Loading...
LTC 181-2012 Upcoming FDOT Roadway Construction on 41st St/Arthur Godfrey Rd from Alton to Collins Ave m MIAMI BEACH 181-2012 LETTER TO COMMISSION TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Kathie G. Brooks, Interim City Manager/4" DATE: July 12, 2012 SUBJECT: UPCOMING FDOT ROADWAY CONSTRUCTION ON 41ST STREET/ARTHUR GODFREY ROAD FROM ALTON ROAD TO COLLINS AVENUE The purpose of this Letter to Commission is to inform you that the Florida Department of Transportation (FDOT) is scheduled to begin construction of a roadway project on Monday, July 16, 2012. The project is located along 41St Street/Arthur Godfrey Road from Alton Road to Collins Avenue. Construction is scheduled to last about six (6) months. To complete the work safely, FDOT will need to close travel lanes at times. According to the attached project fact sheet, lane closures will occur from Sundays to Thursdays from 9PM to 5:30AM and Fridays and Saturdays from 11 PM to 7AM. FDOT has advised that the lane closures will occur in stages and flagmen will be used as needed to help direct traffic and minimize congestion. As part of its public information program, FDOT has created a project website and placed information about lane closures and project details on the following website: www.fdotmiamidade.com. Enclosed please find a project fact sheet which FDOT has distributed throughout the project area. The fact sheet includes project information, the construction schedule, and contact details. Please feel free to contact me if you have any questions or concerns. Attachments o_ C. rn C KGB/JC7 44kWS/JRG _ w CD C7 Ti F:\WORK\$ALL\(1)EMPLOYEE FOLDERS\Jose R.Gonzalez\LTC FACT State Road (SR) 112/41 Street/Arthur Godfrey Road i - - hl OVERVIEW On Monday July 16,the Florida Department of Transportation (FDOT) is scheduled to begin a roadway construction project along SR 112/41 Street/Arthur Godfrey Road from Alton Road to Collins Avenue in the City of Miami Beach. HELPFUL TIPS • Allow extra time to reach your destination • Obey all posted signs and speed limits • Watch for signs with information about upcoming work and traffic conditions ALWAYS PUT SAFETY FIRST For your safety and the safety of others, please use caution when driving, walking or biking around any construction zone. Wearing a safety belt is the single most effective way to protect people and reduce fatalities in motor vehicle crashes. The department takes steps to reduce construction effects, but you might experience the following around the work site. Please note that this schedule could change due to bad weather or other unexpected conditions. • Side street, traffic lane and sidewalk closures • Increased dust and noise • Workers and equipment moving around the area. FOR MORE INFORMATION For more information, please contact CCEI Senior Project Engineer Roland Rodriguez, P.E.at(305) 640-7185, or Public Information Specialist Heather Leslie at(305) 640-7462 or Heather.Leslie @dot.state.fl.us. Please our -• D°T�SIX For CONSTRUCTION 1000 NW 111 AVENUE MIAMI,FL 33172 State Road (SR) 112/41 Street/Arthur Godfrey Road N# 419824-1-52-01 \\, • Begins:July 16 PROJECT LIMITS: from Alton Road to Collins Avenue "�:E a1€ j 1H any su1110 jO 400jo uetpu 65 1 ICI 5 yl y < a '0 68,1 W nd J0 08U. aal '0 aa�l au'd env u•puy4S .� 641, t F 3 `► �d re'ya 3 •n y'"d °Ay u'1ed IRA% (A C Prame Ave °nr08* - 3 a� 4J -C •ny LEGEND 4 Y s °nl 3 a.� 3 Av Project any Electronic •- • pLi c feedback sign hoc � z � Follow us on Twitter @MyFDOT_Miami ono Please visit our website: �SDC For real-time traffic information dial 511 or visit: CONM CnON • 1000 NW 111 AVENUE MIAMI,FL 33172