Loading...
2012-28005 Reso RESOLUTION NO. 2012-28005 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND THE CITY CLERK TO EXECUTE GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO. 1 TO THE PRE-CONSTRUCTION SERVICES AGREEMENT WITH .THE WEITZ COMPANY, DATED APRIL 5, 2012, FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE SOUTH POINTE PARK PIER PROJECT, IN THE AMOUNT OF $4,809,017 WITH FUNDING FOR THIS AMENDMENT PREVIOUSLY APPROPRIATED AS FOLLOWS: $1,442,417 FROM THE SOUTH POINTE CAPITAL FUND 389; AND$3,366,600 FROM THE SOUTH POINTE CONVENTION DEVELOPMENT TAX (CDT) AGREEMENT REV/MUNICIPAL RESORT TAX FUND 388. WHEREAS,on April 13th,2011,the Mayor and City Commission approved Resolution No. 2011-27628,authorizing the execution of an Agreement between the City and Atkins North America, Inc. for professional architecture and engineering services for the replacement of the South Pointe Park Pier; and WHEREAS, the Mayor and City Commission, at this December 14, 2011 meeting, authorized the Administration to issue an RFQ for a Construction Manager at Risk (CMR)firm to provide pre-construction services and construction phase services via a Guaranteed Maximum Price (GMP)amendment for the South Pointe Park Pier Project; and WHEREAS, on February 8, 2012, the Mayor and City Commission approved Resolution No. 2012-27831, authorizing the Mayor and City Clerk to execute a Pre-Construction Services Agreement with the Weitz Company for the South Pointe Park Pier project, pursuant to Request for Qualifications No. 18-11/12 (the Weitz Agreement); and WHEREAS, the Weitz Agreement, provides for the City to issue construction services amendments once the design is complete and a negotiated Guaranteed Maximum Price(GMP)is accepted and approved by the City; and WHEREAS, on June 1, 2012, the Weitz Company held a bid opening where subcontractors submitted sealed bids which were opened in the presence of the City and Atkins and submitted a GMP for the amount of$5,527,465; and WHEREAS,the City and the Weitz Company have now negotiated and agreed to the sum of $4,809,017 as GMP Amendment No. 1 to the Weitz Agreement, for the construction of the proposed South Pointe Park Pier; and WHEREAS,the construction duration of this project has been negotiated at 365 calendar days and it is anticipated that this work will commence in October 2012 with the relocation of the corals attached to the pier structure prior to the demolition of the existing pier; and WHEREAS, the negotiated Guaranteed Maximum Price (GMP) of $4,809,017 was compared to the cost estimates provided by the Architect/Engineer and the independent estimator; and WHEREAS,the administration is of the opinion that the final GMP is competitive,fair and a reasonable price for the construction of the South Pointe Park Pier project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA,that the Mayor and City Commission hereby accept the recommendation of the City Manager approving and authorizing the Mayor and the City Clerk to execute Guaranteed Maximum Price (GMP)Amendment No. 1 to the Pre-Construction services agreement with the Weitz Company, dated April 5, 2012, for Construction Management at Risk Services for the South Pointe Park Pier project, in the amount of$4,809,017. PASSED AND ADOPTED this o'� 'l day of S ea�kn der , 2012 ATTEST: CITY CLERK 1 B MAY R INCORP ORATED Ncb CTM H 26 APPROVED AS TO FORM & LANGUAGE &FOR EXECUTION Q c3 tti orn Date T:\AGENDA\2012\9-12-12\South Point Park Pier-GMP Amendment Weitz.RESO.doc COMMISSION ITEM SUMMARY condensed Title: A Resolution Approving And Authorizing The Mayor And The City Clerk To Execute Guaranteed Maximum Price (GMP)Amendment No. 1 To The Pre-Construction Services Agreement With The Weitz Company, Dated April 5, 2012, For Construction Management At Risk Services For The South Pointe Park Pier Project, In The Amount Of $4,809,017 With Funding For This Amendment Previously Appropriated As Follows: $1,442,417 From The South Pointe Capital Fund 389;And$3,366,600 From The South Pointe CDT Agreement Rev/Municipal Resort Tax Fund 388. Key Intended Outcome Supported: Ensure well-designed quality capital projects Supporting Data(Surveys, Environmental Scan,etc.): The 2012 Customer.Satisfaction Survey indicated that 81%of businesses rated completed capital improvement projects as"excellent"or"good." Issue: Shall the Commission Adopt the Resolution? Item Summa /Recommendation: On June 1, 20 1 2, the Weitz Company held a b i d open in g which rep r ese n tat iv es o f the City and Atkins attended. Subcontractors submitted sealed bids which were opened by Weitz in the presence of the City and Atkins.The GMP submitted, prior to negotiation,was for the amount of$5,527,465. Following a number of discussions, evaluation of value-engineering (VE)options, and analysis of constructability recommendations,Weitz submitted the current negotiated GMP in the amount of$4,809,017(Attachment A).The GMP reflects current market conditions and additional scope never anticipated in the original BODR and required by the Environmental permitting agencies: associated with the relocation of the existing protected corals. This work involves a 30 day notice prior to the relocation and the proper monitoring to the satisfaction of the environmental permitting agencies prior to the demolition phase. It also includes the entrance plaza,the waterside construction of the pier and the offsite storage/staging area due to limited access from the park. The final estimate of probable construction cost conducted by Atkins,the Engineer of Record,on August 26,2011 is $4,454,433. Since the CMR construction contract does not contemplate any change orders and assumes the owner's risk in the construction process,the final estimated construction cost of$4,836,637 includes the 10%CMR premium(Attachment C). In order to obtain further assurance that the best value for this project had been negotiated,the City contracted CMS Estimating Services(CMS),to perform an independent construction cost estimate.CMS'estimated construction cost is$4,778,559 which includes a 10%CMR premium(Attachment B). The administration is of the opinion that the final GMP is a competitive,fair and a reasonable price as the difference between the comparative estimates and the GMP is less than 1%and within industry standards. Currently,the City has a Florida Inland Navigation District(FIND)Assistance Program Phase I grant approval for design consulting fees in the amount of$323,077.This grant amount will be reimbursed upon compliance with the grant requirement to award a construction contract by September 30,2012. In addition,the City has applied for the FIND Assistance Program Phase II,in the amount of$986,000,for reimbursement of construction costs for the South Pointe Park Pier project. The construction duration of this project has been negotiated at 448 calendar days. This includes 90 day pre- construction activities, commencing with the relocation of the corals prior to demolition of the pier. It is recommended that the Mayor and City Commission adopt the resolution. Advisory Board Recommendation: N/A Financial Information: Source of Amount Account Funds: 1 $2,818,469 388-2577-067357 2 $548,131 388-2577-000356 3 $1,331,692 389-2577-067357 4 $110,725 389-2577-069358 OBPI Total $4,809,017 Financial Impact Summary: No funds being expended at this time. City Clerk's Office Legislative Tracking: Raul Aguila,ext 6475 Sign-Offs: Dep m—!,o Director Assistant City M er City MapVer FV JG PDW NO KGB JJJ2 T:WGENDA 012\9-12-12\South Point Park Pier-GIVIP Amendment Weitz. MMARY.doc tO I AM I B EAC H AGENDA ITEM P76- DATE �I /\AIA/\AIBEACH City of Miami Heath, 1700 Convention Center Drive, Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the City C mission FROM: Kathie G. Brooks, Interim City Manager DATE: September 12, 2012 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI REACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND THE CITY CLERK TO EXECUTE GUARANTEED MAXIMUM PRICE (GMP) AMENDMENT NO. 1 TO THE PRE-CONSTRUCTION SERVICES AGREEMENT WITH THE WEITZ COMPANY, DATED APRIL 5, 2012, FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE SOUTH POINTE PARK PIER PROJECT, IN THE AMOUNT OF $4,809,017 WITH FUNDING FOR THIS AMENDMENT PREVIOUSLY APPROPRIATED AS FOLLOWS: $1,442,417 FROM THE SOUTH POINTE CAPITAL FUND 389; AND $3,366,600 FROM THE SOUTH POINTE CDT AGREEMENT REV/MUNICIPAL RESORT TAX FUND 388. ADMINISTRATION RECOMMENDATION Adopt the resolution. KEY INTENDED OUTCOME SUPPORTED Ensure well-designed quality capital projects FUNDING Funding for this amendment in the amount of $4,809,017 has been previously appropriated as follows: $1,442,417 from the South Pointe Capital Fund 389; and $3,366,600 from the South Pointe CDT Agreement Rev/Municipal Resort Tax Fund 388. ANALYSIS The Mayor and City Commission at its December 14, 2011 meeting authorized the Administration to issue an RFQ for a Construction Manager at Risk (CMR) firm to provide pre- construction services and construction phase services via a Guaranteed Maximum Price (GMP) amendment for the South Pointe Park Pier Project. RFQ No.18-11/12 was issued on December 19, 2011 and the Weitz Company (Weitz) submitted their proposal and were interviewed along with four(4) other CMR firms. On January 12, 2012, the selection committee unanimously ranked the Weitz Company as the top-ranked firm. Pursuant to the City Manager's recommendation, on February 8th, 2012, the Mayor and City Commission approved Resolution No. 2012-27831, authorizing the Mayor and City Clerk to execute a Pre-Construction Services Agreement with the Weitz Company. These services included: review of project requirements, existing on-site conditions, review of preliminary budget, project scheduling and phasing, value engineering, and submission of constructability recommendations to Atkins of North America (Atkins), the A/E of Record. Commission Memorandum— Weitz Company GMP for the South Pointe Park Pier Project September 12, 2012 Page 2 of 3 On June 1, 2012, Weitz held a bid opening which was attended by representatives of the City and Atkins. Subcontractors submitted sealed bids which were opened by Weitz in the presence of the City and Atkins. The GMP submitted, prior to negotiation, was in the amount of $5,527,465. Following a number of discussions, evaluation of value-engineering (VE) options, and analysis of constructability recommendations, Weitz submitted the current negotiated GMP in the amount of $4,809,017 (Attachment A). The GMP reflects the current market conditions as well as additional scope not anticipated and additional requirements by the Environmental permitting agencies: associated with the relocation of the existing protected corals. This work involves a 30 day notice prior to the relocation and the proper monitoring to the satisfaction of the environmental permitting agencies prior to the demolition phase. It also includes the entrance plaza, the waterside construction of the pier and the offsite storage/staging area due to limited access from the park. The final estimate of probable construction cost conducted by Atkins, the Engineer of Record, on August 26; 2011 is $4,454,433. Since the CMR construction contract does not contemplate any change orders and assumes the owner's risk in the construction process, the final estimated construction cost of$4,836,637 includes the 10% CMR premium (Attachment C). In order to obtain further assurance that the best value for this project had been negotiated, the City contracted CMS Estimating Services (CMS), to perform an independent construction cost estimate. The estimated construction cost as submitted by CMS is $4,344,145. Since the CMR construction contract does not contemplate any change orders and assumes the owner's risk in the construction process, the estimator has recommended an additional 10% premium on their .estimated construction cost, for a total of$4,778,559 (Attachment B). The administration is of the opinion that the final GMP is a competitive, fair and a reasonable price as the difference between the comparative estimates and the GMP is less than 1% and within industry standards. Currently, the City has a Florida Inland Navigation District (FIND) Assistance Program Phase I grant approval for design consulting fees in the amount of $323,077. This grant amount will be reimbursed upon compliance with the grant requirement to award a construction contract by September 30, 2012. In addition, the City has applied for the FIND Assistance Program Phase II, in the amount of $986,000, for future reimbursement of construction costs for the South Pointe Park Pier project. The construction duration of this project has been negotiated at 448 calendar days (includes 90 days for pre-construction environmental compliance) and it is anticipated that this work will commence in October 2012 (pending the approval of the USACE permit). The first activity will be the relocation of the corals prior to the demolition of the existing pier. The City is taking measures to offset any impact to the project schedule and FIND grant deadlines. The anticipated Project Schedule for the construction of the South Pointe Park Pier is as follows: Commission GMP Awarded: September 12, 2012 Anticipated Notice to Proceed Number One: October 1, 2012 — (30 day notice & coral relocation) Anticipated Notice to Proceed Number Two: December 1, 2012 (demolition of existing pier) Anticipated Construction Start: January 2013 Anticipated Substantial Completion: January 2014 i Commission Memorandum— Weitz Company GMP for the South Pointe Park Pier Project September 12, 2012 Page 3 of 3 CONCLUSION The Administration recommends the approval of the attached resolution authorizing the Mayor and the City Clerk to execute Guaranteed Maximum Price (GMP) Amendment No. 1 to the Pre- Construction Services Agreement with the Weitz Company, dated April 5, 2012, for Construction Management at Risk Services for the South Pointe Park Pier project, in the amount of $4,809,017. Attachments: Attachment A: The Weitz Company— Construction Management at Risk GMP Document Attachment B: CMS—Third Party Estimate of Construction Costs Attachment C: Atkins - Estimate of Probable Construction Cost T:\AGENDA\2012\9-12-12\South Point Park Pier-GMP Amendment Weitz.MEMO.doc i ATTACHMENT A ® BUILD IN a000 connPS►nJr. GMP Estimate Summary Project: South Pointe Park Pier Gross Area(GSF): 10,200 Job#: Estimate Status: Final GMP Date: August 31.2012 Addenda: Z c ~ Trade Description Base Bid Recommended Sub/Vendor Name m 1 01A General Conditions $ 502,776 TWC 2 01B Mobilization $ 81,011 TWC 3 01C Site Security Allowance $ See Alternate below 4 01B Environmental/Coral Relocation $ 144,800 Industrial 5 Allow for supplemental services during coral relocation $ 5,000 Allowance 6 02A Demolition $ 192,162 Murphy Const. 7 03A Concrete Work $ 23,177 TWC 8 03C lArchitectural Precast Concrete $ 24,792 TWC 9 OSC IMisc Metals(based on Alum.materials) $ 444,100 Bostic 10 06A Rough Carpentry $ 235,999 Coastal 11 10A General Specialties $ 2,254 Triangle Fire 12 IOD Signage $ 21,418 Baron 13 10G Awnings $ 25,000 No Equal Design 14 22A Plumbing $ 36,500 Scholz Plumbing 15 26A Electrical $ 176,883 Edd Helms 16 Allow for patch/repair @ Maint. Bldg due to electrical tie-ins $ 3,500 Allowance 17 31A Earthwork $ 15,328 Murphy Const. 18 31D Prestressed Concrete Piling $ 521,740 Murphy Const. 19 32B Pavers&Walks $ 28,790 TWC 20 Allow for repair/replacement of site sidewalks $ 7.500 Allowance 21 Allow for repair/replacement of exist.pavers and coral veneer $ 7,000 Allowance 22 32C Site Improvements&Furnishings $ 67,431 Best Combo 23 32D Landscape&Irrigation $ 17,682 Arazoza 24 Allow for sea oat replacement $ 3,500 Allowance 25 Allow for landscape replacement at Maint.Bldg.due to utility tie-ins $ 5,000 Allowance 26 Allow for new sodding as req'd $ 6,375 Allowance 27 33A Site Utilities $ 66.220 Best Combo 28 Allow for new 4"water meter&box $ 12,500 Allowance 29 35A Marine Work(Primary Pier Structure) $ 1,372,106 1 Murphy Const. Allow for adding'detail"to Allowance deleted 30 portions of pier concrete per 8/24 conference superstructure $ call 31 SUBTOTAL $ 4,050,544 32 Sub Bonds or Subguard Total $ 54,720 33 Permits(Per Atkins 5/21 letter) $ 152,000 34 General Liability Insurance 1.500% $ 72,135 35 Performance Bond 1.000% $ 48,090 36 Tax Savings(Deleted per 6/19 e-mail) $ 37 Contractor Contingency 5.000% $ 202,527 38 1 Construction Fee 5.000% $ 229,001 39 GMP Amount $ 4,809,017 GMP Alternates Add for after hours site security guard $ 50,000 Allowance Add for MMFX reinforcing steel in primary $ 163,248 Includes GC pier structure markups ATTACHMENT B C NST UCTION MANAGEMENT SERVICES, INC. 10 Fairway Drive Suite 301 o Deerfield Beach, Florida 33441 •90-4-481-1611 o FAY.9054=127-3112 SOUTH POINTE PARK PIER PROJECT CITY OF MIAMI BEACH 1700 CONVENTION CENTER DRIVE � MIAMI BEACH, FLORIDA 33109 GIVIP CONSTRUCTION DOCUMENTS COST ESTIMATE August 31, 201:2 PREPARED FOR: CITY OF MIAMI BEACH PREPARED BY: CMS-CONSTRUCTION MANAGEMENT SERVICES,INC. CMS FILE#.2101 Quantity Surveyors e Construction Managers MAIN SUMMARY CMS-CONSTRUCTION MANAGEMENT SERVICES,INC.Confidential Page 1 CMS-Construction Management Services,Inc. 10 Fairway Drive,Suite 301 Deerfield Beach,FI 33441 954-481-1611 CMS FILE#2101 SOUTH POINTE PARK PIER PROJECT CITY OF MIAMI BEACH 1700 CONVENTION CENTER DRIVE MIAMI BEACH,FLORIDA 33109 GMP CONSTRUCTION DOCUMENTS COST ESTIMATE August 31,2012 PREPARED FOR: CITY OF MIAMI BEACH MAIN SUMMARY DIVISION DESCRIPTION AMOUNT %OF TOTAL _. . _._.................. ......................._ ._.... ..- =---- - 01000 !GENERAL CONDITIONS 596,611.461 13.73% .......... — -F........._— --....._......_._..... .........._......._..__.—...._.............._ ..__._. --... ---- .._................._..... __--... . ..............02000 _._..—_....__._..._. SITE WORK! DEMO o ....................._-- E_.._.. -- --..._._376,213A8— --__._._..........__.8.66/°... -------- 3000 . !CONCRETE - 710 202.77 I 16.35% --------.._0 ............................ ._..._................. .........._............. --- _04000..._.......... MASONRY -- ..... 0.00: 0.00% 05000 :METALS 550,986.68: 12.68% 06000 WOOD AND PLASTICS 563,348.40:: ---.............................._.... ....................--...... - --—-- .07044.. _THERMAL/MOIST.PROTECTION ...._.._.__.._._..............._..... _..------0.00: ... 0.00°/° 08000 ;DOORS&WINDOWS € 0.00: - 0.00% .................._....._--. * _.._._......._..--_.-._.--_._...._.._.... F -............._...___._.___.__...._-...................._ _.... -.. _...._._ 09000 FINISHES 20 954.03; _...--_..........-- - -. . ........................_--------............... .. ............ ...- .._....................... r.......... -. 0.48°/° 10000 ;SPECIALTIES!SIGNAGE I 33,263.00; 0.77% 11000 ;EQUIPMENT ........ _._...-- - -- 0.00' 0.00%--.._......................_ 12000 FURNISHINGS — 0.00 3 0.00% _...................--.._.._._...__..._... 13000 SPECIAL CONSTRUCTION -- 50,040.00 __.................._..--..-.--_1.15°la.......... -- 14000 _ CONVEYING SYSTEMS 0.00: 0.00°l0 .. ---..... ......... 22000 PLUM61NG 29,002.10: 0.67% _.._. 26fl00 ELECTRICAL 95 058.08: 2.19°/ _..............._................... — _.._ , ._......_°....._........ 31000 EARTHWORK 563 833,89 12.9$% ..........._..._....._._.._.. __............................. . .......................------- --....... _.... --- 32000 EXTERIOR IMPROVEMENTS /° 111,771.07; 2.57 --------------.._............................. -- 33000 :WATERWAY&MARINE CONSTRUCTION 29 555.00. 0.68% ! I SUBTOTAL $3,730,799.56 85.88% ISUB BONDS 34,476.07 ` 0.79% ..._.............---....-- ........................._..... —_ PERMITS ALLOWANCE( ---'---...._..... -- 152,000.00..:......._ 3.50% .GENERAL LIABILITY INSURANCE 88,085:00 2.03% - _...._--------------- ..__......._...... 1 -- - ..._............. _ _ .................... 1.0% P&P BOND&INSURANCE l 40,582.92 -0.93°!° 2.5% :CONTRACTOR CONTING . ............._......... -- --........ .......... —.._.............._........... ._....... 510% G.C.PROFIT&OVERHEAD(FEE) 204,931.53 4.72% E TOTAL CONSTRUCTION COST; $4,344,145.07; 100.00% Prepared by Gary Weinstein 813112092 Pagel �� I QUALIFICATIONS CMS-CONSTRUCTION MANAGEMENT SERVICES,INC.Confidential Page 1 CMS-Construction Management Services, Inc. 10 Fairway Drive,Suite 301 Deerfield Beach, FI 33441 954-481-1611 CMS FILE#2101 SOUTH POINTE PARK PIER PROJECT CITY OF MIAMI BEACH MIAMI BEACH, FLORIDA 33109 GMP CONSTRUCTION DOCUMENTS COST ESTIMATE August 31,2012 QUALIFICATIONS # ITEM 1 THIS COST ESTIMATE IS BASED ON A STANDARD OPEN-BID PROCESS. 2 IF TYPE OF CONTRACT: "CIVI -AT-RISK." ADD APPROXIMATELY 10 TO 15%TOT COST ........... .. __.... - -- _- .................. . -- - 3 GENERAL CONDITIONS ARE BASED ON A 12-MONTH CONTRACT. - .......... _.._.................. ;THIS ESTIMATE IS BASED ON DRAWINGS BY ATKINS DATED JUNE 20,2012.AND ADDITIONAL INFORMATION 4 AT MEETING ON 8/2812012. — _.._._._. _--_.._.. .. ........... ..... ---.-....._.-.._. ............_ ......------................... . .......... -- ..............- ......... 5 I`I Due to the present volatile nature of the construction market, construction material cost could change substantially prior to construction. --- ................ __...-.....-..--.-.-.. .._......._..__. _..................... - ---- 6 1An Allowance for ALL PERMITS of$152,000.00 is included. - ..............-------..-..................... ........ ..................._._.. __..... _.--. _ ----------._......................... 7 Testing is included. . _.................... ---...-.....--.._..... .......... -------- - _ -- ...............------................ 8 :Impact fees or other utility company charges are NOT included. Prepared by Gary Weinstein 813112012 Page 1 ATTACHMENT C South Pointe Park Pier Project City of Miami Beach 100%Submittal Package South Pointe Park Pier Project Estimate of Probable Construction Cost Rev:8/26/2011 DIV I DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE South Pointe Park Pier Project Coral Relocation Coral transplant/relocation(118 coral transplants) 118 EA $1,000.00 $118,000 (Allowance) Site work/Demolition Site work Mis./Constr.Disruption Adjustments 1 LS $5,000.00 $5,000 Temporary Security Gate(Allowance) 1 EA $1,200.00 $1,200 Removal of existing pier(Allowance) 8,500 SF $40.00 $340,000 Removal&disposal of existing piles(Allowance) 4,510 LF $35.00 $157,850 (incl.removal of all existing piles,etc.) Reworking/Removal of debris from channel bottom 1 LS $20,000.00 $20,000 (Allowance) Demo.of existing wood ramp&railings;also,rope fence 1 LS $1,000.00 $1,000 on landside(Allowance Demo.of existing asphalt pavement&cement bags; 1 LS $1,500.00 $1,500 also,bike racks on landside(Allowance) Remove existing sea oats on landside(Allowance) 2,900 SF $2.00 $5,800 Relocate existing sign on landside Allowance 1 EA $150.00 $150 Disposal&hauling of debris for landside Demo. 1 LS $10,000.00 $10,000 (Allowance) Subt.Site work/Demo.8+Coral Reloc. $660,500 Pier(Site work) Site Survey and Construction Layout(Allowance) 1 LS $10,000.00 $10,000 Manatee Watch Personnel(Allowance) 1 LS $12,000.00 $12,00 Subtotal Pier(Site work) $22,000 Pier(Construction) Pre-Core Drilling Allowance 61 EA $2,500.00 $152,500 24"x 24" Square Pre-Stressed Concrete Piles 3,965 VLF $120.00 $475,800 (FDOT spec.;length of pile 65%all piles to be cut-off and dowels added at top to anchor into cap) Reinforced Concrete Pile Caps(Allowance) 181 CY $900.00.-- $162,900 New Concrete Diaphragms(Allowance) 84 CY $450.00 $37,713 New Concrete Light Stanchions Allowance 245 Cy $450.00 $110,250 (concrete stanchions-only) New Concrete Beams(Allowance) 74 EA $5,000.00 $370,000 New Pier Decking-1 x 6 Premium IPE Wood Decking 10,100 SF $16.00 $161,600 IPE Wood Decking Clips(Allowance) 1 LS $20,000.00 $20,000 New Stainless Steel Grating Decking-2"Deep 10,100 SF $46.00 $464,600 (Allowance) New Guard Railing-SS(Allowance) 1,200 LF $300.00 $360,000 SPPP Project South Pointe Park Pier Project City of Miami Beach 100%Submittal Package South Pointe Park Pier Project Estimate of Probable Construction Cost Rev:812612011 DIV DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE (stainless steel frame with mesh-high grade(A 316) �. l � New Top Railing-IPE Wood-Fishing Area(Allowance) 318 LF $25.00 $7,950 (assume 3"thick x 10"wide continuous) New Top Railing-SS(Allowance) 762' LF $70.00 $53,340 SS Rail Posts(Allowance) 400 EA $240.00 $96,000 Subtotal Pier Construction $2,472,653 New Pier Plaza landside improvements) Stainless Steel Security Entrance Gate;includes 1 LS $25,000.00 $25,000 Hardware double-swing type/Allowance) Decorative Pier(Entrance)Sign(Allowance) 1 LS $750.00 $750 New Barana Benches(per quote/imported) 3 EA $1,400.00 $4,200 Shipping Costs for New Barana Benches(per quote) 1 LS $6,000.00 $6,000 New Guard Railing-SS (Plaza Area/Allowance) 32 LF $300.00 $9,600 (stainless steel frame with mesh-high grade(A 316) New Concrete Pavers(Allowance) 703 SF $12.00 $8,436 New Coral Stone Edging(Allowance) 352 SF $13.00 $4,576 New 12"x 12"Shell Pavers(Allowance) 2,172 SF $14.00 $30,408 SS Bike Racks(Allowance) 6 EA $1,800.00 $10,800 New Bike Racks Concrete Pad(Allowance) 180 SF $6.00 $1,080 Low Level Retaining Walls(Allowance) 1 LS $10,000.00 $10,000 Landscaping Palm Trees(Allowance) 6 EA $800.00 $4,800 Shrubs(Allowance) 147 EA $30.00 $4,410 Misc.Site Improvements(Allowance) 1 LS $5,000.00 $5,000 Subtotal New Pier Plaza $125,060 Specialties - New Benches-on Pier,includes shipping and handling 10 EA $500.00 $5,000 &installation (Allowance) New Waste Containers-on Pier,incl.shipping& 10 EA $990.00 $9,900 handling&installation Allowance New Fire Extinguishers Cabinets-on Pier,incl. 4 EA $440.00 $1,760 installation(Allowance). Pier Signage(Allowance) 1 LS $10,000.00 $10,000 Pier Canopies(Allowance) 2 EA $20,000.00 $40,000 Fish Cleaning Stations(Allowance) 2 EA $5,000.00 $10,000 Subtotal Specialties $76,660 Utilities Water New Water Service to Pier-4"DIP 530 LF $54.00 $28,620 4"Water Meter 1 EA $5,400.00 $5,400 4"Gate Valve DIP 1 EA $850.00 $850 4"90 deg.Bend DIP 2 EA $380.00 $760 4"45 deg.Bend DIP 2 EA $325.00 $650 4"Backflow Preventer 1 LS $3,048.00 $3,048 4"Cap(Allowance) 1 LS $300.00 $300 SPPP Project South Pointe Park Pier Project City of Miami Beach 100%Submittal Package South Pointe Park Pier Project Estimate of Probable Construction Cost Rev:812612011 DIV DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE Connections to Existing 8"WM with 8x4 Reducer 1 LS $1,800.00 $1,800 (Allowance) 2"PVC Piping on SS hangers(Allowance) 650 LF $10.00 $6,500 Hose Bibbs(Allowance) 6 EA $350.00 $2,100 Misc.Plumbing-Incld.Connections, Fittings,etc. 1 LS $3,500.00 $3,500 (Allowance) Subtotal Utilities Water $53,528 Site Electrical New Recessed Light in Concrete Light Stanchions 45 EA $500.00 $22,500 Allowance (recessed lighting in concrete pillars) Junction Boxes(WP) 1 EA $200.00 $200 New Bollard Light Fixtures Allowance 7 EA $400.00 $2,800 (bollards at stairs and entrance to fishing pier) Navigation Lights Allowance 4 EA $900.00 $3,600 4#4,in 1 1/2"Conduit 1,338 LF $6.00 $8,028 2"PVC w/Pull wire(future/phone) 1,500 LF $5.00 $7,500 2"PVC w/Pull wire(future/CCTV) 1,500 LF $5.00 $7,500 New Junction Boxes for 2"Conduit(Allowance) 1 LS $2,500.00 $2,500 Fiber Glass Pullboxes(Allowance) 3 EA $600.00 $1,800 New Panel(3P, 100A)w/NEMA 4X Enclosure 1 LS $7,800.00 $7,800 Transformers,NEMA 4X, 15kvh,480V-120/208V- 2 EA $23,000.00 $46,000 Allowance Disconnect Switches,NEMA 4X,3P,60 Amp- 2 EA $1,000.00 $2,000 Allowance Stainless Steel Rod,3/4", 10'(Allowance) 1 EA $300.00 $300 Unistrut System for Electrical(Allowance) 1 LS $3,500.00 $3,500 Misc.Electrical(Allowance) 1 LS $5,000.00 $5,000 Subtotal Electrical $121,028 Environmental: Water Quality and Environmental Monitoring during 1 LS $10,000.00 $10,000 construction Turbidity Curtains around Project Site 600 LF $100.00 $60,000 Subtotal Environmental $70,000 South Pointe Park Pier Project Subtotal Direct Costs $3,601,429 General Conditions @ 12% $432,171 Subtotal $4,033,600 Bonds& Insurance(includes Builders Risk)@ 4.5% $181,512 Building Permit(Allowance) $50,000 Subtotal $4,265,112 Overhead & Profit @ 8% 341,209 Subtotal $416� Unforeseen Conditions Allowance @ 5% $230,316 Subtotal $4,836,637 Total Probable Construction Cost $4,836,637 SPPP Project I