Loading...
Amendment No. 7 - CH2M Hill - Normandy Shores Neighborhood No. 3 ROW Improvement Projectm MIp,MIBEACH CAPITAL IMPROVEMENT PROJECTS OFFICE TO: Jorge Gonzalez City Manager FROM: Charles Carreric9' CIP Director DATE: September 21, 2009 MEMORANDUM SUBJECT: Amendment No. 7 - CH2M Hill -Normandy Shores Neighborhood No.3 Right-of Way Infrastructure Improvement Project. The scope of work for the Normandy Shores Right~f--Way Infrastructure Improvement project consisted of the beautification of many street ends that abut Biscayne Bay. The scope identified certain drainage improvements that impacted the existing seawalls in many if these areas. During the construction of the project, it was identified that the Public Works Department anticipated the reconstruction of certain seawalls beyond the limits identified in the right-of-way project. The right-of-way project contemplated seawall improvements due to drainage improvements from 15 feet of sheet piling with reinforced concretie cap to approximately 50 feet of sheet piling with a reinforced concrete cap at the Jones Street end, Hagan Street end and the South Shore Drive. In order to effectuate these changes, it was necessary to modify certain permits with the County to allow for this additional construction. The attached Amendment No.8 includes additional design and permitting services at Jones Street end, Hagan Street end, and South Shore Drive to incorporate the seawall reconstruction into the on-going right-of-way project. This ;task includes applications for permits to extend the seawall improvements from 15 feet' of sheet piling with reinforced concrete cap to approximately 50 feet of sheet piling with a reinforced concrete cap at Jones Street end and Hagan Street end while revising the South Shore design that was permitted by others. Due to the limited scope of the'~previously identified work, the project team had secured Class II permits. This change requires submittal to the Miami -Dade Department of Environmental Resources Management for a Class I permit. The total fee proposed for this scope of work shall be anot-to-exceed basis in the amount of $24 X607. `~~ ~vre eammrff~ try .prrDVi~ing axc~Ilent lic ~ryiOe •vr~ safst~ tln ~ l vw'ho ,love„ ~rY~, ;vrro',~9my rn zaur yilarz~nt, :tcr~piev~, laisimrus ~raarnura3iy. ~~ This D~ ~ 1700 City), AMENDMENT NO.$7 ~ TO THE PROFESSIONAL LANDSCAPE ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT BETWEEN j THE CITY OF MIAMI BEACH, FLORIDA AND CH2M HILL, DATED MAY 16, 2001, FOR THE PROVISION OF PROFESSIONAL SERVICES, ~ IN AN AMOUNT NOT-TO-EXCEED $24,607 FOR THE PROVISION OF ADDITIONAL PERMITTING SERVICES )R THE RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENT PROGRAM NEIGHBORHOOD N0.3 -NORMANDY SHORES PROJECT mendment No. ~87to the Agreement made and entered this day of ~, 2009, by and between the CITY OF MIAMI BEACH, a Municipal ~tion existing under the laws of the State of Florida, having its principal offices at onveration Center Drive, Miami Beach, Florida 33139 (hereinafter referred to as nd CH2M HILL, having its offices at 800 Fairway Drive, Suite 350, Deerfield, 3344;1 (hereinafter referred to as Consultant). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 134-99/00, the City adopted Resolution No. 2001-24386, on May 16, 2001, approving and authorizing the Mayor and City Clerk to execute an Agreement with the Consultant, for professional services for the Neighborhood No.3 - Normandy Shores Right-of-Way (ROW) Infrast ~ucture Improvement Project (the Agreement); and WHEREAS, the Agreement was executed fora not-to-exceed amount of )0; and WHEREAS, the scope of the Right-of--Way Infrastructure Improvement Program Neighborhood No.3 - Normandy Shores Project (the Project) is comprised of improvements to the following area: Normandy Shores, a residential island with approximately 200 single family homes and 43 apartment buildings surrounding the Normandy Shores Golf Course and Fairway Park, which is linked to Miami Beach at 71Sc Street; and (WHEREAS, the Project scope of work includes: enhanced landscaping and street Fighting consistent with community preferences; repair, extension or widening of sidewa'ks to comply with ADA -Title III; street resurfacing/pavement markings and improvement of dead end streets with street lighting, landscaping, fencing, and/or parking, where appropriate; bicycle paths and pedestrian access ways; incorporation of traffic ~alming features, consistent with the community preferences; improved storm water rainage collection and disposal infrastructure; and provision of the necessary infrastructure to accommodate the burial of overhead facilities, in the event the residents consider the creation of a special assessment district to underground electric, cable, and telephone services; and -1- .~ WHEREAS, on May 13, 2005, Amendment No. 1 to the Agreement was executed, to include the provision of additional services necessary to prepare and attend a second pre-community design workshop, and community design workshop (CDW) for the Project, for a no-to-exceed amount of $12,811; and WHEREAS, on October 5, 2004, Amendment No. 2 to the Agreement was executed, to include the provision of additional professional services necessary to perforrr~ undergrounding utility verification for the Project, in an amount not-to-exceed $16,325; and WHEREAS, on March 18, 2005, Amendment No.3 to the Agreement was executed, to include the provision of additional professional services necessary to install a drainage test well for the Project, in an amount not-to-exceed $12,750; and ~IVHEREAS, on March 18, 2005, Amendment No.4 to the Agreement was executed, to include provisions for additional professional ~ services necessary to incorporate concrete valley gutters to the Construction Documents for the Project, for a not-to-exceed amount of $3,500; and WHEREAS, on July 14, 2005, Amendment No.5 to the Agreement was executed, to include provisions for additional services necessary to install an additional drainage test well for the Project, in anot-to-exceed amount of $500; and EREAS, on December 6, 2006 Amendment No.6 to the Agreement was to include the provision of resident project representation and additional n management services, in snot-to-exceed amount of $550,000; and WHEREAS at this time, the City, has negotiated Amendment No. 87for the provision of additional permitting services during construction; and WHEREAS the Consultant met with the City and Hazen and Sawyer, the City's Program Manager, and it has been established that this additional service(s) request appears fair and reasonable; ~YIIHEREAS, this Amendment No. 8~increases the previously contracted amount of $1,238,416 by $24,607; resulting in a total fee of $~. i,Z"f1,z93. NOW HEREFORE, the parties hereto, and in consideration of the mutual promises, covena its, agreements, terms, and conditions herein contained, and other good and valuabl consideration, the respect and adequacy are hereby acknowledged, do agree as folio s: ~ . 1. 2. The abpve recitals are true and correct and are incorporated as part of this Amendment No.>3.7. The Agreement is amended as defined in schedule "A-$'lattached herein. -2- t .w 3. 01 All 4. ~/ Th An IN ex Al A' provisions of the Agreement, as amended, are unchanged. and Consultant ratify the terms of the Agreement, as defined by this mt No.&7• :SS WHEREOF, the parties hereto have caused this Amendment No. 8~to be in their names by their duly authorized officials as the date first set forth above. CITY OF MIAAAI BEACH ~ ~' UeLe~ City Clerk SECRETARY G ~l i•4.. Print Name r/°y - ty na er CONSULTANT: CH2M HILL ~ _ Z____~ V-Ce, PRESID NT ~~~-~- vas ~ ~~ Print Name APPROVED AS TO FORM 8~ LANGUAGE ~ FOR EXECUTION City Atton'c ;.:\~ Date -3- SCHEDULE "A-$"7~~ SCOPE OF SERVICES CITY OF MIAMI BEACH RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS PROGRAM NEIGHBORHOOD N0.3 -NORMANDY SHORES OF SERVICES The following new Task 4.10 shall be added to the existing scope of services: Task 4.f10 -Revise Existing Agency Permits and Assemble New Permits In this ffort, the Consultant shall assemble applications and supportive documentation for ren al and/or extensions of existing permits. Furthermore, changes to the method of disp sal for dewatering fluids required a new SFWMD Individual Permit to be assembled and submitted before October 2008. Additional seawall construction is anticipa ed and Class 1 permits are required by DERM. This task includes application for permits to extend the seawall improvements from 15 feet of sheet piling with reinforced concrete cap to approximately 50 feet of sheet piling with reinforced concrete cap. ibles - Assemble applications and supportive documentation for renewal or extensions of existing permits. Assemble and submit a new SFWMD Individual Dewatering permit with an extension of time to coincide with the revised construction schedule. Assemble DERM Class I permit applications for two seawall extensions using existing design features for the outfall system as the basis of design. Attend meetings with the City, Program Manager, and/or permitting agency staff, and generate meeting minutes, as required to review, discuss and finalize permit procurement. Notify the City of checks request for permit application fees and provide fee back-up information. PAYM NT AND COMPENSATION The tot I fee proposed for this scope of work shall be anot-to-exceed basis in the amount of $24,607. This fee is based on estimated labor hours per task and other direct costs, s shown in the attached Schedule "A-8"j Invoicing will be monthly and based on hourly tes in accordance with the original Agreement between the City of Miami Beach and CH2MHILL. • Ori final Agreement amount: $620,800.00 • Am ndment No.1 (Additional services for CDW N0.2) amount: $12,811.00 • Am ndment No.2 (Underground utility verification) amount: $16,325.00 • Am ndment No.3 (Test well installation) amount: $12,750.00 • Am~ndment No.4 (Concrete valley gutters) amount: $3,500.00 • Amendment No.5 (Reimbursable expenses for test well) amount: $500.00 ~+ Am ndment No.6 (Additional construction management services and Resident Pro~ect Representation) amount: $550,000.00 gent No.@~(Additional Permitting Services) amount: $24,607 Agreement amount: .~- f,z~lf,293 ' SCH CITY OF I RIGHT OF WAY INFRASTRUCT CONSULTANT'S COMP NEIGHBORHOOD Cost Estimat F.Craveiro Bob Pontek Jason Debrincat Eric Myer TASK TASK DESCRIPTION Project Director Technologlst/Proje EngineerlArchitect NO. ct Mana er lSclentist ManageNSenloi Pro'ect En Ines 4 CONSTRUCTION MANAGEMENT SERVICES 240 work da s 4.1 PRE-CONSTRUCTION CONFERENCE 4.1A NORMANDY RESIDENTS MEETING 4.2 WEEKLY CONSTRUCTION MEETINGS 40 weeks 4.3 REQUESTS FOR INFORMATION !CONTRACT DOCUMENT CLARIFICATION RFI / CDC 4.4 REQUESTS FOR CHANGES TO CONSTRUCTION COST AND/OR SCHEDULE 4.5 PROCESSING OF SHOP DRAWINGS 4.6 SPECIALITY FIELD OBSERVATION SERVICES Redevelo 10 wells 4.7 PROJECT CLOSEOUT 4.8 POST PROJECT SERVICES 4.9 HOA PREPARATION AND ATTEND MEETINGS 6 ro osed 4.10 REVISE PERMITS FOR EXTENDED TIME/SEAWALLS 4 40 36 4.11 CLUB HOUSE STORM WATER PERMIT MODIFICATION Sub-Total 4 40 36 0 5 ADDITIONAL SERVICES 240 da s 45hr/wk for RPR 5.5 RESIDENT PROJECT REPRESENTATIVE 48 weeks 6 REIMBURSABLES 6.1 REPRODUCTION SERVICES 6.2 TRAVEL AND SUBSISTENCE 6.3 SURVEYING 6.4 GEOTECHNICAL EVALUATION 6.5 UNDERGROUND UTILITY VERIFICATION 6.6 E-BUILDER SOFTWARE LICENSE - 2009 Sub-Total TOTAL HOURS 4 40 36 0 TOTAL FEE ESTIMATE WIO Reimbursables TOTAL FEE ESTIMATE W/ REIMBURSABLES I Hourly Rates - 2009 $174.91 $174.91 $124.24 $124.24 Scopes_NormandyCA Amendment No. A 7 1LE B MI BEACH E PROGRAM A-E CONSULTANT CATION FEE SCHEDULE Normandy Shores Amendment $7 Pat Mohile J.Wojciak Damon Almendinger Glez Chang Resident Project ~ Representative EngineeNArchitect Engineer/Consults Computer /Scientist nt2 neQ~.,..e.. T__~_,_,__ ___ TOTAL HOURS ~ TOTAL COST ~ $0 0 $0 0 $0 0 $0 0 $0 $0 $24,607 $0 $24,607 $0 $0 $24,607 $24,607 $97.60 $104.94 $84.43 $88.05 $62.72 $48.25 i is