2010-27567 Reso RESOLUTION NO., 2010 - 27567 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT, PURSUANT TO INVITATION TO BID NO. 2- 09/10, FOR THE CONSTRUCTION OF THE RIGHT -OF -WAY INFRASTRUCTURE IMPROVEMENT PROGRAM — NEIGHBORHOOD NO. 8B, BAYSHORE, LOWER NORTH BAY ROAD PROJECT, WITH TRANS FLORIDA DEVELOPMENT CORPORATION, IN THE AMOUNT OF $ 4,055,222.92, PLUS A PROJECT CONTINGENCY, IN THE AMOUNT OF $405,522.29, FOR A GRAND TOTAL NOT TO EXCEED $4,460,745.21; INCLUDING $1,399,596.62 FROM FUNDS PREVIOUSLY APPROPRIATED IN THE CAPITAL BUDGET; AND APPROPRIATING $3,061,148.59 FROM FUND 429 STORMWATER PROJECTS LINE OF CREDIT, WITH SUCH FUNDS TO BE REPAID FROM PROPOSED FUTURE STORM WATER BONDS; AND FURTHER AUTHORIZING THE ADMINISTRATION TO ENGAGE IN VALUE ENGINEERING TO FURTHER REDUCE THE COST AND TIME FOR COMPLETION OF SAID PROJECT. WHEREAS, Invitation to Bid (ITB) No. 2 -09/10 was issued on November 25, 2009, with an opening date of February 8, 2010.; and WHEREAS, the bid opening was postponed to November 9, 2010 due to permitting issues; and WHEREAS, Bidsync and Bidnet issued bid notices to 2,942 prospective bidders, which resulted in the receipt of four bids; and WHEREAS, the City Manager appointed a Technical Review Panel (TRP), which consisted of the following individuals: • Janette Fernandez Arencibia, P.E., Capital Projects Coordinator, CIP Office • Roberto Rodriguez, Capital Projects Coordinator, CIP Office • Aaron Sinnes, Senior Capital Projects Coordinator, CIP Office • Millie McFadden, Parks Superintendant, Greenspace Management • Ricardo Guzman, Senior Planner, Planning Department • Walt Schwarz, CH2MHill, Non - voting Technical Support • Charles Fossler, CIP Office, Non - voting Technical Support; and WHEREAS, on November 18, 2010, the TRP convened to evaluate the bids, and interview the bidders key personnel; and WHEREAS, at the conclusion of the interviews, the TRP unanimously recommended Trans Florida Development Corp. as the lowest and best bidder; and WHEREAS, funding in the amount of $1,399,596.62 has been previously appropriated in the Capital Budget as follows: $336,620.00 from 2003 G.O. Bond Neighborhood Account # 384- 2326- 069357; $835,147.00 from 2001 Series Water & Sewer Account #'!! 424 - 2326 - 069357; $100,593.56 from Gulf Breeze 2006 Account # 423 - 2326 - 069357; $33,662.00 from Pay- As -You- Go Account # 302 - 2326 - 000356; and $93,574.06 from Gulf Breeze 2006 Account # 423 -2326- 000356; and WHEREAS, funding, in the amount of $3,061,148.59 needs to be appropriated from Fund 429 Stormwater Projects Line of Credit, with such funds to be repaid from proposed future Stormwater Bonds; and WHEREAS, after considering the recommendation of City staff, the City Manager exercised his due diligence and concurs with the recommendation of the TRP. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute a contract, pursuant to Invitation to Bid No. 2- 09/10, for the construction of the Right -of -Way Infrastructure Improvement Program — Neighborhood No. 8B, Bayshore, Lower North Bay Road Project, with Trans Florida Development Corporation, in the amount of $ 4,055,222.92, plus a project contingency, in the amount of $405,522.29, for a grand total not to exceed $4,460,745.21; including $1,399,596.62 from funds previously appropriated in the Capital Budget; and appropriating $3,061,148.59 from Fund 429 Stormwater Projects Line of Credit, with such funds to be repaid from proposed future Stormwater Bonds; and further authorizing the Administration to engage in value engineering to further reduce the cost and time for completion of said project. PASSED AND ADOPTED THIS 84h DAY OF De be( 2010. ATTEST: V I TY CLERK MA '• R T:\AGENDA\2010 \December 8\Regular\ITB 2 -09 -10 Bayshore 8B RESO.doc APPROVED AS TO FORM & LANGUAGE • & FO' CUTION 11 301 0 City AUomey ` \, Da e COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission Of The City Of Miami Beach, Florida, Approving A Contract Award, Pursuant To Invitation To Bid No. 2- 09/10, For The Construction Of The Right -Of -Way Infrastructure Improvement Program — Neighborhood No. 8B, Bayshore, Lower North Bay Road Project; Authorizing The Mayor And City Clerk To Execute An Agreement With Trans Florida Development Corporation, In The Amount Of $ 4,055,222.92, For The Construction Of The Project, Plus Approve A Project Contingency In The Amount Of $405,522.29, For A Grand Total Not To Exceed $4,460,745.21; Including $1,399,596.62 From Funds Previously Appropriated In The Capital Budget; Appropriating $3,061,148.59 From Fund 429 Stormwater Projects Line Of Credit, With Such Funds To Be Repaid From Proposed Future Storm Water Bonds; And Further Authorizing The Administration To Engage In Value Engineering To Further Reduce The Cost And Time For Completion Of Said Project. Key Intended Outcome Supported: Ensure well maintained infrastructure. Supporting Data (Surveys, Environmental Scan, etc.): The 2009 Customer Satisfaction Survey indicated that 42.5% of Mid -Beach residents rated storm drainage as excellent or good. Completing this Project will add to the needed upgrades in this area and improve overall rating. Issue: Shall the City Commission approve the award of the Contract? Item Summary/Recommendation: On November 25, 2009, Invitation to Bid No. 2 -09/10 was issued, with a bid opening date of February 8, 2010. Due to permitting issues, the bid opening was postponed to November 9, 2010. The Bid process resulted in the receipt of four (4) responsive bids. On November 18, 2010, the Technical Review Panel (TRP) and a representative from CH2MHilI, the Engineer of Record, convened to evaluate the bids submitted and a 20 minute interview of the contractor's key personnel was conducted. The TRP unanimously recommended Trans Florida Development Corp. as the lowest and best responsive bidder. Trans Florida's team brings many years of experience in infrastructure construction, project management and design to successfully complete the project within budget and schedule. They are currently working on the South Point Phases III, IV, and V Right -of -Way Infrastructure Project and recently won the Star Island Right - of -Way Infrastructure Project which is scheduled to start at the beginning of 2011. APPROVE THE AWARD OF CONTRACT. Advisory Board Recommendation: I N/A I Financial Information: Source of Amount Account Funds: 1 $336,620.00 2003 G.O. Bond Neighbohood -384 -2326 2 $835,147.00 2001S Water & Sewer Bonds -424 -2326 9"-- 3 $194,167.62 2006 Gulf Breeze - 423 -2326 4 $ 33,662.00 Pay -As- You -Go — 302 -2326 5 $3,061,148.59 Stormwater Line of Credit — 429-2326 OBPI Total $4,460,745.21 Financial Impact Summary: City Clerk's Office Legislative Tracking: . Gus Lopez Ext. 6641 Sign - O . De • ment Director Asyistant C Man . •; City Ma • er GL . COC EN( /\ I JGG , -�% JMG 1 MAGENDA i s 10\December 8\Regular\ITB 2 -09 -10 Bayshore 8 SUMMARY.doc AGENDA ITEM Rr) / 1 M IAMIBEAC H DATE 1 2- — F-10 + MIAMIBEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Jorge M. Gonzalez, City Manager DATE: December 8, 2010 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING A CONTRACT AWARD, PURSUANT TO INVITATION TO BID NO. 2- 09/10, FOR THE CONSTRUCTION OF THE RIGHT -OF -WAY INFRASTRUCTURE IMPROVEMENT PROGRAM — NEIGHBORHOOD NO. 8B, BAYSHORE, LOWER NORTH BAY ROAD PROJECT; AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH TRANS FLORIDA DEVELOPMENT CORPORATION, IN THE AMOUNT OF $ 4,055,222.92, FOR THE CONSTRUCTION OF THE PROJECT, PLUS APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $405,522.29, FOR A GRAND TOTAL NOT TO EXCEED $4,460,745.21; INCLUDING $1,399,596.62 FROM FUNDS PREVIOUSLY APPROPRIATED IN THE CAPITAL BUDGET; APPROPRIATING $3,061,148.59 FROM FUND 429 STORMWATER PROJECTS LINE OF CREDIT, WITH SUCH FUNDS TO BE REPAID FROM PROPOSED FUTURE STORMWATER BONDS; AND FURTHER AUTHORIZING THE ADMINISTRATION TO ENGAGE IN VALUE ENGINEERING TO FURTHER REDUCE THE COST AND TIME FOR COMPLETION OF SAID PROJECT. ADMINISTRATION RECOMMENDATION Approve the award of contract. KEY INTENDED OUTCOME Ensure value and the timely delivery of a quality capital project. FUNDING Funding in the amount of $1,399,596.62 has been previously appropriated in the Capital Budget and funding in the amount of $3,061,148.59 to be appropriated, as follows: Construction: $ 336,620.00 2003 G.O. Bond Neighborhood account # 384 - 2326- 069357 $ 835,147.00 2001 Series Water & Sewer account # 424 - 2326- 069357 $ 100,593.56 Gulf Breeze 2006 account # 423 - 2326- 069357 $2,782,862.36 Stormwater Project line of Credit account # 429 - 2326- 069357* $4,055,222.92 *To be appropriated and repaid from proposed future Stormwater bonds Contingency: $ 33,662.00 Pay- As- You -Go account # 302 - 2326 - 000356 $ 93,574.06 Gulf Breeze 2006 account # 423 - 2326- 000356 $ 278,286.23 Stormwater Project line of Credit account # 429 - 2326- 000356* $ 405,522.29 *To be appropriated and repaid from proposed future Stormwater bonds $ 4,460,745.21 Grand Total City Commission Memorandum - Bayshore 8B: Lower North Bay Road ROW Improvements Project Contract Award Memo December 8, 2010 Page 2 of 5 The current contracted scope of services with the Engineer -of- Record only includes limited construction administration services. Please note that future Commission action will be required for construction administration and resident project representation services for this project. The Administration intends to finalize negotiations with the engineering firm and bring these items to the City Commission at a future date. ANALYSIS On April 9, 2003, the City Commission approved the Basis of Design Report (BODR), completed and submitted by CH2MHiIl for the Neighborhood No. 8 Bayshore/ Sunset Islands Project. This BODR was the culmination of a comprehensive planning effort that included input from and reviews by residents, various City Departments, and the Design Review Board (DRB). The Project limits in general are bounded by Sunset Drive, Alton Road, Biscayne Bay and Sunset Lake. For a graphical representation of the Project limits, reference Exhibit A. The proposed work activities are anticipated along the following: • North Bay Road, between Sunset Drive and Alton Road. • North Michigan Avenue, between North Bay Road and Dade Boulevard. • 21 Street, between North Bay Road and Alton Road. • 23` Street, between Sunset Lake and Alton Road. • 27 Street, between North Bay Road and Alton Road. • 29 Street, between the Sunset Lake Bridge and Alton Road. The Project Scope of Work includes improvements to the storm water collection and disposal system, including construction of four (4) pressurized wells, and two (2) storm water pump stations, improvements to the water distribution system, demolition, site preparation, earthwork, roadway reconstruction, roadway milling and resurfacing, sidewalk replacement, and signage and pavement markings. BID PROCESS Invitation to Bid No. 2 -09/10 was issued on November 25, 2009, with a bid opening date of February 8, 2010. A Pre -Bid Conference was held on December 15, 2009. Since the City was experiencing some difficulty acquiring the necessary permits to continue with the project due to regulatory agencies taking a stricter approach /interpretation of the anti - degradation policy of Biscayne Bay, the bid opening was postponed until the permit issue could be resolved. Addendum No. 6 was issued on October 18, 2010 to reopen the bid process. The deadline for the receipt of bids was scheduled for November 9, 2010. A second pre -bid meeting was held on October 25, 2010. A total of ten (10) addenda were issued to provide additional information and to respond to all questions submitted by the prospective bidders. Bidsync and Bidnet issued bid notices to 2,719 and 223 prospective bidders, respectively. The notices resulted in the receipt of four (4) bids from the following companies: • Lanzo Construction Co. of Florida • Metro Equipment Service, Inc. • Southeastern Engineering Contractors, Inc. • Trans Florida Development Corp. The following Table 1 provides the bid tabulation results of the total amount bid for all four (4) responses to ITB No. 2- 09/10: City Commission Memorandum - Bayshore 8B: Lower North Bay Road ROW Improvements Project Contract Award Memo December 8, 2010 Page 3 of 5 Table 1 Company Name Total Amount Bid Trans Florida Development Corp. $4,055,222.92 Southeastern Engineering Contractors, Inc. $4,598,040.84 Lanzo Construction of Florida $5,024,140.00 Metro Equipment Service, Inc. $5,291,477.37 Please reference "Attachment A" for a more detailed bid tabulation summary for ITB 2- 09/10. Allowances in the Project pricing included Indemnification in the amount of $25.00; a Permit Fee Allowance, in the amount of $35,000.00, that may be incurred by the contractor by the various agencies having jurisdiction over the project; and a $190,000.00 allowance for cost that maybe incurred by the contractor to repair or replace the existing outfalls if they are determined to be in poor condition for a total amount of $225,025.00. The bid contained Deduct Alternates to be selected at the discretion of the City. The Alternates do not change the status of the bid results. On November 18, 2010, the Technical Review Panel (TRP), as well as support staff from the Design Engineer of Record (EOR), CH2MHill, convened to review, evaluate and rank the bids submitted for the Bayshore — Lower North Bay Road Infrastructure Improvement Project, Neighborhood 8B, and to conduct a 20 minute interview of the contractors' key personnel. The Technical Review Panel consisted of the following individuals: • Janette Fernandez Arencibia, P.E., Capital Projects Coordinator, CIP Office • Roberto Rodriguez, Capital Projects Coordinator, CIP Office • Aaron Sinnes, Senior Capital Projects Coordinator, CIP Office • Millie McFadden, Parks Superintendant, Greenspace Management • Ricardo Guzman, Senior Planner, Planning Department • Walt Schwarz, CH2MHiII, Non - voting Technical Support • Charles Fossler, CIP Office, Non - voting Technical Support Prior to the meeting, the TRP voting members were provided with the proposals submitted by each bidder, the performance evaluation surveys prepared by previous clients of the bidders, the risk assessment value added summary and the resumes of each firm's team proposed to be assigned to the Project. The TRP based its recommendation on the following evaluation criteria: 1. Base Bid Price 50 points 2. Qualifications of bidder 20 points 3. Past Performance 10 points 4. Risk Assessment PlanNalue Added Submittal 10 points 5. Presentation and Interview of Bidder's Key Personnel 20 points Total 110 points It was discussed by the TRP before the interviews the importance of the successful bidder understanding the dewatering effort required, staging limitations, protection of encroachments, 29 Street being the only access to Sunset Islands I and II, Public Information Officer component, volume of work, and ability to deal with permitting agencies. City Commission Memorandum - Bayshore 8B: Lower North Bay Road ROW Improvements Project Contract Award Memo December 8, 2010 Page 4 of 5 The Panel scored the bidders as follows: Table 2 ITB 2 -09/10 — Neighborhood 8B: Bayshore — Lower North Bay Road Janette Roberto Fernandez Ricardo Company Name. Rodriquez Arencibia Guzman Millie McFadden Aaron Sinnes Points Ranking Points Ranking Points Ranking Points Ranking Points Ranking Lanzo Construction 93 3 110 3 84 3 87 3 97 3 Metro Equipment 74 4 80 4 51 4 69 4 72 4 Southeastern Engineering 101 2 101 2 89 2 88 2 105 2 Trans Florida Development 106 1 102 1 103 1 108 1 106 1 Note: maximum based on ITB criteria is 110 points. At the conclusion of the interviews, the TRP unanimously recommended Trans Florida Development Corp. as the lowest and best bidder. Trans Florida identified the areas discussed by the panel, such as the understanding of the dewatering component, and the importance of 29 Street intersection, as key elements to the success of the project. CITY MANAGER'S REVIEW After considering the review and recommendation of City staff, the City Manager exercised his due diligence and recommends to the Mayor and City Commission the award of a contract to Trans Florida Development Corp. If award is approved, the City will engage in value engineering to identify potential cost savings. Trans Florida Development Corp. Trans Florida Development is a state - certified Underground Utility and Excavation Contractor for 13 years. Trans Florida Development has been directly involved in land development for residential and commercial projects, as well as municipal, County and State Government, such as roadways, bridges, street lighting, storm water drainage systems, water distribution systems, sanitary sewer systems and sewage lift stations. Trans Florida has recently completed the sanitary sewer and water distribution project in Key Biscayne, which included the replacement of 23,000 If of water main, which was installed utilizing trench dewatering, and over 27,000 If of sanitary sewer with a lift station and force main; the project included also restoration of neighborhood streets, swales, roundabouts, sidewalks and driveways. The contract amount was $9.5 million. A description of other representative projects is attached ( "Attachment B "). Trans Florida's team brings many years of experience in infrastructure construction, project management and design to address any situation on this project. Dennis D. Maddox, P.E., Vice President and Senior Project Manager, worked at Miami -Dade Water and Sewer from 1991 to 1999, becoming the Chief of the Construction Management Division in 1995. Mr. Gilbert A. Caamano is the Project Manager with over 25 years of engineering design background in infrastructure projects. Martin Moraga, the Project Superintendent, has 14 years of experience as working with Trans Florida. He was directly involved in the recently completed Key Biscayne project. City Commission Memorandum - Bayshore 8B: Lower North Bay Road ROW Improvements Project Contract Award Memo December 8, 2010 Page 5 of 5 Excellent references were received from Trans Florida's clients, which include, the Village of Key Biscayne's Village Manager and Public Works Director (see "Attachment C "), Florida Department of Transportation, Century Homebuilders, and D.R. Horton Inc. It should be noted that the City's regular process of considering the price for projects and its standard process for bidding construction projects has resulted in a price that is reflective of the current market. At present, it appears that the market is very competitive and that the City may continue to receive bids that are lower than those received in the past year or so. The public procurement process, which is an open and competitive, transparent process, has again served the City to provide the lowest and best bidder for this project, as it has in the past, with a proposed project cost which is approximately $1,345,000, lower than the construction budget. CONCLUSION: The Administration recommends award of a contract to Trans Florida Development Corporation pursuant to Invitation to Bid No. 02- 09/10, for the construction of the City of Miami Beach Right -of -Way Infrastructure Improvement Program, Neighborhood No. 8B, Bayshore, Lower North Bay Road Project, in the amount of $ 4,055,222.92, plus approve a project contingency in the amount of $405,522.29, for a grand total not to exceed $4,460,745.21. Funding in the amount of $1,399,596.62 was previously appropriated in the Capital Budget, and appropriate $3,061,148.59 from Fund 429 Stormwater Projects Line of Credit, with such funds to be repaid from proposed future Stormwater Bonds. And further authorize the Administration to engage in value engineering to further reduce the cost and time for completion of said project. ATTACHMENTS: A Bid Tabulation B Representative Projects C Letter from Village of Key Biscayne EXHIBIT: A Project Limits JMG /JGG /COC /GL T:WGENDA\2010 \December 8 \Regular \ITB 2 -09 -10 Bayshore 8B MEMO.doc Attachment A BID TABULATION — ITB 2 -09/10 COMPANY NAME Trans Florida Southeastern Lanzo Metro Development Engineering Construction Equipment Service General Conditions $383,566.35 $378,780.60 $378,054.00 $660,000.00 Water and Sewer $695,869.60 $1,109,572.40 $923,509.00 $1,099,295.52 Stormwater $1,838,392.95 $1,748,003.70 $2,120,411.00 $2,244,138.70 Pavement and Streescape $912,369.02 $1,136,659.14 $1,377,141.00 $1,063,018.15 Allowances $225,025.00 $225,025.00 $225,025.00 $225,025.00 Grand Total Base Bid $4,055,222.92 $4,598,040.84 $5,024,140.00 $5,291,477.37 Deductive Alternante 5.01 $22,689.45 $44,452.80 $20,890.17 $8,387.82 Deductive Alternate 5.02 $145,348.80 $316,960.00 $94,918.20 $77,428.80 Deductive Alternate 5.03 $40,650.12 $146,537.40 $6,010.92 $3,396.00 Deductive Alternante 5.04 $2,612.94 $11,166.60 $93.24 $222.00 Total Deductive Alternates $211,301.31 $519,116.80 $121,912.53 $89,434.62 EXHIBIT A c prA SE AVE. PROJECT LIMITS /% — 7 , o , / ' BISCAYNE BAY _ �,�'� at 1 /: , J 1 I A ,, , Yi / i 1 , ; / )l \` \ \\ 2 th S 1 1 I it I . i I . IX 12 � ( d ; 0 i F ' J i MIAMI BEACH I I �i i 1 GOLF CLUB 23rd ST, W I.' i Z I i I ., i U) {I I ■ • i w i II i J —� , J 1 ' J J 1 J 1 ./ f / { / r / / '/ V. 1. C"a\ : , ' \, ( _ _ _____A-\,_,-- ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD • 77 TRANS FLORIDA DEVELOPMENT CORP. c o dr General Engineering Contractor CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects W -862 Trans Florida Development was the General Engineering Contractor, Dennis Maddox, P.E. was the Project Manager, Angel Farinas was the Superintendent Project Location: SW 127 Ave and SW 216 St Project Description: Miami -Dade Water and Sewer Project. Furnish & Install 10,800 if of 36 "& 24" DIP ,, - J water main, sub - aqueous crossing of both mains across SFWMD C -11 canal and connect to existing water treatment plant. Complete trench restoration, roadway milling and resurfacing and final pavement markings. Owner Contact: Miami -Dade Water & Sewer Project Award Amount $ 3,885,306.83 Final Contract Amount $ Not determined at this time Project Status: Completed May 2010 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD - W \ TRANS FLORIDA DEVELOPMENT CORP. co General Engineering Contractor CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects FDOT Contract T -6192 Trans Florida Development was the General Engineering Contractor, Rolando Encinosa is the Project Manager, and Rolando Gonzalez is the Superintendent Project Location: US 1/ SR 5 from SW 288 St & SW 266 St Project Description: Joint Participatation Project between Miami -Dade Water & Sewer and the Florida ' \ Department of Transportation. The project is a 2 mile reconstruction of US 1 and the construction of a new ' 24" water main on US 1 with cross connections at major intersections along the route. Owner Contact: Miami -Dade Water & Sewer, FDOT, CEI Engineer, Arturo Perez, P.E., P.S.M. Pinnacle Consulting Enterprises, Inc. Project Award Amount $ 10,830,721.23 Final Contract Amount $ unknown Project Status: Under construction, 75 % completed, Scheduled for completion December 2011 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ' c ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD TRANS FLORIDA DEVELOPMENT CORP. TRANS al Engineering Contractor 1� V g CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects FDOT Contract T -6174 Trans Florida Development was the General Engineering Contractor, Rolando Encinosa is the Project Manager, and Rolando Gonzalez is the Superintendent Project Location: Perimeter Road from NW 72 Ave to NW 57 Ave Project Description: Florida Department of Transportation Project. 1.5 mile reconstruction of Perimeter Road from a two lane roadway to a four lane divided highway with drainage, curb and gutters, Culvert crossing and tie in to existing rail road. Owner Contact: FDOT, CEI Engineer, Jose Gonzalez, P.E. CIMA Engineering PO Box 557397 Miami, Florida 33255 T. (305)835- 0262/(954)435 -5882 F. (305)397 - 1987/(954)337 -0301 Project Award Amount $ 4,883,285.28 Final Contract Amount $ unknown Project Status: Completed April 2010 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD TRANS FLORIDA DEVELOPMENT CORP. n oamA General Engineering Contractor 1� V CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects • S -821 Trans Florida Development was the General Engineering Contractor, Dennis Maddox, P.E. was the Project Manager, Angel Farinas was the Superintendent Project Location: SW 18 Rd and SW 2 Ave to SW 11 St and SW 4 Ave Project Description: Miami -Dade Water and Sewer Project. Furnish & Install 18001f of 16 "& 12" DIP sewer, manholes, cross connect to existing sewer system Complete trench restoration, roadway milling and resurfacing and final pavement markings. Owner Contact: Miami -Dade Water & Sewer Project Award Amount $ 1,337,557.07 Final Contract Amount $ 1,363,077.07 Project Status: Completed October 2009 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD ' --' k . TRANS FLORIDA DEVELOPMENT CORP. E v �► General Engineering Contractor • v CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects S -778 Trans Florida Development was the General Engineering Contractor, Dennis Maddox, P.E. was the Project Manager, Angel Farinas was the Superintendent Project Location: SW 87 Ave from SW 132 ST to SW 120 St Project Description: Miami -Dade Water and Sewer Project. Furnish & Install 4300 if of 16 ", 12 ", 10 ", 8 ", `, and 6" force main, cross connect existing force mains as well as private lift station connections to new force main. Complete trench restoration, roadway milling and resurfacing and final pavement markings. Owner Contact: Miami -Dade Water & Sewer Project Award Amount $ 1,583,188.36, Final Contract Amount $ 1,631,488.36 Project Status: Completed November 2009 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ' /---) ATTACHMENT TRANS B - BAYSHORE FLORIDA 8B: LOWER NORTH D EVELOPMENT BAY CORP ROAD . �o mi General Engineering Contractor 1� V l CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects • Landmark At Doral Trans Florida Development was the General Engineering Contractor, Gilbert A. Caamano was the Project Manager, Angel Farinas was the Superintendent Project Location: NW 107 Ave and NW 66 Street, Doral Florida Project Description: Multi Family and Commercial development with New construction of 7585 ft of 8" ) water main, 13,779 if of 12" water main, 10653 if of new 8" Sanitary Sewer, 745 if of 8" sanitary sewer force main, 1 new sanitary sewer pump station installed, 75341f of 15" exfiltration trench, 3201 if of 24" exfiltration trench, 13571f of 15" solid HDPE drainage pipe, 140,850 sy of asphalt pavement, swales, roundabouts, sidewalks and driveways. • Owner Contact: Juan Alvarez, P.E. CDD Engineer. 10560 NW 27 Street, Suite 102, Miami, Florida 33172 Tel. 305- 640 -1345, Fax 305- 640 -1346 Project Award Amount $ 28,434,006.06, Final Contract Amount $ 31,042,350.00 Project Status: 90% completed January 2010 went into receivership by CDD Bond Holders / Sales Negotiations to Lennar Homes 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD TRANS FLORIDA DEVELOPMENT CORP. RID General Engineering Contractor CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects Village of Key Biscayne Zone 2/3 Trans Florida Development was the General Engineering Contractor, Dennis Maddox, P.E. was the Project Manager, Angel Farinas was the Superintendent Project Location: Portion of Key Biscayne from W. Mashta Dr. on the south, Harbor Dr and Warren Lane on the west, W. Heather Dr. on the north and Fernwood Rd and Crandon Boulevard on the east. Project Description: Replacement of 20,850 ft of 8" water main, 2438 if of 12" water main, 22,489 if of new 8" Sanitary Sewer, 2610 if of 10" sanitary sewer and 1941 if of 12" sanitary sewer, 800 if of 8" sanitary sewer force main, 1 new sanitary sewer pump station installed, complete restoration of neighborhood streets, swales, roundabouts, sidewalks and driveways. Owner Contact: Armando Nunez, Public Works Director. 88 West Maclntyre Street, Key Biscayne, FL 33149. TEL: (305) 365 -8945, FAX: (305) 365 -7757 Project Award Amount $ 9,392,909.00, Final Contract Amount $ 9,517,555.54 Project Status: Completed August 2010 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 ATTACHMENT B - BAYSHORE 8B: LOWER NORTH BAY ROAD TRANS FLORIDA DEVELOPMENT CORP. 1 V r wr General Engineering Contractor CITY OF MIAMI BEACH RIGHT OF WAY INFRASTRUCTURE IMPROVEMENT PROGRAM, NEIGHBORHOOD NO. 8B BAYSHORE: LOWER NORTH BAY ROAD Representative Projects Islands at Doral III Trans Florida Development was the General Engineering Contractor, Dennis Maddox, P.E. was the Project Manager, Angel Farinas was the Superintendent Project Location: NW 112 Ave and NW 86 Street, Doral Florida Project Description: New construction of 43,965 ft of 8" water main, 4304 if of 12" water main, 32,362 if of new 8" Sanitary Sewer, 1050 if of 8" sanitary sewer force main, 2630 if of 12" sanitary sewer force main, 2 new sanitary sewer pump station installed, 13,428 if of 18" exfiltration trench, 26,604 if of 18" solid HDPE drainage pipe, 148,737 sy of asphalt pavement, swales, roundabouts, sidewalks and driveways. Owner Contact: Juan Alvarez, P.E. CDD Engineer. 10560 NW 27 Street, Suite 102, Miami, Florida 33172 Tel. 305- 640 -1345, Fax 305- 640 -1346 Project Award Amount $ 29,403,538.00, Final Contract Amount $ 30,173,729.47 Project Status: Completed September 2007 • 13960 S.W. 144 Ave. Rd., Miami, FL 33186 - Phone (305)378 -2323 - Fax (305)378 -6161 C.0 # E982003 wz ATTACHMENT C - BAYSHORE 8B: LOWER NORTH BAY ROAD � VILLAGE OF KEY BISCAYNE � � � Office of the Village Manager Village Council Robert L. Vernon, Mayor Enrique Garcia, Vice Mayor Michael W. Davey March 31, 2010 Robert Gusman Michael E. Kelly Jorge E. Mendia Thomas Thornton Mr. Aquilino Melo President Village Manager Trans Florida Development Corp. Genaro "Chip" Iglesias 1396 SW 144 Avenue Rd. Miami, Florida 33186 Dear Mr. Melo, • I would like to express my appreciation for the work that Trans Florida has performed at the Village of Key Biscayne during the Water and Sewer project. The replacement pf all the water mains and converting over 700 homes from septic to sewer in a barrier island setting is an incredible task. Trans Florida provided a very aggressive pricing proposal that has been backed up by quality work. The conditions that the work crews faced were very difficult along with working along narrow streets. The professionalism exhibited by the entire team was very much appreciated, as well as, the willingness to adapt to unforeseen situations. Your company went above and beyond when the Village of Key Biscayne needed your assistance and you even offered your resources to assist with certain issues we faced that were unrelated to the project. In essence, you practiced good corporate citizenship. This has been a very difficult project for all due to the disruption a project of this magnitude creates and I am certainly looking forward to closure. I wanted to take this opportunity say "Thank you" for delivering a quality project and for the work of all the employees assigned to this project. Re :rds, i - ` i Genaro "Chip" 1: = ias Village Manager 88 West McIntyre Street • Suite 210 • Key Biscayne, Florida 33149 • (305) 365 -5500 • Fax (305) 365 - 8936 MISSION STATEMENT: TO PROVIDE A SAFE, QUALITY COMMUNITY ENVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT." www.keybiscayne.A.gov