AMENDMENT N0.2 CONSTRUCTION MANAGEMENTd,00 ~-. ~ ~D ~~ (~ 7~- - f/i.a~o q GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT N0.2 TO AGREEMENT FOR PRE- CONSTRUCTION SERVICES BETWEEN CITY OF MIAMI BEACH, FLORIDA, AND KVC CONSTRUCTORS INC., FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES PURSUANT TO RESOLUTION N0.2006-26416 (ENTITLED "CONSTRUCTION MANAGEMENT AT RISK PRE-CONSTRUCTION SERVICES FOR THE RENOVATION OF THE SCOTT RAKOW YOUTH CENTER PROJECT) THIS GMP AMENDMENT NO. 2, made and entered into as of this 22 day of April 2009, ("GMP Amendment") amends that certain Agreement between, the CITY OF MIAMI BEACH, FLORIDA (City and/or Owner), and KVC Constructors, Inc. (hereinafter Construction Manager or CM), made as of the 6th day of December 2006, (and amended, pursuant to that certain GMP Amendment No. 1, dated October 17,2009) for the following described Project: Scott Rakow Youth Center New Addition, Remodeling, and Renovation 2700 Sheridan Avenue, Miami Beach Florida WHEREAS, on December 6, 2006, the Mayor and City Commission approved Resolution No. 2006-26415, authorizing the execution of an Agreement between the City and Brown and Brown Architects, Inc. for professional architecture and engineering services for the renovation of the Scott Rakow Youth Center; and WHEREAS, on December 6, 2006, the Mayor and City Commission approved Resolution No. 2006-26416, authorizing the Mayor and City Clerk to execute aPre-Construction Services Agreement with KVC Constructors, Inc (KVC) for the SRYC, pursuant to Request For Qualifications No. 27-05/06 (the KVC Agreement); and WHEREAS, the KVC Agreement, provides for the City to issue construction services amendments once the design is complete and a negotiated Guaranteed Maximum Price (GMP) is accepted and approved by the City; and WHEREAS, on October 17, 2007, the Mayor and the City Commission approved Resolution No. 2007-26668 approving and authorizing the Mayor and the city Commission to execute GMP Amendment No.1 to the KVC Agreement, for the pool filtration system replacement, in the amount of $227,000; 1 Q WHEREAS, the City and KVC have now negotiated and agreed to add the sum of $4,565,666, as GMP Amendment No. 2 to the KVC Agreement, which accepts the GMP for Phase II addition, remodeling, and renovation improvements to SRYC; including ,with out limitation, the following: Addition ,remodeling ,and renovations to the existing facility new bus drop off and parking area and onsite upgrades, new ADA upgrades and elevator, remodeled restrooms, new multipurpose room, new play area, new pool managers office. NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, and for such other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Owner and the Construction Manager do hereby agree as follows: 1. This GMP Amendment No. 2 is executed in connection with, and is deemed to be part of the Agreement and the Contract Documents. Wherever the terms of this GMP Amendment No. 2 and the terms of the Contract Documents are in conflict, the terms of this GMP Amendment No. 2 shall govern and control. The terms used herein, unless otherwise defined in this GMP Amendment No. 2, shall have the meanings ascribed to them in the Contract Documents. 2. The following are hereby incorporated into the Contract Documents and made part thereof: a. The Construction Documents listed on Attachment 1 -GMP No. 2 attached hereto, which are made a part of the Contract Documents by this reference (the "Construction Documents"); and b. The specifications listed on Attachment II -GMP No. 2 attached hereto, which specifications are made a part of the Contract Documents by this reference (the "Specifications"); and c. Those documents listed on Attachment III -GMP No. 2 Additional Contract Documents, refer to the executed Pre-construction Services Agreement for reference. d. Those documents listed on Attachment IV -GMP No. 2 GMP book inclusive of Construction Manager Proposal, Qualifications and Assumptions, attached hereto, are made a part of the Contract Documents by this reference. e. The Scope of the Work for the addition, renovation and remodeling, contemplated in this GMP amendment No. 2 and as described in Attachment I -GMP No. 2 and II -GMP No. 2 is hereby incorporated into the Work. 2 f. The date of Commencement for the Construction of the portion of the Work delineating the addition, renovation and remodeling contemplated in this GMP Amendment No. 2 shall commence upon issuance of Notice To Proceed (NTP) # 2, by the parties hereto (the "Date of Commencement"). g. The Construction Manager shall achieve Substantial Completion of the portion of the Work contemplated in this GMP Amendment No. 2, no later than 425 calendar days from the issuance of NTP # 2 (the "Contract Time"), and final completion no later than 30 days from the date of Substantial Completion. Failure to meet either the Substantial Completion or Final Completion dates shall be a material breach of this Agreement and Liquidated Damages will be aased thereinafter. h. Upon failure of Construction Manager to substantially complete the portion of the work contemplated in this GMP Amendment No. 2 within the specified period of time, plus any approved time extensions, Construction Manager shall pay to the City the sum of $1,000.00 (One Thousand Dollars) for each calendar day after the time specified in subsection 2(g) of this Amendment. i. The Guaranteed Maximum Price (GMP) for the scope of Work contemplated in this GMP No.2 is hereby guaranteed by the Construction Manager not to exceed the sum of $4,793,949.00 (GMP Amendment No. 2), based upon the entire Scope of the Work as described in the Contract Documents, as amended herein, and including, but not limited to, the Drawings and the Specifications, subject only to additions and deductions by Contract Amendment(s) or Construction Change Directives, as provided in the Contract Documents. The GMP for GMP Amendment No. 2 is more particularly itemized in the Schedule of Values prepared in accordance with the terms of the Agreement, which Schedule of Values is attached hereto as Attachment VI -GMP No. 2 and made a part of the Contract Documents by this reference. Included in the Schedule of Values and specifically identified herein, the Owner's Contingency included in the Guaranteed Maximum Price for this GMP Amendment No.2 is $228,283.00. j. Should the Construction Manager realize any savings from the negotiated Schedule of Values, incorporated as Attachment VI -GMP No. 2, the City shall receive 75% of said savings with no line item integrity. The City reserves the right to audit all contract related documents at any time during the Project and at the end of the Project. k. The Construction Manager shall provide Commercial General Liability Insurance, Automobile Liability Insurance, and Worker's Compensation Insurance in compliance with the provisions of Article II, Insurance and Bonds, of the General Conditions of the Contract for Construction. I. The Construction Manager shall provide the Public Construction Payment Bond and the Public Construction Performance and Guarantee Bond, in compliance with the provisions of Article II, Insurance and Bonds, of the General Conditions of the Contract for Construction. m. Utility locations will be identified by the Construction Manager and all existing utility connections will be capped as needed, as noted in the Qualifications and Assumptions Statement. n. The Construction Manager's on site management and supervisory personnel for the Project shall be set forth herein, and incorporated as Attachment VII -GMP No. 2 to this Agreement. o. To the extent that the Owner has authorized the Construction Manager, in writing, to perform the portion of the Work contemplated in this GMP Amendment No. 2 with the Construction Manager's own forces, the salary and wage schedule for the Construction Manager's personnel performing such portion of the Work, agreed upon by the City and the Construction Manager, shall be as set forth on Attachments III 8~ IV- GMP No. 2 attached hereto, and is made a part of the Contract Documents by this reference. The Construction Manager warrants and represents that the salary and wage schedule includes comparable market rates (including any and all benefits, contributions and insurance) charged by the Construction Manager for comparable contracts to other business and individuals for similar services and/or work, that such rates are not higher than the standard paid for this Project. p. A Project Schedule will be provided as Attachment V -GMP No. 2 (Also refer to Date of Commencement and "Contract Time" in subsections 2(f) and (g) of this Amendment). q. Except as expressly provided herein above all of the terms, conditions, covenants, agreements and understandings contained in the Pre- Construction Contract Documents (and as same may have been amended pursuant to GMP Amendment No.1 and this GMP Amendment No.2) shall remain unchanged and in full force and effect, and the same is hereby expressly ratified and confirmed by the City and Construction a ~ Manager. This GMP Amendment No. 2 may be executed in several counterparts, each of which shall be deemed an original but all of which shall constitute one and the same instrument. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] IN WITNESS WHEREOF, the parties have affixed their signatures, effective on the date first written above. FOR CITY/OWNER ATTEST: City Clerk CITY OF MIAMI BEACH By: ayor Ma Herrera Bower FOR CONSTRUCTION MANAGER: KVC CONSTRUCTORS, INC Florida Contractor License: CGC022994 ATTEST: J ~ <.1~. ~~s ~~ J Print Name APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION S.L~i~~l~ld H3~~;~ zWwr~~ ~0 ~1l3 '~~~ ~ (~~ City A Date 6 v Vl~~ h. ~~, t iJ Print Name ATTACHMENT I CONTRACT DOCUMENTS: • Phase III 100% (Construction Documents) Volumes I and II with plans, dated 11/15/2008 • All Architectural, Civil, Structural and MEP/FP drawings included under these covers are identified as Construction Documents and dated Nov 15, 2008 with no revisions notes. • Landscape Drawings, LDs and LPs, are identified as Construction Documents with a Revision No. 2 date of Oct, 31, 2008 • Irrigation Drawings LI-1, LI-2 and LI-3) are identified as Phase III - 90% CD and are dated 05.23.2008. • Irrigation Drawing (I-4) is identified as Phase III - 90% with the note "NOT FOR CONSTRUCTION -FOR REVIEW ONLY" and dated July 15, 2008.Drawing I-4 includes the Legend, Zone Summary Chart, Irrigation Notes and Specifications and Details. The Scope of Work described in this drawing is included in the GMP. • Drawings ADD 1 and ADD 2 dated Jan 20, 2009 and revised Feb 6, 2009. These drawings illustrated additional IT and Owner's requirements. • Technical Specifications Volumes II and III dated Nov 15, 2008. Volume I containing Division 1 was deleted during the Bid/GMP process since general conditions were already included in the Pre- Construction CM@Risk contract with KVC. • BID RFI 1 thru 20 are also included. • Architects (Brown & Brown/ CSA) e-mail with sketches for fire connection dates 2/5/09, 5 pages. ATTACHMENT II CONTRACT DOCUMENTS: SPECIFICATIONS ATTACHMENT III CONTRACT DOCUMENTS: General and Supplementary Conditions See Executed Pre-Construction Services Agreement ATTACHMENT IV CONTRACT DOCUMENTS: KVC Constructors Proposal and Qualifications and Assumptions dated February 27.2009 ATTACHMENT V CONTRACT DOCUMENTS: Construction Schedule ATTACHMENT VI SCHEDULE OF VALUES ATTACHMENT VII ON SITE PERSONNEL Management and Supervisory 7 ~C