LTC 237-2010 Progress Report on the City's Local Mitigationm ~i~~i
OFFICE OF THE CITY MANAGER
No. LTC # 23~-200- LETTER TO COMMIS~OI~
TO: Mayor Matti Herrera .Bower and Members of the City Commission {f =~;1
Gr% ^::
FROM: Jorge M. Gonzalez, City Manager ~,
r=;
DATE: September 9, 2010 ~ ~~°
SUBJECT: Progress Report on the City's Local Mitigation Strategy Projects relative to
Property Owner Discounts. on Flood Insurance Premiums
Introduction and Background
. Miami-Dade County is the designated local coordinator of the Local Mitigation Strategy
Program (LMS) for the Miami-Dade County area, and prepares all the municipal components
of the program into a single unified Countywide Local Mitigation Strategy. The .primary
. mitigation goal of the LMS. is to reduce vulnerability to natural, technological.. and societal
hazards from all sources, but especially in South Florida from hurricanes, tornadoes, floods
and other severe weather events.
The City's participation in the LMS improves its standing and classification in the Community
Rating System, making flood insurance under the National Flood Insurance Program more
. affordable. The Community Rating System (CRS) is a points based system program that
reduces flood insurance premiums for the citizens of .participating communities. In the CRS
program, flood insurance premiums are adjusted to reflect community activities that reduce
flood. damage to existing buildings, protect new buildings beyond the minimum National
Flood Insurance Program (NFIP) protection level, help insurance agents obtain flood data
and -help .people obtain flood insurance. There are 10 CRS classes: Class 1 requires the
most credit pointsand gives the greatest premium reduction. Class 10 receives no premium
reduction.
Currently the City is a Class 7 community, and as such,. the City's residents have been
receiving a 15% discount in their flood insurance premium (equivalent to approximately
$3.5m annually for more than 46,000 policies citywide. NFIP has requested that the City of ,
`r Miami Beach produce a LMS progress :report on an annual basis. Federal Emergency
Management Administration (FEMA) requires this report to be submitted to the City's
governing body.
On June 6, 2000 the Miami-Dade Board of County Commissioners passed Resolution R-
572-00 to adopt the Local Mitigation Strategy (LMS). Miami-Dade County has a metropolitan
form of government; which means that each of the municipalities within the County has also
automatically adopted the LMS. .
On July 12, 2006, the City of Miami Beach adopted Resolution Number 2006-26249
- adopting the Miami-Dade County Local Mitigation Strategy.
1
Program Continuity and Strategy to Inform the Public
City staff attends the Miami-Dade County Local Mitigation Strategy meetings once each
calendar quarter. Additionally, the latest published version of the Local Mitigation Strategy,
along with meeting times, dates and locations are posted on the Miami-Dade County LMS~
website at: www.miamidade.gov/oem/Ims.asp
This memorandum will be made available to the public through the media and City Clerk's
Office.
The following is a progress report on the projects listed in the City's Local Mitigation
Strategy:
flooding:
Drainage Improvement Projects
These projects have been specifically selected to improve the drainage system for the flood
repetitive loss areas.. Improvements consist of drainage improvements to mitigate street
level flooding, reduce property flooding concerns and improve emergency response vehicle
access. These projects are will alleviate chronic neighborhood flooding situations.
Nautilus Drainage Improvements: Drainage improvements for the Nautilus neighborhood
Status: The project is 99% complete.
Biscayne Point Drainage Improvements: Construction of drainage improvements at
Stillwater Drive and 85th and 86th street in Biscayne Beach.
Status: Additional design work is underway. to accommodate an expanded stormwater
infrastructure improvement scope that includes pump stations. The project is expected to be
advertised for construction on late 2010.
Bayshore Drainage Improvements: Construction of drainage improvements from Lower
Bay .Road between 21st to 23rd Streets and also between 27th and Alton Road.
Status: The project is undergoing final design review by permitting agencies.
Normandy Shores Drainage Improvements: Drainage improvements for the entirety of
Normandy Shores excluding the golf course.
Status: The project is 99% complete.
West Avenue Drainage Improvements: Drainage improvements are proposed forthe West
Avenue /Bay Road neighborhood.
Status: Project is in the planning phase and the design criteria is under development as part
of the initial phase of the stormwater.Master Plan update.
Flamingo /Lummus Drainage Improvements: Drainage improvements are proposed for
the Flamingo /Lummus neighborhood along the only east /west rights-of-ways that connect
designated emergency evacuation rights-of-way in the South Beach area.
Status: The project is at approximately 60% design with the stormwater portion pending.
The stormwater design criteria is under development as part of the ongoing stormwater
Master Plan update.
La Gorce Drainage Improvements: Drainage improvements for the La Gorce-Park Area
bounded 63rd Street on South, N, .Bay Road, West and intercostals on East and North.
Status: The project is undergoing final design review by permitting agencies.
2
Lake Pancoast Area Drainage Improvements: Construction of drainage improvements for
West 24th Street, Lake _Pancoast Drive, and West 25th Street.
Status: Project is undergoing final design review by permitting agencies.
Palm and Hibiscus Area Drainage Improvements: Construction of drainage
.improvements for Palm and Hibiscus Islands.
Status: Project design on hold while FPL completes the undergrounding design plans.
Jefferson Avenue/South Pointe Drainage Improvements: Construction of drainage
improvements for the South Pointe area bounded by Meridian Court to the east, and 3ra
Street to the north, Jefferson Avenue to the west, and 2nd Street to the south.
Status: The project has been. completed as part of the South Pointe Phase II right-of-way
improvements project and the system is pending final inspection and testing.
Lakeview Drainage Improvements: Construction of drainage improvements for the
Lakeview Area bounded by 51St Street to north, N. Bay Road to west, Cherokee Avenue to
east and Lake View Drive to south.
Status: The project is currently undergoing final design review by permitting agencies.
Parkview Canal Seawall Revetment: This project includes constructing revetment along
eroded bank areas..
Status: This project was combined with the Dickens Avenue Shoreline Restoration
Project. Conceptual plans are complete.
Extensive Repairs to Seawalls: Citywide repair of seawalls in order to mitigate the damage
to the inland shoreline located throughout the City.
Status:, Island View Park, Bonita Drive and Sunset Lake Park seawalls are complete.
Permitting is in progress for: Rue Bordeaux, Trouville Esplanade, Rue Versailles, Flamingo
Drive, Pine Tree Drive and Washington Court seawalls.
Canal Cleaning arid Shaping -Citywide: Dredging. of the approximately 12 miles of inland
canals located within the City. This would directly impact the ability of the canal to hold tidal
flooding and minimize flooding of surrounding properties during significant weather events.
Status: The City is seeking grant and alternate funding.
Flood Proofing Sewer and Pump Stations: Relining and sealing 31 pump stations and
500 manholes to prevent water intrusion which would damage pump station equipmerit and
structures. to prevent failure of stations thereby avoiding flooding.
Status: The relining and sealing of pump stations is complete. Manhole rehabilitation is
being addressed.
stormwater Outfall and Seawall Reconstruction: Replacement of seawalls and 150
stormwater outfalls with associated relining of piping leading to outfalls as part of a
comprehensive program of drainage improvement projects which will alleviate chronic
neighborhood flooding situations
Status: The City is seeking grant and alternate funding for this project.
City. Center. - Historic District Drainage Improvements: Construction of drainage
improvements from Lincoln Lane North on the south, Washington Avenue on the west, 21St
St on the north, and Collins Avenue on the east are part of a comprehensive program of
drainage improvement projects, which will alleviate chronic neighborhood flooding situations.
The project includes construction of new catchbasins and outfalls with associated piping.
The stormwater will be treated using new gravity wells.
Status: Project is in construction.
Central Bayshore Drainage Improvements: Construction of drainage improvements from
28tH Street on the south, Alton Road on the west, 41St Street on the .north, and Pine Tree
Drive on the east are part of a comprehensive program of drainage improvement projects,
which will alleviate chronic neighborhood flooding situations. The project includes
construction of new catchbasins and outfalls with associated piping. The stormwaterwill be
treated using new gravity and pumped wells.
Status: The project is undergoing final design review by permitting agencies.
Sunset Islands I & II Drainage Improvements: Construction of drainage improvements on
these islands are part of a comprehensive program of drainage improvement projects, which
will alleviate chronic neighborhood flooding situations. The project includes construction of
new catchbasins and outfalls with associated piping. The stormwaterwill be treated using
new exfiltration trenches.
Status:' Project currently in permitting stage, the project is expected to advance into final
design review.
Sunset Islands III & iV Drainage Improvements: Construction of drainage improvements
on these islands are part of a comprehensive program of drainage improvement projects,
which. will alleviate chronic neighborhood flooding situations. The project includes
construction of new catchbasins and outfalls with associated piping. The stormwaterwill be
treated using new gravity wells and/or exfiltration trenches.
Status: Project design is on hold while Homeowners Association finalizes an agreement
with FPL for the undergrourid placement of above ground utilities. Once accomplished, the
. City will then proceed with the design of drainage infrastructure improvements.
Oceanfront Drainage Improvements:- Construction of drainage improvements from 27tH
Street on the south, Indian Creek on the west, 44St Street on the north, and Miami Beach
Drive on the-east are. part of a comprehensive program of drainage improvement projects,
which will alleviate. chronic neighborhood flooding situations. The project includes
construction of new catchbasins and outfalls with associated piping. The stormwaterwill be
treated using new gravity wells and/or exfiltration trenches.
Status: Project in construction, with projected completion by November, 2010.
South Pointe II Drainage Improvements: Construction of drainage improvements south of
Stn Street are part of a comprehensive program of drainage improvement projects, which will
alleviate chronic neighborhood flooding situations. The project includes construction of new
catchbasins and outfalls with associated piping. The stormwaterwill be treated using new
gravity wells and/or exfiltration trenches.
Status:- Project is under construction;•substantial completion anticipated for November,
2010.
. South Pointe III - V Drainage Improvements: Construction of drainage improvements
south of 5th Street are part of a comprehensive program of drainage improvement projects,
which will alleviate chronic neighborhood flooding situations. The project includes
construction of new catchbasins and outfalls with associated piping. The stormwaterwill be
treated using new gravity wells and/or exfiltration trenches.
Status: Project is in construction procurement phase.
Star Island Drainage Improvements: Construction of drainage improvements on the island
are part of a comprehensive program of drainage improvement projects, which will alleviate
chronic neighborhood flooding situations. The project includes construction of new
catchbasins and associated piping. The stormwater will be treated using new gravity wells
and/or exfiltration trenches.
. Status: Project is in the construction procurement phase.
4
Venetian Islands Drainage Improvements: Construction of drainage improvements on the
islands are part of a comprehensive program of drainage improvement projects, which will
alleviate chronic neighborhood flooding situations. The project includes construction of new
catchbasins and outfalls with associated piping. The stormwater will be treated using new
gravity wells and/or exfiltration trenches.
Status: Project at 90% design.
Sunset Harbor Pump Station Upgrades: As a result of changed stormwater regulations,
this project will provide a higher level of stormwater service to the Sunset Harbor
neighborhood. The project will upgrade three neighborhood pump stations and include three
drainage injection wells (Purdy Ave/Dade Blv.) (Purdy Mains) (20th Street/West Ave).
Status: Project is in the design phase.-
48" Outfall at Easement 4180 - 4200 Chase Avenue: Improvements include building a
new 48" outfall; traffic control. and all ancillary and miscellaneous work. This project will
improve the performance of the existing stormwater system and provide adequate flood
protection in the area. The proposed improvements to the stormwater system identified at
- this location based on recommendation in a study requested by the Public Works
Department. to address localized flooding under current conditions. When completed this
project will produce a stormwater system capable of providing a high level of service in the
area:
Status: Project is under design.
Belle Island Outfall Replacement: Replacement of three (3) outfall pipes along the
Venetian Causeway East Bridge and Farrey Lane. The outfall pipes need to be replaced to
.complete the Belle Isle stormwater Improvements, to alleviate the recirculation of water at
the easternmost Venetian Causeway Bridge, and to replace the deteriorated outfall. pipes.
Status: Project in permitting design review phase.
Middle North Bay Road Drainage .Improvements: This project addresses numerous
resident complaints and staff observations regarding a low stormwater service level in the
" neighborhood. Drainage improvements would include additional drainage collection,
conveyance, treatment and disposal facilities.
Status: Project will proceed once future stormwater bonds can be issued.
Windstorm
Storm Shutters and Protective Glass for City Buildings: To provide protection during a
significant weather event.
Status: Impact glass installations for Fire Stations 1 and 3 and the installations at City Hall
and the Police Department are expected to be completed by December 2010.
Streetlight System Upgrade: When flooding occurs in low areas both residential and
commercial, water intrusion occurs inside the bases of the streetlight poles and results in the
malfunction of the lighting system. This project improvement will include re-wiring and
placing individual fuses at each pole base and eliminate streetlight service interruptions, and
damages to the street lighting infrastructure system.
Status: The City is seeking grant and alternate funding for this project.
Enhanced Emergency Response Program: This project provides for a comprehensive
preparedness program by the City including field deployment with- hazard mitigation
5
equipment and training, and equipment and training for search and .rescue teams and
protective clothing and equipment.
Status: Project ongoing. Comprehensive Emergency Management Plan (CEMP) and
Continuity of Operations Plan (COOP) have-been completed. Training for search and rescue.
team (LTRT- Light Technical Rescue Team) is ongoing.
Citywide Dune Enhancement Project: To enhance and restore the City's dune system to
retain sand and protect upland structures from storm surges and flooding impacts.
Status: The City is seeking grant and alternate funding for this project.
Talmudic University: Protective storm shutters and impact resistant glass for the Talmudic
University located at 4000 Alton Road.
Status: Seeking grant and alternate funding for this project.,
Mount Sinai Hospital: Includes building hardening, installation of a protective perimeter
barrier, installation of phase 1 of drainage and stormwater improvements and relocation of
generator and construction enhancements to a new medical office tower, central energy
plant and surgical tower.
Status: Seeking grant and alternate funding for this project.
Other Hazards
Miami Beach Interoperability /Communications / EOC Program: This project includes
enhancements to the City's EOC, such as a Computer Aided Dispatch/Records
Management System, 911 Workstations, a microwave radio system. and PSCU upgrade, etc.
Status: The Computer Aided Dispatch/Records Management System project is underway.
Citywide Water Infrastructure Improvements: ,This project will implement the City of
Miami Beach Water System Master. Plan; the project includes the replacement of aging
water lines (60+ years old).
Status: This project is fully programmed through neighborhood projects and other projects
in the City's 5-Year Capital Improvement Plan (2008/09 - 2012/13), subject to appropriation
of additional programmed funding in fiscal years 2009/10 through 2013-14.
Citywide stormwater Infrastructure Improvements: The City's Master Plan effort
identified over 160 drainage basins in the City of Miami Beach. Approximately 34 of these
basins were identified as a priority. The City has committed to improving the facilities within
the 34 priority basins. .
Status: This project. is fully programmed through neighborhood projects and other projects
in the City's 5-Year Capital Improvement Plan (2008/09 - 2012/13) subject to appropriation
of additional programmed funding.
Portable Traffic Light Signals: Ten (10) portable traffic signals for emergency situations.
Status: The City is seeking grant and alternate funding for this project.
Citywide Wastewater Infrastructure Improvements: The wastewater lines were built
between 1926 and 1956, and the pipes are either beyond or at the end of their useful life.
Status: This project is fully programmed through neighborhood projects and otherprojects
in the City's 5-Year Capital Improvement Plan (2008/09 - 2012/13), subject to appropriation
of additional programmed funding in fiscal years 2009/10 through 2013-14.
West Avenue Bridge: To relieve congestion on Alton Road, reduce the volume of local
traffic at the busiest intersections and provide a safer venue for road users to access the
6
causeway to Miami.
Status: The project is ongoing. The feasibility study has been completed.
Regional Communication/Command Van: Regional Communications/Command Van for
Miami Beach and neighboring barrier island communities. This Regional capability is crucial
as with a natural disaster or terrorist incident, our ability to receive assistance from the
mainland can be non-existent. The ability to communicate and continue to operate public
safety is crucial to mitigating damage and/or injuries caused by a major incident. As the
largest of the barrier island communities, Miami Beach would be in position to provide public
safety services to our neighboring municipalities as well as provide command and control for
a unified operation..
Status: The City has targeted grant funds for this project..
Recommendations:
1. The City will continue to participate in Miami-Dade County's LMS program and
monitor the projects, as needed. '
2. The City will continue to have various outreach projects to inform the residents and
visitors about hurricanes and floods preparedness grid safety.
Pleasedcontact!~~ if you need any additional information.