Loading...
2011-27730 Reso RESOLUTION NO. 2011 -27730 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A JOINT PARTICIPATION AGREEMENT WITH MIAMI -DADE COUNTY TO RECEIVE COUNTY TRANSIT SURTAX FUNDS (CONSTRUCTION), IN A MAXIMUM AMOUNT OF UP TO $500,000, FOR THE CONSTRUCTION OF SAFETY IMPROVEMENTS ALONG PINE TREE DRIVE AND LA GORCE DRIVE, FROM WEST 51 STREET TO WEST 63 STREET. WHEREAS, the La Gorce Pine /Tree Homeowners Association (HOA) submitted a request to Miami -Dade County Public Works to convert Pine Tree Drive and La Gorce Drive from one -way to two -way traffic flow, between 52 Street and 61 Street; and WHEREAS, the HOA requested the conversion in the belief that it would improve traffic conditions and operational safety, reduce the number of accidents, and reduce speeding along these corridors; and WHEREAS, the County conducted a study to evaluate this request, which included an analysis of the vehicular volume, speed, and accident data along both corridors; and WHEREAS, based upon the results of the County's study, it was determined that in order to implement the two -way conversion, approximately two (2) to four (4) of the medians would need to be removed; existing pavement markings would also have to be removed; and a roundabout would need to be installed at the intersection of Pine Tree Drive, La Gorce Drive, and 51 Street; and WHEREAS, due to funding issues, the County cannot implement the two -way conversion at this time; and WHEREAS, the County presented an interim plan that would improve the safety of both corridors by installing sequential sets of speed cushions, with associated traffic signs, as well as re- striping of both corridors; and WHEREAS, the most expeditious way to implement this project is to have the County design and fund it, and the City implement the construction through a Job Order Contract; and WHEREAS, the County presented this proposed traffic calming plan for Pine Tree and La Gorce Drive to residents present at the Mayor on the Move meeting held on July 26, 2011; and WHEREAS, the County has dedicated $500,000 of Transit Surtax Funds for the construction of these safety improvements on Pine Tree and La Gorce Drive, from west 51 Street, to west 63 Street; and WHEREAS, the County and City have negotiated a Joint Participation Agreement (JPA) wherein the County will design and fund the project; the City will permit the project, retain a contractor to build the project, oversee the construction, and be responsible for public information and involvement; and WHEREAS, the JPA also requires approval by the Citizens' Independent Transportation Trust and the Board of County Commissioners. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the Mayor and City Clerk to execute a Joint Participation Agreement with Miami - Dade County to receive County Transit Surtax funds, in a maximum amount of up to $500,000, for the construction of safety improvements along Pine Tree Drive and La Gorce Drive, from West 51 Street to West 63 Street. PASSED AND ADOPTED this 14th day of September, 2011. ATTEST: 1 - AIAI/JF P. • Robert $. Parcher, City Clerk : - i Herrera Bo er, Mayor T:\AGENDA\2011 \9 -14 - -1 , .Nt: rem IN. RESO.doc i . • , - "K ' Rp ORATD : INCO E � � $ .i 2� APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION G til .ti .I��` I • °m'' ' Date i u COMMISSION ITEM SUMMARY Condensed Title: A Resolution approving and authorizing to execute a joint participation agreement with Miami -Dade County to receive County transit Surtax funds for the construction of safety improvements along Pine Tree Drive and La Gorce Drive, from west 51 Street to west 63 Street. Key Intended Outcome Supported: Enhance mobility throughout the City. Supporting Data (Surveys, Environmental Scan, etc.): Transportation remains one of the most significant areas to address from the 2009 Community Satisfaction Survey results (often mentioned as a Key Quality of Life Issue). 24% of residents rated traffic flow as excellent or good, and 37% as poor. Issue: I Should the Commission execute the JPA? Item Summary /Recommendation: Pine Tree Drive and La Gorce Drive are Miami -Dade County (County) roadways. The County is installing the following safety improvements as an interim measure to improve the safety of both corridors: • Installing speed cushions • Adding traffic signs • Restriping both corridors The La Gorce Pine Tree Homeowners Association (HOA) submitted a request to Miami -Dade County Public Works to convert Pine Tree Drive and La Gorce Drive from one -way to two -way traffic flow between 52 Street and 61 Street. The HOA requested the conversion in the belief that it would improve traffic conditions and operational safety, reduce the number of accidents, and reduce speeding along the corridors. Due to funding issues, the County cannot implement the two -way conversion at this time. As an interim solution, the County developed a plan that would improve the safety of both corridors by installing sequential sets of speed cushions with associated traffic signs, as well as restriping of both corridors. At a meeting on July 5, 2011 with County Mayor Carlos Gimenez, County Commissioners Bruno Barreiro and Sally Heyman and City Commissioners Ed Tobin and Deede Weithorn and City Manager, Jorge Gonzalez, it was decided that the most expeditious way to implement this project was to have the County design and fund it and the City implement the construction through JOC. To get feedback from other neighborhoods, the County presented this proposed traffic calming plan for Pine Tree and La Gorce Drive to City residents and multiple HOA's at the Mayor on the Move meeting held July 26, 2011. The County has pledged $500,000 of Transit Surtax Funds (Construction) for the construction of these safety improvements. In order to have the County design and fund the project and the City execute the construction, a Joint Participation Agreement (JPA) must be approved by the City and the County. It is expected that the Board of County Commissioners will approve the JPA at their scheduled meeting on December 6, 2011. To expedite the start of the project, the City Administration has agreed to advance the funds and award the JOC contract as soon as possible. THE ADMINISTRATION RECOMMENDS ADOPTING THE RESOLUTION. Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 2 OBPI Total N/A N/A Financial Impact Summary: N/A City Clerk's Office Legislative Tracking: Richard W. Saltrick, Acting City Engineer, ext.6565 Sign - Offs: Department Direct Assistant C'4 ager City Manager FHB DRB JM � � T:\AGENDA\2011 \9- 4 -11\ - ree_La Gorce JPA Summary.doc AA I Am I BEACH AGENDA ITEM 7Y �' DATE g f I 0- MIAMI City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Jorge M. Gonzalez, City Manager DATE: September 14, 2011 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A JOINT PARTICIPATION AGREEMENT WITH MIAMI - DADE COUNTY TO RECEIVE COUNTY TRANSIT SURTAX FUNDS (CONSTRUCTION) IN THE AMOUNT OF $500,000 (MAXIMUM) FOR THE CONSTRUCTION OF SAFETY IMPROVEMENTS ALONG PINE TREE DRIVE AND LA GORCE DRIVE, FROM WEST 51 STREET TO WEST 63 STREET. ADMINISTRATION RECOMMENDATION The Administration recommends approving the resolution to execute a Joint Participation Agreement (JPA) with Miami -Dade County for Transit Surtax Funds (Construction) funds in the amount of $500,000 (maximum). FUNDING Miami -Dade County for Transit Surtax Funds in the amount of $500,000. BACKGROUND Pine Tree Drive and La Gorce Drive are Miami -Dade County (County) roadways. The County is installing the following safety improvements as an interim measure to improve the safety of both corridors. These include: • Installing speed cushions • Adding traffic signs • Restriping both corridors The La Gorce Pine Tree Homeowners Association (HOA) submitted a request to Miami -Dade County Public Works to convert Pine Tree Drive and La Gorce Drive from one -way to two -way traffic flow between 52 Street and 61 Street. The HOA requested the conversion in the belief that it would improve traffic conditions and operational safety, reduce the number of accidents, and reduce speeding along the corridors. The County conducted a study to evaluate this request. The study includes an analysis of the vehicular volume, speed, and accident data along both corridors. Based upon the results of the study, it was determined that in order to implement the two -way conversion, approximately two (2) to four (4) of the medians would need to be removed, removal of existing pavement markings, and a roundabout would need to be installed at the intersection of Pine Tree Drive, La Gorce Drive and 51s Street. Commission Memorandum -Joint Participation Agreement for Safety Improvements on Pine Tree/ La Gorce Drive September 14, 2011 Page 2 of 3 The County originally estimated the construction cost to be approximately $700,000. The County later determined the pavement has to be re- graded due to the existing condition of the pavement, which increases the construction cost to $1,490,881. Due to funding issues, the County cannot implement the two -way conversion at this time. The County then developed another concept to address both safety and traffic calming concerns, that converts the left lane to a left turn only and the right lane to a through lane only. According to the County, the advantages to this concept include no requirement for any resurfacing of the road, a roundabout will not be needed at Pine Tree Drive and 51 Street, and the use of tubular delineators for a test phase that would prohibit straight movement from the left lane and to reinforce the no -U -turn from the right lane just beyond each island. This concept would address the traffic calming concerns within the neighborhood. At a meeting on July 5, 2011 with County Mayor Carlos Gimenez, County Commissioners Bruno Barreiro and Sally Heyman and City Commissioners Ed Tobin and Deede Weithorn and City Manager, Jorge Gonzalez, it was decided that the most expeditious way to implement this project was to have the County design and fund it and the City implement the construction through JOC. To get feedback from other neighborhoods, the County presented this proposed traffic calming plan for Pine Tree and La Gorce Drive to City residents and multiple HOA's at the Mayor on the Move meeting held July 26, 2011. The County and the City met with the HOA on April 21, 2011 to discuss the County's Interim plan with the left turn only on the left through lane. The City received a letter from the HOA on April 26, 2011 endorsing the County's proposed interim traffic plan for Pine Tree and La Gorce Drive. On May 15, 2011 a meeting was held with the residents and the Homeowners' Association. The County presented its interim plan and the City's interim plan was also discussed at this meeting. However, City staff expressed serious reservations about this concept because of the loss of a through lane and the impact it would have to the capacity of the roads. Further, the City staff believes that there might not be sufficient space between the islands for vehicles attempting to get from the through lane to the left turn lane and the vehicles exiting the side street to cross onto the through lane. As a result, City staff worked with the County to develop alternatives that would not reduce the number of travel lanes but would address the safety concern on both corridors. ANALYSIS The County and City have negotiated a JPA wherein the County will design and fund the project and the City will permit the project, retain a contractor to build the project, oversee the construction, and be responsible for public information and involvement (Attachment). This JPA would only become effective if also approved by the Citizens' Independent Transportation Trust and the Board of County Commissioners. The County has pledged $500,000 of Transit Surtax Funds (Construction) for the construction of these safety improvements. Commission Memorandum -Joint Participation Agreement for Safety Improvements on Pine Tree/ La Gorce Drive September 14, 2011 Page 3 of 3 In order to have the County design and fund the project and the City execute the construction, P J Y , a Joint Participation Agreement (JPA) must be approved by the City and the County. It is expected that the Board of County Commissioners will approve the JPA at their scheduled meeting on December 6, 2011. To expedite the start of the project, the City Administration has agreed to advance the funds and award the JOC contract as soon as possible. CONCLUSION The Administration recommends that the City Commission adopt this resolution authorizing the execution of a JPA for the County to design and fund the project in the amount of $500,000 and the City to build the project. Attachment Draft Joint Participation Agreement DRB/ /FHB /RWS /DF T:WGENDA\2011 \9 -14 -11 \Pine Tree_La Gorce JPA- MEMO - 9- 2011.docx