Loading...
Bid Tender Form - Tran Florida Development Corp. BID TENDER FORM - SCHEDULE OF PRICES BID BID No. 43 -09/10 2. Allowance: Permit fees $ 5,000.00 3. Alternate: Staging Area per Drawing SP -1 $ 3. Lump Sum - For, consideration for indemnification for the Lump sum of: $ 25.00 TOTAL BASE BID AMOUNT ITEMS 1 through 4 $ eJ 7 vs Written: C5 v AVOV2 /^` l /�V �/ 'c..S /�t' ; � / /1►7WIIV�r6 Dollars and ��' Cents Bidder's affirmation: FIRM'S NAME (Print or Type): N,� SIGNATURE: TITLE /PRINTED NAME: '0 /Nf� , /j� / .ADDRESS: P �o i� / t��'. ;1=�.< / "lam /��Gl / ✓,� 5 TELEPHONE NUMBER: ��� g JoZ 3P ` FAX: - 3Z ) r , . EMAIL; Bidders should not delete . or change any items on ' the "Bid Breakdown" form. However, if a bidder believes that an item on the form is not being used, you should simply indicate N/A for ..that item. Bidders may add line. items as necessary The unit quantity breakdown is provided FOR INFORMATIONAL PURPOSES. ONLY. Bidders shall. rely on their own quantity take -offs in the development of their Lump sum prices. Cost component of award will be based on the TOTAL LUMP SUM BASE BID AMOUNT '*plus Allowances, plus none, any or all Alternates which will be selected at the City's sole discretion and based on funding availability). Bidders must fully 'complete the Bid Breakdown Form to include quantities, units of measure, unit pricing, and totals. . . Should , any bidder fail to fully complete this. form, the City will request that the omitted information be' provided within two (2) calendar days upon. request the City. Failure to provide the City with the omitted information within two (2) calendar days after the bidder- has received. the request from the City may result in your bid being deemed: non= responsive and disqualified from further consideration. THE CITY WILL NOT ACCEPT ANY REVISION TO THE BASE LUMP SUM, DIVISIONS, LINE ITEM TOTALS, ADD ALTERNATES, OR GRAND TOTAL BID, AFTER THE DEADLINE FOR RECEIPT OF - BIDS." To receive a copy -of the unit breakdown form in Excel, please contact Theo Carrasco at theocarrascoCaD-miamibeachfl.gov or 305- 673 -7000 ext. 6230. BID NO: 43 -09/10 CITYOF MIAMI BEACH DATE: October 25, 2010 . 51 UNIT PRICE BID BREAKDOWN (ADDENDUM 4) CONTRACTOR MUST PROVIDE THE UNIT PRICE BREAK DOWN BY CSI FORMAT AND ALSO PROVIDE AN ITEMIZED BREAK DOWN IN SUPPORT OF THE TOTAL BID PRICE. Bidders should not delete or change any items on the ''Bid Breakdown" form. However, if a bidder believes that an item on the form is not being used, you should simply indicate N/A for that item. Bidders may add line items as necessary. . - The unit quantity breakdown is provided FOR INFORMATIONAL PURPOSES ONLY. Bidders shall rely on their own quantity take - offs in the development of their lump sum prices. Cost component of award will be based on the TOTAL LUMP'SUM BASE BID AMOUNT plus Allowances, plus none, any or all Alternates which will be selected at the City's sole discretionrand based on, funding availability). Bidders musffully complete the Bid Breakdown Form to include quantities, units of measure, unit pricing, and totals.. Should any bidder fail to fully complete this form, the City will request that the omitted information be provided within two (2) calendar days upon request from the City. Failure to provide the City with the omitted information within two (2) calendar days after the bidder has received the request from the City, may result in your bid being deemed non - responsive and disquali PROJECT: 1T8 43 -09/10 - CMB ROW INFRASTRUCTURE IMPROVEMENTS - NEIGHBORHOOD NO 13A STAR ISLAND . COMPANY NAME: • / _LD l?C JtiJC/V SUMMARY OIVISION 1 - GENERAL CONDITIONS $130,463.40 DIVISION 2.= SITEWORK $398,270.90 DIVISION 3 - CONCRETE .$9,419.40 DIVISION '4 - MASONRY $0:00 DIVISION 5 - METALS $0.00 DIVISION 6 WOOD AND PLASTICS $0:00 DIVISION 7 - THERMACAND MOISTURE PROTECTION $0.00 _ DIVISION 8 - DOORS AND WINDOWS $0.00 ' DIVISION 9; FINISHES, $0.00 DIVISION 10 - SPECIALITIES $0.00 DIVISION 11 EQUIPMENT $0.00 DIVISION 12 - FURNISHINGS $0.00 DIVISION 13 - SPECIAL CONSTRUCTION _ $0.00 . DIVISION 14 - CONVEYING SYSTEMS $0.00 ' DIVISION 15 - MECHANICAL $5,617.10 DIVISION 16 - ELECTRICAL & PLUMBING $130,221.65 LUMP - SUM BASE BID AMOUNT: $673,992.45 ALLOWANCES Permit Fees 1 LS $5,000.00 $5,000:00 Consideration of Indemnification (Base Bid) 1 1 LS 1 $25.001 $25.00 ALTERNATES Staging Area per 'Section SP -1 1 LS' 1 $17,870.00 GRAND TOTAL LUMP SUM BID AMOUNT (LUMP SUM BASE BID + ALLOWANCES + ALTERNATES) $696,887.45 - DIV ITEM Nu r DESCRIPTION,_a BIDDERS _ .. QUANTITY UNIT 3 UNIT PRICE TOTAL't.. DIVISION`1- GENERAL CONDITIONS ' 1 Bonds & Insurance. 1 100.0% % $7,000.001 $7,000.00 2 Mobilization 1 LS $23,100.00 $23,100.00. 3 General Conditions 1 % $55,500.00 $55,500.00 4 Maintenance of Traffic 1 LS $4,863.40 $4,863.40 5 Overhead and Profit 1 LS $25,000.00 $25,000.00 6 Public Information Officer 1 LS $15,000.00 $15,000.00 DIVISION 1 - GENERAL CONDITIONS TOTAL:j $130,463.40 DIVISION 2 - SITEWORK 7 Demo and Removal of Concrete Pavement 94 SY 4 .$361.90 8 Demo and Removal of Asphalt Pavement 7450 SY 1 $7,450.00 9 Demo and Removal Concrete Pavers 146 SY 4 $562.10 10 Demo.and Removal, Sidewalk 10 SY 4 $38.50 11 Mill Asphalt Pavement 1" 990 SY 1 $1,237.50 d 12 Excavation 1660 CY 3 $4,980.00 13 Limerock Base -8 " 7450. SY 7 $52,150.00 14 Sub -base stabilization 7450 SY 1 $7,450.00 15 Resurface w/ type III Surface Course -1 " 990 SY 7 $6,435.00 16 Asphalt -Type III Surface Course 2 " Thick 7450 SY 11 $84,930.00 . 17 Reset Manhole covers 16 EA 150 $2,400.00 18 ` Reset drainage inlets frame and grates 7 EA 1692 $11,844.00 19 Valley Gutter 2' 3510 LF 9 $30,712.50 20 Curb and Gutter 8 LF 13 $102.40 21 Concrete Sidewalk ` 5 SY 22 $110.00 22 Remove 12 "Plug 1 EA 1500 $1,500.00 23 Remove& Salvage Fire Hydrants 2 EA 250 $500.00 , 24 Cap Water Main 1 EA 144 $143.65 25 Cut and Cap existing water main 1 EA 144 $143.65 26 Air Release Valves 0 EA 0 $0.00 27 -. 2" HDP Tubing 2760 LF 16 $43,194.00 28 8" DIP ( RJ), 1310 LF,.' 39 $51,273.40 29 6" DIP(RJ) 106 LF 23 $2,416.80 30 3" DIP ( Sleeves) 540 LF 11 $5,670.00 31 Fire Hydrant Assemblys 4 EA 2286 $9,143.80 32 8 "x 6" DIP Tees 3 EA 327 $981.15 33 12" x 8 DIP Reducers 1 EA 309 $309.25 34 8 "'45 Degree DIP Bends 18 EA 242 $4;361.40 35 8" - 22'Degree DIP Bends ' 2 EA 240 $480.80 36 8" - 90 Degree DIP Bends ' 1 EA 376 "$376.20 .37 Concrete Pavers 8" x 8" 1360 SF 5 $6,188.00 38: Pavement. Marking - 6" solid white 240 LF 1 $276.00 39. Pavement Marking - 6" solid Yellow 280 LF 1 $322.00 40 Pavement Marking - 6" double yellow 240 LF 2 $540.00 41 Pavement Marking - 18 " solid yellow. 60 LF 6 $360.00 42 Bi- directional W -W rpm 43 EA 4 $172.00 43 Bi- directional Y -Y rpm 40 EA 4 $160.00 44 2" PVC irrigation Pipe 430 LF 1 45 11/2" PVC Irrigation Pipe 540 LF 1 $351.00 46 1 1/4" PVC Irrigation Pipe 1300 LF 1 $741.00 47 1" PVC Irrigation Pipe 760 LF 1 $478.80 48 3/4" PVC Irrigation Pipe 780 LF 0 $327.60 49 Sprinkler Heads 100 EA 146 $14,600.00 50 Sod 60000 SF 1 $36,600.00 51' Brick Pavers 900 SF 6 $5,445.00 ' DIVISION 2 - SITEWORK TOTAL:1 $398,270.90 DIVISION 3 - . CONCRETE 52' - Concrete Drainage aprons w/ reinforcing 14 EA 194 $2,713.20 53 Concrete Base for Pavers w /reinforcing 1,370 SF „ S $6,165.00 54 Concrete Header Curb 12 "x 12" w/ reinforcing 82 LF 7 $541.20 DIVISION 3 - CONCRETE TOTAL: $9,419.40 DIVISION 4 - MASONRY 55 Not Used $0.00 ' DIVISION 4 - MASONRY TOTAL:j $0.00 DIVISION 5 - METALS. 56 Not Used $0.00 DIVISION S - METALS TOTALi $0.00 DIVISION 6 - WOODS AND PLASTICS 57 Not Used $0.00 ` DIVISION 6 - WOOD AND PLASTICS TOTAL:j $0.00 DIVISION 7- THERMAL AND MOISTURE PROTECTION 58 NotUsed $0.00 , DIVISION 7 - THERMAL AND MOISTURE PROTECTION TOTAL:j $0.00 DIVISION 8 - DOORS AND WINDOWS (INSTALLED) 59 Not Used - $0.00 DIVISION 8 - DOORS AND WINDOWS TOTAL:j $0.00 DIVISION 9 FINISHES 60 - Not Used $0.00 DIVISION 9 - FINISHES TOTAL:j $0.00 DIVISION' 10- SPECIALITIES 61 Not Used $0.00 DIVISION 10 - SPECIALITIES TOTAL:j $0.00 DIVISION 11 - EQUIPMENT 62 Not Used $0.00 DIVISION 11 - EQUIPMENT TOTAL:j $0.00 DIVISION 12 - FURNISHINGS 63 Not Used $0.00 DIVISION 12 - FURNISHINGS TOTAL:. $0.00 DIVISION 13 - SPECIAL CONSTRUCTION 64 Not Used $0.00 DIVISION 13 - SPECIAL CONSTRUCTION TOTAL:j $0.00 DIVISION 14 - CONVEYING SYSTEMS 65 Not Used $0.00 DIVISION 14 - CONVEYING SYSTEMS TOTAL:j $0.00 DIVISION 15 - -PLUMBING AND MECHANICAL 66 6 Valves w /box • 4 EA 1038 $4,150.60 67 8" Valves w /box 1 EA 1467 •$1,466.50 DIVISION 15 - MECHANICAL & PLU,.'-,NGTOTAL:l $5,617.10 DIVISION X 16 - ELECTRICAL 6 &: Electrical Service Connections 6 EA 650 $3,900.00 69 Conduit 1" - Schedule 40 6130 LF 7 $41;377.50 70 Conductors - THHN.# 8 AWG 600 VOLTS 7530 LF 1 $6,777.00 71 Loop Detectors - Type B 3 EA 450 $1,350.00 72 Ground Rods 3/8" x 10' 60 EA 5 $300.00 73 Fuseholder'60 Amp w /50 Amp Fuse 6 EA 110 $660.00 74 Accent Uplighting - Double Directional 7 EA 1926 $13;482.00 75 Accent Uplighting - DL 16 -NL -MH -150 27 EA _ 1049 $28,335.15 76 Accent Uplighting - DB -120 - MH -M90 37 EA 920 $34,040.00 DIVISION 16 - ELECTRICAL TOTAL: $136,221.65 TOTAL SUM OF BASE BID: $673,992.45 r r ° r - .