Loading...
2012-28076 Reso RESOLUTION NO. 2012-28076 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, SETTING A PUBLIC HEARING PURSUANT TO MIAMI BEACH CITY CODE SECTION 118-563, TO CONSIDER GRANTING A CERTIFICATE OF APPROPRIATENESS FOR THE TOTAL DEMOLITION OF AN EXISTING SINGLE STORY BUILDING AND THE CONSTRUCTION OF A NEW 5-STORY PARKING GARAGE WITH ACCESSORY GROUND LEVEL COMMERCIAL SPACE AT 340 23RD STREET(COLLINS PARK GARAGE). WHEREAS, on May 11, 2011, the Mayor and City Commission approved the issuance of Request for Qualifications No. 31-10/11 (the RFQ) for the Architectural, Engineering, Design, Bid and Award, and Construction Administration Services for the Collins Park Garage Project(the Project); and WHEREAS, the RFQ was issued on June 17, 2011, and on September 14, 2011, the City Commission approved Resolution No. 2011-27735 authorizing the City Manager to negotiate with the top ranked firm of Zaha Hadid Limited t/a Zaha Hadid Architects; and WHEREAS, on March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant) for the Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services; and WHEREAS, the Agreement was executed on May 3rd, 2012, and on May 24, 2012, the Notice to Proceed for the Planning Phase was issued; and WHEREAS, the proposed parking garage will be constructed on the two properties currently occupied by surface parking lots located on 23rd Street, behind the Miami Beach Regional Library and the Miami City Ballet building, bridging over Liberty Avenue; and WHEREAS, the ground level of the proposed structure, between Park and Liberty Avenues, will provide approximately 17,500 sq. ft. of retail space, while the upper five (5) levels of the parking garage will accommodate approximately 470 parking spaces; and WHEREAS, the Project also contemplates a large public plaza at the ground level, just east of Liberty Avenue, which will merge into the Liberty Avenue right of way, between 22nd and 23rd streets, encouraging the pedestrian connectivity between the garage, Collins Park, the Miami Beach Regional Library and the Miami City Ballet; and WHEREAS, there is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City Ballet, which must be demolished in order to accommodate the new structure. WHEREAS, on November 21, 2012, the Historic Preservation Board (HPB) granted approval of the Certificate of Appropriateness for the total demolition of the existing building, and construction of the new five-story parking garage with accessory ground level commercial space; and WHEREAS, pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding Certificates of Appropriateness for demolition of any building, structure, improvement, or landscape feature located within a historic district and located on City-owned property, shall be advisory with the right of approval or disapproval vested with the City Commission. WHEREAS, it should be noted that the City Code does not require the City Commission to schedule a Public Hearing in considering the issuance of a Certificate of Appropriateness for Demolition, however, this is the same process followed by the Historical Preservation Board; and WHEREAS, in order to protect the City from potential challenges, it is recommended that the Commission follow the same process, which will not have an adverse impact on the construction schedule. NOW,THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby set a public hearing pursuant to Miami Beach City Code Section 118-563, to consider granting a Certificate of Appropriateness for total demolition of an existing single story building and the construction of a new 5- story parking garage with accessory ground level commercial space at 340 23rd Street (Collins Park Garage). PASSED AND ADOPTED this 12th day of December, 2012. ATTEST: a Matti Herre a Bower, Mayor Rafa Granado, City Clerk AP ED AS TO FORM, LANGUAGE �; y ND FO Ae N INCORP ORATED' o 1 I Dat e 26 , T:\AGENDA\2012\12-12-12\Collins Park Garage-Certificate of Appropriateness for Demolition\Collins Park Garage-Certificate of Appropriateness for Demolition-Reso.doc COMMISSION ITEM SUMMARY Condensed Title: A Resolution Of The Mayor And City Commission OF The City OF Miami Beach, Florida, Setting A Public Hearing Pursuant To Miami Beach City Code Section 118-563, To Consider Granting A Certificate Of Appropriateness For The Total Demolition Of An Existing Single Story Building And The Construction Of A New 5-Story Parking Garage With Accessory Ground Level Commercial Space At 340 23rd Street(Collins Park Garage). Key Intended Outcome Supported: Ensure value and timely delivery of quality capital projects; improve parking availability. Supporting Data(Surveys, Environmental Scan, etc.): The Cultural Campus is currently serviced by 55 parking spaces on two surface parking lots,these will be replaced with a parking structure of over 400 parking spaces. Item Summa /Recommendation: On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Profe ional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc.(the Consultant)for the Planning,Architectural, Engineering, Design, Bid And Award,And Construction Administration Services for the Collins Park Garage Project(the Project). The Agreement was executed on May 3rd,2012,and on May 24,2012,the Notice to Proceed for the Planning Phase was issued. The proposed parking garage will be constructed on the two properties currently occupied by surface parking lots located on 23rd Street, behind the Miami Beach Regional Library and the Miami City Ballet building, bridging over Liberty Avenue.The ground level of the proposed structure,between Park and Liberty Avenues, will provide approximately 17,500 sq.ft.of retail space,while the upper five(5)levels of the parking garage will accommodate approximately 470 parking spaces. There is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City Ballet, which must be demolished in order to accommodate for the new structure.On November 21,2012,the Historic Preservation Board(HPB)granted approval of the Certificate of Appropriateness for the total demolition of the existing building,and construction of the new five-story parking garage with accessory ground level commercial space. Pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding Certificates of Appropriateness for demolition of any building,structure, improvement,or landscape feature located within a historic district and located on City-owned property, shall be advisory with the right of approval or disapproval vested with the City Commission. It should be noted that the City Code does not require the City Commission to schedule a Public Hearing in considering the issuance of a Certificate of Appropriateness for Demolition, however, this is the same process followed by the Historical Preservation Board. In order to protect the City from potential challenges,it is recommended that the Commission follow the same process,which will not have an adverse impact on the construction schedule. The Administration recommends approval of the Resolution. Advisory Board Recommendation: Historic Preservation Board Financial Information: Source of Amount Account Funds: 1 2 OBPI Total Financial Impact Summary: City Clerk's Office Legislative Tracking: Fernando Vazquez, ext. 6135 Sign-Offs: Departm t Director Assistant CityYanager City Mara r FV JGG KB AGENDA ITEM MIAMIBEACH DATE � l MIAMI BEACH City of Miami Beath, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Matti Herrera Bower and Members of the City Commission FROM: Kathie G. Brooks, Interim City Manager DATE: December 12, 2012 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, SETTING A PUBLIC HEARING PURSUANT TO MIAMI BEACH CITY CODE SECTION 118-563, TO CONSIDER GRANTING A CERTIFICATE OF APPROPRIATENESS FOR THE TOTAL DEMOLITION OF AN EXISTING SINGLE STORY BUILDING AND THE CONSTRUCTION OF A NEW 5-STORY PARKING GARAGE WITH ACCESSORY GROUND LEVEL COMMERCIAL SPACE AT 340 23RD STREET (COLLINS PARK GARAGE). ADMINISTRATION RECOMMENDATION Adopt the Resolution. KEY INTENDED OUTCOME Ensure value and the timely delivery of a quality capital project. ADMINISTRATION RECOMMENDATION Adopt the Resolution. ANALYSIS On May 11, 2011, the Mayor and City Commission approved the issuance of Request for Qualifications No. 31-10/11 (the RFQ)for the Architectural, Engineering, Design, Bid and Award, and Construction Administration Services for the Collins Park Garage Project(the Project). The RFQ was issued on June 17, 2011, and on September 14, 2011, the City Commission approved Resolution No.2011-27735 authorizing the City Manager to negotiate with the top ranked firm of Zaha Hadid Limited t/a Zaha Hadid Architects. On March 21, 2012, the City Commission adopted Resolution No. 2012-27869, approving a Professional Services Agreement between the City and a joint venture of Zaha Hadid Limited t/a Zaha Hadid Architects and Berenblum Busch Architecture, Inc. (the Consultant)for the Planning, Architectural, Engineering, Design, Bid And Award, And Construction Administration Services. The Agreement was executed on May 3rd, 2012, and on May 24, 2012,the Notice to Proceed for the Planning Phase was issued. f Commission Memorandum—Collins Park Garage—Setting Public Hearing for Certificate of Appropriateness December 12,2012 Page 2 of 2 The proposed parking garage will be constructed on the two properties currently occupied by surface parking lots located on 23rd Street, behind the Miami Beach Regional Library, and behind the Miami City Ballet building, bridging over Liberty Avenue. The ground level of the proposed structure, between Park and Liberty Avenues, will provide approximately 17,500 sq. ft. of retail space, while the upper five (5) levels of the parking garage will accommodate approximately 470 parking spaces. The Project also contemplates a large public plaza at the ground level,just east of Liberty Avenue, which will merge into the Liberty Avenue right of way, between 22nd and 23rd streets,encouraging the pedestrian connectivity between the garage,Collins Park,the Miami Beach Regional Library and the Miami City Ballet. The design concept for the Project was presented to the Community on September 5, 2012. The meeting was well attended and the Project was very well received. There is currently a vacant, non-contributing, one-story building, located on the lot behind Miami City Ballet,which must be demolished in order to accommodate for the new structure. On November 21, 2012,the Historic Preservation Board (HPB)granted approval of the Certificate of Appropriateness for the total demolition of the existing building,and construction of the new five-story parking garage with accessory ground level commercial space. Pursuant to Miami Beach City Code Section 118-563(i), the actions of the HPB regarding Certificates of Appropriateness for demolition of any building, structure, improvement,or landscape feature located within a historic district and located on City-owned property, shall be advisory with the right of approval or disapproval vested with the City Commission. It should be noted that the City Code does not require the City Commission to schedule a Public Hearing in considering the issuance of a Certificate of Appropriateness for Demolition, however,this is the same process followed by the Historical Preservation Board. In order to protect the City from potential challenges, it is recommended that the Commission follow the same process,which will not have an adverse impact on the construction schedule. The Basis of Design Report (BODR) is currently being finalized, and will be presented to the Commission for approval in January 2013. CONCLUSION The Administration recommends that the City Commission schedule a Public Hearing to consider the need to grant a Certificate of Appropriateness for the total demolition of an existing single story building and the construction of a new five-story parking garage with accessory ground level commercial space at 340 23`d Street (Collins Park Garage). Attachments: 1. Staff Report-HPB File No 7329 KB/JGG/ /D T:IAGENDA12012112-12-121Collins Park Garage-Certificate of Appropriateness for Demolition\Collins Park Garage-Certificate of Appropriateness for Demolition-Memo.doc