2011-27791 Reso RESOLUTION NO. 2011-27791 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PRE-CONSTRUCTION SERVICES AGREEMENT WITH QGS DEVELOPMENT INC, IN AN AMOUNT NOT TO EXCEED $37,500.00, FOR PRE-CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE PAR 3 GOLF COURSE, PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 41-10/11 FOR A CONSTRUCTION MANAGER AT RISK TO PROVIDE PRE- CONSTRUCTION SERVICES AND CONSTRUCTION PHASE SERVICES VIA GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT FOR THE PAR 3 GOLF COURSE PROJECT; AND, UPON COMPLETION OF PRE- CONSTRUCTION SERVICES, AUTHORIZING THE CITY MANAGER TO ENTER INTO NEGOTIATIONS FOR A GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT (FOR CONSTRUCTION SERVICES); FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A GMP AMENDMENT TO THE AGREEMENT WITH QGS DEVELOPMENT INC., SUBJECT TO AND CONTINGENT UPON THE CITY COMMISSION'S APPROVAL OF THE GMP; WITH PREVIOUSLY APPROPRIATED FUNDING FROM FUND 388 — SP POST RDA CDT AND MUNICIPAL RESORT TAX. WHEREAS, on June 1, 2011, the Mayor and City Commission adopted Resolution No 2011-27677, approving the Par-3 Golf Course Project Master Plan, in concept, as per the scope that had been delineated, with a recommendation by the City Commission that the concept plan be submitted to the Finance and Citywide Projects Committee for approval prior to finalizing construction plans for the Project; and WHEREAS, on July 13, 2011, the City Commission approved the issuance of Request For Qualifications No. 41-10/11 for a Construction Manager at Risk to Provide Pre-Construction Services and Construction Phase Services Via a Guaranteed Maximum Price (GMP) Amendment for the Par. 3 Golf Course Project (the RFQ); and WHEREAS, on October 19, 2011, the Mayor and the City Commission adopted Resolution No. 2011-27784, accepting the Par 3 Project layout and recommendation of the City Manager, pursuant to the RFQ, and authorized the Administration to enter into negotiations with the top ranked firm, QGS Development, Inc; and WHEREAS, the scope of work for this Project consists of all materials, labor, equipment, supervision, mobilization, overhead and profit required to re-develop the City's Par-3 Golf Course, and ancillary support facilities such as a pump house, restrooms, storage area, tennis courts, splash pad and tot lot, 9 parking spaces, jogging path, sidewalks, irrigation, flowering tree groves, new retention lakes, grow-in activity, and landscaping, and WHEREAS, the Project is bounded by Prairie Avenue on the west; West 28th Street on the north; Pine Tree Drive on the east; and Miami Beach Senior High School, the Public Works Yard and the Hebrew Academy on the south; and WHEREAS, the City's latest estimate of probable cost for the Project, including the Par- 3 Golf Course and all related facilities and scope, is $2,900,000; and WHEREAS, the Pre-Construction Services include the following design review, constructability and value engineering of 100% construction documents, for a fee of $6,750; review of onsite and offsite conditions, for a fee of $3,500; cost estimating and cost controls for a fee of$9,750; scheduling, for a fee of$2,500; bidding (GMP Submittal and Negotiations), for a fee of $7,500; E-Builder license (two (2) licenses at $1,200 per license) for a fee of $2,400; tree root/ pruning, for a fee of$2,600; and a contingency of$2,500, and WHEREAS, the Administration recommends approval of the negotiated Pre— Construction Service fee, in the total amount of$37,500, with QGS Development, Inc, and WHEREAS, upon completion of the Pre-Construction Services, the Administration further recommends that the City Manager be authorized to enter into negotiation with QGS Development, Inc., for a GMP Amendment (for Construction Phase Services), and further authorize the Mayor and the City Clerk to execute, the Amendment; provided that the City Commission has first approved the negotiated Guaranteed Maximum Price (GMP) NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and the City Commission of the City of Miami Beach hereby approve and authorize the Mayor and the City Clerk to execute a Pre- Construction Services Agreement with QGS Development Inc., in an amount not to exceed $37,500.00, for Pre-Construction Services for the Construction of the Par-3 Golf Course, Pursuant to Request for Qualifications No 41-10/11 for a Construction Manager at Risk to provide Pre-Construction Services and Construction Phase Services via Guaranteed Maximum Price (GMP) Amendment for the Par 3 Golf Course Project; and, upon completion of the Pre-Construction Services, authorizing the City Manager to enter into negotiations for a Guaranteed Maximum Price (GMP) Amendment (for the Construction Services); further authorizing the Mayor and the City Clerk to execute the GMP Amendment with QGS Development, Inc., subject to and contingent upon the City Commission's approval of the GMP; with previously appropriated funding from Fund 388-SP POST RDA CDT and Municipal Resort Tax. PASSED AND ADOPTED THIS i' DAY OF A'c,mk'c2011. 1Bymi',I%,,,, ATTEST: �P.. ...........-904* 13./ `:ti 124 (. w1, fait. INCORP ORATED' ' s / Robert Parcher, City Clerk H26, Matti Herrera Bower, Mayor APPROVED AS TO FORM & LANGUAGE TAAGENDA\2011\12-14-11\Par3\Pre-Construction service for CMR-QGS-RESO.docx &FOR EXECUTION Attorn-,q►, Date COMMISSION ITEM SUMMARY Condensed Title: A Resolution of the Mayor and City Commission of the City of Miami Beach,Florida,approving and authorizing the Mayor and City Clerk to execute a Pre-Construction Services Agreement with QGS Development Inc.,in an amount not to exceed$37,500,for Pre- construction Services for the construction of the Par 3 Golf Course, pursuant to Request For Qualifications No. 41-10/11, for a Construction Manager at Risk to Provide Pre-Construction Services and Construction Phase Services via Guaranteed Maximum Price(GMP)Amendment for the Par 3 Golf Course Project;and,upon completion of the Pre-Construction Services,authorizing the City Manager to enter into negotiations for a Guaranteed Maximum Price(GMP)for Construction Services;further approving and Authorizing the Mayor and the City Clerk,to execute a GMP Amendment to the agreement with QGS Development Inc.,subjectto and contingent upon the City Commission's approval of the GMP; with previously appropriated funding from fund 388-SP POST RDA CDT and Municipal Resort Tax. Key Intended Outcome Supported: Ensure well designed quality capital projects. Supporting Data (Surveys, Environmental Scan, Etc.): Issue: Shall the Mayor and the City Commission Adopt the Resolution? Item Summary/Recommendation: The scope of the work for this project consist of all materials, labor, equipment, supervision, mobilization, overhead and profit required to redevelop the City's nine-hole Par-3 golf course, and ancillary support facilities such as a pump house, restrooms, storage area,and tennis courts,splash pad,tot lot,9 parking spaces,jogging path,sidewalks,irrigation,flowering tree groves,new retention lakes,grow-in activity and landscaping. The Construction Manager at Risk(CMR)Scope of Services shall include,without limitation,all of the Pre-Construction Services set forth below and, upon approval by the City of the Guaranteed Maximum Price (GMP) and as contemplated in any GMP Amendment(s),all of the Construction Services required to complete the Work in strict accordance with the Contract Documents,and to deliver the Project to the City at or below the GMP and within the Contract time. The CMR shall review/ prepare project requirements,existing on-site and off-site development,surveys and preliminary budget,and make recommendations to the City for revisions, preliminary project schedule in accordance with the Contract Documents and in coordination with the City and the Architect/Engineer,identifying all phases,critical path activities,and critical duties of each of the Project team members.The CMR shall review the permitted set of plans and advise the City and the Architect/Engineer regarding the constructability of the design and of any errors,omissions,or conflicts it discovers. The CMR shall prepare an outline of proposed bid packages and detailed cost estimates,and advise the City regarding trends in the construction and labor markets that may affect the price or schedule of the Project;and attend all Project related meetings.Preconstruction Services shall be provided,and the City shall compensate the CMR for such services,based upon a fixed fee.At the conclusion of the Preconstruction Services Phase,the CMR shall provide the City a proposal for a GMP Amendment for Construction Phase services and,without assuming the duties of the Architect/Engineer,warrant to the City that the plans,specifications and other Contract Documents are consistent,practical,feasible and constructible,and that the Project is constructible within the contract time. The Pre-Construction Services fee negotiated with QGS Development Construction Company includes the following services: Design Review,Constructability and V/E of 100%CD's: $ 6,750 Review of Onsite and Offsite Conditions: $ 3,500 Cost Estimating and Cost Controls: $ 9,750 Scheduling: $ 2,500 Bidding(GMP Submittal and Negotiations): $ 7,500 E-Builder License(two(2)licenses at$1,200 per license): $ 2,400 Tree/Root Pruning: $ 2,600 Contingency: $ 2,500 Total Pre-Construction Services Fee: $37,500 The City's latest construction budget for the project, including the Par 3 Golf Course, related facilities and tennis courts, is approximately$3,000,000. Advisory Board Recommendation: N/A Financial Information. Source of „,, Amount , Account , Approved Funds: 1 $37,500 388-2627-069357-SP POST RDA CDT and Municipal Resort Tax OBPI Total. $37,500 Financial Impact Summary: City Clerk's Office Legislative Tracking: Fernando Vazquez -4.6135 Sign-Offs: Dep • ctor - Assistant 'C ana er City Manager FV DB ►�Y/� JMG T\AGENDA\2011115ecl4 2011\ ar3\Pre-construction Service fo R-QGS-Summary.doc effa ArA Iv\IAIvU BEACH AGENDA ITEM C E DATE I2-If{-I� MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO• Mayor Matti Herrera Bower and Members of the City Commission FROM. Jorge M Gonzalez, City Manager DATE December 14, 2011 SUBJECT A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PRE-CONSTRUCTION SERVICES AGREEMENT WITH QGS DEVELOPMENT INC., IN AN AMOUNT NOT TO EXCEED $37,500.00, FOR PRE-CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE PAR 3 GOLF COURSE, PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 41-10/11 FOR A CONSTRUCTION MANAGER AT RISK TO PROVIDE PRE-CONSTRUCTION SERVICES AND CONSTRUCTION PHASE SERVICES VIA GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT FOR THE PAR 3 GOLF COURSE PROJECT; AND, UPON COMPLETION OF PRE- CONSTRUCTION SERVICES, AUTHORIZING THE CITY MANAGER TO ENTER INTO NEGOTIATIONS FOR A GUARANTEED MAXIMUM PRICE (GMP) FOR CONSTRUCTION SERVICES; FURTHER APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A GMP AMENDMENT TO THE AGREEMENT WITH QGS DEVELOPMENT INC., SUBJECT TO AND CONTINGENT UPON THE CITY COMMISSION'S APPROVAL OF THE GMP; WITH PREVIOUSLY APPROPRIATED FUNDING FROM FUND 388 — SP POST RDA CDT AND MUNICIPAL RESORT TAX. ADMINISTRATION RECOMMENDATION Adopt the Resolution, FUNDING Funding is available from the previously appropriated funding from the Par 3 Golf Course project Construction fund 388- SP POST RDA CDT and Municipal Resort Tax Eligible in account number 388-2627-0069357. BACKGROUND AND ANALYSIS On June 1, 2011, the Mayor and City Commission adopted Resolution No 2011-27677 formally approving the Par-3 project Master Plan in concept as per the scope that had been delineated, with a recommendation by the City Commission that the concept plan be submitted to the Finance and Citywide Projects Committee for approval prior to finalizing construction plans for the project. The Administration has taken into consideration the concerns expressed by the Bayshore Homeowner's Association, the Bayshore residents, and the Commission regarding the preservation of the Par-3 green space, and will be working with the design consultants to Commission Memorandum—Pre-Construction for CMR-QGS for the Par 3 Golf Course Project December 14, 2011 Page 2 of 3 , provide a plan that incorporates the elements in the scope of services in a manner which maximizes the green space to the degree that is feasible and acceptable On July 13, 2011, the City Commission approved the issuance of an RFQ No 41-10/11 for a Construction Manager at Risk Firm to Provide Pre-Construction Services and Construction Phase Services Via a Guaranteed Maximum Price (GMP)Amendment for the Par 3 Golf Course Project. On October 19, 2011, the Mayor and the City Commission adopted Resolution No.2011-27784 accepting the Par 3 layout and recommendation of the City Manager, pursuant to Request for Qualifications (RFQ) 41-10/11, for a Construction Manager at Risk firm to provide Pre- construction services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the Par 3, new construction and remodeling project; and authorizing the administration to enter into negotiations with the top Ranked firm, QGS Development, Inc One of the most important distinctions between the CMR project approach and the Design-Bid- Build approach is that the CMR is selected based on the CMR firm's qualifications. The CMR approach will give the City the added value of having a qualified contractor evaluate the project documents for any inconsistencies, errors and omissions between the various design disciplines and constructability of the project. SCOPE OF WORK The scope of the work for this project consist of all materials, labor, equipment, supervision, mobilization, overhead and profit required to redevelop the City's nine-hole Par-3 golf course, and ancillary support facilities such as a pump house, restrooms, storage area, and tennis courts, splash pad, tot lot, 9 parking spaces, jogging path, sidewalks, irrigation, flowering tree groves, new retention lakes, grow-in activity and landscaping. The Par-3 is bounded by Prairie Avenue on the west, West 28`h Street on the north, Pine Tree Drive on the east, and Miami Beach Senior High School, the Public Works Yard and the Hebrew Academy on the south. The Construction Manager at Risk (CMR) Scope of Services shall include, without limitation, all of the Preconstruction Services set forth below and, upon approval by the City of the Guaranteed Maximum Price (GMP) and as contemplated in any GMP Amendment(s), all of the Construction Services required to complete the Work in strict accordance with the Contract Documents, and to deliver the Project to the City at or below the GMP and within the Contract time. The CMR shall review project requirements, existing on-site and off-site development, surveys and preliminary budget, and make recommendations to the City for revisions The CMR shall prepare a preliminary project schedule in accordance with the Contract Documents and in coordination with the City and the Architect/Engineer, identifying all phases, critical path activities, and critical duties of each of the Project team members The CMR shall review the permitted set of plans and advise the City and the Architect/Engineer regarding the constructability of the design and of any errors, omissions, or conflicts it discovers t3 The CMR shall prepare an outline of proposed bid packages and detailed cost estimates, and advise the City regarding trends in the construction and labor markets that may affect the price or schedule of the Project. The CMR shall attend all Project related meetings. The CMR's Preconstruction Services shall be provided, and the City shall compensate the CMR for such services, based upon a fixed fee. Commission Memorandum—Pre-Construction for CMR-QGS for the Par 3 Golf Course Project December 14, 2011 Page 3 of 3 At the conclusion of the Preconstruction Services Phase, the CMR shall provide the City a proposal for a negotiated GMP Amendment for Construction Phase services and, without assuming the duties of the Architect/Engineer, warrant to the City that the plans, specifications and other Contract Documents are consistent, practical, feasible and constructible, and that the Project is constructible within the contract time The City's latest construction budget for the project, including the Par 3 Golf Course, related facilities and tennis courts, is approximately $3,000,000 The Pre-Construction Services fee (See Attachment 1) negotiated with QGS Development Construction Company includes the following services Design Review, Constructability and V/E of 100% CD's $ 6,750 Review of Onsite and Offsite Conditions $ 3,500 Cost Estimating and Cost Controls $ 9,750 Scheduling $ 2,500 Bidding (GMP Submittal and Negotiations) $ 7,500 E-Builder License (two (2) licenses at $1,200 per license) $ 2,400 Tree/ Root Pruning $ 2,600 Contingency: $ 2,500 Total Pre-Construction Services Fee: $37,500 The schedule for this project is as follows Pre-construction Services begin January 13, 2012 Commission award of GMP. July 18, 2012 Project - Construction Complete May 20, 2013 Project- Grow in complete* August 19, 2013 CONCLUSION The Administration recommends that the Mayor and City Commission approve the attached resolution, which recommends the acceptance to execute Pre-Construction Service Agreement with QGS Development Inc., in an amount not to exceed $37,500 00 for Pre-Construction Services for the construction of the Par 3 Golf Course, pursuant to request for Qualifications No 41-10/11 for a Construction Manager at Risk to provide Pre-Construction Services and Construction Phase Services via Guaranteed Maximum Price (GMP) Amendment for the Par 3 Golf Course Project; and upon completion of the Pre-Construction Services, Authorizing the City Manager to enter into negotiations for a Guaranteed Maximum Price (GMP) for Construction services, further approving and authorizing the Mayor and City Clerk to Execute a GMP Amendment to the Agreement with QGS Development, Inc. subject to and contingent upon the City Commission's approval of the GMP; with previously appropriated funding from Fund 388 — SP POST RDA CDT and Municipal Resort Tax. Attachment 1 QGS Pre-Construction Services Fee Breakdown DB\FV\DM\JC\HC T\AGENDA\2011\12-14-11\Par 3-QGS Pre-Ccon Sery\PAR 3 QGS precon Memo-Dec 2011 mtg.docx ATTACHMENT NO. 1 QGS Pre-Construction Services Fee Breakdown MIAMI BEACH PAR 3 _ 4.7 PAYMENT BREAKDOWN PRECONSTRUCTION SERVICES 1. Design Review, Constructability&Value Engineering $6,750.00 2. Review of On-Site&Off-site Conditions $3,500.00 3. Cost Estimating&Cost Controls $9,750 00 4. Scheduling $2,500.00 5. Bidding (GMP Submittal & Negotiations) $7,500 00 6. E-Builder License $2,400 00 7. Contingency $2,500.00 8.Tree Root Pruning/Trimming $2,600.00 TOTAL PRE-CONSTRUCTION SERVICES FEE $37,500.00 1 Revised 11/16/11 JG MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www miamibeachfl.gov COMMISSION MEMORANDUM TO. Mayor Matti Herrera Bower and Members of the City Commission FROM. Jorge M Gonzalez, City Manag r DATE December 14, 2011 SUBJECT SUPPLEMENTAL MATERIAL F EM #C7E APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A PRE-CONSTRUCTION SERVICES AGREEMENT WITH QGS DEVELOPMENT INC., IN AN AMOUNT NOT TO EXCEED $37,500.00, FOR PRE-CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE PAR 3 GOLF COURSE. CIPOC RECOMMENDATIONS The Committee recommends that prior to negotiating the Guaranteed Maximum Price (GMP) the City hire a cost consultant, to evaluate the GMP arrived at through the pre-construction services This consultant preferably should have experience in golf course construction, and should evaluate prices with other comparable golf courses in other municipalities DB\FV\DM\HC/shl T\AGENDA\2011\12-14-11\Par 3-QGS Pre-Ccon Sery\PAR 3 QGS precon CIPOC Supplemental-Dec 2011 mtg.docx Agenda Item C7E. Date /4-1q--//