Loading...
Agreement,~~o9,~~zs~ AMENDMENT NO. 4 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (A / E) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND EAC, CONSULTING INC. DATED JULY 27, 2005 FOR THE PROVISION OF PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE BISCAYNE POINT RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROJECTS. his Amendment No. 4 to the above referenced Agreement is made and entered this day of c ur~r n! r"L-, 2009, by and between tfre CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Deach, Florida 33139 (heminafter reterred to as Cit~), and EAC,CONSUL7ING INC., a Florida Corporation, having its principal office at 815 NW 57 Avenue, Suite 402, Miami, Florida, 33126 (hereinafter referred to as Consultant). RECITALS: WHEREAS, on July 27, 2005, the ~4ayor and City Commission adopted to Resolution No. 2005-25973, approving and authorizing the Mayor and City Clerk to execute an Agreementwith EAC Consulting Inc., for Professional Architectural and Engineering Services for the Biscayne Point Neighborhood Right of Way (ROVJ) Improvement Project (the Project); and WHEREAS, the Agreement provides for the planning, design, bidding and award, construction administration, and reimbursables for the Project; and WHEREAS, the Agreement was executed for an amount of $1,186,807; and WHEREAS, Amendment No. 1 to the Agreement, in the amount of $129,325 was approved as par Resolulion Nu. 2006-26133, for a total fee of $1,316,132; and WHEREAS, Amendment No. 2 to the Agreement, in the amount of $24,924 was approved administratively, for a total Agreement tee of 51,341,056; and WHEREAS, Amendment No. 3 to the Agreement, in the arnountof $27,000 was approved as per Resolution No. 2009-26979, for a total Agreement fee of $1,368,056; and WHEREAS, EAC's "Pump Station Conceptual Modeling Letter Report" identifies the need for pumps and additional connecting pipes different than those indicated in the BODR; and WHEREAS, Staff have evaluated EAC's supporting documentation for additional stormwater work and concurs with the need for additiona! storrnwater work; and WHEREAS, at this time, the City has negotiated Amendment No. 4, to the existing agreement with EAC for the provision of additional design services associated with the Stormwater Biscayne Pointe Amendment No. 4 F~Age 2 ~' 3 System, including the addition of three (3) pump stations and the necessary pipes and structures needed to comply with regulatory agencies' requirements; and WHEREAS, this Amendment No. 4 includes the additional design services for the stormwater system in the not to exceed amount of 5113,984; and WHEREAS, Amendment No. 4 increases the contracted fees in a amount total of $113,984, for a total contract fee of 51,482,040; and WHEREAS, funding from Stormwater Bond Fund 428 for Design, in the amount of 5113,984, previously appropriated in the Fiscal Year 2003-2004 Capital Budget; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 4. 2. MODIFICATIONS The Agreement is amended to include the necessary professional services to the Biscayne Point Neighborhood Right-Of-Way Improvement Project Services associated with design services for the stormwater system as Ident~ed in EAC's "Pump Station Conceptual Modeling Letter Report" ,and described in EAC's revised proposal dated October 1, 2009, and attached as Attactrment No. 1 f~ereto, the Consultant shall provide the services required pursuant to this Amendment No. 4, in the negotiated total amount of $113,984. 3. OTHER PROVISIONS All other provisions of the Agreement remain unchanyed. 4. RATIFICATION 7"he City and Consultant ratify the terms of the Agreement, as per this Amendment No. 4. Biscayne Pointe Amendment No. 4 Page :t o/ 3 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 4, to be executed in their names by their duly authorized officials as of the date first sal forth above. ATTEST: CITY OF MIAMI BE CH, FLORIDA Gl.~l( ('~~ ~ Y~l~~~~ '~ ~ :- ~~~ City Clerk, Robert Parcher May r, Malti H. Bower, ATTE5l': CONSULTANT: EAC CONSULTING INC. Secretary: President 1 ~jirP no /~. G'ba~SS .~Nr~` w2 ~ ~j'sekS --~--- Print Name Prinl Name ATTACHMENT APPROVED AS TO FORM & LANGUAGE ~i FO CUTIOIJ ~- ~ 1 ~. o`~ C~it tome Da e JMGI.IGGI000IGMF\HSIMP T:WG[NDA12009rDecember 9tRe9ula~Br' Amendment 41Discayne f'olnt Amendment No 4~Amendmen: a_uuc ~1~~ EAL Consulting, Ina ~ ~ ~ C ~ v ~ p November 9, 2009 209 ~!•^•':' 25 PM 3~ 56 Miguel Perez, Capital Pro'ects Coordinator CITY G~ HI:'.~:I ;i= ACN t CAP'TA~ iHt~:,6yEhj~NT City of Miami Beach PROJcCTS Capital Improvements Office 1700 Convention Center Drive Miami Beach, Fl 33139 Re: Biscayne Point Neighborhood Infrastructure Improvements Project - Supplemental Engineering Services Proposal (Amendment 4} Dear Mr. Perez: Pursuant to the protect coordination meeting held June 30t", 2009 at the C.LP Conference Raom, please find as follows our associated scope of engineering services and tee proposal to undertake the requisite engineering services for the following supplemental tasks identified and required for the project. The proposed scope of services is based on the conceptual study performed by EAC Consulting Inc., previously approved by the City. Task 1-System-wide Drainage Analyses. Modeline. Computations and Recommendations This comprises of the effort to revise the design approach to storm water management design, by incorporating the following: a. Incorporation of drainage pump stations as necessary especially it areas of low topography and high susceptibility to flooding. b. Complete civil, mechanical, structural and electrical engineering design of pump stations as necessary for the disposal of storm water runoff via injection wells and positive outfall to Biscayne Bay. c. Provision of Drainage Gravity /Injection wells to dispose only the water quality volume associated with the 5 year--24 hour storm. d. Provision outfall amnection for all proposed drainage systems. e. Limit rnaxirnum stages for the Syear- 24 hour storm to the luwer of the R/W elevation or crovdn of existing roadway. Furthermore, the stages will be verified to ensure no adverse Impact 15 feet from dwellings in instances where the R/W elevation Is lower than the croon of roadway. EAC Consulting Inc, will incorporate applicable information related to revised disposak methodology vdithin the Drainage Documentation report torthe project. Task 2- Construction DrawinE!s and Technical Specifications Upon the cornpietion of Task 1, FAC will proceed with arnendrnenfs to the cunstruaian drawings and technical specifications implementing the recommendations derived. The recommendations will he verified with the City prior to implementation. The full constructor drawings related will require additional plan, profilF and details including the following: a. Mechanical, Electrical and Structural Engineering Design Analyses. Attachment Inc. 1 b. Revisions to existing storm water collection system layout to accommodate the proposed design approach. Please note that based on our project coordination meeting, the development of construction drawings approach will assume that a typical pump station layout will be used for all pump statons regardless of size, with a tabulation showing specific inforrnatlon relative to all the pump stations to be utilized on the project. c. Pump Station Civil Engineering Miscellaneous Details and Notes d. Pump Station Electrical Plans, layout, Service Points, Coordination with FPL and Public Works, Electrical Details anti all miscellaneous work to achieve complete construction documents and operable systems. e. Technical Specifications related to Pump Stations Specifications. f. Pump Station Mechanical/Structural drawings and applicable details. g. Modifications seven (7) sheets of 9r)% complete water main (WM) design and drawings based on revisions to stone water collection system layout. h. Modifications to four (4) sheets of 90% paving and grading (PG) design and drawings based on revisions to storm water collection system layout. The new construction drawings are itemized as the drawing/sheet list provided w(th this fee proposal submittal. Please feel free to contact our office for any questions and/or clarification relating to the proposed improvements planned for the Biscayne Point Neighborhood. Sincerely, EAC Co g, In Mic el ei Civil Bring Hager c.c: File Hiram Siaba (CLIMB CIP Office) AMMENDMENT No.4 CITY OF MIAMI BEACH ROW INFRASTRUCTURE IMPROVEMENT PROGRAM Owwlnp Llst• Rwislov to SWM `..7 -~ ~ BISCAYNE POIN7 NF.IC3 HRO RHgO^ IMPROV~MCFLTS •~ ~,~. _ IDR OWING NUMBER~~~ t (AMENDMENT No.4 REVISIONS IObTORfiAWATER MA#fAGEM~NTp E51GN 11NGORPORATION OFD 1 "I, `'~' 'STORMWATER,P IIM PING STA7I,ONS ANp OUTFACES( • . ;; ~~ SbV SW • SW - j I P 20 21 I SIUKM 4VA7ER!PGC MATERMAIN(ELEC'tHICALl SIKUCTU RAL PLANS ~ TO ~ 151-TORi~IbVA I tH FLlw G Pk'~Fil F SHCC TV 20isiyFR1.~.1 STORtdVJATCR S'r 5TEh9~!?JIu1° PTATiON51.AY0Ui GifCCT _ _ TO 22 FUMP STATION PLAN Vltih' SHEET qAS S'JM;C TVJO SHEEETS) _ _ SW- SW - SVJ- 23 2S I 7G TO 24 f'fPIC~'1L PUPAP STATION PI k!J'ELB/A7;ON UETAIL SHEET WlTABULATION FOR OTIICRSTATIONS - __ I ~ ~ ?:~ PUMP STATION' GRATE BOX _ _ TO ~ 20 PUMP S7A7 iUN - PUDAP HOI1:4iNG CdIdCNSIONS _ _ SW- 27 TO '. "tl PUP.gP ST,:T7iIN - V.41 ~'C_ GOX GIh1EN_SLJNS_ SW - Qb TO 28J NJCCTION WELL DF_7HIL5 SHEET _._ _ SW -f 30 TD 31~~ T FUMP S IAIICIN GAE~:HALIGAI BY_L 0T 67ATERIALS SHtt1 _ _ SIN- 32 lO~ a? Pl1MP STATION CuL'IFhSC!tT AND FdAItKIALS SCHPDi:LF -- _ PG U- 4 TO 7 PAVING ANO GRADING PLAN _ PGD-, 3p TO 39 PAVING' AND ORADINC> PL AN -' - I WM- 7 IO 101 WATERMAIN PLAN & PROFILE SHEET _ _ _ [- t 50 61 TU TO 5U 51 FUMP STATION - FI FC7RICAL SRE PLAN _ _ _ PUMF STATION - ELECTRfGAL CUNT KOL UETAICS _ _ E • 52 TO 33 PUMP S1A1 IUN ELE::TRICAI. SERVICE POINT DCTAILS E- 54 TU! 65' PUMP STATION - CLCCTRICAL NOTES ANC BILL U} IdATEWALS _ - Hu• 10 _ TO tZ FUMF STATION -STRUCTURAL PLANS - _ HS~ 13 TO '4 PUMP STATION -STRUCTURAL UE (AILS __ a3 Trnal PAGE 3 OF 4 ~R ~~ K ~~r m~~° ~ 0~~~~ ~~~~~~ gyam~"9 ~~~m ~, H Commission Memorandum, December 9, 2009 Biscayne Poinf ROW Amendment No. 4 BASIN 142 ---- - ~~ t a t ~ ~tl~t-_ 2~db~_ ' __. matt - . i ~ MMM BtaM MMlcl BCach ~ ~ nan6t _.. ~PO` 3 1~ n nb 8 : ~. (nn 1«wm . .._ __ _. ~.. _ _ Cw~dmtl101 _. . _ _ tlnwlatW P< _. g i i . _ _. ,1• CtP I Ctmpl cT -_ -- '-. GvloMaf, - - - uv,riY.i Rd Palk V "rp ~ - 6 y Hatched area represents Basin 142 Attachment No.2 T:\AOENDA12009\Daaembar 91RegulaABF Amendment 4\Dlscayne Poinl Anre:xSmcnt No 4 Atlachment 1..Aoc