2010-27402 ResoRESOLUTION NO. 2010-27402 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE FINAL PARK PROJECT BUDGET FOR LINCOLN PARK, IN THE AMOUNT OF $13,085,000. WHEREAS, on January 5, 2004, the City of Miami Beach (City) and the New World Symphony (NWS), entered into a Development Agreement and Ground Lease Agreement (the Agreements), providing for design, development and construction of an educational performance and Internet broadcast facility and exterior screen (formally known as "Soundspace"and now known as the "NWS Campus Expansion Project") and a public parking garage to be located on the westernmost portion of the 17th Street surface parking lots, bounded by 17th Street to the north; North Lincoln Lane to the south; Drexel Avenue to the east; and Pennsylvania Avenue to the west; and WHEREAS, pursuant to the direction of the City Commission on September 8, 2004, and consistent with the Planning Board's August 24, 2004, recommendation, the Project site was expanded east to Washington Avenue to include both surface lots; and WHEREAS, on February 20, 2007, the City and NWS executed the First Addendum to the Development Agreement (First Addendum) which further .established the Parties' respective obligations (including processes, scopes for implementation, and estimated costs and budgets for the NWS Campus Expansion, the Garage, and also pertaining to certain Additional Improvements, Infrastructure Improvements, and the design, development and construction of a Park); and WHEREAS,. -the First Addendum also established the City's Preliminary Budgets for the Garage Project at $15,210,135, and the Park Project at $14,960,000, and approved a $15 million Grant-in-Aid for the NWS building; and . WHEREAS, on April 22, 2009, the City Commission approved, on second and final reading, a Second Addendum to the Development Agreement, providing for approval of the Final Garage Budget, in the amount of $17,085,000, and amending the Design-to and Preliminary Park Project Budgets from $14,960,000, to $13,085,000; and WHEREAS, the Second Addendum also waived the "Key .Man" requirement for Gehry Partners, LLC., to be the Architectural Consultant for the Park Project and further authorized NWS to proceed in preparing aselection/solicitation for a new A/E firm for the Park Project, pursuant to a competitive process to be approved by the City Manager, and requiring further that 'the City Commission must approve the new recommended A/E firm; and WHEREAS, on June 1, 2009, NWS, through its Development Manager Hines Limited Partnership (NWS/Hines), embarked. on an RFQ process to identify a new design professional for the Park Project; and WHEREAS, on July 15, 2009, the City Commission approved City Manager/Administration recommendation to select the top-ranked firm of West 8 New York, ("West 8" or "the Architect"), a world-renowned landscape architectural firm based in Rotterdam, the Netherlands; and WHEREAS, on March 10, 2010, the City Commission approved Resolution No. 2010-27358, approving the Basis of Design Report (BODR) /Park Project Concept Plan, which summarized the set of principals and fundamental design concepts for the Park Project, as welt as approving the Design-to and Preliminary Park Project Budgets, in the amount of $13,085,000; WHEREAS, on April 6, 2010, the plans for the Park Project were approved by the City's Design Review Board; and WHEREAS, on April 27, 2010, in an effort to maintain a schedule that would have the Park Project completed as close as possible to the anticipated opening of the Campus Expansion, NWS/Hives, issued a Request for Proposals to a list of pre-qualified general contractors (as determined by NWS and its team), to undertake construction or the Park Project; and WHEREAS, on May 12, 2010, proposals were received from three (3) firms, all of which submitted pricing estimates that were within range of the Preliminary Park Project Budget; and WHEREAS, NWS/Nines is recommending Valley Crest Landscape Development, Inc. (Valley Crest) as the general contractor for the Park Project; and WHEREAS, based on the recommendation for the award of a guaranteed maximum price contract to Valley Crest, NWS/Nines is recommending a Final Park Project Budget, in the same amount as the Preliminary Park Project Budget, $13,085,000; and WHEREAS, upon the City Commission's approval of the Final Park Project Budget, NWS will proceed to enter into and execute a guaranteed maximum price contract with Valley Crest, for construction of the Park Project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve the Final Park Project Budget for Lincoln Park, in the amount of $13,085,000. PASSED and ADOPTED this 26th day of May, 2010. TTI ERRERA B WER, MAYOR ATTEST: ~ ~~~ ROBERT PARCHER, CITY CLERK t:Wgenda\2010\May 26\Regular\Lincoln Park GMP.doc APPROVED AS TO FORM & LANGUAGE Ft~N EXECUTION 1ttt~rney ~-~ COMMLSSION ITEM SUMMARY Condensed Title: A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, approving the Final Park Project Budget in the amouht of $13,085,000 for Lincoln Park . Ke Intended Vutcome 5u orted: Increase community rating of cultural activities and ensure well maintained facilities. Supporting Data (Surveys, Environmental Scan, etc.): While a majority of residents say that the City has the right amount of cultural activities, approximately 30% of those surveyed say there are too few cultural activities. The NWS Project will significantly enhance the City's attraction as a cultural destination. Issue: .Shall the City Commission approve the Final park Project Budget? Item summary/Kecommendation: On June 1, 2009, subsequent to a decision by Gehry Partners not to serve as the Architectural Consultant for the Park compohent, NWS, through its Development Manager Hines Limited Partnership (NWS/Nines), embarked on an RFQ process to identify a new design professional for the Park Project. On July 15, 2009, the City Commission approved City Manager/Administration recommendation to select the top-ranked firm of West 8 New York, ("West 8" or "the Architect"), a world-renowned landscape architectural firm based in Rotterdam, the Netherlands. On March 10, 2010, the City Commission approved Resolution No. 2010-27358, approving the Basis of Design Report (BODR) /Park Project Concept Plan, as well as the Design-to and Preliminary Park Project Budgets, in the amount of $13,085,000. During the meeting NWS/Nines was encouraged by the Commission to coordinate completion of the Parkas close to the formal opening of the Campus Expansion as possible, which is anticipated to occur in mid-January, 2011. On April 6, the plans for the Park Project were approved by the Design Review Board, clearing the way for NWS/Nines and West 8 to fast-track delivery of the final plans and specifications, together with a final proposed Park Project Budget for consideration by the City Commission before June, 2010. On April 27, 2010, in an effort to maintain a schedule that would have the Park completed. as close as possible to the anticipated opening of the Campus Expansion, NWS/Nines, issued aRequest for.Proposals to alist ofpre-qualified general contractors to undertake construction or the Park. On May 12, 2010, three proposals were received, whose pricing estimates were within .range of the Preliminary Park Project Budget. Following an extensive analysis .and accelerated negotiation effort, NWS/Nines has selected Valley Crest Landscape Development, Inc., (Valley Crest) as the general contractor for the Park, based on which NWS/Nines is recommending to maintain the Final Park Project Budget at $13,085,000. It is recommended that the City Commission approve the Final Park Project Budget as proposed by NWS/Nines, pursuant to which, NWS/Nines will proceed to enter into and execute a Guaranteed Maximum Price Contract for the construction of the Park Project. Havisory ~soara rcecommendation: Financial Information: Source of Funds: Amount -: Account: ~ Approved TIF OBPI Total $13, 085,000 Financial Impact Summary: $1,990,000 was appropriated in FY 2007/08 to initiate design of the Park Project. The balance of the funding for the Park Project, in the amount of $11,095,000, was appropriated as part of the FY 2009/10 Capital Budget, funded from Cit Center Redevelo ment A enc TIF. ^•~- ^~-- ~•~< <.~c~r, ~ vuw~ ~e is~ative i racKm Kent O. Bonde, Redevelopment Coordinator Sign-Offs: Redevelopm nt Coordinator .. ~.,, sistant...Ci ...Manager ~ ~ ~ .City nage,r`: :. Uv U m MIAMIBEACH U AGENDA ITEM ~~Q DATE S-Z~O-I() ® MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the Miami, Beach City Commission FROM: Jorge M. Gonzalez, City Manager DATE: May 26, 2010 SUBJECT: A RESOLUTION OF THE MAYOR A CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE FINAL PARK PROJECT BUDGET, IN THE AMOUNT OF $13,085,000 fOR LINCOLN PARK.. ADMINISTRATION RECOMMENDATION Adopt the Resolution FUNDING Pursuant to Resolution No. 2009-27056, the approved Design-to and Preliminary Park Project Budgetfor Lincoln Park is $13,085,000, of which $1,990,000 was appropriated in FY 2007/08 to initiate design of the Park Project. The balance of the funding for the Park Project, in the amount of $11,095,000, was appropriated as part of the FY 2009/10 Capital Budget, funded from City Center Redevelopment Agency TIF. BACKGROUND On January 5, 2004, the City and the New World Symphony (NWS) entered into a Lease and Development Agreement, providing for the development of the NWS' Campus Expansion Project (Campus Expansion), on the 17th Street surface lot between Drexel and Pennsylvania Avenues. World-renowned Architect, Frank Gehry, was engaged to design the, Project, which will include astate-of-the-art building incorporating educational, performance and Internet broadcasting facilities, and a 550-space municipal parking garage with ground floor retail space (the Garage). The Project will be complimented by a public .park to be located on the surface lot between Drexel and Washington Avenues (the Park Project), as well as certain. other land and streetscape improvements surrounding the entire Project site. On February 20, 2007, the City and NWS executed the First Addendum to the Development Agreement, addressing the respective parties' scope and responsibilities pertaining to the design and construction of the Garage, the Park Project, and the additional street and landscaping improvements. The Campus Expansion officially broke ground on January 24, 2008, and continues to move forward, with an anticipated completion in the Fall, 2010. On April 22, 2009, the City Commission approved, on second and final reading, a Second Addendum to the Development Agreement, providing for approval of the Final Garage Budget, in the amount of $17,085,000, and amending the Design-to Park Project Budget from $14,960,000, to $1.3,085,000. In September 2009, construction began on the Garage, with Substantial Completion on the garage portion expected by the end of May. Miami Beach City Commission Memorandum Lincoln Park Basis of Design Report May 26, 2010 Page 2 of 4 On June 1, 2009, subsequent to a decision by Gehry Partners not to serve as the Architectural Consultant for the Park component, NWS, through its Development Manager, Hines Limited Partnership (NWS/Nines), embarked on an RFQ process to identify a new design professional for the Park Project. On July 15, 2009, the City Commission approved City Manager's recommendation to select the top-ranked firm of West 8 New York, ("West 8" or "the Architect"), aworld-renowned landscape architectural firm based in Rotterdam, the Netherlands. On March 10, 2010, the City Commission approved Resolution No. 2010-27358, approving the Basis of Design Report (BODR) /Park Project Concept Plan, as well as the Design-to and Preliminary Park Project Budget, in the amount of $13,085,000, reflected as follows: Total Architectural/Engineering Cost $1,527,000 Total Construction Cost $10,085,000 Total Tax/Insurance Cost $300,000 Total Owner Expenses $0.00 Total General/Admin Costs $573,000 Total Contingency Cost $600,000 Total Project Cost $13,085,000 During the meeting, NWS/Nines was encouraged by the Commission to coordinate completion of the Park as close to the formal opening of the Campus Expansion as possible, which is anticipated to occur in mid-January, 2011. On April 6, 2010, the plans for the Park Project were approved by the Design Review Board, clearing the way for NWS/Nines and West 8 to fast-track delivery of the final plans and specifications, together with a final proposed Park Project Budget, for consideration by the City Commission before June, 2010. Analysis On April 27, 2010, in an effort to maintain a schedule that would have the Park Project completed as close as possible to the anticipated opening of the Campus Expansion, NWS/Nines, issued a Request for Proposals to alist ofpre-qualified general contractors (as determined by NWS and its team), to undertake construction or the Park Project, including the design-build of the "ballet bar" speaker enclosure structure and the projection tower. The proposers were required to use certain pre-approved subcontractors in developing their proposals, including Caylex Architectural Fabrication, which had been selected through a separate RFP process, for the design-build of the pergola structures; Pro Sound as the supplier of the projection system; and Signature Trees & Palms for the landscaping materials, (including the Veitchia palms, the live oaks and flowering trees). Three bids were submitted on May 12, 2010, all of which submitted pricing estimates that were within range of the Preliminary Park Project Budget. Following an extensive analysis of the proposals, NWS/Nines is recommending Valley Crest Landscape Development, Inc. (Valley Crest) as the general contractor for the Park Project, with whom NWS/Nines has negotiated a construction contract amount not to exceed $9,500,000 (not including the AIPP allocation in the amount of $352,155). Further detail pertaining to the selection and negotiation process is provided in the attached correspondence from Hines, dated May 20, 2010. Miami Beach City Commission Memorandum Lincoln Park Basis of Design Report May 26, 2010 Page 3 of 4 Based on the recommendation to award of the Construction Contract to Valley Crest, NWS/Nines is recommending a Final Park Project Budget in the same amount as the Preliminary Park Project Budget, totaling $13,085,000. Total Architectural/Engineering Cost $1,650,000 Total Construction Cost $9,800,000 Total Tax/Insurance Cost $300,000 Total Owner Expenses $0.00 Total General/Admin Costs $573,000 Total Contingency Cost $762,000 Total Project Cost $13,085,000 It should be noted that the decrease in the construction cost line item from the Preliminary Park Project Budget has been offset by increases in architectural/engineering costs and contingency, in order to address any issues involving the design-build elements (pergola structures and ballet bar), as well as the likelihood of having to engage special inspectors to oversee placement of the highly complex foundations to support them. Additionally, as noted in the attached correspondence from Hines, the proposed construction cost includes a project acceleration bonus of $100,000, in order to achieve substantial completion of the Park Project by the end of December, so as to coincide with the anticipated opening of the Campus Expansion inmid-January, 2011. This bonus decreases incrementally if the target date is missed until it is reduced to zero by January 1, 2011. In order to commit to this aggressive schedule, Valley Crest requires access to the entire site, including removal of the construction trailer compound, on or before June 15, 2010. In order o move all construction trailer off site, the City is contemplating leasing office space at the 77717th Street. This will allow for the site to be unencumbered for the construction of the various park elements. Additionally, building permits will need to be in place within the same time frame and Valley Crest will need to secure permission to work extended hours, including nights and weekends. Should conditions preclude Valley Crest from being able to commit to an accelerated schedule, a bonus amount will not be paid and the Park Project Budget will be reduced accordingly. Lastly, pursuant to the direction of the City Commission, a security system has been priced for consideration by the Commission. Due to the unique conditions and late evening programming of the park, and 'the installation of highly specialized sound and projection equipment, it may be advisable to include aclosed-circuit (CCTV) camera system throughout the Park. This suggestion is based on the unique circumstances of this specific park, its location and programming. This is in no way a suggestion that the City should consider similar security devices in our other parks or public spaces. The cost for this additional improvement is $225,000 that should come from the budget's contingency cost. This will leave a.contingency cost of $537,000 which is 5.5% of the total construction cost. Should additional funds be needed in the future, further appropriations will be needed. Miami Beach City Commission Memorandum Lincoln Park Basis of Design Report May 26, 2010 Page 4 of 4 Conclusion Based on the foregoing recommendations from NW/Hines, it is recommended that the City Commission approve the Final Park Project Budget in the amount of $13,085,000. Pursuant to the Development Agreement, the approved Final Park Project Budget represents the final hard and soft construction costs approved in connection with the design, development, and construct of the Park Project. Following approval of the budget by the City Commission, New World Symphony will proceed to enter into and execute a Guaranteed Maximum Price Contract for the construction of the Park Project. Attachment JMG:JGG:KOB Attachment T:WGENDA\2010\May 12\Regular\Lincoln Park GMP Memo.docx May 20, 2010 Mr. Jorge Gomez Assistant City Manager City of Miami Beach 1600 Convention Center Drive Miami Beach, I'lorida 33309 Via. E-Mail and Band delivered Lincoln Parlc Project Re -Request for Approval of Filial Park Project Budget and Award Construction l ~ ~ Contract Dear Mr. Gomez, As required by Development Agreement between New World Symphony, Inc. and the City of Miami Beach we have prepared the following reconnnendation for award of Constriction Contract for the conshliction of the Park adjacent to New World Symphony campus expansion currently called Lincoln Park and request approval of the Final Park Project Budget. On April 22, 2009, the City Conmlission approved on second and filial reading a Second Addendum to the Development Agreement between the City of Miami Beach and the New World Symphony, Inc. dated January 5, 2004 providing for approval of the Design-to Park Project Budget of $13,085,000. On July 15, 2009, the City Commission approved the City Manager/Administration recommendation to confirm the Evaluation Conunittee's unanimous reconunendation of West 8, a world-renowned landscape architectural firm based in Rotterdam, the Netherlands as Architect of Record for Lincoln Park. After award of the design to West 8, we requested recommendations from design team and City staff for names of contractors to review the park desigll at specific milestones to inform the design process with input from contractors on cost and constructability. We discussed the project with more than thirty contractors includirlg general CO11traCtOrS and specialty contractors. We shared the design and progress plans with the contractors who showed an interest in the project and who had the capability to constrict a park with these unique elements and finishes. After receipt of approval of park design fi-om Design Review Board on April 6, 2010, we prepared a list of General Contractors to receive a Request for Proposal (RFP) for General Contractor to construct the Park. On April 27, 2010, we Pa e 1 of 3 New World Symphony 1672 Drexel Avenue Miami Belch, Florida 33139 (305) 535-6284 (305)36-7696 FAX issued the RFP to five general contractors. We received Proposals on May 12, 2010 front three firms and two .firms declined to bid. We interviewed the three firms on May 13, 2010. Mr. Jorge Gomez and Mr. Kent Bonde participated in the interviews. Based on information provided in Proposals, information provided in response to interviews and with review and approval from West 8, we recommend award of Construction Contract to Va1leyCrest Landscape Development, lnc. (ValleyCrest). We have negotiated a Construction Contract with ValleyCrest. The Canstniction Contract amount will be less than $9,500,000. When the Art in Public Places AiPP allocation of $352,155 is included the total construction cost is less than the Total Construction Cost of $10,085,000 as included in Design-to Park Project Budget as stated in Second Addendum to the Development Agreement. Va1leyCrest is the apparent low bid and, also, has conunitted to a constntction schedule that provides for completion of the park to coincide with the grand opening of the New World Symphony campus expansion during the last half of January 2011. To accomplish this, ValleyCrest requires access to the entire site, the removal of all site office trailers and storage containers fiom project site and the necessary Building Pei-~nits by or before June 15, 2010. h1 addition, they need to aiTive at a consensual at-~•angement to allow them to work extended hours including extended or multiple shifts and Saturdays as may be required. ValleyCrest's proposal imputes an arbitrary value for achieving this schedule of $100,000. We have redefined this amount as a Schedule Adherence Bonus that is eanled only if the Contractor achieves the completion requirements as set forth in the Contract. Based on approval of award of Consttliction Contract to ValleyCrest, we submit for your approval the Final Park Project Budget in the amount $13,085,000. Total Architectural/Engineering Cost $1,650,000 Total CoiZStiliction Cost $9,800,000 Total Tax/Illsurance Cost $300,000 Total Owner )/x eases $0. Total General/Adnun Costs $573,000 Total Contingency Cost $762,000 Tot11 Project Cost $13,085,000 We look forward to meeting with you, the Mayor and the City Commission on May 26, 2010 to discuss this recommendation and the Final Park Project Budget. Page 2 of 3 Sin/cerely, 1~ ~~ ;~ ~~~ ~ ~tfli~ v B arr CC ~ avid Phillips, New World Symphony Page 3 of 3 ~4.~ ~ ~S ~ ,t t Yt . ...^y I ®_. `~~ANI~~EA~H - . - . '- CITY OF MIAMI~.EACH NOTICE OF A SPECIAL'' 'CITY COMMISSION MEETING NOTICE IS HEREBY given that_a Special 1 ~nu~~ ;ibi I ~r ting will be held by;t; ifie ~liy Commission of the;C,ity of Miami 9 ;di. Honda on:~May 26 2010,%~~ commencmg:aflO 00 ~A.M:;' m~the~Co~ ~ni ,~. ~~~ r hambers;;3rd tloor~C~ty. Hall 17.00 Convention'Ceiii~u Un.~ 1.1iinu h~ ~ n'9onda to~adopt the;fina; I Lincoln Pe k ~ ~;ect 2 ,~!~~ ~t - - I In addrtii~n tn~ ;~r ~;~• a iis,u n n~a~, ~J is nth~,r 'rt. 1?~r n „ al~~thr.'. meeting:', I~iu~in ~s.~ ~ n ~ in,~~~ tlii, m~-~tinu should L~ ii~rvrie J t~ tl ~ Cit L1 3ii r~ci ~ai ~R~br~iE.Faien~-i Ci[} l Ieih ~( ~, ~f Miami BE~ar.h'_ -~ Fu~:.rint t >~ ii~;n _ ~ 'i;,:, R,i `,t:~``Ihr ~ h; h?r f ~ dd;is the I~ul~li.; F Vii+~fa_pei5unueciaest<<,I~pr~l in,aeci i ~madebytheCityComnuvsiun>,~ A ~tr respect Yo ariy matter gun i~l_~ed~at it meetino or. ~ts'6ean"n~a :such"~ I r on must ensure that ,; vrrf ~tim ~~^ ~"'~ ~t'.thE I r a Ings i ~adQ 'r' f ~hi~h ~~PrM ~ ides thi h~siini~n, end eviaence~ul rn vhirh the il!pc.d ~i i, w r~ ~~~~ ~~ li,~!~ noticr _ioe ~~i can:trtute:con;r,nt h~,~ rhr,:Citvfor-thr:~ ;-intro lu;f~. ~ ~~r ~:rinii inii:of=oth~ s.ise"ih,i 1~n: ,i~lc n~ ire ~I;,rin~ .i~ence:T nord,,~~ it nrtnuii~r, uP~~P< °ppeal~ t~itier i ~I!o°,v~ I r, laa:t~ ~7 ~To rE lu~~Ut thi~lnaienal ui .j~, essible format efr~'n pi„ duilr int r~ et~~u.~~~ inf_r~ i+;on ~r , ~,~~ r,rl erson to 1i~:~1 i ~n ~, arna ~in, ~~ r:~ mini ihtio~n t ~a~~~r~ in it ~ ~ineni oF,partrcip tF'in 1n rf~ , ,n ed i ~ r 'inq -- f h 3 ~ ~.ont~ t i u ~ 6O4xZ483~'(vou f~ ~ f ~ ~;~ 7 ~I i rY; fig i, ~ir f .' is ins F~ tr in ti ~r ;~~u~ r°auest ~~ ~;r: in 3 ~ i~.u~c~li ,11~!~' niJ,i R ~la~, ~:i,e~ - .. ... gd~6C6: 24NE I >'THURSDAY M~Yr20 2010