2011-27709 Reso RESOLUTION NO. 2011 -27709 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH JAMES B. PIRTLE CONSTRUCTION CO., INC., IN AN AMOUNT NOT TO EXCEED $41,710, FOR PRE - CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE FLAMINGO PARK TENNIS CENTER, PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 37- 10/11, AND, UPON COMPLETION OF PRE- CONSTRUCTION SERVICES, AUTHORIZE THE CITY MANAGER TO ENTER INTO NEGOTIATIONS FOR A GUARANTEED MAXIMUM PRICE (GMP) FOR CONSTRUCTION SERVICES AND TO FURTHER SEEK AUTHORIZATION AND APPROVAL FROM THE MAYOR AND CITY COMMISSION, TO EXECUTE AN AGREEMENT APPROVING THE GMP WITH PREVIOUSLY APPROPRIATED FUNDING FROM THE MDC -CDT INTERLOCAL- CDT /RESORT TAX ELIGIBLE FUND. WHEREAS, on September 5, 2007, the Mayor and City Commission adopted Resolution No. 2007 - 26609, approving and authorizing the Mayor and City Clerk to execute an agreement with Wolfberg Alvarez & Partners for professional services for the Flamingo Park Project, pursuant to Request for Qualification (RFQ) No. 15- 06/07; and WHEREAS, the scope of work for this project consists of the demolition of the existing tennis center building and courts, and construction of a new 4,232 square -foot one - story tennis center facility and seventeen (17) clay tennis courts, pursuant to the approved Master Plan (as approved by Resolution 2009 - 27190), inclusive of courts lighting, landscape and irrigation work (the Project); and WHEREAS, on July 14, 2010, the Mayor and City Commission adopted Resolution No. 2010 - 27427, approving and authorizing the Mayor and City Clerk to execute Amendment No.1 to the Agreement with Wolfberg Alvarez & Partners; and WHEREAS, on June 1, 2011, the Mayor and City Commission approved the issuance of Request for Qualifications (RFQ) No. 37- 10/11, for a Construction Manager at Risk (CMR) to provide Pre - Construction Services and Construction Phase Services via a Guaranteed Maximum Price (GMP) Amendment for the Flamingo Park Tennis Center Project; and WHEREAS, on July 13, 2011, the Mayor and City Commission adopted Resolution No. 2011 - 27685, accepting the recommendation of the City Manager, pursuant to Request For Qualifications (RFQ) No. 37- 10/11, and authorized the administration to enter into negotiations with the top- ranked firm, James B. Pirtle Construction Co., Inc.; and WHEREAS, the estimated construction cost of the Project is $5,098,329; and WHEREAS, the fee negotiated with James B. Pirtle Construction Co., Inc., includes the following services: design review, constructability and value engineering of 100% construction documents for a fee of $13,618; review of onsite and offsite conditions for a fee of $3,295; scheduling for a fee of $1,785; bidding (GMP submittal and negotiations) for a fee of $14,720; E- Builder License (two (2) licenses at $1,200 per license) for a fee of $2,400; tree pruning for a fee of $2,100; and contingency for a for a fee of $3,792; all for a total fee of $41,710. J NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute a Professional Services Agreement with James B. Pirtle Construction Co., Inc., in an amount not to exceed $41,710, for Pre- Construction Services for the Construction of the Flamingo Park Tennis Center, pursuant to Request For Qualifications No. 37- 10/11, and, upon completion of Pre - Construction Services, P , authorize the City Manager to enter into negotiations for a Guaranteed Maximum Price (GMP) for Construction Services and to further seek authorization and approval from the Mayor and City Commission, to execute an Agreement approving the GMP with previously appropriated funding from the MDC -CDT Interlocal- CDT /RESORT Tax Eligible Fund. PASSED AND ADOPTED THIS I DAY OF ' .'1 2011. ATTEST: • , 4 Pat/ULLA • .L44 CITY CLERK MA ■ e l Se N INCORP �` s ORATED' � , APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION T:IAGENDAl201119- 14- 111Flamingo Tennis Center1Preconstruction Services for CMR- Pirtle -1- Flamingo Tennis Park Center - RESO.doc COMMISSION ITEM SUMMARY Condensed Title: A Resolution of the Mayor and City Commission of the City of Miami Beach, Florida, approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with James B. Pirtle Construction Co., Inc., in an amount not to exceed $41,710, for Pre - Construction Services for the Construction of the Flamingo Park Tennis Center, pursuant to Request For Qualifications No. 37- 10/11, and, upon completion of Pre - Construction Services, authorize the City Manager to enter into negotiations for a Guaranteed Maximum Price (GMP) for Construction Services and to further seek authorization and approval from the Mayor and City Commission, to execute an Agreement approving the GMP with previously appropriated funding from the MDC -CDT Interlocal- CDT /RESORT Tax Eligible Fund. Key Intended Outcome Supported: Ensure well designed Quality Capital Projects. Supporting Data (Surveys, Environmental Scan, etc.): The 2009 Community satisfaction survey indicates that 87.3% of South Beach and Belle Isle residents rate the appearance and maintenance of the City's public buildings as Excellent and Good. Issue: I Shall the Mayor and City Commission adopt the Resolution? Item Summary /Recommendation: The scope of work for this project consists of the demolition of the existing tennis center building and courts, and construction of a new 4,232 square -foot one -story tennis center facility and seventeen (17) clay tennis courts, pursuant to the approved master plan (Resolution 2009 - 27190), inclusive of courts lighting, landscape and irrigation work. The CMR shall review project requirements, existing on -site and off -site development, surveys and preliminary budget, and make recommendations to the City for revisions. The CMR shall prepare a preliminary project schedule in accordance with the Contract Documents and in coordination with the City and the Architect/Engineer, identifying all phases, critical path activities, and critical duties of each of the Project team members. The CMR shall review the permitted set of plans and advise the City and the Architect/Engineer regarding the constructability of the design and of any errors, omissions, or conflicts it discovers. The CMR shall prepare an outline of proposed bid packages and detailed cost estimates, and advise the City regarding trends in the construction and labor markets that may affect the price or schedule of the Project. The CMR shall attend all Project related meetings. The CMR's Preconstruction Services shall be provided, and the City shall compensate the CMR for such services, based upon a fixed fee. At the conclusion of the Preconstruction Services Phase, the CMR shall, provide the City a proposal for a GMP Amendment for Construction Phase services and without assuming the duties of the Architect/Engineer, warrant to the City, that the plans, specifications and other Contract Documents are consistent, practical, feasible and constructible, and that the Project is constructible within the contract time. The Pre - Construction services fee negotiated with Pirtle Construction Company includes the following services: Design Review, Constructability and Value Engineering of 100% construction documents: $ 13,618 Review of Onsite and Offsite Conditions: $ 3,295 Cost Estimating and Cost Controls: $ 0 Scheduling: $ 1,785 Bidding (GMP Submittal and Negotiations): $ 14,720 E- Builder License (two (2) licenses at $1,200 per license): $ 2,400 Contingency: $ 3,792 Tree Pruning: $ 2,100 Total Pre - Construction Services Fee: $ 41,710 The Flamingo Tennis Center project achieved a permit from the City's Building Department on April 20, 2011. The estimated construction cost of the facility and courts is $5,098,329. The construction budget for the Flamingo Tennis Center Facility is $5,066,296. Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: Municipal 1 $41,710 388 - 2320 - 061357 MDC -CDT Interlocal- CDT /Resort Resort Tax _ Tax Eligible Fund. OBPI Total _ Financial Impact Summary: N/A City Clerk's Office Legislative Tracking: Fernando Vazquez ext. 6135 Si n -Offs: r _ Departm;, t r irector Assistan anager City Manager FV 1 f-a.L F� DB JMG . T:IAGENDAl201119 -14 -1 ". lamingo Tennis Center\Preconstruction Servic-' or CMR - Pirtle -1- Flamingo Tennis Center-SUMMARY , ______) ea AGENDA ITEM C 7D MMIB Mi DATE � �� // CP- MIAMI City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Jorge M. Gonzalez, City Manager DATE: September 14, 2011 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH JAMES B. PIRTLE CONSTRUCTION CO., INC., IN AN AMOUNT NOT TO EXCEED $41,710, FOR PRE - CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE FLAMINGO PARK TENNIS CENTER, PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 37- 10/11, AND, UPON COMPLETION OF PRE - CONSTRUCTION SERVICES, AUTHORIZE THE CITY MANAGER TO ENTER INTO NEGOTIATIONS FOR A GUARANTEED MAXIMUM PRICE (GMP) FOR CONSTRUCTION SERVICES AND TO FURTHER SEEK AUTHORIZATION AND APPROVAL FROM THE MAYOR AND CITY COMMISSION, TO EXECUTE AN AGREEMENT APPROVING THE GMP WITH PREVIOUSLY APPROPRIATED FUNDING FROM THE MDC -CDT INTERLOCAL - CDT /RESORT TAX ELIGIBLE FUND. ADMINISTRATION RECOMMENDATION Adopt the resolution. FUNDING Funding is available from the previously appropriated funding for the Flamingo Park Tennis Center project in the MDC -CDT Interlocal- CDT /Resort Tax Eligible in account number 388- 2320- 061357. ANALYSIS The scope of work for this project consists of the demolition of the existing tennis center building and courts, and construction of a new 4,232 square -foot one -story tennis center facility and seventeen (17) clay tennis courts, pursuant to the approved master plan (Resolution 2009- 27190), inclusive of courts lighting, landscape and irrigation work. On September 5, 2007, the Mayor and City Commission adopted Resolution No. 2007 - 26609, approving and authorizing the Mayor and City Clerk to execute an agreement with Wolfberg Alvarez & Partners for professional services for the Flamingo Park Project, pursuant to Request for Qualification (RFQ) No. 15- 06/07. On July 14, 2010, the Mayor and City Commission adopted Resolution No. 2010 - 27427, approving and authorizing the Mayor and City Clerk to execute Amendment No.1 to the agreement. On June 1, 2011, the Mayor and City Commission approved the issuance of Request for Qualification (RFQ) No. 37 -10/11 for Construction Manager at Risk (CMR) Pre - Construction Commission Memorandum — Resolution for Pre - Construction Services to Pirtle Construction Company for the Flamingo Park Tennis Center Facility September 14, 2011 Page 2 of 3 Services for the construction of the Flamingo Park Tennis Center project located in the Flamingo Park. On July 13, 2011, the Mayor and City Commission adopted Resolution No. 2011 -27685 accepting the recommendation of the City Manager, pursuant to Request For Qualifications (RFQ) No. 37- 10/11, for a Construction Manager at Risk firm to provide Pre - construction services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the Flamingo Park Tennis Center project; and authorizing the administration to enter into negotiations with the top - ranked firm, Pirtle Construction Company. SCOPE OF WORK The Construction Manager at Risk (CMR) Scope of Services shall include, without limitation, all of the Preconstruction Services set forth below and, upon approval by the City of the Guaranteed Maximum Price (GMP) and as contemplated in any GMP Amendment(s), all of the Construction Services required to complete the Work in strict accordance with the Contract Documents, and to deliver the Project to the City at or below the GMP and within the Contract time. The CMR shall review project requirements, existing on -site and off -site development, surveys and preliminary budget, and make recommendations to the City for revisions. The CMR shall prepare a preliminary project schedule in accordance with the Contract Documents and in coordination with the City and the Architect/Engineer, identifying all phases, critical path activities, and critical duties of each of the Project team members. The CMR shall review the permitted set of plans and advise the City and the Architect/Engineer regarding the constructability of the design and of any errors, omissions, or conflicts it discovers. The CMR shall prepare an outline of proposed bid packages and detailed cost estimates, and advise the City regarding trends in the construction and labor markets that may affect the price or schedule of the Project. The CMR shall attend all Project related meetings. The CMR's Preconstruction Services shall be provided, and the City shall compensate the CMR for such services, based upon a fixed fee. At the conclusion of the Preconstruction Services Phase, the CMR shall provide the City a proposal for a GMP Amendment for Construction Phase services and, without assuming the duties of the Architect/Engineer, warrant to the City that the plans, specifications and other Contract Documents are consistent, practical, feasible and constructible, and that the Project is constructible within the contract time. The Pre - Construction Services fee (See Attachment 1) negotiated with Pirtle Construction Company includes the following services: Design Review, Constructability and Value Engineering of 100% construction documents: $ 13,618 Review of Onsite and Offsite Conditions: $ 3,295 Cost Estimating and Cost Controls: $ 0 Scheduling: $ 1,785 Bidding (GMP Submittal and Negotiations): $ 14,720 E- Builder License (two (2) licenses at $1,200 per license): $ 2,400 Contingency: $ 3,792 Tree Pruning: $ 2,100 Commission Memorandum — Resolution for Pre - Construction Services to Pirtle Construction Company for the Flamingo Park Tennis Center Facility September 14, 2011 Page 3 of 3 Total Pre - Construction Services Fee: $ 41,710 The Flamingo Tennis Center project achieved a permit from the City's Building Department on April 20, 2011. The estimated construction cost of the facility and courts is $5,098,329 (See Attachment 2). The construction budget for the Flamingo Tennis Center Facility is $5,066,296. The Schedule for this facility is as follows: Pre - Construction Services Begin: September 14, 2011 Commission GMP Awarded: December 14, 2011 Construction Complete: February 14, 2013 CONCLUSION The Administration recommends approval of the attached resolution that the approving and authorizing the Mayor and City Clerk to execute a Professional Services Agreement with James B. Pirtle Construction Co., Inc., in an amount not to exceed $41,710, for Pre - Construction Services for the Construction of the Flamingo Park Tennis Center, pursuant to Request For Qualifications No. 37- 10/11, and, upon completion of Pre - Construction Services, authorize the City Manager to enter into negotiations for a Guaranteed Maximum Price (GMP) for Construction Services and to further seek authorization and approval from the Mayor and City Commission, to execute an Agreement approving the GMP with previously appropriated funding from the MDC -CDT Interlocal- CDT /RESORT Tax Eligible Fund. Attachment 1: Pirtles Pre - Construction Services Fee Attachment 2: Wolfberg Alvarez &Partners Estimate of Construction Cost DB \FV\DM \JC \GME T:\AGENDA\2011 \9 -14 -11 \Flamingo Tennis Center\Pre- Construction Services for CMR- Pirtle -1- Flamingo Tennis Center - MEMO.docx Attachment 1 LE Pirtle Construction Company • 5700 Griffin Road, Suite 200 • Davie. Florida 33314 PIRT Tel: 954.797.0410 • Fax 954.797.6330 August 12, 2011 City of Miami Beach Capital improvements Projects Office 1700 Convention Center Drive 1 Miami Beach, Florida 33139 Attn.. Graciela Escalante, R.A., Senior Capital Projects Coordinator Re: Flamingo Park Tennis Center Proposal Dear Ms. Esca'ante Pirtle Construction Company is pleased to provide a Proposal for the Flamingo Park Tennis Center. We have reviewed the documents and propose to provide the services as stated in the Contract for the sum of $41,710.00. The services to be provided are Design Review. Constructability and Value Engineering, Review of tin -site and Off - site Condition% Scheduling, GMP Submittal and Tree Pruning. We look forward to working with the entire team and providing a successful project. If you have any questions, please do hesitate to contact me at (954) 343 -6007, Very truly yours, PIRTLE9N UCTION COMPANY Bill Ellis, Vice President Enclosure — Proposal - -- - . -. . „ n_ ___ t _..4 rte.,._».. 0'7j.....4:0s S AAW.A.Pir cr rnrrrarriCY1C cri mi 1 1 SUMMARY OF PRECONSTRUCTION FEE PROJECT NAME: FLAMINGO PARK TENNIS CENTER PROJECT NO: RFQ 37 -10/11 1. DESIGN REVIEW, CONSTRUCTABILITY & VALUE ENGINEERING HOURS RATE /HR TOTAL 30% Construction Document Review N/A 60% Construction Document Review N/A 100% Construction Document Review- Project Executive Review Documents 6 $125.00 $750.00 Confirm Project Managers Review Comments 3 $125.00 $375.00 Confirm Estimating Departments Review Comments 2 $125.00 $250.00 Review and Confirm all Value Engineering Suggestions 2 $125.00 $250.00 Project Meetings- Project Executive 2 Meetings 3 $125.00 $750.00 100% Construction Document Review- Project Manager Review Documents 18 $85.00 $1,530.00 Constructability Analysis 13 $85.00 $1,105.00 Value Engineering Analysis 9 $85.00 $765.00 Project Meetings- Project Manager 2 Meetings 3 $85.00 $518.00 100% Construction Document Review- Tennis Court Consultants Review Documents 15 $125.00 $1,875.00 Coordinate Lighting 8 $125.00 $1,000.00 Review Tennis Court Construction Technique 11 $125.00 $1,375.00 Coordinate Phasing 4 $125.00 $500.00 Project Meetings- Tennis Consultants 2 Meetings 3 $125.00 $375.00 Construction Document Review- Project Coordinator Organize Construction Documents 10 $35.00 $350.00 Support Team 10 $35.00 $350.00 Blue Prints and Copies $1,500.00 2. REVIEW OF ON -SITE & OFF -SITE CONDITIONS Site Visits 4 Site Visits 4 $85.00 $1,360.00 Construction Staging and Site Management Plan 2 $85.00 $170.00 Site Utility Coordination Plan 3 $85.00 $255.00 Maintenance of Traffic Plan 2 $85.00 $170.00 Project Meeting- Project Executive 1 Meeting 4 $125.00 $500.00 Project Meeting- Project Manager 1 Meeting 4 $85.00 $340.00 Project Meeting- Tennis Court Consultants 1 Meeting 4 $125.00 $500.00 3. COST ESTIMATING & COST CONTROL N/A 4. SCHEDULING Review of Architects schedule 1 $85.00 $85.00 Prepare a Baseline Schedule to include: Phasing 4 $85.00 $340.00 Critical Path Activities 8 $85.00 $680.00 Critical Team Member Duties 8 $85.00 $680.00 5. Bidding (GMP Submittal & Negotiations) Develop & Distribute Subcontractor Bid Packages- Project Executive Review Bidders List for Prequalified Subcontractors 5 $125.00 $625.00 Review all Inclusions 10 $125.00 $1,250.00 Develop & Distribute Subcontractor Bid Packages- Project Manager Select Bidders List for Prequalifies Subcontractors 5 $85.00 $425.00 Build Inclusion List for all Scopes 30 $85.00 $2,550.00 Develop & Distribute Subcontractor Bid Packages- Project Coordinator Coordinate and Send out Bid Packages 5 $35.00 $175.00 Receive and Organize Bid Packages 5 $35.00 $175.00 Evaluate Subcontractor Bids- Project Executive Review and Evaluate Project Managers Scoping of Bids 10 $125.00 $1,250.00 Interview Potential Subcontractor for Completeness 20 $125.00 $2,500.00 Evaluate Subcontractor Bids- Project- Manager Review and Evaluate Bids 20 $85.00 $1,700.00 Interview Potential Subcontractor for Completeness 20 $85.00 $1,700.00 Evaluate Subcontractor Bids- Project- Coordinator Prepare GMP Proposal Books 8 $35.00 $280.00 GMP Negotiation Meeting Project Executive 1 Meeting 4 $125.00 $500.00 Project Manager 1 Meeting 4 $85.00 $340.00 Advertising Cost $1,250.00 6. E- BUILDER LICENSE 2 Licenses @ $1,200 per license $2,400.00 7. CONTINGENCY $3,792.00 8. TREE PRUNING $2,100.00 TOTAL $41,710.00 Attachment 2 AN(: 11 {YL L71iIIG ' WOLFBERG ALVAREZ AND PARTNERS 1500 San Remo Avenue - Suite 300 .'.,, p Coral Gables, Florida 33146 LSGICkM1�4 Estimate of Probable Construction Cost PROJECT SUMMARY CONSTRUCTION DOCUMENTS PERMIT SUBMITTAL DATE 16- Mar -10 Project No.: Project Totals $ 4,829,502 Market Conditions 0.90 $ 4,346,552 $ 4,346,552 Flamingo Park Contct's Gnrl Cond 7.5% $ 325,991 $ 4,672,543 Tennis Center OH / Profit - GC 7.5% $ 350,441 $ 5,022,984 Miami Beach, Florida Contingency 0.0% $ - $ 5,022,984 Performance Bond 1.5% $ 75,345 $ 5,098,329 Total Cost $ 5,098,329 ITEM DESCRIPTION SUB -TOTAL SUMMARY Civil j $ 2,282,023 Architectural & Structural $ 1,182,908 Mechanical - HVAC $ 76,198 Plumbing $ 185,464 Electrical $ 344,830 Musco Lighting System $ 608,080 Landscape and I - rigation (Allowance) $ 150,000 NOTE: THIS ESTIMATE DOES NOT INCLUDE ANY COSTS ASSOCIATED WITH CONSTRUCTION PHASING Summary Page 1