Loading...
Amendment 11 - STA w' AMENDMENT NO. 11 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND STA ARCHITECTURAL GROUP, DATED JULY 21 1996. FOR THE PROVISION OF PROFESSIONAL SERVICES ASSOCIATED WITH ADDITIONAL PLANNING AND CONCEPT DESIGN, MEETINGS AND PRESENTATION SERVICES FOR A TWO -STORY AUXILIARY TRAINING STRUCTURE FOR A NOT TO EXCEED AMOUNT OF $2,760. This Amendment No. 11 to the Agreement made and entered this IT day of J_, 2011, by and between the City of Miami Beach, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and STA Architectural Group, Inc., a Florida Corporation, having its offices at 3526 North Miami Avenue, Miami, Florida, 33127 (hereinafter referred. to as CONSULTANT). RECITALS WHEREAS, pursuant to Request for Letters of Interest No 133 - 94/95, the Mayor and City Commission adopted Resolution No. 96 -22068 on July 17, 1996, approving and authorizing the Mayor and City Clerk to execute an Agreement with STA Architectural Group, Inc. for Professional Services for the Renovation and Expansion of Fire Station No. 2 and a Master Plan for the Site at 451 Dade Boulevard (PROJECT); and WHEREAS, the Agreement provided for the detailed .planning, design, bidding and construction administration services for the Fire Station No. 2 Project; and WHEREAS, an Agreement for planning services was executed for a not -to- exceed amount of $78,000; and WHEREAS, on June 28, 2000, the Mayor and .City Commission adopted Resolution No. 2000- 23975, approving Amendment No. 1 to the Agreement, for schematic design, design development, construction documents, permitting & bidding, and construction administration services for the rehabilitation of the historic structure and the new construction of.a dormitory and apparatus structure improvements within the PROJECT, for not -to- exceed amount of $318,020; and WHEREAS, on October 17, 2001, the Mayor and City Commission adopted Resolution No. 2001- 24624, approving Amendment No. 2 to the Agreement for the design of an Emergency Operations Center, a site drainage system, and a dedicated driveway serving the Public Works. Yard, for a not -to- exceed amount_ of $117,000; and WHEREAS, on December 10 2003, the Mayor and City Commission adopted Resolution No. 2003 - 25439, approving Amendment No. 3 to the Agreement for construction administrative services for the PROJECT, for a not -to- exceed amount of $192,000; and WHEREAS, on March 15, 2007, Amendment No. 4 to the Agreement was executed approving additional construction administration services for the PROJECT, for a not -to- exceed amount of $24,500; and WHEREAS, on October 27, 2007, Amendment No. 5 to , the Agreement was executed approving additional construction administration services for the PROJECT, to be rendered on a monthly basis, for a not -to- exceed amount of $24,500; and WHEREAS, on June 20, 2008, Amendment No. 6 to the Agreementwas executed approving additional construction administration services for the PROJECT, to be rendered on a monthly basis, `for a not -to- exceed amount of $24,447; and WHEREAS, on July 10, 2008, Amendment No. 7 to the Agreement was executed approving additional design and construction administration services for the PROJECT, to be rendered on a monthly basis, fora not -to- exceed amount of $40,000; and WHEREAS,.the first phase of the fire Station No. ,2 Project, the construction of Building 'B and its Emergency Operations Center, is substantially complete, and the Fire Department moved into the building and put it into service; and WHEREAS, Building A has now been more thoroughly inspected and several additional items have been identified that require modifications to the construction documents; and WHEREAS, the hose tower wa 's also evaluated and, .despite recent repairs, structural deficiencies were found. As a result, the hose tower, which had not been a part of the original scope of work, will now be included in the renovation project; and WHEREAS, on December 9, 2009, Amendment No_ 8 to the Agreement was negotiated by staff for a fee of $183,000 with the CONSULTANT for an in -depth preconstruction review, Historic Preservation Board presentation, re- drawing and development of .construction documents per current codes, and bid and construction administration services for the rehabilitation of the historic building,,Hose Tower, and new addition two -story connectors; and. WHEARAS, on November 12, 2010, Amendment No. 9 to. the Agreement was executed approving the additional programming, planning, concept design, meetings and presentations for a . two -story Auxiliary Training Structure to be added along the rear side of the PROJECT structure, for a not -to- exceed amount of $10,980, for A/E fees and a not -to- exceed amount of $500 for reimbursable expenses, for a project total of $11,480; and WHEARAS, Amendment No. 10 to the Agreement is currently being administratively processed and approves additional services for the special structural inspections of all the reinforcing steel, structural steel, wood truss framing, bracing, sheathing, exterior door and wood frame- attachments for the construction of the PROJECT, to be performed by a Structural Engineering Subconsultant, as required by the City's Building Department, to be rendered on an hourly basis for a not -to- exceed amount of $10,000. WHEARAS, the following Amendment No'. 1.1 to the Agreement approves additional services for the architectural and structural design services associated with the redesign of foundations for the two connector buildings due to unforeseen conditions during construction, for a not -to- exceed amount of $2;760. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1 ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 11: 2. MODIFICATIONS The Agreement is amended to include "Schedule A -11 ", which is attached and incorporated herein.' 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The CITY and CONSULTANT ratify the terms of the Agreement, as amended by .this Amendment No. 11. IN WITNESS WHEREOF, the P arties hereto have caused this Amendment No. 11 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH By City Clerk City a ager Robert Parcher Jor M. onzalez ATTEST: CONSULTANT: STA ARCHITECTURAL GRqJ4P, INC. By TITLE: Tltjetf y' p '�CODh T"6A,5 Print Name Print Name APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION' �3 . i i� f _4 • t .i t ai'. f ., t. k. l<J r. (4if.i l;.' fi k� r 1r' a.. r i ' a ate y', ��n Pi v SCHEDULE A -11 1. SCOPE OF WORK AND SERVICES REQUIRED Exhibit "A" of the Agreement, entitled "Scope of Services ", is amended as follows and attached as Schedule A -11: Additional Services: Foundation Redesign This Amendment consists of additional services for the redesign of the structural foundations for the two connector buildings in the project due to unforeseen conditions. After the demolition and excavation under the two existing connector structures, it was determined that there were no existing piles and pile caps. The Consultants assumptions for the existing pile locations were based on as- builts of the existing buildings which depicted piles under the connector buildings. The proposed foundation design used the existing piles as shown on the as- built drawings. The Consultant and Subconsultant shall redesign the proposed foundations of the two connector buildings to accommodate the lack of existing piles encountered during construction (unforeseen condition). The redesign shall make an effort to. minimize impacts to the current design, schedule, and cost. This scope of services shall include coordination with the all parties- involved in. the redesign process. Consultant shall issue •revised drawings as necessary for construction. 2. TIME OF COMPLETION Services contemplated by this Amendment have been completed. 3. PAYMENT AND COMPENSATION The scope of services described in this Amendment No. 11 shall be performed for a not -to- exceed amount of $2,760. Invoicing shall be as referenced in the original agreement. Compensation: Original Agreement $78,000.00 Amendment No. 1 $318,020.00 Amendment No. 2 $117,000.00 Amendment No. 3 $192,000.00 Amendment No. 4 $24,500.00 Amendment No. 5 $24,500.00 Amendment No. 6 $24,446.70 Amendment No. 7 $40,000.00 Amendment No. 8 $183,000.00 Amendment No. 9 $11,480.00 Amendment No. 10 $10,000.00 Amendment No. 11 $2,760.00 Total Revised Agreement $1,025,706.70 /V\]AM.1B.E Authorization for A/E Additional. Services A/E Firm:- - 7 -A A/E Principal /Partner: ,� a>� I .O 2 1 Name Ly g f at - LG- D ate Project Title: e S 1 ,� N^ _ r4-`T IC A) Project Number: D 7 Additional Service Number: Cause (Check All That Apply): C) � 4 r > _ _ CONTRACTOR REQUEST -- ❑ UTILITY COMPANY /PUBLIC AGENCY -£ 1� ~ OWNER REQUEST ❑ CITY CONCURRENCY f. ❑ OWNER DELAY / CONTRACTOR DELAY `= ,, [�UNFORSEEN �= °_ ❑ OTHER Contract Reference: Reason for Service: (Back -up attached): g Al d F F-0 04 m-i 17;,0.0 5 6 �' 7 tip C 7 9 a O.o^; 6e TD /z F3 c) 1 j..6 al FA cr-T T Et* T el a AC; v'.��" P i 4Z.< Q R P c t cA -PS 108 -i5 Fb yx) 59e Ar'i'dc.Kg-D Rd'vYS9D .56 � 5-2-/.5-2-2 4 x - 3.1 Description of Services: T +e �` + A) F r* 3 ! "C V JZAJ, f 0A * I. O Pb V/V f f-J Scheduled Sta j Date: .� A-� , 2011 Scheduled Completion Dater ?-0 11 s�'� • Scheduled Cori truction Cost: $ )01l.113 3 Cost of Services: $ 2 '7(, ..ov Method of p nt: Funding Acct#: �— P/A String. P.O. Number: Project or n or, ital Improvement Projects ,_�_ Projects t _— ___. -__ - - - - -- -- - 0( Assistant Director, Capital Improvement Projects Dire r, apital Improvem nt Projects Budget Office Title: Amendment - Redesign. of Connector Foundations ADDITIONAL_ WORK AUTHORIZATION Date: January 25, 2011 - Fire Station No 2 - Miami Beach No. AWA 9607.010 Scope of Services Projected Fee hours rate fee - ""��£ �c! fi rr -.: `` �� "v., �y'%� ..1p - v i.�« y^ „ r:+f v - _ , . 1 architectural revisions foundation redesign coordination with Contractor, surveyor, structural engineer of the redesign of the structural foundations due to unforseen conditions. After the demolition and excavation under the two connector structures, it was determined there were no existing piles and pile caps. The foundation will be redesigned to address this condition. - Principal 2 $ 150 $ 300 Project Manager 6 $ 120 $ 720 Technical Staff 0 $ 80 $ - - Total Hours 8 $ 1,020 _ w 2 mep revisions - site /sub -slab mep redesign no additional work anticipated, i.e. none included 0 Principal 0 $ '150 $ - Project Manager 0 $ 120 $ - Technical Staff 0 $ 80 $ - Total Hours 0 $ MIAMI- IBM 3 3 structural revisions - foundation redesign Re- design of foundations of the two connector buildings due to the fact that no existing piles or pile caps were found. 18 Principal 2 $ 150 $ 300 Project Manager 4 $ 120 $ 480 Technical Staff - 12 $ 80 $ 960 Total Hours 18 $ 1,740 . . r • a W Notes: 1. No work shall begin without customer authorization 2. Reimbursables are not included in this fee Total .Amounts 26 $2,760 ^ -- -. ' ....;...,.. � .e-� o-, .. ..,.. - .�a_r .., - - , x:., ., z• <t —. fi�� ...' "" .fir - ..,,, '� Authorization / Approval Date STA Architectural Group 4 € 9pbM Le -y � i .w _ ¢ 6666 ®� g n � t U- Z s Ix f K n N § J-.Y 2-. .t-.1 an Y-J it � I 4 • s as _ " p $ '-w -� —5 s , i�_aS v .N P S .N i-J! 1 .m-.6 a L .N hu - .o-. - - I a n ® 1 - s nn py, - q .Na -.a Q o Y 2 o '® m S E kk LL n - O � �y�a2�2�3flsa w sj a H 3S ° a $ 1 $ $ s a O4 3 o -TRAL a m r.5r,i m -.i 0 a6 mmo c q LL Lu� °� f f L f f ` o S01 iFA � �� �aLL4 a4 Q�C .o-.o 1 a - §` .s•.a - � ��L7�wu�wwu�w�fYi� - A-% .S 4 E q � $ in f we 4 s .. n rct . A-.G .[-,G .N G-.f .N 9-.I _A•.i .f-.i A-.K ifif k r LLJ ZZ � i � Uw � aF LIK LIK: `.t ow iCq -. - Liz 6 - .w .NG-,r .[-,f A .Y.f A-.9 .C-,f MG-.r NO b - P rtx 4-4 FL as ,r.f .4.G Y. .CA to t-. A - . . A -IM :. . � (atxAx3 r.rcx,G - � „ (.rLX..Q)903 r.W x Am 4 I I If b I I ° �; aGror Ma .o tf�o :. A xl I xl I �9D9.f 19Da �• I' 'uWa Md.o K" q t, T X I QL I Grsa Slwa ^I I . x ® ° I I o I et I x I 0l I ®I ° R E it bi tv,� 51 1 I x x xl I III jl II ®O Q , ° T u1 11 � � Q — r — itt z.Gm -- y{ OI• S a ts� ELI II I1' �ft vim Md .C UM nG am.!'droa ft ' K° =. I.I �•[' A18'D I I BViG :NTJ,G'1WO .SI I � � �I I avi6xm .f df°a� .I I - xi - 'Olga wa.ntawl I •zl I � � ° �I I I � LL s (.W x A(m H OIL �g7 ,4.6 .Y.{ ,C-.1 N L•. A L ,N Y. w °° ; G o-.:!` .[ C .C.f .N o-.r V„ O t a — .. O - �_ S A-.rx i®oWn + A tl A A.dj - . (rt. rrCTgxi3 L L• ® � O lffi wh r' X . . . . . .N 6-,6 .t-.f .S•.G - ,t-.f - .N o-.tf � - ggp f r � cli LU ci 5 V) 2w Wzz WZ CIL Q U 0 Z to' Lu U W15 CEECO� Q S L Z 0 tE . W m LL CL CL � � Z 8 O — LL s� Z U � E w J 2 z a t _ Z° ° z d _ J U7 aJ x I z8 U wb g l oo Ah I a i- fl � $ fa t� � � � � � ❑Q7 J s � C a 7 IzIKKq - Q U ' O i � O &fit SEW W i p b w w aro.c •+ E- I w ❑ ❑ ❑ ❑ ❑ ❑ a ❑ ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ ❑ ID a Cl W ts = u E ❑ Q =3 HIP gay INN a x x x =3 << N 2 Y Y x oco qq � x X He �eo �T" FF. I RJVG .3 A LLI W ® eA - - WZ tn 02 ° a•` .r - sg Z —1-- 4 =I I a i d ..� _ o It - — -- —_ — s •V q Z �i Hi H+Ri+R++H O N" i s d d 9 3` d I ^ i 4 Z 3 O a ave Z i U) o U p tt�S W En e o d W C) o tma age 9c z @� — — IL N S[ d Im — Z id O id tid (na U W s d n .� f1VS N m oa L W a b N d C) W§ a �d d q a - o a LLI 9t - ° 3 ERA Z LU .9 Nod �� -