Loading...
2001-24596 RESO RESOLUTION NO. 2001-24596 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA APPROPRIATING $170,062 FROM THE GENERAL FUND UNDESIGNATED FUND BALANCE, AND AWARDING A CONTRACT TO SOUTHERN COAST ENTERPRISES, INC., IN THE AMOUNT OF $160,062, TO INCLUDE A CONTINGENCY FEE OF $10,000; SHOULD A REQUIREMENT EXIST TO PROVIDE ADDITIONAL WORK FOR UNFORESEEN CONDITIONS; PURSUANT TO INVITATION TO BID NO. 23-00/01, FOR THE SUPPLY AND INSTALLATION OF A MAINTENANCE COATING SYSTEM FOR THE POLICE STATION ROOF. WHEREAS, the City has identified a requirement for the application of a urethane maintenance coating system to cover approximately 28,000 square feet of existing concrete decks and to provide an acrylic coating system to approximately 13,000 square feet of existing walls, for the Police Station roof; and WHEREAS, the City issued Invitation to Bid No. 23-00/01 for the supply and installation of a maintenance coating system for the Police Station roof; and WHEREAS, two-hundred-eighty-five (285) bid notices, and fifty-seven (57) sets of specifications for Bid No. 23-00/01 were issued, resulting in the receipt of five (5) bids, two of which were responsive; with the lowest bid of $112,000 from Inclan Painting Corp., determined to be non-responsive, and the second lowest bid, of $160,062 from Southern Coast Enterprises, Inc. deemed as the lowest responsive and best bid; and WHEREAS, the City must appropriate $170,062 for this project from the General Fund Undesignated Fund Balance to award a contract to Southern Coast Enterprises, Inc. for $160,062, and to include a contingency fee of $10,000, should a requirement exist to provide additional work for unforeseen conditions; and WHEREAS, the City Manager has reviewed the administration's recommendation for the contract award to Southern Coast Enterprises, Inc. and concurs with this recommendation. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein authorize the Administration to appropriate $170,062 from the General Fund Undesignated Fund Balance and award a contract to Southern Coast Enterprises, Inc. for $160,062, and to include a $10,000 contingency fee, should a requirement exist to provide additional work for unforeseen conditions; pursuant to Bid No. 23-00/01 for the supply and installation of a maintenance coating system for the Police Station roof. PASSED and ADOPTED this 20th day of septe1/ll-me , . ATTEST: APPROVED AS TO ~ nt1... v n A J. FORM & LANGUAGE MA R ~O r~ & FOR EXECUTION CITY CLERK F:\PURC\SALLIJOHN\COMM\12-00 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 http:\\ci.miami-beach.fl.us COMMISSION MEMORANDUM TO: Mayor Neisen O. Kasdin and Members of the City Commission DATE: September 20, 2001 FROM: Jorge M. Gonzalez City Manager J~ SUBJECT: A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida Appropriating $170,062 from the General Fund Undesignated Fund Balance, and to Award a Contract to Southern Coast Enterprises, Inc. in the Amount of $160,062, and to include a Contingency Fee of $10,000, Should a Requirement Exist to Provide Additional Work for Unforeseen Conditions, Pursuant to Bid No. 23-00/01 for the Supply and Installation of a Maintenance Coating System for the Police Station Roof. ADMINISTRATION RECOMMENDATION Adopt the Resolution. BID AMOUNT AND FUNDING $170,062 Funding is available from the General Fund Undesignated Fund Balance. ANALYSIS The scope of work requires the application of a urethane maintenance coating system to cover approximately 28,000 square feet of existing concrete decks over the City of Miami Beach Police Station. This application will consist of a twelve (12) Year Water Intrusion Warranty with no exclusions for ponding water. Additionally, the work will include the application of an acrylic coating system to approximately 13,000 square feet of existing walls, which will include a ten (10) Year Water Intrusion Warranty. The contractor will supply all labor, materials, equipment and supervision necessary for completing this work, in accordance with the bid specifications. The contractor will be substantially completed with the work within forty-five (45) calendar days, and the entire work will be completed within sixty (60) calendar days after the issuance of the notice to proceed. Contractor will provide Performance and Payment Bonds each in the amount of one-hundred (100%) percent of the contract pnce. AGENDA ITEM t7a q-~-ol DATE Budget Bid No. 23-00/01 Page Two September 20, 2001 ANALYSIS (Continued) Invitation to Bid No. 23-00101 was issued on March 13,2001, with an opening date of June 15, 2001. A non-mandatory pre-bid conference and site inspection was held March 272001, which resulted in several questions regarding the scope of work required, so that the work would be covered under the required manufacturer warranties. This resulted in a subsequent site visit, which was held on May 30, 2001. At this site visit the required scope of work was discussed and clarified by the Property Management Division. The decision was also made at that time, to include the Crime Lab Roof, to the scope of work, which consisted of an additional 1,536 slf of the maintenance coating system be provided. This information resulted in the issuance of another Addendum. (Addendum #7) DemandStar.com issued bid notices to two-hundred-eighty-five (285) prospective bidders, resulting in fifty-seven (57) vendors requesting bid packages, which resulted in the receipt of five (5) bids. The lowest bid was received from Inclan Painting, Corp., however when the Procurement Division requested a clarification of their bid, regarding the proposed product to be used for this project, Inclan Painting Corp. submitted "or Equals" on three different occasions. On each product submittal, the proposed product either did not come with the requested twelve (12) 1 ten (10) year warranty, and/or the submitted product does not have "Dade County Product Approval" for this type of roofmg project, therefore a permit cannot be pulled by the Contractor. The next lowest bid was a responsive bid received from Southern Coast Enterprises, Inc. References have been checked, and this Contractor comes highly recommended. The information provided, indicates that this contractor has been in business for over seven years as a General Contractor, and provides quality work and completes all jobs within the required completion dates. Based on this analysis, the City recommends that the contract be awarded to the lowest and best bidder, Southern Coast Enterprises, Inc. Bid No. 23-00/01 Page Three September 20, 2001 BID TABULATION Item Description Inclan Murton Roofing Southern Preventive Advanced Painting Corporation Coast Ent. Maintenance Roofing, Inc. Services A Lump Sum $108,500 $118,880 $155,300 $177,400 $192,825 Add Alternate 1 Omitted (Crime Lab Roof) Omitted B $3,500.00 $4,762.00 $3,750.00 GRAND TOTAL $112,000 $118,880 $160,062 $181,150 $192,825 JM~I F:\PURC\$ALL \JOHN\COMM\23-000 l.doc