Trans Florida Development Corp - Agreement (2) i
Project Manual Bid/Tender Form
SCHEDULE OF PRICES
ITB #:
The Bidder hereby proposes to furnish all. labor, materials, equipment, transportation,
supervision, incidental scope documentation services as required, and facilities necessary
to complete in a workmanlike manner and in accordance with the Contract Documents, all
Work ordered under a particular Job Order for the compensation in accordance with the
following schedule of prices: The Contractor bids three (3) Adjustment Factors. Two will be
applied against th"rices set forth in the Construction Task Catalog (CTC). The first
Adjustment Factor will be for work performed during normal working hours. The second
Adjustment Factor will be for work performed during other than normal working hours. The
third Adjustment Factor will be used for Non Prepriced, Work Tasks. These Adjustment
Factors will be in effect for total duration of the contract.
Line 1 Normal Working Hours Construction: Contractor shall perform any or all functions
called for in the Contract Documents and the individual project Detailed Scope of
Work, scheduled during normal working hours in the quantities specified in
'individual Job Orders against this contract for the unit price sum specified in the
Construction Task Catalog (CTC) multiplied times the Adjustment Factor of:
1 D Z o o
(Specify to four (4) decimal places)
Line 2 Other Than Normal Working Hours Construction: Contractor shall perform any or
all functions called for in the Contract Documents and the individual project
Detailed Scope of Work, scheduled during other than normal working hours in
the quantities specified in individual Job Orders against this contract for the unit
price sum specified in the Construction Task Catalog (CTC) multiplied times the
Adjustment Factor of:
/ D D d
(Specify to four (4) decimal places)
BID/TENDER FORM PAGE 2
July 2010 City of Miami Beach . Page 122 of 185
Project'Manual Bid/Tender Forme
Line 3 Non Prepriced Work Tasks: Contractor shall perform any or all functions called
for in the Contract Documents and the individual project Detailed Scope of Work,
that are considered Non 'Prepriced Work Tasks multiplied times the Adjustment
Factor of:
f ,
(Specify to four (4) decimal places)
Line 4 Weighted Adjustment Factor (From Line 7, Bid/Tender Form, Page 4)
(Specify to four (4) decimal places)
EXAMPLE: Write the Adjustment Factor to four decimal places as the following example
illustrates.
1 1 0 0 0
r
BIDITENDER FORM PAGE 3
July 2010 City of Miami Beach Page 123 of 185
J
Project Manual Bid/Tender Form
. I!
WEIGHTED ADJUSTMENT FACTOR WORKSHEET
ITB #: 3 7 !Z 1 d
For the purposes of determining the low bid the Contractor shall complete the following
worksheet.
(Specify to four (4) decimal places).
1. Normal Working Hours Construction Adjustment Factor .....................
(Found on Bid/Tender Form, Page 2, Line 1)
2. Multiply Line 1 by (.80) ....................................... ..........:................:... 0.
3. Other Than Normal Working Hours Construction Adjustment Factor... 9ydD
(Found on Bid/Tender Form, Page 2, Line 2)
4. Multiply Line 3 by (.10) ........................................................................ C 1C4
5. Non Prepriced Work Tasks Adjustment Factor ..... ............................... - D
Z O(7
(Found on Bid/Te.nder Form, Page 3, Line 3)
6. Multiply Line 5 by (.10) ............... ............................... ........................
/D
/ Z2
7. Add lines 2 +4+6 ................... .............................................................. D
(Weighted Adjustment Factor)
The Bidder shall complete this Weighted Adjustment Factor Worksheet and transfer the Bid
Adjustment Factors, (Lines 1, 3, and 5,) and Final Weighted Adjustment Factor (Line 7) to
the space provided on the Bid/Tender Form, Page 3, Line 4 of this proposal. The lowest
Weighted Adjustment Factor will be deemed the lowest bid. The City of Miami Beach
reserves the right to. revise all arithmetic calculations for correctness.
Note: Should there exist a discrepancy in the Adjustment Factors bid on the Schedule of
Prices (Bid /Tender Form Page 2 and Bid/Tender Form Page 3) With the Weighted
Adjustment Factor Worksheet (Bid/Tender Form Page 4), the Schedule of Prices
(Bid/Tender Form Page 2 and Bid/Tender Form Page 3) shall take precedence.
BIDITENDER FORM PAGE 4
July _2010 City of Miami Beach Page 124 of 185