Loading...
LTC 060-2010 Analysis of Fire Dept Unanticipated Leave Usage and Overtime Quarter 1 FS 09/10~E~;EIL?.n m MIAMI BEACH ZQIOflAR-3 k~ 9:29 ci i~Y i;LFRt~'S OFF ICf OFFICE OF THE CITY MANAGER NO. LTC # 060-2010 LETTER TO COMMISSION TO: Mayor Matti Hen'era Bower and Members of the City Commission FROM: Jorge M. Gonzalez, City Manager DATE: March 2, 2010 SUBJECT: Analysis of Fire Department Unanticipated Leave Usage and Overtime -Quarter 1 FY 2009/10 This letter provides the Fiscal Year (FY) 2009/10 Quarter 1 update to the analysis of Fire Rescue Overtime and Leave Usage based on direction from the Budget Briefings at the Finance and Citywide Projects Committee meeting June 30, 2008. Background At the City's annual Commission retreat in May 2008 and during the City's budget briefings, the impact of the Fire Department unanticipated leave usage and overtime was discussed as overtime has traditionally been an issue but had become even more pronounced since the minimum staffing ordinance was implemented in February 2003 -- based on a review conducted in mid FY 2006/07, the Fire Department level of unanticipated leave usage had the highest of any other department in the City. Unanticipated leave (or unscheduled leave) includes sick leave, injury, and emergency vacation. As compared with FY 2002/03, overtime in the Fire Department Suppression, Rescue, and Support Divisions has increased from $365,362 to $1.27 million through FY 2007/08. While the FY 2007/08 overtime reflected a decrease from the prior year, as well as a lower amount than had been projected at mid-year, the total cumulative increase over FY 2002/03 is still significant at 247%. Fiscal Year Adopted Budget Actual Over/(Under) FY 02 426,986 368,680 (58,306) FY 03 321,013 365,362 44,349 FY 04 321,013 700,805 379,792 FY 05 587,974 1,010,179 422,205 FY 06 652,488 1,057,701 405,213 FY 07 1,238,731 1,518,898 280,167 FY 08 1,272,219 1,269,597 (2,622) Prior to FY 2007/08, efforts made to address overtime use in excess of budget continued to fail in yielding results. These efforts included increasing the overtime budget, adding positions, hiring in advance of anticipated vacancies and instituting a sick leave sell-back program as well as a random drug testing for employees whose leave balance fall below 200 hours (300 hours for shift personnels between FY 2001/02 and FY 2007/08, 7 fire fighter positions were added. Current staffing levels provides coverage for leave types such as R-days, scheduled leave, training, Analysis of Fire Department Unanticipated Leave Usage and Overtime Quarter 1 FY 2009/10 Page 2 of 5 and some level of unanticipated leave. However, over the years, unanticipated leave usage increased, resulting in the need for more overtime. In an attempt to address this issue, one of the alternatives analyzed for the FY 2008/09 budget, was the impact of providing the Fire Chief with the discretion to allow for a decrease from 44 to 42 in times of higher levels of unanticipated leave usage. In the event of a major fire, in addition to the ability to call in additional personnel on overtime, the Department would still have the ability to use mutual aid from other Fire departments. Based on this analysis, it was estimated that over $800,000 in department overtime (approximately 2/3rds) could be eliminated by providing the Fire Chief flexibility to manage the minimum staffing. However, as part of the FY 2008/09 budget discussions, it was agreed that, in lieu of changing the minimum staffing ordinance to allow this discretionary reduction to 42 positions during periods of higher unanticipated leave usage, the City would implement a more restrictive sick leave policy and monitor the results. FY 2008/09 Results During the first quarter of FY 2008/09, overtime decreased significantly for all days of the week, for a total overtime reduction from $386,108 to $206,733 (a 47 percent decrease) for the Fire Suppression and Fire Rescue Divisions. However, the savings were derived from the five additional personnel were added to the staffing of the Fire Suppression and Fire Rescue Divisions from the Fire Prevention Bureau as the result of a separate initiative, that were equivalent to $211,014 in savings rather than from any significant decrease in unanticipated leave usage. Unanticipated leave usage only decreased 3 percent during this quarter. After presenting the results of the first quarter to the Union President in February 2009, the union wanted to continue to work on the use of Emergency Vacation and Sick Leave with the membership. The Fire Department total overtime cost for the two divisions for the entire FY 2008/09 was $805,123. W hile this was $63,383 over budget for the two divisions, it was $394,472 less than FY 2007/08 actual expenditures (a 33 percent decrease from FY 2007/08), although part of these savings should be attributed to the presence of the 5 personnel from the Fire Prevention Division for the month of January (Five personnel left the Division the 02/01/2009 after completion of the City's Deferred Retirement Option Program -DROP). Further, reduction in overtime and leave usage was significant only during the second quarter. Fiscal Year Actual FY 2007108 Bud et Q1 Q2 Q3 Q4 Total Difference Overtime ($'s) 1,272,_2.1.9 386,109 380,475 271,795 161,466 1,199,845 72,374 Unanticipated ; _ leave (hrs) ! i 4,301 4,347 3,696 3,404 15,748' Fiscal Year Actual FY 2008/09 Bud et Q1 Q2 Q3 Q4 Total Difference Overtime ($'s) 741,740 122,320 235,760 211,288 235,755 805,123 (63,383) Unanticipated , leave hrs ' 4,082 3,140 3,997 4,582 15,801 Further, the trend of unscheduled leave being significantly higheron weekends continued, although at lower levels than in the prior years on all days except Saturdays. This resulted in the continued need for additional overtime to backfill on those days, although at lower levels than in prior years. Analysis of Fire Department Unanticipated Leave Usage and Overtime Quarter 1 FY 2009/10 Page 3 of 5 Unantici ated Leave Usa a FY 2007/08 Sunda Monda Tuesda Wednesda Thursda Frida Saturda EVAC 1,469.5 793.0 1,053.5 373.0 575.0 885.5 1,604.5 SICK 2,247.5 1,834.3 1,919.0 800.5 849.0 1,038.5 1,800.0 Total 3,717.0 2627.3 2,972.5 1,173.5 1,424.0 1,924.0 3,404.5 Unanticipated Leave Usage FY 2008/09 Sunda Monda Tuesda Wednesda Thursda Frida Saturda EVAC 1,448. 1,068. 649. 505. 504. 795.5 1,119. SICK 1,940. 1,400. 1,352. 938. 907. 1,100. 2,029. Total 3, 388. 2,468. 2,001. 1,444. 1,411. 1,895. 3,148. Fiscal Year 2009/10 Results to Date Results for the first quarter of 2009/10 showed that Emergency Vacation and Sick Leave similar to the years prior to FY 2008/09. Similarly, overtime expenditures for the Fire Suppression and Fire Rescue Divisions for the first quarter of 2009/10 reflected similar levels as in years prior to FY 2008/09. As of the first quarter, approximately 43 percent of the total overtime budget for the year has been expended. Fiscal Year Actual FY 2009/10 Bud et Q1 Overtime ($'s) 754,590 321,385 Unanticipated i leave (hrs) ~ ~ 5,356 Further, the trend of unscheduled leave being significantly higher on weekends continued, resulting in the continued need for additional overtime to backfill on those days. JMG/EY/KGB Analysis of Fire Department Unanticipated Leave Usage and Overtime quarter 1 FY 2009/10 Page 4 of 5 Attachment 1 Unantici ated Leave Us D f p age by ay o the Week Q109/10 Unscheduled Leave mU 90 80 ?0 24 Flour Shift 60 by Ory 0f week .50 60 30 •SICK 20 .U ^ EVAC 0 c+ wroa u~xheduied Leave ,oo w w Yo ao z. now NHbM w Wy of wank 40 ya ^SICK Za OEVAC io 0 ~ ~ ~ ~~ ~~ E 4 N auMrY-8aWr4ry FY 07/08 Unscheduledleave 160 140 lzo :exoar3nxa loo gr0ay of 80 Weak fi0 ~ ^61CK 20 • EVAC 0 ~~~' 4~ SYIILiy•SYWdiy li - _- - t]1 08/09 Un¢ehedubA Leave FY 08/09 Unscheduled Leave 160 loo 140 SO ~- 120 100 24 hour ehlea~ 20 MOUr 8hifn M YIaYa qr Day of 80 week 40 Weak 60 Zd aISK:K eEVwc 4U ZO ^SICK ^ EVAC O ~ ~ * ~ ~ 0 4~ ~ ~ },'pa g'a ~ ~ ~ a ~ ~ ~ 1 > euasy • Brurdy Suntlay • Saturday Sunday•Saturday Analysis of Fire Department Unanticipated Leave Usage and Overtime Quarter 1 FY 2009/10 Page 5 of 5 Attachment 2 Overtime Usage by Day of the Week c16Troeo7 ya 50 X Xour Shlb by M DaYM Waak ~ ZO OoT t0 0 SundaY-gaNNay 010810907 ro e0 50 M 1bur 2l Naur ap ehlb by Day of Waak ~ p OOT 10 0 p tl ~i. ~. p~. 58~. Pr ~a ~~. 4 4 ~ G 3 $ K eun4ay•SaWrtlay Ql 09/10 OT ;a 60 50 29NDUt SAihs 40 by Day Oi Week 30 20 10 U y~i , O~ Sunday-Saturday Y cv o~/08 or lao ]60 ]40 24 MOUE Shiha l20 per Day of 100 Week 80 60 60 20 0 wrwar • wturAay ^ OT FV 08/09 OT tso 160 l60 24 Nour Shlfts 130 per Days 100 Week 80 60 d0 10 O wnlw - Spturdar • OT ^ OT I