Loading...
HomeMy WebLinkAboutAmendment 1 - Brown & Brown Architects AMENDMENT N.O. 1 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND BROWN + BROWN ARCHITECTS, INC./ CSA GROUP, DATED DECEMBER 6, 2006 FOR THE PROVISION OF PROFESSIONAL SERVICES ASSOCIATED WITH PROVIDING SPECIAL STRUCTURAL INSPECTIONS THROUGH CONSTRUCTION FOR A NOT TO EXCEED AMOUNT OF $11,600.00: This Amendment No. 01 to the Agreement made and entered this IWA day.of J4 014 V , 2010, by -and ; between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and BROWN + .BROWN ARCHITECTS, INC., a CSA Group Company and Florida Corporation, having its offices at 61.00 Blue Lagoon Drive, Suite 300, Miami, Florida, 33126 (hereinafter referred to as Consultant). g RECITALS WHEREAS,.the Scott Rakow Youth Center (SRYC) Renovation Project was initiated by the Mayor and City Commission in 1994 and was a part of the original $15- Million Parks Bond issue; and WHEREAS, the original scope called for the expansion and renovation of the ice rink and other improvements to the SRYC; and WHEREAS, on October 17, 2005, the City retained the Consultant to develop a Schematic Conceptual Master Plan which would evaluate code concerns (including ADA and fire safety), validate the program and the budget, and propose a phasing plan for construction; and WHEREAS, on May 10, 2006, the Mayor and City Comm,ission approved the issuance of Request for Qualifications (RFQ) No. 26 -05/06 for Architectural,' Engineering, and Landscape Architecture Services for the Planning, Design, Bid and Award, and Construction Administration Services for the Renovation and Construction of the Scott Rakow Youth Center (hereinafter referred to as Project); and ; WHEREAS, on September 6, 2006, the City Commission authorized the Administration to enter into negotiations with the Consultant as the top- ranked firm; accordingly City and Consultant executed a professional services :agreement -for the Project, dated ,December 6, 2006 (the Agreement); and WHEREAS, the estimated Project construction cost is $4,290,000; and WHEREAS, the fee negotiated with the Consultant includes the following services: A/E design and construction administration to be completed within eighteen (18) months for a fee of $571,140; reimbursable expenses for a fee of $25,000; boundary, topographic and underground survey for a fee of $50,000; and geotechnical testing services for a fee of $15,000; all for a total fee of $661,140; and WHEREAS, the parties need to amend the Agreement to include professional services associated with providing special structural inspections throughout the construction phase of the Project (as requested by the Building Department during the building permitting process); and WHEREAS, the following Amendment No. 1 to the Agreement approves the additional services request by Consultant to provide special structural inspections throughout construction, for . a not -to- exceed amount of $11,600. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein 'contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1: ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 1. 2. MODIFICATIONS The Agreement is amended to include Exhibit A -1 and Exhibit B -1, which is attached and incorporated herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 1. [ REMAINDER OF THIS PAGE LEFT INTENTIONALLY BLANK ] 2 IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH Y City Clerk Ci Pa W g o e , Rob ert Parcher J e zalez ATTEST CONSULTANT: BROWN.+ BROWN ARCHITECTS, INCJ CSA GROUP Bv Secretary: ' %)•Pres(den . Print Name Pint Name APPROVED AS TO FORM & LANGUAGE a FO R CUTION • .�- '� mey t J EXHIBIT A -1 SCOPE OF SERVICES 1. SCOPE OF WORK AND SERVICES REQUIRED Schedule A of the Agreement, entitled "Scope of Services ", is amended as follows and attached as Exhibit A -1: Task 4.1 — Special Structural Inspections: - The CONSULTANT shall provide special structural inspections of the structural elements of the Project during the plan review phase of the permitting process. Field Reports shall be provided for each inspection that is conducted. The reports shall include notes regarding the inspector's observations, delineation of any actions required to remediate problems, a log of when corrections are completed, and certifications of the work performed by the Contractor at each inspection. 2. TIME OF COMPLETION 'The duration of the services contemplated herein shall be based on the schedule provided by the Contractor for the installation of the structural - elements of the Project. Notwithstanding the proceeding, Consultant shall provide the services contemplated herein throughout the duration of the construction phase of the Project. Should the Project, schedule go beyond the original schedule and the Project is not completed as originally anticipated, the Consultant will not seek additional compensation. 3. PAYMENT AND COMPENSATION Payment for services performed shall be on an hourly basis at a fixed hourly rate of $100.00 per hour subject to a not -to- exceed amount of $11,600.00. The total maximum fee proposed for the scope of work pursuant 'to this Amendment No. 1 shall be a not -to- exceed amount of $11,600.00. Notwithstanding the proceeding, Consultant shall provide the services contemplated herein throughout the duration of the construction phase of the Project. Invoicing will be monthly and based on hourly rates as referenced above. Compensation: • Original Agreement amount $661,140.00. • Amendment No. 1 (Special Structural Inspections) on an hourly basis, at a fixed hourly rate of $100.00 per hour, for a not -to- exceed amount of $11,600.00 and a Project total of $672,740.00. • Revised Agreement total amount: $672,740.70 .. 4 . I EXHIBIT B -1 AUTHORIZATION FOR A/E ADDITIONAL SERVICES Please refer to the attached Exhibit. 5