and be for existing contractors. A. The anticipated date that the parking area is to be vacated is July of 2009. Q31. Please confirm if primary electrical service to new transformer is to be by FPL or included as part of the Contractor's scope. If work is to be included, please existing pole to tie into. A. Indicated in Sheet E2.0. Q32. Please confirm if drinking fountains shall be required. A. Yes, one drinking fountain shall be provided, see revised drawings attached. CITYOF MIAMI BEACH BID NO: 21-08109 160 DATE: April 6, 2009 Q33. Addendum #1 is dated October 16, 2008, on the architectural drawings, October 29, 2008, on the electrical drawings, November 3, 2008, on the civil drawings, and December 19, 2008, on the ITB document. Addendum #2 is dated November 6, 2008, on the architectural drawings, November 6, 2008, on the structural drawings, and December 24, 2008 on the ITB document. Addendum #3 is dated December 17, 2008, on the architectural drawings and December 15, 2008, for the plumbing drawings. Please clarify. A. Those are the dates noted on the addenda for the architectural drawings. There is the likelihood that the dates noted on the updated drawings might not reflect exactly with the addenda issued by the City. Q34. Page 16 of the ITB document outlines Prevailing Wage requirements and outlines projects that are exempt. Please confirm if this project is subject to state or federal wage rates. If so, please provide the applicable wage determination for this project. A. While prevailing wages are not applicable with this project, the General Contractor must comply with all applicable state and federal minimum wage laws. Q35. Page 47 of the ITB document states that the "Building Department -Plumbing, Structural, and Electrical fees are to be waived." Item 2 in page 50 of the ITB document states that an allowance is to be included for building permits. Please clarify. A. Item 2 in page 50 of the ITB document represents all other permit fees (if any) not waived by the City. Q36. Pages 73 to 80 of the ITB document provide a form of contract for this project. Please specify if this form is to be included with the bid document. A. Yes, this is to be included in the bid proposal. Q37. Item 7.1.4 located on page 94 of the ITB document states that the Builder's Risk "is / is not" required. Please confirm is Builder's risk insurance is required and if the City or the Contractor is provide the policy. A. Builder's Risk insurance for the construction of and/or addition to aboveground buildings or structures is required. The coverage shall be "All Risk" coverage for 100 percent of the completed value, covering City as a named insured, with a deductible of not more than Five Thousand Dollars ($5,000.00) each claim. Q38. Is the facility LP or natural gas? A. LP gas as indicated in the Bid Documents, plumbing drawings. Q39. In regards to the pieces specified as existing/relocate in Section 11400, where are they being located to? Is the facility on-site or off-site? Who is providing the storage for these pieces? A. City of Miami Beach will be responsible for the relocation and installation of this equipment. Not part of this Contract. Q40. In regards to the pieces specified as existing/relocate in Section 11400, assuming a separate trip will be needed to relocate the items, will these trips be during normal working hours or at night? A. Not required. See response Q39. CITYOF MIAMI BEACH BID NO: 21-08/09 161 DATE: April 6, 2009 Q41. Can MC cables be permitted on this project for concealed branch circuit wiring in lieu of EMT conduits? A. No. Q42. What is the project duration for Phases I and II? A. Phase I and II are 300 and 120 calendar days respectively. Q43. Please provide the S-4 roof plan in addition to A-1.3, A-1.4, and A-1.5. A. S-4 has not changed from the original bid. documents. CITY OF MIAMI BEACH ~~ Gus Lopez, CPPO Procurement Director CITYOF MIAMI BEACH BID NO: 21-08/09 162 DATE: April 6, 2009 m MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov PROCUREMENT DIVISION Tel: 305-673-7490, Fax: 786394-4235 Invitation To Bid (ITB) NO. 09-08/09 (Revised) Addendum No. 5 February 3, 2009 Notice to Potential Vendors 1. In order to be deemed responsive to this bid, all potential vendors must comply and submit all required documentation and information noted throughout the bid document (see Section 00315 for additional information). To assist potential vendors, a checklist is provided in Attachment A noting the required information needed upon submitting a bid. Attachment A should be submitted as part of any bid with the proper initials included attesting that the requested information is being included in the submitted proposal. 2. Unless deemed nonresponsive by the City, bidders should be prepared to be interviewed by a Technical Review Committee that is set to convene no later than Friday, February 13, 2009. 3. An updated plan log is attached. Questions and Answers Q1. Question 42 of Addendum #4 indicates that this project is phased. Does food service install in both phases or just one? If one, please specify which phase. A. Food service is part of Phase 1 only. Q2. Please provide the details and specifications for the kitchen cabinetry, including the elevation specifications. A. There is no cabinetry in the kitchen. The kitchen specifications are part of the technical specifications Section 11400. Q3. Please provide the details and specifications for the bathroom countertop, including the elevation specifications. A. Bathroom elevations can be found in Sheet A7-1. Q4. In regards to Section 11400, items #76, #80, B-1, B-15, B-17, B-19, B-21 are not part of the kitchen equipment package and are listed as custom millwork. Please provide the details and specifications for these items. A. Any millwork listed in Section 11400 was for the Bar and the details and elevations can be found in Sheet A7-2 issued in Addenda #3. Q5. The bathroom the selection of Mountain Peak is continued. Would Cliff Pointe be a suitable substitution? A. As long as it is in the same price range, we will accept. Final color will be selected after award. CITYOF MIAMf BEACH BID NO: 21-08109 163 DATE: April 6, 2009 Q6. Please provide the carpet details and specification for Room office 017. A. See response to Q.3 in Addendum No. 3. Q7. Please provide the resilient the details and specifications for Rooms 009, 010, and 016. A. Resilient the specifications can be found in Specification Section 09660. Q8. Room 016 is calls for a telecom on the floor plan and beverage storage on the finish schedule. Please clarify. A. That was revised and issued in Addendum #2, drawing sheet A9-2. Q9. In Room 010, please confirm that there needs to be resilient the flooring with a wooden base. A. Yes; there needs to be resilient the flooring with a wooden base. Q10. If the bath floors are to be sloped to drains, will the pad be recessed? A. The pad can be recessed 'h". Q11. Please the type of grout to be used including the grout joint width. A. Grout information can be found in Section 09330 attached to Addendum #4. Q12. If bathroom floors are to be sloped, 18 x 18 the does not work. A mosaic the or anything no larger than 6 x 6 is workable. Please confirm. A. The tiles are 12 x 12 and see response to Q.10 above. Q13. Please provide the details and specifications for the the in the lounge area. A. See response to Q.36 Addendum #3. Q14. The cooler and freezer are to be epoxy resin per the finish schedule. Please confirm. A. No it is quarry the as indicated in Q.35 Addendum #3. Q15. In regards to the ramp, please provide the details and specifications to the tiling needed. A. If this refers to the small ramp in the cooler/freezer area, see response above. Q16. Please provide SD-2.1 and SD-2.3. A. See attached. Q17. Please provide the specifications for the bricks to be used inside the fireplaces. A. They are part of the fireplace specification, it is apre-fabricated unit. If this references the brick around the fireplace, then provide a brick from the same manufacturer as the brick being provided in the outside "red" color and sized as indicated in the section. CITY OF MIAMI BEACH ~~ Gus Lopez, CPPO Procurement Director CITYOF MIAMI BEACH BID NO: 21-08109 164 DATE: April 6, 2009