Amendment 2 - Chen & Associates ZoO?— ,27 v3,( AMENDMENT No. 2 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND CHEN & ASSOCIATES, INC. DATED MARCH 18, 2009, FOR THE SUNSET ISLANDS I & II NEIGHBORHOOD RIGHT -OF -WAY INPROVEMENT PROJECT, SAID AMENDMENT IN AN AMOUNT NOT -TO- EXCEED $22,073:.00; TO PROVIDE REVISIONS TO ORIGINAL PLANS INDICATING ROAD WIDENING, DESIGN AND PERMITTING, ADDITIONAL FIELD VERIFICATION OF EXISTING CONDITIONS, AND DERM TREE REMOVAL PERMIT This Amendment No. 2 to the Agreement, made and entered this day of WQrc� L2012, by and between the CITY OF MIAMI BEACH, a Municipal Corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and CHEN AND ASSOCIATES, INC, a Florida Corporation, having its offices at 500 Cypress Creek Road, Suite Fort . Lauderdale, Florida 33309 (hereinafter referred to as the Consultant). RECITALS WHEREAS, on March 18, 2009, the Mayor and. City Commission authorized the execution of an Agreement between the City of Miami Beach and Chen & Associates, Inc. (Consultant), for a not -to- exceed amount of $239,340, for the re- design, bid and award, and construction management services for the Sunset Islands I & II Bayshore Neighborhood 8E right -of -way improvement project (the Project); and WHEREAS, the Project includes improvements to the stormwater system, valley gutter curb upgrades, outfall reconstruction, watermain replacement, and road. resurfacing and reconstruction; and WHEREAS, on November 16, 201 1, 'the Capital Improvement Projects (CIP) Office approved Amendment No. 1 to the Agreement, for a not -to- exceed amount of $20,757.00, for the design of additional watermains outside of the original scope.of work of the project; and WHEREAS, on February 15, 2011 the residents of Sunset Islands 1 & 2 voted in favor of maintaining the existing roadway directions within both islands; and WHEREAS, on March 11, 2011, the Consultant revised the plans to incorporate the final roadway design; and WHEREAS, the revised roadway design required additional field verification of the existing conditions; and WHEREAS, a DERM Tree removal permit is required for the project which_ is outside of the original scope of work and WHEREAS, the consultant has submitted a proposal for additional professional services associated with the additional scope of work; and WHEREAS, the total additional fee requested by the Consultant for the additional work is $22,073.00; and WHEREAS, City staff have evaluated the Consultant's cost proposal and are in agreement that the proposal is reasonable; and WHEREAS, additional funds have been appropriated within the capital budget for the additional design work; and WHEREAS, this Amendment No. 2 to the Agreement will revise the total contract sum to a not -to- exceed total of $282,170.00. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above ' recitals are true and correct-and are incorporated as a part of this Amendment No. 2. 2. MODIFICATIONS F The Agreement is amended to include and incorporate the additional work, as set forth 1 in Schedules A and B, attached hereto. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. a 4. RATIFICATION. The City and Consultant ratify the terms of the . Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH, FLORIDA �c iLd� Robert Parcher, City Clerk rg 64—G ' onz ity,94anager ! i ATTEST CONSULTANT: ! CHEN MO AND ASSOCIATES, INC - i Secretary Preside f. a Print Name Print Name APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION: L- �Q -Iti t r APft$aI to ey Date l \Project Files \Sunset Islands 1 & 2 \Sunset Islands Amendment No. 2.doc . SCHEDULE "A" SUNSET ISLAND NO. I & II SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services ", is amended as follows: ADD the following under TASK 5 — ADDITIONAL SERVICES: "Task 5.2 — Additional Design Services — Roadwav Widening Design and Permitting As required by the City of Miami Beach Public Works Department and Miami -Dade Traffic Engineering, Sunset Islands 1 & 2 Bid Package No. 8E project will require additional design efforts to address widening existing roadways. At the direction of Miami -Dade, nine (9) feet wide travel lanes are only acceptable as part of a two -lane 18 ft. wide local road. Nine (9) feet travel lanes are not acceptable as per the Florida Greenbook as a single lane. A single lane can be 10 feet wide minimum, excluding the valley gutters. Valley gutters cannot be considered part of the travel lane. Existing dimensions for two -way lane roads are approximately 17 feet wide (9 total streets) and approximately 16 feet wide (7 total streets). Roadway width was discussed during negotiation meetings and the CITY directed the CONSULTANT to maintain existing roadway widths. Effort to widen existing roadway widths was not included in the original scope of services. The CONSULTANT shall provide professional services, in accordance with the base scope of services, for the design of the wider roadway. This task is limited to the design to incorporate wider roadways including updating the affected sheets. This work will impact at least 63 sheets. It is anticipated that the CONSULTANT will include the design contract documents for these improvements in its Bid Package No. 8E contract documents set. The CITY will provide additional funding to support the additional work into the project construction budget at a future date. Professional services to be provided by the CONSULTANT shall include: • Perform detailed design of wider roadways and revise affected sheets. • Incorporate the detailed design and cost estimate into the contract documents for Bid Package No. 8E for the Permit Set submittal. • Bid / Award services are assumed to be included within the base scope of services as it is the CITY's opinion that this additional work does not represent a material impact to the project from this perspective. Basis of Scope: The above scope was prepared based on the following assumptions: • Incorporating the wider roadways into the BODR via Addendum is not included. • CITY will be responsible for coordinating conflict removals as required. The additional work is inclusive of widening existing roadway pavement for the use of vehicles only. This scope does not include providing ADAipedestrian walking routes, sidewalks, or ramps. Page 1 cf 3 ++ns�e Deliverables: • Perform detailed design and prepare revised construction documents. • .Provide six (6) half size (11 "x17 ") copies of construction plans to CITY at Permit Set and 100% design stages. • Prepare applications and appropriate documents to include additional work and respond to regulatory agency comments Schedule: • Additional design will commence upon notification of Notice to Proceed (NTP) by the CITY. • Permit Set design stage documents will be completed within 21 calendar days of receipt of the CITY's. NTP. 100% design stage documents will be completed with 14 calendar days of receipt of final regulatory agency / CITY comments: Fee: • This additional service will be completed for a lump sum fee of $7,215. C &A will invoice the City on a monthly basis based on the percentage complete. Task 5.3 - Field Verification of Existing Conditions: The CONSULTANT shall collect field data of the existing encroachments within the right of way areas to be impacted by construction activities due to the widening of the roadway: The CONSULTANT shall locate and identify existing surface improvements / topographic features that are visible along the corridor that would be impacted by the construction activity. Corridors to be assessed include all CITY public rights -of -way within the Sunset Island No. 1 & 2 outside roadways (i.e. North View Drive, West 28 t1 ' Street, Lake Avenue, West 27` Street, West Bay Road, and West 25`' Street). Basis of Scope: The above scope was prepared based on the following assumptions: • The existing encroachments could be existing utilities owned by third party utility companies. Chen and Associates will make every effort to coordinate with these companies, however any construction delays caused by these utility companies should not be held against Chen and Associates. • CITY will be responsible for coordinating encroachment removals as required. Deliverables: • Perform field verification work as noted and incorporate existing encroachments into the construction plans. Fee: • This additional service will be completed for a lump sum fee of 53,223. C &A will invoice the City on a monthly basis based on the percentage complete. Task 5.=1 — DERM Tree Remo` Permit: The CONSULTANT shall conduct a field visit to identify existing trees within the project right -o way. For the purposes of the DERM Tree Removal Permit. a tree is Page 2 .f 3 ' +rnS c ,n or 1,1 -4 1 !r f defined as "any woody or fibrous perennial plant having a minimum trunk DBH (Diameter at Breast Height measured at 4 % feet above ground) of three inches or greater or with an Over All Height (OAR) of twelve or more feet. Existing trees within the project right -of -way will be identified on the design plans by identifying number correlated to a matrix to describe the characteristics, of each existing tree including: identification number, species (botanical name /common name), DBH (Diameter at. Breast Height), Over All Height (OAH), Canopy, to be removed/relocated /remain and condition of the tree. Existing "regular- sized" trees scheduled for removal, with the exception of exempt or prohibited species, will be proposed to be replaced with an equal amount (100 %) of tree canopy on the design plans. Existing `.`specimen - sized" trees will be proposed to be replaced with double (200 %) canopy replacement on the design plans. A tree relocation plan will be prepared, if necessary, for the relocation of any existing trees. The CONSULTANT shall prepare a DERM Tree Removal Permit application form.and submit the application and supporting documentation to the DERM Tree Program for review. All application, review and permit fees will be provided by the CITY. The CONSULTANT will coordinate with DERM Tree Program staff and respond to up to one (1) request for additional information during processing of the Tree Removal Permit. Basis of Scope: The above scope was prepared based on the following assumptions: • The City of Miami Beach will identify off -site locations for tree mitigation should replacement trees not feasible within the project area. Defiverables: • Conduct a field visit to identify existing trees within the project right -of -way. Prepare DERM Tree Removal Approval and supporting documents to secure. permit. Fee: This additional service will be completed for a lump sum fee of $11,634. C &A will invoice the City on a monthly basis based on the percentage complete" ° °ye 3 of 3 } 1(1rld Q­­ 1e1­ f 11 . 1 'a it Co Ornn-i 1A1;.1ani­ � Z;. 1 m'm o I I I V _ Imo W i 1 I 1 w W IW Vi < 1 t I m o m S ! 1 W v I . t Z c I iojo of � iol ,o.$ c J LU Z J IY ~ r 1 - Op �W �Nrn S L) uj W Iolo �� ( l t I.N a ui U Q LL g I I s ff I m W O Z O W k�_ i I I I .wN•m GOWN c l¢ I I L U w t- N O O c w4 I I i i u�,n ±o F U 7 �y ml NL�1 i �oi i IQ. Q N I cc •cc Z Z H M R. i 4 m o 1 1 ,mra LL O� I I I I Ip ww m x .j 1 3 t I Z �R W W Ia tIL - �� Zx�: s" yY. I2f 2 'w` IQZQ A . >. 2Tz<.Z F i >IzrO - LD DOw2 Ovl o' o 0 Qi=t