Loading...
Amendment 12 - STA Architectural Group 7/17/9,6 AMENDMENT NO. 12 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND STA ARCHITECTURAL GROUP, DATED JULY 21, 1996 FOR THE PROVISION OF PROFESSIONAL SERVICES ASSOCIATED WITH REMEDIATION SPECIAL STRUCTURAL INSPECTIONS FOR STRUCTURAL SPALLING REPAIRS FOR AN HOURLY NOT TO EXCEED AMOUNT OF $16,600. This Amendment No 12 to the Agreement made and entered this day of DGc�)0,62_,2011, by and between the City of Miami Beach, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as CITY), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and STA Architectural Group, Inc.,a Florida Corporation, having its offices at 3526 North Miami Avenue, Miami, Florida, 33127 (hereinafter referred to as CONSULTANT). RECITALS WHEREAS, pursuant to Request for Letters of Interest No 133-94/95, the Mayor and City Commission adopted Resolution No 96-22068 on July 17, 1996, approving and authorizing the Mayor and City Clerk to execute an Agreement with STA Architectural Group, Inc. for Professional Services for the Renovation and Expansion of Fire Station No 2 and a Master Plan for the Site at 451 Dade Boulevard (PROJECT), and WHEREAS, the Agreement provided for the detailed planning, design, bidding and construction administration services for the Fire Station No 2 Project; and WHEREAS,an Agreement for planning services was executed for a not-to-exceed amount of $78,000, and WHEREAS, on June 28, 2000, the Mayor and City Commission adopted Resolution No 2000-23975, approving Amendment No 1 to the Agreement, for schematic design, design development, construction documents, permitting & bidding, and construction administration services for the rehabilitation of the historic structure and the new construction of a dormitory and apparatus structure improvements within the PROJECT, for a not-to-exceed amount of$318,020, and WHEREAS, on October 17, 2001,the Mayor and City Commission adopted Resolution No 2001-24624, approving Amendment No 2 to the Agreement for the design of an Emergency Operations Center, a site drainage system, and a dedicated driveway serving the Public Works Yard, fora not-to-exceed amount of$117,000, and WHEREAS, on December 10, 2003, the Mayor and City Commission adopted Resolution No 2003-25439, approving Amendment No. 3 to the Agreement for construction administrative services for the PROJECT, for a not-to-exceed amount of$192,000, and WHEREAS, on March 15, 2007, Amendment No 4 to the Agreement was executed approving additional construction administration services for the PROJECT, for a not-to-exceed amount of$24,500, and WHEREAS, on October 27, 2007, Amendment No. 5 to the Agreement was executed approving additional construction administration services for the PROJECT, to be rendered on a monthly basis, for a not-to-exceed amount of$24,500; and WHEREAS,on June 20, 2008,Amendment No 6 to the Agreement was executed approving additional construction administration services for the PROJECT,to be rendered on a monthly basis, for a not-to-exceed amount of$24,447, and WHEREAS,on July 10, 2008,Amendment No. 7 to the Agreement was executed approving additional design and construction administration services for the PROJECT, to be rendered on a monthly basis, for a not-to-exceed amount of$40,000, and WHEREAS, the first phase of the Fire Station No 2 Project, the construction of Building B and its Emergency Operations Center, is substantially complete, and the Fire Department moved into the building and put it into service; and WHEREAS, Building A has now been more thoroughly inspected and several additional items have been identified that require modifications to the construction documents, and WHEREAS, the hose tower was also evaluated and, despite recent repairs, structural deficiencies were found.As a result,the hose tower,which had not been a part of the original scope of work, will now be included in the renovation project; and WHEREAS, on December 9, 2009,Amendment No 8 to the Agreement was negotiated by staff for a fee of$183,000 with the CONSULTANT for an in-depth preconstruction review, Historic Preservation Board presentation, re-drawing and development of construction documents per current codes, and bid and construction administration services for the rehabilitation of the historic building, Hose Tower, and new addition two-story connectors; and WHEARAS, on November 12, 2010, Amendment No 9 to the Agreement was executed approving the additional programming, planning,concept design, meetings and presentations for a two-story Auxiliary Training Structure to be added along the rear side of the PROJECT structure,for a not-to-exceed amount of $10,980 for NE fees and a not-to-exceed amount of $500 for reimbursable expenses, for a project total of$11,480; and WHEARAS, on March 25, 2011, Amendment No 10 to the Agreement was executed approving additional services for the special structural inspections of all the reinforcing steel, structural steel,wood truss framing, bracing, sheathing, exterior door and wood frame attachments for the construction of the PROJECT, to be performed by a Structural Engineering Subconsultant, as required by the City's Building Department,to be rendered on an hourly basis for a not-to-exceed amount of$10,000; and WHEARAS, on May 17, 2011, Amendment No 11 to the Agreement was executed approving additional services for the architectural and structural design services associated with the redesign of foundations for the two connector buildings due to unforeseen conditions during construction, for a not-to-exceed amount of$2,760; and WHEARAS,the following Amendment No. 12 to the Agreement approves additional services for remediation special inspection services required for the structural engineer to oversee the structural spalling repairs of the building, to be rendered on an hourly basis for a not-to-exceed amount of$16,600 NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No 12 2 MODIFICATIONS The Agreement is amended to include"Schedule A-12",which is attached and incorporated herein 3 OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged 4 RATIFICATION. The CITY and CONSULTANT ratify the terms of the Agreement, as amended by this Amendment No. 12. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No 12 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST CITY OF MIAMI BEACH PO u By( , City Clerk Ci� Ma a r Y ty Robert Parcher J ge M. Gonzalez ATTEST CONSULTANT: STA ARCHITECTURAL GROUP, INC. Br TITLE Print Name Print Name APPROVED AS TO FORM&LANGUAGE i FQ CUTION F\CAPI\$all\Employee Files\JANETTE\Fire Station No 21Contract\STA\Amendment#1/201"-2* • endm-nt#12.doc D \ ', ity tome j (,,, Data � 1V SCHEDULE A-12 1. SCOPE OF WORK AND SERVICES REQUIRED Exhibit"A"of the Agreement, entitled "Scope of Services", is amended as follows and attached as Schedule A-12. Additional Services - Remediation Special Inspection Services: This Amendment consists of additional services for remediation special inspection services required for the structural engineer to oversee the structural spalling repairs of the building Since the project entails the restoration of a historical structure,the project has encountered an inordinate amount of structural spalling repairs to the column, joists, beams, and slabs of the existing building. These types of repairs would only be required for restoration work, are not considered standard in the construction of a building, and are above and beyond the services that would typically be required as part of a special structural inspections scope Accordingly, this added scope requires additional services for the additional inspections associated with oversight of these repairs The Subconsultant Structural Engineer shall provide remediation special inspection services during the repairs of the structural spalling to be conducted by the Contractor. The scope of services will consist of site visits to inspect and direct the Contractor on the extent of the work to be performed, coordination with the City,the Contractor,and the Architect;and inspection of all spalling repairs to the building including but not limited to the joist, columns, beams, and slabs. The Subconsultant shall provide information and documentation as required by the City to approve payment application and change order request by the Contractor as support documentation, provide sign-off on all repairs conducted by the Contractor, and conduct the inspection in order to provide the City with the Certificate of Compliance at the completion of the project as required by the City of Miami Beach Building Department. 2. TIME OF COMPLETION Services authorized by this Amendment shall be conducted an hourly basis throughout the duration of the structural spalling repairs conducted by the Contractor 3. PAYMENT AND COMPENSATION The scope of services described in this Amendment No 12 shall be performed for a not-to- exceed amount of$16,600 Invoicing shall be as referenced in the original agreement. Compensation. Original Agreement $78,000 00 Amendment No 1 $318,020.00 Amendment No. 2 $117,000 00 Amendment No. 3 $192,000.00 Amendment No 4 $24,500.00 Amendment No 5 $24,500.00 Amendment No. 6 $24,446 70 Amendment No. 7 $40,000.00 Amendment No. 8 $183,000 00 Amendment No 9 $11,480 00 Amendment No 10 $10,000 00 Amendment No. 11 $2,760.00 Amendment No. 12 $16,600.00 Total Revised Agreement $1,042,306.70 ell MIAMBEACH Authorization for A/E Additional Services A/E Firm. S / j; AA' ; a l V/e-A.L �� .. i A/E Pnncipal/Partner j Ct.. I prs-AJ I I -/u-1e' 2°1/ Name ir a e Date jiA Project Title: 't 14c Si71-T a/6 if_z Project Number: Additional Service Number Cause (Check All That Apply): N 7� O ❑ CONTRACTOR REQUEST --;7-- -' 73 ❑ d TILITY COMPANY/PUBLIC AGENCY .-J e c m OWNER REQUEST a:---_ N 0 ❑ CITY CONCURRENCY -_..t.. — ' T ❑ OWNER DELAY/CONTRACTOR DELAY L+c --- •: ❑ UNFORSEEN "' ..,-;' I'+ ❑ OTHER rn>0 =.s o w Contract Reference. Reason for Service. (Back-up attached): -s-;7-6- aY Sr�oc-ruKA-c Pty �Vc(,/c'e al-`1 03F H;R ; 2••5- r.El --g.J7 t a-i.)ir .1�-6-P6.e_7-H t N7 Descnption Services: J,. ...e- NE_ -;4T®,t APEr G -.t.3sr'c-nc,.J °CE h R ' Of. S►R,)c T 0 RAI E Z lz o f A ca2_6-- .1,,.- Les 11 Fig.' kh Scheduled Start Date- 4 V&rt&ei!Zo(p Scheduled Completion Date. 0-744/t;Ot-g.y/-24/Z Scheduled Construction Cost: $ Cost of Services- $ /l ‘c9.-rD,.rn Meted. of payment: Funding • cct#. P/A ng: P.0.v er• ∎a�,im .E4:•! Ola 21 I f Al / 3 it t Coord .. ir, Capital Improvement Projects . 'rod l•V.'o Tina .r, Ca. tal Improvement ts .,t I . 1 . If ✓ 1 15/ll Assistant ■it tor, Capital Improvement Projects Director, Mpital Improvement Projects Budget" ffice DE LOS REYES ENGINEERING, INC. CONSUL=TING STRUCTURAL ENGINEERS 8726 N,W 26th STREET STJIMgS I&2 HECTOR DE LOS REYES, Y.E. MIAMI,FLORIDA 33172 ht f eirificate cr 33 1 1 2 TEL.305-477 826 FAX 305-477-88I 4 May 24th, 2011 Mr Todd Tragash, AIA STA Architectural Group 3526 North Miami Avenue Miami, FL 33127 RE: FIRE STATION NO.2 Miami Beach, Florida Structural Inspection Services Breakdown of Fees Dear Todd: Regarding the breakdown of inspections for structural remedial work versus new construction, we have reviewed all of the inspection reports (up to May 4th)and according to the records, out of the 146 hours of inspections performed, 88 hours were for inspections of remedial work and 58 hours were for inspections of new construction. Basically, 60%of the inspection hours invoiced have been for remedial work, and 40%for new construction. A total of Fourteen Thousand Six Hundred Dollars ($14,600 00) has been invoiced thought May 4th, 2011 The breakdown of the invoiced amount for inspections for new construction versus remedial work is as follows $5,800 00 New construction $8,800.00 Remedial work Our original fee proposal for inspection services included an estimated (not a not to exceed) fee for structural inspections for new construction of Ten Thousand Dollars($10,000 00). Up to May 4'h, 2011, we have invoiced Five Thousand Eight Hundred Dollars ($5,800.00) for inspection services for the new construction. There is still Four Thousand Two Hundred Dollars ($4,200 00)of the estimated fee remaining for inspections of new construction. The structural<tins ections' p :performed°�for:=remedial��-w r � Y otal°Eglit +������ �.:, �3.. -� � o k�=(ttiiougli�ltila 4 q,,20`l�:l$ t rThousandrtEight=Hundredi 1 m �l�larsq($8;800`0.0)=w- Based;on*:t1ie�;emailfrom�Janette��F:;.ernandezx r = ,." �'> t' ` x--:. :xw2?:� c?��, 1��.s.ataa..�:r� r t' :.. :� r,.r Arencibia,on Mays,9 , 2011.,theremedial work is scheduled to_continueuthrou,��.,'October 201}1i Trlisr"__er ai_i'a ; i •.a ' yam . �r _ lso,-states that the contt actor will.-be°_reguestingoneY inspection-n"er week,=to°insect �a ;sC-r s `%;: �•-�r f'".-�.,.. �y,,.: pay-..,- rem_edial work a There;are », ,�.., .'eksYfrom�May�4,�;Lo�.:October�=3-L`:,:201�1Takiiig t�hisTintoaccoiirit� and:;assuming. that«each weekly'ins-ection' is:$three-hours','long-maximu`°c tl e{`;remainin fi insp ions°wouldtoo l Sve i;Th usandt Eig- _ �D Ors.;( , figure a dedd lit uridred'po $7;800 00) This; egad t_to :the:amount,„already invoiced' for 'remedial: work; ($8,80q Q0. totals^` x .r:S� - -. .. .ti.._-,......° '., t�.�..�)'�, . SiXteenThOUSanda�Sixa�, Hundred Dollars($.16 60x0.00)` STA Architectural Group Firestation No.2 Structural Inspection Services Breakdown of Fees Page#2 As per the information presented to me, as stated above, and the inspections performed through May 4th, 2011, I respectfully request Sixteen Thousand Six Hundred Dollars ($16,600 00) to perform remedial work special inspections through October 31st, 2011. This figure, is only an estimate, based on the information provided, and is not a not to exceed fee. The actual cost of inspection services depends on the contractor, and how he breaks down his construction cycle. Note. This fee proposal does not include any other structural service except for structural inspection services. General Conditions. 1 Inspections must be requested twenty-four hours in advance. We will always try our best to accommodate the specific time requested, however, inspections will be scheduled on a first call-first serve basis. It is the contractor's responsibility to cancel scheduled inspections if weather does not permit inspection, or job to be inspected is not ready for inspection. Once our inspector is on his way to the job site we must bill for the first hour of inspection. 3 In order for our office to provide the Certificate of Compliance, at completion of the project, all required inspections must be scheduled and approved by our inspectors. 4 Additional fees will apply if more than one/three hour inspection is requested weekly 5 Additional fees will apply if the weekly inspection exceeds the three hour maximum inspection period considered. 6 If construction period exceeds the estimated completion date additional costs will apply 7 Onsite parking must be provided for inspector If parking is not provided, then parking expenses will be considered a reimbursable expense, to be reimbursed to us in full. 8 The estimated fee quoted excludes inspection services requested to be performed on Saturday, Sunday, or holidays. If you should have any questions regarding this matter, please do not hesitate to contact me. Sincerely, DE LOS REYES ENGINEERING, INC. �f ectar De'Lo- Reyes Hector De Los Reyes, P.E President