2012-28076 Reso RESOLUTION NO. 2012-28076
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI
BEACH, FLORIDA, SETTING A PUBLIC HEARING PURSUANT TO MIAMI BEACH
CITY CODE SECTION 118-563, TO CONSIDER GRANTING A CERTIFICATE OF
APPROPRIATENESS FOR THE TOTAL DEMOLITION OF AN EXISTING SINGLE
STORY BUILDING AND THE CONSTRUCTION OF A NEW 5-STORY PARKING
GARAGE WITH ACCESSORY GROUND LEVEL COMMERCIAL SPACE AT 340 23RD
STREET(COLLINS PARK GARAGE).
WHEREAS, on May 11, 2011, the Mayor and City Commission approved the issuance of
Request for Qualifications No. 31-10/11 (the RFQ) for the Architectural, Engineering, Design, Bid and
Award, and Construction Administration Services for the Collins Park Garage Project(the Project); and
WHEREAS, the RFQ was issued on June 17, 2011, and on September 14, 2011, the City
Commission approved Resolution No. 2011-27735 authorizing the City Manager to negotiate with the top
ranked firm of Zaha Hadid Limited t/a Zaha Hadid Architects; and
WHEREAS, on March 21, 2012, the City Commission adopted Resolution No. 2012-27869,
approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited
t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant) for the Planning,
Architectural, Engineering, Design, Bid And Award, And Construction Administration Services; and
WHEREAS, the Agreement was executed on May 3rd, 2012, and on May 24, 2012, the Notice to
Proceed for the Planning Phase was issued; and
WHEREAS, the proposed parking garage will be constructed on the two properties currently
occupied by surface parking lots located on 23rd Street, behind the Miami Beach Regional Library and
the Miami City Ballet building, bridging over Liberty Avenue; and
WHEREAS, the ground level of the proposed structure, between Park and Liberty Avenues, will
provide approximately 17,500 sq. ft. of retail space, while the upper five (5) levels of the parking garage
will accommodate approximately 470 parking spaces; and
WHEREAS, the Project also contemplates a large public plaza at the ground level, just east of
Liberty Avenue, which will merge into the Liberty Avenue right of way, between 22nd and 23rd streets,
encouraging the pedestrian connectivity between the garage, Collins Park, the Miami Beach Regional
Library and the Miami City Ballet; and
WHEREAS, there is currently a vacant, non-contributing, one-story building, located on the lot
behind Miami City Ballet, which must be demolished in order to accommodate the new structure.
WHEREAS, on November 21, 2012, the Historic Preservation Board (HPB) granted approval of
the Certificate of Appropriateness for the total demolition of the existing building, and construction of the
new five-story parking garage with accessory ground level commercial space; and
WHEREAS, pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB
regarding Certificates of Appropriateness for demolition of any building, structure, improvement, or
landscape feature located within a historic district and located on City-owned property, shall be advisory
with the right of approval or disapproval vested with the City Commission.
WHEREAS, it should be noted that the City Code does not require the City Commission to
schedule a Public Hearing in considering the issuance of a Certificate of Appropriateness for Demolition,
however, this is the same process followed by the Historical Preservation Board; and
WHEREAS, in order to protect the City from potential challenges, it is recommended that the
Commission follow the same process, which will not have an adverse impact on the construction
schedule.
NOW,THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION
OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby set a public
hearing pursuant to Miami Beach City Code Section 118-563, to consider granting a Certificate of
Appropriateness for total demolition of an existing single story building and the construction of a new 5-
story parking garage with accessory ground level commercial space at 340 23rd Street (Collins Park
Garage).
PASSED AND ADOPTED this 12th day of December, 2012.
ATTEST:
a
Matti Herre a Bower, Mayor
Rafa Granado, City Clerk
AP ED AS TO FORM, LANGUAGE �; y
ND FO Ae N
INCORP ORATED'
o 1 I Dat e
26 ,
T:\AGENDA\2012\12-12-12\Collins Park Garage-Certificate of Appropriateness for Demolition\Collins Park Garage-Certificate of
Appropriateness for Demolition-Reso.doc
COMMISSION ITEM SUMMARY
Condensed Title:
A Resolution Of The Mayor And City Commission OF The City OF Miami Beach, Florida, Setting A Public
Hearing Pursuant To Miami Beach City Code Section 118-563, To Consider Granting A Certificate Of
Appropriateness For The Total Demolition Of An Existing Single Story Building And The Construction Of A New
5-Story Parking Garage With Accessory Ground Level Commercial Space At 340 23rd Street(Collins Park
Garage).
Key Intended Outcome Supported:
Ensure value and timely delivery of quality capital projects; improve parking availability.
Supporting Data(Surveys, Environmental Scan, etc.):
The Cultural Campus is currently serviced by 55 parking spaces on two surface parking lots,these will be
replaced with a parking structure of over 400 parking spaces.
Item Summa /Recommendation:
On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Profe ional
Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and
Berenblum Busch Architecture, Inc.(the Consultant)for the Planning,Architectural, Engineering, Design, Bid
And Award,And Construction Administration Services for the Collins Park Garage Project(the Project).
The Agreement was executed on May 3rd,2012,and on May 24,2012,the Notice to Proceed for the Planning
Phase was issued.
The proposed parking garage will be constructed on the two properties currently occupied by surface parking
lots located on 23rd Street, behind the Miami Beach Regional Library and the Miami City Ballet building,
bridging over Liberty Avenue.The ground level of the proposed structure,between Park and Liberty Avenues,
will provide approximately 17,500 sq.ft.of retail space,while the upper five(5)levels of the parking garage will
accommodate approximately 470 parking spaces.
There is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City Ballet,
which must be demolished in order to accommodate for the new structure.On November 21,2012,the Historic
Preservation Board(HPB)granted approval of the Certificate of Appropriateness for the total demolition of the
existing building,and construction of the new five-story parking garage with accessory ground level commercial
space.
Pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding Certificates of
Appropriateness for demolition of any building,structure, improvement,or landscape feature located within a
historic district and located on City-owned property, shall be advisory with the right of approval or disapproval
vested with the City Commission. It should be noted that the City Code does not require the City Commission to
schedule a Public Hearing in considering the issuance of a Certificate of Appropriateness for Demolition,
however, this is the same process followed by the Historical Preservation Board. In order to protect the City
from potential challenges,it is recommended that the Commission follow the same process,which will not have
an adverse impact on the construction schedule.
The Administration recommends approval of the Resolution.
Advisory Board Recommendation:
Historic Preservation Board
Financial Information:
Source of Amount Account
Funds: 1
2
OBPI Total
Financial Impact Summary:
City Clerk's Office Legislative Tracking:
Fernando Vazquez, ext. 6135
Sign-Offs:
Departm t Director Assistant CityYanager City Mara r
FV JGG KB
AGENDA ITEM
MIAMIBEACH DATE � l
MIAMI BEACH
City of Miami Beath, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor Matti Herrera Bower and Members of the City Commission
FROM: Kathie G. Brooks, Interim City Manager
DATE: December 12, 2012
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI
BEACH, FLORIDA, SETTING A PUBLIC HEARING PURSUANT TO MIAMI BEACH
CITY CODE SECTION 118-563, TO CONSIDER GRANTING A CERTIFICATE OF
APPROPRIATENESS FOR THE TOTAL DEMOLITION OF AN EXISTING SINGLE
STORY BUILDING AND THE CONSTRUCTION OF A NEW 5-STORY PARKING
GARAGE WITH ACCESSORY GROUND LEVEL COMMERCIAL SPACE AT 340 23RD
STREET (COLLINS PARK GARAGE).
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
KEY INTENDED OUTCOME
Ensure value and the timely delivery of a quality capital project.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
ANALYSIS
On May 11, 2011, the Mayor and City Commission approved the issuance of Request for
Qualifications No. 31-10/11 (the RFQ)for the Architectural, Engineering, Design, Bid and Award,
and Construction Administration Services for the Collins Park Garage Project(the Project).
The RFQ was issued on June 17, 2011, and on September 14, 2011, the City Commission
approved Resolution No.2011-27735 authorizing the City Manager to negotiate with the top ranked
firm of Zaha Hadid Limited t/a Zaha Hadid Architects.
On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a
Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a
Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant)for the Planning,
Architectural, Engineering, Design, Bid And Award, And Construction Administration Services.
The Agreement was executed on May 3rd, 2012, and on May 24, 2012,the Notice to Proceed for the
Planning Phase was issued.
f
Commission Memorandum—Collins Park Garage—Setting Public Hearing for Certificate of Appropriateness
December 12,2012
Page 2 of 2
The proposed parking garage will be constructed on the two properties currently occupied by
surface parking lots located on 23rd Street, behind the Miami Beach Regional Library, and behind
the Miami City Ballet building, bridging over Liberty Avenue. The ground level of the proposed
structure, between Park and Liberty Avenues, will provide approximately 17,500 sq. ft. of retail
space, while the upper five (5) levels of the parking garage will accommodate approximately 470
parking spaces. The Project also contemplates a large public plaza at the ground level,just east of
Liberty Avenue, which will merge into the Liberty Avenue right of way, between 22nd and 23rd
streets,encouraging the pedestrian connectivity between the garage,Collins Park,the Miami Beach
Regional Library and the Miami City Ballet.
The design concept for the Project was presented to the Community on September 5, 2012. The
meeting was well attended and the Project was very well received.
There is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City
Ballet,which must be demolished in order to accommodate for the new structure. On November 21,
2012,the Historic Preservation Board (HPB)granted approval of the Certificate of Appropriateness
for the total demolition of the existing building,and construction of the new five-story parking garage
with accessory ground level commercial space.
Pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding
Certificates of Appropriateness for demolition of any building, structure, improvement,or landscape
feature located within a historic district and located on City-owned property, shall be advisory with
the right of approval or disapproval vested with the City Commission.
It should be noted that the City Code does not require the City Commission to schedule a Public
Hearing in considering the issuance of a Certificate of Appropriateness for Demolition, however,this
is the same process followed by the Historical Preservation Board. In order to protect the City from
potential challenges, it is recommended that the Commission follow the same process,which will not
have an adverse impact on the construction schedule.
The Basis of Design Report (BODR) is currently being finalized, and will be presented to the
Commission for approval in January 2013.
CONCLUSION
The Administration recommends that the City Commission schedule a Public Hearing to consider
the need to grant a Certificate of Appropriateness for the total demolition of an existing single story
building and the construction of a new five-story parking garage with accessory ground level
commercial space at 340 23`d Street (Collins Park Garage).
Attachments:
1. Staff Report-HPB File No 7329
KB/JGG/ /D
T:IAGENDA12012112-12-121Collins Park Garage-Certificate of Appropriateness for Demolition\Collins Park Garage-Certificate of